FEASIBILITY STUDIES
Transcript
Page 1: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

FEASIBILITY STUDIES

Page 2: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Tier 1Basic ServicesThis level of services might rely on an existing survey, broker plan, rough drawings or sketches the Owner can supply to the Architect.

These level of services will be less accurate as the Architect won’t personally document the conditions to confirm the measurements and dimensions are accurate, but instead will rely on the accuracy of what is provided to AGD.

Tier 2Signature ServicesThese services might include exteriors that need to be documented in addition to the interior and might include more extensive documentation of the interior such as documenting existing power, lighting, ceilings, piping, and other interior elements beyond documentation of just doors, walls, and windows.

Tier 3Premium ServicesThis might include 3d renderings of the existing conditions and 3d diagrams showing what will be demoed in the renovation versus what is existing to remain or other premium services to help the client fully understand how the feasibility study impacts the existing site and buildings.

Step 1: Existing Conditions Documentation

Steps Towards a Successful Feasibility Study

Unless your site is completely vacant, or you’re looking at demoing all existing buildings and building new, then typically the first required step in a feasibility study is to document and evaluate the existing conditions of the site.

The more of the existing site and space you’re looking to renovate or reuse in the renovation; then the more time and level of services is required from amy green design in order to help you most effectively evaluate how the proposed work will affect the existing conditions and what can be reused in the renovation versus what needs to be relocated, removed, or replaced with new

Sample Existing Conditions Documentation Service Tiers

Step 1:Existing

Conditions Documentation

Step 2:Programming & Kick Off Meeting

Step 3:Feasibility

Drawings for Renovation, Demo

& New Building

Step 4:Bids from

Contractors & Proposals from

Consultants

Step 5:Evaluation of

Study

Page 3: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Examples of amy green design’s Services

Existing ConditionsBelow shows an example of how amy green design documented and created existing power, telephone, thermostat, intecom, lighting, HVAC, plumbing, and other plan documentation in addition to just the existing doors, windows, and walls of an existing space in order to evaluate for the client which of existing items could be reused in the renovation.

existing plans such as those shown here are indicative of Tier 2 Signature Level of Existing Conditions Documentation Services from amy green design

Page 4: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Tier 1Basic ServicesIn this level of services clients provide AGD with their desired Program and AGD then simply implements that client’s program into the feasibility study.

Tier 2Signature ServicesIn this level of services clients further benefit from AGD’s knowledge in building codes, equipment needs, furniture and accessibility clearances as AGD works with clients to develop their Program with AGD at their side.

Tier 3Premium ServicesThis might include diagrams showing just how much space is allocated to certain uses such as corridors versus office spaces or calculating how many special occupants can be serviced in a special use such as daycare based on how many children of each age are allowed by code in the classrooms of the daycare.

Step 2: Programming & Kick Off MeetingArchitectural Programming is the study of the needs of the people, spaces, furniture, equipment, and functions of a building project.

It includes considerations such as how many people a restaurant wants to seat, how many two bedroom units a co-op building wants to accommodate, how many bathrooms a retail store wants for customers, how many conference rooms an office space wants, what people occupy each space, what equipment and furniture is in each space, and more!

In the lower tier level of services, clients provide amy green design with a list of their desired program and AGD then helps them implement it; whereas in higher levels of services, AGD can help the client create that Program utilizing AGD’s expertise in space planning, functional layouts, minimum room sizes, and building equipment needs to help clients consider the full extent of the Program needed for their Feasibility Study.

Sample Programming Service Tiers

this color coded plan is indicative of Tier 3 Services from amy green design

Page 5: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Tier 1Basic ServicesA feasibility study at this level is typically focused on representing allowable building heights, lot coverage, setbacks, Floor Area Ratio, parking requirements, and allowable building footprint in simple calculations and diagrams.

