54
Facility Condition Assessment Report
Transcript
Page 1: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Facility Condition Assessment Report

Page 2: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey ElementaryAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: Facility Code 1061Super Cluster 2

General Information: Function: Elementary School Year Built:Gross Area: 40,414 S.F. Last Renovation:

Facility Description:

The Livsey Elementary School campus consists of two buildings located at 4137 Livsey Road in Tucker, Georgia. The original campus was constructed in 1971 and a gymnasium building was constructed in 2003. In addition to the buildings, the campus contains a storage building, covered walkways, playgrounds, and playfield. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building or other facility on the campus.

Current Repair Cost: $4,399,270.99 Replacement Cost: $8,756,400.10 FCI: 50.24%

08-Feb-2011Livsey Elementary School

Page 3: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 FCI Report

Livsey Elementary Weighted FCI ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility Name

Last

Renovation

Cost Per

Sq. Ft.

Gross Area

(Sq. Ft.) Repair Cost

Replacement

Cost

Weighted

FCI

Critical

wt 1.25

Potentially

Critical

wt 1.1

Necessary

wt 1

Recommended

wt 0.75

Discretionary

wt 0.5

Livsey Elementary\ 1971 Building $193.48 34,936 $3,923,812 $6,759,292 52.32% $0 $247,692 $2,205,106 $1,293,617 $177,397

Livsey Elementary\Site $22.81 40,414 $405,947 $921,682 33.55% $0 $0 $30,808 $363,377 $11,763

Livsey Elementary\1971 Storage $80.95 170 $3,213 $13,762 17.51% $0 $0 $0 $3,213 $0

Livsey Elementary\ 2003 Gym $153.15 5,478 $56,154 $838,971 6.69% $0 $0 $56,154 $0 $0

Livsey Elementary\Playfield $4.84 36,600 $10,146 $177,085 2.86% $0 $0 $0 $0 $10,146

Livsey Elementary\Covered Walkway 2 $27.64 630 $0 $17,414 0.00% $0 $0 $0 $0 $0

Livsey Elementary\Covered Walkway 1 $27.64 1,020 $0 $28,194 0.00% $0 $0 $0 $0 $0

Page 4: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Survey Report

Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

DeKalb County School System $3,216,593 $1,182,678 $4,399,271 Elementary Schools $3,216,593 $1,182,678 $4,399,271 Livsey Elementary $3,216,593 $1,182,678 $4,399,271 1971 Building $2,843,342 $1,080,470 $3,923,812 Building Systems $2,843,342 $1,080,470 $3,923,812

B2020 Exterior Windows

System Beyond Service Life

Renew System 1 Ea. $176,008 $66,883 $242,890 Recommended

Deferred Maintenance

The original metal frame, single pane, operable windows are aged, worn, and inefficient, and should be replaced.

B2030 Exterior Doors System Beyond Service Life

Renew System 1 Ea. $24,211 $9,200 $33,411 Recommended

Deferred Maintenance

The original metal exterior doors are aged and should be replaced with energy efficient doors.

B3010 Roof Coverings -BUR

System Beyond Service Life

Renew System 1 Ea. $154,487 $58,705 $213,192 Potentially Critical

Deferred Maintenance

The built-up roofing is aged, does not drain properly, and should be replaced.

B3020 Roof Openings System Beyond Service Life

Renew System 1 Ea. $15,756 $5,987 $21,743 Recommended

Deferred Maintenance

The roof openings are aged and worn and should be replaced.

C1020 Interior Doors System Beyond Service Life

Renew System 1 Ea. $42,203 $16,037 $58,240 Recommended

Deferred Maintenance

The original wood interior doors are aged and worn and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Service Life

Renew System 1 Ea. $25,171 $9,565 $34,737 Recommended

Deferred Maintenance

The wall paint is aged, scuffed, and stained, and should be repainted.

C3020 Floor Finishes - Carpet

System Beyond Service Life

Renew System 1 Ea. $10,954 $4,162 $15,116 Discretionary

Deferred Maintenance

The carpet is aged and worn and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Service Life

Renew System 1 Ea. $85,682 $32,559 $118,241 Recommended

Deferred Maintenance

The VCT flooring is aged and faded and should be replaced.

C3030 Ceiling Finishes System Beyond Service Life

Renew System 1 Ea. $250,177 $95,067 $345,244 Recommended

Deferred Maintenance

The acoustical ceiling tile and grid system is aged and damaged due to roof leaks and should be replaced.

D3020 Heat Generating Systems

System Beyond Service Life

Renew System 1 Ea. $115,673 $43,956 $159,629 Necessary

Deferred Maintenance

The boiler is functional, but aged and inefficient and should be replaced.

D3040 Distribution & Exhaust Systems

System Beyond Service Life

Renew System 1 Ea. $129,892 $49,359 $179,251 Necessary

Deferred Maintenance

Distribution and exhaust are distressed and should be replaced.

D3050 Terminal & Package Units

System Beyond Service Life

Renew System 1 Ea. $601,423 $228,541 $829,964 Necessary

Deferred Maintenance

RTUs are aged and worn and should be replaced with heat recovery units for improved indoor air quality.

D3060 Controls & Instrumentation

System Beyond Service Life

Renew System 1 Ea. $89,925 $34,172 $124,097 Necessary

Deferred Maintenance

Controls are aged and should be replaced.

D3090 Other HVAC Systems/Equip -Kitchen Hood

System Beyond Service Life

Renew System 1 Ea. $32,665 $12,413 $45,078 Necessary

Deferred Maintenance

The original kitchen hood is inefficient and should be replaced.

D5010 Electrical Service/Distribution

System Beyond Service Life

Renew System 1 Ea. $54,186 $20,591 $74,776 Necessary

Deferred Maintenance

Electrical service is aged, near capacity, and should be replaced.

D5020 Branch Wiring System Beyond Service Life

Renew System 1 Ea. $181,772 $69,073 $250,845 Necessary

Deferred Maintenance

Branch wiring is aged and inadequate and should be replaced.

Page 5: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Survey Report

Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

D5030 Communications and Security - Clock & PA Systems

System Beyond Service Life

Renew System 1 Ea. $153,334 $58,267 $211,601 Necessary

Deferred Maintenance

The PA system is aged and should be replaced.

E1090 Other Equipment

System Beyond Service Life

Renew System 1 Ea. $318,197 $120,915 $439,112 Recommended

Deferred Maintenance

Kitchen equipment is aged and should be replaced.

E2010 Fixed Furnishings

System Beyond Service Life

Renew System 1 Ea. $117,595 $44,686 $162,281 Discretionary

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn and damaged, and should be replaced.

A1010 Standard Foundations

Engineering Study for Foundations

Needs Remediation

Study analyze and develop solution

1 Ea. $25,000 $9,500 $34,500 Potentially Critical

Safety Differential settlement was observed throughout the building and an engineering study is recommended to determine the cause. Pricing does not include remediation measures.

