STS-130/20A FD 09 Execute Package MSG Page(s) Title
110A 1 - 14 FD09 Flight Plan Revision
111 15 - 16 FD09 Mission Summary
112 --- Daily Summary
113 17 - 26 Stowage Locations for FD09 (GMT 047)
114 --- IMMT Results - 2/15/10
116 27 - 29 STS-130 (20A) EMU Story
117 30 FD09 Crew Choice Downlink
118C 31 STS-130 Overview Timeline FD09 to EOM (14+2) Approved by FAO: R. Smith Last Updated: Feb 15 2010 8:54 PM GMT JEDI (Joint Execute package Development and Integration), v3.0
I have you now, young Skywalker! Pewww‐Pewww‐Pewwww!!!
What to watch out for on crew off‐duty days with the new Cupola.
MSG 110A (22-0731A) - FD09 FLIGHT PLAN REVISION Page 1 of 14
1 MSG INDEX 2
3 MSG NO. TITLE 4
5 6 7 8 9
10 11 12 13 14
MSG-110 FD09 Flight Plan Revision MSG-111 FD09 Mission Summary MSG-112 Daily Summary MSG-113 Stowage Locations for FD09 (GMT 047) MSG-114 IMMT Results - 2/15/10 MSG-116 STS-130 (20A) EMU Story MSG-117 FD09 Crew Choice Downlink MSG-118 STS-130 Overview Timeline FD09 to EOM (14+2) 1. Post-Sleep Cryo Config 15
16
17
18 19
20 21 22
23 24
For today's Post-Sleep cryo config, O2 tanks 1 and 2 and H2 tanks 1 and 4 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) O2 TK2 HTR A - AUTO A15 CRYO TK5 HTR O2 A - OFF
Pre-Sleep Cryo Config 25
26
27 28
29
30 31
32
33
34
35 36
√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 1 will be closed with O2 tanks 1 and 5 and H2 tanks 1 and 4 active. A15 CRYO TK5 HTR O2 A - AUTO R1 O2 TK2 HTR A - OFF O2,H2 MANF VLV TK1 (two) - CL (tb-CL)
2. Defer Post-Sleep LiOH Changeout 37
PPCO2 continues to track predicts. Therefore, a LiOH can changeout is not required this morning. MCC will continue to monitor PPCO2 levels to determine if a changeout is required during the day.
38 39 40 41
3. EVA Deltas for Zambo 42 We've put together a summary story outlining the issues we've had with the EMUs and why we did each resize. Take a look at MSG 116 STS-130 EMU Story, and please let us know if you have any questions.
43 44 45 46 47 48 49 50
Page 1 of 14, MSG 110A (22-0731A) 1
MSG 110A (22-0731A) - FD09 FLIGHT PLAN REVISION Page 2 of 14
Page 2 of 14, MSG 110A (22-0731A)
1 4. EVA Deltas for Bob and Nick 2
Good news, all EMU gloves are declared GO for EVA. We're pulling together an updated story on the get-aheads for EVA 3. We'll uplink the latest and greatest version, and what we think you might be able to get done before Procedure Review. In the meantime, take a look at FS 7-120 in the EVA Checklist. From what is currently in your book, P1 FHRC P-clamps, P1 RBVM Thermal Bootie F151 Closure, and ESP-2 to Lab Gap Spanner Install seem to fit. We also have a few more requests from the program to go through, and we'll include those items in the get-aheads message.
3 4 5 6 7 8 9
10
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
5. REPLACE PAGES 2-30 THROUGH 2-33 and 3-92 THROUGH 3-99. 11
2
02/15/10 13:59:41
FLT PLN/130/FLT
FD09
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
EV2
EV1
NO EXERCISE
[FROM PMA3 CBM DEMATE UNTIL A-BOLTS COMPLETE]
REPL
ANNE
D
2-30
S T S - 1 3 0 S T S ISS
22
23
02/16
01
02
03
04
05
06
07
08
09
GMT 02/15/10 (046)
12
13
14
15
16
17
18
19
20
21
22
23
008/00
MET
Day 007
CDR
PMA 3
PRESS
CHECK
E V A 3
MEAL
C W C
I N I T # 4
C W C
I N I T # 5
C W C
T E R M
C W C
T E R M
PFC
OCA
OFF DUTY
EXERCISE
OFF DUTY
POST SLEEP
P/TV06 ROBO
OPS
POST
SLEEP
P/TV06
ROBO
OPS
P / T V 0 6
R O B O
O P S
PLT
I M U
E V A 3
MEAL
EXERCISE
OFF DUTY
L O GPOST SLEEP
OFF DUTY
I L L U M - O
P / T V 0 6
S / UCWC
XFER
(2)
M C I U *
CUPOLA VEST OUTFIT
MS1
CBCS
STOW
MEAL
OFF DUTY
EXERCISE
POST SLEEP
OFF DUTY
C B C S ^
POST SLEEP
N 3 P *
PFC
A/G
C U P O L A
CUPOLA VEST OUTFIT
MS2
E V A 3
MEAL
EXERCISE
CCAA-AV
MOUNT-RMVL
LT-PPA LR-RMV
OFF DUTY
OFF DUTY
POST SLEEP
MS3
E V A 3
MEAL
EXERCISE
PMA3
MNVR
P M A 3
I N S T L
U N G R P L
B R A K E S
L I M P
OFF DUTY
POST SLEEP
L O G
OFF
DUTY
M N V R #
S S R M S ^
MS4
E V A 3
MEAL
EXERCISE
PFC
OCA
M D D K C K
POST SLEEP
PMA3
MNVR
P M A 3
I N S T L
L I M P
U N G R P L
B R A K E S
OFF DUTY
M N V R #
S S R M S ^
DAY/NIGHT
ORBIT
119
120
121
122
123
124
125
126
127
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
*FILTER CK
^POWERDOWN
*HATCH LATCH
#TRRJ VIEW
^LEE CUE CARD REVIEW
NOTES
2-30
FD09
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
EV2
EV1
NO EXERCISE
[FROM PMA3 CBM DEMATE UNTIL A-BOLTS COMPLETE]
REPL
ANNE
D
S T S - 1 3 0 S T S ISS
22
23
02/16
01
02
03
04
05
06
07
08
09
GMT 02/15/10 (046)
12
13
14
15
16
17
18
19
20
21
22
23
008/00
MET
Day 007
CDR
PMA 3
PRESS
CHECK
E V A 3
MEAL
C W C
I N I T # 4
C W C
I N I T # 5
C W C
T E R M
C W C
T E R M
PFC
OCA
OFF DUTY
EXERCISE
OFF DUTY
POST SLEEP
P/TV06 ROBO
OPS
POST
SLEEP
P/TV06
ROBO
OPS
P / T V 0 6
R O B O
O P S
PLT
I M U
E V A 3
MEAL
EXERCISE
OFF DUTY
L O GPOST SLEEP
OFF DUTY
I L L U M - O
P / T V 0 6
S / UCWC
XFER
(2)
M C I U *
CUPOLA VEST OUTFIT
MS1
CBCS
STOW
MEAL
OFF DUTY
EXERCISE
POST SLEEP
OFF DUTY
C B C S ^
POST SLEEP
N 3 P *
PFC
A/G
C U P O L A
CUPOLA VEST OUTFIT
MS2
E V A 3
MEAL
EXERCISE
CCAA-AV
MOUNT-RMVL
LT-PPA LR-RMV
OFF DUTY
OFF DUTY
POST SLEEP
MS3
E V A 3
MEAL
EXERCISE
PMA3
MNVR
P M A 3
I N S T L
U N G R P L
B R A K E S
L I M P
OFF DUTY
POST SLEEP
L O G
OFF
DUTY
M N V R #
S S R M S ^
MS4
E V A 3
MEAL
EXERCISE
PFC
OCA
M D D K C K
POST SLEEP
PMA3
MNVR
P M A 3
I N S T L
L I M P
U N G R P L
B R A K E S
OFF DUTY
M N V R #
S S R M S ^
DAY/NIGHT
ORBIT
119
120
121
122
123
124
125
126
127
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
*FILTER CK
^POWERDOWN
*HATCH LATCH
#TRRJ VIEW
^LEE CUE CARD REVIEW
3
02/15/10 13:59:41
FLT PLN/130/FLT
FD09
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD09
REPL
ANNE
D
NO EXERCISE
[FROM PMA3 CBM DEMATE UNTIL A-BOLTS COMPLETE]
2-31
I S S E X P 2 2 STS
22
23
02/16
01
02
03
04
05
06
07
08
09
GMT 02/15/10 (046)
12
13
14
15
16
17
18
19
20
21
22
23
008/00
MET
Day 007
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
15
12
34
56
78
112
132
112
144
112
122
142
TLM FORMAT
-XVV +ZLV TEA
ATTITUDE
ALL VHF
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
ISS
CDR
P O S T
S L E E P
POST SLEEP