Tier 2Signature ServicesIn this level of services clients benefit from not just the Basic Level of Services they will also receive, but also Schematic Design level drawings and floor plans that will show the client how the site and building could be laid out.

Tier 3Premium ServicesThis can include 3d renderings to more visually present the Feasibility Study findings.

Step 3: Feasibility DrawingsThe level of Feasibility Drawings a client desires has the greatest impact on the cost and timeline of a Feasibility Study with amy green design.

Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would be allowed to be built on a site by current code, zoning, and other local regulations.

Feasibility studies in Tier 2 Services are performed at a Schematic Design level of services rather than just diagrammatically, and as such further show how stairs, elevators, circulation, parking, restrooms, units, support spaces, and more will be laid out across the building and site in order to achieve the client’s desired Program in actual floor plan layouts and designs.

At the end of Tier 2 Feasibility Study drawings, a client’s project is typically roughly 25% complete, which allows clients to quickly progress forward with their project at the end of a Tier 2 Feasibility Study with Schematic Design Drawings in hand from their Feasibility Study.

Sample Feasibility Drawing Service Tiers

this diagrammatic building section is indicative of Tier 1 Feasibility Drawing Services from amy green design showing the total allowed building height, floor to floor heights, floors, setbacks, building footprint, and lot coverage allowed - represented diagramatiically in section - as part of the Feasibility Study Drawings

ADRAS NOTED

Z-001.0003

SETBACK DIAGRAMHEIGHT AND

DOB JOB #BIN #DATEDRAWN BYSCALE

DOB BSCAN STICKER

AR

CH

ITEC

TUR

AL

STR

UC

TUR

AL

MEC

HA

NIC

AL

ELEC

TRIC

AL

PLU

MB

ING

16 Court Street, 36th FloorBrooklyn, NY 11241

718.569.2200

Design Consultant

Owner

General Contractor

Mechanical Engineer

Structural Engineer

REVISION TABLENo. Date Description

DOB ConsultantSPEEDY EXPEDITING

481 Wythe Ave Suite #105Brooklyn, NY 11249

718.919.2500

M ARCHITECTURE, P.C.CHARLES MALLEA

Architect

TITAN ENGINEERS PC1331 Stuvesant Ave,

Union, NJ 07083 908.624.0044

SHARON ENGINEERING, PC34-27 Steinway Street, Suite 201

Long Island City, NY 11101718.752.1500

10/31/20163071529

SHEET OF 72

16 Court Street, 36th FloorBrooklyn, NY 11241

718.569.2200

A-1 GARDEN LLC320 Roebling St. PMB 110

Brooklyn, NY 11211

PREFERRED BUILDERS1115-50th Street

Brooklyn, NY 11219347.715.9409

321372698

ISSUE FOR DOB

10/31/16ISSUE FOR DOBISSUE FOR DOB

08/30/1604/01/16

DENSITYZR 24-20 APPLICABILITY OF DENSITY REGULATIONS TO ZONING LOTS CONTAINING BOTHRESIDENTIAL AND COMMUNITY FACILITY USESIN ALL DISTRICTS, THE MAXIMUM NUMBER OF DWELLING UNITS OR ROOMING UNITS ON A ZONING LOTCONTAINING BOTH COMMUNITY FACILITY AND RESIDENTIAL USES SHALL EQUAL THE MAXIMUMRESIDENTIAL FLOOR AREA PERMITTED ON SUCH ZONING LOT DETERMINED IN ACCORDANCE WITHTHE PROVISIONS SET FORTH IN SECTION 24-16 DIVIDED BY THE APPLICABLE FACTOR IN SECTION23-20

(ZR 23-22) DENSITY FACTOR: R6 - 680R6: 42,650.52 / 680: 62 DU PERMITTEDPROPOSED: 62 DWELLING UNITS (OK)

YARDSZR 23-45: NO FRONT YARDS REQUIRED, PROPOSED : 4'-61

2"ZR 23-462(c) SIDE YARDS: 0' OR 8' - PROPOSED: 0' (OK)ZR 23-541: NO REAR YARD REQUIRED WITHIN 100' OF CORNER

HEIGHT AND SETBACK REGULATIONS(ZR 23-662) THE HEIGHT OF ALL BUILDINGS OR OTHER STRUCTURES SHALL BE MEASURED FROM THEBASE PLANE.

