FABRICATION DRAWING: DUCT WORK
J
1
2
3
EXAMI./ DOC.
TOILET
PREP./POST. BED
LOBBY
1500 mm 740 mm
17
5 m
m
81
mm
Radius Bend - F4Angle 30*(100mm x 100mm)
15
00
mm
74
4 m
m1
56
mm
100 mmx100 mmTOD : 2940 mmBOD : 2840 mm
VCD-F8
FAD FAD
FAD
100 mmx100 mmTOD : 2940 mmBOD : 2840 mm
2400 mm x 150 mm Linear Grille-6A26
71
9 m
m
200 mmø-200 mmx100 mm
200 mmx200 mmTOD : 2830 mmBOD : 2630 mm
405 mm15
7 m
m
200 mmx100 mmTOD : 2780 mmBOD : 2680 mm
EAD
EAD
100 CFM Inline Fan-E6 For Toilet Exhaust Air
Linear Grille-6C4(1000 mm x 150 mm)
FCU - 6C 1.0 TR
46
0 m
m4
28
mm
600 mmx200 mmTOD : 2870 mmBOD : 2670 mm
Transition-6C2(600mm x 200mm - 700mm x 150mm)
SAD
CS AHU - 6A 2 Stage 1200 CFM
187 mm 500 mm 187 mm
27
60
mm
50
0 m
m1
868
mm
327 mm 250 mm
331 mm 250 mm
250 mm959 mm
81
4 m
m
250 mm206 mm
Canvas Connection(600mm x 250mm)
600 mmx250 mmTOD : 3275 mmBOD : 3025 mm
Transition-6A3(600mm x 250mm - 600mm x 200mm)
600 mmx200 mmTOD : 3250 mmBOD : 3050 mm
200 mmx150 mmTOD : 2800 mmBOD : 2650 mm
200 mmx150 mmTOD : 2800 mmBOD : 2650 mm
2400 mm x 150 mm Linear Grille-6A25
600 mmx150 mmTOD : 3225 mmBOD : 3075 mm
Radius Bend-6A14(600mm x 150mm)
Radius Bend-6A12Angle 90*(600mm x 150mm)
Radius Bend-6A5Angle 90*(600mm x 200mm)
Square Bend-6A9(600mm x 150mm)
Square Bend-6A19, 6A22(600mm x 150mm)
600 mmx150 mmTOD : 3225 mmBOD : 3075 mm
350 mmx200 mmTOD : 3250 mmBOD : 3050 mm
Transition-6A15(600mm x 200mm - 350mm x 200mm)
600 mmx150 mmTOD : 3225 mmBOD : 3075 mm
SAD
SAD
SAD
SAD
SADSAD
SAD
978 mm
200 mmx100 mmTOD : 2800 mmBOD : 2700 mm
200 mmø-200 mmx100 mm
100 CFM Inline Fan-EA4For Toilet Exhaust Air
200 mmx200 mmTOD : 2850 mmBOD : 2650 mm
310 mm
EAD EAD
18
00
mm
417 mm
2757 mm
31
6 m
m
34
4 m
m
Louver-E1(200mm x 200mm)
1000 mm
1226 mm
1226 mm
236 mm214 mm
32
2 m
m
451 mm 79 mm
936 mm
564 mm
80
9 m
m
1870 mm
83
0 m
m
1156 mm
Side Throw Grille-6A25(4950mm x 150mm)
2622 mm
14
14
mm
53
1 m
m
853 mm
671 mm
65
6 m
m
986 mm
318 mm
10
56
mm
406 mm
Louver-EA1(200mm x 200mm)
91
0 m
m
TOILET
Side Throw Grille-6C3(700mm x 150mm)
Exhaust Diffuser-E8Down Throw(100mm x 100mm)
Plenum Size-E3(200mm x 300mm (H)
Linear Grille-6A24(4950 mm x 150mm)
Exhaust Air DuctFor Toilet
Supply Air Duct
Fresh Air Duct
2
H001.A
EXAMI./ DOC.