D5020 Lighting System Beyond Service Life

Renew System 1 Ea. $239,032 $90,832 $329,864 Necessary

Deferred Maintenance

There was a minor lighting replacement in 2008, but the bulk of the fixtures in the classrooms and media center remain aged and inadequate.

2003 Gym $40,691 $15,463 $56,154 Building Systems $40,691 $15,463 $56,154

D3050 Terminal & Package Units

Packaged A/C, Elec. Ht., Const. Volume

Missing Install Package A/C - 20 ton

1 Ea. $40,691 $15,463 $56,154 Necessary

Capital Improvement

An air conditioning system is missing in the gymnasium and should be installed.

1971 Storage $2,328 $885 $3,213 Building Systems $2,328 $885 $3,213

B2030 Exterior Doors System Beyond Service Life

Renew System 1 Ea. $381 $145 $526 Recommended

Deferred Maintenance

The original metal exterior doors are aged and should be replaced.

B3010 Roof Coverings System Beyond Service Life

Renew System 1 Ea. $1,947 $740 $2,686 Recommended

Deferred Maintenance

The built-up roofing is aged and worn and should be replaced.

Playfield $8,052 $2,094 $10,146 Building Systems $8,052 $2,094 $10,146

F1040 Special Facilities - Sports Field - Natural Turf

System Beyond Service Life

Renew System 1 Ea. $8,052 $2,094 $10,146 Discretionary

Deferred Maintenance

The grass is damaged and should be reseeded.

Page 6: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Survey Report

Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Site $322,180 $83,767 $405,947 Building Systems $322,180 $83,767 $405,947

G2010 Roadways System Beyond Service Life

Renew System 1 Ea. $114,695 $29,821 $144,516 Recommended

Deferred Maintenance

The asphaltic roadways are aged and should be resurfaced.

G2020 Parking Lots System Beyond Service Life

Renew System 1 Ea. $52,013 $13,523 $65,536 Recommended

Deferred Maintenance

The asphaltic parking lots are aged, inadequate, and should be resurfaced and restriped.

G2030 Pedestrian Paving

System Beyond Service Life

Renew System 1 Ea. $58,237 $15,142 $73,378 Recommended

Deferred Maintenance

The sidewalks are aged, cracked, damaged, and inadequate for accessibility, and should be replaced.

G2040 Site Development

System Beyond Service Life

Renew System 1 Ea. $9,336 $2,427 $11,763 Discretionary

Deferred Maintenance

Site delevelopment features, such as flagpole, signage, and site furnishings are beyond thier service life and should be replaced.

G2040105 Fence & Guardrails

System Beyond Service Life

Renew System 1 Ea. $63,450 $16,497 $79,947 Recommended

Deferred Maintenance

The fencing is aged, rusted, and damaged, and should be replaced.

G4020 Site Lighting System Beyond Service Life

Renew System 1 Ea. $24,450 $6,357 $30,808 Necessary

Deferred Maintenance

Exterior lighting is inadequate in the parking areas, northeast corner, east side, between the gym and the building, and around the portables.

Page 7: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 BuildingAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: Building Codes 2010Fire Sprinkler System No

General Information: Function: Elementary School Year Built: 1971Gross Area: 34,936 S.F. Last Renovation:

Facility Description:

The Livsey Elementary School main building is a one-story building located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Replacing the exterior windows with energy efficient windows; 2) Replacing the exterior doors with energy efficient doors; 3) Replacing the roof covering and insulation; 4) Replacing inefficient interior electrical lamps and fixtures; and 5) Replacing the existing RTUs with high efficient units.

Current Repair Cost: $3,923,811.73 Replacement Cost: $6,759,292.50 FCI: 58.05%

08-Feb-2011North Elevation

08-Feb-2011East Elevation

08-Feb-2011South Elevation

08-Feb-2011West Elevation

Page 8: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $193.48 S.F. 34,936 108 $7,301,241 40 1977 1979 2010 $3,923,812 $6,759,291 58

Substructure $13.21 S.F. 34,936 100 $461,386 100 1971 $34,500 $461,386 7

Foundations $13.21 S.F. 34,936 100 $461,386 100 1971 $34,500 $461,386 7

Standard Foundations $6.49 S.F. 34,936 100 $226,595 100 1971 $34,500 $226,595 15

Special Foundations $4.14 S.F. 0 100 100 1971

Slab on Grade $6.72 S.F. 34,936 100 $234,791 100 1971 $234,791

Basement Construction 0 0 0

Basement Excavation $0.22 S.F. 0 100 100 1971

Basement Walls $5.93 S.F. 0 100 100 1971

Shell $32.20 S.F. 34,936 104 $1,171,253 69 1971 1981 $511,236 $1,124,777 45

Superstructure $4.43 S.F. 34,936 100 $154,759 100 1971 $154,759

Floor Construction $14.14 S.F. 0 100 100 1971

Roof Construction $4.43 S.F. 34,936 100 $154,759 100 1971 $154,759

Exterior Enclosure $21.65 S.F. 34,936 103 $781,559 75 1971 2001 $276,301 $756,440 37

Exterior Walls $14.46 S.F. 34,936 100 $505,258 100 1971 $505,258

Exterior Windows $6.32 S.F. 34,936 110 $242,890 30 1971 2001 $242,890 $220,809 110

Exterior Doors $0.87 S.F. 34,936 110 $33,411 30 1971 2001 $33,411 $30,373 110

Roofing $6.11 S.F. 34,936 110 $234,935 25 1971 1981 $234,935 $213,578 110

Roof Coverings - Asphalt

Shingles

$3.70 S.F. 0 110 10 1971 1981

Roof Coverings - BUR $5.55 S.F. 34,936 110 $213,192 25 1971 1996 $213,192 $193,811 110

Roof Coverings - EPDM $2.84 S.F. 0 110 15 1971 1986

Roof Coverings - Preformed

Metal

$4.28 S.F. 0 110 30 1971 2001

Roof Coverings - Standing

Seam Metal

$23.47 S.F. 0 110 75 1971 2046

Roof Openings $0.57 S.F. 34,936 110 $21,743 30 1971 2001 $21,743 $19,767 110

Interiors $50.12 S.F. 34,936 109 $1,904,331 44 1978 1979 $571,578 $1,751,064 33

Interior Construction $11.04 S.F. 34,936 104 $402,423 70 1984 2001 $58,240 $385,694 15

Partitions $6.40 S.F. 34,936 110 $246,072 100 1971 $223,702

Interior Doors $2.08 S.F. 34,936 80 $58,240 30 1971 2001 $58,240 $72,800 80

Fittings $2.55 S.F. 34,936 110 $98,111 20 2010 2030 $89,192

Interior Finishes $39.08 S.F. 34,936 110 $1,501,908 37 1971 1979 $513,338 $1,365,370 38

