7/26/2019 Failures in pavements.ppt
1/60
Failures in pavementsFailures in pavements
7/26/2019 Failures in pavements.ppt
2/60
Need for highway maitenanceNeed for highway maitenance
Maintenance InvolvesMaintenance Involves
Assessment of road conditionAssessment of road condition
Diagnosis of problemDiagnosis of problem
7/26/2019 Failures in pavements.ppt
3/60
General causes of pavement failuresGeneral causes of pavement failures
Defects in quality of materialsDefects in quality of materials
Defects in construction methodDefects in construction method
Inadequate surface or subsurface drainageInadequate surface or subsurface drainage Increase in wheel loads and repetition of loadsIncrease in wheel loads and repetition of loads
due to increase in trafficdue to increase in traffic
Settlement of foundation of embankmentSettlement of foundation of embankment Environmental factors like heavy rain, waterEnvironmental factors like heavy rain, water
table frost, snowtable frost, snow
7/26/2019 Failures in pavements.ppt
4/60
TYPES OF M!NTENN"ETYPES OF M!NTENN"E
he maintenance activities are divided intohe maintenance activities are divided into
two categories!two categories!
"reventive maintenance"reventive maintenance
#orrective maintenance#orrective maintenance
7/26/2019 Failures in pavements.ppt
5/60
"reventive maintenance activities includes"reventive maintenance activities includes
repairs to small si$ed potholes, crack sealing,repairs to small si$ed potholes, crack sealing,
maintenance of shoulders, drainage systems,maintenance of shoulders, drainage systems,
etc%etc%
#orrective maintenance includes patch#orrective maintenance includes patch
repairs, surface treatments, renewal andrepairs, surface treatments, renewal and
overlaysoverlays
7/26/2019 Failures in pavements.ppt
6/60
#lassification of Maintenance#lassification of Maintenance
ActivitiesActivities
As per I ! '(, maintance operations can be classifiedAs per I ! '(, maintance operations can be classifiedasas
#outine maintenance#outine maintenance) *rdinary &epairs) *rdinary &epairs&outine maintenance, such as , pothole filling, filling&outine maintenance, such as , pothole filling, fillingthe cracks, etc% round the year%the cracks, etc% round the year%
Periodic maintenancePeriodic maintenance
"eriodic maintenance covering renewals, which are"eriodic maintenance covering renewals, which arerequired to be done at periodic interval every fewrequired to be done at periodic interval every fewyears%years%
7/26/2019 Failures in pavements.ppt
7/60
7/26/2019 Failures in pavements.ppt
8/60
Maintenance management systemMaintenance management system
Minimum standards for maintenance ofMinimum standards for maintenance of
different categories of roadsdifferent categories of roads
+ield survey for evaluation of maintenance+ield survey for evaluation of maintenancerequirementsrequirements
Sub grade soil, drainage, climaye, traffic,Sub grade soil, drainage, climaye, traffic,
environmental conditionenvironmental condition
7/26/2019 Failures in pavements.ppt
9/60
7/26/2019 Failures in pavements.ppt
10/60
7/26/2019 Failures in pavements.ppt
11/60
#lay soil- plastic deformation#lay soil- plastic deformation
Improper compaction . consolidationImproper compaction . consolidation
deformationdeformation
7/26/2019 Failures in pavements.ppt
12/60
Failures in su%%ase or %ase courseFailures in su%%ase or %ase course
Inadequate stability or strengthInadequate stability or strength
/oss of binding action/oss of binding action
/oss of base course materials/oss of base course materials Inadequate wearing courseInadequate wearing course
0se of inferior materials0se of inferior materials
/ack of lateral confinement/ack of lateral confinement
7/26/2019 Failures in pavements.ppt
13/60
!nade&uate Sta%ility or Strength'!nade&uate Sta%ility or Strength'
((
"oor Mi proportioning or inadequate"oor Mi proportioning or inadequate
thickness are main reasons for the lack ofthickness are main reasons for the lack of
