Page | 1 Faisalabad Industrial Estate Development & Management Company FINANCIAL BIDS/PROPOSALS EVALUATION REPORT Engineering Consultants’ Services (Electrical) NAME OF SERVICES: Engineering Consultants’ Services (Electrical) EMPLOYER/CLIENT: FIASALABAD INDUSTRIAL ESTATE DEVELOPMENT & MANAGEMENT COMPANY, FAISALABAD 1. INTRODUCTION FIEDMC has been established by Government of the Punjab on the basis of Public Private Partnership to achieve orderly, planned and rapid industrialization. The main objective is to develop a chain of new industrial estate along with upgrading the existing ones in a dynamic and innovative manner and providing solution to the problems of prospective entrepreneurs. FIEDMC establishing a modern industrial city known as M-3 INDUSTRIAL CITY (formerly FAISLAABAD INDUTRIAL CITY) spread over an area of about 4,500 Acres at intersection of Sahianwala on Motorway M-3. This report is Financial Bids/Proposals Evaluation Report for the bids/proposals received for the Services as envisaged in Annexure-A. 2. DOCUMENTS Invitation to Bid/Proposal For Engineering Consultants’ Services (Electrical) was published in daily newspapers Dawn & Nawa-e-Waqt and at PPRA-Punjab and FIEDMC websites on 25.02.2015 (Ad along with the details/documents is attached as Annexure-A) with the following particulars: Submission of Bids/Proposals 13 th March, 2015 up to 1100 hours Opening of Bids/Proposals 13 th March, 2015 up to 1130 hour The documents were required by the interested Consulting Firms/Consultants/JV to be downloaded from the PPRA Punjab and FIEDMC Websites. 3. RECEPIT & OPENNING OF BIDS/PROPOSALS On the date of bids/proposals opening date i.e. 13.03.2015, bids/proposals of following eight (08) Consultants/Consulting Firms/JV(s) were received and opened at 1130 hrs on 13.03.2015 at FIEDMC Office; bids/proposals receiving and opening statements recorded on the day of bids/proposals receiving and at the time of bids/proposals opening are attached here as Annexure-B:
Transcript

P a g e | 1

Faisalabad Industrial Estate Development & Management Company

FINANCIAL BIDS/PROPOSALS EVALUATION REPORT

Engineering Consultants’ Services (Electrical) NAME OF SERVICES: Engineering Consultants’ Services (Electrical)

EMPLOYER/CLIENT: FIASALABAD INDUSTRIAL ESTATE DEVELOPMENT &

MANAGEMENT COMPANY, FAISALABAD

1. INTRODUCTION

FIEDMC has been established by Government of the Punjab on the basis of Public Private Partnership to achieve orderly, planned and rapid industrialization. The main objective is to develop a chain of new industrial estate along with upgrading the existing ones in a dynamic and innovative manner and providing solution to the problems of prospective entrepreneurs.

FIEDMC establishing a modern industrial city known as M-3 INDUSTRIAL CITY (formerly FAISLAABAD INDUTRIAL CITY) spread over an area of about 4,500 Acres at intersection of Sahianwala on Motorway M-3.

This report is Financial Bids/Proposals Evaluation Report for the bids/proposals received for the Services as envisaged in Annexure-A.

2. DOCUMENTS

Invitation to Bid/Proposal For Engineering Consultants’ Services (Electrical) was published in daily newspapers Dawn & Nawa-e-Waqt and at PPRA-Punjab and FIEDMC websites on 25.02.2015 (Ad along with the details/documents is attached as Annexure-A) with the following particulars:

Submission of Bids/Proposals 13th March, 2015 up to 1100 hours

Opening of Bids/Proposals 13th March, 2015 up to 1130 hour

The documents were required by the interested Consulting Firms/Consultants/JV to be downloaded from the PPRA Punjab and FIEDMC Websites.