Wall Finishes - Ceramic &

Glazed

$9.58 S.F. 17,468 110 $184,024 30 1971 $167,295

Wall Finishes - Paint $1.81 S.F. 17,468 110 $34,737 10 1971 1981 $34,737 $31,579 110

Wall Finishes - Wall Coverings $1.99 S.F. 0 110 10 1971 1981

Floor Finishes - Carpet $7.87 S.F. 1,747 110 $15,116 8 1971 1979 $15,116 $13,742 110

Floor Finishes - Ceramic &

Quarry Tile

$13.40 S.F. 3,494 110 $51,501 50 1971 2021 $46,819

Floor Finishes - Terrazzo $48.99 S.F. 13,974 110 $753,045 50 1971 2021 $684,586

Floor Finishes - VCT $8.79 S.F. 12,228 110 $118,241 20 1971 1991 $118,241 $107,491 110

Floor Finishes - Wood $13.58 S.F. 0 110 20 1971 1991

Ceiling Finishes $8.98 S.F. 34,936 110 $345,244 20 1971 1991 $345,244 $313,858 110

Services $82.30 S.F. 34,936 110 $3,162,878 22 1981 1981 2010 $2,205,105 $2,875,343 77

Conveying 0 0 0

Elevators and Lifts $1.17 S.F. 0 110 30 1971

Plumbing $23.13 S.F. 34,936 110 $888,830 23 1990 2001 2019 $808,027

Plumbing Fixtures $16.10 S.F. 34,936 110 $618,893 20 2010 2030 $562,630

Domestic Water Distribution $3.59 S.F. 34,936 110 $137,885 30 2010 2040 $125,350

Sanitary Waste $3.05 S.F. 34,936 110 $117,203 30 1971 2001 2019 9 $106,548

Rain Water Drainage $0.88 S.F. 0 110 30 1971

Other Plumbing Systems -

Natural Gas

$0.39 S.F. 34,936 110 $14,849 30 1971 2001 2019 9 $13,499

HVAC $34.82 S.F. 34,936 110 $1,338,019 20 1971 1986 $1,338,019 $1,216,380 110

Heat Generating Systems $4.15 S.F. 34,936 110 $159,629 30 1971 2001 $159,629 $145,117 110

Cooling Generating Systems $4.22 S.F. 0 110 30 1971

Distribution & Exhaust Systems $4.66 S.F. 34,936 110 $179,251 30 1971 2001 $179,251 $162,955 110

Terminal & Package Units $21.60 S.F. 34,936 110 $829,964 15 1971 1986 $829,964 $754,513 110

Controls & Instrumentation $3.23 S.F. 34,936 110 $124,097 20 1971 1991 $124,097 $112,815 110

Other HVAC Systems/Equip -

Kitchen Hood

$1.17 S.F. 34,936 110 $45,078 30 1971 2001 $45,078 $40,980 110

Fire Protection 0 0 0 2010

Sprinklers $4.25 S.F. 0 110 30 0 2010

Standpipes $0.44 S.F. 0 110 30 0

Electrical $24.36 S.F. 34,936 110 $936,029 24 1983 1981 $867,086 $850,936 102

Electrical Service/Distribution $1.95 S.F. 34,936 110 $74,776 30 1971 2001 $74,776 $67,978 110

Branch Wiring $6.53 S.F. 34,936 110 $250,845 30 1971 2001 $250,845 $228,041 110

Page 9: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Lighting $8.58 S.F. 34,936 110 $329,864 30 1971 2001 $329,864 $299,877 110

Communications and Security -

Clock & PA Systems

$5.51 S.F. 34,936 110 $211,601 10 1971 1981 $211,601 $192,365 110

Communications and Security -

Fire Alarm

$1.20 S.F. 34,936 110 $46,139 10 2008 2018 $41,944

Communications and Security -

Security & CCTV

$0.59 S.F. 34,936 110 $22,804 10 2008 2018 $20,731

Other Electrical Systems -

Emergency Generator

$0.37 S.F. 0 110 15 1971

Equipment & Furnishings $15.65 S.F. 34,936 110 $601,393 20 1971 1991 $601,393 $546,721 110

Equipment $11.43 S.F. 34,936 110 $439,112 20 1971 1991 $439,112 $399,193 110

Commercial Equipment $7.53 S.F. 0 110 20 1971

Institutional Equipment $0.40 S.F. 0 110 20 1971

Other Equipment $11.43 S.F. 34,936 110 $439,112 20 1971 1991 $439,112 $399,193 110

Furnishings $4.22 S.F. 34,936 110 $162,281 20 1971 1991 $162,281 $147,528 110

Fixed Furnishings $4.22 S.F. 34,936 110 $162,281 20 1971 1991 $162,281 $147,528 110

Special Construction 0 0 0

Special Construction 0 0 0

Special Structures - Canopies $1.19 S.F. 0 100 25 1971 1996

Page 10: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total $3,923,812 $106,484 $172,298 $331,057 $1,113,679

Substructure $34,500

Foundations $34,500

Standard Foundations $34,500

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $511,236

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $276,301

Exterior Walls

Exterior Windows $242,890

Exterior Doors $33,411

Roofing $234,935

Roof Coverings - Asphalt Shingles

Roof Coverings - BUR $213,192

Roof Coverings - EPDM

Roof Coverings - Preformed Metal

Roof Coverings - Standing Seam

Metal

Roof Openings $21,743

Interiors $571,578 $19,149 $46,683 $1,113,679

Interior Construction $58,240

Partitions

Interior Doors $58,240

Fittings

Interior Finishes $513,338 $19,149 $46,683 $1,113,679

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $34,737 $46,683

Wall Finishes - Wall Coverings

Floor Finishes - Carpet $15,116 $19,149

Floor Finishes - Ceramic & Quarry

Tile

$71,289

Floor Finishes - Terrazzo $1,042,390

Floor Finishes - VCT $118,241

Floor Finishes - Wood

Ceiling Finishes $345,244

Services $2,205,105 $87,335 $172,298 $284,374

Conveying

Elevators and Lifts

Plumbing $172,298

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste $152,923

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

$19,375

HVAC $1,338,019

Heat Generating Systems $159,629

Cooling Generating Systems

Distribution & Exhaust Systems $179,251

Terminal & Package Units $829,964

Controls & Instrumentation $124,097

Other HVAC Systems/Equip -

Kitchen Hood

$45,078

Fire Protection

Sprinklers

Standpipes

Electrical $867,086 $87,335 $284,374

Electrical Service/Distribution $74,776

Branch Wiring $250,845

Page 11: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Lighting $329,864

Communications and Security -

Clock & PA Systems

$211,601 $284,374

Communications and Security - Fire

Alarm

$58,447

Communications and Security -

Security & CCTV

$28,888

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $601,393

Equipment $439,112

Commercial Equipment

Institutional Equipment

Other Equipment $439,112

Furnishings $162,281

Fixed Furnishings $162,281

Special Construction

Special Construction

Special Structures - Canopies

Page 12: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Somnath Das Fri, 01-Apr-2011Priority: 2Quantity: 1

Assembly: A1010 System: Standard Foundations Material: Engineering Study for Foundations Distress: Needs Remediation Category: Safety Correction: Study analyze and develop solution Note: Differential settlement was observed throughout the building and an engineering study is recommended to

determine the cause. Pricing does not include remediation measures.