♣DPC
CEVIS
PMA3 CBM
DEMATE
C W C I
F I L L 1
V E R I F
C W C I
F I L L 2
1ST
STG
CAP
2ND STG
CAP /ABOLT
MEAL
PMC
OFF DUTY
ARED
⊕
C U P O L A
FE-1
♦
POST SLEEP
♥∆
DPC
PW
♠φ
КПТ-2-ВЫП-21-22
•PMC
MEAL
OFF DUTY
TVIS
VELO
FE-4
∇◊
POST
SLEEP
∗♣
⊕♦
DPC
PW
Э Л К Т
КПТ-2-ВЫП-21-22
СОЖ-MNTPMC
И П - 1
MEAL
OFF DUTY
VELO
TVIS
FE-5
P O S T
S L E E P
POST
SLEEP
PFC
♥DPC
P T V S / U
ARED
ACOPS
C B C S *
PMA3 CBM
DEMATE
V E R I F
1ST
STG
CAP
2ND STG
CAP /ABOLT
MEAL
OFF DUTY
OFF
DUTY
OFF DUTY
PMC
T2
C E V I S
FE-6
S A L V A
POST
SLEEP
POST SLEEP
P O S T
S L E E P
∆DPC
T2
PW
♠φ
SODF-CUE
CARD-DPLY
NOD3
AFT
HATCH
COVR
•MEAL
P T V S / U
OFF DUTY
O F F
D U T Y
OFF DUTY
PMC
ARED
∇◊
♣ПЗЭ-MO-8(22)
⊕P/TV P/B
♦POST SLEEP
POST SLEEP
♥ПЗЭ-MO-7
∆ПЗЭ-MO-8(22)
♠БИО-5-C/O
φТЕХ-15-DAKON-CK
•СУБА-ИУС-ППЭ-REFRESH
∇POST SLEEP
◊POST SLEEP
∗ПЗЭ-MO-8-INSTL
♣ПЗЭ-MO-8-INSTL
⊕ПЗЭ-MO-7
♦ПЗЭ-MO-8(22)
POST SLEEP
♥ПЗЭ-MO-8(22)
∆ПЗЭ-MO-8(22)
♠UPA FILL
φIWIS-UOP-RECONFIG
•IFM-UOP-CBL-INSPCT
∇P/TV P/B
◊EVA 3 PROC REVIEW
*POWER UP
NOTES
2-31
FD09
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD09
REPL
ANNE
D
NO EXERCISE
[FROM PMA3 CBM DEMATE UNTIL A-BOLTS COMPLETE]
I S S E X P 2 2 STS
22
23
02/16
01
02
03
04
05
06
07
08
09
GMT 02/15/10 (046)
12
13
14
15
16
17
18
19
20
21
22
23
008/00
MET
Day 007
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
15
12
34
56
78
TLM FORMAT
112
132
112
144
112
122
142
ATTITUDE
-XVV +ZLV TEA
ALL VHF
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
ISS
CDR
P O S T
S L E E P
POST SLEEP
♣DPC
CEVIS
PMA3 CBM
DEMATE
C W C I
F I L L 1
V E R I F
C W C I
F I L L 2
1ST
STG
CAP
2ND STG
CAP /ABOLT
MEAL
PMC
OFF DUTY
ARED
⊕
C U P O L A
FE-1
♦
POST SLEEP
♥∆
DPC
PW
♠φ
КПТ-2-ВЫП-21-22
•PMC
MEAL
OFF DUTY
TVIS
VELO
FE-4
∇◊
POST
SLEEP
∗♣
⊕♦
DPC
PW
Э Л К Т
КПТ-2-ВЫП-21-22
СОЖ-MNTPMC
И П - 1
MEAL
OFF DUTY
VELO
TVIS
FE-5
P O S T
S L E E P
POST
SLEEP
PFC
♥DPC
P T V S / U
ARED
ACOPS
C B C S *
PMA3 CBM
DEMATE
V E R I F
1ST
STG
CAP
2ND STG
CAP /ABOLT
MEAL
OFF DUTY
OFF
DUTY
OFF DUTY
PMC
T2
C E V I S
FE-6
S A L V A
POST
SLEEP
POST SLEEP
P O S T
S L E E P
∆DPC
T2
PW
♠φ
SODF-CUE
CARD-DPLY
NOD3
AFT
HATCH
COVR
•MEAL
P T V S / U
OFF DUTY
O F F
D U T Y
OFF DUTY
PMC
ARED
∇◊
NOTES
♣ПЗЭ-MO-8(22)
⊕P/TV P/B
♦POST SLEEP
POST SLEEP
♥ПЗЭ-MO-7
∆ПЗЭ-MO-8(22)
♠БИО-5-C/O
φТЕХ-15-DAKON-CK
•СУБА-ИУС-ППЭ-REFRESH
∇POST SLEEP
◊POST SLEEP
∗ПЗЭ-MO-8-INSTL
♣ПЗЭ-MO-8-INSTL
⊕ПЗЭ-MO-7
♦ПЗЭ-MO-8(22)
POST SLEEP
♥ПЗЭ-MO-8(22)
∆ПЗЭ-MO-8(22)
♠UPA FILL
φIWIS-UOP-RECONFIG
•IFM-UOP-CBL-INSPCT
∇P/TV P/B
◊EVA 3 PROC REVIEW
*POWER UP
4
02/15/10 13:59:41
FLT PLN/130/FLT
FD09
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
FD09
EV2
EV1
ISS A/L Campout @ 10.2 psi
10.2
DPRS
REPL
ANNE
D
PROC REVIEW
PROC REVIEW
PROC REVIEW
PROC REVIEW
PROC REVIEW
FN LK CK
INIT
2-32
S T S - 1 3 0 S T S ISS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/16/10 (047)
008/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 008
CDR
SLEEP
EVA 3
PRE
SLEEP
MASK P/B
CONFIG
PRE SLEEP
PMC
A/G
F D C O N F
PRE
SLEEP
C S A - O 2 *
PLT
SLEEP
PRE SLEEP
EVA 3
W C S #
MS1
SLEEP
PRE SLEEP
CUPOLA
MS2
SLEEP
PRE SLEEP
EVA 3
DPC
M D D K C K
MS3
SLEEP
EVA 3
PRE SLEEP
MASK P/B
CONFIG
PRE
SLEEP
MS4
SLEEP
EVA 3
PRE SLEEP
MASK P/B
CONFIG
PRE
SLEEP
DAY/NIGHT
ORBIT
127
128
129
130
131
132
133
134
135
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
*READINGS
#COMPACT
NOTES
2-32
FD09
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
FD09
EV2
EV1
ISS A/L Campout @ 10.2 psi
10.2
DPRS
REPL
ANNE
D
PROC REVIEW
PROC REVIEW
PROC REVIEW
PROC REVIEW
PROC REVIEW
FN LK CK
INIT
S T S - 1 3 0 S T S ISS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/16/10 (047)
008/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 008
CDR
SLEEP
EVA 3
PRE
SLEEP
MASK P/B
CONFIG
PRE SLEEP
PMC
A/G
F D C O N F
PRE
SLEEP
C S A - O 2 *
PLT
SLEEP
PRE SLEEP
EVA 3
W C S #
MS1
SLEEP
PRE SLEEP
CUPOLA
MS2
SLEEP
PRE SLEEP
EVA 3
DPC
M D D K C K
MS3
SLEEP
EVA 3
PRE SLEEP
MASK P/B
CONFIG
PRE
SLEEP
MS4
SLEEP
EVA 3
PRE SLEEP
MASK P/B
CONFIG
PRE
SLEEP
DAY/NIGHT
ORBIT
127
128
129
130
131
132
133
134
135
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
*READINGS
#COMPACT
5
02/15/10 13:59:41
FLT PLN/130/FLT
FD09
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD09
REPL
ANNE
D
2-33
I S S E X P 2 2 STS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/16/10 (047)
008/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 008
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
89
10
11
12
13
14
15
16
142
142
TLM FORMAT
-XVV +ZLV TEA
ATTITUDE
ALL VHF
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
ISS
CDR
CUPOLA
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-1
V E L O
♣PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-4
TVIS
Э Л К Т
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-5
CEVIS
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-6
EVA 3 PROC
REVIEW
⊕DPCPW
PRE SLEEP-ISS
SLEEP
♣TVIS MNT ⊕UPA FILL
NOTES
2-33
FD09
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD09
REPL
ANNE
D
I S S E X P 2 2 STS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/16/10 (047)
008/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 008
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
89
10
11
12
13
14
15
16
TLM FORMAT
142
142
ATTITUDE
-XVV +ZLV TEA
ALL VHF
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
ISS
CDR
CUPOLA
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-1
V E L O
♣PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-4
TVIS
Э Л К Т
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-5
CEVIS
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
FE-6
EVA 3 PROC
REVIEW
⊕DPCPW
PRE SLEEP-ISS
SLEEP
NOTES
♣TVIS MNT ⊕UPA FILL
6
02/15/10 14:01:08
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
09
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
FD09 EZ ACTIVITIES:
√O
CAC
FILT
ER &
MDD
K DU
CT S
CREE
N
TEPC (
STAT
US C
HECK)
(
ORB
OPS,
CRE
W SYS)
HA
RD R
EBOO
T AL
L PGSC
s EX
CEPT
:
STS
-6(W
LES)
,STS
-5(R
POP2
),&
O
CA R
OUTE
R. Return all Shuttle
IFM tools
used on ISS, per MS
G 05
2, t
o
End
eavo
ur p
rior
to sleep.