3. RECEPIT & OPENNING OF BIDS/PROPOSALS

On the date of bids/proposals opening date i.e. 13.03.2015, bids/proposals of following eight (08) Consultants/Consulting Firms/JV(s) were received and opened at 1130 hrs on 13.03.2015 at FIEDMC Office; bids/proposals receiving and opening statements recorded on the day of bids/proposals receiving and at the time of bids/proposals opening are attached here as Annexure-B:

P a g e | 2

I. MZ Engineering Services international Consulting Engineers II. National Engineering Services Pakistan (Pvt) Limited

III. Techno Legal Consultants JV with KP & Associate. IV. Power Com Consultants V. Osmani & Company (Pvt.) Ltd.

VI. Indus Associated Consultants (Pvt) Ltd. VII. EnMasse (Pvt.) Limited

VIII. BARQAAB Consulting Services (Pvt.) Limited

4. PRELIMINARY EXAMINATION OF BIDS/PROPOSALS

On receipt of bids on 13.03.2015, Preliminary Examination has been done as follow:-

Consulting firms / Consultants must have valid registration with Pakistan

Engineering Council.

5. DETAILED EXAMINATION OF BIDS

Detailed Arithmetical Check of the Bids/Proposals was done and clarifications were asked vide letters as attached as Annexure C and response(s) as attached as Annexure D, following table exhibits the status:

P a g e | 3

Engineering Consultants’ Services (Electrical)

Bid/Proposal Evaluation

Indus EnMasse Barqaab MZ Engg. PowerCom Osmani NESPAK

Fee/Remuneration Fee/Remuneration Fee/Remuneration Fee/Remuneration Fee/Remuneration Fee/Remuneration Fee/Remuneration

(*****Pak Rs.) (*****Pak Rs.) (*****Pak Rs.) (*****Pak Rs.) (*****Pak Rs.) (*****Pak Rs.) (*****Pak Rs.)

1

*Services for Design of

132kV/11kV Sub-Staion at M-

3 Industrial City and its approval

from FESCO/ NTDC.

700,000 1,000,000 500,000 2,800,000 2,900,000 8,395,942

2

Services regarding Pre-

qualification of constructors,

evaluation of bids,

recommending award of

Contracts and other related

Services etc. and the Services as

required under this head for Sub-

Station to be constructed at M-3

Industrial City.

250,000 200,000 500,000 400,000 870,000 2,798,647

**Services envisaged regarding

Construction Supervision,

Contract Management, Testing

& Commissioning and Handing

Over to the Employer and any

other Services (but not including

the Services stipulated at Sr. No.

2 hereinabove) to be paid as

***%age of the Works done by

the Contractor for One Sub-

Station. (Total Works Done

(Tentative) to be executed by the

Contractor is to be taken as Rs.

250**** Million)

1,750,000 3,750,000 3,500,000 5,625,000 3,000,000 11,600,000 12,500,000

Percentage 0.7% Percentage 1.5% Percentage 1.4% Percentage 2.25% Percentage 1.2% Percentage 4.64% Percentage 5%

Estimated time for Completion of

One Sub-Station is envisaged as

15 months.

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

(Amount in Pak

Rupees = % x

Rs.250,000,000)

* Services regarding design of

11kV network emanating from

the existing & intended Sub-

Station and approval from

cernerned authories.

11kV Feeders/Circuits

emanating from Sub-Station(s)

of M-3 Industrial City to be paid

per Km of length of 11kV

feeders/circuits (Over Head or

Under Ground)

a. One Feeder per Km length 22,500 15,000 6,000 30,000 29,000 10,000

b.Two Feeders per Km length 32,500 20,000 6,500 35,000 35,000 12,000

c. Three Feeders per Km length 37,500 25,000 7,000 40,000 41,000 15,000

5

Services during Defects Liability

Period (One Year) for

132kV/11kV Sub-Station

400,000 200,000 250,000 450,000 870,000 360,000

6

Services regarding Pre-

qualification of constructors,

evaluation of bids,

recommending award of

Contracts and other related

Services etc. and the Services as

required under this head for

11kV External Infrastructure

Network Works.