6A1 6A2 6A3 6A4 6A5
6A6
6A76A8
6A106A116A12
6A13
6A14
6A15
6A16
6A176A186A19
6A206A216A22 6A236C1
6C2
6C3
E2
E4
E5
E7
E10
E11
F1
F2
F3
F5
F6
F7
F9
End Cap-F10
F11 F12F13
EA2
EA3EA5EA6
E9
EA7
EA10
Sixth Floor Lvl
26450
Terrace Lvl
30075
1
24
50
mm
200 mmx600 mmTOD : 2870 mmBOD : 2670 mm
Transition-6C2(600mm x 200mm - 700mm x 150mm)
Side Throw Grille-6C3For Supply Air (400 CFM)Size : 700mm x 150mm)
Threaded Rod
EXAMI./ DOC.
85
0 m
m
Linear Grille-6C41000 mm x 150 mm
45
5 m
m9
5 m
m
24
5 m
m
1062 mm
FCU - 6C 1.0 TR
SAD
6C1
6C2
SI.No. Size Description Material Length (RM) Quantity (Nos)
600mm x 250mm Rectangular Duct - 6A2 26G Galvanized Sheet Steel Ducting 0.187 11)
600mm x 200mm Rectangular Duct - 6A4 26G Galvanized Sheet Steel Ducting 0.187 12)
600mm x 200mm Rectangular Duct - 6A6 26G Galvanized Sheet Steel Ducting 2.760 13)
600mm x 150mm Rectangular Duct - 6A8 26G Galvanized Sheet Steel Ducting 0.206 14)
600mm x 150mm Rectangular Duct - 6A11 26G Galvanized Sheet Steel Ducting 0.959 15)
600mm x 150mm Rectangular Duct - 6A13 26G Galvanized Sheet Steel Ducting 0.8146)
600mm x 150mm Rectangular Duct - 6A18 26G Galvanized Sheet Steel Ducting 0.3317)
600mm x 150mm Rectangular Duct - 6A21 26G Galvanized Sheet Steel Ducting 0.3278)
600mm x 150mm Rectangular Duct (For Grille Connection) 26G Galvanized Sheet Steel Ducting 0.8239)
350mm x 250mm Rectangular Duct - 6A16 26G Galvanized Sheet Steel Ducting 1.868 110)
1
1
1
1
8.462 10TOTAL CARRIED TO SUMMARY
Service : 6A (Ducting for Pre. Post Bed :- 1200 CFM)SI.No. Size Description Material Length (RM) Quantity (Nos)
600mm x 200mm Rectangular Duct - 6C1 26G Galvanized Sheet Steel Ducting 0.460 11)
0.460 1TOTAL CARRIED TO SUMMARY
Service : 6C (Ducting for Exami. / Doc. :- 1.0 TR)
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 300mm Plenum Box - E3 26G Galvanized Sheet Steel Ducting 0.405 11)
1.367 4TOTAL CARRIED TO SUMMARY
Service : E (Ducting for Toilet :- 100 CFM)
200mm x 200mm Rectangular Duct - E2 26G Galvanized Sheet Steel Ducting 0.160 12)
200mm x 300mm Rectangular Duct - E4 26G Galvanized Sheet Steel Ducting 0.083 13)
200mm x 300mm Rectangular Duct - E10 26G Galvanized Sheet Steel Ducting 0.719 14)
ABBREVIATION:
SAD :-Supply Air DuctEAD :-Exhaust Air DuctFAD :-Fresh Air DuctFCU :-Fan Coil UnitAHU :- Air Handling UnitTOD :-Top of DuctBOD :- Bottom of DuctVCD :- Volume Control Damper
Date
Drawn by
Checked by
Approved by
Project No.
Drawing No.
Dimensions are not to be scaled.
NO
TE
S
Structural Consultant
Project Title
Drawing Title
Client
Architects
MEP Consultant
DescriptionDateNo. By
All dimensions (if present) are in mm.
