© 2010-2015 SMGlobal Inc. FastMaint CMMS 7.0 User Guide When you first start using FastMaint Professional edition, the system asks you to specify a password for the "admin" account. Make sure that the Admin password is NOT longer than 10 characters. You will need to use this password the next time you use FastMaint. Rev 2015-03-16 Basic/Standard/Professional Editions
Transcript
Page 1: Fast Maint Manual

© 2010-2015 SMGlobal Inc.

FastMaint CMMS 7.0 User Guide

When you first start using FastMaint Professional edition, the system asks you tospecify a password for the "admin" account. Make sure that the Admin password isNOT longer than 10 characters. You will need to use this password the next time youuse FastMaint.

Rev 2015-03-16

Basic/Standard/Professional Editions

Page 2: Fast Maint Manual

All rights reserved. No parts of this work may be reproduced in any form or by any means - graphic, electronic, ormechanical, including photocopying, recording, taping, or information storage and retrieval systems - without thewritten permission of the publisher.

Products that are referred to in this document may be either trademarks and/or registered trademarks of therespective owners. The publisher and the author make no claim to these trademarks.

While every precaution has been taken in the preparation of this document, the publisher and the author assume noresponsibility for errors or omissions, or for damages resulting from the use of information contained in thisdocument or from the use of programs and source code that may accompany it. In no event shall the publisher andthe author be liable for any loss of profit or any other commercial damage caused or alleged to have been causeddirectly or indirectly by this document.

Printed: March 2015

FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

Page 3: Fast Maint Manual

Contents

3

© 2010-2015 SMGlobal Inc.

3FastMaint CMMS 7.0 User Guide 3

Table of Contents

Part I Welcome to FastMaint 6

Part II Getting Started 8

................................................................................................................................... 91 About Tasks and Work Orders

................................................................................................................................... 112 Maintenance Management Workflow

................................................................................................................................... 143 Setting Up The System

Part III Screen Reference 18

................................................................................................................................... 191 Main Window

................................................................................................................................... 202 Lists (left bar buttons)

.......................................................................................................................................................... 23Calendars

.......................................................................................................................................................... 25Categories

.......................................................................................................................................................... 27Equipment

.......................................................................................................................................................... 31Locations

.......................................................................................................................................................... 34Parts

.......................................................................................................................................................... 37People

.......................................................................................................................................................... 39Purchases

.......................................................................................................................................................... 42Tasks

.......................................................................................................................................................... 47Vendors

.......................................................................................................................................................... 50Work Orders

.......................................................................................................................................................... 58Statistics

................................................................................................................................... 603 Toolbar (top bar buttons)

.......................................................................................................................................................... 62Workload Balancing And Detecting Schedule Conflicts

.......................................................................................................................................................... 64Planning Report/ Print Work Orders

.......................................................................................................................................................... 68Fast Feedback

.......................................................................................................................................................... 70Email Processing

................................................................................................................................... 744 Menus

.......................................................................................................................................................... 77Importing Data

.......................................................................................................................................................... 80Export Wizard

.......................................................................................................................................................... 82Groups

.......................................................................................................................................................... 84User Accounts

.......................................................................................................................................................... 86Settings (Email, Alerts, etc.)

.......................................................................................................................................................... 91Reports

................................................................................................................................... 1075 Other

.......................................................................................................................................................... 108HTML Editor

.......................................................................................................................................................... 110Login Window

.......................................................................................................................................................... 112Work Requests

.......................................................................................................................................................... 116Web Based Work Request Module

Part IV Frequently Asked Questions (FAQs) 120

................................................................................................................................... 1211 How to import data?

Page 4: Fast Maint Manual

© 2010-2015 SMGlobal Inc.

4FastMaint CMMS 7.0 User Guide 4

................................................................................................................................... 1282 Do I need to create a new task every time I want a new work

order?

................................................................................................................................... 1293 How to create a 240 day task?

................................................................................................................................... 1364 How to create a meter based task?

................................................................................................................................... 1425 How to create an alarm based task?

................................................................................................................................... 1466 How can I see past due, current and future work orders?

................................................................................................................................... 1477 How can I create breakdown/ request work orders?

................................................................................................................................... 1488 How do I get rid of work orders that were never worked on?

................................................................................................................................... 1499 How can I print files attached (linked) to a work order or other

report?

................................................................................................................................... 15010 How can I customize a report?

................................................................................................................................... 15711 How can I sum a numeric field on a report?

................................................................................................................................... 15812 How do I use barcodes?

................................................................................................................................... 16013 How do I install/ upgrade FastMaint?

................................................................................................................................... 16314 How do I back up and restore my data?

................................................................................................................................... 16415 How can I open the database with another program (e.g.

Microsoft Access)?

Part V For IT Administrators 167

Part VI Get Support/ Contact Us 172

Part VII Video Tutorials 174

Page 5: Fast Maint Manual

Part

I

Page 6: Fast Maint Manual

Welcome to FastMaintFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

6

1 Welcome to FastMaint

FastMaint can help you quickly put together a maintenance management

program. Manage preventive and unplanned (e.g. breakdown) maintenance jobs,

track inventory usage, labor and material costs, create a variety of reports and

more.

FastMaint comes in four editions; Basic (single user), Standard (single user),

Professional (multiple users) and Web (browser access, multiple users).

This help documentation is for the Basic, Standard & Professional

editions.

If you are new to FastMaint you may want to see the Getting Started section

and the Frequently Asked Questions (FAQs) section. You may also be

interested in seeing Video Tutorials .

Rev 2015-03-16

8

120

174

Page 7: Fast Maint Manual

Part

II

Page 8: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

8

2 Getting Started

Work through this section to get a sense of what FastMaint can do for you, and

how.

To start off you may want to see the About Tasks and Work Orders section.

Then, as you use the system, you'll probably discover features you want to

know more about - that's the time to consult the Screen Reference section

and the Frequently Asked Questions (FAQs) section.

9

18

120

Page 9: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

9

2.1 About Tasks and Work Orders

In FastMaint, you create maintenance task templates that are used to create

maintenance work orders as needed (i.e. planned as well as unplanned/

breakdown work orders).

Some tasks are one-off, and you can treat them as "Any Other Maintenance".

However, most tasks will require work orders more than once, so FastMaint

enables you to enter them in the system for later re-use.

Whenever you create a work order,

FastMaint fills it with information from

the task - you can edit this information

as required on the work order.

Typically, a work order is created in

one of three ways (see illustration):

Automatic: The task's frequency

settings automatically schedule

work orders, e.g. a monthly deep

clean or a quarterly oil change. When

you run the Planning Report these

work orders are automatically

created. You can also modify these

work orders .

Manual: The task frequency is

specified as “Unplanned”.You enter the work order manually . Once created

you can also modify these work orders .

45

64

52

55

52

Page 10: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

10

Equipment: An alarm or meter reading on a piece of equipment triggers

different tasks to generate work orders. Again, this depends on the task's

frequency settings .

Among other things, tasks and work orders can also be assigned equipment ,

parts (spares) , people and locations . By default these assignments are

copied from the task to the work order. However, you can change them as

needed on the work order.

Next, have a look at the Maintenance Management Workflow section to

understand how the pieces fit together.

29

45

27

34 37 31

11

Page 11: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

11

2.2 Maintenance Management Workflow

At its core, FastMaint has a very simple workflow:

Task Frequency

settings

automatically

schedule planned

work orders

The task's frequency

settings automatically

schedule work orders, e.g.

a monthly deep clean. An

alarm or meter reading

on a piece of equipment

triggers the a task to

generate a work order.

Again, this depends on the task's frequency settings .

If you have the Web Based Work Request Module , your staff and clients can

also make maintenance requests online. Use the Requests/Breakdowns button

to schedule work orders from the work requests.

Manager reviews scheduled work orders, then creates

and emails/ prints them

"Planned" work orders appear on the work order list without a status . Find

these by running a Planning Report , or just by double-clicking them. Once you

have created and saved them, you can email or print the work orders using the

Planning Report .

45

29

45

116

52

64

64

Page 12: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

12

Manager creates any unplanned work orders and prints

them

You can also create "unplanned" work orders . Once you have created and

saved them, email or print the work orders using the Planning Report .

Maintenance staff execute the work orders

Who does what, using which equipment depends on the work order or the

original task - see About Tasks and Work Orders . This information will be on

the work order. If the maintenance staff received the work order by email they

can reply to the email with updated status and their feedback. If you have

FastMaint Professional you can process such emailed updates and automatically

update/ close the work orders.

A special WO Tag field can contain special lockout data/ shutdown information

about the equipment or location.

Manager or staff update the work order...

You can update the status of a work order by opening and editing it. If you have

FastMaint Professional you can also update batches of work orders using Fast

Feedback or use the Email Processing feature to automatically update work

orders based on emailed responses from maintenance personnel who complete

the work orders.

If you have the Web Based Work Request Module , your non-maintenance

users e.g. customers or management, can also check the status of tasks work

orders online. If you have the Barcode Support Module , you can also use the

“Find” feature to bring up the correct work order using a hand scanner to scan

the bar code from the work order printout.

55

64

9

68 70

116

88

Page 13: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

13

...FastMaint updates any quantities

If your tasks or work orders specify particular parts (spares) , then FastMaint

updates the quantities of these. (Should a work order be canceled, it "returns"

the parts to the inventory.)

Manager generates any reports

You can use a range of built-in or custom reports to monitor maintenance

activity over time - see Report Designer .

Next, have a look at the Setting Up The System section to understand what

you need to setup the system.

34

98

14

Page 14: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

14

2.3 Setting Up The System

Once it's installed, you can start using FastMaint right way; just generate work

orders, and enter any reusable information as you go along (there's always a

handy Add or Edit button). If in doubt, base work orders on the "Any other

maintenance" task.

However, depending on how you plan to use the system, you may want to enter

some information right away either by entering your data or importing existing

data .

Workflow

FastMaint enables you to assign work orders to particular people, and track the

progress. You can also use this information to avoid asking two people to be in

the same place at once! (See Workload Balancing And Detecting Schedule

Conflicts .)

Equipment: Enter the equipment to be maintained - see Equipment .

Locations: Buildings, rooms, assembly lines, stations, etc where maintenance

may be needed - see Locations .

Parts: Maintenance parts/ spares needed to complete maintenance - see Parts

.

People: About the workers performing the maintenance - see People .

Tasks: If some people are needed for certain jobs, set up a list of tasks and

assign people to them - see Tasks .

Groups and User Accounts: If other users are able to update the status of

work orders, then you need to assign passwords and permissions - see Groups

and User Accounts .

77

62

27

31

34

37

42

82 84

Page 15: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

15

Consider getting the Web Based Work Request Module , an add-on product

that allows any user to submit a work request for breakdown (Unplanned) tasks

or report alarm conditions via a web browser. For more information please visit

http://www.smglobal.com.

Inventory

FastMaint can track the use of parts, and even generate purchase orders .

Parts: List the parts and their current quantities. You can use the Reorder at

setting to identify when parts need to be reordered - see Parts .

Tasks: Set up tasks and use the Parts tab to list what parts are required -

see Tasks .

Vendors: Enter a list of vendors and their rating as suppliers - see Vendors .

Equipment Maintenance

FastMaint can generate work orders for a piece of equipment based on an alarm

or meter reading.

Equipment: Enter the equipment to be maintained, and set up alarms or

meters - see Equipment .

Tasks: Enter a list of tasks, and use the task's frequency settings to tie

them to the equipment - see Tasks .

Reporting

You can use a range of built-in or custom reports to monitor maintenance

activity over time - see Reports and Report Designer .

116

39

34

42

47

27

45

42

91 98

Page 16: Fast Maint Manual

Getting StartedFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

16

Categories: A useful tool that enables you to tag almost anything according to

custom categories - see Categories .

Locations: It's handy to keep track of where certain jobs take place -

Locations .

Custom Fields: Set up custom fields for equipment, locations, parts, etc. by

selecting Custom Fields under the Administration menu on the main window.

Next, for examples on how to do some common tasks see the Frequently Asked

Questions (FAQs) .

25

31

120

Page 17: Fast Maint Manual

Part

III

Page 18: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

18

3 Screen Reference

This section describes the main features available through the FastMaint

screens.

Page 19: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

19

3.1 Main Window

This is the main window from which all the other windows can be accessed. It

contains the following major sections; Lists (left bar buttons) , Toolbar (top

bar buttons) , Menus (main window menus).

If you are new to FastMaint you may also want to see the Getting Started

section and the Frequently Asked Questions (FAQs) section.

20

60 74

8

120

Page 20: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

20

3.2 Lists (left bar buttons)

The bar on the left of the main window contains buttons providing access to all

FastMaint's lists e.g. equipment list, location list, part list, work order list, etc.

Instructions

Add and edit the contents of each list using the Add, Open, and Delete toolbar

buttons, or by double-clicking an entry.

Use the Find button to quickly locate entries e.g. find all work orders with a

number starting with “5”, find an equipment named “PUMP-56A”. The Find

button is particularly useful if you have barcode support since you can scan

in the barcode and quickly pull up the relevant record.

Listing

Button Description

Calendars

Calendars are used for a variety of reasons:

For scheduling tasks based on holidays and

working times.

Calculation of equipment meters based on

estimated use.

Specifying when people are available for work,

so as to support Workload Balancing And

Detecting Schedule Conflict .

88

23

62

Page 21: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

21

Button Description

Categories

Categories are a useful way to classify tasks,

equipment people and parts, e.g. "electrical",

"plumbing", and "Production".

Equipment

Examples of equipment include air conditioning

plants, pumps, vehicles, and printers.

Locations

Specifying locations makes it easier to perform

and track work orders , as well as to report and

classify all the maintenance data you collect.

If you are doing facilities maintenance, Locations could

be used to specify the buildings/ rooms/ areas which

need maintenance work.