stability or strength of sub-base or base course%stability or strength of sub-base or base course%
7/26/2019 Failures in pavements.ppt
14/60
7/26/2019 Failures in pavements.ppt
15/60
7/26/2019 Failures in pavements.ppt
16/60
7/26/2019 Failures in pavements.ppt
17/60
)se of inferior materials)se of inferior materials
Many failures, mainly structural failure areMany failures, mainly structural failure are
attributed due to use of inferior materials in theattributed due to use of inferior materials in the
passing 3obs%passing 3obs%
*ac+ of lateral confinement for the granular*ac+ of lateral confinement for the granular
%ase course'%ase course'
Due to lack of lateral confinement of granularDue to lack of lateral confinement of granular
base course, deterioration occurs%base course, deterioration occurs%
7/26/2019 Failures in pavements.ppt
18/60
7/26/2019 Failures in pavements.ppt
19/60
7/26/2019 Failures in pavements.ppt
20/60
5ormally, the affected area is not large%5ormally, the affected area is not large%
2hen it does occur on a large scale, the2hen it does occur on a large scale, the
cracking is most likely due to repeated loadscracking is most likely due to repeated loads
above the designed strength of the pavementabove the designed strength of the pavement
7/26/2019 Failures in pavements.ppt
21/60
7/26/2019 Failures in pavements.ppt
22/60
7/26/2019 Failures in pavements.ppt
23/60
7/26/2019 Failures in pavements.ppt
24/60
7/26/2019 Failures in pavements.ppt
25/60
reatmentreatment
1ecause a structural failure is taking place the1ecause a structural failure is taking place the
only possible solution to alligatoring is toonly possible solution to alligatoring is to
perform a full-depth patch%perform a full-depth patch%
7/26/2019 Failures in pavements.ppt
26/60
7/26/2019 Failures in pavements.ppt
27/60
7/26/2019 Failures in pavements.ppt
28/60
reatmentreatment
/ess severe cracks measuring 8)( inch or less/ess severe cracks measuring 8)( inch or less
can be sealed to prevent moisture fromcan be sealed to prevent moisture from
entering into the sub grade%entering into the sub grade%
More severe cracks should be fied byMore severe cracks should be fied by
removing the cracked pavement layer andremoving the cracked pavement layer and
replacing it with an overlay%replacing it with an overlay%
7/26/2019 Failures in pavements.ppt
29/60
ransverse #rackingransverse #racking
ransverse cracks are single cracksransverse cracks are single cracks
perpendicular to the pavement9s centerline orperpendicular to the pavement9s centerline or
laydown direction%laydown direction%
ransverse cracks can be caused by reflectiveransverse cracks can be caused by reflective
cracks from an underlying layer, dailycracks from an underlying layer, daily
temperature cycles, and poor construction duetemperature cycles, and poor construction due
to improper operation of the paver%to improper operation of the paver%
7/26/2019 Failures in pavements.ppt
30/60
7/26/2019 Failures in pavements.ppt
31/60
reatmentreatment
/ess severe cracks measuring 8)( inch or less/ess severe cracks measuring 8)( inch or less
can be sealed to prevent moisture fromcan be sealed to prevent moisture from
entering into the sub grade%entering into the sub grade%
More severe cracks should be fied byMore severe cracks should be fied by
removing the cracked pavement layer andremoving the cracked pavement layer and
replacing it with an overlay%replacing it with an overlay%
7/26/2019 Failures in pavements.ppt
32/60
Edge #racksEdge #racks
Edge #racks travel along the inside edge of aEdge #racks travel along the inside edge of apavement surface within one or two feet%pavement surface within one or two feet%
he most common cause for this type of crack ishe most common cause for this type of crack is
poor drainage conditions and lack of support at thepoor drainage conditions and lack of support at thepavement edge%pavement edge% As a result underlying base materials settle andAs a result underlying base materials settle and
become weakened%become weakened%
