DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. HighAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Facility Code 0103Super Cluster 4
General Information: Function: High School Year Built:Gross Area: 186,272 S.F. Last Renovation:
Facility Description:
Martin Luther King Jr. High School campus consists of one main school building located 3991 Snapfinger Road in Lithonia, Georgia. The original campus was constructed in 2001 and there have been no additions or major renovations to the main school building. In addition to the main school building, the campus contains a storage building, baseball field, softball field, dugouts, football field, tennis courts, and track. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building and other facilities on the campus.
Current Repair Cost: $14,822,853.46 Replacement Cost: $48,673,676.98 FCI: 30.45%
25-Jan-2011Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 FCI Report
Martin Luther King Jr. High Weighted FCI ReportStone Mountain, GA 30083 Report Date: 24 Jun 2011
Facility Name
Last
Renovation
Cost Per
Sq. Ft.
Gross Area
(Sq. Ft.) Repair Cost
Replacement
Cost
Weighted
FCI
Critical
wt 1.25
Potentially
Critical
wt 1.1
Necessary
wt 1
Recommended
wt 0.75
Discretionary
wt 0.5
Martin Luther King Jr. High\Track $14.73 49,200 $638,952 $724,686 44.08% $0 $0 $0 $0 $638,952
Martin Luther King Jr. High\ 2001 Building $224.60 186,272 $14,135,843 $41,836,907 32.05% $229,862 $999,358 $9,365,041 $3,541,582 $0
Martin Luther King Jr. High\Football Field $5.36 108,000 $14,969 $578,340 2.59% $0 $0 $14,969 $0 $0
Martin Luther King Jr. High\Softball Field $5.87 21,100 $5,849 $123,891 2.36% $0 $0 $0 $0 $5,849
Martin Luther King Jr. High\ 2001 Storage
Building
$140.90 700 $2,088 $98,629 2.12% $0 $0 $2,088 $0 $0
Martin Luther King Jr. High\Site $23.70 186,272 $25,153 $4,414,758 0.71% $25,153 $0 $0 $0 $0
Martin Luther King Jr. High\Baseball Field $5.87 98,000 $0 $575,417 0.00% $0 $0 $0 $0 $0
Martin Luther King Jr. High\Baseball Dugout
2
$66.21 400 $0 $26,485 0.00% $0 $0 $0 $0 $0
Martin Luther King Jr. High\Baseball Dugout
1
$66.21 400 $0 $26,485 0.00% $0 $0 $0 $0 $0
Martin Luther King Jr. High\ Softball Dugout 2 $66.21 256 $0 $16,950 0.00% $0 $0 $0 $0 $0
Martin Luther King Jr. High\ Softball Dugout 1 $66.21 256 $0 $16,950 0.00% $0 $0 $0 $0 $0
Martin Luther King Jr. High\Tennis Courts $8.87 26,400 $0 $234,179 0.00% $0 $0 $0 $0 $0
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey ReportMartin Luther King Jr. High Detailed Facility Needs Assessment ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
DeKalb County School System $10,788,467 $4,034,387 $14,822,853 High Schools $10,788,467 $4,034,387 $14,822,853 Martin Luther King Jr. High $10,788,467 $4,034,387 $14,822,853 2001 Building $10,243,365 $3,892,479 $14,135,843 Building Systems $10,243,365 $3,892,479 $14,135,843
C3020 Floor Finishes - Carpet
System Beyond Service Life
Renew System 1 Ea. $175,190 $66,572 $241,762 Recommended
Deferred Maintenance
The carpet is worn, stained, and frayed, and should be replaced.
C3020 Floor Finishes - Neoprene Flooring
System Needs Remediation
Renew System 1 Ea. $84,887 $32,257 $117,144 Potentially Critical
Deferred Maintenance
The rubber flooring is a tripping hazard and should be replaced.
D5030 Communications and Security - Security & CCTV
System Inadequate Renew System 1 Ea. $168,017 $63,847 $231,864 Necessary
Deferred Maintenance
The security system is inadequate, has poor coverage, and should be replaced.
D5030 Communications and Security - Fire Alarm
System Needs Remediation
Renew System 1 Ea. $112,695 $42,824 $155,518 Necessary
Deferred Maintenance
The original fire alarm system is outdated, has reported outages, and should be replaced.
D2010 Plumbing Fixtures
System Needs Remediation
Renew System 1 Ea. $2,391,174 $908,646 $3,299,820 Recommended
Deferred Maintenance
The original plumbing fixtures are aging prematurely and should be replaced.
D2030 Sanitary Waste System Needs Remediation
Renew System 1 Ea. $639,286 $242,928 $882,214 Potentially Critical
Deferred Maintenance
The sanitary waste system has frequent leaks and back-ups, and sewer odor complaints are reported throughout the facility. Sewage damage to the celings and floors are occuring and the system should be replaced.
D2040 Rain Water Drainage
System Needs Remediation
Renew System 1 Ea. $124,989 $47,496 $172,484 Necessary
Deferred Maintenance
The rain water drainage system is inadequate, backs-up frequently, and discharges directly on the ground near the building foundation. No internal piping or drains were installed to remove water from portions of the roof and associated roof drain piping is not connected to an underground storm drainage system. Replacement of the rain water drainage system is needed and should include connecting the system to a network of subsurface storm drain piping designed to direct the rainwater away from the building and foundation.
D3020 Heat Generating Systems
System Needs Remediation
Renew System 1 Ea. $616,747 $234,364 $851,110 Necessary
Deferred Maintenance
The heating system, including the gas fired boilers, pumps, and valves, are aging prematurely and should be replaced.
D3040 Distribution Systems & Exhaust Systems
System Needs Remediation
Renew System 1 Ea. $739,686 $281,081 $1,020,767 Necessary
Deferred Maintenance
With exception of the kitchen systems, the exhaust fans and duct systems are damaged and dirty throughout the building and should be replaced.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey ReportMartin Luther King Jr. High Detailed Facility Needs Assessment ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
D3050 Terminal & Package Units
System Needs Remediation
Renew System 1 Ea. $2,567,387 $975,607 $3,542,994 Necessary
Deferred Maintenance
The roof top package units, energy recovery units, and water source heat pumps are worn and damaged and should be replaced.
D3060 Controls & Instrumentation
System Beyond Service Life
Renew System 1 Ea. $424,141 $161,174 $585,315 Necessary
Deferred Maintenance
The HVAC controls are inadequate, have obsolete parts and equipment, and should be replaced.
D5030 Communications and Security - PA & Clock Systems
System Beyond Service Life
Renew System 1 Ea. $698,706 $265,508 $964,215 Necessary
Deferred Maintenance
The PA and clock systems are aged and inadequate and should be replaced.
A1030 Slab on Grade Engineering Study for Slab on Grade
Needs Remediation
Study analyze and develop solution
1 Ea. $25,000 $9,500 $34,500 Critical Safety Differential settlement was observed throughout the building slab and block walls. An engineering study is needed to analyze the structural systems to determine the cause and resolution to the settlement. Pricing does not include remediation measures.
B1020 Roof Construction
CIP Concrete Roof Construction
Needs Remediation
Repair CIP Concrete Roof Construction
186,272 S.F. $74,509 $28,313 $102,822 Critical Deferred Maintenance
The horizontal expansion joints for the roof construction are reportedly damaged and leaking. Sections of the interior ceilings and walls have moisture damaged as a result. The roof construction expansion joints should be replaced. A roof study by a roofing consultant is recommended to analyze the roofing system to determine the cause and resolution. Pricing does not include remediation measures.