BASEPLANE CALCULATION:

ON BUSHWICK AVE.:22.07' + 22.44' + 22.71' + 23.19' + 23.48' = 113.89 / 5 = 22.778'

148.08' (BUSHWICK) / 237.5' (TOTAL LINEAR SIDEWALK) = 62% 22.778' X 62% = 14.12'ON VARET ST.: 23.48' + 24.24' + 25.08' = 72.8 / 3 = 24.26 89.42' (VARET) / 237.5' (TOTAL LINEAR SIDEWALK) = 37% 24.26 X 37% = 8.97'

14.12' + 8.97' = 23.09'

(ZR 23-662) SETBACK REGULATIONSFOR ALL BUILDINGS OR OTHER STRUCTURES, SETBACKS ARE REQUIRED FOR ALL PORTIONS OFBUILDINGS OR OTHER STRUCTURES THAT EXCEED THE MAXIMUM BASE HEIGHT SPECIFIED IN THETABLE IN THIS SECTION. SUCH SETBACKS SHALL BE PROVIDED IN ACCORDANCE WITH THEFOLLOWING REGULATIONS: (1) AT A HEIGHT NOT LOWER THAN THE MINIMUM BASE HEIGHT OR HIGHERTHAN THE MAXIMUM BASE HEIGHT SPECIFIED IN THE TABLE IN THIS SECTION, A SETBACK WITH ADEPTH OF AT LEAST 10 FEET SHALL BE PROVIDED FROM ANY STREET WALL FRONTING ON A WIDESTREET. AND 15 FEET HSALL BE PROVIDED FROM ANY NARROW STREET

BUILDING HEIGHTS REQUIREMENT:MIN. BASE HEIGHT: 40'-0"MAX. BASE HEIGHT: 65'-0",MAX. BLD'G HEIGHT: 70'-0"ABOVE MAX. BLD'G HEIGHT MIN. FRONT SETBACK REQ: 10'-0” ON BUSHWICK AVE, 15' VARET STREETPROPOSED BASE HEIGHT: 59'-11" (OK)PROPOSED BUILDING HEIGHT: 69'-11" (OK)PROPOSED FRONT SETBACK: 10'-0” ON BUSHWICK AVE AND 15' ON VARTE STREET (OK)

DORMERS(ZR 23-621)(C) (1) DORMERSDORMERS SHALL BE ALLOWED AS A PERMITTED OBSTRUCTION, PROVIDED THAT ON ANY STREETFRONTAGE, THE AGGREGATE WIDTH OF ALL DORMERS AT THE MAXIMUM BASE HEIGHT DOES NOTEXCEED 60 PERCENT OF THE WIDTH OF THE STREET WALL OF THE HIGHEST STORY ENTIRELY BELOWTHE MAXIMUM BASE HEIGHT. FOR EACH FOOT ABOVE THE MAXIMUM BASE HEIGHT, THE AGGREGATEWIDTH OF ALL DORMERS SHALL BE DECREASED BY ONE PERCENT OF THE STREET WALL WIDTH OFTHE HIGHEST STORY ENTIRELY BELOW THE MAXIMUM BASE HEIGHT.

SEE DORMER CALCULATION ON SHEET A-105.