Estimates:Raw Cost $25,000.00

Plus or (Minus) Additional Cost $9,500.00Total Estimated Amount $34,500.00

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal frame, single pane, operable windows are aged, worn, and inefficient, and should be replaced.

Estimates:Raw Cost $176,007.57

Plus or (Minus) Additional Cost $66,882.88Total Estimated Amount $242,890.45

Page 13: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Thu, 17-Feb-2011Priority: 4Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal exterior doors are aged and should be replaced with energy efficient doors.

Estimates:Raw Cost $24,210.65

Plus or (Minus) Additional Cost $9,200.05Total Estimated Amount $33,410.70

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 2Quantity: 1

Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The built-up roofing is aged, does not drain properly, and should be replaced.

Estimates:Raw Cost $154,486.99

Plus or (Minus) Additional Cost $58,705.06Total Estimated Amount $213,192.05

Page 14: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: B3020 System: Roof Openings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The roof openings are aged and worn and should be replaced.

Estimates:Raw Cost $15,756.14

Plus or (Minus) Additional Cost $5,987.33Total Estimated Amount $21,743.47

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original wood interior doors are aged and worn and should be replaced.

Estimates:Raw Cost $42,202.69

Plus or (Minus) Additional Cost $16,037.02Total Estimated Amount $58,239.71

Page 15: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Sun, 26-Jun-2011Priority: 4Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The wall paint is aged, scuffed, and stained, and should be repainted.

Estimates:Raw Cost $25,171.39

Plus or (Minus) Additional Cost $9,565.13Total Estimated Amount $34,736.52

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 5Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The carpet is aged and worn and should be replaced.

Estimates:Raw Cost $10,953.69

Plus or (Minus) Additional Cost $4,162.40Total Estimated Amount $15,116.09

Page 16: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The VCT flooring is aged and faded and should be replaced.

Estimates:Raw Cost $85,681.60

Plus or (Minus) Additional Cost $32,559.01Total Estimated Amount $118,240.61

Deficiency: Surveyor/Update: Paul Hufford Tue, 21-Jun-2011Priority: 4Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The acoustical ceiling tile and grid system is aged and damaged due to roof leaks and should be replaced.

Estimates:Raw Cost $250,176.70

Plus or (Minus) Additional Cost $95,067.14Total Estimated Amount $345,243.84

Page 17: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 3Quantity: 1

Assembly: D3020 System: Heat Generating Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The boiler is functional, but aged and inefficient and should be replaced.

Estimates:Raw Cost $115,673.10

Plus or (Minus) Additional Cost $43,955.78Total Estimated Amount $159,628.88

Deficiency: Surveyor/Update: Paul Hufford Fri, 18-Feb-2011Priority: 3Quantity: 1

Assembly: D3040 System: Distribution & Exhaust Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Distribution and exhaust are distressed and should be replaced.

Estimates:Raw Cost $129,892.05

Plus or (Minus) Additional Cost $49,358.98Total Estimated Amount $179,251.03

Page 18: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Thu, 31-Mar-2011Priority: 3Quantity: 1

Assembly: D3050 System: Terminal & Package Units Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: RTUs are aged and worn and should be replaced with heat recovery units for improved indoor air quality.

Estimates:Raw Cost $601,423.24

Plus or (Minus) Additional Cost $228,540.83Total Estimated Amount $829,964.07

Deficiency: Surveyor/Update: Paul Hufford Thu, 03-Mar-2011Priority: 3Quantity: 1

Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Controls are aged and should be replaced.

Estimates:Raw Cost $89,925.26

Plus or (Minus) Additional Cost $34,171.60Total Estimated Amount $124,096.86

Page 19: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Thu, 03-Mar-2011Priority: 3Quantity: 1

Assembly: D3090 System: Other HVAC Systems/Equip - Kitchen Hood Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original kitchen hood is inefficient and should be replaced.

Estimates:Raw Cost $32,665.16

Plus or (Minus) Additional Cost $12,412.76Total Estimated Amount $45,077.92

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1

Assembly: D5010 System: Electrical Service/Distribution Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Electrical service is aged, near capacity, and should be replaced.

Estimates:Raw Cost $54,185.74

Plus or (Minus) Additional Cost $20,590.58Total Estimated Amount $74,776.32

Page 20: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Tue, 21-Jun-2011Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is aged and inadequate and should be replaced.

Estimates:Raw Cost $181,772.01

Plus or (Minus) Additional Cost $69,073.36Total Estimated Amount $250,845.37

Deficiency: Surveyor/Update: Paul Hufford Mon, 14-Mar-2011Priority: 3Quantity: 1

Assembly: D5020 System: Lighting Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: There was a minor lighting replacement in 2008, but the bulk of the fixtures in the classrooms and media center

remain aged and inadequate.

Estimates:Raw Cost $239,032.11

Plus or (Minus) Additional Cost $90,832.20Total Estimated Amount $329,864.31

Page 21: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1

Assembly: D5030 System: Communications and Security - Clock & PA

Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The PA system is aged and should be replaced.

Estimates:Raw Cost $153,334.10

Plus or (Minus) Additional Cost $58,266.96Total Estimated Amount $211,601.06

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1

Assembly: E1090 System: Other Equipment Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Kitchen equipment is aged and should be replaced.

Estimates:Raw Cost $318,197.09

Plus or (Minus) Additional Cost $120,914.89Total Estimated Amount $439,111.98

Page 22: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 5Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn and

damaged, and should be replaced.

Estimates:Raw Cost $117,594.58

Plus or (Minus) Additional Cost $44,685.94Total Estimated Amount $162,280.52

Page 23: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 2003 GymAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: Building Codes 2020Fire Sprinkler System No

General Information: Function: Elementary School Year Built: 2003Gross Area: 5,478 S.F. Last Renovation:

Facility Description:

The 2003 Gymnasium Addition at Livsey Elementary School is a one-story building located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

An energy conservation opportunity for this building is to select and install an energy efficient cooling system.

