+ All Categories
Home > Documents > FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac...

FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac...

Date post: 19-Dec-2015
Category:
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
18
1 FAC review, 10/27 D. Schultz e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System development advancing. Undulator System In production.
Transcript
Page 1: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

1FAC review, 10/27D. Schultz

e-Beams System Update

Injector System Installation has started.

Linac System Preparing for ’06 installation.

Controls System development advancing.

Undulator System In production.

Page 2: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

2FAC review, 10/27D. Schultz

Drive laser transport tube installed 10/14:

The first piece of installed LCLS beamline.

The ceiling in the injector vault

Injector System Installation

Laser bldg. construction

Page 3: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

3FAC review, 10/27D. Schultz

SLAC linac tunnel research yard

Linac-1L 9 m

Linac-2L 330 m

Linac-3L 550 m

BC-1L 6 m

BC-2L 22 m

LTUL =275 m

undulator

135 MeV 250 MeV 4.54 GeV 14.1 GeV

Linac-XL =0.6 m

21-3b24-6d

25-1a30-8c

Linac-0L =6 m

6 MeV

L0-A,B

rfgun

X

T-C

av

T-Cav

Installation Schedule

DumpInjector, 2006 down

Spect.

21-1b21-1d

Linac, 2007 down

‘Wall Region’

Page 4: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

4FAC review, 10/27D. Schultz

PORCU

PINE CATHODE

HOLDE

R

UHV A

LL METAL

GATE VALVES

SPOOLS FRO

M VALVE

SEAL

LONG B

ELLOWS

ASSEM

BLY

TREATMEN

T CHAM

BER

VACUU

M PUMPS

Laser System April 2006 Gun Region Nov.

2006 through

Heater Region March 2006 Wall Region October

2005 Injection Region August

2006 Spectrometer Region

through BC1 August 2006

Waveguide through wall and up penetration October 2005

Injector System Installation

Page 5: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

5FAC review, 10/27D. Schultz

Current Injector Installation

Installed Injector beamline, to mate to spring install schedule.

Page 6: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

6FAC review, 10/27D. Schultz

Injector Installation

Access to the Injector vault. Laser facility construction through 2/06 Install Injector in the vault 3/06-11/06

Aug.- Nov. 2006 down Install to end of Injector spectrometer Install Linac to Bunch Compressor 1 dump PPS connection to SLAC Linac & certification

Page 7: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

7FAC review, 10/27D. Schultz

Injector Commissioning

Commission drive laser 4/06-11/06 Needs laser safety system certification Coordinate with Injector installation in vault

Dec. 2006 to Aug. 2007 Commission electron beam through Injector and BC1 Occurs during B-factory operations.

Need Injector SAD, ARR 11/06

Page 8: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

8FAC review, 10/27D. Schultz

Injector System Status

Drive laser is ordered.Gun in detailingL0A, L0B are in fabrication.Laser tables on orderMagnets are on orderVacuum hardware in hand,

Special chambers in design

Floor, supports, finishing design Schedule remains critical for these systems.

Page 9: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

9FAC review, 10/27D. Schultz

BC1 articulation is with a vendor with vacuum system

Magnets through BC1 are on orderX-band system designed

X-band structure in hand New klystron fabricated, to test

Linac-1 design complete, parts on order BPMs design modification

Linac System

Page 10: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

10FAC review, 10/27D. Schultz

Controls

SLC-aware IOC is completeIn test with SLC applications

Magnet power system for the ’06 installation,

Supplies in purchasing/orderedCable plant defined and in designStill investigating new designs for Linac and Und.

Redundancy, Imbedded IOC controllers

PLC based PPS system for Injector in preparation for SLAC approval.

Page 11: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

11FAC review, 10/27D. Schultz

ControlsLLRF system conceptual design review was held

Significant issues were raisedDesign and reviews will continue

Vacuum system well definedSystem hardware design review, Electrical safety review

Timing system is in testEvent Generator and the Event Receiver boards are being interfaced

Work on high level applications has started In coordination with the LCLS Commissioning/Operations Working Group

Controls group leader, interviews held, offer soon

Page 12: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

12FAC review, 10/27D. Schultz

1st article Ti undulator strongback machined.

Mechanical tolerance met and bettered.

Undulator System

1st article undulator strongback.

3 other units in rough machining at 2 vendors.

Poles and magnet blocks in fabrication – on schedule

Assembly contracts placed, 2 vendors, at favorable costs.

Page 13: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

13FAC review, 10/27D. Schultz

Undulator support girder preliminary design

Good temperature stability Cam mover motion/reproducibility studies well along

Cavity BPM system development Scope moved to APS Install 4/06 for beam tests @ APS

WP system is under study at SLACResolution & drift < 100nm/day

Undulator System

Page 14: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

14FAC review, 10/27D. Schultz

Vacuum system Al on SS prototypes under study

BFW system under design New scope Well under way

LCLS Undulator Alignment and Motion Review 10/20-21

Addressed undulator fiducialization and measurementSee Heinz-Dieter Nuhn’s talk

Undulator System

Page 15: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

15FAC review, 10/27D. Schultz

1st article finished undulator due at SLAC 5/12/06

2nd Article due 6/12/06

MMF facility under construction, b.o. 2/06

Major equipment on order

Undulator girder assembly area identified

SLAC building 750

Undulator System

Page 16: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

16FAC review, 10/27D. Schultz

Undulator hall:Baseline from JE was overpriced.Able to loosen tolerances, redesign for lower cost.

Temperature stability ±0.2°C ±1°F Support structure stability design study at ANL k variations sets the tolerance Diagnostic cable length is also a concern

150k CFM conditioned air 20k CFM Need to validate the ability of the design to meet the tolerances.

Undulator System

Page 17: FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.

17FAC review, 10/27D. Schultz

We’re going to be busy in 2006 Injector installation Laser commissioning Aug.-Nov. ’06 downtime preparations Undulator girder assembly and measurement FFBT removal in preparation for BTH const.