A Omit steps 1.2 and 3
Use A/G 2 for audio
Inform MCC which PGSC will be used
REP
LANN
ED
ECLSS: 2.810 PMA LEAK CHECK
Steps 1-3.12,4
VAJ/ISA setup will be used for
CUP fine leak check.
3-92
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/15
(046)
12:00
13:00
14:00
15:00
16:00
MET
Day 007
WE
Z
T D R S
~~ ~~
D / N
O R B 1 1 9 1 2 0 1 2 1 1 2 2
~ ~B I A S - X L V - Z V VS T S A T T
CDR
CWC FILL (ORB OPS, CWC OPS)
Init Fill #4
Ref. MSG 027
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC) Private Family Conference
KU TDRE (13:53-14:29) A Gimbal Flip:14:20
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√HUM SEP for H2O Accumulation
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
PLT
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
SLEEP LOGBOOK (ORB OPS, SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
TV (ILLUMINATOR OPS) (PHOTO/TV, CC)
ILLUMINATORS OFF - A & D
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Perform SETUP
L17 Check MCIU filter screen
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
~
MS1
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIVATE FAMILY CONFERENCE
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
Perform via A/G 2
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
~
Notes
3-92
ZAMK
AVI
RTS
HIRE
09
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
FD09 EZ ACTIVITIES:
√O
CAC
FILT
ER &
MDD
K DU
CT S
CREE
N
TEPC (
STAT
US C
HECK)
(
ORB
OPS,
CRE
W SYS)
HA
RD R
EBOO
T AL
L PGSC
s EX
CEPT
:
STS
-6(W
LES)
,STS
-5(R
POP2
),&
O
CA R
OUTE
R. Return all Shuttle
IFM tools
used on ISS, per MS
G 05
2, t
o
End
eavo
ur p
rior
to sleep.
A Omit steps 1.2 and 3
Use A/G 2 for audio
Inform MCC which PGSC will be used
REP
LANN
ED
ECLSS: 2.810 PMA LEAK CHECK
Steps 1-3.12,4
VAJ/ISA setup will be used for
CUP fine leak check.
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/15
(046)
12:00
13:00
14:00
15:00
16:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 1 9 1 2 0 1 2 1 1 2 2
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
CWC FILL (ORB OPS, CWC OPS)
Init Fill #4
Ref. MSG 027
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC) Private Family Conference
KU TDRE (13:53-14:29) A Gimbal Flip:14:20
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√HUM SEP for H2O Accumulation
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
PLT
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
SLEEP LOGBOOK (ORB OPS, SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
TV (ILLUMINATOR OPS) (PHOTO/TV, CC)
ILLUMINATORS OFF - A & D
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Perform SETUP
L17 Check MCIU filter screen
~
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
MS1
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIVATE FAMILY CONFERENCE
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
Perform via A/G 2
~
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
Notes
7
02/15/10 14:01:08
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
09
A Omit steps 1.2 and 3
Use A/G 2 for audio
Inform MCC which PGSC will be used
REP
LANN
ED
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
3-93
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/15
(046)
12:00
13:00
14:00
15:00
16:00
MET
Day 007
WE
Z
T D R S
~~ ~~
D / N
O R B 1 1 9 1 2 0 1 2 1 1 2 2
~ ~B I A S - X L V - Z V VS T S A T T
MS2
1.134 NODE 3 LTL PUMP PACKAGE ASSEMBLY
(PPA)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
Prior to step 5.3, replace FDS Closeout
removed in step 1.4. After step 5.3
replace Beta Cloth on NOD3D1-02.
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
SSRMS LEE CUE CARD Review
MS4
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC) Private Family Conference
KU TDRW (14:48-15:19) A
GLACIER STATUS CHECK (ASSY OPS,CC)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
~
SSRMS LEE CUE CARD Review
Notes
3-93
ROBI
NSON
PATR
ICK
BEHN
KEN
09
A Omit steps 1.2 and 3
Use A/G 2 for audio
Inform MCC which PGSC will be used
REP
LANN
ED
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/15
(046)
12:00
13:00
14:00
15:00
16:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 1 9 1 2 0 1 2 1 1 2 2
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
~
1.134 NODE 3 LTL PUMP PACKAGE ASSEMBLY
(PPA)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
Prior to step 5.3, replace FDS Closeout
removed in step 1.4. After step 5.3
replace Beta Cloth on NOD3D1-02.
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
~
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
SSRMS LEE CUE CARD Review
MS4
L9 PAYLOAD STATION AUDIO A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC) Private Family Conference
KU TDRW (14:48-15:19) A
GLACIER STATUS CHECK (ASSY OPS,CC)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
SSRMS LEE CUE CARD Review
Notes
8
02/15/10 14:01:08
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
09
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
REP
LANN
ED
MEAL
N3P HATCH LATCH B
B 1. Verify Node 3 Port Hatch Ratchet in
LATCH Position.
2. Engage Crank Handle.
3. Turn Crank Handle in LATCH direction
until fully latched.
4. Stow Crank Handle.
3-94
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/16
(047)
16:00
17:00
18:00
19:00
20:00
MET
Day 007
WE
Z
T D R S
~
~ ~
~
D / N
O R B 1 2 2 1 2 3 1 2 4
~ ~B I A S - X L V - Z V VS T S A T T
CDR
MEAL
CWC FILL (ORB OPS, CWC OPS)
Init Fill #5
Ref. MSG 027
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
OFF DUTY
~
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
PLT
MEAL
OFF DUTY
~
CWC TRANSFER
Transfer 2 CWCs to ISS
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
~
MS1
1.180 CBCS INSTL/RMVL-PMA3 INSTL
(ASSY OPS, ACT&C/O) Steps 6-end
OFF DUTY
~
1.180 CBCS INSTL/RMVL-PMA INSTL
(ASSY OPS, ACT&C/O) Step 5
1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
~
Notes
3-94
ZAMK
AVI
RTS
HIRE
09
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
REP
LANN
ED
MEAL
N3P HATCH LATCH B
B 1. Verify Node 3 Port Hatch Ratchet in
LATCH Position.
2. Engage Crank Handle.
3. Turn Crank Handle in LATCH direction
until fully latched.
