of 17
8/9/2019 FDP I Kickoff Briefing Jan 2015
1/17
FIELD DEVELOPMENT PROJECT I (PCB 4032)15 JAN 2015
Kick
-
off Briefing
Berihun Mamo Negash (L-1-24)
8/9/2019 FDP I Kickoff Briefing Jan 2015
2/17
PRESENTATION OUTLINE
Introduction1
Objectives2
Task3
Proposed Milestone4
Rules and regulations5
8/9/2019 FDP I Kickoff Briefing Jan 2015
3/17
PRESENTATION OUTLINE (CONT)
Resources6
Roles and responsibilities7
Assessment8
8/9/2019 FDP I Kickoff Briefing Jan 2015
4/17
OBJECTIVES
Is to carry out avolumetric calculationinpreparation for technical and economicstudy of a field focusing on the latest
technology, economics, environmentaland political conditions.
2
The ultimate objective is to prepare asingle report to satisfy the requirementsof the panel of examiners.
8/9/2019 FDP I Kickoff Briefing Jan 2015
5/17
TASKSFDP
FDP I
(2 Cr. Hrs)
Static Modelling &
Volumetric calculation
FDP II
(3 Cr. Hrs)
Dynamic Modeling
Technical and economic evaluation
Develop a static model for the Gulfaks field andPerform volumetric calculation using PETREL.
Manually Calculate the volumetric and compare
results. (Probabilistic and Deterministic)
8/9/2019 FDP I Kickoff Briefing Jan 2015
6/17
PROPOSED MILESTONE
No Items Date (2015)
1. FDP I BRIEFING AND DATA HANDOVER 15 JAN (WEEK 1)
2. INTRO TO PETREL SEMINAR.
G & G SEMINARS.
21 JAN (WEEK 2)
04 FEB (WEEK 4)
3. PROGRESS REPORT SUBMISSION- PETREL 18 FEB (WEEK 6)
4. PRESENTATION-PETREL (SUPERVISORS) (WEEK 7)
5. PROGRESS REPORT SUBMISSION-MANUAL 27 MAR (WEEK 11)
6. PRESENTATION-MANUAL (SUPERVISORS) (WEEK 12)
7. FINAL G&G REPORT SUBMISSION 08 APR (WEEK 13)
8. FINAL PRESENTATION 15 APR (WEEK 14)
9. ONLINE TEST 16 APR (WEEK 14)
10. PEER EVALUATION 15 APR (WEEK 14)
3
8/9/2019 FDP I Kickoff Briefing Jan 2015
7/17
RULES AND REGULATIONSREPORT
ALL REPORTS SHOULD BE SUBMITTED BY THE DEADLINE.
INTERIM REPORTS WILL BE PRESENTED TO SUPERVISORS.
FINAL REPORT WILL BE PRESENTED TO TWO OR MORE INTERNAL EXAMINERS.
REPORT FORMAT
THERE IS NO STANDARD FORMAT, EACH GROUP SHOULD DISCUSS WITH
RESPECTIVE SUPERVISOR AND COME UP WITH THE BEST REPORT.
SEMINARS
ALL STUDENTS SHOULD ATTEND SEMINARS
ANY ABSENTEE WILL BE PENALIZED (5 % OF TOTAL MARK FOR EACH DAY
MISSED)
LOGBOOK
EACH STUDENT MUST PRODUCE A LOGBOOK FOR EACH WEEKS ACTIVITY
AND GET ENDORSEMENT FROM THE SUPERVISOR.
PEER EVALUATION HONESTLY EVALUATE YOUR GROUP MATE
8/9/2019 FDP I Kickoff Briefing Jan 2015
8/17
Final Poster Presentation (Sell Idea)--NEW!!!
(FDP II)
8/9/2019 FDP I Kickoff Briefing Jan 2015
9/17
Available software for the project (Pocket C5 and Building 15)
Petrel (Static Modelling)
Eclipse (Dynamic Modelling)
PipeSim
PanSystem
WellFlo (Well Performance)
PEEP (Petroleum Economics)
Questor (Facilities and Economics)
Landmark (Drilling)
Resources
8/9/2019 FDP I Kickoff Briefing Jan 2015
10/17
ROLE & RESPONSIBILITY
StudentsTo produce report which clearly defines the objective (s) and the
scope of project work
To plan meeting schedule with their Supervisors
To adhere to the meeting schedule with the Supervisor for the
purpose of updating the progress and seeking advise on projectmatters
To be responsible in finding alternative solution for problems
encountered in order to complete the project
To submit report on time
8/9/2019 FDP I Kickoff Briefing Jan 2015
11/17
ROLE & RESPONSIBILITY OF FDP PROJECT COMMITTEE
ChairmanHead of Department
Responsible for all final decision based on
the committees recommendation
To approve proposed field for the project
To appoint Panel of Examiners
To endorse Final Grades
8/9/2019 FDP I Kickoff Briefing Jan 2015
12/17
Coordinators To distribute guidelines
To plan and manage the FDP Project Process
To arrange FDP oral presentation according to the agreed schedule.
To collect the final draft from students and forward it to the examiners for
evaluation during oral presentation at the end of the semester.
To compile the groups assessment marks
To collect two hard cover copies of final project from each group
To compile and retain all submitted forms for at least one year after
graduation for auditing purposes
Role & Responsibility of FDP Project
Committeecont
8/9/2019 FDP I Kickoff Briefing Jan 2015
13/17
Supervisors
To supervise students until the submission of the
final report
To assist student on the accessibility of the tools
needed in the projectTo monitor and schedule progress of the students
and their projects.
To guide students on the project and the
preparation of Final Report according to theapproved format.
To assess students performance
Role & Responsibility of FDP Project
Committeecont
8/9/2019 FDP I Kickoff Briefing Jan 2015
14/17
PANEL OF EXAMINERS
Examinerspeople from industry (external
examiners) and the supervisors.
The examiners will function as project
evaluators who are responsible to evaluate
the oral presentations and dissertations.
8/9/2019 FDP I Kickoff Briefing Jan 2015
15/17
ORAL PRESENTATION
The presentation is to be made using acomputer driven projector.
Each group will have 40min (30min
presentation and 10min for Q and A).
Tentative date: As per schedule
8
8/9/2019 FDP I Kickoff Briefing Jan 2015
16/17
ASSESSMENT9
Assessment Supervisor Examiner Group Individual
Interim Report-PETREL 20 10 10
Interim Report-
Manual20 10 10
Final Report 25 25Final Oral
Presentation20 10 10
Test 10 10
Individual Logbook 5 5
Away day
Presentation10
Total 45 55 55 45
8/9/2019 FDP I Kickoff Briefing Jan 2015
17/17
FURTHER DETAIL WILL BE COMMUNICATED THROUGH ELEARNING
THANK YOU