FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 July 1, 2015 Through June 30, 2020 COUNTY POLK FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 - DRAFT 2016 2020 TENTATIVE WORK PROGRAM REPORT Tentative Work Program Fiscal Years ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES Page: 1 11/24/2014 Run Date: SnapShot Date: 11/12/2014
Transcript
Page 1: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

July 1, 2015 Through June 30, 2020

COUNTYPOLK

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

-

DRAFT

2016 2020

TENTATIVE WORK PROGRAM REPORT

Tentative Work Program Fiscal Years

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 111/24/2014Run Date: SnapShot Date: 11/12/2014

Page 2: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

COUNTYPOLK

MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.

July 1, 2015 Through June 30, 2020

DRAFTTENTATIVE WORK PROGRAM REPORT

Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362

Debbie TowerCommunications DirectorSouthwest Area Office10041 Daniels ParkwayFort Myers, FL 33913(239) 461-4300

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 211/24/2014Run Date: SnapShot Date: 11/12/2014

Page 3: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

COUNTYPOLK

July 1, 2015 Through June 30, 2020

CURRENTLY REPORTED ACTIVE FUND CODES

DRAFTTENTATIVE WORK PROGRAM REPORT

ACSU

BRRP State Bridge Repair And Rehab

CIGP County Incentive Grant Program

CM Congestion Mitigation – ACQ

DDR District Dedicated Revenue

DI State-Statewide Inter/Intrastate Highway

DIH State In-house Product Support

DITS Statewide ITS - State 100%

DPTO State PTO

DS State Primary Highways and PTO

DU State Primary/Federal Reimbursement

DWS Weigh Stations - State 100%

FAA Federal Aviation Administration

FTA Federal Transit Administration

FTAT FHWA Transfer to FTA (non-bud)

HSP Highway Safety Program

LF Local Funds

LFP Local Fund for Participating

PKYI Tpk Improvement

PKYR Tpk Maintenance Reserve

PL Metro Plan (85% FA; 15% other)

RHH Rail-Highway Xings – Hazard

SA STP, Any Area

SL STP, Areas < 200k

SU STP, Urban Areas > 200k

TRIP Trans Regional Incentive Prog

ACBZ

ACNP

ACTU

NHRE

TALT

TALU

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 311/14/2014Run Date: SnapShot Date: 11/12/2014

Advance Construction (SU)

Advance Construction BRTZ

Advance Construction NHPP

NAT HWY Perform ­ Resurfacing

Advance Construction TALU

Transportation ALTS­ ANY AREATransportation ALTS­ >200K

Page 4: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

HIGHWAYS

FPN: 4136441 Project/Location: AUBURNDALE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.820

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 10.690 End Mile Post: 11.510

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $25,536 $26,303 $27,092 $27,904 $28,741

$25,536 $26,303 $27,092 $27,904 $28,741Project Total:

FPN: 4328091 Project/Location: BAKER ST FROM N VAN FLEET DR TO BRITTS

LANE-XING #624503-T

Project Length: 0.201

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.201

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $270,600

$270,600Project Total:

FPN: 4367951 Project/Location: BARTOW ADAPTIVE DBOM US 98 FROM MANOR

DR TO US 17

Project Length: 1.111

Desc: ATMS - ARTERIAL TRAFFIC MGMT

Comments:

Begin Mile Post: 1.194 End Mile Post: 1.994

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DI $75,000

DSB DI $793,046

DSB DIH $25,675

OPS DI $109,334 $109,334

$893,721 $109,334 $109,334Project Total:

FPN: 4313521 Project/Location: BARTOW NORTHERN CONNECTOR PHASE II

FROM US 17 TO SR 60

Project Length: 2.000

Desc: NEW ROAD CONSTRUCTION

Comments:

Begin Mile Post: 2.062 End Mile Post: 4.062

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST CIGP $467,864

CST LFP $9,819,995

CST TRIP $2,998,420

$13,286,279Project Total:

FPN: 4136451 Project/Location: BARTOW TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.002

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 16.896 End Mile Post: 17.898

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $36,480 $37,575 $38,702 $39,863 $41,059

$36,480 $37,575 $38,702 $39,863 $41,059Project Total:

FPN: 4332571 Project/Location: BELLA VISTA FROM MLK JR AVE TO LAKE

PARKER DRIVE

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

LAR ACTU $320,287

$320,287Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 411/24/2014Run Date: SnapShot Date: 11/12/2014

Page 5: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4345081 Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER

ROAD

Project Length: 1.000

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 1.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV SA $10,000 $20,000

CST HSP $661,193

CST SA $10,530

$10,000 $691,723Project Total:

FPN: 4351071 Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD

TO TENTH STREET

Project Length: 0.556

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.844 End Mile Post: 1.400

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST SU $151,090

$151,090Project Total:

FPN: 4316411 Project/Location: CENTRAL POLK PWKY FROM POLK PWKY (SR

540) TO SR 35 (US 17)

Project Length: 7.103

Desc: NEW ROAD CONSTRUCTION

Comments:

Begin Mile Post: 0.000 End Mile Post: 7.103

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ROW DDR $1,966,740 $1,985,083

ROW DIH $151,944 $136,943

$2,118,684 $2,122,026Project Total:

FPN: 4316412 Project/Location: CENTRAL POLK PWKY FROM SR 35 (US 17) TO

LOGISTICS PARKWAY

Project Length: 5.794

Desc: NEW ROAD CONSTRUCTION

Comments:

Begin Mile Post: 7.103 End Mile Post: 12.897

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ROW DDR $4,611,162 $3,479,790

ROW DIH $506,479 $456,479

$5,117,641 $3,936,269Project Total:

FPN: 4316418 Project/Location: CENTRAL POLK PWKY FROM US 17/US 92 TO I-

4

Project Length: 0.001

Desc: NEW ROAD CONSTRUCTION

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DDR $9,212,000

PE DIH $110,000

$9,322,000Project Total:

FPN: 1976204 Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC

NETWORK

Project Length: 0.000

Desc: TRAFFIC CONTROL DEVICES/SYSTEM

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS SL $20,278 $20,278 $20,278 $20,278 $20,278

$20,278 $20,278 $20,278 $20,278 $20,278Project Total:

FPN: 4367891 Project/Location: COLEMAN RD RECKER HWY TO 26TH ST X-ING #

625397R

Project Length: 0.122

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 1.021 End Mile Post: 1.143

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $276,600

$276,600Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 511/24/2014Run Date: SnapShot Date: 11/12/2014

Page 6: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4317721 Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER

ROSALIE/ZIPPRER CANAL

Project Length: 0.001

Desc: BRIDGE REPLACEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST ACBZ $1,668,600

$1,668,600Project Total:

FPN: 4367871 Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO DOC

GAY RD X-ING #624214S

Project Length: 0.199

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 2.659 End Mile Post: 2.858

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $119,671

$119,671Project Total:

FPN: 4367911 Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO GAY

RDX-ING #624215Y

Project Length: 0.034

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 2.625 End Mile Post: 2.659

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $119,671

$119,671Project Total:

FPN: 4332721 Project/Location: CR 544 AT SR 17

Project Length: 0.001

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST LF $70,485

CST SU $1,000,182

$1,070,667Project Total:

FPN: 4332741 Project/Location: CR 655 (RIFLE RANGEROAD) FROM 10TH STREET

E TO BOMBER ROAD

Project Length: 0.865

Desc: SIDEWALK

Comments:

Begin Mile Post: 9.645 End Mile Post: 10.510

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST SU $295,146

$295,146Project Total:

FPN: 4349421 Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS

RD TO KITTY FOX

Project Length: 2.770

Desc: TRAFFIC OPS IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 2.770

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST HSP $1,483,046

CST SA $8,424

$1,491,470Project Total:

FPN: 4350691 Project/Location: CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY

RD

Project Length: 0.343

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.326 End Mile Post: 0.669

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST ACSU $550,159

CST SU $1,000

$551,159Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 611/24/2014Run Date: SnapShot Date: 11/12/2014

Page 7: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4350941 Project/Location: DAVENPORT COMPLETE STREET PHASE I AND

PHASE II

Project Length: 0.001

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE TALU $225,000

$225,000Project Total:

FPN: 4136461 Project/Location: DAVENPORT TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.094

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 3.768 End Mile Post: 3.862

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $3,040 $3,132 $3,226 $3,322 $3,422

$3,040 $3,132 $3,226 $3,322 $3,422Project Total:

FPN: 4361451 Project/Location: DRAINAGE IMPROVEMENT CTY OF LAKE

ALFRED FROM E HOFFMAN ST TO E ORANGE ST

Project Length: 0.199

Desc: DRAINAGE IMPROVEMENTS

Comments:

Begin Mile Post: 15.215 End Mile Post: 15.414

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DIH $5,135

CST DS $374,757

CST LF $51,350

$431,242Project Total:

FPN: 4136471 Project/Location: DUNDEE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.065

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 28.850 End Mile Post: 29.915

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $9,728 $10,020 $10,321 $10,631 $10,949

$9,728 $10,020 $10,321 $10,631 $10,949Project Total:

FPN: 4136481 Project/Location: EAGLE LAKE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.440

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 25.390 End Mile Post: 25.830

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $9,120 $9,394 $9,676 $9,966 $10,265

$9,120 $9,394 $9,676 $9,966 $10,265Project Total:

FPN: 4332291 Project/Location: EAST LAKE HOWARD TRAIL

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST TALT $342,360

CST TALU $256,475

$598,835Project Total:

FPN: 4309181 Project/Location: EASTSIDE ELEMENTARY SCHOOL SAFETY

SIDEWALKS

Project Length: 0.000

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST TALT $174,758

$174,758Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 711/24/2014Run Date: SnapShot Date: 11/12/2014

Page 8: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4345021 Project/Location: EWELL ROAD AT LUNN RD

Project Length: 5.000

Desc: SKID HAZARD OVERLAY

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE HSP $96,293

CST HSP $463,342

CST SA $10,530

$96,293 $473,872Project Total:

FPN: 4136491 Project/Location: FROSTPROOF TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.443

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 4.750 End Mile Post: 6.193

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $7,752 $7,985 $8,225 $8,471 $8,725

$7,752 $7,985 $8,225 $8,471 $8,725Project Total:

FPN: 4136501 Project/Location: FT MEADE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.700

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 7.000 End Mile Post: 7.700

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $8,360 $8,611 $8,870 $9,136 $9,410

$8,360 $8,611 $8,870 $9,136 $9,410Project Total:

FPN: 4136511 Project/Location: HAINES CITY TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.270

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 21.500 End Mile Post: 22.770

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $38,912 $40,080 $41,282 $42,521 $43,796