Parts

Parts are items required to complete a task, e.g.

an air conditioning filter, a toner cartridge, or a

quart of oil. When you mark a task as complete,

FastMaint reduces the quantity of required parts

accordingly.

People

Tell FastMaint about people who work for you or

your company, whether as contractors or

employees.

Purchases

Purchase orders can be created to order parts

from vendors . You can see outstanding

purchase orders on each part. When purchase

order items are received they are added to stock.

25

27

3152

34

37

3947

Page 22: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

22

Button Description

Tasks

Each task describes a job or action that can be

specified in a work order , for example a weekly

maintenance check, fixing an equipment

breakdown or doing a 3000 mile vehicle service.

Vendors

Enter vendors into the system and list and rate

them as possible suppliers for equipment and

parts. You can then generate purchase orders ,

and print vendor contact information on Parts to

Reorder reports.

Work Orders

Use work orders to assign maintenance tasks for

particular dates and times. FastMaint

automatically schedules work orders for regular

tasks, however you still have to create these

manually , or run a Planning Report .

4252

47

39

50

52 64

Page 23: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

23

3.2.1 Calendars

Calendars

Calendars contain information related to working days, holidays and other

absences. Calendar information on a task is used to schedule the task based on

holidays and working times. There can also be different calendars for different

people and equipment. Calendar information can be checked during task

scheduling to see if the right people are available.

In the Professional edition you can restrict a user's ability to view or modify

calendars.

Page 24: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

24

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.

Listing

Name: A code or name identifying the calendar, e.g. "Night Shift Calendar".

(This field is locked for the "Default" calendar.)

Description: One-line description of the Calendar.

Working Days: Select days of the week that will be worked.

Start Of Day, End Of Day, "Same Day"/"Next Day": For overnight shifts,

select the ending time and specify that it is the "Next Day".

Holidays: Click Add to add new holidays or days off. Double-click an item to

edit or delete it.

Comments: Enter any additional information. See HTML Editor for how to

insert links, pictures, etc.

108

Page 25: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

25

3.2.2 Categories

Categories

Categories are a useful way to classify tasks, equipment people and parts, e.g.

"electrical", "plumbing", and "Production". This makes it easier to report and

classify all the maintenance data you collect.

In the Professional edition you can restrict a user's ability to view or modify

information on categories.

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

Page 26: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

26

Listing

Name: A name or code to identify the category, e.g. "HO Department",

“Mechanical”, or “Fleet Operations”.

Description: One-line description of the category.

Annual Budget: For tracking purposes.

Comments: Enter any additional information. See HTML Editor for how to

insert links, pictures, etc.

108

Page 27: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

27

3.2.3 Equipment

Equipment

Examples of equipment include air conditioning plants, pumps, vehicles, and

printers.

In the Professional edition you can restrict a user's ability to view or modify

equipment.

Page 28: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

28

Instructions

1.Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes, or Clone to make a new

record based on this one.)

2.If required, click Requests/Breakdowns to create a work order .

Listing

Name: Identifies the equipment, a name e.g. "Forklift Truck 1" or an internal

code e.g. "VH-FLFT-1".

Tip: If you have a large quantity of equipment, it may make sense to switch to using a unique

equipment code/identifier. Put the equipment code in the “Name” field and a detailed equipment

name and description in the “Description” field.

Description: One-line description of the equipment.

Location: The location where this equipment is based or kept.

Category: The equipment belongs to this category .

Vendor: The vendor who supplied this equipment. Click New to add one to

the list.

Part Of: Use this if the equipment is part of another piece of equipment.

Model # and Serial #: As supplied by the manufacturer.

WO Tag: Any special lockout data/ shutdown information for the equipment

that will appear on work orders.

52

31

25

47

Page 29: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

29

Comments tab: Any additional information about the equipment, e.g. pictures,

or links to manufacturer’s manuals. You may enter several pages of

comments. See HTML Editor for how to insert links, pictures, etc.

Alarm tab: You can specify if an alarm condition is reportable on this

equipment (e.g. an overheated bearing, a regulatory inspection, etc.). You can

enter/ modify dates the alarm condition is reported. You can set up different

tasks to be scheduled whenever this equipment has an alarm - see Tasks-

Frequency tab . This when used in conjunction with Create Work Orders For

Breakdowns/ Requests or the Work Requests screens can be used to

report alarm conditions and schedule work orders from the tasks.

Log tab: Clickable list of log entries relating to the equipment e.g. issues

reported by operators, or changes made to operating parameters. Click New

to add a new entry. Click Delete to remove a selected entry.

Meter tab: Enables you to set up and update a meter which can then schedule

work orders . For example, you could set up a "mileage" meter for a car and

then have an "oil change" task scheduled for every 3000 miles.

To set up the meter, select Has a meter, then decide whether to schedule

tasks by Estimated use, or Actual use and fill in the details. If you select

Estimated Use, FastMaint will try to estimate meter readings over time and

schedule any associated tasks accordingly. If you selected Actual use, then

somebody must use the Add readings button to add regular readings or

periodically import the readings using the Import feature .

For setting up tasks triggered by a meter, see the Tasks - Frequency tab .

Non-working days: Specify a calendar to use when calculating estimated

use (see above, "Meter tab"). You can also click the Add button to enter

Vacation/ Off Days and double-click an existing entry to change or delete it.

108

45

55 112

52

77

45

23

Page 30: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

30

Parts: Clickable list of parts associated with this equipment. To edit the list,

click Add/Remove Parts From List. To have FastMaint use the existing tasks

to work out what parts are required, click Identify Parts Required from

Tasks.

Tasks tab, Work Orders tab: Clickable list of tasks and work orders

associated with this equipment. Use Add and Remove to edit the list. Adding

or removing tasks will not change associated work orders that already exist.

Custom Fields tab: Enter specific information not covered in the other tabs. In

the main window, select Administration, Define Custom Fields to add fields, e.g.

customer number, contact person, or contract renewal date.

42 52

Page 31: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

31

3.2.4 Locations

Locations

Specifying locations makes it easier to perform and track work orders , as well

as to report and classify all the maintenance data you collect. If you are doing

facility maintenance, locations can be a way to manage maintenance of specific

rooms or buildings.

In the Professional edition you can restrict a user's ability to view or modify

information on locations.

52

Page 32: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

32

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.

Listing

Name: Identifies a location, either an actual name (e.g. “Room 101”) or an

internal code (e.g. “AZ-DG5438”).

Tip: If you have a large number of locations, it may make sense to switch to

using unique location code/identifier. Put the location code in the “Name” field,

and a detailed location name and description in the “Description” field.

Description: Longer one-line description.

Part Of: Use this if the location is part of another location, e.g. a room or

outbuilding.

WO Tag: For any special lockout data/ shutdown information for the location

on work orders.

Comments tab: Any additional information about the location, e.g. maps,

pictures, or notes. You may enter several pages of comments. See HTML

Editor for how to insert links, pictures, etc.

Equipment tab, Parts tab, People tab, Tasks tab, Work Orders tab:

Clickable lists of equipment, parts, people, tasks and work orders associated

with this location. Use Add and Remove to edit the lists. Adding or removing

tasks will not change associated work orders that already exist.

108

Page 33: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

33

Custom Fields tab: Additional information you need on each location. In the

main window, select Administration, Define Custom Fields to add fields, e.g.

square footage, customer contacts, etc.

Page 34: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

34

3.2.5 Parts

Parts

Parts are items required to complete a task, e.g. an air conditioning filter, a toner

cartridge, or a quart of oil. When you mark a task as complete, FastMaint

reduces the quantity of required parts accordingly.

In the Professional edition you can restrict a user's ability to view or modify

parts.

Page 35: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

35

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes, or Clone to create a new

part based on this one.).

Listing

Name: Identifies the part. Either a name, e.g. "Oil Filter 55AWC", or an internal

code e.g. "HPC4092A".

Tip: If you have a large number of parts, it may make sense to switch to

using unique part code/identifier. Put the part code in the “Name” field and a

detailed part name and description in the “Description” field.

Description: One-line description of the part.

Price: The cost of the part. Updating the price updates any automatically

calculated costs.

Quantity In Stock: Number of parts available.

Units: Any units of measurement for the part e.g. gallons, boxes, etc.

Reorder At: Reorder when the quantity hits this floor. Enter "-1" (minus one) if this

is not needed for this part.

Category: Enter the related category .

Comments tab: Provide more information about the part, e.g. pictures or

notes. See HTML Editor for how to insert links, pictures, etc.

25

108

Page 36: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

36

Equipment tab: Clickable list of equipment for which this part is required.

Click Auto Identify to let FastMaint use the tasks to work out which

equipment requires the part. Click Change to edit the list.

Locations/Stores tab: Clickable list of locations where this part is

stored.Click Change to edit the list.

Purchases: Clickable list of purchase orders for this part. To add a new one,

click Create New Purchase Order.

Tasks tab: Clickable list of tasks for which this part is required.

Vendors tab: Clickable list of vendors who supply this part (note the Rating

column!). Click Change to edit the list.

Custom Fields tab: Additional information you need about the part. In the

main window, select Administration, Define Custom Fields to add fields, e.g.

alternate parts, special requirements, etc.

27

31

39

42

47

Page 37: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

37

3.2.6 People

People

You can tell the system about people who work for you or your company,

whether as contractors or employees.

In the Professional edition you can restrict a user's ability to view or modify

information on people.

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.

Page 38: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

38

Listing

Name: Identifies the person, either an actual name, e.g. "William Marshal" or

an internal code, e.g. “Electrician-L3”.

Phone & Email: Contact details.

Category: The person belongs to this category .

Location: Person works or is based at this location .

Hourly Rate: An hourly wage rate/cost rate applicable for this person. If this

is changed, any automatically calculated labor costs for tasks will be updated.

Comments tab: Provide more information about the person, e.g pictures or

notes. See HTML Editor for how to insert links, pictures, etc.

Non-Working Days tab: Define working hours and days for this person by

selecting a calendar . You can also click the Add button to enter Vacation/

Off Days and double-click an existing entry to change or delete it.

Tasks tab: Lists tasks for which this person is required. Double-click a task

to bring up a clickable list of work orders or click Add/Remove tasks From

List to edit the list.

Work Orders tab: List of work orders involving this person. Double-click an

entry to review and edit it, or click Add/Remove tasks From List to edit the

list.

Custom Fields tab: Additional information you need about the person. In the

main window, select Administration, Define Custom Fields to add fields, e.g.

hire date, employee number, specialties, etc.

25

31

108

23

42

52

52

Page 39: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

39

3.2.7 Purchases

Purchases

Purchase orders can be created to order parts from vendors . You can see

outstanding purchase orders on each part. When purchase order items are

received they are added to stock.

In the Professional edition you can restrict a user's ability to view or modify

purchase orders.

47

Page 40: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

40

Instructions

1.Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

2.Select the Print button to print out the purchase order for approval or

submission to a vendor. You can save your changes by selecting the Add/

Save button. Selecting the Cancel button discards all changes. The Delete

button will delete the purchase order (after asking you for confirmation!).

Listing

PO Request #: Automatically generated request number identifying the

purchase order. When you first create a purchase order, FastMaint asks you to

enter a template for these numbers.

Description: A one-line description of the order.

Order Date: Date of the order.

PO Number: Purchase order number, e.g. as assigned to by the purchasing

department.

Required By: Date when the order should be completed and parts delivered.

Status: Status of the order, e.g. "Requested", "Approved" etc.

Completed: Available when the order status is completed. Enter the date the

order was completed (all parts received).

Details tab: Shipping and billing addresses, plus payment terms.

Discounts/ Charges tab: Any discounts, shipping charges, taxes etc.

Page 41: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

41

Instructions tab: Any special instructions for the vendor.

Parts tab: Specify parts to be ordered.

Other tab: Any other non-stock parts or services to be ordered.

Custom Fields tab: Additional information on each purchase order.

(You can add fields to this tab, e.g. cost center, approvals. To do this, in the

main window, from the Administration menu, select Define Custom Fields).

Page 42: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

42

3.2.8 Tasks

Tasks

Each task describes a job or action that can be specified in a work order , for

example weekly maintenance checks, fixing an equipment breakdown or

changing an oil filter. You can create a task when you fill out a work order, but

it's better to enter some standard tasks beforehand. Also, if you define a task as

having a regular frequency, FastMaint schedules it for you. For step-by-step

examples see - How to create a 240 day task? and How to create a meter

based task?

In the Professional edition you can restrict a user's ability to view, create or

modify tasks.

"Any Other Maintenance": This task can be used to create ad-hoc unplanned

work orders using the Request/ Breakdowns button. Do not delete it, or

assign equipment or locations to it. If you can't find this task (because someone

changed its name), in the Create Work Orders For Breakdowns/ Maintenance

Requests Request/Breakdowns window, look for the hint next to the Equipment

and Location entries, "...you can always use the same unplanned task...". If this

doesn't list a task, create a new one called "Any Other Maintenance".

52

129

136

55

Page 43: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

43

Instructions

1.Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

2.If required, Click Work Orders/History to display a schedule of work orders,

which you can create by clicking Add.

You can also create a new task based on the current one by using the Clone

button; and use the Delete button to remove the current task.

Page 44: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

44

Listing

Name: Identifies the task, either a short description (e.g. "Weekly A/C

Maintenance") or an internal code (e.g."PUMP-01-SCHED-A").

Tip: If you have a large number of tasks it may make sense to switch to using unique task

code/ identifier. Put the task code in the “Name” field and a detailed task name and

description in the “Description” field.

Description: More information about the task.

Class: Is this a "preventive maintenance task" or a "breakdown maintenance

task"?

Category: Category, e.g. "Electrical", "Production Dept.", "Customer #5". Use

the Add/ Edit button to add new categories.

Class & Category information can be useful for reporting & analysis.

Priority: The priority for the task.

Start Time & Duration: Expected start time and duration of work orders for

this task.