B2010 Exterior Walls Concrete Block Wall
Damaged Repair Concrete Block Wall
186,272 S.F. $67,058 $25,482 $92,540 Critical Deferred Maintenance
The vertical expansion joints for the exterior walls are reportedly damaged and leaking due to builidng settlement. Sections of the interior walls are also damaged. Replacement of the exterior wall expansion joints is needed.
C3030 Ceiling Finishes System Needs Remediation
Renew System 1 Ea. $1,333,894 $506,880 $1,840,773 Necessary
Deferred Maintenance
The ceiling finishes will need to be replaced due to damage caused by roof and wall leaks, as well as the work associated with replacing the roof, exterior wall expansion joints, and HVAC terminal units.
2001 Storage Building $1,513 $575 $2,088 Building Systems $1,513 $575 $2,088
D2010 Plumbing Fixtures
Drinking Fountain Systems
Damaged Replace Drinking Fountain Systems
1 Ea. $1,513 $575 $2,088 Necessary
Deferred Maintenance
The exteior drinking fountain, the only source of drinking water, is damaged and inoperable and should be replaced.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey ReportMartin Luther King Jr. High Detailed Facility Needs Assessment ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Football Field $11,880 $3,089 $14,969 Building Systems $11,880 $3,089 $14,969
F1040 Special Facilities - Footbal Field - Natural Turf
System Beyond Service Life
Renew System 1 Ea. $11,880 $3,089 $14,969 Necessary
Deferred Maintenance
The football field turf is worn and should be reseeded.
Site $19,963 $5,190 $25,153 Building Systems $19,963 $5,190 $25,153
G2040 Site Development
Storm Sewer Needs Remediation
Slope and Regrade Soil 1 Job $19,963 $5,190 $25,153 Critical Deferred Maintenance
Rainwater from the roof and surface is back draining and ponding around the perimeter of the building foundation, saturating the soil, and could possibly compromise the foundation. Grading and sloping of the soil to establish a positive rainwater run-off away from the building is need throughout the building perimeter.
Softball Field $4,642 $1,207 $5,849 Building Systems $4,642 $1,207 $5,849
F1040 Special Facilities - Sports Field - Natural Turf
System Beyond Service Life
Renew System 1 Ea. $4,642 $1,207 $5,849 Discretionary
Deferred Maintenance
The softball field turf is worn and should be reseeded.
Track $507,104 $131,847 $638,952 Building Systems $507,104 $131,847 $638,952
F1040 Special Facilities - Running Track Surface & Curbing
System Beyond Service Life
Renew System 1 Ea. $507,104 $131,847 $638,952 Discretionary
Deferred Maintenance
The track's hard surface is damaged and cracked, and should be resurfaced and restriped.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 BuildingAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Building Codes 5010Fire Sprinkler System Yes
General Information: Function: High School Year Built: 2001Gross Area: 186,272 S.F. Last Renovation:
Facility Description:
The Martin Luther King Jr. High School main building is a two-story building located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no additions and no major renovations to this building. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Replacing the single pane, operable windows with double pane, energy efficient windows; 2) Replacing the roof covering and insulation; 3) Replacing the plumbing fixtures with low flow units and flush control valves; 4) Replacing the boilers and roof top package units with up to date energy efficiently units; and 5) Replacing the building automation system with an effective energy management system that completely controls HVAC and lighting.
Current Repair Cost: $14,135,843.38 Replacement Cost: $41,836,906.95 FCI: 33.79%
25-Jan-2011North Elevation
25-Jan-2011Northeast Elevation
25-Jan-2011South Elevation
25-Jan-2011East Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $224.60 S.F. 186,272 107 $44,802,665 47 2001 2009 2010 $14,135,842 $41,836,908 34
Substructure $6.86 S.F. 186,272 100 $1,277,565 100 2001 $34,500 $1,277,565 3
Foundations $6.86 S.F. 186,272 100 $1,277,565 100 2001 $34,500 $1,277,565 3
Standard Foundations $3.49 S.F. 186,272 100 $650,350 100 2001 $650,350
Special Foundations S.F. 0 100 100 2001
Slab on Grade $3.37 S.F. 186,272 100 $627,215 100 2001 $34,500 $627,215 6
Basement Construction 0 0 0
Basement Excavation S.F. 0 100 100 2001
Basement Walls S.F. 0 100 100 2001
Shell $58.32 S.F. 186,272 103 $11,239,685 78 2001 2011 $195,362 $10,862,638 2
Superstructure $23.92 S.F. 186,272 100 $4,454,769 100 2001 $102,822 $4,454,769 2
Floor Construction $14.14 S.F. 186,272 100 $2,634,817 100 2001 $2,634,817
Roof Construction $9.77 S.F. 186,272 100 $1,819,952 100 2001 $102,822 $1,819,952 6
Exterior Enclosure $25.20 S.F. 186,272 104 $4,899,475 68 2001 2031 $92,540 $4,693,831 2
Exterior Walls $14.16 S.F. 186,272 100 $2,637,388 100 2001 $92,540 $2,637,388 4
Exterior Windows $10.42 S.F. 186,272 110 $2,134,845 30 2001 2031 $1,940,768
Exterior Doors $0.62 S.F. 186,272 110 $127,242 30 2001 2031 $115,675
Roofing $9.20 S.F. 186,272 110 $1,885,441 51 2001 2011 $1,714,038
Roof Coverings - Asphal
Shingles
S.F. 0 110 10 2001 2011
Roof Coverings - BUR $5.55 S.F. 149,018 110 $909,361 25 2001 2026 $826,692
Roof Coverings - EPDM S.F. 0 110 15 2001 2016
Roof Coverings - Preformed
Metal
S.F. 0 110 30 2001 2031
Roof Coverings - Standing
Seam Metal
$23.47 S.F. 37,254 110 $961,942 75 2001 2076 $874,493
Roof Openings $0.07 S.F. 186,272 110 $14,138 30 2001 2031 $12,853
Interiors $60.19 S.F. 186,272 107 $12,000,921 53 2001 2009 2010 $2,199,679 $11,211,854 20
Interior Construction $28.75 S.F. 186,272 104 $5,593,781 73 2001 2021 $5,354,464
Partitions $17.77 S.F. 186,272 110 $3,641,960 100 2001 $3,310,873
Interior Doors $5.30 S.F. 186,272 80 $789,674 30 2001 2031 $987,093
Fittings $5.67 S.F. 186,272 110 $1,162,147 20 2001 2021 $1,056,498
Stairs $1.93 S.F. 186,272 100 $359,878 100 2001 $359,878
Stair Construction $1.93 S.F. 186,272 100 $359,878 100 2001 $359,878
Interior Finishes $29.51 S.F. 186,272 110 $6,047,262 31 2001 2009 2010 $2,199,679 $5,497,512 40
Wall Finishes - Ceramic &
Glazed
$9.58 S.F. 27,941 110 $294,356 30 2001 2031 $267,597
Wall Finishes - Paint $1.81 S.F. 158,331 110 $314,854 10 2001 2011 2014 4 $286,231
Wall Finishes - Wall Coverings S.F. 0 110 10 2001 2011
Floor Finishes - Carpet $7.87 S.F. 27,941 110 $241,762 8 2001 2009 $241,762 $219,784 110
Floor Finishes - Ceramic &
Quarry Tile
$13.40 S.F. 18,627 110 $274,558 50 2001 2051 $249,598
Floor Finishes - Neoprene
Flooring
