F. ToralCLIC Workshop. 3-11-2011
CIEMAT contribution to CLIC Experimental Verification
F. Toral on behalf of Accelerator Technology Group, CIEMAT
F. ToralCLIC Workshop. 3-11-2011
Present developments for CTF3: TBL PETS (I)
CIEMAT contribution
First prototype: Engineering design. Fabrication and assembly. Low power RF Test.
Test Beam Line in CTF3: Study and validate the drive beam
stability during deceleration.
Scheduled 16 PETS (TBL with 12 PETS in 2012)
Series production: Implementation of
modifications. Assembly of 3 PETS tanks. Low power RF test. Fabrication of several parts for
8 tanks + 4 tanks more
F. ToralCLIC Workshop. 3-11-2011
Present developments for CTF3: TBL PETS (II)
RF low power test
Assembly
Assembly
Waveguide
Cooling pipes
F. ToralCLIC Workshop. 3-11-2011
TBL PETS commissioning status
FIRSTCIEMATPETS
SECOND CIEMATPETS
THIRDCIEMATPETS
FOURTHCIEMATPETS
SER
IES P
RO
DU
CTIO
N
PR
OTO
TYPE
Installed in TBL and decelerating 14 A and 19 A beams
Sent to CERN in week 36, 2011
Sent to CERN in week 38, 2011 Courtesy of Steffen Doebert
Present developments for CTF3: TBL PETS (III)
F. ToralCLIC Workshop. 3-11-2011
Future contributions to Experimental Verification
CTF3-003: Task 1: Development of PETS with two couplers for
TBL+.CTF3-004:
CIEMAT contribution to components of the Two Beam modules is accounted in CTC-TBM work package.
CLIC-001: Task 3: Development of bunchers for drive beam
injector.
(In all cases, final numbers for available resources are still under discussion with the Spanish Ministry of Science and Innovation, to be confirmed soon)