Effective Period: This task can only be used to create work orders during this

time period. This is useful, e.g., if you wish to disable this task after a specific

date or number of work orders. Normally you would select “Never Ends” for

this field.

Page 45: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

45

Work Order Options: Select the "Create separate work orders for each

equipment and location associated with this task" to always generate a

separate work order for each location and piece of equipment associated with

the task.

If you don't select this option, then a single work order will cover all the

associated equipment and locations (unless you assign a custom frequency to

each location and piece of equipment on the Locations tab and the Equipment

tab).

Frequency tab: Specify how often the task should be automatically scheduled,

and then fill out additional information depending on what you selected.

FastMaint automatically schedules work orders (calculates work order dates)

for regular tasks, however you still have to create these work orders manually

, or run a the Planning Report to create all scheduled work orders in a

specific period. If you specify a Calendar, working hours and off days will be

considered.

Use "Unplanned" or "Alarm" for emergency or breakdown maintenance jobs.

You have to schedule these manually.

Equipment tab/ Locations tabs/ Part tabs/ People tabs: Use these tabs

to associate particular equipment, locations, parts and people with the task. In

each, use the Add button to open a list, select the check boxes then click OK.

Costs tab: Record the Labor Cost (cost of people needed), Material Cost (cost

of parts needed) and Other Cost (any other costs involved) for this task. If you

want to calculate any of these manually, uncheck the box. Otherwise FastMaint

calculates labor automatically based on the entries here.

Instructions tab: Enter up to several pages of instructions. You can format

the instructions with paragraphs and spaces to make them easy to read when

displayed or printed on reports. See HTML Editor for how to insert links,

pictures, etc.

52 64

108

Page 46: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

46

Feedback tab: Leave this blank or enter a template for the work order

feedback e.g. a fill in form, checklist, etc.

Custom Fields tab: Enter specific information not covered in the other tabs. In

the main window, select Administration, Define Custom Fields to add fields, e.g.

customer number, contact person, contract renewal date, etc.

Page 47: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

47

3.2.9 Vendors

Vendors

You can enter vendors into the system and list and rate them as possible

suppliers for equipment and parts. You can then generate purchase orders ,

and print vendor contact information on Parts to Reorder reports.

In the Professional edition you can restrict a user's ability to view or modify

vendor information.

39

Page 48: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

48

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

Listing

Name: Name or internal code to identify the vendor, e.g. "Sam"s Auto Parts",

or “V5463-22”.

Tip: If you have a large number of vendors, it may make sense to switch to using unique vendor code/

identifier. Put the vendor code in the “Name” field and the vendor name and description in the

“Description” field.

Description: One-line description of the vendor.

Our Account: Your organization's account number with this vendor.

Vendor Rating: A good way to record how good a vendor is.

Contacts tab: Enter different contact information for each service provided by

a vendor, or click select Only one contact for all sales and services to use just

one set of contact details for all sales & services.

Equipment tab, Parts tab, Purchases tab: Review and edit equipment,

parts and purchase orders related to the vendor. The vendor will then appear

on the Vendors tab of the relevant record.

Comments tab: Provide more information about the vendor. You may enter

several pages of comments. See HTML Editor for how to insert links,

pictures, etc.

108

Page 49: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

49

Custom Fields tab: Additional information on each vendor.

(You can add fields to this tab, e.g. cost center, approvals. To do this, in the

main window, from the Administration menu, select Define Custom Fields).

Page 50: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

50

3.2.10 Work Orders

Work Orders

Use work orders to assign maintenance tasks for particular dates and times.

New work orders are created from pre-entered tasks . The default values are

copied from the task e.g. start time, duration, equipment, people, etc. This

speeds up data entry. When a work order is created it is given a unique "Work

Order #" (work order number).

When are work orders created (work order # assigned)?

FastMaint automatically schedules work orders (i.e. calculates work order dates)

for most types of tasks, however you still have to create them (the work order

# will be assigned when created). You can create these work orders by running

the Planning Report for the work order dates (click the Plan button).

Alternatively look in the work order list for work orders with an empty status

(see screenshot below) and open the work order to create it using the Create/

Modify Work Orders window. For tasks with a frequency of "Unplanned" or

"Alarm" you have to use the Requests/ Breakdown function to schedule (&

create) unplanned task work orders or enter alarm conditions which will schedule

(& create) any work orders based on the alarm condition.

42

64

52

55

Page 51: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

51

Page 52: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

52

3.2.10.1 Create/Modify Work Orders

With the Work Order list displayed, double-click a work order

When are work orders created (work order # assigned)?

FastMaint automatically schedules work orders (i.e. calculates work order

dates) for most types of tasks, however you still have to create them (the

work order # will be assigned when created). You can create these work

orders by running the Planning Report for the work order dates (click the

Plan button). Alternatively look in the work order list on the main window for

work orders with an empty status and open the work order to create it. For

tasks with a frequency of "Unplanned" or "Alarm" you have to use the

Requests/ Breakdown function to schedule (& create) unplanned task work

orders or enter alarm conditions which will schedule (& create) any work orders

based on the alarm condition.

64

55

Page 53: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

53

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes. Any scheduled task will

still remain scheduled.)

You can also use the Delete button to remove the current work order (It will still

be scheduled by FastMaint if the work order is not based on an Unplanned

frequency task. Set the work order status to "Canceled" if you do not want it in

the schedule). Use Email to email the work order to all the people associated

with the work order. Use Print to print the work order - when the print window

pops up, you can select the Print all linked documents to print all supporting

documents required for the work order.

Listing

Task Name and Description: From the original task . (You can't edit this.)

Last Changed: For tracking purposes, shows when this work order was last

changed. (You can't edit this.)

Work Order #: Automatically assigned when the work order is created (will be

"N/A" until you click Save). This number can be used to locate the work order

using the Find button on the main window. (You can't edit this.)

Last Emailed: For tracking purposes, shows when this work order was last

emailed. (You can't edit this.)

Planned: Date & time this task was planned for.(You can change this only for

work orders based on an Unplanned frequency task.)

Description: More information about the task.

42

Page 54: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

54

Start Time Actual start time.

Duration: Actual duration of work.

Work Status & Completed: Current status of the work. If it is completed

then enter the completed date. If the work order is canceled then enter the

date it was canceled.

If the Work Status is changed to "Started" "Incomplete" or "Completed", the

quantity in stock for all parts needed for this task will be appropriately reduced.

If the Work Status is changed from "Started", "Incomplete" or "Completed" to

"Planned" or "Planned (Requested)", the quantity in stock for all parts used for

this task will be increased since the parts will not yet have been used.

Priority: The priority for the task.

Problems: Wether there were any problems when executing this work order.

Feedback tab: The place for any additional information. You can format the

instructions with paragraphs and spaces to make them easy to read when

displayed or printed on reports. See HTML Editor for how to insert links,

pictures, etc.

Equipment tab/ Locations tabs/ Parts tabs/ People tabs: Use these tabs

to associate particular equipment, locations, parts and people with the task. In

each, use the Add button to open a list, select the check boxes then click OK.

Costs tab: Records the Labor Cost (cost of people needed), Material Cost

(cost of parts needed) and Other Cost (any other costs involved). Depending

on the settings in the original task, these are usually calculated automatically

for you based on the Duration, and contents of the Parts tab and the People

tab.

108

Page 55: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

55

Custom Fields tab: Enter specific information not covered in the other tabs. In

the main window, select Administration, Define Custom Fields to add fields, e.g.

customer number, contact person, contract renewal date, etc.

Instructions button: Review task instructions (can be changed only by editing

the task ).

3.2.10.2 Create Work Orders For Breakdowns/ Maintenance Requests

With the Work Order list displayed, click Add

OR

In the main window, click Requests/ Breakdowns

Use this screen to create work orders for breakdowns and maintenance

emergencies, or maintenance requests. If you select one of the tasks you

defined earlier, then some of the information is filled in for you.

You can also use this screen to modify and print work orders. The resulting work

orders will also appear in the Planning Report - useful if you want to schedule

non-emergency maintenance requests for the next period.

In the Professional edition you can restrict this screen to specific groups of

users.

42

64

Page 56: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

56

Instructions

Complete the form (see Listing, below) then click one of the buttons:

Reset: Clear the form and start again.

Create: Finalize the work order, saving your changes.

Cancel: Close the window without saving your changes.

Listing

Work Order Details: Indicate whether this work order is unplanned or based

on an alarm. (Daily/ Weekly/ Monthly/ Yearly/ Meter/ task types are

automatically scheduled by the system.)

Page 57: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

57

TIP: It speeds up data entry if you've already created several "Unplanned" tasks

for common breakdowns/ requests. Do this now by clicking the Task Add/Edit

button. This opens the Tasks screen .

Only Show Tasks For: Limit the list of possible tasks by specific equipment/

location.

Task: Base the Work Order on this task. Use the Add/ Edit button to add new

tasks or modify existing tasks

Reason: Reason for the work order.

Work Order Date: The work order is for this date (today or in the future).

Work Order Comments/Special Instructions: Any additional text.

Tip: If you need to remove an unplanned/ alarm work order that have already

been submitted, delete the work order (Creating And Updating Work Orders ).

Also remove the alarm on the equipment if the work order’s task is scheduled

based on an equipment alarm. Alternatively you can just set the work order's

status to "Canceled". This will ensure that such work orders do not get scheduled

in the Planning report.

42

52

Page 58: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

58

3.2.11 Statistics

Statistics

View current system statistics (e.g. work order backlog, equipment downtime,

pending work orders, etc.) and compare them with prior periods. For example in

each period you can identify which equipment took the most work order time for

breakdown (unplanned) maintenance as well as planned (preventive)

maintenance. This can help identify trends or signal potential problems if you see

unusual changes over the three different periods.

By default the current period (P1) is the last 30 days. Two prior periods are last

31-60 days (P2) and last 61-90 days (P3). You can change the size of the

periods used for the statistics calculation (e.g. from 30 days to 90 days) by

using System Settings . 86

Page 59: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

59

Page 60: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

60

3.3 Toolbar (top bar buttons)

The buttons on the main window toolbar enable you to quickly perform common

tasks, most of them relating to the lists opened by the buttons on the left bar .20

Page 61: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

61

Listing

Add: Add a new entry to the selected list.

Open: Open the selected list entry. (You can also do this by double-clicking.)

Delete: Delete the selected entry.

Find: Find an entry on any of the lists - no need to display the list first. If you

have the barcode support module , then you can also scan in identification

numbers using this feature.

Requests/Breakdowns: Process emailed/ web submitted work requests or

create new unplanned work orders for maintenance requests or

breakdowns.

Workload: Review workload and resolve schedule conflicts, e.g. where people

are not available for a job, or are required elsewhere - see Workload Balancing

And Detecting Schedule Conflicts .

Plan: Create and print (or re-print) pending work orders for any period - see

Planning Report/ Print Work Orders .

Feedback: A quick way of updating the status of multiple work orders for a

selected period - see Fast Feedback .

Email: Process staff emailed/ SMS text responses to work orders emailed to

them - see Email Processing .

88

50

62

64

68

70

Page 62: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

62

3.3.1 Workload Balancing And Detecting Schedule Conflicts

Click Workload

Use this screen to review workload and resolve schedule conflicts, e.g. where

people are not available for a job, or are required elsewhere. This can help reduce

overtime hours, and ensure that jobs get done.

Instructions

1.Specify the period to review (you can also click the buttons to focus on specific

task categories, people, equipment etc), then click OK.

The Workload screen opens. This may take a few minutes if there are a large

number of tasks or the period you selected is very large.

Page 63: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

63

2.Review the Task Duration Chart. When you find a red bar (representing a day

with conflict), click it.

The tasks for that day appear in the Task Chart.

3.Work through the Task Chart, clicking each red bar (representing a task with

conflict) and using the Modify button to resolve any conflict.

4.Click Refresh to update the display, then return to step #3 until you have

resolved all the conflicts.

5.Click Close.

The window closes. Now would be a good time to review the Planning Report

to create a work plan or directly produce work orders.

Description

Bars in red indicate conflicts.

Task Duration Chart: A bar chart showing workload. The title on top shows

the period for the chart as well as the number of dates found with conflicts.

Each bar represents a single day. The height shows the total duration or total

labor hours of all the tasks for that day (depending on the Chart total labor

hours... checkbox). When calculating total labor hours, tasks with no

associated people are treated as requiring a single person.

Select a bar to see the breakdown of the tasks for that day in the Task Chart.

Task Chart: A bar chart showing tasks for the date selected in the Task

Duration Chart.

Each bar represents a single task.The height shows the duration.

For dates with conflicts, the title of the Task chart will show how many of the

tasks had conflicts. You can select an individual task bar to see more details of

the task. Click Modify to resolve the conflict by updating the task or work

order .

64

42

52

Page 64: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

64

3.3.2 Planning Report/ Print Work Orders

Click Plan

Planning provides a way to create and email or print (or re-print) pending work

orders for any period.

50

Page 65: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

65

Email Work Orders

You can email pending work orders in a period to each person associated with

the work order (make sure that they have a valid email/ SMS text address using

the People window). Specify the period (you can also click the buttons to

focus on specific task categories, people, equipment etc, and use the check box

to save the settings until the next time), then click OK. You will be asked if you

wish to modify the work orders before emailing them - this is a good time make

any changes or to cancel any work orders that are no longer needed. Once this

is done the work orders are emailed. This may take some time.

The maintenance staff who receive these email/ SMS text messages can

perform the work and send you back a status update by email/ SMS text. If you

have FastMaint Professional you can receive and process the emailed

responses from the maintenance staff using the Email Processing feature.

Print Work Orders

Built-in Report Templates

1.Compact: Print work orders with multiple work orders per page.

2.Detailed: Print work orders with each work order on its own page.

3.List: Print work orders in a tabular form - similar to a spreadsheet.