4. Stow Crank Handle.
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/16
(047)
16:00
17:00
18:00
19:00
20:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 2 2 1 2 3 1 2 4
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
MEAL
CWC FILL (ORB OPS, CWC OPS)
Init Fill #5
Ref. MSG 027
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
~
OFF DUTY
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
PLT
MEAL
~
OFF DUTY
CWC TRANSFER
Transfer 2 CWCs to ISS
~1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
MS1
1.180 CBCS INSTL/RMVL-PMA3 INSTL
(ASSY OPS, ACT&C/O) Steps 6-end
~
OFF DUTY
1.180 CBCS INSTL/RMVL-PMA INSTL
(ASSY OPS, ACT&C/O) Step 5
~1.156 VESTIBULE OUTFITTING N3-CUPOLA
(ASSY OPS, ACT&C/O)
Steps 4-7,9-10,13-22
Ref. MSG 093
Notes
9
02/15/10 14:01:08
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
09
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 15
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 15
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 14 EXERCISE CONST
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 14 EXERCISE CONST
REP
LANN
ED
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
3-95
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/16
(047)
16:00
17:00
18:00
19:00
20:00
MET
Day 007
WE
Z
T D R S
~
~ ~
~
D / N
O R B 1 2 2 1 2 3 1 2 4
~ ~B I A S - X L V - Z V VS T S A T T
MS2
MEAL
1.132 NODE 3 CCAA ANTI-VIBRATION
MODULE(AVM)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
1.134 NODE 3 LTL PUMP PACKAGE ASSEMBLY
(PPA)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
Prior to step 5.3, replace FDS Closeout
removed in step 1.4. After step 5.3
replace Beta Cloth on NOD3D1-02.
~
OFF DUTY
~
MS3
MEAL
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
~
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Step 13 EXERCISE CONSTRAINTS
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 16-16.3
OFF DUTY
~
ROBO: 1.520 SSRMS MNVR TO TRRJ VIEWING
& NODE 2 GRAPPLE Steps 1-2
MS4
MEAL
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
~
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Step 13 EXERCISE CONSTRAINTS
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 16-16.3
OFF DUTY
~
ROBO: 1.520 SSRMS MNVR TO TRRJ VIEWING
& NODE 2 GRAPPLE Steps 1-2
Notes
3-95
ROBI
NSON
PATR
ICK
BEHN
KEN
09
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 15
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 15
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 14 EXERCISE CONST
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 14 EXERCISE CONST
REP
LANN
ED
NO
EXERCISE
FROM PMA3
CBM DEMATE
UNTIL A-BOLTS
COMPLETE
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/16
(047)
16:00
17:00
18:00
19:00
20:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 2 2 1 2 3 1 2 4
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
MEAL
1.132 NODE 3 CCAA ANTI-VIBRATION
MODULE(AVM)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
~1.134 NODE 3 LTL PUMP PACKAGE ASSEMBLY
(PPA)LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
Prior to step 5.3, replace FDS Closeout
removed in step 1.4. After step 5.3
replace Beta Cloth on NOD3D1-02.
~
OFF DUTY
MS3
MEAL
~ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Step 13 EXERCISE CONSTRAINTS
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 16-16.3
~
OFF DUTY
ROBO: 1.520 SSRMS MNVR TO TRRJ VIEWING
& NODE 2 GRAPPLE Steps 1-2
MS4
MEAL
~ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Steps 6-12
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE
Step 13 EXERCISE CONSTRAINTS
ROBO: 1.510 SSRMS CUPOLA RELEASE AND
PMA3 RELOCATE Step 16-16.3
~
OFF DUTY
ROBO: 1.520 SSRMS MNVR TO TRRJ VIEWING
& NODE 2 GRAPPLE Steps 1-2
Notes
10
02/15/10 14:01:08
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
09 R
EPLA
NNED
EVA PROCEDURE REVIEW
See Page 3-98
EVA PROCEDURE REVIEW
See Page 3-98
1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK
See Page 3-98
3-96
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/16
(047)
20:00
21:00
22:00
23:00
00:00
MET
Day 007
WE
Z
T D R S
~~ ~~
D / N
O R B 1 2 4 1 2 5 1 2 6 1 2 7
~ ~B I A S - X L V - Z V VS T S A T T
CDR
~
OFF DUTY
~
EXERCISE
OFF DUTY
PLT
~
EXERCISE
OFF DUTY
OFF DUTY
~
MS1
OFF DUTY
~
EXERCISE
OFF DUTY
~
Notes
3-96
ZAMK
AVI
RTS
HIRE
09 R
EPLA
NNED
EVA PROCEDURE REVIEW
See Page 3-98
EVA PROCEDURE REVIEW
See Page 3-98
1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK
See Page 3-98
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/16
(047)
20:00
21:00
22:00
23:00
00:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 2 4 1 2 5 1 2 6 1 2 7
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
~~
OFF DUTY
EXERCISE
OFF DUTY
PLT
~
EXERCISE
OFF DUTY
~
OFF DUTY
MS1
~
OFF DUTY
EXERCISE
OFF DUTY
~
Notes
11
02/15/10 14:01:08
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
09 R
EPLA
NNED
EVA PROCEDURE REVIEW
See Page 3-99
EVA PROCEDURE REVIEW
See Page 3-99
0
EVA PROCEDURE REVIEW
See Page 3-99
3-97
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/16
(047)
20:00
21:00
22:00
23:00
00:00
MET
Day 007
WE
Z
T D R S
~~ ~~
D / N
O R B 1 2 4 1 2 5 1 2 6 1 2 7
~ ~B I A S - X L V - Z V VS T S A T T
MS2
~
EXERCISE
OFF DUTY
~
OFF DUTY
MS3
~
EXERCISE
OFF DUTY
~
OFF DUTY
MS4
~
EXERCISE
OFF DUTY
~
Notes
3-97
ROBI
NSON
PATR
ICK
BEHN
KEN
09 R
EPLA
NNED
EVA PROCEDURE REVIEW
See Page 3-99
EVA PROCEDURE REVIEW
See Page 3-99
0
EVA PROCEDURE REVIEW
See Page 3-99
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/16
(047)
20:00
21:00
22:00
23:00
00:00
MET
Day 007
WE
Z
T D R SD / N
O R B 1 2 4 1 2 5 1 2 6 1 2 7
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
~
EXERCISE
~
OFF DUTY
OFF DUTY
MS3
~
EXERCISE
~
OFF DUTY
OFF DUTY
MS4
~
EXERCISE
~
OFF DUTY
Notes
12
02/15/10 14:01:08
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
09
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
CREW WAKE AT 08/12:00
REP
LANN
ED
3-98
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/16
(047)
00:00
01:00
02:00
03:00
04:00
MET
Day 008
WE
Z
T D R S
~
~~ ~
D / N
O R B 1 2 7 1 2 8 1 2 9
~ ~B I A S - X L V - Z V VS T S A T T
CDR
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
~
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE Steps 1-16
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIVATE MEDICAL CONFERENCE
L9 PAYLOAD STATION A/G(two) - OFF
Perform via A/G 2
FLIGHT DIRECTOR CONFERENCE
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
CSA-O2 READINGS
Activate 2 CSA-O2s in E/L for Campout.
Notify MCC-H of readings for accuracy
check. Deactivate both CSA-O2s.
PLT
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ILLUMINATORS OFF - ALL
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
~
WCS COMPACTOR OPS (DUAL-VANE)
(ORB OPS, CUE CARD)
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK
(ASSY OPS, ACT&C/O)
Steps 1-7.3
VAJ/ISA to remain mated to NOD3 Deck MPEV.
~
Notes
3-98
ZAMK
AVI
RTS
HIRE
09
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
CREW WAKE AT 08/12:00
REP
LANN
ED
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/16
(047)
00:00
01:00
02:00
03:00
04:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 2 7 1 2 8 1 2 9
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
~
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE Steps 1-16
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIVATE MEDICAL CONFERENCE
L9 PAYLOAD STATION A/G(two) - OFF
Perform via A/G 2
FLIGHT DIRECTOR CONFERENCE
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
CSA-O2 READINGS
Activate 2 CSA-O2s in E/L for Campout.
Notify MCC-H of readings for accuracy
check. Deactivate both CSA-O2s.
PLT
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ILLUMINATORS OFF - ALL
~
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
WCS COMPACTOR OPS (DUAL-VANE)
(ORB OPS, CUE CARD)
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK
(ASSY OPS, ACT&C/O)
Steps 1-7.3
VAJ/ISA to remain mated to NOD3 Deck MPEV.