300,000 200,000 500,000 300,000 870,000 1,674,065

500,000 750,000 500,000 1,375,000 2,500,000 2,320,000 6,000,000

Percentage 1% Percentage 1.5% Percentage 1% Percentage 2.75% Percentage 5% Percentage 4.64% Percentage 12%

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

(Amount in Pak

Rupees = % x

Rs.50,000,000)

8

Services during Defects Liability

Period (One Year) for 11kV

External Infrastructre Network

Works.

400,000 100,000 250,000 300,000 870,000 360,000

4,392,500 6,260,000 6,019,500 7,000,000 9,855,000 20,405,000 32,125,654

Discount 700,000

6,300,000

203,670

TOTAL (Pak Rupees) 4,453,845

226,765

7

**Services envisaged regarding

Construction Supervision,

Contract Management, Testing

& Commissioning and Handing

Over to the Employer and any

675,000

Percentage 1.35%

(Amount in Pak

Rupees = % x

Rs.50,000,000)

Rs. 650,000/- was

submitted and latter

on clarification vide

letter

650/IAC/2855

dated 01.04.2015,

rates for three

different feeders

have been given

Rs. 500,000/- was

submitted and latter

on clarification vide

letter BQB/P-

FIEDMC/178

dated 27.03.2015,

rates for three

different feeders

have been given

15,000

19,000

22,000

203,670

3

2,700,000

Percentage 1.08%

(Amount in Pak

Rupees = % x

Rs.250,000,000)

4

Rs. 161,965/- was

submitted and latter

on clarification vide

letter

TLC/03/FIEDMC/

1048 dated

04.04.2015 , rates

for three different

feeders have been

given

161,975

226,765

Techno-KP JV

Sr.

No.Head

Fee/Remuneration

(*****Pak Rs.)

P a g e | 4

P a g e | 5

Annexure A

On Letter Head of the Consulting Firms/Consultant

FAISALABAD INDUSTRIAL ESTATE

DEVELOPMENT & MANAGEMENT COMPANY

(FIEDMC)

INVITATION TO BID/PROPOSAL

For Engineering Consultants’ Services (Electrical)

Faisalabad Industrial Estate Development and Management Company (FIEDMC) intends to

procure engineering consultancy services of an Electrical Consultant and hereby solicits

bids/proposals from consulting firms / consultants (Registered with Pakistan Engineering

Council), who have relevant expertise and experience for the services as per the details

available at FIEDMC and PPRA Punjab Websites.

For selection of Consultant/Consulting Firm, Least Cost Selection method shall be used as

envisaged in Punjab Procurement Rules 2014.

Bids/Proposals in duplicate, based on the documents, which can be downloaded from

FIEDMC and PPRA Punjab websites, should reach the office of the undersigned at or before

1100 hours, on 13/03/2015. Any bid/proposal received after the deadline for submission of

bid/proposal shall be returned unopened. Bids/Proposals will be opened at 1130 hours on the

same day, in the presence of bidder’s representatives who choose to attend at the same

address.

Punjab Procurement Rules 2014 and Standard Form of Contract for Engineering Consultancy

Serves (Time Based Assignments) prepared by Pakistan Enginering Council shall apply.

Chief Executive Officer

FAISALABAD INDUSTRIAL ESTATE DEVELOPMENT & MANAGEMENT COMPANY

1st Floor, FCCI Complex, East Canal Road, Canal Park, Faisalabad,

Tel: 041-9230231-4, Fax: 041-9230235, e-mail: [email protected],

P a g e | 6

INVITATION TO BID/PROPOSAL

For Engineering Consultants’ Services (Electrical)

Qualification Criteria

The Consultants / Consulting Firms must meet the following criteria for the

responsiveness of their bids/proposlas:

Consulting firms / Consultants must have valid registration with Pakistan

Engineering Council.

Consulting firms / Consultants must completed at-least 03 projects of

similar type(s) within last five years, 2010-2014; proof should be appended

with the bids/proposals.

o 03 projects related to design and construction supervision of

132kV/11kV Sub-Stations.

o 03 projects related to design and construction supervision of 11kV

network.