37

70

Page 66: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

66

1.Specify the period to review (you can also click the buttons to focus on specific

task categories, people, equipment etc, specify what appears on the report in

Print Options, or pick a different Order or Report Template, and use the check

box to save the settings until the next time), then click OK. You will be asked if

you wish to modify the work orders before printing them - this is a good time

make any changes or to cancel any work orders that are no longer needed.

The report opens. This may take some time.

2.After the report is created: Click Save to save the report as a PDF (opens

in Adobe Acrobat Reader or similar) or HTML file (opens in your web browser)

and Email to send the report via email. Click Preview to see how many pages

the report would be before printing it out, and the Print to print (when the

print window pops up, on the Options tab you can select the Print all linked

documents to print all supporting documents required for the work order).

Tip: If you wish to create custom report templates see - How can I customize a

report? 150

Page 67: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

67

Page 68: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

68

3.3.3 Fast Feedback

Click Feedback

The Fast Feedback screen is a quick way of updating the status of multiple work

orders for a selected period. It makes it very easy for maintenance personnel to

update their work orders.

1.Specify the period and which categories of work order to review (you can also

click the buttons to focus on specific task categories, people, equipment etc,

and use the checkbox to save the settings until the next time), then click OK.

The Update Work Order Status screen opens.

Page 69: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

69

2.Do one or both of the following:

Click the check boxes to update the status. Selecting a check box marks the

work order as completed and parts used will be reduced from stock.

Unselecting a checkbox marks the work order as incomplete (parts are

returned to stock only if the work order status is changed to "Planned").

Double-click a work order to edit it and enter additional details .

3.Click Close.

The screen closes.

52

Page 70: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

70

3.3.4 Email Processing

Click Email

The Email Processing screen allows you to receive

1.Maintenance technicians emailed/ SMS text responses to work orders emailed

to them. Based on these responses work orders can be updated or closed.

2.Emailed work requests and work request updates from external users.

Instructions

1.Click the Receive button to get the email responses sent to the default email

address specified in Settings .86

Page 71: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

71

2.Review the received email. The Errors column will display any errors (e.g.

bounced email). Double click on an email message to edit it or delete it . You

will do this to fix errors or forward/ reply to the message to request

clarifications.

3.Click Process to process the email messages. All email messages without

errors will be checked. If the text "Work Order #:" is found in the email

subject, the corresponding work order is located & updated. The work order

status is set based on the first word found in the email message (Completed/

Canceled/ Incomplete). The relevant part of the email message is copied into

the work order feedback. If you have turned on emailed work requests in

Settings , and if the text "Work Request #:" is found in the email subject, the

corresponding work request is located & updated. Any remaining messages

are treated as new work requests (unless you have specified an optional text/

word that must be in the email subject for a work request). Any errors during

this process will cause the email message to be marked with an error.

Messages that are successfully processed are removed from the list.

4.Go back to step 2 to fix any email with errors. If none of the messages left are

needed (e.g. they are all bounce errors) then click on Delete All to remove all

remaining messages. If done click on the Close button to exit.

72

86

Page 72: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

72

3.3.4.1 Edit Email

In Email Processing, double click on an Email

You can use this to fix some email errors e.g. work order # not found in the

email subject because the subject was changed in the email. You can also use

this to Reply to the email to get clarifications or Forward it to someone else to

get more information.

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

Page 73: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

73

Listing

From: Name of the person this email is from.

From Email: Email address of the person who sent the email.

To: The email address the email was sent to. It cannot be changed. This will

normally be the default email address set in the system Settings .

Subject: The email subject. Avoid changing this to avoid email processing

errors. You would normally change this only when trying to fix an email error

like "Cannot find Work Order # in subject". To fix such an error make sure that

the work order number is correct and that it comes immediately after the text

"Work Order #:" in the subject.

Message: The actual response from the person. When processing the email to

update the work order, FastMaint will pull out the relevant part of the response

and use it to update the work order feedback.

Reply/ Forward button: Use this button to forward the email message to

someone else or send a reply to the person who sent the email. Pressing this

button will show a slightly different screen since the message will be from

FastMaint to another person (From address, To address will change). You can

enter your message here and press the Send button to send the email

message and return to the edit screen. Note that replying/ forwarding the

message will not remove the original email message - you can still process it.

Save button: Save your changes.

Delete button: Delete the message so that it will not be processed.

86

Page 74: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

74

3.4 Menus

Keyboard shortcuts are listed next to the menu item on the actual menu, e.g.

"Delete Ctrl+D".

Menu Options

File Add: Add an item to the displayed list .

Open: Open the selected item.

Import: Load information from other tools - see

Importing Data .

Export: Save information so it can be used by other

tools - see Export Wizard .

Edit Delete: Delete the selected item.

Find: Find an entry on any of the lists - no need to

display the list first. If you have the barcode support

module , then you can also scan in identification

numbers using this feature.

View Refresh: Update the display to take account of any

changes, e.g. by somebody else using the Web Based

Request Module .

Text Size: Increase or reset the text size for easy

readability.

20

77

80

88

116

Page 75: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

75

Menu Options

Administration Groups & User Accounts (Professional Edition):

Create and manage multiple user accounts with different

permissions - see User Accounts and Groups .

Define Custom Fields: Set up custom fields for the

Custom Fields tabs.

Settings (Email, Alerts, etc.): Alter the system

settings for alerts, email, bar codes and so on - see

Settings .

Application Setup: Use this option to setup FastMaint

(upgrades, change databases etc).

Compact Database: A bit like defragmenting your hard

drive; this option speeds up the system by reorganizing

the way information has been stored.

Tools Bar Code Labels (Bar Code Module): Print barcode

labels, depending on your Bar Code Options .

Fast Feedback: A quick way of updating the status of

multiple work orders for a selected period - see Fast

Feedback .

Workload Balancing: Review workload and resolve

schedule conflicts, e.g. where people are not available for

a job, or are required elsewhere - see Workload

Balancing And Detecting Schedule Conflicts .

84 82

86

88

68

62

Page 76: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

76

Menu Options

Reports A variety of useful reports, including:

Maintenance, Planning / Create Work Orders: A way

to create and print (or re-print) pending work orders for

any period - see Planning Report/ Print Work Orders .

For a list of available reports see Reports .

Help Help in using this application plus:

Check for updates: Check for any changes to

FastMaint. You should do this regularly.

Online Demos/ Tutorials: Access online demos/

tutorials on the SMGlobal website

User Manual: Open printable user manual.

Registration: Enter your license key to convert

FastMaint from the trial version to the full version.

64

91

Page 77: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

77

3.4.1 Importing Data

Select File, Import

The Import function can be used to import Microsoft Excel Spreadsheets (.xls

files) and comma delimited text files containing data such as alarm and meter

readings, parts lists, and vendors. This can be a good way to quickly load your

system with information about your site. The import function can also be used to

update existing data e.g. part prices & quantities, etc. For a step-by-step

example see - How to import data?

Import rights are based on the user's rights to update information. For example,

if they have no update rights to Equipment they will not be able to import

Equipment. See Groups for how to set access rights.

Instructions

1.Ensure that your source file is correctly organized (see below). The easiest

way to do this is to export similar data and use the resulting file as a

template.

121

82

80

Page 78: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

78

2.Select File, Import.

The Wizard starts.

3.Work through the wizard using the Next button. (You can backtrack by

clicking Previous.)

At the end, a list of errors appears. Entries with errors will not be imported.

4.Open the original file, fix any errors and try again.

FastMaint treats any duplicates as errors and skips them.

TIP: In the column-mapping step of the Import wizard, place the mouse over

selected columns to see "tool tips" with more information on what is expected in

the column as well as any special formatting instructions.

Format for source file

Its simplest to export similar data and use the resulting file as a template.80

Page 79: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

79

Comma delimited files: If you create the text file by exporting the data as

Comma Separated File (CSV) from another program such as Microsoft Excel™

or Microsoft Access™, it will normally take care of formatting.

All fields should be separated by a comma. The first line should contain the

column names. Each subsequent line should contain a single item of data:

Column-Name1, Column-Name2, Column-Name3

Item1-Col1-Value1, Item1-Col2-Value2, Item1-Col3-Value3

Item2-Col1-Value2, Item2-Col2-Value2, Item2-Col3-Value2

Item3-Col1-Value3, Item3-Col2-Value3, Item3-Col3-Value3

Replace any double quotes in the original data with single quotes ('). Replace

any embedded newlines/ carriage returns with "^p" (Shift+6 and p). Any fields

containing commas should have double quotes (") around them.

The resulting file should look like this:

Name, Email, Phone, Calendar, Comment, Rate

"Smith, Sam",, 555-1212, Default,No overtime, 15.75

Ben Lane,,, Maintenance Calendar,,,22

"Paz, Bob R.","[email protected]","Ext 15","Default","","",25.00

Microsoft Excel™ Spreadsheets: Only the first workbook in the spreadsheet can

be imported. The first row should contain the column names.

Page 80: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

80

3.4.2 Export Wizard

Select File, Export

Use the Export Wizard to export People, Equipment, Parts, Tasks, Vendors and

Work Orders (pending or historical data) to an external text file or Microsoft

Excel spreadsheet. This can be a way to transfer information to another system

as needed.

Export rights are based on the user's rights to view People, Equipment, Parts,

Tasks and Vendors. For example, if they have no rights to view Equipment they

will not be able to export Equipment. See Groups .82

Page 81: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

81

Instructions

Work through the wizard using the Next button. (You can backtrack by

clicking Previous.)

Listing

Format: "MS Excel File" produces a standard file with the extension ".xls".

"Text File (comma delimited)" produces a file with commas separating the

fields (sometimes known as a CSV file).

"Text File (tab delimited)" produces a file with tabs separating the fields - this is

probably the easiest to import into a word processor or spreadsheet program.

Page 82: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

82

3.4.3 Groups

Select Administration, Groups then select a group and click Open

The settings for each group enables you to control who uses what parts of the

system.

You do this by setting up a User Account for each person who uses the

system. You then assign each user to one of three groups:

Administrators: Complete rights to use the system.

Power Users: Rights to everything except manage user accounts and group

rights.

Basic Users. Limited rights to use the system

You can change the settings of a group to control access to different parts of the

system for all users who belong to that group.

84

Page 83: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

83

Instructions

Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

Listing

Name: Identifies the group.

Comments: Any useful information about the group.

Access Rights: Scroll through the list, assigning access as required. Hovering

the mouse pointer brings up additional information about each setting.

Page 84: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

84

3.4.4 User Accounts

Select Administration, User Accounts, then select an account and click

Open or New

User accounts contain a user's login details, and determine their group

membership , which in turn controls their access to the system.

IMPORTANT: Keep the default "admin" account password in a safe place.

Without access to an account with administrator group rights, you cannot

manage users and groups, compact the database or register the software.

Instructions

Complete the form (see below) and click Save or Add.

(Alternatively, click Cancel to abandon your changes.)

Listing

Name: A unique name for the user, perhaps their real name or a network ID.

Try to make it easy to both remember and type, since this name is required

every time they log on!

82

Page 85: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

85

Contact Details: How to contact the user.

Password & Re-enter: Leave this blank to have the user enter their own

password the next time they log on. This is useful for resetting existing

passwords.

Group: Determines access to FastMaint - see Groups .

Comments: Any useful information.

82

Page 86: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

86

3.4.5 Settings (Email, Alerts, etc.)

Select Administration, Settings

Use this window to alter the system settings for a variety of FastMaint features

such as the statistics period, work request alerts, email accounts, initial system

settings and so on.

Instructions

Complete the form (see below) and click Save. (Click Cancel to return to the

previous page.)

Listing

1) Main tab: General settings such as:

Page 87: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

87

a. If you have also purchased the Web Based Work Request add-on:

Require an equipment or location to be specified when a work request is

submitted.

b. Disable deletion of a work order once it is created (a work order #

assigned). This will prevent work orders from being accidentally deleted. This

is useful if you need to keep track of every work order number assigned for

auditing purposes.

c. Change the number of days from the default 30 days in a period for

Statistics . Do not make this too large as otherwise system performance

will suffer as the statistics are periodically refreshed.

d. Option to automatically insert the user name & date in the work order

feedback whenever the work order is updated

e. Daily when program starts, email pending work orders & reminders: If this

option is selected, once a day when the program is started it will email out all

pending work orders and work order reminders to technicians. You can

specify how many days a work order should be overdue to send a

reminder. Note: If no one runs the program that day - no work orders or

reminders will be sent out that day!

2) Requests tab: Work request processing is available only in FastMaint

Professional edition. You can get or send alerts by email SMS/ text messages

when a work request is received or updated. You can also turn on the ability to

receive work requests by email.

3) Bar Codes tab: Print and use bar codes in FastMaint. Requires the bar code

module add-on to be purchased. More details of each bar code option is

available here .

116

58

88

Page 88: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

88

4) Email tab: Email account settings. You will need to specify both receive email

settings (POP3) as well as send email settings (SMTP).

5) Initial settings tab: The initial system settings such as whether you want to

create a demo database, work order numbering, work request numbering

(used if you have FastMaint Professional edition) and purchase order

numbering.

3.4.5.1 Bar Code Options

Select Administration, Settings, Bar Codes tab

Use this to alter the standard settings for bar codes generated by FastMaint.

FastMaint can generate and print bar codes, and then read them using the Find

function (on the main window's Edit menu ). Bar codes can be a great way to

reduce data entry and make it easier to use the system. For example, you can

use bar codes for checking out parts from inventory, and then for updating the

work order.

Requirements: To print and use barcodes, you will need to have the Bar Code

module, an add-on for the Standard & Professional editions. If you wish to

evaluate the module please contact [email protected] for a trial or to

purchase a license. You will also need to have or purchase your own barcode

scanners to scan in the bar codes. The bar code scanners should be of the

"wedge" type (plug into the keyboard) OR should use software that makes it

seem like the bar codes are being entered as text on the keyboard.