4eavy vegetation along the pavement edge and4eavy vegetation along the pavement edge andheavy traffic can also be the instigator of edgeheavy traffic can also be the instigator of edgecrackingcracking
7/26/2019 Failures in pavements.ppt
33/60
7/26/2019 Failures in pavements.ppt
34/60
7/26/2019 Failures in pavements.ppt
35/60
Slippage #racksSlippage #racks
Slippage cracks are crescent-shaped cracks orSlippage cracks are crescent-shaped cracks or
tears in the surface layer6s7 where the newtears in the surface layer6s7 where the new
material has slipped over the underlyingmaterial has slipped over the underlying
course%course%
his problem is caused by a lack of bondinghis problem is caused by a lack of bonding
between layers%between layers%
7/26/2019 Failures in pavements.ppt
36/60
7/26/2019 Failures in pavements.ppt
37/60
7/26/2019 Failures in pavements.ppt
38/60
reatmentreatment
All of the areas ehibiting the :stretch marks;All of the areas ehibiting the :stretch marks;
will need to be removed and will require awill need to be removed and will require a
partial or full depth patch%partial or full depth patch%
7/26/2019 Failures in pavements.ppt
39/60
7/26/2019 Failures in pavements.ppt
40/60
As alligator cracking becomes severe, theAs alligator cracking becomes severe, the
interconnected cracks create small chunks ofinterconnected cracks create small chunks of
pavement, which can be dislodged as vehiclespavement, which can be dislodged as vehicles
drive over them%drive over them% he remaining hole after the pavement chunkhe remaining hole after the pavement chunk
is dislodged is called a pothole%is dislodged is called a pothole%
7/26/2019 Failures in pavements.ppt
41/60
7/26/2019 Failures in pavements.ppt
42/60
7/26/2019 Failures in pavements.ppt
43/60
DepressionsDepressions
Depressions are locali$ed pavement surfaceDepressions are locali$ed pavement surface
areas with slightly lower elevations than theareas with slightly lower elevations than the
surrounding pavement%surrounding pavement%
Depressions are very noticeable after a rainDepressions are very noticeable after a rain
when they fill with water%when they fill with water%
7/26/2019 Failures in pavements.ppt
44/60
7/26/2019 Failures in pavements.ppt
45/60
7/26/2019 Failures in pavements.ppt
46/60
7/26/2019 Failures in pavements.ppt
47/60
7/26/2019 Failures in pavements.ppt
48/60
h l
7/26/2019 Failures in pavements.ppt
49/60
0pheaval0pheaval
0pheaval is a locali$ed upward movement in a0pheaval is a locali$ed upward movement in a
pavement due to swelling of the subgrade%pavement due to swelling of the subgrade%
his can be due to epansive soils that swellhis can be due to epansive soils that swell
due to moisture or frost heave 6ice under thedue to moisture or frost heave 6ice under the
pavement7%pavement7%
7/26/2019 Failures in pavements.ppt
50/60
7/26/2019 Failures in pavements.ppt
51/60
reatmentreatment
+ull depth patch+ull depth patch
7/26/2019 Failures in pavements.ppt
52/60
7/26/2019 Failures in pavements.ppt
53/60
7/26/2019 Failures in pavements.ppt
54/60
7/26/2019 Failures in pavements.ppt
55/60
7/26/2019 Failures in pavements.ppt
56/60
7/26/2019 Failures in pavements.ppt
57/60
7/26/2019 Failures in pavements.ppt
58/60
Sealing of #racksSealing of #racks''
he cracks are opened and cleaned withhe cracks are opened and cleaned with
brush%brush%
ack coat of hot bitumen is then appliedack coat of hot bitumen is then applied
under pressure to fill-up the cracks%under pressure to fill-up the cracks%
he treated surface is then covered withhe treated surface is then covered with
premi material%premi material%
7/26/2019 Failures in pavements.ppt
59/60
4air cracks can be repaired by applying slow4air cracks can be repaired by applying slow
setting emulsion evenly at the rate of ? to @setting emulsion evenly at the rate of ? to @
kg)sqm%kg)sqm%
/ight tamping to the coat of bituminous/ight tamping to the coat of bituminous
emulsion is recommended%emulsion is recommended%
7/26/2019 Failures in pavements.ppt
60/60