Consulting firms / Consultants must have at-least one project in hand of

similar type. Proof of it should be given with the bids/proposlas.

P a g e | 7

INVITATION TO BID/PROPOSAL

For Engineering Consultants’ Services (Electrical)

Description of Services

Design of 132kV/11kV Sub-Staion at M-3 Industrial City and its approval

from FESCO/NTDC. The design shall be based on WAPDA Standards.

Design of 11kV network emanating from the existing & intended Sub-

Station and its approval from the cercerned authorities. The design shall be

based on WAPDA Standards. The design shall be considering the actual

load(s) of the industries at M-3 Industrial City.

All steps regarding pre-qualfication of contractors, preparation of bidding

documents, tenden notice, evaluation of bids etc.

Construction Supervision (including Contract Management) of

132kV/11kV Sub-Station and 11kV network upto their completion(s) and

defects liability period(s) etc.

Reports as per the requirements of Services/Works

P a g e | 8

INVITATION TO BID/PROPOSAL

For Engineering Consultants’ Services (Electrical)

REMUNERATION FOR SERVICES

The Consultant/Consulting Firm should quote for the following for the Servcies to

be carried out as envisaged/stipulated herein, including direct cost(s), overhead &

profit, visits to the Site/Faislaabd including any visit in WAPDA House/NTDC

Lahore , all applicable taxes and including any other cost to be born by the

Consultant/Consulting Firm:

Sr.

No. Head

Fee/Remuneration

(*****Pak Rs.)

1 *Services for Design of 132kV/11kV Sub-Staion at M-3

Industrial City and its approval from FESCO/ NTDC.

2

Services regarding Pre-qualification of constructors, evaluation

of bids, recommending award of Contracts and other related

Services etc. and the Services as required under this head for

Sub-Station to be constructed at M-3 Industrial City.

3

**Services envisaged regarding Construction Supervision,

Contract Management, Testing & Commissioning and Handing

Over to the Employer and any other Services (but not including

the Services stipulated at Sr. No. 2 hereinabove) to be paid as

***%age of the Works done by the Contractor for One Sub-

Station. (Total Works Done (Tentative) to be executed by the

Contractor is to be taken as Rs. 250**** Million)

Estimated time for Completion of One Sub-Station is envisaged

as 15 months.

Percentage

(Amount in Pak Rupees

= % x Rs.250,000,000)

4

* Services regarding design of 11kV network emanating from

the existing & intended Sub-Station and approval from

cernerned authories.

11kV Feeders/Circuits emanating from Sub-Station(s) of M-3

Industrial City to be paid per Km of length of 11kV

feeders/circuits (Over Head or Under Ground)

a. One Feeder per Km length

b. Two Feeders per Km length

c. Three Feeders per Km length

5 Services during Defects Liability Period (One Year) for

132kV/11kV Sub-Station

P a g e | 9

6

Services regarding Pre-qualification of constructors, evaluation

of bids, recommending award of Contracts and other related

Services etc. and the Services as required under this head for

11kV External Infrastructure Network Works.

7

**Services envisaged regarding Construction Supervision,

Contract Management, Testing & Commissioning and Handing

Over to the Employer and any other related Services etc. but

not including the Services stipulated at Sr. No. 6 hereinabove,

to be paid as ***%age of the Works done by the Contractor for

11kV External Infrastructure Network Works. (Total Works

Done (Tentative) to be executed by the Contractor is to be

taken as Rs. 50**** Million)

Percentage

(Amount in Pak Rupees

= % x Rs.50,000,000)

8 Services during Defects Liability Period (One Year) for 11kV

External Infrastructre Network Works.

TOTAL (Pak Rupees)

*

FESCO/NTDC charges, at actual, to be borne by the Client.