$38,912 $40,080 $41,282 $42,521 $43,796Project Total:

FPN: 4301853 Project/Location: I-4 @ SR 33 INTERCHANGE

MODIFICATION

Project Length: 0.650

Desc: INTERCHANGE IMPROVEMENT

Comments:

Begin Mile Post: 12.032 End Mile Post: 12.682

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV SA $1,300,000

ROW DIH $271,270

ROW DS $33,489

ROW SA $2,483,295

$1,300,000 $2,788,054Project Total:

FPN: 2012178 Project/Location: I-4 AT CSX RAILROAD

Project Length: 0.004

Desc: REPLACE RAILROAD BRIDGE

Comments:

Begin Mile Post: 4.887 End Mile Post: 4.891

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE ACNP $1,690,000

$1,690,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 811/24/2014Run Date: SnapShot Date: 11/12/2014

Page 9: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 2012153 Project/Location: I-4 AT SR 557

Project Length: 1.610

Desc: INTERCHANGE IMPROVEMENT

Comments:

Begin Mile Post: 21.767 End Mile Post: 22.878

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DI $100,000

RRU ACNP $4,500,000

CST ACNP $54,664,218

CST DIH $508,099

$100,000 $59,672,317Project Total:

FPN: 4273152 Project/Location: I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA

COUNTY LINE

Project Length: 16.235

Desc: ITS FREEWAY MANAGEMENT

Comments:

Begin Mile Post: 15.787 End Mile Post: 32.022

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE HSP $75,000

DSB DIH $23,621

DSB HSP $3,635,366

$3,733,987Project Total:

FPN: 4328041 Project/Location: INTERLACHEN PKWY FROM FERN RD TO E

GARY RD-XING# 624155-S

Project Length: 0.091

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.168 End Mile Post: 0.259

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $281,300

$281,300Project Total:

FPN: 4136521 Project/Location: LAKE ALFRED TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.010

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 15.590 End Mile Post: 15.600

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $10,336 $10,647 $10,966 $11,294 $11,634

$10,336 $10,647 $10,966 $11,294 $11,634Project Total:

FPN: 4351091 Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST

SW

Project Length: 0.001

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE LF $155,000

CST TALT $83,773

CST TALU $344,752

$155,000 $428,525Project Total:

FPN: 4136531 Project/Location: LAKE WALES TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.017

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 18.968 End Mile Post: 19.985

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $33,440 $34,444 $35,477 $36,541 $37,638

$33,440 $34,444 $35,477 $36,541 $37,638Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 911/24/2014Run Date: SnapShot Date: 11/12/2014

Page 10: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4371071 Project/Location: LAKELAND TMC OPS FUND CITY

WIDE

Project Length: 0.001

Desc: OTHER ITS

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DS $159,000 $159,000

$159,000 $159,000Project Total:

FPN: 4136541 Project/Location: LAKELAND TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 4.770

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 23.830 End Mile Post: 28.600

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $345,372 $355,733 $369,727 $380,819

OPS DITS $335,312

$335,312 $345,372 $355,733 $369,727 $380,819Project Total:

FPN: 4367901 Project/Location: LEM CARNES RD CR 547N TO SR 600/US 17 X-ING

#622960T

Project Length: 0.010

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.010

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $270,600

$270,600Project Total:

FPN: 4350611 Project/Location: LINCOLN AVE SIDEWALKS

Project Length: 0.498

Desc: SIDEWALK

Comments:

Begin Mile Post: 1.226 End Mile Post: 1.724

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST ACSU $231,540

CST SU $1,000

$232,540Project Total:

FPN: 4298831 Project/Location: LK ALFRED TR AT US 17/92 BRIDGE

Project Length: 0.100

Desc: PEDESTRIAN/WILDLIFE OVERPASS

Comments:

Begin Mile Post: 14.406 End Mile Post: 14.506

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV TALT $50,000

CST CM $1,524,600

CST DDR $48,444

CST SA $214,087

$1,837,131Project Total:

FPN: 4136551 Project/Location: MULBERRY TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 2.500

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 18.450 End Mile Post: 20.950

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $18,240 $18,788 $19,351 $19,932 $20,530

$18,240 $18,788 $19,351 $19,932 $20,530Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1011/24/2014Run Date: SnapShot Date: 11/12/2014

Page 11: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4332581 Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE

DRIVE TO EDGEWOOD DRIVE

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

LAR ACSU $269,314

$269,314Project Total:

FPN: 4332601 Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM

SIKES BLVD TO NEW YORK AVENUE

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE LF $115,307

PE TALU $1,000

CST TALU $532,500

$116,307 $532,500Project Total:

FPN: 4344891 Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK

ROAD

Project Length: 0.500

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.500

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST HSP $679,483

CST SA $10,530

$690,013Project Total:

FPN: 4353911 Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO

HAINES CITY

Project Length: 0.001

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PDE SU $1,048,752

$1,048,752Project Total:

FPN: 4367881 Project/Location: PAYNE ST SR 600/US92 - BLUE JAY AVE X-ING

#623084U

Project Length: 0.001

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU RHH $255,600

$255,600Project Total:

FPN: 4350461 Project/Location: POLK COUNTY SCOUR COUNTERMEASURE AT

VARIOUS LOCATIONS

Project Length: 4.484

Desc: BRIDGE-REPAIR/REHABILITATION

Comments:

Begin Mile Post: 25.276 End Mile Post: 25.298

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST BRRP $163,791

CST DIH $24,488

$188,279Project Total:

FPN: 4126751 Project/Location: POLK COUNTY TRAFFICSIGNALS

REIMBURSEMENT

Project Length: 12.175

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 2.300 End Mile Post: 14.475

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $374,649 $385,888 $400,787 $412,810

OPS DITS $363,736

$363,736 $374,649 $385,888 $400,787 $412,810Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1111/24/2014Run Date: SnapShot Date: 11/12/2014

Page 12: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4125301 Project/Location: POLK TPO IDENTIFIED OPERATIONAL

IMPROVEMENTS- FUNDING

Project Length: 0.000

Desc: TRAFFIC OPS IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE SU $220

ROW SU $220

CST SU $3,059,726 $5,952,956 $4,987,260 $5,951,368

$3,059,726 $5,952,956 $4,987,260 $5,951,808Project Total:

FPN: 4351041 Project/Location: ROSE STREET SIDEWALKS AT VARIOUS

LOCATIONS

Project Length: 0.533

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.144 End Mile Post: 0.677

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE LF $70,000

CST TALT $13,542

CST TALU $256,576

$70,000 $270,118Project Total:

FPN: 4333791 Project/Location: SR 17 AT HUNT BROTHERS ROAD

Project Length: 0.296

Desc: ROUNDABOUT

Comments:

Begin Mile Post: 17.203 End Mile Post: 17.499

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

INC DDR $40,000

$40,000Project Total:

FPN: 4344881 Project/Location: SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM

LOOP RD

Project Length: 0.206

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 3.510 End Mile Post: 3.716

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $6,967

CST DIH $25,816

CST HSP $168,366 $6,318

$201,149 $6,318Project Total:

FPN: 4333961 Project/Location: SR 33 AT DEEN STILL ROAD

Project Length: 0.285

Desc: ROUNDABOUT

Comments:

Begin Mile Post: 19.580 End Mile Post: 19.865

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

INC DDR $32,000

$32,000Project Total:

FPN: 4312911 Project/Location: SR 33 FROM HAYNES CIRCLE TO

WITHLACOOCHEE BRIDGE

Project Length: 12.535

Desc: RESURFACING

Comments:

Begin Mile Post: 14.603 End Mile Post: 27.138

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DS $50,000

CST DDR $3,561,825

CST DIH $154,050

CST DS $3,602,942

$7,368,817Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1211/24/2014Run Date: SnapShot Date: 11/12/2014

Page 13: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4366731 Project/Location: SR 35/700 (US 98) FROM N. OF WEST SOCRUM

LOOP RD TO SR 471

Project Length: 7.531

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 9.005 End Mile Post: 16.536

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PDE DIH $200,000

PDE DS $2,100,000

$2,300,000Project Total:

FPN: 1975624 Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E

MAIN STREET

Project Length: 3.033

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 9.189 End Mile Post: 12.222

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ROW CM $1,723,607 $1,723,454

ROW SA $1,522,651 $4,242,750

$3,246,258 $5,966,204Project Total:

FPN: 4312781 Project/Location: SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR

CREEK APTS

Project Length: 3.050

Desc: RESURFACING

Comments:

Begin Mile Post: 15.969 End Mile Post: 18.511

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DS $50,000

CST DDR $154,050

CST DIH $107,835

CST SA $5,040,708

$5,352,593Project Total:

FPN: 4345071 Project/Location: SR 37 AT LAKE HARRIS DRIVE

Project Length: 0.285

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 23.436 End Mile Post: 23.721

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $31,982

CST HSP $641,240

CST SA $10,530

$683,752Project Total:

FPN: 4349371 Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST

RD)

Project Length: 7.571

Desc: RESURFACING

Comments:

Begin Mile Post: 7.386 End Mile Post: 14.957

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU DS $100,000

CST DIH $95,536

CST DS $6,522,511

$100,000 $6,618,047Project Total:

FPN: 4366011 Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA

ST

Project Length: 0.796

Desc: RESURFACING

Comments:

Begin Mile Post: 18.209 End Mile Post: 19.005

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $100,000

CST SA $1,818,211

$100,000 $1,818,211Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1311/24/2014Run Date: SnapShot Date: 11/12/2014

Page 14: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4106662 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP

RD

Project Length: 2.305

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 0.380 End Mile Post: 2.685

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DS $40,000 $200,000

RRU DDR $1,000,000

RRU LF $2,951,628

ROW SU $5,241,467 $1,221,060

CST DDR $15,736,323

CST DIH $331,800

$5,281,467 $1,421,060 $20,019,751Project Total:

FPN: 4106664 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP

ROAD

Project Length: 2.476

Desc: LANDSCAPING

Comments:

Begin Mile Post: 0.000 End Mile Post: 2.476

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DIH $5,670

CST DS $234,396

$240,066Project Total:

FPN: 4106663 Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US

27

Project Length: 3.648

Desc: WIDEN/RESURFACE EXIST LANES

Comments:

Begin Mile Post: 2.779 End Mile Post: 6.427

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ROW DDR $5,402,004 $6,810,022

ROW DIH $477,405 $477,405

$5,879,409 $7,287,427Project Total:

FPN: 4352841 Project/Location: SR 546 (MEMORIAL) FROM CHESTNUT RD E TO

BRUNNELL PKWY

Project Length: 0.856

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 3.876 End Mile Post: 4.732

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $10,000

CST DIH $15,405

CST DS $883,672

$909,077Project Total:

FPN: 4365691 Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N.