19

Page 89: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

89

Instructions

1.Complete the form (see below) and click OK.

2.If required, select Tools, Barcode Labels to print your bar codes.

(You can pick from a range of standard labels, or define your own. )

3.If the scanner fails to read your bar codes, increase the dimensions and quiet

zone and try again.

Listing

Create Bar Codes of Type: Select a standard type of bar code. Code 128

produces the most compact.

Height, Narrow Width: Dimensions of the bar code.

Page 90: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

90

Quiet Zone: Blank area on either side of the bar code to enable the scanner to

work.

Page 91: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

91

3.4.6 Reports

Select Reports

There are a variety of useful reports. Most reports use a report template. You

can create new report templates or modify existing ones to create customized

reports - see Report Designer and How can I customize a report? .

List of available reports:

Menu Report Name Description

Select Reports,

Maintenance

Work Order Analysis This report helps compare preventive,

unplanned and other (miscellaneous)

maintenance work orders over a period

of time. Use it to identify trends (e.g.

too much variance from estimated

work durations, frequent unplanned

maintenance, etc.) and other issues

that may need to be fixed in the

maintenance plan.

See Work Order Analysis Report .

Select Reports,

Maintenance

Equipment

Maintenance

Calendar

This reports gives you an overview of

maintenance work due by week on

different equipment over a twelve

month period. This can be very useful

for planning and identifying machine

downtime periods.

See Equipment Maintenance Calendar

.

98 150

95

96

Page 92: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

92

Menu Report Name Description

Select Reports,

Maintenance

Planning/ Create

Work Orders

Use this report to actually generate and

print work orders as needed. It will allow

you to modify work orders prior to

printing as well as calculate part and

person availability. Depending on the

report templates you choose, you can

print out work orders in tabular format,

detailed format, etc.

See Planning/ Create Work Orders .

Select Reports,

Maintenance

Work Order History This report allows you to review & print

past and future work orders. See Work

Order History Report .

Select Reports,

Maintenance

Work Requests This reports allows you to review & print

work requests. To use this you have to

have FastMaint Professional with the

web work request add-on.

Select Reports,

Categories

Details This reports allows you to list all the

categories in your system, plus the

associated equipment, tasks, parts, etc.

Select Reports,

Categories

History This reports allows you to compare

work order costs and durations by

category, over a specified period.

64

97

Page 93: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

93

Menu Report Name Description

Select Reports,

Equipment

Details This reports allows you to list all the

equipment in your system, plus the

associated tasks, parts, etc.

Select Reports,

Equipment

History This reports allows you to compare

work order costs and durations by

equipment, over a specified period. Use

the "Part Of" option to get a detailed

work order cost and duration roll-up of

a piece of equipment and its sub-

equipment.

Select Reports,

Locations

Details This reports allows you to list all the

locations in your system, plus the

associated equipment, tasks, parts, etc.

Select Reports,

Locations

History This reports allows you to compare

work order costs and durations by

location, over a specified period. You

can also include work orders by

equipment in the location. Use the "Part

Of" option to get a detailed work order

cost and duration roll-up of a location

and its sub-locations.

Select Reports,

Parts

Details This reports allows you to list all the

parts in your system, plus the

associated equipment, tasks, vendors,

etc.

Page 94: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

94

Menu Report Name Description

Select Reports,

Parts

History This reports allows you to compare

work order parts usage costs and

durations by part, over a specified

period.

Select Reports,

People

Details This reports allows you to list all the

people in your system, plus the

associated tasks, holidays, etc.

Select Reports,

People

History This reports allows you to compare

work order costs and durations by

person, over a specified period.

Select Reports,

Purchases

This reports allows you to list all

purchase orders in your system, over a

specified period.

Select Reports,

Tasks

This reports allows you to list all the

tasks in your system, plus the

associated equipment, locations, parts,

etc.

Select Reports,

Vendors

This reports allows you to list all the

vendors in your system, plus the

associated equipment, parts, etc.

Page 95: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

95

3.4.6.1 Work Order Analysis Report

Select Reports, Maintenance, Work Order Analysis

The Work Order Analysis Report is used to compare preventive, unplanned and

other (miscellaneous) maintenance work orders (see Creating And Updating

Work Orders ) over a period of time. Use it to identify trends (e.g. too much

variance from estimated work durations, frequent unplanned maintenance, etc.)

and other issues that may need to be fixed in the maintenance plan. For example

the variation of average days to complete work orders (difference between

Completed date & Planned date) tells you how well you are following your

maintenance plan. Ideally it should be zero or a small positive number of days.

From the Maintenance sub-menu in the Reports menu, select Work Order

Analysis.

Built-in Report Templates

1.Breakdown vs Preventive: Compare time spent, average days to complete &

costs of breakdown vs. preventive vs. other task work orders.

2.Cost & Duration Variance: Compare actual cost & actual duration variances

from task estimates of different types of work orders.

3.Tabular Data: See all analysis data in tabular form rather than in charts.

Instructions

1.Specify the period to review (you can also click the buttons to focus on specific

task categories, people, equipment etc, enter a different Title for the report, or

pick a different grouping (Show By - Day/ Week/ Month) or Report Template,

and use the checkbox to save the settings until the next time), then click OK.

The report opens. This may take some time.

52

Page 96: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

96

2.Click Save to save the report as an HTML file (opens in your web browser).

Click Preview to see how many pages the report would be before printing it

out, and the Print to print.

Tip: If you wish to create custom report templates see - How can I customize a

report?

3.4.6.2 Equipment Maintenance Calendar

Select Reports, Maintenance, Equipment Maintenance Calendar

The Equipment Maintenance Calendar Report gives you an overview of

maintenance work due by week on different equipment over a twelve month

period. This can be very useful for planning and identifying machine downtime

periods. From the Maintenance sub-menu in the Reports menu, select Equipment

Maintenance Calendar.

Instructions

1.Specify the twelve month (one year) period to create the calendar for (you

can also click the buttons to focus on specific task categories, people,

equipment etc), then click OK. The report opens. This may take some time if

you have a lot of equipment or many maintenance tasks.

2.Click Save to save the report as an HTML file (opens in your web browser).

Click Preview to see how many pages the report would be before printing it

out, and the Print to print.

Tip: If you wish to create custom report templates see - How can I customize a

report?

150

150

Page 97: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

97

3.4.6.3 Work Order History Report

Select Reports, Maintenance, Work Order History

The Work Order History Report is used to see work orders (see Creating And

Updating Work Orders ) done in a given period. From the Maintenance sub-

menu in the Reports menu, select Work Order History.

Built-in Report Templates

1.Compact: Print work orders with multiple work orders per page.

2.Detailed: Print work orders with each work order on its own page.

3.List: Print work orders in a tabular form - similar to a spreadsheet.

52

Page 98: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

98

Instructions

1.Specify the period to review (you can also click the buttons to focus on specific

task categories, people, equipment etc, enter a different Title for the report, or

pick a different Order or Report Template, and use the checkbox to save the

settings until the next time), then click OK.

The report opens. This may take some time.

2.Click Save to save the report as an HTML file (opens in your web browser).

Click Preview to see how many pages the report would be before printing it

out, and the Print to print.

Tip: If you wish to create custom report templates see - How can I customize a

report?

3.4.6.4 Report Designer

Select Report, then any report, then click Add/Edit next to Report

Template, then New or Open on the list of templates

Report templates are used to generate most reports. You can modify most

report templates and also create your own ones. For a step-by-step example

see - How can I customize a report?

You can create new fields for an item (e.g. a new warranty date field for

equipment) that can be displayed on the report by selecting Administration,

Define Custom Fields for that specific item type (e.g. equipment) on the main

window.

150

150

Page 99: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

99

Instructions

1.Open the report for editing.

If it's a built in report, FastMaint creates a copy - you can't edit built-in

reports!

2.If required, change the report name and description to something more

descriptive.

3.If you are an administrator, you can specify if the report template is available

only to you or all other users.

4.Edit the template as required, using the Insert Field button to insert fields -

see Editing a Report Template . You can click on the HTML View button to

see the report code.

100

Page 100: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

100

5.Click OK then Add.

The report is now available for use.

Listing

Name: Short easy-to-remember name for the report.

Description: Longer description of the report.

Type: Determines which fields are available,

Sub-Type: Determines the layout, e.g. "List".

Owner: Whoever created the report.

Available for: Who can use this report. You need to be an administrator to

alter this setting which is available under Groups .

Report Template: See Editing a Report Template .

3.4.6.4.1 Editing a Report Template

From inside a Report, click in the Report Template field

The report template is used to generate the actual report. You can insert tables,

columns, add/ remove fields or functions and so on. All report fields/ functions

are enclosed in double square brackets (e.g. "[[wo.category]] ").

82

100

Page 101: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

101

Instructions

Edit the report as you would using any word processor. Enter text and format it

using the icon buttons. Hovering the mouse over the buttons displays tool tips

explaining what each one does. The first button toggles between Design view and

HTML view (you can also use the HTML View/ Design View button above the

template to the right).

If you insert any pictures & links make sure that the files are in locations

available to all users e.g. a public website or shared folder. Otherwise you will be

able to access them but others will get errors when trying to access them from

some other computer (pictures will not be displayed and links will not work).

Page 102: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

102

Insert/ Modify fields: Click on a field/ function in design view to change the

field/ function. Insert fields and functions at a particular location by moving the

cursor there and then clicking on the Insert Field button. Once a field is

selected, you can also use drag and drop to move it around within the section

(Header/ Detail/ Footer) it was created in.

You can create new fields for an item (e.g. a new warranty date field for

equipment) that can be displayed on the report by selecting Administration,

Define Custom Fields for that specific item type (e.g. equipment). This new field

will now be visible when you click on the Insert Field button.

Detail record field: For example an equipment field on a work order report can

occur multiple times - once for each equipment on the work order, a part field on

an equipment report can occur multiple times - once for each part associated

with the equipment. In such cases insert a list (use the numerical list/ unordered

list toolbar buttons in editor) before the field e.g.

[[equipment.name]]

HTML view (experts only!): Review and directly edit the HTML code here. Do

not put in the <html>, <header>, <body> tags as they are automatically be

inserted - duplicate tags may cause your reports to look odd! You can use most

tags normally found within the <body> section of HTML documents. For fields/

functions make sure that there are no spaces between the square brackets.

DO NOT delete or move around the Header, Details or Footer sections otherwise

your report will produce errors or be incorrect if you try to use this template. If

you accidentally do this, you may need to delete this template and start afresh if

you have saved your changes.

Components Of A Report Template

Sections: A report template contains three sections:

Page 103: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

103

1.Header Section: It can contain report title, summary information, etc. It is

marked by the tag [[report.header]] in HTML View.

2.Details Section: It contains the actual content of the report e.g. work

order details, part details, etc. It is marked by the tag [[report.detail]] in

HTML View.

3.Footer Section: It can contain summary information (e.g. report totals). It

is marked by the tag [[report.footer]] in HTML View.

Report Functions: Function names are case insensitive. Functions may also

be nested e.g. [[FormatCurrency(total(wo.laborcost))]] will format the total

labor cost of all work orders retrieved in the current currency format.

Avg: Gets the average of a numeric column e.g. [[avg(wo.laborcost)]].

Count: Gets the numer of rows/ records found e.g. [[count(wo.name)]]

Total: Gets the total of a numeric column e.g. [[total(wo.laborcost)]].

Typically used in the report's footer section to get totals.

FormatCurrency: Formats a numeric value into the current currency

format e.g. [[formatcurrency(wo.laborcost)]].

FormatDate: Formats a date value into the current date format e.g.

[[formatdate(wo.completeddate)]].

FormatDuration: Formats a time duration value into the hour & minute

format e.g. [[formatduration(wo.actduration)]].

FormatTime: Formats a time value into the current time format e.g.

[[formattime(wo.StartTime)]]

Page 104: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

104

IfPresent: Takes two or three arguments e.g.

[[IfPresent(equipment.description, equipment.description, "-No

description-"]]. If the first argument evaluates to empty/ null, it returns the

third argument or nothing if no third argument is supplied. If the first

argument is present and not empty, it returns the second argument.

RowNum: Gets the row number of the current record being processed e.g.

[[rownum(wo.name)]].

DrawChart: Draws a chart of the specified type. Parameters are:

o Type: Can be “barchart”, “linechart” or “piechart”

o Width: Chart width in pixels

o Height: Chart height in pixels

o Chart title

o Horizontal axis title

o Horizontal series data

o Vertical axis title

o First vertical series name

o First vertical series data

o Second vertical series name (optional)

o Second vertical series data (optional)

o Third vertical series name (optional)

o Third vertical series data (optional)

Report Variables: Variable names are case insensitive. Enclose variable names

in square brackets e.g. [[report.date]].

report.date: Returns date report was created.

report.dump: Returns a full list of all parameters available in a report section. Useful ifyou want to find out what variables and records are available in a report section.

Page 105: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

105

report.newline: Returns a line break (useful for formatting).

report.null: Returns an empty value. Useful as a placeholder - say as a secondargument for the IfPresent function. E.g. [[ifPresent(eqp.name, report.null,report.commentstart)]] - this will comment out a report section if no equipment recordsare found.

report.pagebreak: Produces a new page.

report.space: Returns a single space. Useful for formatting.

report.commentstart: Starts an HTML comment. Useful to use with the IfPresentfunction to comment out (hide) unused sections of a report. Must be used along withreport.commentend. See the "Location History" report template for an example of howthis is used to show/ hide equipment information based on whether the checkbox to listall equipment in a location is selected.

report.commentend: Ends an HTML comment. Useful to use with the IfPresentfunction to end a comment out (hide) unused sections of a report. Must be used withreport.commentstart.

Hints & Troubleshooting

Make sure that there are no spaces within the double square brackets e.g.

something like "[ [" or "] ]" will cause items not to be recognized.