Notes
13
02/15/10 14:01:08
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
09
CREW WAKE AT 08/12:00
REP
LANN
ED
3-99
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/16
(047)
00:00
01:00
02:00
03:00
04:00
MET
Day 008
WE
Z
T D R S
~
~~ ~
D / N
O R B 1 2 7 1 2 8 1 2 9
~ ~B I A S - X L V - Z V VS T S A T T
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
~
DAILY PLANNING CONFERENCE
GLACIER STATUS CHECK (ASSY OPS,CC)
MS3
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
Notes
3-99
ROBI
NSON
PATR
ICK
BEHN
KEN
09
CREW WAKE AT 08/12:00
REP
LANN
ED
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/16
(047)
00:00
01:00
02:00
03:00
04:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 2 7 1 2 8 1 2 9
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
DAILY PLANNING CONFERENCE
GLACIER STATUS CHECK (ASSY OPS,CC)
MS3
~
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
~
EVA PROCEDURE REVIEW
Ref. EVA 3 BRIEFING CARD
(EVA, TIMELINES)
Ref. MSG 100
Ref. MSG 110, Item 4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA SYSTEMS: 1.206 10.2 PSIA CAMPOUT MASK
PREBREATHE
Ref. STS-130 Consumables Tracking CC(EVA)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
Notes
14
MSG 111 - FD09 MISSION SUMMARY
1 2 3 4 5 6 7 8 9
10 11
Good Morning Endeavour!!!! Yesterday was such a fantastic moving day! Thanks! It was great to watch Cupola relocate to its proper position!!!! Be sure and take some time to look out the window today and just marvel at what you see!!! YOUR CURRENT ORBIT IS: 188 X 181 NM NOTAMS: NO CHANGE 12
13 14 15 16 17 18 19 20 21 22 23 24
EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS USABLE. DRYING OUT. WAL- CLOSED. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. ESN - RWY 03R/21L CLOSED. 03L/21R USABLE. GUA - RWY 06L/24R RWY END LIGHTS OUT OF SERVICE. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.
NEXT 2 PLS OPPORTUNITIES: 25
26 27 28 29 30
EDT04L ORB 126 – 7/22:38 SKC 7 030/3P4 EDT22R ORB 141 – 8/21:25 BKN250 7 270/4P6 OMS TANK FAIL CAPABILITY: 31
32 33 34 35
L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 36
37 38 39 40
L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 41
42 43 44 45 46 47 48 49 50 51
L OMS OX = 30.2 R OMS OX = 31.4 FU = 29.9 FU = 31.2 Subtract interconnect counter for current OMS quantities.
END OF PAGE 1 OF 2 15
MSG 111 - FD09 MISSION SUMMARY
END OF PAGE 2 OF 2
1 DELTA V AVAILABLE: 2
3 4
OMS 321 FPS ARCS (TOTAL ABOVE QTY1) 44 FPS 5
6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
TOTAL IN THE AFT 365 FPS ARCS (TOTAL ABOVE QTY2) 77 FPS FRCS (ABOVE QTY 1) 32 FPS AFT QTY 1 82 % AFT QTY 2 44 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.
16
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
1 o
f 10
Pag
e 1
of 1
0, 2
2-07
32 (M
SG
113
)
Con
tent
s:
1
Tim
elin
e Pr
oced
ures
: 2
** P
MA
3 P
RE
SS
CH
EC
K
3
** L
T-P
PA
LR
-RM
V
4
WR
S-U
PA-
FILL
5
WR
S-C
WC
I-FIL
L-PT
1 6
WR
S-C
WC
I-FIL
L-PT
2 7
NO
D3-
AFT
-HAT
CH
-CO
VR
8
CC
AA-A
V M
OU
NT-
RM
VL
9
P/T
V-A
RE
D A
CO
-S/U
10
P/T
V-A
RE
D A
CO
P/B
11
** C
BC
S S
TOW
12
** C
UP
OLA
FN
LK
CK
INIT
13
ESA
Tim
elin
e Pr
oced
ures
: 14
Non
e 15
JAXA
Tim
elin
e Pr
oced
ures
: 16
Non
e 17
Task
list P
roce
dure
s:
18
BC
AT3
-CR
YST
AL-
CH
EC
K
19
WH
C-K
TO-R
EPLA
CE
20
WH
C-ЕДВ-У-
R&
R
21
PW
D-B
EV
AD
PTR
-R&R
22
JAXA
Tas
klis
t Pro
cedu
res:
23
Non
e 24
ESA
Tas
klis
t Pro
cedu
res:
25
Non
e 26
27
28
29
30
31
32
33
17
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
2 o
f 10
Pag
e 2
of 1
0, 2
2-07
32 (M
SG
113
)
Tim
elin
e Pr
oced
ures
: 1
2
** P
MA
3 P
RES
S C
HEC
K
2.81
0 PM
A L
eak
Che
ck
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Tem
p St
ow
NO
D3
M
PE
V In
tern
al S
ampl
ing
Ada
pter
(IS
A)
97M
5583
0-1
2 00
0002
M
2
Sco
pem
eter
Pre
ssur
e
P
robe
S
EG
3913
0244
-302
00
4012
4594
7200
0096
92J
3 V
AJ-
83-1
35f
t 68
3-17
111-
2 -
0000
2676
J
4 V
AJ-
78-1
5ft
683-
1711
1-1
- 00
0026
77J
5
Mul
timet
er K
it 10
118-
1001
8-04
10
17
-
6
Mul
timet
er
87
1010
00
0886
36J
“Hap
py”
3
4
** L
T-PP
A L
R-R
MV
1.13
4 N
OD
E 3
LTL
PUM
P PA
CK
AG
E A
SSEM
BLY
(PPA
) LA
UN
CH
BR
AC
KET
REM
OVA
L Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
1D4
5/16
" Com
bina
tion
Wre
nch
SK
G33
1175
62-3
28
- -
2
5/16
" Soc
ket,
1/4"
Driv
e S
KG
3311
7562
-697
-
-
3 1/
2" S
ocke
t, 1/
4" D
rive
SK
G33
1175
62-7
02
- -
4
2" E
xt, 1
/4" D
rive
SK
G33
1175
62-7
63
- -
5
10" E
xt, 1
/4" D
rive
SK
G33
1175
62-7
66
- -
6
Uni
vers
al J
oint
, 1/4
" Driv
e S
KG
3311
7562
-010
-
-
7 In
spec
tion
Mirr
or
SK
G33
1175
62-9
23
- -
8
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
5/32
" Hex
Hea
d, 1
/4" D
rive
SK
G33
1175
62-7
42
- -
9
4" E
xt, 1
/4" D
rive
SK
G33
1175
62-7
64
- -
10
6"
Ext
, 1/4
" Driv
e S
KG
3311
7562
-765
-
-
11
Rat
chet
, 1/4
" Driv
e SK
G33
1175
62-9
39
- -
12
D
river
Han
dle,
1/4
" Driv
e S
KG
3311
7562
-941
-
-
18
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
3 o
f 10
Pag
e 3
of 1
0, 2
2-07
32 (M
SG
113
)
Type
: Res
tow
13
NO
D1P
2 3.
0 C
TB: N
ode
3 V
estib
ule
Out
fittin
g ki
t (V
OK)
, S/N
10
48, B
/C
0042
33J
0.5
CTB
: NO
D3
Uni
nsta
lled
Har
dwar
e S
EG
3311
1836
-303
10
65
0039
47J
14
Zipl
ock:
Nod
e 3
Clo
seou
t P
anel
Lau
nch
Bol
ts
- -
-
15
Lau
nch
Bol
ts [Q
TY: 2
0]
- -
-
16
Clo
seou
t Pan
el L
aunc
h B
olts
[QTY
: 31]
-
- -
Fast
ener
s
17
24” X
24“
Zip
lock
-
- -
LAB
EL “A
VM
Blo
ckin
g S
pace
rs”
18
U-S
hape
d A
VM B
lock
ing
Dev
ice
Spa
cer
N2-
DR
-OH
B-01
.21.
20.0
13
- -
Bra
cket
s
19
Sm
all A
VM
Blo
ckin
g D
evic
e S
pace
r N
2-D
R-O
HB-
01.2
1.20
.012
-
-
20
Larg
e A
VM
Blo
ckin
g D
evic
e S
pace
r N
2-D
R-O
HB-
01.2
1.20
.011
-
-
21
NO
D3D
1 S
hear
Fra
me
Ass
embl
y 17
40N
D20
5 -
-
1
2
WR
S-U
PA-F
ILL
21-0
223
1.90
4 U
PA A
CTI
VATI
ON
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1P
2 0.