INGRAHAM AVENUE

Project Length: 3.311

Desc: RIGID PAVEMENT REHABILITATION

Comments:

Begin Mile Post: 1.738 End Mile Post: 5.049

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $10,000

CST NHRE $3,696,305

CST SA $4,839,609

$10,000 $8,535,914Project Total:

FPN: 4350711 Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A

SW

Project Length: 0.497

Desc: RESURFACING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.497

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $2,084,013

CST DIH $17,646

$2,101,659Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1411/24/2014Run Date: SnapShot Date: 11/12/2014

Page 15: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4350851 Project/Location: SR 563 (SIKES BLVD)FROM LIME ST TO SR 539

(MLK JR BLVD)

Project Length: 0.417

Desc: RIGID PAVEMENT REHABILITATION

Comments:

Begin Mile Post: 0.006 End Mile Post: 0.423

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $10,000

CST DDR $980,530

CST DIH $111,290

$10,000 $1,091,820Project Total:

FPN: 4345091 Project/Location: SR 60 AT BAILEY RD

Project Length: 0.303

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 2.848 End Mile Post: 3.151

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $25,300

CST HSP $596,354

CST SA $54,963

$676,617Project Total:

FPN: 4312941 Project/Location: SR 60 FROM CR 630 TO KISSIMMEE RIVER

BR

Project Length: 5.876

Desc: RESURFACING

Comments:

Begin Mile Post: 18.634 End Mile Post: 24.510

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $803,563

CST DIH $205,400

CST DS $4,549,309

$5,558,272Project Total:

FPN: 4356061 Project/Location: SR 60 HILLSBOROUGH C/L DIESEL

RD

Project Length: 5.281

Desc: RESURFACING

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.281

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU DS $275,000

CST DDR $3,425,710

CST NHRE $5,966,364

CST SA $105,300

$275,000 $9,497,374Project Total:

FPN: 4349381 Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E

OF FISH HATCHERY RD

Project Length: 0.164

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 3.859 End Mile Post: 4.023

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

RRU DS $75,000

CST DIH $130,536

CST DS $996,463

$75,000 $1,126,999Project Total:

FPN: 4350751 Project/Location: SR 600 (US 92) FROM E OF WALKER RD TO SR

544

Project Length: 1.868

Desc: RESURFACING

Comments:

Begin Mile Post: 9.236 End Mile Post: 11.104

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $4,626,710

CST DIH $28,756

$4,655,466Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1511/24/2014Run Date: SnapShot Date: 11/12/2014

Page 16: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4350761 Project/Location: SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY

RD

Project Length: 0.824

Desc: RESURFACING

Comments:

Begin Mile Post: 11.104 End Mile Post: 11.928

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $1,204,970

CST DIH $16,432

$1,221,402Project Total:

FPN: 4366721 Project/Location: SR35/700 US 98 FROM WEST DAUGHTERY ROAD

TO NORTH OF WEST SOCRUM LOOP RD

Project Length: 3.382

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 5.623 End Mile Post: 9.005

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PDE DIH $150,000

PDE SA $1,500,000

$1,650,000Project Total:

FPN: 4347621 Project/Location: SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH

AVE

Project Length: 1.412

Desc: RIGID PAVEMENT RECONSTRUCTION

Comments:

Begin Mile Post: 0.300 End Mile Post: 1.712

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DDR $75,000

CST DDR $9,620,274

CST DIH $46,831

CST DS $1,667,620

INC DDR $480,000

$11,409,725 $480,000Project Total:

FPN: 4350781 Project/Location: US 17 AND 544 BUS STOP

IMPROVEMENTS

Project Length: 0.000

Desc: PUBLIC TRANSPORTATION SHELTER

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST FTAT $49,661

CST SU $49,661

$99,322Project Total:

FPN: 4313511 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)

TO 17TH STREET

Project Length: 0.310

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 22.460 End Mile Post: 22.770

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PDE DIH $20,000

PDE DS $150,998 $800,000

$170,998 $800,000Project Total:

FPN: 4313512 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)

TO 17TH STREET

Project Length: 0.310

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 22.460 End Mile Post: 22.770

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $3,000

PE DS $1,350,000

$1,353,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1611/24/2014Run Date: SnapShot Date: 11/12/2014

Page 17: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4345061 Project/Location: US 27 AT MAIN ST/CRUMP RD

Project Length: 0.379

Desc: LIGHTING

Comments:

Begin Mile Post: 10.303 End Mile Post: 10.682

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE HSP $64,437

CST DDR $12,925

CST HSP $264,801

CST SA $10,530

$64,437 $288,256Project Total:

FPN: 4192434 Project/Location: US 27 FROM PRESIDENTS DRIVE TO SR

60

Project Length: 5.178

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 13.638 End Mile Post: 18.816

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DI $195,000 $500,000

CST DDR $52,843,410

CST DIH $941,628

$195,000 $500,000 $53,785,038Project Total:

FPN: 4312061 Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN

AVE

Project Length: 2.663

Desc: RESURFACING

Comments:

Begin Mile Post: 2.469 End Mile Post: 5.132

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DS $100,000

RRU DS $5,000

CST DIH $82,160

CST DS $4,326,132

$4,513,292Project Total:

FPN: 4312081 Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO

SCHALAMAR CREEK ENT

Project Length: 1.250

Desc: BRIDGE REPLACEMENT

Comments:

Begin Mile Post: 4.327 End Mile Post: 5.577

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DDR $884,467

CST DIH $386,374

CST DS $10,635,796

INC DS $392,000

$11,906,637 $392,000Project Total:

FPN: 4335582 Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH

AVENUE

Project Length: 4.131

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 0.000 End Mile Post: 4.131

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE SA $4,450,000

$4,450,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1711/24/2014Run Date: SnapShot Date: 11/12/2014

Page 18: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4351081 Project/Location: US 92 FROM HOLIDAY MPH ENTRANCE TO N

CHESTNUT RD

Project Length: 1.504

Desc: SIDEWALK

Comments:

Begin Mile Post: 2.486 End Mile Post: 3.990

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE SU $345,000

CST DS $45,093

CST SU $965,076

$345,000 $1,010,169Project Total:

FPN: 4298131 Project/Location: US 92 -NEW TAMPA HWY AT WABASH

AVE

Project Length: 0.200

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 4.031 End Mile Post: 4.231

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV DDR $10,000 $30,000

CST DDR $818,466

CST DIH $1,000

$10,000 $30,000 $819,466Project Total:

FPN: 4348862 Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO

0064 (JOHN SINGLETARY BRIDGE)

Project Length: 0.103

Desc: BRIDGE REPLACEMENT

Comments:

Begin Mile Post: 1.189 End Mile Post: 1.292

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $100,000

PE SA $2,000,000

$2,100,000Project Total:

FPN: 4313121 Project/Location: US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN

STREET

Project Length: 0.893

Desc: RESURFACING

Comments:

Begin Mile Post: 11.329 End Mile Post: 12.222

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST DIH $51,350

CST SA $1,860,303

$1,911,653Project Total:

FPN: 4353421 Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION

STUDY

Project Length: 8.745

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 9.005 End Mile Post: 17.750

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PDE DWS $1,000,000

$1,000,000Project Total:

FPN: 4313531 Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST

BELMAR ST TO OAKHILL STREET

Project Length: 0.790

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.790

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST LF $182,005

CST SU $127,595

CST TALT $97,851

CST TALU $333,722

$741,173Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1811/24/2014Run Date: SnapShot Date: 11/12/2014

Page 19: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4371081 Project/Location: WINTER HAVEN TMC OPS CITY

WIDE

Project Length: 0.001

Desc: OTHER ITS

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DS $43,500 $43,500

$43,500 $43,500Project Total:

FPN: 4136561 Project/Location: WINTER HAVEN TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 2.880

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 27.760 End Mile Post: 30.640

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DDR $89,832 $92,527 $95,303 $98,162 $101,107

$89,832 $92,527 $95,303 $98,162 $101,107Project Total:

HIGHWAYS TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$82,415,719 $54,804,203 $19,625,560 $60,639,156 $139,956,731

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 1911/24/2014Run Date: SnapShot Date: 11/12/2014

Page 20: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

TRANSPORTATION PLANNING

FPN: 4348551 Project/Location: POLK COUNTY MPO 2018/2019 UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PLN PL $615,778 $615,778

$615,778 $615,778Project Total:

FPN: 4256691 Project/Location: POLK COUNTY MPO FY 2015/2016

UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PLN PL $615,778

$615,778Project Total:

FPN: 4318091 Project/Location: POLK COUNTY MPO FY 2017/2018

UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PLN PL $615,778 $615,778

$615,778 $615,778Project Total:

TRANSPORTATION PLANNING TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$615,778 $615,778 $615,778 $615,778 $615,778

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2011/24/2014Run Date: SnapShot Date: 11/12/2014

Page 21: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

TURNPIKE

FPN: 4289721 Project/Location: PAINT BRIDGES - POLK

PKWY(160249,160250,160251 ,160252,160253,160254)

Project Length: 7.400

Desc: BRIDGE - PAINTING

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.600

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE PKYR $218,419

CST PKYR $1,653,771

$218,419 $1,653,771Project Total:

FPN: 4311232 Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 &

160268)

Project Length: 0.958

Desc: BRIDGE - PAINTING

Comments:

Begin Mile Post: 13.568 End Mile Post: 14.526

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE PKYI $1,500 $200,000

CST PKYI $1,541

CST PKYR $403,276

$3,041 $200,000 $403,276Project Total:

FPN: 4365201 Project/Location: RESURFACE POLK PKWY, MP 0.00-8.00 & 17.24-

18.09

Project Length: 18.090

Desc: RESURFACING

Comments:

Begin Mile Post: 0.000 End Mile Post: 18.090

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE PKYR $566,685

CST PKYR $6,375,211

$566,685 $6,375,211Project Total:

FPN: 4365202 Project/Location: THERMOPLASTIC OF POLK PKWY RESURFACING

FROM MP 0.00-8.00 & 17.24-18.09

Project Length: 18.090

Desc: SIGNING/PAVEMENT MARKINGS

Comments:

Begin Mile Post: 0.000 End Mile Post: 18.090

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CST PKYR $303,440

$303,440Project Total:

TURNPIKE TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$3,041 $985,104 $8,432,258 $303,440

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2111/24/2014Run Date: SnapShot Date: 11/12/2014

Page 22: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: AVIATION

FPN: 4363721 Project/Location: AIRFIELD PAVEMENT MARKINGS AT BARTOW

MUNICIPAL AIRPORT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $266,308

CAP LF $66,577

$332,885Project Total:

FPN: 4370601 Project/Location: BARTOW MINICIPAL AIRPORT CAPITAL

IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $600,000 $600,000

CAP LF $150,000 $150,000

$750,000 $750,000Project Total:

FPN: 4336461 Project/Location: BARTOW MUNICIPAL AIRPORT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $640,000

CAP LF $160,000

$800,000Project Total:

FPN: 4348191 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL

IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $405,000

CAP LF $101,250

$506,250Project Total:

FPN: 4336371 Project/Location: LAKE WALES MUNICIPAL AIRPORT

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $197,993

CAP LF $49,498

$247,491Project Total:

FPN: 4204181 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION SECURITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $300,000

CAP LF $75,000

$375,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2211/24/2014Run Date: SnapShot Date: 11/12/2014

Page 23: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4204231 Project/Location: LAKELAND LINDER REGIONAL

AIRPORT

Project Length: 0.000

Desc: AVIATION SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $800,000 $1,192,481

CAP LF $200,000

$1,000,000 $1,192,481Project Total:

FPN: 4309681 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $340,000

CAP DPTO $354,442

CAP LF $88,610 $85,000

$443,052 $425,000Project Total:

FPN: 4313701 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $41,742

CAP DPTO $208,258

CAP FAA $4,500,000

CAP LF $250,000

$5,000,000Project Total:

FPN: 4336381 Project/Location: LAKELAND LINDER REGIONAL

AIRPORT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $5,000 $96,000 $1,587,200

CAP DPTO $32,200

CAP FAA $1,800,000

CAP LF $1,100 $24,000 $396,800

$1,806,100 $152,200 $1,984,000Project Total:

FPN: 4362011 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

AIRSIDE CENTER ROOF

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $200,000

CAP DPTO $522,500 $522,500

CAP LF $522,500 $522,500 $200,000

$1,045,000 $1,045,000 $400,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2311/24/2014Run Date: SnapShot Date: 11/12/2014

Page 24: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4369751 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $37,500

CAP FAA $675,000

CAP LF $37,500

$750,000Project Total:

FPN: 4369771 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $63,750

CAP FAA $1,147,500

CAP LF $63,750

$1,275,000Project Total:

FPN: 4369781 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $146,590

CAP DPTO $13,410

CAP FAA $2,880,000

CAP LF $160,000

$3,200,000Project Total:

FPN: 4370771 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $775,000

CAP LF $258,333

$1,033,333Project Total:

FPN: 4370781 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $490,000

CAP LF $490,000

$980,000Project Total:

FPN: 4370791 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $440,000

CAP LF $440,000

$880,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2411/24/2014Run Date: SnapShot Date: 11/12/2014

Page 25: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: AVIATION TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$8,783,985 $2,238,052 $3,774,691 $4,592,064 $6,984,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2511/24/2014Run Date: SnapShot Date: 11/12/2014

Page 26: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: INTERMODAL

FPN: 4309701 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL

IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $605,573

CAP DPTO $994,427 $390,000

CAP LF $400,000 $97,500

$2,000,000 $487,500Project Total:

FPN: 4370591 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL

IMPROVEMENTS

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $600,000

CAP LF $600,000

$1,200,000Project Total:

FPN: 4358231 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

FACILITY REHABILITATION

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $112,184

CAP LF $28,046

$140,230Project Total:

FPN: 4369901 Project/Location: LAKELAND LINDER REGIONAL AIRPORT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $100,000 $1,140,000

CAP DPTO $1,500,000 $1,500,000

CAP LF $100,000 $1,500,000 $1,500,000 $1,140,000

$200,000 $3,000,000 $3,000,000 $2,280,000Project Total:

FLP: INTERMODAL TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$2,340,230 $3,487,500 $3,000,000 $2,280,000 $1,200,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2611/24/2014Run Date: SnapShot Date: 11/12/2014

Page 27: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: RAIL

FPN: 4366561 Project/Location: NEW YORK AVENUE PEDESTRIAN

UNDERPASS

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE TRIP $1,500,000

ENV TRIP $25,000

RRU TRIP $30,000 $400,000

ROW DIH $28,000

ROW TRIP $153,000

CST DIH $481,500

$2,036,500 $181,000 $400,000Project Total:

FLP: RAIL TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$2,036,500 $181,000 $400,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2711/24/2014Run Date: SnapShot Date: 11/12/2014

Page 28: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: TRANSIT

FPN: 4101491 Project/Location: LAKELAND - LAMTD FTA 5307

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP FTA $638,412 $638,412 $638,412 $638,412 $638,412

CAP LF $159,603 $159,603 $159,603 $159,603 $159,603

$798,015 $798,015 $798,015 $798,015 $798,015Project Total:

FPN: 4101492 Project/Location: LAKELAND - LAMTD FTA SECTION 5307

OPERATING

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS FTA $1,915,235 $1,915,235 $1,915,235 $1,915,235 $1,915,235

OPS LF $1,915,235 $1,915,235 $1,915,235 $1,915,235 $1,915,235

$3,830,470 $3,830,470 $3,830,470 $3,830,470 $3,830,470Project Total:

FPN: 4101421 Project/Location: LAKELAND AREA MASS TRANSIT - OPERATING

ASSISTANCE STATE BLOCK GRANT

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DPTO $784,359 $783,999 $804,267 $830,819 $872,359

OPS LF $784,359 $783,999 $804,267 $830,819 $872,359

$1,568,718 $1,567,998 $1,608,534 $1,661,638 $1,744,718Project Total:

FPN: 4140631 Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)-

OPERATING ASSISTANCE - CORRIDOR

Project Length: 0.000

Desc: URBAN CORRIDOR IMPROVEMENTS

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DPTO $452,852 $709,151 $762,481 $795,083 $818,945

OPS LF $452,852 $709,151 $762,481 $795,083 $818,945

$905,704 $1,418,302 $1,524,962 $1,590,166 $1,637,890Project Total:

FPN: 4328381 Project/Location: LAKELAND AREA MASS TRANSIT DISTRICT

CAPITAL IMPROVEMENT

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DPTO $50,000

CAP LF $12,500

$62,500Project Total:

FPN: 4101161 Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA

SECTION 5305 (D)

Project Length: 0.000

Desc: MODAL SYSTEMS PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PLN DPTO $14,745 $14,745 $15,187 $15,187 $15,195

PLN DU $117,962 $117,962 $121,501 $121,501 $121,559

PLN LF $14,745 $14,745 $15,187 $15,187 $15,195

$147,452 $147,452 $151,875 $151,875 $151,949Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2811/24/2014Run Date: SnapShot Date: 11/12/2014

Page 29: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FPN: 4101281 Project/Location: POLK COUNTY TRANSIT OPERATING

ASSISTANCE FTA SECTION 5311

Project Length: 0.000

Desc: OPERATING/ADMIN. ASSISTANCE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DU $712,856 $712,856 $712,856 $712,856 $897,295

OPS LF $712,856 $712,856 $712,856 $712,856 $897,295

$1,425,712 $1,425,712 $1,425,712 $1,425,712 $1,794,590Project Total:

FPN: 4357711 Project/Location: POLK TRANSIT FTA SECT 5339 CAPITAL ASSIST

LKLD/WH UZA

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP FTA $490,708 $490,708 $490,708 $490,708 $480,121

CAP LF $122,678 $122,678 $122,678 $122,678 $120,030

$613,386 $613,386 $613,386 $613,386 $600,151Project Total:

FPN: 4350771 Project/Location: TRANSIT STOP IMPROVEMENTS @ VARIOUS

LOCATIONS FTAT TRANSFER

Project Length: 0.000

Desc: TRANSIT IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP FTAT $174,028

CAP SU $174,028

$348,056Project Total:

FPN: 4101501 Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA

SECTION 5307 CAPITAL ASSISTANCE

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP FTA $500,743 $500,743 $500,743 $500,743 $515,092

CAP LF $125,186 $125,186 $125,186 $125,186 $128,773

$625,929 $625,929 $625,929 $625,929 $643,865Project Total:

FPN: 4101502 Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA

SECTION 5307 OPERATING ASSISTANCE

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS FTA $1,502,230 $1,502,230 $1,502,230 $1,502,230 $1,545,276

OPS LF $1,502,230 $1,502,230 $1,502,230 $1,502,230 $1,545,276

$3,004,460 $3,004,460 $3,004,460 $3,004,460 $3,090,552Project Total:

FPN: 4101431 Project/Location: WINTER HAVEN AREA TRANSIT (WHAT)

OPERATING STATE TRANSIT BLOCK GRANT

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

OPS DPTO $711,773 $711,446 $729,838 $753,933 $791,629

OPS LF $711,773 $711,446 $729,838 $753,933 $791,629

$1,423,546 $1,422,892 $1,459,676 $1,507,866 $1,583,258Project Total:

FPN: 4328391 Project/Location: WINTER HAVEN AREA TRANSIT CAPITAL

IMPROVEMENT

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

CAP DDR $50,000

CAP LF $12,500

$62,500Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 2911/24/2014Run Date: SnapShot Date: 11/12/2014

Page 30: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLP: TRANSIT TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$14,816,448 $14,854,616 $15,043,019 $15,209,517 $15,875,458

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 3011/24/2014Run Date: SnapShot Date: 11/12/2014

Page 31: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

FLORIDA RAIL ENTERPRISE

FPN: 4366501 Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN

THE DOWNTOWN AREA

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE DIH $50,000

PE TRIP $75,000

DSB DIH $179,273

DSB TRIP $1,842,225

RRU DPTO $300,000

$350,000 $2,096,498Project Total:

FPN: 4366531 Project/Location: KENTUCKY AVENUE PEDESTRIAN

OVERPASS

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE TRIP $1,000,000

ENV DPTO $20,000

RRU TRIP $30,000 $400,000

ROW DIH $54,000

ROW TRIP $88,000

CST DIH $258,000

$20,000 $1,288,000 $142,000 $400,000Project Total:

FPN: 4365601 Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE

SPANNING THE CSX RR TRACK IN POLK CO

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

PE TRIP $2,700,000

ENV TRIP $25,000

RRU TRIP $30,000

ROW DIH $70,000

ROW TRIP $3,517,000

$2,755,000 $3,587,000Project Total:

FPN: 4365591 Project/Location: SR60 GRADE SEPARATION OVER CSX

RAILROAD

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

ENV TRIP $75,000

RRU DPTO $500,000

CST DPTO $24,739,633

CST TRIP $2,300,000

$500,000 $27,114,633Project Total:

FLORIDA RAIL ENTERPRISE TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20

$370,000 $3,884,498 $29,869,633 $142,000 $3,987,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 3111/24/2014Run Date: SnapShot Date: 11/12/2014