$19.06 S.F. 5,588 110 $117,144 15 2001 2016 2010 $117,144 $106,495 110
Floor Finishes - Terrazzo $48.99 S.F. 37,254 110 $2,007,581 50 2001 2051 $1,825,073
Floor Finishes - VCT $8.79 S.F. 93,136 110 $900,593 20 2001 2021 $818,721
Floor Finishes - Wood $13.58 S.F. 3,725 110 $55,641 20 2001 2021 $50,583
Ceiling Finishes $8.98 S.F. 186,272 110 $1,840,773 20 2001 2021 2011 1 $1,840,773 $1,673,430 110
Services $86.75 S.F. 186,272 110 $17,774,349 23 2001 2011 2010 $11,706,301 $16,158,500 72
Conveying $0.84 S.F. 186,272 110 $172,484 30 2001 2031 $156,804
Elevators and Lifts $0.84 S.F. 186,272 110 $172,484 30 2001 2031 $156,804
Plumbing $25.88 S.F. 186,272 110 $5,301,767 24 2001 2021 2010 $4,354,518 $4,819,788 90
Plumbing Fixtures $16.10 S.F. 186,272 110 $3,299,820 20 2001 2021 2010 $3,299,820 $2,999,836 110
Domestic Water Distribution $3.42 S.F. 186,272 110 $701,247 30 2001 2031 $637,497
Sanitary Waste $4.31 S.F. 186,272 110 $882,214 30 2001 2031 2010 $882,214 $802,013 110
Rain Water Drainage $0.84 S.F. 186,272 110 $172,484 30 2001 2031 2010 $172,484 $156,804 110
Other Plumbing Systems - Acid
Waste
$0.50 S.F. 186,272 110 $101,794 30 2001 2031 $92,540
Other Plumbing Systems -
Natural Gas
$0.70 S.F. 186,272 110 $144,208 30 2001 2031 $131,098
HVAC $34.21 S.F. 186,272 110 $7,009,642 22 2001 2016 2010 $6,000,186 $6,372,403 94
Heat Generating Systems $4.15 S.F. 186,272 110 $851,110 30 2001 2031 2010 $851,110 $773,737 110
Cooling Generating Systems $4.22 S.F. 186,272 110 $865,248 30 2001 2031 $786,589
Distribution Systems & Exhaust
Systems
$4.98 S.F. 186,272 110 $1,020,767 30 2001 2031 2010 $1,020,767 $927,970 110
Terminal & Package Units $17.29 S.F. 186,272 110 $3,542,994 15 2001 2016 2010 $3,542,994 $3,220,904 110
Controls & Instrumentation $2.86 S.F. 186,272 110 $585,315 20 2001 2021 2010 $585,315 $532,105 110
Other HVAC Systems/Equip -
Kitchen Hood
$0.70 S.F. 186,272 110 $144,208 30 2001 2031 $131,098
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Fire Protection $3.70 S.F. 186,272 110 $757,799 30 2001 2031 $688,908
Sprinklers $3.70 S.F. 186,272 110 $757,799 30 2001 2031 $688,908
Standpipes $0.40 S.F. 0 110 30 2001
Electrical $22.12 S.F. 186,272 110 $4,532,657 24 2001 2011 2010 $1,351,597 $4,120,597 33
Electrical Service/Distribution $1.85 S.F. 186,272 110 $378,900 30 2001 2031 $344,454
Branch Wiring $5.35 S.F. 186,272 110 $1,097,112 30 2001 2031 $997,375
Lighting $8.03 S.F. 186,272 110 $1,645,668 30 2001 2031 $1,496,062
Communications and Security -
Fire Alarm
$0.76 S.F. 186,272 110 $155,518 10 2001 2011 2010 $155,518 $141,380 110
Communications and Security -
PA & Clock Systems
$4.71 S.F. 186,272 110 $964,215 10 2001 2011 2010 $964,215 $876,559 110
Communications and Security -
Security & CCTV
$1.13 S.F. 186,272 110 $231,864 10 2001 2011 2010 $231,864 $210,785 110
Other Electrical Systems -
Emergency Generator
$0.29 S.F. 186,272 110 $59,380 15 2001 2016 $53,982
Equipment & Furnishings $10.56 S.F. 186,272 108 $2,114,280 19 2001 2016 $1,966,473
Equipment $3.33 S.F. 186,272 102 $632,613 16 2001 2016 $619,503
Commercial Equipment $0.77 S.F. 0 110 20 2001 2021
Institutional Equipment $0.70 S.F. 186,272 110 $144,208 20 2001 2021 $131,098
Other Equipment (Kitchen
Equipment)
$2.62 S.F. 186,272 100 $488,405 15 2001 2016 $488,405
Furnishings $7.23 S.F. 186,272 110 $1,481,667 20 2001 2021 $1,346,970
Fixed Furnishings $7.23 S.F. 186,272 110 $1,481,667 20 2001 2021 $1,346,970
Special Construction $1.93 S.F. 186,272 110 $395,865 20 2001 2021 $359,878
Special Construction $1.93 S.F. 186,272 110 $395,865 20 2001 2021 $359,878
Special Structures - Canopies $1.93 S.F. 186,272 110 $395,865 20 2001 2021 $359,878
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $14,135,842 $354,371 $654,084 $306,257 $1,816,434 $5,730,898
Substructure $34,500
Foundations $34,500
Standard Foundations
Special Foundations
Slab on Grade $34,500
Basement Construction
Basement Excavation
Basement Walls
Shell $195,362
Superstructure $102,822
Floor Construction
Roof Construction $102,822
Exterior Enclosure $92,540
Exterior Walls $92,540
Exterior Windows
Exterior Doors
Roofing
Roof Coverings - Asphal Shingles
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Preformed Metal
Roof Coverings - Standing Seam
Metal
Roof Openings
Interiors $2,199,679 $354,371 $306,257 $2,932,336
Interior Construction $1,608,684
Partitions
Interior Doors
Fittings $1,608,684
Stairs
Stair Construction
Interior Finishes $2,199,679 $354,371 $306,257 $1,323,652
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $354,371
Wall Finishes - Wall Coverings
Floor Finishes - Carpet $241,762 $306,257
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Neoprene Flooring $117,144
Floor Finishes - Terrazzo
Floor Finishes - VCT $1,246,632
Floor Finishes - Wood $77,020
Ceiling Finishes $1,840,773
Services $11,706,301 $70,903 $1,816,434
Conveying
Elevators and Lifts
Plumbing $4,354,518
Plumbing Fixtures $3,299,820
Domestic Water Distribution
Sanitary Waste $882,214
Rain Water Drainage $172,484
Other Plumbing Systems - Acid
Waste
Other Plumbing Systems - Natural
Gas
HVAC $6,000,186
Heat Generating Systems $851,110
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
$1,020,767
Terminal & Package Units $3,542,994
Controls & Instrumentation $585,315
Other HVAC Systems/Equip -
Kitchen Hood
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Fire Protection
Sprinklers
Standpipes
Electrical $1,351,597 $70,903 $1,816,434
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security - Fire
Alarm
$155,518 $209,004
Communications and Security - PA
& Clock Systems
$964,215 $1,295,824
Communications and Security -
Security & CCTV
$231,864 $311,606
Other Electrical Systems -
Emergency Generator
$70,903
Equipment & Furnishings $583,181 $2,250,592
Equipment $583,181 $199,618
Commercial Equipment
Institutional Equipment $199,618
Other Equipment (Kitchen
Equipment)
$583,181
Furnishings $2,050,974
Fixed Furnishings $2,050,974
Special Construction $547,970
Special Construction $547,970
Special Structures - Canopies $547,970
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Mon, 25-Apr-2011Priority: 1Quantity: 1
Assembly: A1030 System: Slab on Grade Material: Engineering Study for Slab on Grade Distress: Needs Remediation Category: Safety Correction: Study analyze and develop solution Note: Differential settlement was observed throughout the building slab and block walls. An engineering study is
needed to analyze the structural systems to determine the cause and resolution to the settlement. Pricing does not include remediation measures.