5 C
TB, S
/N
1221
, B/C
01
0402
J
Reg
en E
CLS
S T
ox-2
PP
E K
it S
EG
4210
3702
-302
10
02
CH
CC
PK
02J
2 S
afet
y G
oggl
es
503R
-
-
3 M
ess-
Up
Mitt
s R
MU
M-1
2 -
-
4 S
ilver
Shi
eld
Glo
ves
SS
104M
-
-
5 S
urgi
cal M
asks
82
10
- -
6
LAB
1S1
TeS
S S
tow
age
Are
a
Крышка
ЕДВ
(ED
V C
over
) 11Ф
615.
8711
-18
0А15
-1
934
0011
6325
J
7
Корпус ЕДВ
(ED
V B
ucke
t) 11Ф
615.
8711
-12
0А15
-1
458
0011
6318
J
19
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
4 o
f 10
Pag
e 4
of 1
0, 2
2-07
32 (M
SG
113
)
Type
: Res
tow
8 LA
B1S
1 Te
SS
Sto
wag
e A
rea
Крышка
ЕДВ
(ED
V C
over
) 11Ф
615.
8711
-180А1
5-1
942
0011
6327
J
9
Корпус ЕДВ
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
424
0009
8519
R
1
WR
S-C
WC
I-FIL
L-PT
1 W
RS-
CW
CI-F
ILL-
PT2
20-0
021
2.91
3 C
WC
- Io
dine
Fill
from
WPA
with
WPA
H2O
Tra
nsfe
r Com
mon
Hos
e Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
2O2
Mes
h B
ag
CW
C-Io
dine
S
EG
3312
0607
-301
20
21
1079
22J
2 LA
B1O
3 W
PA
H2O
Tra
nsfe
r Com
mon
H
ose
SE
G33
1194
91-3
02
1004
00
0733
23J
3 LA
B1P
4 Zi
ploc
k -
- -
4
Z
iplo
ck: “
Yello
w/Y
ello
w H
ose-
QD
Rem
oved
on
GM
T X
XX
” -
- -
5
R/Y
QD
Ada
pter
10
108-
2017
5-01
50
08
-
Type
: Res
tow
6 JL
P1F1
C
WC
-Iodi
ne
SE
G33
1206
07-3
01
2021
10
7922
J
2
NO
D3-
AFT
-HA
TCH
-CO
VR
18-0
989
NO
DE
1 N
AD
IR H
ATC
H H
AR
DW
AR
E PR
OTE
CTI
ON
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
1D2
1.0
CTB
[QTY
: 2]
SE
G33
1118
38-3
07
1211
A
ny
0067
07J
Any
U
se C
TBs
with
Sof
t G
oods
for H
atch
P
rote
ctio
n, R
etrie
ve
from
PM
A1 if
not
at
NO
D1D
2 R
EPO
RT
S/N
s to
M
CC
-H
2 0.
5 C
TB
SE
G33
1118
36-3
01
Any
A
ny
3
20
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
5 o
f 10
Pag
e 5
of 1
0, 2
2-07
32 (M
SG
113
)
CC
AA
-AV
MO
UN
T-R
MVL
1.
132
NO
DE
3 C
CA
A A
NTI
-VIB
RA
TIO
N M
OD
ULE
(AVM
) LA
UN
CH
BR
AC
KET
REM
OVA
L Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
2 D
eplo
yed
TOO
L P
AG
E C
ASE
P
ER
S00
33
- P
ER
S33
02M
2
6" L
ong,
3/1
6" B
all T
ip H
ex
H
ead,
3/8
" Driv
e FA
BL6
E
- -
3 N
OD
1D4
10" E
xt, 1
/4" D
rive
SK
G33
1175
62-7
66
- -
4
Uni
vers
al J
oint
, 1/4
" Driv
e S
KG33
1175
62-0
10
- -
5
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
Rat
chet
, 1/4
" Driv
e S
KG33
1175
62-9
39
- -
6
3/16
" Hex
Hea
d,1/
4" D
rive
SKG
3311
7562
-743
-
-
7 5/
32" H
ex H
ead,
1/4
" Driv
e S
KG
3311
7562
-742
-
-
8 D
river
Han
dle,
1/4
" Driv
e S
KG
3311
7562
-941
-
-
9 8-
1/4"
Lon
g, 2
" Cut
Sci
ssor
s S
KG
3311
7562
-934
-
-
10
1/4"
to 3
/8" A
dapt
er
TA3
- -
Ty
pe: R
esto
w
11
N
OD
1P2
3.0
CTB
: Nod
e 3
Ves
tibul
e O
utfit
ting
kit
(VO
K), S
/N
1048
, B/C
00
4233
J
0.5
CTB
: NO
D3
Uni
nsta
lled
Har
dwar
e S
EG
3311
1836
-303
10
65
0039
47J
12
Zip
lock
: Nod
e 3
Clo
seou
t
Pan
el L
aunc
h B
olts
-
- -
13
CC
AA
Upp
er L
eft A
VM
Lau
nch
Bra
cket
N
2-D
R-O
HB-
01.4
4.43
.037
-
-
14
CC
AA
Upp
er R
ight
AV
M L
aunc
h B
rack
et
N2-
DR
-OH
B-01
.44.
43.0
37
- -
15
CC
AA
Low
er L
eft A
VM
Bra
cket
#1
N2-
DR
-OH
B-0
1.44
.43.
020
- -
16
C
CA
A L
ower
Lef
t AV
M B
rack
et #
2 N
2-D
R-O
HB
-01.
44.4
3.04
7 -
-
17
CC
AA
Low
er R
ight
AV
M B
rack
et #
1 N
2-D
R-O
HB-
01.4
4.43
.017
-
-
18
CC
AA
Low
er R
ight
AV
M B
rack
et #
2 N
2-D
R-O
HB-
01.4
4.43
.047
-
-
19
Sad
dle
Bra
cket
11
90N
D90
5 -
-
1 2
21
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
6 o
f 10
Pag
e 6
of 1
0, 2
2-07
32 (M
SG
113
)
1
P/TV
-AR
ED A
CO
-S/U
P/
TV-A
RED
AC
O P
/B
4.20
1 G
1 C
AM
CO
RD
ER N
OM
INA
L SE
TUP
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D2P
4 0.
5 C
TB:
Pho
toTV
C
onsu
mab
les,
S
/N 1
360,
B/C
C
TB00
265J
Min
i DVC
AM T
ape
[QTY
: 2]
SE
D33
1114
89-3
05
- -
2
** C
BC
S ST
OW
1.
180
20A
CB
CS
INST
ALL
ATI
ON
/REM
OVA
L - P
MA
3 IN
STA
LL
Type
: Res
tow
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D1S
4_A
2 1.
0 C
TB: C
BCS
Stri
ng 1
, S/N
10
30, B
/C
0029
15J
Cam
era
Bag
S
EG
3311
2759
-301
-
-
2 C
BCS
Cam
era
Ass
embl
y S
EG
3311
2576
-301
-
-
3 K
u-B
and
Pow
er S
uppl
y S
EG
4611
6711
-302
-
-
4 LE
D C
ontro
l Uni
t S
EG
3311
2643
-301
-
-
5 V
ideo
Inte
rface
Uni
t S
EG
3311
2646
-301
-
-
6 C
BC
S C
amer
a C
able
S
EG
3311
2641
-301
-
-
7 C
BC
S E
lect
roni
cs C
able
S
EG
3311
2638
-301
-
-
8 U
OP
Pow
er P
SA C
able
, 12
0VD
C
SE
G46
1167
45-3
01
- -
3 4
22
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
7 o
f 10
Pag
e 7
of 1
0, 2
2-07
32 (M
SG
113
)
1
** C
UPO
LA F
N L
K C
K IN
IT
1.18
8 C
UPO
LA F
INE
LEA
K C
HEC
K O
N N
OD
E 3
DEC
K
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Tem
p St
ow N
OD
3
MP
EV
Inte
rnal
Sam
plin
g Ad
apte
r (IS
A)
97M
5583
0-1
2 00
0002
M
Leav
e C
onne
cted
to
NO
D3
Dec
k M
PE
V a
fter a
ctiv
ity
2
Sco
pem
eter
Pre
ssur
e
P
robe
S
EG
3913
0244
-302
00
4012
4594
7200
0096
92J
3 V
AJ-
83-1
35f
t 68
3-17
111-
2 -
0000
2676
J 4
VA
J-78
-1 5
ft 68
3-17
111-
1 -
0000
2677
J 5
Mul
timet
er K
it 10
118-
1001
8-04
10
17
-
6
Mul
timet
er
87
1010
00
0886
36J
“Hap
py”
7 Pr
egat
here
d To
olse
t “J
eff”
or “
TV”
Rat
chet
, 1/4
" Driv
e -
- -
8
5/32
" Hex
Hea
d, 1
/4" D
rive
- -
-
2
ESA
Tim
elin
e Pr
oced
ures
: 3
Non
e 4
5
JAXA
Tim
elin
e Pr
oced
ures
: 6
Non
e 7
8
Task
list P
roce
dure
s:
9
10
BC
AT3
-CR
YSTA
L-C
HEC
K
2.03
4 B
CA
T-4
CR
YSTA
L C
HEC
K F
OR
SA
MPL
ES 8
,9, a
nd 1
0 Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1O
7 R
ack
Fron
t BC
AT-3
Slo
w G
row
th S
ampl
e M
odul
e 67
041F
SM
2200
-
0003
0426
L
2 LA
B1O
4_J1
0.