Page 32: FDOT Tentative Work Program 2016-2020

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT

July 1, 2015 Through June 30, 2020 COUNTYPOLK

DRAFT

COUNTY TOTALSPOLK

Phase Fund Total2015/16 2016/17 2017/18 2018/19 2019/20

$109,345,201 $82,906,251 $80,360,939 $83,962,955 $169,018,967COUNTY Total: $525,594,313

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 3211/24/2014Run Date: SnapShot Date: 11/12/2014

Page 33: FDOT Tentative Work Program 2016-2020

H a r d e e C o \ LH a r d e e C o \ L

Hills

boro

ugh

Co\ L

H il l s

b or o

ugh

Co\ L

O s c e o l a Co \ L

Osc eo l a Co \ L

A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e

G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L

Sumter

Sumter

Co\LCo\L

L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L

®q

®q

®q

®q

ÜÜÜ17

ÜÜÜ37

ÜÜÜ33

ÜÜÜ60

ÜÜÜ570

ÜÜÜ544

ÜÜÜ540

ÜÜÜ659

ÜÜÜ542ÜÜÜ655ÜÜÜ572

ÜÜÜ471

ÜÜÜ563

ÜÜÜ674

ÜÜÜ559

ÜÜÜ540ÜÜÜ570

ÜÜÜ570

ÜÜÜ17

ÜÜÜ60ÜÜÜ60

ÜÜÜ64

ÜÜÜ544

ÜÜÜ33

ÜÜÜ33

ÜÜÜ35

ÜÜÜ35

ÜÜÜ35ÜÜÜ700

ÜÜÜ540

(((27

(((17

(((92

(((98

(((17

(((98

(((92

(((17

(((27

(((27

(((98

(((98

(((92

(((92

(((17

(((17

(((17

(((192

%&'(4

%&'(4

4567557

4567640

L a k eL a k eK i s s i m m e eK i s s i m m e e

L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a

L a k eL a k eR o s a l i eR o s a l i e

T i g e rT i g e r L a k e L a k e

R e e d yR e e d yL a k eL a k e

Lak e A r b u c k l e

L ak e A r b u c k l e

C r o o k e dC r o o k e dL a k eL a k e

L a k eL a k eP i e r c eP i e r c e

L a k e L a k eH a t c h i n e h aH a t c h i n e h a

L a k eL a k eH a n c o c kH a n c o c k

L a k eL a k eP a r k e rP a r k e r

L a k eL a k eB u f f u mB u f f u m

L a k eL a k eM a r i o nM a r i o n

B ar t o wB ar t o wM u n ic ip a lM u n ic ip a l

A i rp o r tA i rp o r t

L ake W a l esL ake W a l esM u n ic ip a lM u n ic ip a l

A i rp o r tA i rp o r t

La ke la n d-La ke la n d-L in de rL in de r

Re g i ona lRe g i ona lAi rp or tAi rp or t

W in t er Ha v enW in t er Ha v en M un ic ip a l M un ic ip a l A i rp or t A i rp or t

D u n d e eD u n d e e

F o r tM e a d e

W i n t e rH a v e n

L a k eW a l e s

C r o o k e dC r o o k e dL a k eL a k eP a r kP a r k

L a k e L a k eH a m i l t o nH a m i l t o n

B a r t o wM u l b e r r yM u l b e r r y

H a i n e s C i t y

L a k e l a n dL a k eL a k e

A l f r e dA l f r e d

C y p r e s sC y p r e s sG a r d e n sG a r d e n s

P o l kP o l kC i t yC i t y

D a v e n p o r tD a v e n p o r t

F r o s t p r o o fF r o s t p r o o f

11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

L a ke l an d - L i n d e rL a ke l an d - L i n d e rR eg io n a l A i r p o r tR eg io n a l A i r p o r t

®q

(((92

(((98

(((92

(((98

ÜÜÜ659

ÜÜÜ572

ÜÜÜ563ÜÜÜ570

ÜÜÜ33

ÜÜÜ539

ÜÜÜ546

ÜÜÜ600

ÜÜÜ35

ÜÜÜ37

ÜÜÜ35

%&'(4

45675824567542A

456733A

4567542

L a k eL a k eP a r k e rP a r k e r

L a k eL a k eB o n n yB o n n y

C OM B

E EC O

M BE E

GALL

OWAY

GALL

OWAY

E D G E W O O DE D G E W O O D

G R I F F I N R DG R I F F I N R D

1 0 t h S T1 0 t h S T

M E M O R I A L B L V DM E M O R I A L B L V D

B A R T O W R D

B A R T O W R D

FLOR

IDA

AVE

FLOR

IDA

AVE

O L D T A M P AO L D T A M P A H W Y H W Y

B E L L A V I S T A S TB E L L A V I S T A S T

A R I A N A S TA R I A N A S T

RDRD

AIRP

ORT

AIRP

ORT

RDRD

K A T H L E E NK A T H L E E N

R DR D

LAKE

L AN D

HI L

L SL A

K EL A

N D H

I LL S

B LV D

B LV D R DR D

L AK E

L AK E

P AR K

E R A

V EP A

R KE R

AV E

WAB

ASH

WAB

ASH

AVE

AVE

N E W T A M P AN E W T A M P A

H W YH W Y

P O L KP O L K P K W YP K W Y HARD

ENHA

RDEN

BLVD

BLVD D RD R

L a k e l a n d

®q

®q

®q

®q (((17

(((92

(((92

(((17(((27

(((17

ÜÜÜ544

ÜÜÜ540

ÜÜÜ542ÜÜÜ655

ÜÜÜ540

ÜÜÜ559

ÜÜÜ570

ÜÜÜ544

4567550

4567542

4567655

4567546

L a k e L a k eH a m i l t o nH a m i l t o n

L a k eL a k eH e n r yH e n r y

L a k e L a k eF a n n i eF a n n i e

L a k eL a k eR o c h e l l eR o c h e l l e

L a k e L a k eA r i a n aA r i a n a L a k e L a k e

M a r i a n n a M a r i a n n a

L a k eL a k eA l f r e dA l f r e d

L a k e L a k eH a i n e sH a i n e s

L a k eL a k eS h i p pS h i p p

Wi n t er H a venWi n t er H a venMu n i c i p a lMu n i c i p a l

Ai r p o r tAi r p o r t

42ND

42ND STST

D U N D E E R DD U N D E E R D

D E R B Y A V ED E R B Y A V E

3RD

ST3R

D ST

A V E N U E GA V E N U E G

A V E TA V E T

1ST

ST1S

T ST

6TH

ST6T

H ST

W I N T E R L A K EW I N T E R L A K ER DR D

O L DO L DL A K E L A N D R DL A K E L A N D R D

H W YH W YR E C K E RR E C K E R

B L V DB L V D

H A V E N D A L E

H A V E N D A L E

L U CL U C P A R KP A R K R DR DE R N EE R N E

D RD RO V E R L O O KO V E R L O O K

C Y P R E S SC Y P R E S S G A R D E N SG A R D E N SB L V DB L V D

W i n t e rH a v e n

L a k e A l f r e dL a k e A l f r e d

C y p r e s sC y p r e s sG a r d e n sG a r d e n s

A u b u r n d a l eA u b u r n d a l e

µ

Revision #

ÆÆ88

ÆÆ99

0 5Miles

0 10Miles

POLK COUNTYRESURFACING PROJECTS

LEGEND

Interstate HighwaysState Roads and US HighwaysCity/County Roads

Resurfacing Projects

ÆÆ66

ÆÆ55

ÆÆ1212

ÆÆ1111

ÆÆ44

ÆÆ1010

ÆÆ1515

ÆÆ1616

ÆÆ11

ÆÆ33ÆÆ1717

DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020

ÆÆ77

ÆÆ1414

ÆÆ1313

ÆÆ22

Page 34: FDOT Tentative Work Program 2016-2020

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4345021

Description: SKID HAZARD OVERLAY

EWELL ROAD AT LUNN RD 1 CST HSP $0 $463,342 $0 $0 $0

CST SA $0 $10,530 $0 $0 $0

PE HSP $96,293 $0 $0 $0 $0

$96,293 $473,872 $0 $0 $0Project Total:

4365201

Description: RESURFACING

RESURFACE POLK PKWY,

MP 0.00-8.00 & 17.24-18.092 CST PKYR $0 $0 $6,375,211 $0 $0

PE PKYR $0 $566,685 $0 $0 $0

$0 $566,685 $6,375,211 $0 $0Project Total:

4312911

Description: RESURFACING

SR 33 FROM HAYNES CIRCLE

TO WITHLACOOCHEE

BRIDGE

3 CST DDR $3,561,825 $0 $0 $0 $0

CST DIH $154,050 $0 $0 $0 $0

CST DS $3,602,942 $0 $0 $0 $0

ENV DS $50,000 $0 $0 $0 $0

$7,368,817 $0 $0 $0 $0Project Total:

4312781

Description: RESURFACING

SR 35/SR 555/US 17 FROM

BARTOW RD TO BEAR

CREEK APTS

4 CST DDR $154,050 $0 $0 $0 $0

CST DIH $107,835 $0 $0 $0 $0

CST SA $5,040,708 $0 $0 $0 $0

ENV DS $50,000 $0 $0 $0 $0

$5,352,593 $0 $0 $0 $0Project Total:

4349371

Description: RESURFACING

SR 37 FROM CR 630 TO CR

640 (PINECREST RD) 5 CST DIH $0 $95,536 $0 $0 $0

CST DS $0 $6,522,511 $0 $0 $0

RRU DS $100,000 $0 $0 $0 $0

$100,000 $6,618,047 $0 $0 $0Project Total:

4366011

Description: RESURFACING

SR 37 FROM SR 60 TO N OF

VIRGINIA ST 6 CST SA $0 $1,818,211 $0 $0 $0

PE DIH $100,000 $0 $0 $0 $0

$100,000 $1,818,211 $0 $0 $0Project Total:

4106663

Description: WIDEN/RESURFACE EXIST LANES

SR 542 FROM BUCKEYE

LOOP ROAD TO US 27

7 ROW DDR $5,402,004 $6,810,022 $0 $0 $0

ROW DIH $477,405 $477,405 $0 $0 $0

$5,879,409 $7,287,427 $0 $0 $0Project Total:

4365691

Description: RIGID PAVEMENT REHABILITATION

SR 546 (US 92) FROM

WABASH AVENUE TO N.