Avoid using HTML code in function arguments (e.g. in the IfPresent function).

This can cause problems depending on the input data.

Use the [[report.dump]] tag to get a detailed list of variables available in a

report section if the report generator cannot find a requested parameter.

You can switch the Report Template to HTML mode (click HTML View) to see

the raw HTML code and hence locate the cause of some hard to find errors.

If a field/ function does not display correctly make sure that you have not

moved it from the section (Header/ Footer/ Detail) that it was created in

originally.

Page 106: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

106

Seeing extra columns or rows in a table? If a field is detail record field it may

have multiple values for each master record field (e.g. more than one part

record associated with each work order record). You may need to put such

fields in their own sub-table or in a list by inserting a list symbol before the field

(use the numerical list/ unordered list toolbar buttons in editor). Otherwise you

may see an extra table column or row for each occurrence of this field.

Problems with tables? If the table does not fill the width make sure that table

width is set to 100%. Blank table cells not displayed when you print or create a

PDF. If you want them displayed (because they have a border or margin) put

something in the cell. For example you can change a cell like "<td ……. ></td>"

to "<td ……. >&nbsp;</td>" ("&nbsp;" is a non-breaking HTML space). To

make text in a table cell bold use "<th>" rather than "<td>" e.g. rather than

"<td><strong>My Heading</strong></td>" use "<th>My Heading</th>".

Font sizes & styles: If you want to make specific sections of a report larger

e.g. "Planned Date" field in the "Work Order: Detailed" report you have to edit

the HTML style. The report editor fonts are not used on the final report since it

is generated based on HTML 5 styles. To change the HTML styles click HTML

View.

Change:

<p>Date: [[wo.planneddate]]</p>

To:

<p style="font-size: 200%;">Date: [[wo.planneddate]]</p>

Page 107: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

107

3.5 Other

This covers miscellaneous features of FastMaint.

Page 108: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

108

3.5.1 HTML Editor

On any form, you edit Comments/ Instructions with this editor

You don't actually need to understand HTML in order to use the editor! You enter

text and images just as you would in a word processor such as Microsoft Word.

The editor is recognizable in any field due to the row of icon buttons at the top

as shown below.

The HTML Editor allows you to insert pictures, tables, formatted text and even

links to other documents. Note that these are links to these files - so you must

update the documents and pictures directly in their folders, e.g. when manuals

change.

Only links to documents in HTML format can be printed. Links to documents

of other types can be viewed when you click on them in the reports if you have

the corresponding document viewer installed in your web browser (e.g. for PDF,

Word, etc.). However, unless they are in HTML format they will not be printed

out. If you have many documents in other formats check if they can be

converted to HTML files. Note that Microsoft Word, Microsoft Excel, etc. are able

to save and edit documents as HTML files.

Page 109: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

109

Instructions

If you insert any pictures & links make sure that the files are in locations available

to all users e.g. a public website or shared folder. Otherwise you will be able to

access them but others will get errors when trying to access them from some

other computer (pictures will not be displayed and links will not work).

Enter text and format it using the icon buttons. Hovering the mouse over the

buttons displays tool tips explaining what each one does. The first button

toggles between Design view and HTML view.

Listing

Design view: Use the buttons and menus to insert tables, insert pictures,

format paragraphs and more. You can even select pictures and tables and drag

them to another location or even re-size them.

HTML view (experts only!): Review and directly edit the HTML code here. Do

not put in the <html>, <header>, <body> tags as they are automatically be

inserted - duplicate tags may cause your reports to look odd! You can use

most tags normally found within the <body> section of HTML documents.

Page 110: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

110

3.5.2 Login Window

The login window is where you enter your user name (account id) and password

to start using FastMaint Professional. Based on your account options, you will

have different access rights to the system .

The Admin Password (first use of FastMaint

Professional)

When you first start using FastMaint Professional edition, the system asks you to

specify a password for the "admin" account.

Make sure that the Admin password is NOT longer than 10 characters.

You will need to use this password the next time you use FastMaint.

82

Page 111: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

111

Forgotten Password: If you are a normal user, ask your FastMaint administrator

to reset your account password .

If you are the administrator, see Forgotten Admin Password (Administrators

Only) .

3.5.2.1 Forgotten Admin Password (Administrators Only)

If you have forgotten your Admin password...

1.Try passwords you normally use (most people seem to have a few favorite

passwords).

2.If you originally entered a password longer than 10 characters, try logging on

by entering the first 10 characters ONLY.

3.If all else fails, do ONE of the following:

OPTION #1 - Reinstall the software: This means losing all your existing

data.

Uninstall FastMaint, then use the software installer you previously

downloaded to reinstall the software. It will automatically give you a new 30-

day trial. This option is only good for people doing a software trial and who do

not have much data yet in the database.

OPTION #2 - Reset the administrator account (Admin) password:

Open a command line window (click the Windows Start button, select Run

then type "cmd" and hit Enter). In the command window, change the folder to

the FastMaint install directory (usually "cd C:\Program Files\fastmaint").

Enter "fastmaint.exe -reset". This starts FastMaint Professional with the

administrator account ("admin" user) password cleared out. You can login as

"admin" with no password. At this point you will have to enter a new

password .

84

111

110

Page 112: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

112

3.5.3 Work Requests

External non-FastMaint users can submit requests for maintenance work or

report an alarm condition on equipment by email or by using the add on Web

Based Work Request Module . Work requests are available only in the

Professional edition.

To receive emailed work requests you should turn on emailed work requests

in the Settings and periodically run the Email Processing function to receive

the email and create/ update work requests.

In the Professional edition you can restrict a user's ability to view or modify work

requests.

116

86 70

Page 113: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

113

Instructions

1. Complete the form (see below) and click Save.

(Alternatively, click Cancel to abandon your changes.)

2. Select the Email Requester button to send an email to the person who

made this request so that you can collect additional information if needed. You

can save your changes by selecting the Save button. Selecting the Cancel

button discards all changes. The Delete button will delete the work request

(after asking you for confirmation!).

Page 114: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

114

Listing

Status: When first submitted the work request status will be "Requested". You

can change it to "Canceled" to cancel the request or "Assigned" to assign it to

a work order. Once you change the status to "Assigned" you can enter a work

order number in the "Work Order #" field (use the Find WO button to search

for the work order if you need to) or click on the Create WO button to create

a new work order from this work request. Remember to make any changes to

the work request before you assign it so that your changes are carried over to

the work order!

Unplanned Task/ Alarm: The work request can be a request for a specific

unplanned task to be done on an equipment/ at a location OR to report an

alarm condition. Reporting an alarm condition will schedule all tasks whose

frequency is set to this alarm condition.

Equipment/Location: Limit the list of possible tasks by specific equipment/

location.

Task OR Alarm: Select the unplanned task you want to create a work order

for OR select the alarm condition to report.

TIP: It speeds up data entry if you've already created several "Unplanned" tasks

for common breakdowns/ requests. Do this now by clicking the Task Add/Edit

button. This opens the Tasks screen .

Reason: Reason for the work request.

Name, Email & Phone: Enter the requester's name & contact information.

The email address will be used to send alerts and updates when changes are

made to this work request.

42

Page 115: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

115

Date: The date the task work order should be scheduled OR if an alarm

condition the date the alarm is being reported for.

Work Order Comments/Special Instructions: Any additional instructions or

comments.

Page 116: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

116

3.5.4 Web Based Work Request Module

The Web Based Work Request Module is an add-on product for FastMaint

Professional edition that allows any user (e.g. your clients or staff) to submit a

work request for specific breakdown/ unplanned tasks or report alarm conditions

via a web browser. Unlike in emailed work requests, non-FastMaint users will be

able to specify the task they want or the alarm they wish to report.

During the trial period, FastMaint Professional edition allows processing of

requests submitted using the Web Based Work Request Module. See Get

Support/ Contact Us for more information and to contact us to get a trial/

purchase this add-on module. After the trial period you will not be able to see

these work requests unless you buy a license for both FastMaint Professional and

the Web Based Work Request Module. FastMaint Web has a built-in work request

module with more advanced features.

Note that this add-on module is NOT REQUIRED if you just want to receive and

process work requests by email.

172

Page 117: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

117

Instructions

1. Open your browser at the module's URL (the maintenance manager will

supply this). Click on the Submit Work Request link. The work request form

displays.

2. Complete the form and click Submit Request. Make note of the work

request number so that you can use that to check the status at a later date.

3. You can also click on the Check Work Status link to check the status of

previously submitted requests or look up the status of work at an equipment

or location.

Page 118: Fast Maint Manual

Screen ReferenceFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

118

Listing (Submit Work Request)

Equipment/Location: Limit the list of possible tasks by specific equipment/

location.

Work Order Details: Indicate whether this Work Order is Unplanned or based

on an Alarm. (Daily/ Weekly/ Monthly/ Yearly/ Meter/ types are automatically

scheduled by the system.)

TIP: It speeds up data entry if you've already created several "Unplanned" tasks

for common breakdowns/ requests. Do this now by clicking the Task Add/Edit

button. This opens the Tasks screen .

Task OR Alarm: Base the Work Order on an unplanned Task or an Alarm.

Reason: Reason for the work request.

Name, Email & Phone: Enter your name & contact information.

Date: The work order is for this date (today or in the future).

Work Order Comments/Special Instructions: Any additional text.

42

Page 119: Fast Maint Manual

Part

IV

Page 120: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

120

4 Frequently Asked Questions (FAQs)

This section contains answers to frequently asked questions.

1. How do I import data?

2. Do I need to create a new task every time I want a new work order?

3. How can I create a 240 day task?

4. How to create a meter based task?

5. How to create an alarm based task?

6. How can I see past due, current and future work orders?

7. How can I create breakdown/ request work orders?

8. How do I get rid of work orders that were never worked on?

9. How can I print files attached (linked) to a work order or other report?

10. How can I customize a report?

11. How can I sum a numeric field on a report?

12. How do I use barcodes?

13. How do I install/ upgrade FastMaint?

14. How do I back up and restore my data?

15. How can I open the database with another program (e.g. Microsoft

Access)?

121

128

129

136

142

146

147

148

149

150

157

158

160

163

164

Page 121: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

121

4.1 How to import data?

You can import and export data to text files and Microsoft Excel spreadsheets.

Use this to bring in maintenance data from your existing system - most software

programs can export data to comma delimited text files. You can also use the

import function to update existing data e.g. part prices & quantities and so on.

Tip: You can create custom data fields for different items e.g. parts, equipment,

etc. and import them also.

1. Select the Import menu item under the File menu on the main window.

2. This brings up an Import wizard that provides a step-by-step guide to

importing your data.

3. Select the type of data (People, Equipment, Parts, ...) that you want to

import. If you want to update existing items make sure the check box "Update

existing items if present" is checked off.

4. Click the Next button and FastMaint will show you the fields that can be

imported based on your selection.

Page 122: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

122

Fields you can import: This shows you the list of fields you can import based

on the type of import you selected previously e.g. the screen below shows

equipment fields. Click the Next button once again to specify the import file.

Select your data source (input data file): Here we specify the input file that

contains the data we want to import. This file can be a comma delimited or tab

delimited text file or even a Microsoft Excel spreadsheet. The first row of the file

should contain column (field) names and the actual data should start from the

second row onwards. Click on the Select Data Source button to specify the data

file.

Page 123: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

123

Select your data source (input data file): Clicking the Select Data Source

button brings up the file selection window below. Use this to locate the file you

wish to import. You can use the Files Of Type selection field to only display files

of the type you are interested in. Select the file (in this case "imp_eqp.csv") and

click on the Open button to continue.

Page 124: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

124

Select your data source (Completed): You see that the file you specified is

shown next to the Select Data Source button. If you realize that this is the

wrong file, just click on the Select Data Source button to select another file. Once

you are satisfied, click on the Next button to go to the next step.

Page 125: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

125

Check if the right data is being imported: This step in the wizard allows you

to check if the data you specified is the correct data and that it is in the required

format. The first line of the import file should contain the column (field) names.

The actual data should be in the second row onwards. Here the Field Names line

shows what was found in the first row. The First Item line shows what was found

in the second row (first row of data). You may need to edit the data file so that

it fits this format. If you need to fix the input file first cancel the import. Fix the

file and then try to import it again. Once you are satisfied, click on the Next

button to go to the next step.

Page 126: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

126

Specify location of fields in the input file: In this step in the wizard you specify

what field in the input file maps to the corresponding field in FastMaint. For

example, here we have specified that the column "Name" in the input file

corresponds to the field "Equipment Name" in FastMaint. Fields that do not

correspond can be left at "<--No match-->". Use the scroll bar to go through

the entire list of fields. Once you are satisfied, click on the Next button to go to

the next step.

Complete the import: Based on your settings in prior steps the Import wizard

will read in the data from the input file and create the corresponding items in

FastMaint. As it proceeds it give you information on items it did not import

because of problems (duplicate entries, fields with unexpected format, etc.).

Once the import is completed you can use this information to fix the input file

and run the Import wizard once again on the same file. Items that were

previously imported will be automatically skipped.

Page 127: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

127

Click on the OK button to return to the main window. If we click on the

Equipment button in the main window we should see all the equipment we just

imported.

Page 128: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

128

4.2 Do I need to create a new task every time I want a new workorder?

A task is basically a template for creating work orders - by the system or by

you. Work orders created from a task can be completely modified so that they

bear little relation to the original task. You can use the same task to create

multiple work orders with each work order being for different equipment. For

example you create an unplanned task named "General Maintenance" or

"Change Light Bulb". Now you can create work orders as needed using this task

as a template. Each work order can be modified to associate it with different

equipment, locations, etc.

In the most extreme case you could have just one unplanned task in the system

e.g. named "Any Maintenance". You could then create all work orders as needed

from this by selecting "New" work order OR by selecting "Requests/

Breakdowns" (from on the main window). Modify the resulting work orders to

change equipment/ locations/ parts/ people/ etc.