Estimates:Raw Cost $25,000.00
Plus or (Minus) Additional Cost $9,500.00Total Estimated Amount $34,500.00
Deficiency: Surveyor/Update: Troy Weeks Wed, 11-May-2011Priority: 1Quantity: 186,272
Assembly: B1020 System: Roof Construction Material: CIP Concrete Roof Construction Distress: Needs Remediation Category: Deferred Maintenance Correction: Repair CIP Concrete Roof Construction Note: The horizontal expansion joints for the roof construction are reportedly damaged and leaking. Sections of the
interior ceilings and walls have moisture damaged as a result. The roof construction expansion joints should be replaced. A roof study by a roofing consultant is recommended to analyze the roofing system to determine the cause and resolution. Pricing does not include remediation measures.
Estimates:Raw Cost $74,508.80
Plus or (Minus) Additional Cost $28,313.34Total Estimated Amount $102,822.14
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Troy Weeks Mon, 25-Apr-2011Priority: 1Quantity: 186,272
Assembly: B2010 System: Exterior Walls Material: Concrete Block Wall Distress: Damaged Category: Deferred Maintenance Correction: Repair Concrete Block Wall Note: The vertical expansion joints for the exterior walls are reportedly damaged and leaking due to builidng settlement.
Sections of the interior walls are also damaged. Replacement of the exterior wall expansion joints is needed.
Estimates:Raw Cost $67,057.92
Plus or (Minus) Additional Cost $25,482.01Total Estimated Amount $92,539.93
Deficiency: Surveyor/Update: Kate McPhillips Thu, 03-Mar-2011Priority: 4Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The carpet is worn, stained, and frayed, and should be replaced.
Estimates:Raw Cost $175,190.07
Plus or (Minus) Additional Cost $66,572.23Total Estimated Amount $241,762.30
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Cesar De La Canal Wed, 30-Mar-2011Priority: 2Quantity: 1
Assembly: C3020 System: Floor Finishes - Neoprene Flooring Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The rubber flooring is a tripping hazard and should be replaced.
Estimates:Raw Cost $84,887.31
Plus or (Minus) Additional Cost $32,257.18Total Estimated Amount $117,144.49
Deficiency: Surveyor/Update: Troy Weeks Wed, 11-May-2011Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes will need to be replaced due to damage caused by roof and wall leaks, as well as the work
associated with replacing the roof, exterior wall expansion joints, and HVAC terminal units.
Estimates:Raw Cost $1,333,893.79
Plus or (Minus) Additional Cost $506,879.64Total Estimated Amount $1,840,773.43
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Cesar De La Canal Wed, 30-Mar-2011Priority: 4Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The original plumbing fixtures are aging prematurely and should be replaced.
Estimates:Raw Cost $2,391,173.66
Plus or (Minus) Additional Cost $908,645.99Total Estimated Amount $3,299,819.65
Deficiency: Surveyor/Update: Cesar De La Canal Sat, 30-Apr-2011Priority: 2Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The sanitary waste system has frequent leaks and back-ups, and sewer odor complaints are reported throughout
the facility. Sewage damage to the celings and floors are occuring and the system should be replaced.
Estimates:Raw Cost $639,285.50
Plus or (Minus) Additional Cost $242,928.49Total Estimated Amount $882,213.99
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Cesar De La Canal Thu, 05-May-2011Priority: 3Quantity: 1
Assembly: D2040 System: Rain Water Drainage Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The rain water drainage system is inadequate, backs-up frequently, and discharges directly on the ground near
the building foundation. No internal piping or drains were installed to remove water from portions of the roof and associated roof drain piping is not connected to an underground storm drainage system. Replacement of the rain water drainage system is needed and should include connecting the system to a network of subsurface storm drain piping designed to direct the rainwater away from the building and foundation.
Estimates:Raw Cost $124,988.51
Plus or (Minus) Additional Cost $47,495.63Total Estimated Amount $172,484.14
Deficiency: Surveyor/Update: Cesar De La Canal Wed, 30-Mar-2011Priority: 3Quantity: 1
Assembly: D3020 System: Heat Generating Systems Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The heating system, including the gas fired boilers, pumps, and valves, are aging prematurely and should be
replaced.
Estimates:Raw Cost $616,746.59
Plus or (Minus) Additional Cost $234,363.70Total Estimated Amount $851,110.29
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Cesar De La Canal Wed, 30-Mar-2011Priority: 3Quantity: 1
Assembly: D3040 System: Distribution Systems & Exhaust Systems Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: With exception of the kitchen systems, the exhaust fans and duct systems are damaged and dirty throughout the
building and should be replaced.
Estimates:Raw Cost $739,686.11
Plus or (Minus) Additional Cost $281,080.72Total Estimated Amount $1,020,766.83
Deficiency: Surveyor/Update: Troy Weeks Thu, 14-Apr-2011Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The roof top package units, energy recovery units, and water source heat pumps are worn and damaged and
should be replaced.
Estimates:Raw Cost $2,567,386.98
Plus or (Minus) Additional Cost $975,607.05Total Estimated Amount $3,542,994.03
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Troy Weeks Thu, 14-Apr-2011Priority: 3Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The HVAC controls are inadequate, have obsolete parts and equipment, and should be replaced.
Estimates:Raw Cost $424,141.34
Plus or (Minus) Additional Cost $161,173.71Total Estimated Amount $585,315.05
Deficiency: Surveyor/Update: Cesar De La Canal Thu, 03-Mar-2011Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Fire Alarm Material: System Distress: Needs Remediation Category: Deferred Maintenance Correction: Renew System Note: The original fire alarm system is outdated, has reported outages, and should be replaced.
Estimates:Raw Cost $112,694.56
Plus or (Minus) Additional Cost $42,823.93Total Estimated Amount $155,518.49
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Building (continued)
Deficiency: Surveyor/Update: Troy Weeks Sat, 18-Jun-2011Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - PA & Clock
Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The PA and clock systems are aged and inadequate and should be replaced.
Estimates:Raw Cost $698,706.27
Plus or (Minus) Additional Cost $265,508.38Total Estimated Amount $964,214.65
Deficiency: Surveyor/Update: Cesar De La Canal Sat, 30-Apr-2011Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Security &
CCTV Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: The security system is inadequate, has poor coverage, and should be replaced.