INGRAHAM AVENUE

8 CST NHRE $0 $0 $3,696,305 $0 $0

CST SA $0 $0 $4,839,609 $0 $0

PE DIH $10,000 $0 $0 $0 $0

$10,000 $0 $8,535,914 $0 $0Project Total:

4350711

Description: RESURFACING

SR 555 (US 17) FROM

AVENUE G SW TO AVENUE A

SW

9 CST DDR $0 $2,084,013 $0 $0 $0

CST DIH $0 $17,646 $0 $0 $0

$0 $2,101,659 $0 $0 $0Project Total:

4350851

Description: RIGID PAVEMENT REHABILITATION

SR 563 (SIKES BLVD)FROM

LIME ST TO SR 539 (MLK JR

BLVD)

10 CST DDR $0 $0 $0 $0 $980,530

CST DIH $0 $0 $0 $0 $111,290

PE DIH $0 $0 $10,000 $0 $0

$0 $0 $10,000 $0 $1,091,820Project Total:

4312941

Description: RESURFACING

SR 60 FROM CR 630 TO

KISSIMMEE RIVER BR

11 CST DDR $803,563 $0 $0 $0 $0

CST DIH $205,400 $0 $0 $0 $0

CST DS $4,549,309 $0 $0 $0 $0

$5,558,272 $0 $0 $0 $0Project Total:

4356061

Description: RESURFACING

SR 60 HILLSBOROUGH C/L

DIESEL RD 12 CST DDR $0 $3,425,710 $0 $0 $0

CST NHRE $0 $5,966,364 $0 $0 $0

CST SA $0 $105,300 $0 $0 $0

RRU DS $275,000 $0 $0 $0 $0

$275,000 $9,497,374 $0 $0 $0Project Total:

4350751

Description: RESURFACING

SR 600 (US 92) FROM E OF

WALKER RD TO SR 544

13 CST DDR $4,626,710 $0 $0 $0 $0

CST DIH $28,756 $0 $0 $0 $0

$4,655,466 $0 $0 $0 $0Project Total:

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4350761

Description: RESURFACING

SR 600 (US 92) FROM E OF

SR 544 TO W OF JERSEY RD14 CST DDR $1,204,970 $0 $0 $0 $0

CST DIH $16,432 $0 $0 $0 $0

$1,221,402 $0 $0 $0 $0Project Total:

4347621

Description: RIGID PAVEMENT RECONSTRUCTION

SR546 (MEMORIAL BLVD)

FROM I-4 TO WABASH

AVE

15 CST DDR $9,620,274 $0 $0 $0 $0

CST DIH $46,831 $0 $0 $0 $0

CST DS $1,667,620 $0 $0 $0 $0

ENV DDR $75,000 $0 $0 $0 $0

INC DDR $0 $480,000 $0 $0 $0

$11,409,725 $480,000 $0 $0 $0Project Total:

4312061

Description: RESURFACING

US 92 (SR 600) FROM

CHURCHILL AVE TO SLOAN

AVE

16 CST DIH $82,160 $0 $0 $0 $0

CST DS $4,326,132 $0 $0 $0 $0

ENV DS $100,000 $0 $0 $0 $0

RRU DS $5,000 $0 $0 $0 $0

$4,513,292 $0 $0 $0 $0Project Total:

4313121

Description: RESURFACING

US 98 (SR 35) FROM LAKE

BONNY PARK TO MAIN

STREET

17 CST DIH $51,350 $0 $0 $0 $0

CST SA $1,860,303 $0 $0 $0 $0

$1,911,653 $0 $0 $0 $0Project Total:

Page 35: FDOT Tentative Work Program 2016-2020

®q

®q

®q

®q

B a r t o wB a r t o wM u n ic ip a lM u n ic ip a l

A i r p o r tA i r p o r t

L ak e W a le sL ak e W a le sM u n ic ip a lM u n ic ip a l

A i r p o r tA i r p o r t

La k e la n d-La k e la n d-L i nd e rL i nd e r

Re g io na lRe g io na lAi r po r tAi r po r t

W i n t e r H av e nW i nt e r H av e n M u n ic i pa l M u n ic i pa l A i rp or t A i rp or t

H a r d e e C o \ LH a r d e e C o \ L

Hills

boro

ugh

Co\ L

H il l s

b or o

ugh

Co\ L

O s c e o l a C o \ L

Osc eo l a C o \ L

A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e

G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L

Sumter

Sumter

Co\LCo\L

L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L

D u n d e eD u n d e e

F o r tM e a d e

W i n t e rH a v e n

L a k eW a l e s

L a k e L a k eH a m i l t o nH a m i l t o n

E a g l eE a g l eL a k eL a k e

B a r t o wM u l b e r r yM u l b e r r y

H a i n e s C i t y

L a k e l a n d

L a k eL a k eA l f r e dA l f r e d

P o l kP o l kC i t yC i t y

D a v e n p o r tD a v e n p o r t

F r o s t p r o o fF r o s t p r o o f

(((27

(((17

(((92

(((98

(((17

(((98

(((92

(((17

(((27

(((27

(((98

(((98

(((92

(((92

(((17

(((17

(((17

(((192

ÜÜÜ17

ÜÜÜ37

ÜÜÜ33

ÜÜÜ60

ÜÜÜ570

ÜÜÜ544

ÜÜÜ540

ÜÜÜ659

ÜÜÜ542ÜÜÜ655ÜÜÜ572

ÜÜÜ471

ÜÜÜ563

ÜÜÜ674

ÜÜÜ559

ÜÜÜ540

ÜÜÜ570

ÜÜÜ570

ÜÜÜ17

ÜÜÜ60ÜÜÜ60

ÜÜÜ64

ÜÜÜ544

ÜÜÜ33

ÜÜÜ33

ÜÜÜ35

ÜÜÜ35

ÜÜÜ35ÜÜÜ700

ÜÜÜ540

!C

!C

89:Z 89:m

89:m!C

!C

89:m89:D

89:m

!C

89:m

!Ï!C

89:D

89:l

89:D

89:D

89:m O

!C

89:D

89:D

89:l

89:m

89:l89:l89:l

!C !½

L a k eL a k eK i s s i m m e eK i s s i m m e e

L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a

L a k eL a k eR o s a l i eR o s a l i e

T i g e rT i g e r L a k e L a k e

R e e d yR e e d yL a k eL a k e

Lak e A r b u ck l e

L ak e A r b u ck l e

C r o o k e dC r o o k e dL a k eL a k e

L a k eL a k eP i e r c eP i e r c e

L a k e L a k eH a t c h i n e h aH a t c h i n e h a

L a k e L a k eH a m i l t o nH a m i l t o n

L a k eL a k eH a n c o c kH a n c o c k

L a k eL a k e

P a r k e rP a r k e r

L a k eL a k eB u f f u mB u f f u m

L a k eL a k eM a r i o nM a r i o n

%&'(4

%&'(4

11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

®q

C OM B

E EC O

M BE E

GALL

OWAY

GALL

OWAY

E D G E W O O DE D G E W O O D

G R I F F I N R DG R I F F I N R D

1 0 t h S T1 0 t h S T

M E M O R I A L B L V DM E M O R I A L B L V D

B A R T O W R D

B A R T O W R D

FLOR

IDA

AVE

FLOR

IDA

AVE

O L D T A M P AO L D T A M P A H W Y H W Y

B E L L A V I S T A S TB E L L A V I S T A S T

A R I A N A S TA R I A N A S TRDRD

AIRP

ORT

AIRP

ORT

RDRD

K A T H L E E NK A T H L E E N

R DR D

LAKE

L AN D

HI L

L SL A

K EL A

N D H

I LL S

B LV D

B LV D R DR D

L AK E

L AK E

P AR K

E R A

V EP A

R KE R

AV E

WAB

ASH

WAB

ASH

AVE

AVE

N E W T A M P AN E W T A M P A

H W YH W Y

P O L KP O L K P K W YP K W Y HARD

ENHA

RDEN

BLVD

BLVD D RD R

La k e l a n d - L i n de rLa k e l a n d - L i n de rR e gi on a l A i r p or tR e gi on a l A i r p or t

!C

89:m

!C

!C

89:m

89:D

89:m

!C

89:D

89:l

89:D

89:m 89:l89:l(((92

(((98

(((92

(((98

ÜÜÜ659

ÜÜÜ572

ÜÜÜ563ÜÜÜ570

ÜÜÜ33

ÜÜÜ539

ÜÜÜ546

ÜÜÜ600

ÜÜÜ35

ÜÜÜ37

ÜÜÜ35

%&'(4

45675824567542A

456733A

4567542L a k eL a k e

B o n n yB o n n y

L a k e l a n d

L a k e L a k eH a m i l t o nH a m i l t o n

L a k eL a k eH e n r yH e n r y

L a k e L a k eF a n n i eF a n n i e

L a k eL a k eR o c h e l l eR o c h e l l e

L a k e L a k eA r i a n aA r i a n a

L a k eL a k eH o w a r dH o w a r d

L a k e L a k e M a r i a n n a M a r i a n n a

L a k eL a k eA l f r e dA l f r e d

L a k e L a k eH a i n e sH a i n e s

L a k eL a k eC a n n o nC a n n o n

L a k eL a k eS h i p pS h i p p

L a k eL a k eL u l uL u l u

42ND

42ND STST

D U N D E E R DD U N D E E R D

D E R B Y A V ED E R B Y A V E

3RD

ST3R

D ST

A V E N U E GA V E N U E G

A V E TA V E T

1ST

ST1S

T ST

6TH

ST6T

H ST

W I N T E R L A K EW I N T E R L A K ER DR D

O L DO L DL A K E L A N D R DL A K E L A N D R D

H W YH W YR E C K E RR E C K E R

B L V DB L V D

H A V E N D A L E

H A V E N D A L E

L U CL U C P A R KP A R K R DR DE R N EE R N E

D RD RO V E R L O O KO V E R L O O K

C Y P R E S SC Y P R E S S G A R D E N SG A R D E N SB L V DB L V D

®q

!C

!Õ89:m

O

89:l89:l

!C!½

(((17

(((92

(((92

(((17(((27

(((17

ÜÜÜ544

ÜÜÜ540

ÜÜÜ542ÜÜÜ655

ÜÜÜ540

ÜÜÜ559

ÜÜÜ570

ÜÜÜ544

4567550

4567542

4567655

4567546

Wi n te r Ha ve nWi n te r Ha ve nMu n i c ip a lMu n i c ip a l

A i r p o r tA i r p o r t

W i n t e rH a v e n

L a k e A l f r e dL a k e A l f r e d

C y p r e s sC y p r e s sG a r d e n sG a r d e n s

A u b u r n d a l eA u b u r n d a l e

µ

Revision #

0 12.5Miles

POLK COUNTYTRAFFIC OPERATIONSAND OTHER PROJECTS

ÆÆ2121

ÆÆ3232

ÆÆ3030

ÆÆ55

ÆÆ1717

ÆÆ1414

ÆÆ2222

ÆÆ1919

ÆÆ1818

ÆÆ2424

ÆÆ44

ÆÆ2626

ÆÆ22

ÆÆ77

ÆÆ1212

ÆÆ1111

ÆÆ33

ÆÆ3131

ÆÆ1616

ÆÆ1313ÆÆ66

ÆÆ2525

ÆÆ1515

ÆÆ99 ÆÆ88

ÆÆ3131

ÆÆ2020

ÆÆ2323

ÆÆ2929

ÆÆ1010

LEGEND

DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020

ÆÆ2727

Traffic Signal Update

ÆÆ11

ÆÆ2828

Interstate Highways State Roads and US HighwaysITS Freeway Management City/County Roads