Current Repair Cost: $56,153.58 Replacement Cost: $838,970.53 FCI: 6.69%

08-Feb-2011Northeast Elevation

08-Feb-2011Northwest Elevation

08-Feb-2011Southwest Elevation

08-Feb-2011Southeast Elevation

Page 24: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $153.15 S.F. 5,478 106 $889,609 61 2003 2011 2014 0 $838,974

Substructure $17.07 S.F. 5,478 100 $93,513 100 2003 $93,513

Foundations $17.07 S.F. 5,478 100 $93,513 100 2003 $93,513

Standard Foundations $10.57 S.F. 5,478 100 $57,907 100 2003 $57,907

Slab on Grade $6.50 S.F. 5,478 100 $35,606 100 2003 $35,606

Shell $45.06 S.F. 5,478 103 $254,585 89 2003 2033 $246,822

Superstructure $14.21 S.F. 5,478 100 $77,864 100 2003 $77,864

Roof Construction $14.21 S.F. 5,478 100 $77,864 100 2003 $77,864

Exterior Enclosure $18.96 S.F. 5,478 101 $105,124 91 2003 2033 $103,869

Exterior Walls $16.67 S.F. 5,478 100 $91,320 100 2003 $91,320

Exterior Doors $2.29 S.F. 5,478 110 $13,804 30 2003 2033 $12,549

Roofing $11.88 S.F. 5,478 110 $71,597 75 2003 2078 $65,089

Roof Coverings - Standing

Seam Metal

$11.88 S.F. 5,478 110 $71,597 75 2003 2078 $65,089

Interiors $45.91 S.F. 5,478 107 $269,677 57 2003 2011 2014 $251,512

Interior Construction $21.51 S.F. 5,478 104 $122,655 76 2003 2023 $117,855

Partitions $13.57 S.F. 5,478 110 $81,742 100 2003 $74,311

Interior Doors $4.25 S.F. 5,478 80 $18,627 40 2003 2043 $23,284

Fittings $3.70 S.F. 5,478 110 $22,286 20 2003 2023 $20,260

Interior Finishes $24.40 S.F. 5,478 110 $147,022 42 2003 2011 2014 $133,657

Wall Finishes - Ceramic $7.19 S.F. 0 110 30 2003 2033

Wall Finishes - Paint $1.52 S.F. 5,478 110 $9,147 10 2003 2013 $8,316

Floor Finishes - Ceramic Tile $7.16 S.F. 110 110 $867 8 2003 2011 2014 4 $788

Floor Finishes - Neoprene $19.06 S.F. 5,204 110 $109,094 50 2003 2053 $99,177

Floor Finishes - VCT $5.38 S.F. 164 110 $971 15 2003 2018 $883

Ceiling Finishes $4.47 S.F. 5,478 110 $26,943 20 2003 2023 $24,493

Services $45.11 S.F. 5,478 110 $271,834 26 2003 2013 $247,127

Plumbing $14.59 S.F. 5,478 110 $87,895 30 2003 2033 $79,906

Plumbing Fixtures $7.20 S.F. 5,478 110 $43,407 30 2003 2033 $39,461

Domestic Water Distribution $5.96 S.F. 5,478 110 $35,923 30 2003 2033 $32,658

Sanitary Waste $0.87 S.F. 5,478 110 $5,239 30 2003 2033 $4,763

Rain Water Drainage $0.22 S.F. 5,478 110 $1,330 30 2003 2033 $1,210

Other Plumbing Systems -

Natural Gas

$0.33 S.F. 5,478 110 $1,996 30 2003 2033 $1,814

HVAC $12.79 S.F. 5,478 110 $77,085 28 2003 2018 $70,078

Distribution Systems & Exhaust

Systems

$10.39 S.F. 5,478 110 $62,616 30 2003 2033 $56,924

Terminal & Package Units $0.81 S.F. 5,478 110 $4,906 15 2003 2018 $4,460

Controls & Instrumentation $1.59 S.F. 5,478 110 $9,563 20 2003 2023 $8,694

Electrical $17.73 S.F. 5,478 110 $106,854 22 2003 2013 $97,143

Electrical Service/Distribution $1.34 S.F. 5,478 110 $8,066 30 2003 2033 $7,333

Branch Wiring $5.96 S.F. 5,478 110 $35,923 30 2003 2033 $32,658

Lighting $5.96 S.F. 5,478 110 $35,923 20 2003 2023 $32,658

Communications and Security -

Fire Alarm

$2.46 S.F. 5,478 110 $14,802 10 2003 2013 $13,456

Communications and Security -

Public Address & Clock System

$1.01 S.F. 5,478 110 $6,070 20 2003 2023 $5,519

Communications and Security -

Security & CCTV

$1.01 S.F. 5,478 110 $6,070 10 2003 2013 $5,519

Page 25: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total $32,802 $975 $7,445 $1,236

Substructure

Foundations

Standard Foundations

Slab on Grade

Shell

Superstructure

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Doors

Roofing

Roof Coverings - Standing Seam

Metal

Interiors $9,995 $975 $1,230 $1,236

Interior Construction

Partitions

Interior Doors

Fittings

Interior Finishes $9,995 $975 $1,230 $1,236

Wall Finishes - Ceramic

Wall Finishes - Paint $9,995

Floor Finishes - Ceramic Tile $975 $1,236

Floor Finishes - Neoprene

Floor Finishes - VCT $1,230

Ceiling Finishes

Services $22,807 $6,215

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $6,215

Distribution Systems & Exhaust

Systems

Terminal & Package Units $6,215

Controls & Instrumentation

Electrical $22,807

Electrical Service/Distribution

Branch Wiring

Lighting

Communications and Security - Fire

Alarm

$16,174

Communications and Security -

Public Address & Clock System

Communications and Security -

Security & CCTV

$6,633

Page 26: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Chuck Gulley Thu, 26-May-2011Priority: 3Quantity: 1

Assembly: D3050 System: Terminal & Package Units Material: Packaged A/C, Elec. Ht., Const. Volume Distress: Missing Category: Capital Improvement Correction: Install Package A/C - 20 ton Note: An air conditioning system is missing in the gymnasium and should be installed.

