Stephen Reiland – FD&C Jared Webster – FD&C James Clark – McCarthy Questions to FD&C Contracts: Eduardo Avellaneda [email protected] Facilities Design and Construction North/South Wing Demolition Project #M011895 Prequalification Conference September 23, 2021 - 11:00am
Transcript
Page 1: Facilities Design and Construction North/South Wing ...

1Department or Presentation Title

Stephen Reiland – FD&C

Jared Webster – FD&C

James Clark – McCarthy

Questions to FD&C Contracts:

Eduardo Avellaneda

[email protected]

Facilities Design and ConstructionNorth/South Wing Demolition

Project #M011895Prequalification Conference

September 23, 2021 - 11:00am

Page 2: Facilities Design and Construction North/South Wing ...

2Department or Presentation Title

North/South Wing Demo - #M011895 – Agenda

Introductions & Contact Info Selection Timeline Delivery Method Selection Scoring Project Scope Description Location Existing Conditions Façade Replacement Questions

Facilities Design & Construction

Page 3: Facilities Design and Construction North/South Wing ...

3Department or Presentation Title

North/South Wing Demo – Project Contact Info

Stephen ReilandProject [email protected]

Jared WebsterProject [email protected]

Any questions regarding the RFP for the North/South Wing Demolition (M011895) should be directed to:

Eduardo AvellanedaContracts [email protected]

Facilities Design & Construction

Page 4: Facilities Design and Construction North/South Wing ...

4Department or Presentation Title

North/South Wing Demo - #M011895

Selection Timeline

Page 5: Facilities Design and Construction North/South Wing ...

5Department or Presentation Title

North/South Wing Demo - #M011895

Facilities Design & Construction

Page 6: Facilities Design and Construction North/South Wing ...

6Department or Presentation Title

North/South Wing Demo – RFQ Scoring

Element 1 – Pass/ Fail Criteria Required Financial, Insurance, & Claims History Required Licenses Experience Removal From a ProjectElement 2 – Evaluation Scoring Local Preference – Up to 15 Points Comparable Project Experience – Up to 195 points (Only 3 Projects) Key Personnel – Up to 110 Points

Detailed scoring information can be found on page 18 of the RFQ.

Page 7: Facilities Design and Construction North/South Wing ...

7Department or Presentation Title

North/South Wing Demo - #M011895

Project Scope

North/South Tower Demolition: In order to satisfy seismic safety requirements imposed by SB1953 & AB2190, UC Davis Health has elected to demolish the North/South Wing, Surgery Center, and MRI Building of the UC Davis Medical Center.

• 6 floors above ground, ramp to roof penthouse, and basement• Reinforcement of East Tower Below Grade• Reskin exterior of East Tower and South Entrance• Required hardscape and minimal landscaping• Target Cost Range of $32M - $37M, inclusive of preconstruction, design, and construction cost

including escalation.• Estimated Overall Project Duration: Approximately 40 Months• Estimated Completion Date: Q1/Q2 2025• Teaming Agreements will be required to proceed to RFP

Page 8: Facilities Design and Construction North/South Wing ...

PROJECT LOCATIONUnlike the UC Davis main campus, the Sacramento campus is an urban campus, located in a downtown location surrounded by freeways, light rail, a variety of residential neighborhoods, and commercial corridors .The campus is within the City of Sacramento, located at 2315 Stockton Boulevard, approximately 2 .5 miles southeast of downtown Sacramento, 17 miles east of the UC Davis Main Campus in the City of Davis, and 90 miles northeast of San Francisco .

The site is located between Parking Structure 1 and the EastWing. ParkingStructure 3 is located to the South, with the new Admin Office Addition to the North.The accompanying images provide an existing site vicinity aerial plan and overallcontext of the site .

Page 9: Facilities Design and Construction North/South Wing ...

9Department or Presentation Title

North/South Wing Demo - #M011895

Original 2 stories built in 1920s

4 stories added over and around in 1950’s (Brown)

East Tower added in 1964 (Blue)

Utilities currently being severed & new stair tower being added to East Tower

“Normal” electricity to remain in utility risers for use during soft demolition

Page 10: Facilities Design and Construction North/South Wing ...

• Work Area• Laydown• Gates• Logistics• RHT Make

Ready

Page 11: Facilities Design and Construction North/South Wing ...

11Department or Presentation Title

North/South Wing Demo – Façade ReplacementOVERALL DESIGN CONCEPT:

This project represents the physical context of the site and responds to the goals of the UCDMC through the following means:

The building facade is oriented toward the western edge of the campus, closest to Stockton Boulevard. The building face is set back about 100’ from the edge of the parking structure and provides a direct connection to the west entry. The building skin will also engage and wrap around portions of the existing bed tower and will need to integrate with exterior conditions that will remain in place.

This portion of the project is primarily a “re-skin” of an existing building . The selected materials must blend into the architectural character of the UCDMC campus. The design concept is an organizing idea centered around an inside-out and outside-in experience. The project addresses the functional need to provide identity as it will become the west facade of the existing hospital and highly visible from Stockton Boulevard .

It is desired to provide natural daylighting along the internal corridor and vertical circulation core of the East Wing and to provide a healing experience in context with the forms, materials, and color, of the existing and new structures, and the outdoor spaces around the campus. Building entries are a key component of all buildings on the campus. With a west facing entry facade, the project will also serve as the main staff entrance from Parking Garage 1. The West staff entry feature, circulation corridors, and internal elevator core will define the function behind a suggested curtainwall element. The parking structure will provide filtered shade and screened natural lighting into the landscaped area between the parking structure and the East Wing .

Landscaping will be limited to irrigation and hydroseeding with necessary walkways, and hardscape.

Page 12: Facilities Design and Construction North/South Wing ...

12Department or Presentation Title

North/South Wing Demo - #M011895

Q & A

Any future questions regarding the RFP for the North/South Wing Demolition (M011895) should be directed to:

Eduardo Avellaneda