Estimates:Raw Cost $168,017.34
Plus or (Minus) Additional Cost $63,846.59Total Estimated Amount $231,863.93
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Storage BuildingAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Fire Sprinkler System No
General Information: Function: Storage Building Year Built: 2001Gross Area: 700 S.F. Last Renovation:
Facility Description:
The Storage Building at Martin Luther King Jr. High School is located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no addition and no major renovations to the storage building. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $2,087.94 Replacement Cost: $98,628.60 FCI: 2.12%
25-Jan-2011Southwest Elevation
25-Jan-2011Southeast Elevation
25-Jan-2011Northeast Elevation
25-Jan-2011Northwest Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Storage Building (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $140.90 S.F. 700 106 $104,074 54 2001 2021 $2,088 $98,628 2
Substructure $7.89 S.F. 700 100 $5,526 100 2001 $5,526
Foundations $7.89 S.F. 700 100 $5,526 100 2001 $5,526
Standard Foundations $4.49 S.F. 700 100 $3,140 100 2001 $3,140
Slab on Grade $3.41 S.F. 700 100 $2,386 100 2001 $2,386
Basement Construction 0 0 0
Basement Excavation $0.21 S.F. 0 100 100 2001
Basement Walls $3.41 S.F. 0 100 100 2001
Shell $68.08 S.F. 700 103 $49,028 76 2001 2021 $47,653
Superstructure $13.57 S.F. 700 100 $9,496 100 2001 $9,496
Roof Construction $13.57 S.F. 700 100 $9,496 100 2001 $9,496
Exterior Enclosure $40.14 S.F. 700 101 $28,470 90 2001 2031 $28,101
Exterior Walls $34.87 S.F. 700 100 $24,411 100 2001 $24,411
Exterior Windows $4.54 S.F. 700 110 $3,496 30 2001 2031 $3,178
Exterior Doors $0.73 S.F. 700 110 $563 30 2001 2031 $512
Roofing $14.37 S.F. 700 110 $11,062 20 2001 2021 $10,056
Roof Coverings $14.37 S.F. 700 110 $11,062 20 2001 2021 $10,056
Interiors $29.99 S.F. 700 108 $22,614 29 2001 2021 $20,990
Interior Construction $16.97 S.F. 700 106 $12,594 36 2001 2021 $11,881
Partitions $11.92 S.F. 700 110 $9,181 40 2001 $8,346
Interior Doors $2.26 S.F. 700 80 $1,267 30 2001 2031 $1,584
Fittings $2.79 S.F. 700 110 $2,146 20 2001 2021 $1,951
Interior Finishes $13.01 S.F. 700 110 $10,020 20 2001 2021 $9,109
Wall Finishes $1.50 S.F. 700 110 $1,158 20 2001 2021 $1,053
Floor Finishes $6.07 S.F. 700 110 $4,675 20 2001 2021 $4,250
Ceiling Finishes $5.44 S.F. 700 110 $4,187 20 2001 2021 $3,806
Services $34.94 S.F. 700 110 $26,906 25 2001 2021 $2,088 $24,459 9
Plumbing $19.53 S.F. 700 110 $15,036 22 2001 2021 $2,088 $13,669 15
Plumbing Fixtures $16.10 S.F. 700 110 $12,401 20 2001 2021 $2,088 $11,273 19
Domestic Water Distribution $3.42 S.F. 700 110 $2,635 30 2001 2031 $2,396
Rain Water Drainage $1.38 S.F. 0 110 30 2001 2031
Electrical $15.41 S.F. 700 110 $11,870 30 2001 2031 $10,790
Electrical Service/Distribution $3.30 S.F. 700 110 $2,540 30 2001 2031 $2,309
Lighting and Branch Wiring $12.12 S.F. 700 110 $9,330 30 2001 2031 $8,481
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Storage Building (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $2,088 $49,318
Substructure
Foundations
Standard Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $15,312
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing $15,312
Roof Coverings $15,312
Interiors $16,841
Interior Construction $2,971
Partitions
Interior Doors
Fittings $2,971
Interior Finishes $13,870
Wall Finishes $1,603
Floor Finishes $6,472
Ceiling Finishes $5,795
Services $2,088 $17,165
Plumbing $2,088 $17,165
Plumbing Fixtures $2,088 $17,165
Domestic Water Distribution
Rain Water Drainage
Electrical
Electrical Service/Distribution
Lighting and Branch Wiring
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ 2001 Storage Building (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Troy Weeks Mon, 25-Apr-2011Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: Drinking Fountain Systems Distress: Damaged Category: Deferred Maintenance Correction: Replace Drinking Fountain Systems Note: The exteior drinking fountain, the only source of drinking water, is damaged and inoperable and should be
replaced.
Estimates:Raw Cost $1,513.00
Plus or (Minus) Additional Cost $574.94Total Estimated Amount $2,087.94
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 1Address: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Fire Sprinkler System No
General Information: Function: Sports Bleachers Concession
PressYear Built: 2001
Gross Area: 256 S.F. Last Renovation:
Facility Description:
Softball Dugout 1 at Martin Luther King Jr. High School is located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $16,950.37 FCI: 0.00%
25-Jan-2011South Elevation
25-Jan-2011West Elevation
25-Jan-2011North Elevation
25-Jan-2011East Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 1 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $66.21 S.F. 256 102 $17,318 81 2001 2021 0 $16,951
Substructure $3.41 S.F. 256 100 $873 100 2001 $873
Foundations $3.41 S.F. 256 100 $873 100 2001 $873
Slab on Grade $3.41 S.F. 256 100 $873 100 2001 $873
Shell $62.80 S.F. 256 102 $16,445 80 2001 2021 $16,078
Superstructure $13.57 S.F. 256 100 $3,473 100 2001 $3,473
Roof Construction $13.57 S.F. 256 100 $3,473 100 2001 $3,473
Exterior Enclosure $34.87 S.F. 256 100 $8,927 100 2001 $8,927
Exterior Walls $34.87 S.F. 256 100 $8,927 100 2001 $8,927
Roofing $14.37 S.F. 256 110 $4,045 20 2001 2021 $3,678
Roof Coverings $14.37 S.F. 256 110 $4,045 20 2001 2021 $3,678
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 1 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $5,600
Substructure
Foundations
Slab on Grade
Shell $5,600
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Roofing $5,600
Roof Coverings $5,600
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 1 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 2Address: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Fire Sprinkler System No
General Information: Function: Sports Bleachers Concession
PressYear Built: 2001
Gross Area: 256 S.F. Last Renovation:
Facility Description:
Softball Dugout 2 at Martin Luther King Jr. High School is located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $16,950.37 FCI: 0.00%
25-Jan-2011West Elevation
25-Jan-2011South Elevation
25-Jan-2011East Elevation
25-Jan-2011North Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 2 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $66.21 S.F. 256 102 $17,318 81 2001 2021 0 $16,951
Substructure $3.41 S.F. 256 100 $873 100 2001 $873
Foundations $3.41 S.F. 256 100 $873 100 2001 $873
Slab on Grade $3.41 S.F. 256 100 $873 100 2001 $873
Shell $62.80 S.F. 256 102 $16,445 80 2001 2021 $16,078
Superstructure $13.57 S.F. 256 100 $3,473 100 2001 $3,473
Roof Construction $13.57 S.F. 256 100 $3,473 100 2001 $3,473
Exterior Enclosure $34.87 S.F. 256 100 $8,927 100 2001 $8,927
Exterior Walls $34.87 S.F. 256 100 $8,927 100 2001 $8,927
Roofing $14.37 S.F. 256 110 $4,045 20 2001 2021 $3,678
Roof Coverings $14.37 S.F. 256 110 $4,045 20 2001 2021 $3,678
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 2 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $5,600
Substructure
Foundations
Slab on Grade
Shell $5,600
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Roofing $5,600
Roof Coverings $5,600
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\ Softball Dugout 2 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 1Address: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Fire Sprinkler System No