5 C
TB B
CAT
S/N
12
40, B
/C 0
1042
1J
LED
Min
i Mag
light
60
107M
FA20
17
- 00
1052
56L
3
1.5V
Bat
tery
Siz
e A
A [Q
TY:2
] 52
8-41
350-
3 -
- (if
requ
ired)
23
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
8 o
f 10
Pag
e 8
of 1
0, 2
2-07
32 (M
SG
113
)
WH
C-K
TO-R
EPLA
CE
2.30
5 W
HC
[KTO
] R&
R
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
FGB
Pan
el 2
20 o
r FG
B F
loor
or
N
OD
1O2
Sol
id W
aste
Con
tain
er –
Bod
y (a
ka K
TO B
ody)
11Ф
615.
8720А
55-2
0 25
7 26
3 26
4 26
5 27
2 27
5 27
8 28
2 30
4 30
7 30
8 30
9 31
0 32
5
- 00
1127
22J
0011
2724
J 00
1127
35J
0011
6316
J 00
1163
13J
0011
6302
J 00
1163
11J
0011
2744
J 00
1127
38J
- 00
1127
46J
0011
2748
J 00
1127
36J
This
is th
e lis
t of
avai
labl
e K
TO B
odie
s.
REP
OR
T S/
N a
nd B
/C
2 S
olid
Was
te C
onta
iner
– L
id
(aka
KTO
Bot
tom
) 11Ф
615.
8720А
55-1
0 25
7 25
8 26
3 26
5 27
2 27
4 27
5 27
8 28
2 30
7 30
8 30
9 31
0 32
5
0009
8427
R
0009
8428
R
0011
2721
J 00
1127
33J
0009
8472
R
0009
8474
R
0009
8475
R
0009
8438
R
0009
8442
R
0011
2737
J -
0011
2745
J 00
1127
47J
-
This
is th
e lis
t of
avai
labl
e K
TO L
ids.
R
EPO
RT
S/N
and
B/C
3 LA
B1D
1 S
olid
Was
te C
onta
iner
– B
ody
(aka
KTO
Bod
y)
11Ф
615.
8720А
55-2
0 30
5 00
1127
30J
Pre
posi
tione
d fo
r Ins
tall
4 S
olid
Was
te C
onta
iner
–
Lid
(aka
KTO
Bot
tom
)11Ф
615.
8720А
55-1
0 27
6 00
0984
36R
24
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
9 o
f 10
Pag
e 9
of 1
0, 2
2-07
32 (M
SG
113
)
5 N
OD
1D4
Rat
chet
, 1/4
" Driv
e S
KG
3311
7562
-939
-
-
6 10
mm
6 P
t Soc
ket,
1/4"
Driv
e S
KG
3311
7562
-657
-
-
7 (1
0-50
in-lb
s) T
rq W
renc
h, 1
/4"
Driv
e S
EG
3311
2395
-301
M
2064
22
-
Type
: Res
tow
8 LA
B1S
1 Te
SS
S
olid
Was
te C
onta
iner
–
Body
(a
ka K
TO B
ody)
11Ф
615.
8720А
55-2
0 -
- R
EPO
RT
S/N
and
B
/C
9 S
olid
Was
te C
onta
iner
– L
id
(aka
KTO
Bot
tom
) 11Ф
615.
8720А
55-1
0 -
-
1
WH
C-ЕДВ
-У-R
&R
2.
302
WH
C ЕДВ
R&
R
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
LAB
1P2
0.5
CTB
S
/N 1
221,
B
/C 0
1040
2J
Reg
en E
CLS
S T
ox-2
PPE
KIT
S
EG
4210
3702
-302
10
02
CH
CC
PK
02J
2
Saf
ety
Gog
gles
16
644-
0000
0 -
-
3 S
ilver
Shi
eld
Glo
ves
SS
G/1
0 -
-
4 D
ust M
ask
9211
-
-
5 LA
B1D
1 ЕД
В Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
93
5 00
1255
49J
Pre
posi
tione
d
6 ЕДВ
Корпус
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
459
0012
5565
J 7
NO
D1O
2 ЕД
В Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
90
2 00
0985
92R
8 ЕД
В Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
90
4 00
0985
94R
9
ЕДВ
Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
92
2 00
0478
31R
10
FG
B
ЕДВ
Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
-
- R
EPO
RT
S/N
and
B/C
11
ЕД
В Корпус
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
- -
Type
: Res
tow
12
LAB
1S1
ЕДВ
Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
93
1 00
1163
26J
13
ЕДВ
Корпус
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
455
0011
6319
J
2 3
25
22-0
732
(MSG
113
) – S
tow
age
Loca
tions
for F
D09
(GM
T 04
7)
Page
10
of 1
0 P
age
10 o
f 10,
22-
0732
(MS
G 1
13)
1
PWD
-BEV
AD
PTR
-R&
R
22-0
309
PWD
Bev
erag
e A
dapt
er M
odifi
catio
n an
d In
stal
l Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1O
4_D
1 P
WD
Bev
erag
e A
dapt
er
SE
G33
1203
33-3
02
1002
-
2
NO
D1D
4 R
atch
et, 1
/4” D
rive
SKG
3311
7562
-939
-
-
3 5/
32” H
ex H
ead,
1/4
” Driv
e S
KG
3311
7562
-742
-
-
Type
: Res
tow
4 LA
B1O
4_D
1 PW
D B
ever
age
Adap
ter
SEG
3312
0333
-301
-
-
2
JAXA
Tas
klis
t Pro
cedu
res:
3
Non
e 4
5
ESA
Tas
klis
t Pro
cedu
res:
6
Non
e 7
26
22-0736 (MSG 116) – STS-130 (20A) EMU Story Page 1 of 3
Page 1 of 3, 22-0736 (MSG 116)
STS-130 EMU story 1
2
The original plan was to have Bob use EMU 3004 and Nick use EMU 3005 for all 3 3
docked EVAs. Then EMU 3005 would be swapped with the ISS EMU 3018 for the 4
trip home. The following is a timeline of what occurred and is yet to happen. 5
6
FD3: REBA Powered Hardware Checkout 7
Bob=EMU 3004 EMU 3018 8
Nick = EMU 3005 9
10
Issue: EMU 3004 was unable to deliver power from the REBA battery to the heated 11
gloves or EMU TV. 12
Workaround: The ground team looked into the power harness R & R and even 13
worked up a preliminary procedure, but ultimately decided that resizing ISS EMU 14
3018 for Bob was quicker and simpler. 15
Result: EMU 3018 was resized on FD4. EVA1 on FD5 was performed with Bob in 16
EMU 3018 and Nick in EMU 3005. 17
18
FD5: EVA1 to FD6: EMU Resize and Power Harness R&R 19
Bob = EMU 3018 20
Nick = EMU 3005 EMU 3004 21
22
Issue1: Bob’s prime Comm Cap developed low volume issues about 4 hours into 23
the EVA and did not recover, even at max volume. 24
Workaround1: Bob’s backup Comm Cap was tested Post EVA1 for Comm volume 25
and found to be satisfactory. 26
Issue2: Not a failure, but a combination of signatures that made EMU 3005 27
suspect. First it was noted during the EVA that EMU 3005 Fan RPMs dropped 400 28
RPMs, from 19, 300 to 18,900 RPMs. The value of 18, 900 RPM is slightly below 29
the historically seen values. After several hours, the RPMs increased back into the 30
nominally seen range. At all times, the lower RPMs of the motor provided airflow 31
which was well above the minimum required for CO2 control. The other signature 32
was when Nick called down POST EVA that his suit had water droplets in the visor 33
and his feet were wet. 34
Workaround2: Neither of these signatures by themselves is significant enough to 35
call EMU 3005 no-go. We’ve seen this type of moisture during repress in the past, 36
as Nick has described. The FAN RPM drop could be just variations in the fan 37
circuitry. If these two signatures were related, it would indicate a significant failure in 38
the water processing system within the EMU (excess water in the loop could slow 39
down the fan). While the engineering team was working on resolving these 40
signatures, they declared EMU 3005 no-go for EVA until they could clear it. That 41