Estimates:Raw Cost $40,691.00

Plus or (Minus) Additional Cost $15,462.58Total Estimated Amount $56,153.58

Page 27: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\1971 StorageAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: ***None***

General Information: Function: Storage Building Year Built: 1971Gross Area: 170 S.F. Last Renovation:

Facility Description:

The Storage Building at Pleasantdale Elementary School is located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $3,212.85 Replacement Cost: $13,761.64 FCI: 23.35%

08-Feb-2011North Elevation

08-Feb-2011West Elevation

08-Feb-2011South Elevation

08-Feb-2011East Elevation

Page 28: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $80.95 S.F. 170 104 $14,255 73 1971 1991 $3,212 $13,761 23

Substructure $3.41 S.F. 170 100 $579 100 1971 $579

Foundations $3.41 S.F. 170 100 $579 100 1971 $579

Standard Foundations $4.49 S.F. 0 100 100 1971

Slab on Grade $3.41 S.F. 170 100 $579 100 1971 $579

Basement Construction 0 0 0

Basement Excavation $0.21 S.F. 0 100 100 1971

Basement Walls $3.41 S.F. 0 100 100 1971

Shell $65.62 S.F. 170 103 $11,446 78 1971 1991 $3,212 $11,155 29

Superstructure $13.56 S.F. 170 100 $2,306 100 1971 $2,306

Roof Construction $13.57 S.F. 170 100 $2,306 100 1971 $2,306

Exterior Enclosure $37.69 S.F. 170 101 $6,454 94 1971 2001 $526 $6,407 8

Exterior Walls $34.87 S.F. 170 100 $5,928 100 1971 $5,928

Exterior Windows $4.54 S.F. 0 110 30 1971 2001

Exterior Doors $2.82 S.F. 170 110 $526 30 1971 2001 $526 $479 110

Roofing $14.36 S.F. 170 110 $2,686 20 1971 1991 $2,686 $2,442 110

Roof Coverings $14.37 S.F. 170 110 $2,686 20 1971 1991 $2,686 $2,442 110

Interiors $11.92 S.F. 170 110 $2,230 40 1971 1991 $2,027

Interior Construction $11.92 S.F. 170 110 $2,230 40 1971 1991 $2,027

Partitions $11.92 S.F. 170 110 $2,230 40 1971 $2,027

Interior Doors $2.26 S.F. 0 80 30 1971 2001

Fittings $2.79 S.F. 0 110 20 1971 1991

Interior Finishes 0 0 0

Wall Finishes $1.50 S.F. 0 110 20 1971 1991

Floor Finishes $6.07 S.F. 0 110 20 1971 1991

Ceiling Finishes $5.44 S.F. 0 110 20 1971 1991

Services 0 0 0

Plumbing 0 0 0

Rain Water Drainage $1.38 S.F. 0 110 30 1971 2001

Electrical 0 0 0

Electrical Service/Distribution $3.30 S.F. 0 110 30 1971 2001

Lighting and Branch Wiring $12.12 S.F. 0 110 30 1971 2001

Page 29: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total $3,212

Substructure

Foundations

Standard Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $3,212

Superstructure

Roof Construction

Exterior Enclosure $526

Exterior Walls

Exterior Windows

Exterior Doors $526

Roofing $2,686

Roof Coverings $2,686

Interiors

Interior Construction

Partitions

Interior Doors

Fittings

Interior Finishes

Wall Finishes

Floor Finishes

Ceiling Finishes

Services

Plumbing

Rain Water Drainage

Electrical

Electrical Service/Distribution

Lighting and Branch Wiring

Page 30: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Somnath Das Wed, 09-Mar-2011Priority: 4Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal exterior doors are aged and should be replaced.

Estimates:Raw Cost $381.48

Plus or (Minus) Additional Cost $144.96Total Estimated Amount $526.44

Deficiency: Surveyor/Update: Somnath Das Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: B3010 System: Roof Coverings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The built-up roofing is aged and worn and should be replaced.

Estimates:Raw Cost $1,946.67

Plus or (Minus) Additional Cost $739.73Total Estimated Amount $2,686.40

Page 31: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1Address: 4137 Livsey Road, Tucker, GA 30084

Attributes: ***None***

General Information: Function: Elementary School Year Built: 2003Gross Area: 1,020 S.F. Last Renovation:

Facility Description:

An engineered metal covered walkway connects the classrooms with the gymnasium and provides some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $28,194.23 FCI: 0.00%

08-Feb-2011Southeast Elevation

08-Feb-2011Northwest Elevation

08-Feb-2011West Elevation

08-Feb-2011North Elevation

Page 32: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $27.64 S.F. 1,020 100 $28,194 25 2003 2028 0 $28,194

Special Construction $27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194

Special Construction $27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194

Special Structures - Covered

Walkways Metal

$27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194

Page 33: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total

Special Construction

Special Construction

Special Structures - Covered

Walkways Metal

Page 34: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 35: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2Address: 4137 Livsey Road, Tucker, GA 30084

Attributes: ***None***

General Information: Function: Elementary School Year Built: 2003Gross Area: 630 S.F. Last Renovation:

Facility Description:

An engineered metal covered walkway connects the main school building with the student drop off and pick up area and provides some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $17,414.08 FCI: 0.00%

08-Feb-2011Northwest Elevation

08-Feb-2011Southwest Elevation

08-Feb-2011Northeast Elevation

08-Feb-2011Northwest Elevation

Page 36: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $27.64 S.F. 630 100 $17,414 25 2003 2028 0 $17,414

Special Construction $27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414

Special Construction $27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414

Special Structures - Covered

Walkways Metal

$27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414

Page 37: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total

Special Construction

Special Construction

Special Structures - Covered

Walkways Metal

Page 38: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 39: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\PlayfieldAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: ***None***

General Information: Function: Elementary School Year Built: 1971Gross Area: 36,600 S.F. Last Renovation:

Facility Description:

The Playfield at Livsey Elementary School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $10,145.52 Replacement Cost: $177,085.44 FCI: 5.73%

08-Feb-2011Playfield at Livsey Elementary School

Page 40: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $4.84 S.F. 36,600 101 $178,008 95 1971 1981 $10,146 $177,085 6

Special Construction $0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110

Special Construction $0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110

Special Facilities - Sports Field -

Natural Turf

$0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110

Building Sitework $4.59 S.F. 36,600 100 $167,862 100 1971 1991 $167,862

Site Preparation $4.59 S.F. 36,600 100 $167,862 100 1971 $167,862

Site Earthwork $4.59 S.F. 36,600 100 $167,862 100 1971 $167,862

Site Improvements 0 0 0

Site Development - Fencing $1.39 S.F. 0 110 20 1971 1991

Landscaping - Irrigation $0.09 S.F. 0 110 20 1971 1991

Site Mechanical Utilities 0 0 0

Water Supply - Water Service $0.34 S.F. 0 110 30 1971 2001

Site Electrical Utilities 0 0 0

Site Lighting $1.69 S.F. 0 110 30 1971 2001

Page 41: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total $10,146 $13,635

Special Construction $10,146 $13,635

Special Construction $10,146 $13,635

Special Facilities - Sports Field -

Natural Turf

$10,146 $13,635

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing

Landscaping - Irrigation

Site Mechanical Utilities

Water Supply - Water Service

Site Electrical Utilities

Site Lighting

Page 42: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Thu, 17-Feb-2011Priority: 5Quantity: 1

Assembly: F1040 System: Special Facilities - Sports Field - Natural Turf Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The grass is damaged and should be reseeded.