Revisions
DescriptionDateNo. By
Issues
BIM Consultant
BIM HOUSE GLOBAL Pvt. Ltd.Projects | Consulting | Training
The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings
This drawing should not be referred for any other purpose
A1 Size Sheet = 841 x 594
BC-108, Matrix Tower, Opp. Jaypee Hospital,Sector-132, Noida-201304
dd/mm/yyyy
Author
H001.A
Fabrication_HVAC Part-01
Checker
Approver
1 : 25
6th Floor_HVAC - Part 011
1 : 15
Section 22
1 : 50
Quantity_Ducting Route 6A
1 : 50
Quantity_Ducting Route 6C
1 : 50
Quantity_Ducting Route E
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 200mm Rectangular Duct - EA2 26G Galvanized Sheet Steel Ducting 0.310 11)
1.288 2TOTAL CARRIED TO SUMMARY
Service : EA (Ducting for Toilet :- 100 CFM)
200mm x 100mm Rectangular Duct - EA6 26G Galvanized Sheet Steel Ducting 0.978 12)
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 150mm Rectangular Duct- F1 & F11 26G Galvanized Sheet Steel Ducting 1.500 21)
4.897 8TOTAL CARRIED TO SUMMARY
Service : F (Ducting for Fresh Air Duct)
200mm x 150mm Rectangular Duct - F12 26G Galvanized Sheet Steel Ducting 0.740 12)
100mm x 100mm Rectangular Duct - F3 26G Galvanized Sheet Steel Ducting 0.081 13)
100mm x 100mm Rectangular Duct - F5 26G Galvanized Sheet Steel Ducting 0.176 14)
100mm x 100mm Rectangular Duct - F6 26G Galvanized Sheet Steel Ducting 1.500 15)
100mm x 100mm Rectangular Duct - F7 26G Galvanized Sheet Steel Ducting 0.744 16)
100mm x 100mm Rectangular Duct - F9 26G Galvanized Sheet Steel Ducting 0.156 17)
SI.No. Size Description Material Length (RM) Quantity (Nos)
4950mm x 150mm Linear Grille - 6A24 Aluminum (With Powder coated & 18G Blade Thickness
4.950 11)
4950mm x 150mm Side Throw Grille - 6A25 4.950 12)
9.900 3TOTAL CARRIED TO SUMMARY
Service : 6A (Equipment for Pre. Post Bed :- 1200 CFM)
Aluminum (With Powder coated & 18G Blade Thickness
1800mm x 850mm 800mm(H)
CS AHU - 6A2 Stage (1200 CFM)
13) As per BOQ NA
SI.No. Size Description Material Length (RM) Quantity (Nos)
700mm x 150mm Side Throw Grille - 6C3 Aluminum (With Powder coated & 18G Blade Thickness
0.700 11)
1000mm x 150mm Linear Grille - 6C4 1.000 12)
1.700 3TOTAL CARRIED TO SUMMARY
Service : 6C (Equipment for Exami. / Doc. :- 1.0 TR)
Aluminum (With Powder coated & 18G Blade Thickness
1000mm x 550mm 300mm (H)
FCU - 6C 1.0 TR
NA 13) As per BOQ
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 300mm Linear Grille - E1 Aluminum (With Powder coated & 18G Blade Thickness
0.200 11)
100mm x 100mm Exhaust Diffuser - E8 0.000 12)
0.200 2TOTAL CARRIED TO SUMMARY
Service : E (Equipment for Toilet :- 100 CFM)
Aluminum (With Powder coated)
100 Dia Inline Fan - E6 NA 13) As per BOQ
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 200mm Linear Grille - EA1 Aluminum (With Powder coated & 18G Blade Thickness
0.200 11)
100mm x 100mm Exhaust Diffuser - EA7 0.000 12)
0.200 3TOTAL CARRIED TO SUMMARY
Service : EA (Equipment for Toilet :- 100 CFM)
Aluminum (With Powder coated)
100mm Dia Inline Fan NA 13) As per BOQ
SI.No. Size Description Material Length (RM) Quantity (Nos)
100mm x 100mm Volume Control Damper - F8 Aluminum 0.078 11)
0.078 1TOTAL CARRIED TO SUMMARY
Service : F (Equipment for Fresh Air Duct)
SI.No. Size Description Material Length (RM) Quantity (Nos)