General Information: Function: Sports Bleachers Concession
PressYear Built: 2001
Gross Area: 400 S.F. Last Renovation:
Facility Description:
Baseball Dugout 1 at Martin Luther King Jr. High School is located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $26,484.96 FCI: 0.00%
25-Jan-2011West Elevation
25-Jan-2011South Elevation
25-Jan-2011East Elevation
25-Jan-2011North Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 1 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $66.21 S.F. 400 102 $27,059 81 2001 2021 0 $26,484
Substructure $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Foundations $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Slab on Grade $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Shell $62.80 S.F. 400 102 $25,696 80 2001 2021 $25,121
Superstructure $13.56 S.F. 400 100 $5,426 100 2001 $5,426
Roof Construction $13.57 S.F. 400 100 $5,426 100 2001 $5,426
Exterior Enclosure $34.87 S.F. 400 100 $13,949 100 2001 $13,949
Exterior Walls $34.87 S.F. 400 100 $13,949 100 2001 $13,949
Roofing $14.36 S.F. 400 110 $6,321 20 2001 2021 $5,746
Roof Coverings $14.37 S.F. 400 110 $6,321 20 2001 2021 $5,746
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 1 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $8,750
Substructure
Foundations
Slab on Grade
Shell $8,750
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Roofing $8,750
Roof Coverings $8,750
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 1 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 2Address: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Fire Sprinkler System No
General Information: Function: Sports Bleachers Concession
PressYear Built: 2001
Gross Area: 400 S.F. Last Renovation:
Facility Description:
Baseball Dugout 2 at Martin Luther King Jr. High School is located at 3991 Snapfinger Road in Lithonia, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $26,484.96 FCI: 0.00%
25-Jan-2011West Elevation
25-Jan-2011North Elevation
25-Jan-2011East Elevation
25-Jan-2011South Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 2 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $66.21 S.F. 400 102 $27,059 81 2001 2021 0 $26,484
Substructure $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Foundations $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Slab on Grade $3.41 S.F. 400 100 $1,363 100 2001 $1,363
Shell $62.80 S.F. 400 102 $25,696 80 2001 2021 $25,121
Superstructure $13.56 S.F. 400 100 $5,426 100 2001 $5,426
Roof Construction $13.57 S.F. 400 100 $5,426 100 2001 $5,426
Exterior Enclosure $34.87 S.F. 400 100 $13,949 100 2001 $13,949
Exterior Walls $34.87 S.F. 400 100 $13,949 100 2001 $13,949
Roofing $14.36 S.F. 400 110 $6,321 20 2001 2021 $5,746
Roof Coverings $14.37 S.F. 400 110 $6,321 20 2001 2021 $5,746
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 2 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $8,750
Substructure
Foundations
Slab on Grade
Shell $8,750
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Roofing $8,750
Roof Coverings $8,750
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Dugout 2 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball FieldAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: ***None***
General Information: Function: High School Year Built: 2001Gross Area: 98,000 S.F. Last Renovation:
Facility Description:
The Baseball Field at Martin Luther King Jr. High School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $575,416.80 FCI: 0.00%
25-Jan-2011Baseball Field at Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $5.87 S.F. 98,000 102 $588,012 81 2001 2011 2014 0 $575,417
Special Construction $0.25 S.F. 98,000 110 $27,166 10 2001 2011 2014 $24,696
Special Construction $0.25 S.F. 98,000 110 $27,166 10 2001 2011 2014 $24,696
Special Facilities - Sports Field -
Natural Turf
$0.25 S.F. 98,000 110 $27,166 10 2001 2011 2014 4 $24,696
Building Sitework $5.62 S.F. 98,000 102 $560,846 85 2001 2021 $550,721
Site Preparation $4.59 S.F. 98,000 100 $449,467 100 2001 $449,467
Site Earthwork $4.59 S.F. 98,000 100 $449,467 100 2001 $449,467
Site Improvements $0.69 S.F. 98,000 110 $74,705 20 2001 2021 $67,914
Site Development - Fencing;
Scoreboard; Dug Outs
$0.60 S.F. 98,000 110 $65,197 20 2001 2021 $59,270
Landscaping - Irrigation $0.09 S.F. 98,000 110 $9,508 20 2001 2021 $8,644
Site Mechanical Utilities $0.34 S.F. 98,000 110 $36,674 30 2001 2031 $33,340
Water Supply - Water Service $0.34 S.F. 98,000 110 $36,674 30 2001 2031 $33,340
Site Electrical Utilities 0 0 0
Site Lighting $1.69 S.F. 0 110 30 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Field (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $30,575 $103,410
Special Construction $30,575
Special Construction $30,575
Special Facilities - Sports Field -
Natural Turf
$30,575
Building Sitework $103,410
Site Preparation
Site Earthwork
Site Improvements $103,410
Site Development - Fencing;
Scoreboard; Dug Outs
$90,249
Landscaping - Irrigation $13,161
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Baseball Field (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Football FieldAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: ***None***
General Information: Function: High School Year Built: 2001Gross Area: 108,000 S.F. Last Renovation:
Facility Description:
The Football Field at Martin Luther King Jr. High School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $14,968.80 Replacement Cost: $578,340.00 FCI: 2.59%
25-Jan-2011Football Field at Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Football Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $5.36 S.F. 108,000 101 $586,641 88 2001 2011 2010 $14,969 $578,341 3
Special Construction $0.13 S.F. 108,000 110 $14,969 10 2001 2011 2010 $14,969 $13,608 110
Special Construction $0.13 S.F. 108,000 110 $14,969 10 2001 2011 2010 $14,969 $13,608 110
Special Facilities - Footbal Field
- Natural Turf
$0.13 S.F. 108,000 110 $14,969 10 2001 2011 2010 $14,969 $13,608 110
Building Sitework $5.23 S.F. 108,000 101 $571,672 90 2001 2021 $564,733
Site Preparation $4.59 S.F. 108,000 100 $495,331 100 2001 $495,331
Site Earthwork $4.59 S.F. 108,000 100 $495,331 100 2001 $495,331
Site Improvements $0.30 S.F. 108,000 110 $35,925 20 2001 2021 $32,660
Site Development - Fencing;
Goal Post; Scoreboard
$0.21 S.F. 108,000 110 $25,447 20 2001 2021 $23,134
Landscaping - Irrigation $0.09 S.F. 108,000 110 $10,478 20 2001 2021 $9,526
Site Mechanical Utilities $0.34 S.F. 108,000 110 $40,416 30 2001 2031 $36,742
Water Supply - Water Service $0.34 S.F. 108,000 110 $40,416 30 2001 2031 $36,742
Site Electrical Utilities 0 0 0
Site Lighting $1.69 S.F. 0 110 30 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Football Field (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $14,969 $20,117 $49,729
Special Construction $14,969 $20,117
Special Construction $14,969 $20,117
Special Facilities - Footbal Field -
Natural Turf
$14,969 $20,117
Building Sitework $49,729
Site Preparation
Site Earthwork
Site Improvements $49,729
Site Development - Fencing; Goal
Post; Scoreboard
$35,225
Landscaping - Irrigation $14,504
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Football Field (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Thu, 03-Mar-2011Priority: 3Quantity: 1
Assembly: F1040 System: Special Facilities - Footbal Field - Natural Turf Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The football field turf is worn and should be reseeded.