Estimates:Raw Cost $8,052.00

Plus or (Minus) Additional Cost $2,093.52Total Estimated Amount $10,145.52

Page 43: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\SiteAddress: 4137 Livsey Road, Tucker, GA 30084

Attributes: Site Code 1395

General Information: Function: Elementary School Year Built: 1971Gross Area: 40,414 S.F. Last Renovation:

Facility Description:

The Livsey Elementary School site was originally constructed in 1971, has a total area of 9.8 acres, and is occupied by approximately 40,414 square feet of permanent building space. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for the site features.

Current Repair Cost: $405,947.31 Replacement Cost: $921,681.68 FCI: 44.04%

04-Feb-2011Aerial Image of Livsey Elementary School

Page 44: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal RSL Deficiency$ Replacement Value FCI%

Total $22.81 S.F. 40,414 109 $1,005,856 35 1971 1981 $405,948 $921,682 44

Building Sitework $22.81 S.F. 40,414 109 $1,005,856 35 1971 1981 $405,948 $921,682 44

Site Improvements $11.87 S.F. 40,414 108 $519,656 22 1971 1981 $375,140 $479,682 78

Roadways $3.25 S.F. 40,414 110 $144,516 25 1971 1996 $144,516 $131,378 110

Parking Lots $1.47 S.F. 40,414 110 $65,536 25 1971 1996 $65,536 $59,578 110

Pedestrian Paving $1.65 S.F. 40,414 110 $73,378 30 1971 2001 $73,378 $66,707 110

Site Development $0.26 S.F. 40,414 110 $11,763 10 1971 1981 $11,763 $10,694 110

Site Development 2 $1.98 S.F. 40,414 100 $79,947 30 1971 2001 $79,947 $79,947 100

Fence & Guardrails $1.98 S.F. 40,414 100 $79,947 30 1971 2001 $79,947 $79,947 100

Landscaping $3.25 S.F. 40,414 110 $144,516 10 1971 $131,378

Site Mechanical Utilities $10.24 S.F. 40,414 110 $455,392 50 1971 2021 $413,993

Water Supply $2.38 S.F. 40,414 110 $105,866 50 1971 2021 $96,242

Sanitary Sewer $2.36 S.F. 40,414 110 $104,746 50 1971 2021 $95,223

Storm Sewer $5.51 S.F. 40,414 110 $244,780 50 1971 2021 $222,528

Fuel Distribution - Gas $0.21 S.F. 0 110 30 1971

Site Electrical Utilities $0.69 S.F. 40,414 110 $30,808 30 1971 2001 $30,808 $28,007 110

Electrical Distribution $0.52 S.F. 0 110 30 1971

Site Lighting $0.69 S.F. 40,414 110 $30,808 30 1971 2001 $30,808 $28,007 110

Page 45: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Site (continued)

Renewal Schedule:

Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Total $405,948 $15,808 $630,369

Building Sitework $405,948 $15,808 $630,369

Site Improvements $375,140 $15,808

Roadways $144,516

Parking Lots $65,536

Pedestrian Paving $73,378

Site Development $11,763 $15,808

Site Development 2 $79,947

Fence & Guardrails $79,947

Landscaping

Site Mechanical Utilities $630,369

Water Supply $146,543

Sanitary Sewer $144,993

Storm Sewer $338,833

Fuel Distribution - Gas

Site Electrical Utilities $30,808

Electrical Distribution

Site Lighting $30,808

Page 46: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The asphaltic roadways are aged and should be resurfaced.

Estimates:Raw Cost $114,694.93

Plus or (Minus) Additional Cost $29,820.68Total Estimated Amount $144,515.61

Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1

Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The asphaltic parking lots are aged, inadequate, and should be resurfaced and restriped.

Estimates:Raw Cost $52,012.82

Plus or (Minus) Additional Cost $13,523.33Total Estimated Amount $65,536.15

Page 47: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ Site (continued)

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1

Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The sidewalks are aged, cracked, damaged, and inadequate for accessibility, and should be replaced.

Estimates:Raw Cost $58,236.57

Plus or (Minus) Additional Cost $15,141.51Total Estimated Amount $73,378.08

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 5Quantity: 1

Assembly: G2040 System: Site Development Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Site delevelopment features, such as flagpole, signage, and site furnishings are beyond thier service life and

should be replaced.

Estimates:Raw Cost $9,335.63

Plus or (Minus) Additional Cost $2,427.26Total Estimated Amount $11,762.89

Page 48: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

DeKalb County School System

1701 Mountain Industrial Blvd COMET4 Facility Report

Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011

Facility: \Elementary Schools\Livsey Elementary\ Site (continued)

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1

Assembly: G2040105 System: Fence & Guardrails Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The fencing is aged, rusted, and damaged, and should be replaced.

Estimates:Raw Cost $63,449.98

Plus or (Minus) Additional Cost $16,496.99Total Estimated Amount $79,946.97

Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1

Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Exterior lighting is inadequate in the parking areas, northeast corner, east side, between the gym and the building,

and around the portables.

Estimates:Raw Cost $24,450.47

Plus or (Minus) Additional Cost $6,357.12Total Estimated Amount $30,807.59

Page 49: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Educational Adequacy Report

Page 50: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

DeKalbCounty:

1Region:

Rating

1061Site #:

Assessments 2010 Livsey ES

Project #:

4469

Site Type: Site Size:Grade Config:

PK-5 0.00Elementary

Suitability - Elementary

Site

2.00 1.34 67.00 TrafficFair

0.97 0.97 100.00 Pedestrian TrafficGood

0.81 0.54 67.00 ParkingFair

2.34 2.34 100.00 PlaygroundGood

Safety and Security

0.75 0.75 100.00 FencingGood

1.00 1.00 100.00 Signage & Way FindingGood

3.50 3.50 100.00 Ease of SupervisionG/F

0.50 0.50 100.00 Limited EntrancesG/F

0.50 0.50 100.00 Interior CirculationG/F

0.50 0.00 0.00 Sprinkler SystemUnsat

School Climate

5.00 0.00 0.00 Learning Style VarietyP/U

5.00 5.00 100.00 School EnvironmentG/F

1.00 1.00 100.00 LandscapingG/F

General Classrooms

16.45 11.02 67.00 SizeFair

3.53 2.36 67.00 AdjacenciesFair

3.53 2.36 67.00 Storage\Fixed Equip.Fair

Remedial - Special Needs

3.50 3.50 100.00 SizeGood

0.75 0.75 100.00 AdjacenciesG/F

0.75 0.75 100.00 Storage\Fixed Equip.G/F

Library

3.41 1.71 50.00 SizeFair

0.73 0.73 100.00 AdjacenciesG/F

0.73 0.73 100.00 Storage\Fixed Equip.G/F

P.E.