ELEVATOR AND STAIR BULKHEADS(ZR 23-62(G)) ELEVATOR OR STAIR BULKHEADS (INCLUDING SHAFTS; AND VESTIBULES NOT LARGERTHAN 60 SQUARE FEET IN AREA PROVIDING ACCESS TO A ROOF), ROOF WATER TANKS ANDACCESSORY MECHANICAL EQUIPMENT (INCLUDING ENCLOSURES), OTHER THAN SOLAR OR WINDENERGY SYSTEMS, PROVIDED THAT:(1) SUCH OBSTRUCTIONS SHALL BE LOCATED NOT LESS THAN 10 FEET FROM THE STREET WALL OF ABUILDING, EXCEPT THAT SUCH OBSTRUCTIONS NEED NOT BE SET BACK MORE THAN 25 FEET FROM ANARROW STREET LINE OR MORE THAN 20 FEET FROM A WIDE STREET LINE. HOWEVER, SUCHRESTRICTIONS ON LOCATION SHALL NOT APPLY TO ELEVATOR OR STAIR BULKHEADS (INCLUDINGSHAFTS OR VESTIBULES), PROVIDED THE AGGREGATE WIDTH OF STREET WALLS OF SUCHBULKHEADS WITHIN 10 FEET OF A STREET WALL, FACING EACH STREET FRONTAGE, TIMES THEIRAVERAGE HEIGHT, IN FEET, DOES NOT EXCEED AN AREA EQUAL TO FOUR TIMES THE WIDTH, IN FEET,OF THE STREET WALL OF THE BUILDING FACING SUCH FRONTAGE;(2) ALL MECHANICAL EQUIPMENT SHALL BE SCREENED ON ALL SIDES(3) (II) THE LOT COVERAGE OF ALL SUCH OBSTRUCTIONS DOES NOT EXCEED 20 PERCENT OF THE LOTCOVERAGE OF THE BUILDING, AND WHERE THE MAXIMUM PERMITTED HEIGHT OF A BUILDING IS LESSTHAN 120 FEET, SUCH OBSTRUCTIONS ARE LIMITED TO A MAXIMUM HEIGHT OF 25 FEET, AND WHERETHE MAXIMUM PERMITTED HEIGHT OF A BUILDING IS 120 FEET OR GREATER, SUCH OBSTRUCTIONSARE LIMITED TO A MAXIMUM HEIGHT OF 40 FEET.

REFER TO Z-106 FOR CALCULATION

RESIDENTIAL PARKING ANALYSIS(ZR 25-23) REQUIREMENTS WHERE GROUP PARKING FACILITIES ARE PROVIDED50% OF NUMBER OF DWELLING UNITS: 62 X 50% = 31 SPACES REQUIRED (OK)

ZR 25-31 GENERAL PROVISIONS REQUIRED ACCESSORY OFF-STREET PARKING SPACES FORPERMITTED NONRESIDENTIAL USESCOMMUNITY FACILITY PARKING ANALYSIS:AMBULATORY DIAGNOSTIC OR TREATMENT HEALTH CARE FACILITIES LISTED IN USE GROUP 41 PER 800 - R6 ZONING DISTRICT: 8,958.68 SF / 800 = 11.98 = 12 PARKING SPACES REQUIRED

ZR 25-33 WAIVER OF REQUIREMENTS FOR SPACES BELOW MINIMUM NUMBERR6 ZONING DISTRICT: 25 SPACES - NONE PROPSOED

TOTAL PARKING SPACES PROPOSED: 32 IN CELLAR (OK)

BICYCLE PARKING(ZR 25-811) (ZR 25-833) BICYCLE PARKINGUSE GROUP 2: 1 SPACE PER 2 DWELLING UNITS, EACH TO BE 15 SF MIN.USE GROUP 4, HOUSE OF WORSHIP, AMBULATORY DIAGNOSTIC - ALL OTHER USE GROUP 3 AND USEGROUP 4 USES NOT OTHERWISE LISTED IN THIS TABLE 1 PER 10,000 SQUARE FEET OF FLOOR AREA -HOWEVER, THE BICYCLE PARKING REQUIREMENTS SET FORTH IN THE TABLE SHALL BE WAIVED FORBICYCLE PARKING SPACES THAT ARE ACCESSORY TO:(D)ALL OTHER COMMUNITY FACILITY USES NOT OTHERWISE LISTED IN THE TABLE WHERE THENUMBER OF REQUIRED BICYCLE PARKING SPACES IS THREE OR LESSPROPOSED 62 D.U. X 50% = 31 PARKING SPACES, TOTAL OF 465 SF - LOCATED IN CELLAR.