Estimates:Raw Cost $11,880.00
Plus or (Minus) Additional Cost $3,088.80Total Estimated Amount $14,968.80
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\SiteAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: Site Code 1919
General Information: Function: High School Year Built: 2001Gross Area: 186,272 S.F. Last Renovation:
Facility Description:
The Martin Luther King Jr. High School site was originally constructed in 2001, has a total area of 116 acres, and is occupied by approximately 186,272 square feet of permanent building space. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $25,152.88 Replacement Cost: $4,414,758.16 FCI: 0.57%
03-Nov-2010Aerial Image of Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $23.70 S.F. 186,272 109 $4,811,874 31 2001 2011 2014 $25,153 $4,414,758 1
Building Sitework $23.70 S.F. 186,272 109 $4,811,874 31 2001 2011 2014 $25,153 $4,414,758 1
Site Improvements $16.64 S.F. 186,272 109 $3,366,106 24 2001 2011 2014 $25,153 $3,100,424 1
Roadways $4.88 S.F. 186,272 110 $999,129 25 2001 2026 $908,300
Parking Lots $6.36 S.F. 186,272 110 $1,303,774 25 2001 2026 $1,185,249
Pedestrian Paving $0.94 S.F. 186,272 110 $193,630 30 2001 2031 $176,027
Site Development $0.26 S.F. 186,272 110 $54,216 10 2001 2011 2014 4 $25,153 $49,288 51
Site Development 2 $2.38 S.F. 186,272 100 $443,588 30 2001 2031 $443,588
Fence & Guardrails $2.38 S.F. 186,272 100 $443,588 30 2001 2031 $443,588
Landscaping $1.81 S.F. 186,272 110 $371,769 10 2001 $337,972
Site Mechanical Utilities $5.66 S.F. 186,272 110 $1,159,196 50 2001 2031 $1,053,815
Water Supply $1.03 S.F. 186,272 110 $211,702 50 2001 2051 $192,456
Sanitary Sewer $0.45 S.F. 186,272 110 $92,942 50 2001 2051 $84,493
Storm Sewer $4.04 S.F. 186,272 110 $828,735 50 2001 2051 $753,396
Fuel Distribution - Gas $0.13 S.F. 186,272 110 $25,817 30 2001 2031 $23,470
Site Electrical Utilities $1.40 S.F. 186,272 110 $286,572 30 2001 2031 $260,519
Electrical Distribution $0.52 S.F. 186,272 110 $105,851 30 2001 2031 $96,228
Site Lighting $0.69 S.F. 186,272 110 $141,995 30 2001 2031 $129,086
Site Communication and
Security
$0.19 S.F. 186,272 110 $38,726 30 2001 2031 $35,205
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Site (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $25,153 $61,021
Building Sitework $25,153 $61,021
Site Improvements $25,153 $61,021
Roadways
Parking Lots
Pedestrian Paving
Site Development $25,153 $61,021
Site Development 2
Fence & Guardrails
Landscaping
Site Mechanical Utilities
Water Supply
Sanitary Sewer
Storm Sewer
Fuel Distribution - Gas
Site Electrical Utilities
Electrical Distribution
Site Lighting
Site Communication and Security
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Troy Weeks Mon, 25-Apr-2011Priority: 1Quantity: 1
Assembly: G2040 System: Site Development Material: Storm Sewer Distress: Needs Remediation Category: Deferred Maintenance Correction: Slope and Regrade Soil Note: Rainwater from the roof and surface is back draining and ponding around the perimeter of the building
foundation, saturating the soil, and could possibly compromise the foundation. Grading and sloping of the soil to establish a positive rainwater run-off away from the building is need throughout the building perimeter.
Estimates:Raw Cost $19,962.60
Plus or (Minus) Additional Cost $5,190.28Total Estimated Amount $25,152.88
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Softball FieldAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: ***None***
General Information: Function: High School Year Built: 2001Gross Area: 21,100 S.F. Last Renovation:
Facility Description:
The Softball Field at Martin Luther King Jr. High School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $5,848.92 Replacement Cost: $123,890.76 FCI: 4.72%
25-Jan-2011Softball Field at Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Softball Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $5.87 S.F. 21,100 102 $126,602 81 2001 2011 2010 $5,849 $123,890 5
Special Construction $0.25 S.F. 21,100 110 $5,849 10 2001 2011 2010 $5,849 $5,317 110
Special Construction $0.25 S.F. 21,100 110 $5,849 10 2001 2011 2010 $5,849 $5,317 110
Special Facilities - Sports Field -
Natural Turf
$0.25 S.F. 21,100 110 $5,849 10 2001 2011 2010 $5,849 $5,317 110
Building Sitework $5.62 S.F. 21,100 102 $120,753 85 2001 2021 $118,573
Site Preparation $4.59 S.F. 21,100 100 $96,773 100 2001 $96,773
Site Earthwork $4.59 S.F. 21,100 100 $96,773 100 2001 $96,773
Site Improvements $0.69 S.F. 21,100 110 $16,084 20 2001 2021 $14,622
Site Development - Fencing;
Scoreboard; Dug Outs
$0.60 S.F. 21,100 110 $14,037 20 2001 2021 $12,761
Landscaping - Irrigation $0.09 S.F. 21,100 110 $2,047 20 2001 2021 $1,861
Site Mechanical Utilities $0.34 S.F. 21,100 110 $7,896 30 2001 2031 $7,178
Water Supply - Water Service $0.34 S.F. 21,100 110 $7,896 30 2001 2031 $7,178
Site Electrical Utilities 0 0 0
Site Lighting $1.69 S.F. 0 110 30 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Softball Field (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $5,849 $7,860 $22,265
Special Construction $5,849 $7,860
Special Construction $5,849 $7,860
Special Facilities - Sports Field -
Natural Turf
$5,849 $7,860
Building Sitework $22,265
Site Preparation
Site Earthwork
Site Improvements $22,265
Site Development - Fencing;
Scoreboard; Dug Outs
$19,431
Landscaping - Irrigation $2,834
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Softball Field (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Sat, 18-Jun-2011Priority: 5Quantity: 1
Assembly: F1040 System: Special Facilities - Sports Field - Natural Turf Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The softball field turf is worn and should be reseeded.
Estimates:Raw Cost $4,642.00
Plus or (Minus) Additional Cost $1,206.92Total Estimated Amount $5,848.92
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Tennis CourtsAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: ***None***
General Information: Function: High School Year Built: 2001Gross Area: 26,400 S.F. Last Renovation:
Facility Description:
The Tennis Courts at Martin Luther King Jr. High School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $234,178.56 FCI: 0.00%
25-Jan-2011Tennis Courts at Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Tennis Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $8.87 S.F. 26,400 109 $255,069 22 2001 2021 0 $234,179
Special Construction $7.91 S.F. 26,400 110 $229,788 20 2001 2021 $208,898
Special Construction $7.91 S.F. 26,400 110 $229,788 20 2001 2021 $208,898
Special Facilities - Tennis Court
Hard Surface
$7.91 S.F. 26,400 110 $229,788 20 2001 2021 $208,898
Building Sitework $0.96 S.F. 26,400 100 $25,281 38 2001 2031 $25,281
Site Preparation $0.11 S.F. 26,400 100 $2,994 100 2001 $2,994
Site Earthwork $0.11 S.F. 26,400 100 $2,994 100 2001 $2,994
Site Improvements $0.84 S.F. 26,400 100 $22,287 30 2001 2031 $22,287
Site Development - Fencing $0.84 S.F. 26,400 100 $22,287 30 2001 2031 $22,287
Site Electrical Utilities 0 0 0
Site Lighting $0.69 S.F. 0 110 30 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Tennis Courts (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $318,080
Special Construction $318,080
Special Construction $318,080
Special Facilities - Tennis Court
Hard Surface
$318,080
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Site Electrical Utilities
Site Lighting
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Tennis Courts (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\TrackAddress: 3991 Snapfinger Road, Lithonia, GA 30038
Attributes: ***None***
General Information: Function: High School Year Built: 2001Gross Area: 49,200 S.F. Last Renovation:
Facility Description:
The Track at Martin Luther King Jr. High School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $638,951.54 Replacement Cost: $724,686.48 FCI: 88.17%
25-Jan-2011Track at Martin Luther King Jr. High School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Track (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $14.73 S.F. 49,200 108 $782,773 27 2001 2011 2010 $638,952 $724,686 88
Special Construction $11.81 S.F. 49,200 110 $638,952 10 2001 2011 2010 $638,952 $580,865 110
Special Construction $11.81 S.F. 49,200 110 $638,952 10 2001 2011 2010 $638,952 $580,865 110
Special Facilities - Running
Track Surface & Curbing
$11.81 S.F. 49,200 110 $638,952 10 2001 2011 2010 $638,952 $580,865 110
Building Sitework $2.92 S.F. 49,200 100 $143,821 100 2001 $143,821
Site Preparation $2.92 S.F. 49,200 100 $143,821 100 2001 $143,821
Site Earthwork $2.92 S.F. 49,200 100 $143,821 100 2001 $143,821
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Track (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $638,952 $858,697
Special Construction $638,952 $858,697
Special Construction $638,952 $858,697
Special Facilities - Running Track
Surface & Curbing
$638,952 $858,697
Building Sitework
Site Preparation
Site Earthwork
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility ReportMartin Luther King Jr. High Facility Executive Summary ReportStone Mountain, GA 30083
Report Date: 24 Jun 2011
Facility: \High Schools\Martin Luther King Jr. High\Track (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Sat, 18-Jun-2011Priority: 5Quantity: 1
Assembly: F1040 System: Special Facilities - Running Track Surface &
Curbing Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The track's hard surface is damaged and cracked, and should be resurfaced and restriped.