600mm x 250mm Canvas Connection - 6A1 26G Galvanized Sheet Steel Ducting 0.100 11)
350mm x 200mm End Cap - 6A23 26G Galvanized Sheet Steel Ducting 0.000 12)
600mm x 150mm Radius Bend 90* Deg - 6A14, 6A12 26G Galvanized Sheet Steel Ducting 0.000 23)
600mm x 200mm Radius Bend 90* Deg - 6A5
26G Galvanized Sheet Steel Ducting 0.000 3
4)
600mm x 150mm Square Bend 90* Deg - 6A9, 6A19, 6A22
26G Galvanized Sheet Steel Ducting 0.250
5)
6)
7)
800mm x 150mm - 600mm x 150mm Shoe - 6A7, 6A10, 6A17, 6A20
26G Galvanized Sheet Steel Ducting
8)
Transition - 6A15 26G Galvanized Sheet Steel Ducting 0.500 1
4
2.100 14
Service : 6A (Fitting for Pre. Post Bed - 1200 CFM)
600mm x 200mm - 350mm x 200mm
600mm x 250mm - 600mm x 200mm 26G Galvanized Sheet Steel Ducting
TOTAL CARRIED TO SUMMARY
0.500Transition - 6A3 1
0.000 1
SI.No. Size Description Material Length (RM) Quantity (Nos)
600mm x 200mm - 700mm x 150mm Transition - 6C2 26G Galvanized Sheet Steel Ducting 0.428 11)
0.428 1TOTAL CARRIED TO SUMMARY
Service : 6C (Fitting for Exami. / Doc. - 1.0 TR)
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 100mm End Cap - E11 26G Galvanized Sheet Steel Ducting 0.000 11)
0.575 5TOTAL CARRIED TO SUMMARY
Service : E (Fitting for Toilet :- 100 CFM)
200mm x 300mm
200mm x 100mm - 100mm x 100mm
200mm Dia - 200mm x 100mm
End Cap - E3
Shoe - E9
Square to Round - E5, E7
26G Galvanized Sheet Steel Ducting
26G Galvanized Sheet Steel Ducting
26G Galvanized Sheet Steel Ducting
0.000 1
0.175 1
0.200 2
2)
3)
4)
SI.No. Size Description Material Length (RM) Quantity (Nos)
200mm x 100mm End Cap - EA10 26G Galvanized Sheet Steel Ducting 0.000 11)
0.575 4TOTAL CARRIED TO SUMMARY
Service : EA (Fitting for Toilet :- 100 CFM)
200mm x 100mm - 100mm x 100mm
200mm Dia - 200mm x 100mm
Shoe - EA7
Square to Round - EA3, EA5
26G Galvanized Sheet Steel Ducting
26G Galvanized Sheet Steel Ducting
0.175 1
0.200 2
2)
3)
SI.No. Size Description Material Length (RM) Quantity (Nos)
100mm x 100mm End Cap - F10 26G Galvanized Sheet Steel Ducting 0.000 11)
0.175 5TOTAL CARRIED TO SUMMARY
Service : F (Fitting for Fresh Air Duct)
200mm x 150mm
100mm x 100mm
End Cap - F13
Radius Bend - F4
26G Galvanized Sheet Steel Ducting
26G Galvanized Sheet Steel Ducting
0.000 1
0.000 2
2)
3)
200mm x 100mm - 100mm x 100mm Shoe - F2 26G Galvanized Sheet Steel Ducting 0.175 14)
ABBREVIATION:
SAD :-Supply Air DuctEAD :-Exhaust Air DuctFAD :-Fresh Air DuctFCU :-Fan Coil UnitAHU :- Air Handling UnitTOD :-Top of DuctBOD :- Bottom of DuctVCD :- Volume Control Damper
Dimension Value (mm)
A Width 200B Depth 100C Diameter 200D Length 200E Extension 50F Collar 50G Corner Radius 0.0H Slope Angle 18.439
Fitting No. E5, E7, EA3 & EA5
Dimension Value (mm)
A Width In 700B Depth In 150C Width Out 600D Depth Out 200E Length 427.95F Extension In 50G Extension Out 50H Offset Width -50
Fitting No. 6C2
I
J
Offset Depth -180
Angle 28.76043
Dimension Value (mm)
A Top Width 150B Depth 600C Bottom Width 150D Top Extension 100E Bottom Extension 100
Fitting No. 6A9, 6A19 & 6A22
Date
Drawn by
Checked by
Approved by
Project No.
Drawing No.
Dimensions are not to be scaled.
NO
TE
S
Structural Consultant
Project Title
Drawing Title
Client
Architects
MEP Consultant
DescriptionDateNo. By
All dimensions (if present) are in mm.
