Factories of the Future PPP: From FP-7 to Horizon 2020 Progress Through Partnership Željko Pazin Executive Director, EFFRA
Transcript
Page 1: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Factories of the Future PPP: From FP-7 to Horizon 2020

Progress Through Partnership

Željko Pazin Executive Director, EFFRA

Page 2: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Origins of PPPs in R&D&I

European Technology Platforms (ETPs)

There are currently 36 European Technology Platforms (ETPs)

Their strategic research agendas are one source of ideas for FP7 research topics

Both PPPs and JTIs have arisen primarily at the initiative of ETPs

IMPORTANT: one needs to distinguish between:

- PPPs for e.g. building bridges, big infrastructure projects in MS

and

- PPPs in the area of European Research Policy; one of these PPPs in the Factories of the Future PPP

Page 3: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

What is a PPP? Public Private Partnerships Background

European level PPPs in the area of R&D&I are a

cooperation by the EU and private partners

PPPs are created to drive research, development

& innovation

Aim to strengthen European industrial base,

create sustainable industry in Europe & secure jobs

in Europe

PPPs represent a pragmatic shift from previous

programmes: focus on industry relevant research

roadmaps and pre-competitive co-operation

Page 4: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Why a PPP on R&D and Innovation?

Public Private Partnerships Background

EU – wide consensus on challenges that needed to be resolved:

Previous framework programme focus became too academic

Decline in industry participation in last decades: downward trend

from FP to FP, slipping from 39% in FP4 to 31% in FP6 and now

approx. 25% in FP7

Strong desire for more effectively targeted R,D&I funding

Strong desire for funding to be spent on projects, not consultants

(cut out the ‘middle man’)

Relevant projects: Practically applicable to the “real world”, to

factory floor & elsewhere

Desire to speed up the process: reduction in time to grant

Page 6: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

The “PPP Landscape”: difference between JTIs and PPPs

of the European Economic Recovery Plan

PPP & JTIs

JTIs

- JTIs have the freedom to develop special rules

- for each JTI a new „body“ was created

- setting up a JTI needs time and is relativley complicated (Article 187 TFEU)

Recovery Plan

PPPs

- General FP7 rules apply

- no new body

- relatively easy to set up; no new regulation required

Page 7: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Why does the FoF PPP stand out?

Joint vision development & strategic agenda setting

Industry-relevant roadmaps: Co-operation of experts

Strong ETP ManuFuture with strong national link

Interaction between industry, SMEs, research

organisations and public entities

Network that actively encourages new involvement

Transparent & accessible:

Clear funding rules: Open to all

Easier for SMEs to get involved

Strategic funding: Calls relevant to industry

Subject to usual FP framework regulations &

mechanisms

Public Private Partnerships Background

Page 8: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Engaging into a PPP

Private sector partners

needs to commit to support the development and

implementation of research and innovation agendas

must show strategic importance to the Union's

competitiveness and/or address specific societal challenges

must show the added value of action at Union level

must show that it is able to leverage additional investments

in research and innovation

The creation of a non-profit association is necessary:

companies and research organisations within a sector are

obliged to cooperate with each other

Public Private Partnerships Background

Page 9: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Developing a Research Roadmap

A central & key activity undertaken by a PPP

Building on a broad & open consulation process

2 years in development

Involvement of industry, research & related stakeholders across

Europe – from inside & outside of the partnerships

Challenges identified through consulation process

Creation of roadmap chapters from challenges

Roadmap chapters are reflected in research call topics

Public Private Partnerships Background

Page 10: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

PPP Projects

From the Roadmap to individual calls

The procedure for the calls is exactly the same as for any other

FP project

Only difference: one-stage instead of two-stage procedure

Issue of calls

Networking & consortia building

Project proposal application

Evaluation by experts

Funding approval

Public Private Partnerships Background

Page 11: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Recap on developments Industry re-engaged in projects:

• statistics show industrial participation

of more than 50% in FoF PPP

projects (compared to some 20-30%

for total FP7)

• time-to-contract in first call was 8.5

months

• Ad-hoc Industry Advisory Group

AIAG works well, ensures that

roadmap reflects industrial needs

‘Factories of the Future’ PPP

Page 12: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Overview of the FoF PPP ‘Factories of the Future’ PPP

• Funded under FP-7

• 59 projects up and running

• € 250M of EU in 2010/11

• Success rate of up to 20%

• Time-to-contract 1st call: 8.5 months

• Industry participation: 50-60%

• Additional € 400M in 2012/13

After 2013?

• FP-7 will be replaced by

Horizon 2020

• PPP will continue under

Horizon 2020

Page 13: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

EFFRA: Who we are and what we do

About EFFRA

• industry-driven European

association

• created by MANUFUTURE

ETP and by industrial

associations

• partner of the European

Commission

• creates consensus on

common R&D priorities

Page 14: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

• report with 50 priority

actions grouped in four

areas

• finalised February 2010

• submitted to European

Commission within an

advisory group

• download at:

www.effra.eu

EFFRA: Who we are and what we do

Advising the EU on top research priorities

Page 15: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

EFFRA Roadmap: ‘Factories of the Future in Horizon 2020’

RD&I roadmap 2014-2020 • roadmap will cover R&D and

innovation activities

• guiding principles:

industry competitiveness,

from research to industrial

application and market uptake

• ongoing comprehensive multi-

sector consultation process:

across Manufuture ETP, related

ETPs and broad network of

interested parties across the

industrial and research

communities

Page 16: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

EFFRA Roadmap: ‘Factories of the Future in Horizon 2020’

Baselines

Challenges &

opportunities Technologies & enablers

• Economical

• Social sustainability

• Environmental

• Future products and markets

• Advanced manufacturing processes

• Mechatronics for advanced

manufacturing systems

• ICT for manufacturing enterprises

• Modeling, simulation and

forecasting

• Manufacturing strategies

Page 17: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

EFFRA Roadmap: ‘Factories of the Future in Horizon 2020’ Impact through focus:

The right technologies for the right challenges or opportunities = the

right research priorities

+ Measuring the (potential) impact of technologies

Research

&

innovation

priorities

Page 18: Factories of the Future PPP: From FP-7 to Horizon …Recap on developments Industry re-engaged in projects: • statistics show industrial participation of more than 50% in FoF PPP

Thank you

Contact

Željko Pazin

Executive Director

[email protected]

www.effra.eu