**

The Consultant will deploy following personnel as per the requirements of the

Works at Site for the proper and efficient supervision of the Works and for the

Services as envisaged herein; the consultant may deploy more staff as per the

needs/requirements of Works; remuneration, nevertheless, shall be as stated

hereinabove for the Services as envisaged. Site Facilities like transport, office,

computer, telephone, resident etc. will be given to the Consultant through the

construction Contract.

Project Manager and/or Contract Manager

(Min Qualification B.Sc. Engineering in the relevant discipline)

Construction Manager

(Min Qualification B.Sc. Engineering in the relevant discipline)

Quantity Surveyor/Site Surveyor/Site Supervisor

(Min Qualification Diploma of Associate Engineer in the relevant discipline)

Site Supervisor (Civil)

(Min Qualification Diploma of Associate Engineer in the relevant discipline)

Site Supervisor (Electrical)

(Min Qualification Diploma of Associate Engineer in the relevant discipline)

Protection & Commissioning Engineer

(Min Qualification B.Sc. Engineering in the relevant discipline)

***

Works means the Contract Price as stipulated in the Letter of Acceptance (i.e.

Contract Price without price adjustment) and the payment to the hired Consulting

P a g e | 10

Firm/Consultant shall be equal to the quoted %age of the net payable amount to the

Contractor before tax deduction and without price adjustment.

****

Total remuneration under this Cosultnacy Contract shall be adjusted according

according to the Construction Contract Value.

*****

All payments shall be in Pak Rupees only.

Full Name:__________________________

Signature:__________________________

Title:______________________________

P a g e | 11

In response of some queries, following is hereby intimated:

Query Response

(***) it is stated in para graph under

these steric on last page of your RFP

that the expression “Work means …..

adjustment” and may be substituted

by as under:

“Contract Price means the price

stipulated in the Letter of

Acceptance; nad the payment to the

consulting firms /consultants shall be

equal to the quoted percentage of the

payable amount to the Contractor”.

The reason is that when the

consultant is to include in his price

8% withholding tax and 16% sales

tax than the percentage of Contrator’s

money should be also based on gross

payable before deduction of taxation.

(***) stated in the Invitaion to the

Bid/Proposal is hereby reproduced as

under and it is quite clear:

***

Works means the Contract Price as

stipulated in the Letter of Acceptance (i.e.

Contract Price without price adjustment)

and the payment to the hired Consulting

Firm/Consultant shall be equal to the

quoted %age of the net payable amount to

the Contractor before tax deduction and

without price adjustment.

However, for the clarity, the word “net”

should be replaced with “gross”; “Gross

Work Done by the Contractor without any

Price Adjustment” shall be the basis of

payment to the Consulting Firm /

Consultant.

The note under (*) that

“FESCO/NTDC charges at actual to

be borne by the Client”. Please

elaborate whether these charges

pertaining to the testing and

commissioning of the completed

services by FESCO/NTDC or any

other charges.

These include all/any charges/fee etc.

regarding approval of design, testing or

commissioning etc.

Under the qualification criteria, it is

required that the Consutlant has

executed six projects in last five years

and 1 such project is in hand.

Keeping in view, form the sechedule

given in your RFP for a single 132

KV Grid Station, it seems to be very

hight figure. Instead of three projects

each performance in two projects are

also enough as a proof of capacity of

the Firm. It is not the total number of

projects executed by a consultant but

the questions of executing so many

projects in last five years in which

each projects takes over two years.

Bullet two of the Qualification Criteria

should be replaced as under:

Consulting firms / Consultants

must completed or completion

certificate issued for at-least 03

projects of similar type(s) within

last five years, 2010-2014; proof

should be appended with the

bids/proposals.

o 03 projects related to

design and construction

supervision of

132kV/11kV Sub-

Stations.

o 03 projects related to

design and construction

supervision of 11kV

network.

P a g e | 12

Annexure-B

P a g e | 13

Annexure-C

P a g e | 14

P a g e | 15

P a g e | 16

P a g e | 17

P a g e | 18

P a g e | 19

Annexure-D

P a g e | 20

P a g e | 21

P a g e | 22

P a g e | 23

P a g e | 24


Recommended