PLANTINGZR 2303/26-41 STREET TREE PLATING IN RESIDENCE DISTRCITSREQUIRED ONE TREE FOR EVERY 25'-0" OF STREET FRONTAGE OF THE ZONING LOT

LOT FRONTAGE: 237'-6” / 25 = 10 TREES REQUIREDPROPOSED: 8 TREES TO PLAN ON SITE, 2 TREES TO PAY INTO TREE FUND

ZR 23-861 MINIMUM DISTANCE BETWEEN LEGALLY REQUIRED WINDOWS AND WALLS OR LOT LINESR1 R2 R3 R4 R5 R6 R7 R8 R9 R10IN ALL DISTRICTS, AS INDICATED, EXCEPT AS OTHERWISE PROVIDED IN SECTION 23-862 (MINIMUMDISTANCE BETWEEN LEGALLY REQUIRED WINDOWS AND LOT LINES ON SMALL CORNER LOTS IN R9OR R10 DISTRICTS) OR SECTION 23-863 (MINIMUM DISTANCE BETWEEN LEGALLY REQUIRED WINDOWSAND ANY WALL IN AN INNER COURT), THE MINIMUM DISTANCE BETWEEN A LEGALLY REQUIREDWINDOW AND:(A) ANY WALL;(B) A REAR LOT LINE, OR VERTICAL PROJECTION THEREOF; OR(C) A SIDE LOT LIN, OR VERTICAL PROJECTION THEREOF;SHALL BE 30 FEET, MEASURED IN A HORIZONTAL PLANE AT THE SILL LEVEL OF, AND PERPENDICULARTO, SUCH WINDOW FOR THE FULL WIDTH OF THE ROUGH WINDOW OPENING; PROVIDED, HOWEVER,THAT A LEGALLY REQUIRED WINDOW MAY OPEN ON ANY OUTER COURT MEETING THEREQUIREMENTS OF SECTION 23-84 (OUTER COURT REGULATIONS).

PROPOSED: ONLY FRONT AND REAR WINDOWS ARE PROPOSED, REAR WINDOWS ARE FACING 37'REAR YARD WITHOUT OBSTRUCTIONS.

CURB CUTS(ZR 25-631) LOCATION AND WIDTH OF CURB CUTS IN CERTAIN DISTRICTSALL CURB CUTS ON ZONING LOTS WITH BUILDINGS CONTAINING RESIDENCES SHALL COMPLY WITHTHE PROVISIONS OF THIS SECTION, EXCEPT THAT, IN LOWER DENSITY GROWTH MANAGEMENTAREAS, THE PROVISIONS OF SECTION 25-632 SHALL APPLY. THE MINIMUM WIDTH OF A CURB CUTSHALL BE EIGHT FEET, INCLUDING SPLAYS.(E) R6 R7 R8

EXISTING CURB TO REMAIN CURB CUT 12 FT IN WIDTH, SEE PLOT PLAN

QUALITY HOUSING REGULATIONS(ZR 23-011) QUALITY HOUSING PROGRAMR6 R7 R8 R9 R10(B) IN THE DISTRICTS INDICATED WITHOUT A LETTER SUFFIX, THE BULK REGULATIONS APPLICABLE TOQUALITY HOUSING BUILDINGS MAY, AS AN ALTERNATIVE, BE APPLIED TO ZONING LOTS WHEREBUILDINGS ARE DEVELOPED PURSUANT TO ALL OF THE REQUIREMENTS OF THE QUALITY HOUSINGPROGRAM..