Estimates:Raw Cost $507,104.40
Plus or (Minus) Additional Cost $131,847.14Total Estimated Amount $638,951.54
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
0103Site #:
Assessments 2010 M.L. King, Jr., HS
Project #:
4469
Site Type: Site Size:Grade Config:
9 - 12 0.00High
Suitability - High School
Site
1.00 1.00 100.00 TrafficGood
0.98 0.98 100.00 Pedestrian TrafficGood
2.11 2.11 100.00 ParkingGood
2.77 1.85 67.00 Play Courts & FieldsFair
Safety and Security
0.85 0.57 67.00 FencingFair
1.00 0.67 67.00 Signage & Way FindingFair
3.50 0.00 0.00 Ease of SupervisionP/U
0.50 0.50 100.00 Limited EntrancesG/F
0.50 0.50 100.00 Interior CirculationG/F
0.50 0.50 100.00 Sprinkler SystemGood
School Climate
5.00 5.00 100.00 Learning Style VarietyG/F
5.00 5.00 100.00 School EnvironmentG/F
1.00 1.00 100.00 LandscapingG/F
General Classrooms
13.65 9.15 67.00 SizeFair
2.93 2.93 100.00 AdjacenciesGood
2.93 1.96 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
2.91 2.91 100.00 SizeGood
0.62 0.62 100.00 AdjacenciesG/F
0.62 0.62 100.00 Storage\Fixed Equip.G/F
Library
2.95 0.00 0.00 SizeP/U
0.63 0.63 100.00 AdjacenciesG/F
0.63 0.63 100.00 Storage\Fixed Equip.G/F
P.E.
8.40 8.40 100.00 SizeGood
1.80 1.80 100.00 AdjacenciesG/F
1.80 1.80 100.00 Storage\Fixed Equip.G/F
Music
2.08 2.08 100.00 SizeGood
0.45 0.45 100.00 AdjacenciesG/F
0.45 0.45 100.00 Storage\Fixed Equip.G/F
Page 1 of 31/19/2011 3:13:33PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
0103Site #:
Assessments 2010 M.L. King, Jr., HS
Project #:
4469
Site Type: Site Size:Grade Config:
9 - 12 0.00High
Art
2.33 1.16 50.00 SizeFair
0.50 0.50 100.00 AdjacenciesG/F
0.50 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.12 1.12 100.00 SizeGood
0.24 0.24 100.00 AdjacenciesGood
0.24 0.24 100.00 Storage\Fixed Equip.Good
Vocational Technical
5.98 5.98 100.00 SizeGood
1.28 1.28 100.00 AdjacenciesGood
1.28 1.28 100.00 Storage\Fixed Equip.G/F
Science
2.90 1.45 50.00 SizeFair
0.62 0.62 100.00 AdjacenciesGood
0.62 0.62 100.00 Storage\Fixed Equip.G/F
Administration
1.83 1.83 100.00 SizeGood
0.39 0.39 100.00 AdjacenciesG/F
0.39 0.39 100.00 Storage\Fixed Equip.G/F
0.91 0.46 50.00Fair Restrooms (Student)
0.71 0.00 0.00P/U Teacher Lounge and Work Room(s)
4.00 2.68 67.00Fair Cafeteria
5.11 5.11 100.00Good Food Prep
0.76 0.76 100.00Good Counseling
0.24 0.00 0.00P/U Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
100.00 80.72 80.72Total For Site:
Comments
Suitability - High School
Martin Luther King Jr. High School was constructed in 2001 and serves students in grades 9-12. The building is a
two -story structure and offers traditional academic programs and a number of vocational technical programs. In
addition eight modulars containing 4 classrooms each, and 5 trailers are located on the site.
Suitability - High School->Site-->Play Courts & Fields
The play courts/fields are large enough to allow for organized and free play. However, they are not fully developed
and some of the track surface is rough. A section of the play field does not have grass, and therefore becomes
muddy during inclement weather.
Suitability - High School->Safety and Security-->Fencing
Some areas of the school site are not fenced.
Suitability - High School->Safety and Security-->Signage & Way Finding
An electronic sign identifying the school is located on the main thoroughfare, but the building is not visible.
Therefore, visitors new to the school have difficulty locating it. Some interior signage is missing.
Suitability - High School->Safety and Security-->Ease of Supervision
Some areas of the building are not easily supervised, particularly at the rear of the school.
Page 2 of 31/19/2011 3:13:33PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
0103Site #:
Assessments 2010 M.L. King, Jr., HS
Project #:
4469
Site Type: Site Size:Grade Config:
9 - 12 0.00High
Suitability - High School->General Classrooms-->Size
Some of the general classrooms do not meet the state or district size standards, and are too small.
Suitability - High School->General Classrooms-->Storage\Fixed Equip.
Most of the classrooms have adequate casework for storage. However, some are too small and have limited
storage.
Suitability - High School->Library-->Size
The library does not meet the district standard for size.
Suitability - High School->Art-->Size
Two art classrooms are located in portable classrooms, which are too small.
Suitability - High School->Art-->Storage\Fixed Equip.
None of the art rooms have adequate storage for supplies and student projects.
Suitability - High School->Science-->Size
Some of the science labs do not meet the state or district standards for size.
Suitability - High School->Restrooms (Student)
The boys' restrooms do not have urinal privacy partitions.
Suitability - High School->Teacher Lounge and Work Room(s)
The original teacher's lounge has been converted into an administrative office space.
Suitability - High School->Cafeteria
The cafeteria is too small for the number of students served. Five lunch periods are necessary to accommodate
everyone.
Suitability - High School->Clinic
The school does not have a health clinic.
Page 3 of 31/19/2011 3:13:33PM
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
DeKalbCounty:
1Region:
Rating
0103Site #:
Assessments 2010 M.L. King, Jr., HS
Project #:
4469
Technology Readiness
15.00 15.00 100.00 MDF\IT Equipment Environment Good
10.00 10.00 100.00 Electrical Power Good
10.00 10.00 100.00 Cooling Good
10.00 3.30 33.00 Drops Poor
5.00 0.00 0.00 Wireless Unsat
10.00 10.00 100.00 WAN Backbone Good
10.00 10.00 100.00 LAN-WAN Performance Good
5.00 2.50 50.00 Video Distribution Fair
5.00 5.00 100.00 Voice Distribution Good
10.00 0.00 0.00 Faculty & Staff Technology Unsat
5.00 5.00 100.00 Emergency Alert Good
5.00 0.00 0.00 Projectors Unsat
100.00 70.80 70.80Total For Site:
Comments
Technology Readiness->Drops
Approximately 30% of the classrooms have four computers.
Technology Readiness->Wireless
The school does not have wireless capability.
Technology Readiness->Video Distribution
The school has infrastructure for smartboards, but not all instructional spaces have them.
Technology Readiness->Faculty & Staff Technology
No faculty stations have wireless connections.
Technology Readiness->Projectors
No instructional spaces have ceiling-mounted projectors.
Page 1 of 11/19/2011 3:30:12PM