Facilities Committee Meeting Tuesday, January 7, 2020 1
Transcript
Page 1: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Facilities Committee Meeting

Tuesday, January 7, 2020

1

Page 2: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

2

Page 3: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Cheltenham School District

Mission &Vision

Statements

Mission StatementDrawing on its cultural richness, creativity, and tradition of scholastic excellence, the Cheltenham School District strives to nurture each child through a wealth of academic endeavors and community partnerships that provide the skills and vision needed to lead a productive and meaningful life beyond our classroom walls.

Vision StatementWith a clear connection between the classroom and the world, the Cheltenham School District will strive for excellence by:

1. inspiring our students to develop principled and knowledgeable responses to the local, national, and global challenges of the 21st century;

2. actively engaging parents in their children’s intellectual, social, and moral education;

3. encouraging faculty and staff to continually broaden the web of connections between their academic disciplines and the world on which they depend;

4. stimulating dynamic leadership of building and district administrators; and5. creating partnerships with community individuals, institutions, organizations,

and businesses that model real-world connections for all students.

3

Page 4: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateHigh School

High School● The proposal for the structural inspection of the Auditorium exterior

wall, the company would not change the contract with changes provided by the school districts solicitor. We are in the process of finding another firm to complete the report.

● Our BMS (Building Maintenance System) lost connectivity throughout sections of the building. We have been working on this for the last month and have established many areas. This continues to be a work in progress.

● Updated Athletic banners have been installed in the Gym.

4

Page 5: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateElkins Park

Elkins Park● The boiler has refractory that has collapsed and this will need to be

replaced. We are working on this with our contractor and awaiting a proposal. This was identified earlier in the year but no work was completed. This work is being completed by JCI at a cost of $9,164. There was a delay in getting the parts and this is now planned for next week.

● The water feed line on boiler 1 had a crack in the piping, CSD Maintenance made a temporary repair and we will plan the full repair in the coming weeks.

5

Page 6: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateWyncote

Wyncote● As reported at the December meeting we had concerns with our Glycol lines as we had

lost volume in the pipework. There were no visible signs of this anywhere in the building where it was being lost.

● At the time we had concerns that we may have an underground leak in the piping which runs from the boiler room to the cooling tower. Image attached.

● We had our contractor out and isolated the system from the building. The system was filled up and we lost pressure immediately. This was indication that there is a leak in between the building and cooling tower.

● We needed to isolate the main building for the cooling tower to ensure we still provided heat for the building. This was completed.

● Our next challenge was ensuring the cooling tower coils don't freeze as if they crack we would be looking at a very large sum of money to repair.

● The cooling tower in construction did not have access saddles to drain the system.● We needed to install 4 access saddles to the system, re-insulate and refill the tower with

glycol.● The cost for the access saddles, insulation, air bleeders was $7,975.● The cost to add glycol to the tower to ensure it would not freeze was $4,200.● After Christmas we will need to arrange for the underground pipe to be tested and locate

the leak and make plans to have this repaired. I have spoken with Cara and we are investigating if this will be covered under our insurance.

● We currently have the situation resolved and heat in the building but need this to be repaired in time for when we need Air Conditioning.

6

Page 7: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateWyncote

7

Access Saddles and Shut Off Valves. Insulation will be repaired.

Page 8: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateWyncote

8

Glycol added to cooling towers to prevent coil freezing. Shut off valves installed.

Page 9: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateWyncote

9

More Valves installed. Insulation to be repaired.

Page 10: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

UpdateWyncote

10

Next step is to locate piping leak between tower and mechanical room location. Dependent on location a plan will be provided on how best to fix the pipe leak

Page 11: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD Building and Maintenance

Update

Glenside● No updates.

Myers● No Updates

Cheltenham Elementary● No Updates

District Wide● Reviewing BMS and HVAC Service contracts.● Rectifying BMS Issues within our schools with our new BMS Contract.● Summer project planning. ● Reviewing current custodial schedules, ordering procedures and

planning for summer.● Reviewing Service contracts that expire at the end of the school year.

11

Page 12: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Elkins Park Air Conditioning

Update

● Elkins Park Currently only has minimal Air-Conditioning throughout the building.

● This summer we installed 6 wall unit A/C units in the cafeteria and this provided great relief over the summer.

● The next few slides are proposals to install throughout the building.● There is a need for power upgrades to achieve this.● Due to the existing building conditions and possibility of construction at

Elkins Park in the coming years, I feel this to be the best short term fix for resolve the Air conditioning issue until a decision in made in the coming years.

12

Page 13: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Elkins Park Air Conditioning

Update

13

Page 14: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Elkins Park Air Conditioning

Update

14

Page 15: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Elkins Park Air Conditioning

Update

15

Page 16: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

Elkins Park Air Conditioning

Update

16

Page 17: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD School Dude

Update

● School Dude Maintenance Direct was re-installed and operational on Tuesday, September 3, 2019.

● All PM Schedules have been rolled out in the system.

● Facilities Direct training has been scheduled for the 28th of January.

● I am looking at bringing one elementary school online for all staff to report work orders as a trial. My hope is at the start of next years we will have all staff reporting work orders from each school.

● Still looking at educating all users to ensure we have productive data.

● I would say we are tracking ahead of where I thought we would be with the roll out of this program.

17

Page 18: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD School Dude

Update

● November 26th Totals

18

Page 19: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD School Dude

Update

● January 2nd Totals

19

Page 20: Facilities Committee Meeting...Elkins Park Air Conditioning Update Elkins Park Currently only has minimal Air-Conditioning throughout the building. This summer we installed 6 wall

CSD School Dude

Update

20


Recommended