ZR 24-011IN OTHER R6, R7, R8, R9 OR R10 DISTRICTS, ANY COMMUNITY FACILITY PORTION OF A QUALITYHOUSING BUILDING SHALL COMPLY WITH THE APPLICABLE PROVISIONS OF ARTICLE II, CHAPTER 8.

(ZR 28-12) REFUSE STORAGE AND DISPOSALREQUIRED REFUSE STORAGE FOR BLD'G WITH 9 D.U. OR MORE.PROVIDED ON EVERY FLOOR (OK).NUMBER OF DWELLING UNITS = 62 X 2.9 = 180 CUBIC FEET SIZE OF REFUSE ROOM REQUIRED,369 CF(41 SF X 9'-0") REFUSE ROOM PROVIDED EVERY FLOORSEPARATE REFUSE ROOM PROVIDE FOR THE COMMUNITY FACILITY PORTION

(ZR 28-14) DAYLIGHT IN CORRIDORS50% OF THE SQUARE FOOTAGE OF A CORRIDOR MAY BE EXCLUDED FROM THE DEFINITION OF FLOORAREA IF A WINDOW WITH A CLEAR, NON-TINTED, GLAZED AREA OF AT LEAST 20 SQUARE FEET ISPROVIDED IN SUCH CORRIDOR.SEE FLOOR AREA DEDUCTION DIAGRAMS ON SHEETS Z-101 THROUGH Z-105

(ZR 28-21) REQUIRED RECREATION SPACE3.3% OF THE TOTAL AMOUNT OF RESIDENTIAL F.A. IS REQUIRED FOR RECREATIONAL SPACE FORENLARGEMENTS WITH 9 D.U. OR MORE.REQUIRED RECREATION SPACE: 42,650.52 SF X 3.3% = 1,407.45 SFPROVIDED IN CELLAR: 1,077.6 SFPROVIDED IN 7TH FLOOR: 780.63 SFTOTAL : 1,077.6 SF + 780.63 SF = 1,858.43 SF > 1,407.45 SF (OK)(ONLY 780.63 SF DEDUCTED OF THE 1,858.43 SF IS USE)

(ZR 28-23) PLANTING AREASTHE AREA OF THE ZONING LOT BETWEEN THE STREET LINE AND THE STREET WALL SHALLBE PLANTED AT GROUND LEVEL. - PLANTING PROVIDED

(ZR 28-31) DENSITY PER CORRIDORIF THE NUMBER OF DWELLING UNITS OR ROOMING UNITS SERVED BY A VERTICAL CIRCULATION COREAND CORRIDOR ON EACH STORY DOES NOT EXCEED THE NUMBER SET FORTH IN THE FOLLOWINGTABLE, 50 PERCENT OF THE SQUARE FEET OF THE CORRIDOR SERVING SUCH DWELLING UNITS ORROOMING UNITS ON SUCH STORY MAY BE EXCLUDED FROM THE DEFINITION OF FLOOR AREA.NUMBER OF DWELLING UNITS AND ROOMING UNITS SERVED BY A CORRIDOR PER STORY: 11DISTRICT: R6SEE FLOOR AREA DEDUCTION DIAGRAMS ON SHEETS Z-101 THROUGH Z-105

(ZR 28-43) LOCATION OF ACCESSORY PARKINGON-SITE ACCESSORY OFF-STREET PARKING SHALL NOT BE PERMITTED BETWEEN THE STREET LINEAND THE STREET WALL OF A BUILDING OR ITS PROLONGATION. N/A

Page 6: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Examples of amy green design’s Services

Feasibility Study Drawings at Tier 2100'-0"

74'-0 1/2"

53'-5" 46'-5"

2"

19'-1

0 1/

2"

47'-5

3/4

"

2"

15'-6" 12'-2 3/4"