However, it is advisable to create different tasks for different types of

maintenance (e.g. tasks specific to boilers, tasks specific to cooling systems,

preventive maintenance tasks, etc.). This will make it easier to standardize best

practices (in the task instructions), organize work orders as well improve

reporting/ audits/ analysis/ etc.

Page 129: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

129

4.3 How to create a 240 day task?

I want to set up a task that schedules a work order for different equipment once

in 240 days. First I set up the task as below:

I associate any equipment as needed on the Equipment tab:

Page 130: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

130

You can double click on each equipment above to bring up a new windows that

will allow us to specify a custom work order frequency for each equipment. We

double click on the row above for equipment "HVAC-B" to modify the task work

order frequency from the default 240 day cycle e.g. below we changed the Start

Date to 4/1/2011 and effectively put this HVAC unit on a different 240 day cycle.

Save the changes.

Page 131: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

131

Return to the task screen. See that "HVAC_B" shown below now has a “*” next

to its frequency showing that it is on a custom frequency not the default.

Page 132: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

132

Now click on the “Work Orders/ History” button to see the work orders this task

would generate (see below). We can see a work order for "HVAC-M" and

another for "HVAC-B" generated every 240 days (dates may be adjusted for

Calendar holidays if the task has a calendar associated with it).

You can click on the “Add” button to modify the work orders.

If you now go to the main window you can see these work orders scheduled:

Page 133: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

133

If I open one of the work orders and mark it as completed

Page 134: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

134

On the main window I see that the Status column value has changed from blank

to "Completed":

Page 135: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

135

The second 240 day task for "HVAC-B" (due 4/1/2011) is still open till I

complete it. Then about eight months later (240 days), I should see two new

work orders scheduled again for this task and repeating every eight months (240

days).

Page 136: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

136

4.4 How to create a meter based task?

I want to set up a task that schedules a work order whenever a meter reading

changes by some amount. I can specify that an equipment has a meter and use

that meter to schedule tasks for that equipment or entirely different equipment.

In this case I have a forklift that needs to be serviced every 3000 miles of use.

First I create an equipment record for the forklift. On the meter tab I check

off that it has a meter. Since I am going to be scheduling tasks based on actual

use of the forklift, I select the “Actual Use” option. This gives me two options for

the meter type – a regular meter that has ascending/ descending readings or a

batch meter. Batch meters are useful for industrial equipment where one tracks

how much product was made per day e.g. 150 widgets one day, 200 widgets

the next day and so on. For the forklift since I am keeping track of the mileage it

has, I chose a regular meter type (Ascending/ Descending Readings) as

below:

Page 137: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

137

I have already entered some meter readings for the forklift. I can enter them

directly here or use the import function to import meter readings in the

future.

Next I create a new task for the 3000 mile forklift service. On the Frequency

tab I select the meter option. From the Equipment Meter drop-down I select

the forklift I just created. I specify that this task is to be done every time the

meter readings changes 3000 miles since the task was last done.

121

Page 138: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

138

I then click on the Equipment tab to associate the task with the equipment that

needs the work done. Since I am going to do the service work on the specific

forklift I only associate the specific forklift to this task.

Page 139: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

139

Advanced Tip: If I had multiple forklifts e.g. Forklift-2, Forklift-3, etc. I could

associate all of them with this task and give each of them a custom frequency

based on a meter reading associated with them. So Forklift-2 could have its own

meter and I could create a custom frequency association with this forklift by

double clicking on the equipment to change the frequency setting from the

default as shown below. This is useful when I have a standard maintenance task

that has to be done at different frequencies on different equipment.

Page 140: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

140

I save the new task. The Work Orders button will now be enabled. I can click on

the Work Orders button to see the work orders this task would generate if I

have meter reading entered for this equipment.

Page 141: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

141

Scheduling work orders: Work orders will be scheduled from this task as meter

readings are entered for the equipment with the meter. This can be done

manually on the equipment screen or by using the import function to import

meter readings.

121

Page 142: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

142

4.5 How to create an alarm based task?

I want to set up a task that schedules a work order whenever an alarm condition

is reported on an equipment. I can specify that an equipment has an alarm and

use that alarm to schedule tasks for that equipment or entirely different

equipment. In this case I have an overheating alarm defined on an HVAC unit.

When this alarm is reported I need to create a work order for someone to go

check this equipment.

First I create an equipment record for the HVAC unit. On the alarm tab I

check off that it has an alarm. I do not need to enter any alarm dates at this

time since I can use the Create Work Orders For Breakdowns/ Maintenance

Requests function or have users report an alarm condition using the Web

Based Work Request Module (if I have it).

55

116

Page 143: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

143

Next I create a new task for the alarm service. On the Frequency tab I select

the alarm option. From the Equipment Alarm drop-down I select the equipment

alarm I want to use to schedule this task.

I then click on the Equipment tab to associate the task with the equipment that

needs the work done ("HVAC-B" in this case). However, it is possible that the

alarm condition could be used to schedule work on totally different equipment/

locations by associating them with the task.

Page 144: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

144

Advanced Tip: If I had multiple similar equipment e.g. HVAC-B, HVAC-C, etc. I

could associate all of them with this task and give each of them a custom

frequency based on an alarm associated with them. So HVAC-C could have its

own alarm and I could create a custom frequency association with this

equipment by double clicking on the equipment to change the frequency setting

from the default as shown below. This is useful when I have a standard

maintenance task that has to be done at different frequencies on different

equipment.

Page 145: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

145

I save the new task. The Work Orders button will now be enabled. However, no

work orders will be shown as scheduled unless I have some alarm conditions

reported on associated equipment.

Scheduling work orders: Work orders will be scheduled from this task on every

day an alarm condition is reported on associated equipment alarms. This can be

done in the following ways:

1. Manually enter alarm dates on the Alarm tab in the equipment screen

2. Using the import function to import alarm conditions

3. Using the Create Work Orders For Breakdowns/ Maintenance Requests

function

4. Have users report an alarm condition using the Web Based Work Request

Module (if I have it)

121

55

116

Page 146: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

146

4.6 How can I see past due, current and future work orders?

You can use the selections on the main window such as: Last Week, Next

Week, This Week, This Month, Last 30 Days or Custom Period (if nothing else

matches!). With Custom Period selected you can enter period start & end dates.

Note that too large a period can make FastMaint very slow and unusable since a

lot of calculations are required! Another alternative is the Work Order History

Report . This report offers a variety of sorting and filtering options to get

reports on work orders for periods that you specify. You could even specify

future periods to see planned tasks due and work orders (if created).

Tip: Use the Planning Report (Planning button) to create/ re-print pending work

orders for a specific period.

19

97

Page 147: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

147

4.7 How can I create breakdown/ request work orders?

On the main window you can click on the "Requests/ Breakdowns" button.

Alternatively you can directly open the affected equipment/ location and click on

the "Requests/ Breakdowns" button at the bottom left of the form. For detailed

instructions on how to use this feature see - Create Work Orders For

Breakdowns/ Maintenance Requests .55

Page 148: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

148

4.8 How do I get rid of work orders that were never worked on?

Set the status of such work orders to "Canceled". No parts will be reduced from

stock for them and costs will be set to zero. For more information, see Create/

Modify Work Orders

Example: Suppose there's a daily task to check the rollers. Some days this is

skipped and on the following day, the new daily work order is completed. The

uncompleted/ skipped work orders from previous days still appear on the screen

until you change their status to "Canceled".

52

Page 149: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

149

4.9 How can I print files attached (linked) to a work order or otherreport?

Sometimes you need to print additional information information (e.g. special

instructions, manufacturer's recommendations, etc.) along with each work

order. These can be added as hyperlinks in comments/ instructions.

Only links to documents in HTML format can be printed. Links to documents

of other types can be viewed when you click on them in the reports if you have

the corresponding document viewer installed in your web browser (e.g. for PDF,

Word, etc.). However, unless they are in HTML format they will not be printed

out. If you have many documents in other formats check if they can be

converted to HTML files. Note that Microsoft Word, Microsoft Excel, etc. are able

to save and edit documents as HTML files.

Instructions

Make sure that any pictures & links are to files that are in locations available to all

users e.g. a public website or shared folder. Otherwise you will be able to access

them but others will get errors when trying to access them from some other

computer (pictures will not be displayed and links will not work).

1.If you have not already done so, add the hyperlinks to the task instructions or

work order comments.

2.When printing (by clicking the appropriate Print button), select the Options tab

and then check "Print all linked documents".

The system prints all the linked documents.

Page 150: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

150

4.10 How can I customize a report?

Report templates are used to generate most reports. You can modify/ create

new report templates to create customized reports. There are several built-in

report templates that you can copy & change to suit your needs.

Example 1 - adding a custom field to the Work Order (Detailed) report:

Let us assume that you created a new custom field (a user specified field) called

"ApprovedOn" for tasks & work orders (Note: You can define custom fields by

using the "Define Custom Fields" option in the "Administration" menu on the

main window). The "ApprovedOn" field will now be available as an entry on the

Custom Fields tab on tasks as well as on work orders. On a task this field should

be left empty since each work order created from a task will have a different

approval date.

Now let us add the approval date to the "Work Order: Detailed" report. In

the main window click on the Plan button to start the planning report (pictured

below). Click on the Add/ Edit button found next to the Report Template field at

the bottom left of the window. This will bring up a list of all report templates

available to you.

Page 151: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

151

Scroll down the list of report templates in this list (shown below) till you find the

"Work Order: Detailed" report template. Double click on it to open it. Since this is

a built-in system report (the Owner column is blank) it cannot be modified.

Instead you will be asked if you would like to make a copy of the report template

to modify it. Select Yes and the report editing window will open up.

Page 152: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

152

You will see that the name of the report has changed to "Copy of WorkOrder".

You can change the name to suit your needs e.g. call it "ABCWorkorder" as

shown below. Leave the Type & SubType fields as is. Now click in the Report

Template field to modify the actual template contents (how to use the Report

Designer ).

In the template below we have dropped the task/ work order class ("Class:

[[wo.class]]") and instead replaced it with "Approved Date: [[wo.approvedon]]"

in the middle column of the third row of the table. Make sure that there are no

spaces between the two square brackets ([) e.g. it should be "[[" NOT "[ [".

There are a variety of report functions & options available for your use to

customize the report. See Editing a Report Template for more information on

these functions.

98

102

Page 153: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

153

Once you are done click on the OK button to save your changes. This brings

you back to the report window. Click Add to save the report template you have

created. Make a note of the report template name since you will select this

report template when you run the Planning Report. You will now see your newly

created template in the Reports list window (you may need to scroll through the

list to find it). Click on the Cancel button to close the Reports list window and

return to the Planning Report options window.

Using the modified report template: Now you should be back in the Planning

Report options window. Click on the dropdown arrow next to the Report

Template field. You should find your newly created template in the list. Select it.

Click on the OK button to run the Planning Report. You should see the report

generated with the custom field in it for each work order printed.

Problems? Check the troubleshooting section in Editing a Report Template .

Example 2 - adding a field for equipment in the Work Order (List) report:

105

Page 154: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

154

If you look at a work order report generated using the "Work Order: List" report

template you will see it has a variety of columns as shown below but no column

with the equipment the work order is associated with.

Page 155: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

155

You can create a new report template by editing and creating a copy of the

"Work Order: List" template. In this new template we replace the column

Instructions with a new column Equipment. First change the name of the

column. Then select the [[wo.Instruction]] field in the table and delete it (you can

use the scissors icon in the top toolbar). Now you have an empty table cell. The

equipment is a multi-valued field (multiple equipment can be associated with a

work order). So you must include the list bullet so that if there are multiple

equipment they will be listed one after another. Otherwise it will produce two

columns if there are two equipment associated. Put the cursor in the empty table

cell and click on the list bullet icon in the top toolbar to create a list. Press the

space bar key a couple of times to insert some space after the list bullet - useful

if you want to add several different equipment fields in the list. After the list bullet

click on the Insert Field button and insert the [[equipment.name]] field. Move

the cursor a couple of spaces right over the spaces you inserted. Click on the

Insert Field button and insert the [[equipment.description]] field. The cell

contents will be as follows:

• [[equipment.name]] [[equipment.description]]

For example as shown below in the new report template "Copy Of WorkOrder:

List":

Page 156: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

156

You can now select this report template "Copy Of WorkOrder: List" when you

want to print a list of work orders with the associated equipment in the list.

Page 157: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

157

4.11 How can I sum a numeric field on a report?

To create a summation on a numeric field use the function Total. It gets the

total of a numeric column e.g. [[total(wo.laborcost)]]. Typically used in the

report's footer section to get totals. For a list of available functions look at the

help section Editing a Report Template .102

Page 158: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

158

4.12 How do I use barcodes?

Requirements: To print and use barcodes, you will need to have the Bar Code

module, an add-on for the Standard & Professional editions. If you wish to

evaluate the module please contact [email protected] for a trial or to

purchase a license. You will also need to have or purchase your own barcode

scanners to scan in the bar codes. The bar code scanners should be of the

"wedge" type (plug into the keyboard) OR should use software that makes it

seem like the bar codes are being entered as text on the keyboard.

Bar codes for equipment, parts, etc. can be printed on work orders. With bar

codes it is easier to scan out parts from stores, work orders can be easily

retrieved as needed and so on. The add-on currently supports "Code

39(Extended)" and "Code 128" barcodes. These barcode types are the most

commonly used in manufacturing industries worldwide and are supported by

most bar code scanners.

1. First you will need to set the bar code options by selecting "Settings " from

the "Administration" menu on the main window.

2. Option 1: You can print bar code labels for equipment, parts or people by

selecting "Bar Code Labels" from the "Tools" menu on the main window. This

can be useful if you want to stick the labels on the equipment/ parts and use

the label in conjunction with a hand held scanner and the "Find" function

available on the main window to pull up equipment/ part details.