meant resizing EMU 3004 for Nick’s use and completing the procedure for the power 42
harness R & R so Nick would have heated gloves and EMU TV. 43
Result: EMU 3004 was resized on FD6 and its power harness was successfully 44
replaced as well. EVA2 was performed with Bob in EMU 3018 and Nick in EMU 45
3004. 46
27
22-0736 (MSG 116) – STS-130 (20A) EMU Story Page 2 of 3
Page 2 of 3, 22-0736 (MSG 116)
1
FD7: Engineering Analysis Results 2
EMU 3005 is declared go for EVA. It was determined that the two signatures 3
(slightly low RPMs and water in the suit) were unrelated and the suit is operating 4
nominally. The overall low RPM signature is consistent with the documented pre-5
flight settings. The moisture Nick reported in the suit was consistent with his 6
reported TCV (Temperature Control Valve) management. Nick’s TCV settings would 7
have built up humidity and condensation in his vent loop. Then during repress, the 8
increased density of the suit atmosphere would have pushed any moisture built up 9
from the vent loop out into the helmet. It is typical for an EMU’s extremities to be 10
cooler than the rest of the suit, so if humidity were to build up in the suit, water would 11
also condense at the feet, causing wet feet. 12
We gave Nick additional words for ingress cooling and TCV management during the 13
FD 6 discussion of the water droplets. 14
15
FD7: EVA2 PREP 16
Bob=EMU 3018 17
Nick = EMU 3004 18
19
Issue: Bob’s backup comm cap worked fine in the comm check to the ground, but 20
during the EMU display and tones test, he reported not being able to hear any tones. 21
Workaround: Power cycling the EMU did not work, so it was suggested for Bob to 22
go to Nick’s backup comm cap. They powered down the Comm circuitry to swap the 23
comm caps, and when they repowered, Bob reported being able to hear the tones. 24
Result: Bob used Nick’s backup comm cap for EVA2 and will use it for EVA3. 25
26
FD7: POST EVA2 to FD8: EMU Resize 27
Bob=EMU 3018 EMU 3005 28
Nick = EMU 3004 29
30
Issue: Not only did Bob have comm issues during EVA1 and EVA 2 Prep, but STS-31
129 had multiple comm issues too. Initially, the STS-129 comm issues were thought 32
to be related to the comm cap. However, given the currently seen issues, EMU 33
3018 is also a common denominator. It is undetermined whether power cycling the 34
comm circuitry or switching out the comm cap was what resolved the tones issue 35
Bob had during EVA2 PREP. Preliminary fault tree analysis has not identified a 36
likely root cause. More testing will be done once EMU 3018 is back on the ground. 37
Workaround: Given the history of EMU 3018 with no likely root cause, we had 38
EMU 3005 resized for Bob. 39
Result: For EVA3, Bob will be in EMU 3005 and Nick in EMU 3004, the reverse of 40
what was planned pre-flight. The crew was directed to place Williams’ comm caps in 41
the E-Lk to use for backup comm caps for EVA3. 42
43
28
22-0736 (MSG 116) – STS-130 (20A) EMU Story Page 3 of 3
Page 3 of 3, 22-0736 (MSG 116)
FD10: EVA3 1
Bob = EMU 3005 2
Nick = EMU 3004 3
4
FD11 or FD12: EMU RETURN PLAN 5
One more EMU resize is required to bring EMU 3018 home. Since EMU 3004 is 6
already sized for Nick, we’ll resize EMU 3018 back to Bob’s configuration for the 7
return. 8
9
EMU 3018 is cleared for contingency use because the suit has never experienced a 10
total comm failure and successfully recovered audio function previously by swapping 11
comm caps and power cycling the suit. If EMU CWS tones are lost, MCC will be 12
prime to monitor and inform the crew of any fault messages. In the unlikely event of 13
total comm loss, most contingency EVAs can be completed by a single EV 14
crewmember. The affected crewmember can return to SCU, keep eyes on the other 15
EV, and use hand signals per standard no comm. training. 16
17
EMU 3005 will be left on ISS per the original plan. EMU 3005 is certified for use for 6 18
years, and has been cleared after extensive data review. The other EMUs are only 19
certified for 2-3 years. 20
29
MSG 117 - FD09 CREW CHOICE DOWNLINK
1
TDRS AOS LOS Delta (min) Notes W-171 8/00:35 8/01:08 33 E-275 8/02:01 8/02:11 10 Gimbal flip at 02:08; Analog only W-171 8/02:12 8/02:43 31 E-275 8/03:40 8/03:50 10 Analog only
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.
END OF PAGE 1 OF 1, MSG 117 30
MSG 118C - STS-130 OVERVIEW TIMELINE FD09 TO EOM (14+2)
1
MET
D D
MET
Node 3 & Cupola Outfitting
MET
D D
R̂eboost
MET
D D
MET
D D
UNDK 15:40 ̂
MET
MET
IK̂SC 217 13/16:59
Landing KSC 13/18:03
10 11
FD 1
1 STS ECLSS RACK XFERSMeal
EVA & MDDK XFER
ISS ECLSS RACK XFERS GET AHEADSOrb Att
MT/SSRMS WS4/Lab
21 22 23 10/0 1 216 17 18 19 20 6 7 8 9
12 13 14 15
9
96 7
3 4 512 13 14 15
116 17
10320 223 821 22 6 711/0 1
FD 0
9 STSMeal
ISSOrb Att
MT/SSRMS
LVLH TEA
52312
PMA 3 RelocateNode3/Cupola Outfit
WS4/Lab
1 2 4 7 11808/0 3 9 106
1120
CampoutOFF DUTY (3.5 hrs) & PFCs
19
EVA 3 Rvw
8 1009/0 521 43
12 13
LVLH TEA
13 14 15 18
Undock
12
12
Crew Conf
16
13 14 16
13 14 15
Post EVA Xfer
18 22
1716
23
18 19 20 21 22
17B
ye
RNDZ Tools
Xfer & DCB ODS Lk Ck
113 4 5 6 7
-ZLV -XVV
Pilot Ops B
rief
2014 15 17
L-1
Cm KU &
PGSC StowL-
1 C
m
19
PAO
21 22 23 109
9
Cabin Stow
18
20 21 22
8
18Dump
-ZLV -YVV
Flyaround and Sep
13/0 1 2
2017
Cabin Stow
12 13 14 15 16 1023 14/0 1 2 3 4 5 6 7 8 11
9 10 117
-ZLV -XVV
FD 1
5
STS Ent
Orb Att
D/O Prep
Meal
17 18 19
FD 1
4
STS FCS C/O / RCS HF
Orb Att
IMU
-XSI Comm Ent
114 516
FD 1
3 STS
Orb AttMT/SSRMS WS4/Lab
ISS
83 4 5 623 12/0 1 221 2215
19
19
FD 1
2 STS
MT/SSRMS WS4/Lab
ISSOrb Att
Meal
Hat
ch
Xfer
STS-130/20A Overview Timeline 14+2 (3 EVAs)GMTLO 039/09:14:08 Feb 8th, 2010
OBSS Berth
TPS InspectionUndock/Flyaround
TPS Inspection
2
Reboost
LVLH TEA
LVLH TEA LVLH TEA
FD 1
0 STS EVA 3 (Node 3, Cupola & PMA Tasks)ISS Meal
MT/SSRMS WS4/LabOrb Att LVLH TEA
Pre EVAN1 FSS & CUP RWS
Post EVA
2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17
END OF PAGE 1 OF 1, MSG 118C 31