73'-11 3/4"46'-3"

60'-0

1/2

"2"

2"

4'-6 1/2"

5'-0"

3'-8

"

8'-6 1/2"

59'-8

1/2

" 14'-2

1/4

"

7'-7

1/2

"

5'-0" 15'-8 1/2"

15'-7"

7'-6

"

7'-6

"

21'-4"

6

5'-0"

DATE:

LOCATION: SHEET NO.SHEET TITLE:

DRAWN BY: AMG SCALE: REV. DATE ISSUE

amy green designRegistered Architect & Interior Designer579 W 177th St #51New York, NY 10033amygreendesign@gmail.com503.438.5411architecturaldesignernewyork.com

1101 HOE AVE, 1173 & 1175 W FARMS ROADBRONX, NY

FEASIBILITY STUDY

03.16.2018 1/8" = 1'-0"

PROPOSED CELLAR PLAN SK-1

PRELIMIN

ARY PLANS - N

OT FOR CONSTRUCTIO

N

NOR PERMITS

SD/CM

SD/CM

SD/CM

SD/CM

SD/CM

1

1

5 23

4

6

7

31'-0" 22'-7"

5'-0"

8'-7"

9'-6

"

11'-0 1/2"

14'-2

1/2

"

14'-8 1/2"

12'-11 3/4"

12'-4

"10

'-7"

15'-6" 30'-11"2"

19'-9

1/2

"

8'-5"

6'-0

"

8'-2 1/2"

39'-5

1/2

"

47'-6

3/4

"

2"

59'-8

1/2

"

14'-11" 15'-6" 12'-8 3/4"

43'-2"31'-0"

2"

60'-0

1/2

"

100'-0"

74'-0 1/2"

2"

1

23

8'-0"

6'-0

"

8

4'-2"

8

5

2'-0"

4'-0"

5'-0"

4

2'-3 1/2"

2'-0"

9'-3

"

SD/CM

5'-0

"

6'-0"

6'-6"15'-11 3/4"

9'-9 1/2"

8'-6

"

8'-2

1/2

"

8'-6

1/2

"

6'-0"

8'-0

"10

'-6"

SD/CM

SD/CM

SD/CM

SD/CM

SD/CM

SD/CM

5

5

5

2

2

3

3

4

4

8'-2 1/2"

8'-2

1/2

"

1

1

1

1

1

8

8

6'-0

"

9'-0"

11'-7

"

10'-10 3/4"

10'-0"

2 34

6'-0"

8'-0

"

20'-10 1/2"

3'-11"

4'-1

0"

4'-4

"

3'-6

"

27'-5 3/4"

8'-7

"

16'-4

1/2

"

9'-4"

DATE:

LOCATION: SHEET NO.SHEET TITLE:

DRAWN BY: AMG SCALE: REV. DATE ISSUE

amy green designRegistered Architect & Interior Designer579 W 177th St #51New York, NY 10033amygreendesign@gmail.com503.438.5411architecturaldesignernewyork.com

1101 HOE AVE, 1173 & 1175 W FARMS ROADBRONX, NY

FEASIBILITY STUDY

03.16.2018 1/8" = 1'-0"

PROPOSED TYPICAL FLOOR PLAN - 5 UNITS PER FLOOR SK-3

PRELIMIN

ARY PLANS - N

OT FOR CONSTRUCTIO

N

NOR PERMITS

10"

9'-2

"

10"

9'-2

"

10"

9'-2

"

10"

9'-2

"

10"

MAX

. BAS

E H

EIG

HT

= 75

'-0"

MIN

. BAS

E H

EIG

HT

= 40

'-0"

MAX

. BU

ILD

ING

HEI

GH

T =

80'-0

"

10'-0

"14

'-0"

10'-0

"10

'-0"

10'-0

"10

'-0"

10'-0

"

9'-2

"