86

Page 159: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

159

3. Option 2: Select the option to print bar codes in the Planning report. This

will print bar codes for equipment, parts, work orders, etc. For example the

printed part bar codes on the work order could be used by the inventory

manager to pull up the parts when the technician goes to get the maintenance

parts from inventory. The work order bar codes can make it easy to pull up &

update/ close the work orders using the "Find" function on the main window

once the technician completes the work order and returns it with their

comments/ feedback.

64

Page 160: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

160

4.13 How do I install/ upgrade FastMaint?

FastMaint can be installed and setup as one of three editions - Basic (single-

user), Standard (single-user) of Professional (multi-user). It is possible to

upgrade from Basic to Standard to Professional editions by buying the

appropriate license. Upgrading to the Professional edition gives you a new 30-

day trial before you have to purchase the license. You may be eligible for special

upgrade pricing.

Note that you CANNOT "downgrade" from the Professional edition to the Basic/

Standard editions since the maintenance database formats differ. To go back to

your previous edition, uninstall the Professional edition and remove any database

files. Then re-install FastMaint the original edition and restore any pre-upgrade

backups.

Basic and Standard Editions

1.If upgrading, backup any existing data .

2.Run the installer to upgrade or install the software.

3.Run FastMaint and click through the wizard, making sure to select the correct

edition.

Professional Edition with built-in Microsoft Access (Jet)

database

1.If upgrading, backup any existing data .

2.Run the installer to upgrade or install the software.

3.Run FastMaint and click through the wizard, making sure to select the

"Professional Edition". (If you get this wrong, you can use the Administration

menu, Application Setup option.)

163

163

Page 161: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

161

4.Follow the instructions to use an internal database, then select the option to

setup a new shared database.

5.Click the Change Database Location button to enter the shared drive/

network location you want the database files to be kept. 

If you are upgrading from the Basic/ Standard edition, your existing database

will be upgraded and copied to this location.

6.Login into FastMaint using the “admin” account.

(If this is your first login, you will be asked to enter a new admin password

.)

7.Use the Administration menu to create some user accounts and tailor their

access .

8.Repeat steps #2, #3 and #4 on all the remaining destination computers.

Professional edition with Microsoft SQL Server

You should already own licenses for SQL Server and have it set up on your

server.

1.If upgrading, backup any existing FastMaint data .

2.Using Microsoft SQL Server, create an empty database for use with

FastMaint.

3.Create a database user account that has DDL administration as well as read

+write access to the database (avoid using the SQL administrator account for

security reasons).

110

84

163

Page 162: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

162

4.In Microsoft Windows, under the Control Panel, Administrative Tools, select

"Data Sources (ODBC)". Set up a System DSN with an SQL Server based data

source. Point to the SQL Server database you created for FastMaint. Use the

database user account you created (do not use Windows/ Integrated

security). Test the connection.

5.Run the installer to upgrade or install the software.

6.Run FastMaint and click through the wizard, making sure to select the

"Professional Edition". (If you get this wrong, you can use the Administration

menu, Application Setup option.)

7.Follow the instructions to use an external SQL Server database. Specify the

System DSN you setup in step #2.

The setup wizard will initialize the empty SQL Server database. If you are

upgrading from the Basic/ Standard edition it can also transfer all your existing

data over to the SQL Server database.

8.Login into FastMaint using the “admin” account.

(If this is your first login, you will be asked to enter a new admin password

.)

9.Use the Administration menu to create some user accounts and tailor their

access .

9.Repeat steps #4, #5 and #6 on all the remaining destination computers.

110

84

Page 163: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

163

4.14 How do I back up and restore my data?

It is very important to periodically make a copy of the database for backup and

restore purposes. It is also recommended prior to installing a software update or

upgrade.

1.Make sure that all users are out of FastMaint.

2.Copy the database files FastMaint.mdb and FastMaint.mdw and paste them

into a safe location.

The location of these files depends on the FastMaint edition. Basic and

Standard both use the program install directory (usually “c:\Program Files

\fastmaint” OR on 64-bit systems “C:\Program Files (x86)\fastmaint”) .

However, Professional uses a location specified by the FastMaint.ini file found

in the program install directory.

3.If required, again make sure that all users are out of FastMaint, then restore

the backups to the original location.

Page 164: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

164

4.15 How can I open the database with another program (e.g.Microsoft Access)?

It's sometimes useful to access your data using another program e.g. to create

a custom report/ fix some data. How you do this depends on which FastMaint

edition you are using:

To preserve the integrity of the FastMaint system it is advisable to open the

database as Read Only. Bad updates can cause the FastMaint system to fail or

work incorrectly.

Single user edition or multi-user edition using an

internal database (Microsoft Jet/ Access 2000):

FastMaint data is stored in a Microsoft Jet/ Access 2000 database called

FastMaint.mdb. Many third-party programs, utilities and report generation tools

can access this database. You will need to configure the tools to also use the

workgroup information file FastMaint.mdw (found in the same location as the

FastMaint.mdb file).

Two user accounts are provided with the Access database to read/ write data in

this database. This will enable you to create any special reports you need, export

maintenance data to a corporate data repository and so on.

Account "reader": No password (default) – has read access to many tables

in the database.

Account "editor": No password (default) – has read and update access to

many tables in the database.

To open the database with Microsoft Access 2000

Page 165: Fast Maint Manual

Frequently Asked Questions (FAQs)FastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

165

Create a shortcut on your desktop to Microsoft Access and use this shortcut to

open the FastMaint database. The shortcut should call Microsoft Access with

the following properties: (MS Access path) (database path) /WRKGRP

(workgroup path)

e.g. (all on a single line)

"C:\Program Files\Microsoft Office\Office\MSACCESS.EXE" "C:\Program Files

\fastmaint\FastMaint.mdb" /WRKGRP "C:\Program Files\fastmaint

\FastMaint.mdw" /excl

(The "/excl" flag above opens the database in exclusive mode (single user

mode). It is optional and is only required if you want to create custom

Microsoft Access Reports in the database.)

Warning: Set passwords on the "reader" and "editor" accounts as soon as

possible to prevent unauthorized access to FastMaint data.

External Microsoft SQL Server database (ODBC

connection)

Many third-party programs, utilities and report generation tools, can also accessthis database.

Page 166: Fast Maint Manual

Part

V

Page 167: Fast Maint Manual

For IT AdministratorsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

167

5 For IT Administrators

Regular backups are important!

On a regular basis, please take a backup of the FastMaint.mdb and

FastMaint.mdw files

Basic/ Standard editions: The files are in the program install directory.

Professional edition: For an internal database, the files are in the database

directory specified in the Fastmaint.ini file. For an external database using

ODBC, please speak with the database administrator about taking regular

backups of the FastMaint database.

Improving performance

It's a good idea to regularly compact the database to reduce wasted space:

Select Administration, Compact Database.

If you are connecting to an external database using ODBC, speak with the

database administrator to see what kind of regular maintenance needs to be

scheduled for optimum performance.

If configuring the Professional Edition for users from multiple workstations, put

the database on a fast network location to get best performance. Slow and

unreliable network connections will result in poor performance as well as

database corruption and loss of data.

Changing the database location (Professional edition

only)

Internal database (Microsoft Jet/ Access 2000)

Page 168: Fast Maint Manual

For IT AdministratorsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

168

1.Move the FastMaint.mdb and FastMaint.mdw files to the required location.

2.Ensure that all users who will connect to this database have file create,

update and delete rights in this new location.

3.Edit the Fastmaint.ini file (found in the FastMaint installation directory of

each workstation that has FastMaint installed) and change the path of the

Database attribute to point to the new location. Each workstation that

connects to the FastMaint database should have the Fastmaint.ini file

modified to point to the same database location. You can also use the

Application Setup Wizard (Administration menu) to make this change to the

FastMaint.ini file on each workstation.

External Microsoft SQL Server database (ODBC connection):

1.Speak with the database administrator about backing up and restoring the

existing database onto another server/ location.

2.Go to each workstation that will be connecting to this database and use the

ODBC Connection Wizard to add/ change the ODBC connection to the

relocated database.

3.If using a new ODBC connection, also use the Application Setup Wizard

(Administration menu) to make changes to the FastMaint.ini file to point to

the newly setup database.

Integration with other systems/ Getting access to

FastMaint data

To preserve the integrity of the FastMaint system it is advisable to open the

database as Read Only. Bad updates can cause the FastMaint system to fail or

work incorrectly.

Page 169: Fast Maint Manual

For IT AdministratorsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

169

Single user edition or multi-user edition using an internal database

(Microsoft Jet/ Access 2000): FastMaint data is stored in a Microsoft Jet/Access 2000 database called FastMaint.mdb. Many third-party programs,utilities and report generation tools can access this database. You will need toconfigure the tools to open the workgroup information file FastMaint.mdw(found in the same location as the FastMaint.mdb file).

Two user accounts are provided with the Access database to read/ write datain this database. This will enable you to create any special reports you need,export maintenance data to a corporate data repository and so on.

Account "reader": No password (default) – has read access to many tablesin the database. Account "editor": No password (default) – has read and update access tomany tables in the database.

To open the database with Microsoft Access 2000:Create a shortcut on your desktop to Microsoft Access and use this shortcut toopen the FastMaint database. The shortcut should call Microsoft Access withthe following properties: (MS Access path) (database path) /WRKGRP(workgroup path)

e.g. (all on a single line)

"C:\Program Files\Microsoft Office\Office\MSACCESS.EXE" "C:\Program Files\fastmaint\FastMaint.mdb" /WRKGRP "C:\Program Files\fastmaint\FastMaint.mdw" /excl

(The "/excl" flag above opens the database in exclusive mode (single usermode). It is optional and is only required if you want to create customMicrosoft Access Reports in the database.)

Warning: Set passwords on the "reader" and "editor" accounts as soon as

possible to prevent unauthorized access to FastMaint data.

External Microsoft SQL Server database (ODBC connection): Many third-

party programs, utilities and report generation tools, can also access thisdatabase.

Page 170: Fast Maint Manual

For IT AdministratorsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

170

Data locking issues (Professional edition only)

If using the internal (Microsoft Jet/ Access 2000) database, all FastMaint users

should have file create, update and delete rights on the directory where the

shared FastMaint database files are stored.

If a user workstation crashes when editing an item (e.g. a Part, Task, etc.), a

lock may still be retained on one or more items, preventing all users from being

able to access them (you will get an item is locked error message). To release

such spurious locks, first ensure that all users are out of the FastMaint

application, then shut down and restart the file server or workstation on which

the FastMaint database files are kept. This will release all open locks. If

connecting to an external database using ODBC please speak to the database

administrator about how to release such locks.

Page 171: Fast Maint Manual

Part

VI

Page 172: Fast Maint Manual

Get Support/ Contact UsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

172

6 Get Support/ Contact Us

Visit the Support Center (http://www.smglobal.com/support) to search for

information, helpful tutorials or submit support requests.

For sales questions (pricing, upgrades, add-on modules, etc.) please email

[email protected].

Page 173: Fast Maint Manual

Part

VII

Page 174: Fast Maint Manual

Video TutorialsFastMaint CMMS 7.0 User Guide

© 2010-2015 SMGlobal Inc.

174

7 Video Tutorials

Our tutorials keep changing so please visit the online Tutorial section (http://

www.smglobal.com/fastmaint/demo) for the latest video tutorials and other

tutorials on different FastMaint features.

Page 175: Fast Maint Manual

IndexFastMaint CMMS 7.0 User Guide 175

© 2010-2015 SMGlobal Inc.

Index- 3 -3rd party system 164

- A -About Tasks and Work Orders 8

Access (MS Access) 164

accounts 86

add-on 112

administration 110, 167

alarm 142

alert 86

alerts 86

analysis 95

- B -backlog 58

backup 163

bar code 86, 158

Bar codes 86, 88, 158

barcode 158

Barcodes 86, 158

batch 136, 142

breakdown 95, 147

breakdowns 55

bug 172

bugs 172

- C -calendar 96

calendars 23

categories 25

comma delimited 121

completed 95

configuration 86

configure 86

create 136, 142, 147

custom 150

customize 150

- D -data 121, 163

database 163

Deleting expired work orders 148

downtime 58, 96

- E -email 70, 72, 86, 112

emergency 147

equipment 27, 96, 121, 128, 136, 142

errors 72

estimating 58

excel 121

export data 80

- F -FastMaint 160

fields 100, 150

fonts 100

forward 72

frequency 136, 142

functions 157

- H -HTML Editor 108

- I -import 121

import data 77

importing 121

Installation 160

integration 164

- L -Linked files 149

Location 128

Locations 31, 128

login 110

Page 176: Fast Maint Manual

IndexFastMaint CMMS 7.0 User Guide 176

© 2010-2015 SMGlobal Inc.

- M -main window 19

meter 136

module 112

- N -numeric 157

- O -open database 164

- P -parts 34, 39

past due 58

pending 58

people 37

percentage 58

plan 95

planned 95

planning 52, 62, 64

preventive 95, 96

Printing 149

process 70, 72

purchase order 39

- R -reply 72

report designer 98

reports 150, 157

request 112, 116, 147

requests 112

restore 163

- S -schedule 55

settings 86

setup 86

sms 70, 72

spreadsheet 121

statistics 58

styles 100

sum 157

suppliers 47

support 172

- T -task 136, 142

Task Frequency tab 45

Tasks 42, 128

text messages 70, 72

total 157

training 172, 174

trends 95

tutorial 172, 174

tutorials 172, 174

- U -unplanned 55, 147

updates 70, 72

upgrade 160

- V -variance 95

vendors 47

video tutorials 6, 174

videos 174

Viewing all past due, current and future 146

- W -web 112, 116

work order 128, 147

Work orders 52, 58, 64, 68, 70, 72, 95, 96, 97, 128,146, 148

work request 112

work requests 55, 112, 116

workbook 121

workload balancing 62