+ All Categories
Home > Documents > Facilities Included In Joint Desalination Project Rehabilitate 15 Source Wells – 18.5 MGD 16 New...

Facilities Included In Joint Desalination Project Rehabilitate 15 Source Wells – 18.5 MGD 16 New...

Date post: 18-Jan-2018
Category:
Upload: sarah-anderson
View: 221 times
Download: 0 times
Share this document with a friend
Description:
Hueco Model Graphic of Brackish Water Interception Trough

If you can't read please download the document

Transcript

Facilities Included In Joint Desalination Project Rehabilitate 15 Source Wells 18.5 MGD 16 New Blend Wells MGD RO Plant MGD Treated Water Concentrate Disposal Facilities Pipelines - Collection, Transmission, Brine Disposal Water Resources Learning Center Hueco Model Graphic of Brackish Water Interception Trough Conceptual Rendering Water Resources Learning Center Study Area; Lower Valley Desalination Hudspeth Jeff Davis El Paso Presidio Culberson Wild Horse Ranch 110 miles 150 miles Wild Horse RanchAcreage 20,946 Antelope Valley RanchAcreage 24,778 Capitan Reef FarmsAcreage 29,318 Importation of Groundwater Antelope Valley Ranch Dell City 80 miles DESALINATION Capitan Reef Farms Questions?


Recommended