6.72 6.72 100.00 SizeGood

1.44 1.44 100.00 AdjacenciesG/F

1.44 1.44 100.00 Storage\Fixed Equip.G/F

Music

2.59 0.00 0.00 SizeP/U

0.56 0.00 0.00 AdjacenciesP/U

0.56 0.00 0.00 Storage\Fixed Equip.P/U

Page 1 of 31/19/2011 3:13:26PM

Page 51: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

DeKalbCounty:

1Region:

Rating

1061Site #:

Assessments 2010 Livsey ES

Project #:

4469

Site Type: Site Size:Grade Config:

PK-5 0.00Elementary

Art

1.64 0.00 0.00 SizeP/U

0.35 0.00 0.00 AdjacenciesP/U

0.35 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

2.12 2.12 100.00 SizeGood

0.45 0.45 100.00 AdjacenciesGood

0.45 0.23 50.00 Storage\Fixed Equip.Fair

Computer Labs

1.19 0.60 50.00 SizeFair

0.26 0.26 100.00 AdjacenciesG/F

0.26 0.26 100.00 Storage\Fixed Equip.G/F

Kindergarten

2.86 1.43 50.00 SizeFair

0.61 0.61 100.00 AdjacenciesG/F

0.61 0.61 100.00 Storage\Fixed Equip.G/F

Administration

2.49 1.25 50.00 SizeFair

0.53 0.53 100.00 AdjacenciesG/F

0.53 0.00 0.00 Storage\Fixed Equip.P/U

0.89 0.89 100.00Good Restrooms (Student)

1.27 0.63 50.00Fair Teacher Lounge and Work Room(s)

5.00 3.35 67.00Fair Cafeteria

6.20 2.05 33.00Poor Food Prep

0.29 0.29 100.00Good Counseling

0.58 0.00 0.00P/U Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

100.00 67.01 67.01Total For Site:

Comments

Suitability - Elementary

Livsey Elementary School opened in 1971 as a neighborhood school for students in grades PK through 5th. The

school has Discovery and special education programs as well as the standard elementary curriculum. The county

built the school on land deeded by James McEvaney Livsey around the turn of the century, and includes a large

common-use sporting field. The school has not been significantly renovated since 1971.

Suitability - Elementary->Site-->Traffic

The staff parking area doubles as the bus pickup and drop-off area.

Suitability - Elementary->Site-->Parking

The school lacks sufficient car parking spaces.

Suitability - Elementary->Safety and Security-->Sprinkler System

The school does not have a sprinkler system.

Suitability - Elementary->School Climate-->Learning Style Variety

The school lacks sufficient smaller rooms for specialized and remedial programs.

Page 2 of 31/19/2011 3:13:26PM

Page 52: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

DeKalbCounty:

1Region:

Rating

1061Site #:

Assessments 2010 Livsey ES

Project #:

4469

Site Type: Site Size:Grade Config:

PK-5 0.00Elementary

Suitability - Elementary->General Classrooms-->Size

Most classrooms are well-sized, but the school has some small general classrooms and uses trailers for some

classrooms.

Suitability - Elementary->General Classrooms-->Adjacencies

The school uses some trailers for classrooms that are outside of the main school building and some distance from

school amenities.

Suitability - Elementary->General Classrooms-->Storage\Fixed Equip.

Some school classrooms lack sufficient storage space.

Suitability - Elementary->Library-->Size

The school library is smaller than it should be for the current school enrollment.

Suitability - Elementary->Library-->Storage\Fixed Equip.

The school library lacks sufficient storage space for all its materials.

Suitability - Elementary->Music-->Size

The school music room is currently in a trailer.

Suitability - Elementary->Music-->Adjacencies

The school music room is currently in a trailer.

Suitability - Elementary->Music-->Storage\Fixed Equip.

The school music room is currently in a trailer.

Suitability - Elementary->Art-->Size

The school art room is currently in a trailer.

Suitability - Elementary->Art-->Adjacencies

The school art room is currently in a trailer.

Suitability - Elementary->Art-->Storage\Fixed Equip.

The school art room is currently in a trailer.

Suitability - Elementary->Performing Arts\Auditorium-->Storage\Fixed Equip.

The school auditorium space lacks sufficient storage space.

Suitability - Elementary->Computer Labs-->Size

The school computer lab is smaller than the standard and for the current student enrollment.

Suitability - Elementary->Kindergarten-->Size

Some rooms are smaller than they should be.

Suitability - Elementary->Administration-->Size

School administrative areas are too small, and would benefit from additional offices.

Suitability - Elementary->Administration-->Storage\Fixed Equip.

The school lacks sufficient administrative storage space in the main office.

Suitability - Elementary->Teacher Lounge and Work Room(s)

The teachers' lounge is too small for the number of teachers in the school.

Suitability - Elementary->Cafeteria

The school cafeteria is smaller than it should be, but is well laid out and has access to an outside courtyard.

Suitability - Elementary->Food Prep

The school kitchen is significantly smaller than it should be, and lacks good flow in serving areas.

Suitability - Elementary->Clinic

The clinic is small, lacks a waiting area and a separate bathroom space.

Page 3 of 31/19/2011 3:13:26PM

Page 53: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Technology Readiness Report

Page 54: Facility Condition Assessment Report...Instrumentation System Beyond Service Life Renew System 1 Ea. $89,925 $34,172 $124,097 Necess ary Deferred Maintena nce Controls are aged and

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

DeKalbCounty:

1Region:

Rating

1061Site #:

Assessments 2010 Livsey ES

Project #:

4469

Technology Readiness

15.00 7.50 50.00 MDF\IT Equipment Environment Fair

10.00 5.00 50.00 Electrical Power Fair

10.00 10.00 100.00 Cooling Good

10.00 6.70 67.00 Drops Fair

5.00 2.50 50.00 Wireless Fair

10.00 10.00 100.00 WAN Backbone Good

10.00 10.00 100.00 LAN-WAN Performance Good

5.00 2.50 50.00 Video Distribution Fair

5.00 5.00 100.00 Voice Distribution Good

10.00 10.00 100.00 Faculty & Staff Technology Good

5.00 5.00 100.00 Emergency Alert Good

5.00 0.00 0.00 Projectors Unsat

100.00 74.20 74.20Total For Site:

Comments

Technology Readiness->MDF\IT Equipment Environment

School IT equipment is mostly housed in janitorial spaces or other storage closets.

Technology Readiness->Electrical Power

The school has sufficient power outlets, but they are not well-positioned in classrooms.

Technology Readiness->Drops

Most rooms have two computer drops and sufficient computers. Approximately 20% of classrooms do not have

computers.

Technology Readiness->Wireless

The school wireless network is patchy and does not cover all of the school buildings.

Technology Readiness->Video Distribution

The school uses a combination of smartboards and analog video to distribute video signals.

Technology Readiness->Projectors

Around 50% of school general classrooms lack video projectors.

Page 1 of 11/19/2011 3:30:07PM


Recommended