Revisions
DescriptionDateNo. By
Issues
BIM Consultant
BIM HOUSE GLOBAL Pvt. Ltd.Projects | Consulting | Training
The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings
This drawing should not be referred for any other purpose
A1 Size Sheet = 841 x 594
BC-108, Matrix Tower, Opp. Jaypee Hospital,Sector-132, Noida-201304
dd/mm/yyyy
Author
H001.B
Fabrication_HVAC Part-01
Checker
Approver
1 : 50
Quantity_Ducting Route EA
1 : 50
Quantity_Ducting Route F
1 : 50
Quantity_Equipment for Route 6A
1 : 50
Quantity_Equipment for Route 6C
1 : 50
Quantity_Equipment for Route E
1 : 50
Quantity_Equipment for Route EA
1 : 50
Quantity_Equipment for Route F
1 : 50
Quantity_Fitting for Route 6A
1 : 50
Quantity_Fitting for Route 6C
1 : 50
Quantity_Fitting for Route E
1 : 50
Quantity_Fitting for Route EA
1 : 50
Quantity_Fitting for Route F
1 : 50
Details_Square to Round Fitting
1 : 50
Details_Transition
1 : 50
Details_Square Bend 90*
FABRICATION LEVEL MODEL TO CUTTING ANDASSEMBLY AT FACTORY
SPOOL DRAWING FOR FABRICATION &INSTALLATION
002H
002B
002A
002C
002D
002E
002F
002G
002I
002J
002K
CWR 002
CHR 001
CWR 002
CWR 003
CWR 004
CWS 005
Mark Qty Description Length (meter)Size
MS Pipe Class C as per IS : 1239002B 1 150mm Dia 1.100
MS Pipe Class C as per IS : 1239002H 1 150mm Dia 0.916
MS Pipe Class C as per IS : 1239CWR 002 1 150mm Dia 0.719
2.735 meterTotal
Spool CWR 002 Bill of Material_Pipe
Mark Qty Description Length (m)Size
Threadolet002A 1 250mm-150mm Dia 0.166
Gate Valve002E 1 150mm Dia 0.267
PN 25 Type 11 WN Flange002F 1 150mm Dia 0.035
MS 90 deg Elbow002J 1 150mm Dia
PN 25 Type 11 WN Flange002D 1 150mm Dia 0.035
NA
Spool CWR 002 Bill of Material_Fitting
Mark Qty Description Length (m)Size
PN 25 Bolt002F 4 150mm Dia 0.000
002D 4 150mm Dia 0.000
002F 1 150mm Dia 0.000
002D 1 150mm Dia 0.000
PN 25 Bolt
PN 25 Gasket
PN 25 Gasket
Spool CWR 002 Bill of Material_Bought
Mark Qty Description Length (m)Size
MS Field Weld Gap 3mm002I 1 150mm Dia 0.003
002K 1 150mm Dia 0.003
002G 1 150mm Dia 0.003
002C 1 150mm Dia 0.003
MS Field Weld Gap 3mm
MS Field Weld Gap 3mm
MS Field Weld Gap 3mm
Spool CWR 002 Bill of Material_Weld
6401 mm
6289 mm
4910 mm
90
.00°
90.00°
LEGEND
CWR:- Chilled Water Return
MS:- Mild Steel
Date
Drawn by
Checked by
Approved by
Project No.
Drawing No.
Dimensions are not to be scaled.
NO
TE
S
Structural Consultant
Project Title
Drawing Title
Client
Architects
MEP Consultant
DescriptionDateNo. By
All dimensions (if present) are in mm.
Revisions
N
Issues
BIM Consultant
BIM HOUSE GLOBAL PVT. LTD.BUILDING INFORMATION MODELLING SERVICES
The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings
This drawing should not be referred for any other purpose
A2 Size Sheet = 594 x 420
DescriptionDateNo. By
Design | Construction | Facility Management
Noida, INDIA (Head Office) | Houston, USA | www.bimhouseglobal.com
dd/mm/yyyy
Author
A101
Spool Drawing
Checker
Approver
Spool_CWR 0021
Spool Continued on:- CWR 001
3D View2
1 : 25
Spool CWR 002_Elevation Front3
1100 m
m
MS
Pip
e C
lass C
916 m
m
MS
Pip
e C
lass C
719 mm
MS Pipe Class C
Flange
Bolt
Gasket
Threadolet
Weld
All Dimensions are to the end of pipe, face of flange, or centerline of fitting, unless otherwise noted.
Note:-
Spool_CWR 0014