89:l Bike Path

"¾àDDA Add Turn Lane

Lighting

Landscaping!Ï

Pedestrian/Wildlife Overpass!ÕSidewalks8m

Intersection89:D

Rail Safety Project!CPublic Transportation Shelter!½

O Traffic Ops Improvement89:Z

Page 36: FDOT Tentative Work Program 2016-2020

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4328091

Description: RAIL SAFETY PROJECT

BAKER ST FROM N VAN

FLEET DR TO BRITTS LANE-

XING #624503-T

1 RRU RHH $270,600 $0 $0 $0 $0

$270,600 $0 $0 $0 $0Project Total:

4345081

Description: INTERSECTION IMPROVEMENT

BOMBER ROAD AT SPRUCE

ROAD AND GERBER

ROAD

2 CST HSP $0 $661,193 $0 $0 $0

CST SA $0 $10,530 $0 $0 $0

ENV SA $10,000 $20,000 $0 $0 $0

$10,000 $691,723 $0 $0 $0Project Total:

4351071

Description: SIDEWALK

BRUNNELL PARKWAY FROM

MEMORIAL BLVD TO TENTH

STREET

3 CST SU $0 $151,090 $0 $0 $0

$0 $151,090 $0 $0 $0Project Total:

4367891

Description: RAIL SAFETY PROJECT

COLEMAN RD RECKER HWY

TO 26TH ST X-ING # 625397R4 RRU RHH $276,600 $0 $0 $0 $0

$276,600 $0 $0 $0 $0Project Total:

4367871

Description: RAIL SAFETY PROJECT

CR 542 OLD TAMPA HWY

FROM GAY RD TO DOC GAY

RD X-ING #624214S

5 RRU RHH $119,671 $0 $0 $0 $0

$119,671 $0 $0 $0 $0Project Total:

4367911

Description: RAIL SAFETY PROJECT

CR 542 OLD TAMPA HWY

FROM GAY RD TO GAY RDX-

ING #624215Y

6 RRU RHH $119,671 $0 $0 $0 $0

$119,671 $0 $0 $0 $0Project Total:

4332721

Description: INTERSECTION IMPROVEMENT

CR 544 AT SR 17

7 CST LF $70,485 $0 $0 $0 $0

CST SU $1,000,182 $0 $0 $0 $0

$1,070,667 $0 $0 $0 $0Project Total:

4332741

Description: SIDEWALK

CR 655 (RIFLE RANGEROAD)

FROM 10TH STREET E TO

BOMBER ROAD

8 CST SU $295,146 $0 $0 $0 $0

$295,146 $0 $0 $0 $0Project Total:

4349421

Description: TRAFFIC OPS IMPROVEMENT

CREWS LAKE RD FROM

LAKELAND HIGHLANDS RD

TO KITTY FOX

9 CST HSP $0 $1,483,046 $0 $0 $0

CST SA $0 $8,424 $0 $0 $0

$0 $1,491,470 $0 $0 $0Project Total:

4350691

Description: SIDEWALK

CRYSTAL LAKE DR FROM US

98 TO NEW JERSEY RD

10 CST ACSU $550,159 $0 $0 $0 $0

CST SU $1,000 $0 $0 $0 $0

$551,159 $0 $0 $0 $0Project Total:

4332291

Description: BIKE PATH/TRAIL

EAST LAKE HOWARD

TRAIL 11 CST TALT $342,360 $0 $0 $0 $0

CST TALU $256,475 $0 $0 $0 $0

$598,835 $0 $0 $0 $0Project Total:

4309181

Description: SIDEWALK

EASTSIDE ELEMENTARY

SCHOOL SAFETY

SIDEWALKS

12 CST TALT $174,758 $0 $0 $0 $0

$174,758 $0 $0 $0 $0Project Total:

4273152

Description: ITS FREEWAY MANAGEMENT

I-4 FROM EAST OF POLK

PARKWAY TO OSCEOLA

COUNTY LINE

13 DSB DIH $23,621 $0 $0 $0 $0

DSB HSP $3,635,366 $0 $0 $0 $0

PE HSP $75,000 $0 $0 $0 $0

$3,733,987 $0 $0 $0 $0Project Total:

4328041

Description: RAIL SAFETY PROJECT

INTERLACHEN PKWY FROM

FERN RD TO E GARY RD-

XING# 624155-S

14 RRU RHH $281,300 $0 $0 $0 $0

$281,300 $0 $0 $0 $0Project Total:

4351091

Description: BIKE PATH/TRAIL

LAKE HOWARD DR

FROM AVE D SW TO

15TH ST SW

15 CST TALT $0 $0 $0 $83,773 $0

CST TALU $0 $0 $0 $344,752 $0

PE LF $0 $155,000 $0 $0 $0

$0 $155,000 $0 $428,525 $0Project Total:

4367901

Description: RAIL SAFETY PROJECT

LEM CARNES RD CR 547N

TO SR 600/US 17 X-ING

#622960T

16 RRU RHH $270,600 $0 $0 $0 $0

$270,600 $0 $0 $0 $0Project Total:

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4350611

Description: SIDEWALK

LINCOLN AVE

SIDEWALKS 17 CST ACSU $231,540 $0 $0 $0 $0

CST SU $1,000 $0 $0 $0 $0

$232,540 $0 $0 $0 $0Project Total:

4298831

Description: PEDESTRIAN/WILDLIFE OVERPASS

LK ALFRED TR AT US 17/92

BRIDGE 18 CST CM $1,524,600 $0 $0 $0 $0

CST DDR $48,444 $0 $0 $0 $0

CST SA $214,087 $0 $0 $0 $0

ENV TALT $50,000 $0 $0 $0 $0

$1,837,131 $0 $0 $0 $0Project Total:

4332601

Description: BIKE PATH/TRAIL

NEW YORK CYCLE TRACK

(LIME STREET) FROM SIKES

BLVD TO NEW YORK AVENUE

19 CST TALU $0 $0 $532,500 $0 $0

PE LF $0 $115,307 $0 $0 $0

PE TALU $0 $1,000 $0 $0 $0

$0 $116,307 $532,500 $0 $0Project Total:

4344891

Description: SIDEWALK

OLD DIXIE HIGHWAY/

SADDLE CREEK

ROAD

20 CST HSP $0 $679,483 $0 $0 $0

CST SA $0 $10,530 $0 $0 $0

$0 $690,013 $0 $0 $0Project Total:

4367881

Description: RAIL SAFETY PROJECT

PAYNE ST SR 600/US92 -

BLUE JAY AVE X-ING

#623084U

21 RRU RHH $255,600 $0 $0 $0 $0

$255,600 $0 $0 $0 $0Project Total:

4344881

Description: INTERSECTION IMPROVEMENT

SR 33 (LAKELAND HILLS

BLVD) AT N SOCRUM LOOP

RD

22 CST DDR $6,967 $0 $0 $0 $0

CST DIH $25,816 $0 $0 $0 $0

CST HSP $168,366 $6,318 $0 $0 $0

$201,149 $6,318 $0 $0 $0Project Total:

4345071

Description: INTERSECTION IMPROVEMENT

SR 37 AT LAKE HARRIS

DRIVE 23 CST DDR $0 $31,982 $0 $0 $0

CST HSP $0 $641,240 $0 $0 $0

CST SA $0 $10,530 $0 $0 $0

$0 $683,752 $0 $0 $0Project Total:

4106664

Description: LANDSCAPING

SR 542 FROM 1ST STREET

TO BUCKEYE LOOP

ROAD

24 CST DIH $0 $0 $0 $0 $5,670

CST DS $0 $0 $0 $0 $234,396

$0 $0 $0 $0 $240,066Project Total:

4352841

Description: BIKE PATH/TRAIL

SR 546 (MEMORIAL) FROM

CHESTNUT RD E TO

BRUNNELL PKWY

25 CST DIH $15,405 $0 $0 $0 $0

CST DS $883,672 $0 $0 $0 $0

PE DIH $10,000 $0 $0 $0 $0

$909,077 $0 $0 $0 $0Project Total:

4345091

Description: INTERSECTION IMPROVEMENT

SR 60 AT BAILEY

RD 26 CST DDR $0 $25,300 $0 $0 $0

CST HSP $0 $596,354 $0 $0 $0

CST SA $0 $54,963 $0 $0 $0

$0 $676,617 $0 $0 $0Project Total:

4349381

Description: RAIL SAFETY PROJECT

SR 600 (US 92) FROM W OF

THOMPSON RD TO E OF FISH

HATCHERY RD

27 CST DIH $0 $130,536 $0 $0 $0

CST DS $0 $996,463 $0 $0 $0

RRU DS $75,000 $0 $0 $0 $0

$75,000 $1,126,999 $0 $0 $0Project Total:

4350781

Description: PUBLIC TRANSPORTATION SHELTER

US 17 AND 544 BUS STOP

IMPROVEMENTS 28 CST FTAT $49,661 $0 $0 $0 $0

CST SU $49,661 $0 $0 $0 $0

$99,322 $0 $0 $0 $0Project Total:

4345061

Description: LIGHTING

US 27 AT MAIN ST/CRUMP RD

29 CST DDR $0 $12,925 $0 $0 $0

CST HSP $0 $264,801 $0 $0 $0

CST SA $0 $10,530 $0 $0 $0

PE HSP $64,437 $0 $0 $0 $0

$64,437 $288,256 $0 $0 $0Project Total:

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4351081

Description: SIDEWALK

US 92 FROM HOLIDAY MPH

ENTRANCE TO N CHESTNUT

RD

30 CST DS $0 $0 $0 $45,093 $0

CST SU $0 $0 $0 $965,076 $0

PE SU $0 $345,000 $0 $0 $0

$0 $345,000 $0 $1,010,169 $0Project Total:

4298131

Description: INTERSECTION IMPROVEMENT

US 92 -NEW TAMPA HWY AT

WABASH AVE 31 CST DDR $0 $0 $818,466 $0 $0

CST DIH $0 $0 $1,000 $0 $0

ENV DDR $10,000 $30,000 $0 $0 $0

$10,000 $30,000 $819,466 $0 $0Project Total:

4313531

Description: BIKE PATH/TRAIL

WESTGATE-CENTRAL TRAIL

FROM WEST BELMAR ST TO

OAKHILL STREET

32 CST LF $0 $182,005 $0 $0 $0

CST SU $0 $127,595 $0 $0 $0

CST TALT $0 $97,851 $0 $0 $0

CST TALU $0 $333,722 $0 $0 $0

$0 $741,173 $0 $0 $0Project Total:

Page 37: FDOT Tentative Work Program 2016-2020

H a r d e e C o \ LH a r d e e C o \ L

Hills

boro

ugh

Co\ L

H il l s

b or o

ugh

Co\ L

O s c e o l a Co \ L

Osc eo l a Co \ L

A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e

G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L

Sumter

Sumter

Co\LCo\L

L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L

®q

®q

®q

®qà

à

à

(((27

(((17

(((92

(((98

(((17

(((98

(((92

(((17

(((27

(((27

(((98

(((98

(((92

(((92

(((17

(((17

(((17

(((192

ÜÜÜ17

ÜÜÜ37

ÜÜÜ33

ÜÜÜ60

ÜÜÜ570

ÜÜÜ544

ÜÜÜ540

ÜÜÜ659

ÜÜÜ542ÜÜÜ655ÜÜÜ572

ÜÜÜ471

ÜÜÜ563

ÜÜÜ674

ÜÜÜ559

ÜÜÜ540

ÜÜÜ570

ÜÜÜ570

ÜÜÜ17

ÜÜÜ60ÜÜÜ60

ÜÜÜ544

ÜÜÜ33

ÜÜÜ33

ÜÜÜ35

ÜÜÜ35

ÜÜÜ35ÜÜÜ700

ÜÜÜ540

%&'(4

%&'(4

L a k eL a k eK i s s i m m e eK i s s i m m e e

L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a

L a k eL a k eR o s a l i eR o s a l i e

T i g e rT i g e r L a k e L a k e

R e e d yR e e d yL a k eL a k e

Lak e A r b u c k l e

L ak e A r b u c k l e

C r o o k e dC r o o k e dL a k eL a k e

L a k eL a k eP i e r c eP i e r c e

L a k e L a k eH a t c h i n e h aH a t c h i n e h a

L a k e L a k eH a m i l t o nH a m i l t o n

L a k eL a k eP a r k e rP a r k e r

L a k eL a k eB u f f u mB u f f u m

L a k eL a k eM a r i o nM a r i o n

B ar t o wB ar t o wM u n ic ip a lM u n ic ip a l

A i rp o r tA i rp o r t

L ake W a l esL ake W a l esM u n ic ip a lM u n ic ip a l

A i rp o r tA i rp o r t

La ke la n d-La ke la n d-L in de rL in de r

Re g i ona lRe g i ona lAi rp or tAi rp or t

W in t er Ha v enW in t er Ha v en M un ic ip a l M un ic ip a l A i rp or t A i rp or t

D u n d e eD u n d e e

F o r tM e a d e

W i n t e rH a v e n

L a k eW a l e s

C r o o k e dC r o o k e dL a k eL a k eP a r kP a r k

L a k e L a k eH a m i l t o nH a m i l t o n

B a r t o wM u l b e r r yM u l b e r r y

H a i n e s C i t y

L a k e l a n dL a k eL a k e

A l f r e dA l f r e d

C y p r e s sC y p r e s sG a r d e n sG a r d e n s

P o l kP o l kC i t yC i t y

D a v e n p o r tD a v e n p o r t

F r o s t p r o o fF r o s t p r o o f

11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.

µ 0 5Miles

ÆÆ22

Revision #

ÆÆ33 ÆÆ55

ÆÆ11

ÆÆ99

ÆÆ1010

ÆÆ1313

ÆÆ44

ÆÆ1515

ÆÆ1010

ÆÆ1212ÆÆ1111

ÆÆ66

POLK COUNTYCAPACITY PROJECTS

State Roads and US Highways

LEGEND

Interstate Highways

City/County Roads

Bridge Projects

Capacity - Design PhaseCapacity - PD&E Phase

à

Capacity - Right-of-Way PhaseCapacity - Construction Phase

ÆÆ1414

ÆÆ77ÆÆ88

DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020

ÆÆ1717

ÆÆ1616

Page 38: FDOT Tentative Work Program 2016-2020

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4313521

Description: NEW ROAD CONSTRUCTION

BARTOW NORTHERN

CONNECTOR PHASE II FROM

US 17 TO SR 60

1 CST CIGP $0 $0 $0 $467,864 $0

CST LFP $0 $0 $0 $9,819,995 $0

CST TRIP $0 $0 $0 $2,998,420 $0

$0 $0 $0 $13,286,279 $0Project Total:

4316411

Description: NEW ROAD CONSTRUCTION

CENTRAL POLK PWKY FROM

POLK PWKY (SR 540) TO SR

35 (US 17)

2 ROW DDR $0 $0 $0 $1,966,740 $1,985,083

ROW DIH $0 $0 $0 $151,944 $136,943

$0 $0 $0 $2,118,684 $2,122,026Project Total:

4316412

Description: NEW ROAD CONSTRUCTION

CENTRAL POLK PWKY FROM

SR 35 (US 17) TO LOGISTICS

PARKWAY

3 ROW DDR $0 $0 $0 $4,611,162 $3,479,790

ROW DIH $0 $0 $0 $506,479 $456,479

$0 $0 $0 $5,117,641 $3,936,269Project Total:

4316418

Description: NEW ROAD CONSTRUCTION

CENTRAL POLK PWKY FROM

US 17/US 92 TO I-4

4 PE DDR $0 $9,212,000 $0 $0 $0

PE DIH $0 $110,000 $0 $0 $0

$0 $9,322,000 $0 $0 $0Project Total:

4317721

Description: BRIDGE REPLACEMENT

COW CAMP ROAD BRIDGE

NO. 160400 OVER

ROSALIE/ZIPPRER CANAL

5 CST ACBZ $0 $1,668,600 $0 $0 $0

$0 $1,668,600 $0 $0 $0Project Total:

4301853

Description: INTERCHANGE IMPROVEMENT

I-4 @ SR 33 INTERCHANGE

MODIFICATION 6 ENV SA $0 $0 $1,300,000 $0 $0

ROW DIH $0 $0 $0 $271,270 $0

ROW DS $0 $0 $0 $33,489 $0

ROW SA $0 $0 $0 $2,483,295 $0

$0 $0 $1,300,000 $2,788,054 $0Project Total:

2012153

Description: INTERCHANGE IMPROVEMENT

I-4 AT SR 557

7 CST ACNP $0 $0 $0 $0 $54,664,218

CST DIH $0 $0 $0 $0 $508,099

ENV DI $0 $0 $100,000 $0 $0

RRU ACNP $0 $0 $0 $0 $4,500,000

$0 $0 $100,000 $0 $59,672,317Project Total:

4366731

Description: PD&E/EMO STUDY

SR 35/700 (US 98) FROM N.

OF WEST SOCRUM LOOP RD

TO SR 471

8 PDE DIH $0 $0 $0 $0 $200,000

PDE DS $0 $0 $0 $0 $2,100,000

$0 $0 $0 $0 $2,300,000Project Total:

1975624

Description: ADD LANES & RECONSTRUCT

SR 35/700 (US98) FROM

EDGEWOOD DRIVE TO E

MAIN STREET

9 ROW CM $0 $0 $0 $1,723,607 $1,723,454

ROW SA $0 $0 $0 $1,522,651 $4,242,750

$0 $0 $0 $3,246,258 $5,966,204Project Total:

4106662

Description: ADD LANES & RECONSTRUCT

SR 542 FROM 1ST STREET

TO BUCKEYE LOOP RD

10 CST DDR $0 $0 $0 $15,736,323 $0

CST DIH $0 $0 $0 $331,800 $0

ENV DS $40,000 $200,000 $0 $0 $0

ROW SU $5,241,467 $1,221,060 $0 $0 $0

RRU DDR $0 $0 $0 $1,000,000 $0

RRU LF $0 $0 $0 $2,951,628 $0

$5,281,467 $1,421,060 $0 $20,019,751 $0Project Total:

4366721

Description: PD&E/EMO STUDY

SR35/700 US 98 FROM WEST

DAUGHTERY ROAD TO

NORTH OF WEST SOCRUM

LOOP RD

11 PDE DIH $0 $0 $0 $0 $150,000

PDE SA $0 $0 $0 $0 $1,500,000

$0 $0 $0 $0 $1,650,000Project Total:

4313511

Description: PD&E/EMO STUDY

US 17/92 HINSON AVE FROM

SR 17 (10TH STREET) TO

17TH STREET

12 PDE DIH $20,000 $0 $0 $0 $0

PDE DS $150,998 $800,000 $0 $0 $0

$170,998 $800,000 $0 $0 $0Project Total:

4313512

Description: ADD LANES & RECONSTRUCT

US 17/92 HINSON AVE FROM

SR 17 (10TH STREET) TO

17TH STREET

13 PE DIH $0 $0 $0 $3,000 $0

PE DS $0 $0 $0 $1,350,000 $0

$0 $0 $0 $1,353,000 $0Project Total:

# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20

4192434

Description: ADD LANES & RECONSTRUCT

US 27 FROM PRESIDENTS

DRIVE TO SR

60

14 CST DDR $0 $0 $0 $0 $52,843,410

CST DIH $0 $0 $0 $0 $941,628

ENV DI $0 $0 $195,000 $500,000 $0

$0 $0 $195,000 $500,000 $53,785,038Project Total:

4312081

Description: BRIDGE REPLACEMENT

US 92 (SR 600) FROM

REYNOLDS RD TO

SCHALAMAR CREEK ENT

15 CST DDR $884,467 $0 $0 $0 $0

CST DIH $386,374 $0 $0 $0 $0

CST DS $10,635,796 $0 $0 $0 $0

INC DS $0 $392,000 $0 $0 $0

$11,906,637 $392,000 $0 $0 $0Project Total:

4335582

Description: ADD LANES & RECONSTRUCT

US 92 FROM COUNTY LINE

ROAD TO WABASH

AVENUE

16 PE SA $0 $0 $0 $4,450,000 $0

$0 $0 $0 $4,450,000 $0Project Total:

4348862

Description: BRIDGE REPLACEMENT

US 98 (PEACE RIVER-FT

MEADE) AT BRIDGE NO 0064

(JOHN SINGLETARY BRIDGE)

17 PE DIH $0 $0 $0 $0 $100,000

PE SA $0 $0 $0 $0 $2,000,000

$0 $0 $0 $0 $2,100,000Project Total:


Recommended