0'-0" A.F.F.FIRST FLOOR

ZR 23-62(G) PERMITTEDOBSTRUCTION STAIRBULKHEAD

ZR 23-62(G) PERMITTEDOBSTRUCTIONELEVATOR BULKHEAD

NEW CELLARBELOW GRADE

13'-2

"9'

-2"

ZR 23-62(G) PERMITTEDOBSTRUCTION 3'-6"HIGH PARAPET

SEISMIC GAP

-10'-0" A.F.F.CELLAR

14'-0" A.F.F.SECOND FLOOR

24'-0" A.F.F.THIRD FLOOR

34'-0" A.F.F.FOURTH FLOOR

44'-0" A.F.F.FIFTH FLOOR

64'-0" A.F.F.SEVENTH FLOOR

74'-0" A.F.F.ROOF

54'-0" A.F.F.SIXTH FLOOR

84'-0" A.F.F.BULKHEAD

9'-2

"

10"

10"

10"

10'-0

"10

'-0"

3'-6

"

SEE

W F

ARM

S R

D E

LEVA

TIO

N F

OR

REM

AIN

DER

OF

ANG

LED

BU

ILD

ING

FAC

ADE

10"

9'-2

"

10"

9'-2

"

10"

9'-2

"

10"

9'-2

"

10"

MAX

. BAS

E H

EIG

HT

= 75

'-0"

MIN

. BAS

E H

EIG

HT

= 40

'-0"

MAX

. BU

ILD

ING

HEI

GH

T =

80'-0

"

10'-0

"14

'-0"

10'-0

"10

'-0"

10'-0

"10

'-0"

10'-0

"

9'-2

"

0'-0" A.F.F.FIRST FLOOR

ZR 23-62(G) PERMITTEDOBSTRUCTION STAIRBULKHEAD

ZR 23-62(G) PERMITTEDOBSTRUCTIONELEVATOR BULKHEAD

NEW CELLAR BELOWGRADE

13'-2

"9'

-2"

ZR 23-62(G) PERMITTEDOBSTRUCTION 3'-6"HIGH PARAPET

-10'-0" A.F.F.CELLAR

14'-0" A.F.F.SECOND FLOOR

24'-0" A.F.F.THIRD FLOOR

34'-0" A.F.F.FOURTH FLOOR

44'-0" A.F.F.FIFTH FLOOR

64'-0" A.F.F.SEVENTH FLOOR

74'-0" A.F.F.ROOF

54'-0" A.F.F.SIXTH FLOOR

84'-0" A.F.F.BULKHEAD

9'-2

"

10"

10"

10"

10'-0

"10

'-0"SEISMIC GAP

SEE

HO

E AV

E EL

EVAT

ION

FO

R R

EMAI

ND

ER O

F BU

ILD

ING

FAC

ADE

DATE:

LOCATION: SHEET NO.SHEET TITLE:

DRAWN BY: AMG SCALE: REV. DATE ISSUE

amy green designRegistered Architect & Interior Designer579 W 177th St #51New York, NY 10033amygreendesign@gmail.com503.438.5411architecturaldesignernewyork.com

1101 HOE AVE, 1173 & 1175 W FARMS ROADBRONX, NY

FEASIBILITY STUDY

04.10.2018 1/16" = 1'-0"

PROPOSED SCHEMATIC FRONT ELEVATIONS SK-7

PRELIMIN

ARY PLANS - N

OT FOR CONSTRUCTIO

N

NOR PERMITS

6

7

31'-0" 22'-5"

5'-0"

16'-6 1/4" 30'-1"

2"

19'-9

1/2

"

39'-5

1/2

"

47'-6

3/4

"

2"

59'-8

1/2

"

14'-8 1/2" 16'-4 1/2" 12'-0 3/4"

43'-2"31'-0"

2"

60'-0

1/2

"

100'-0"

74'-0 1/2"

2"

3'-8"

5'-0"

15'-4 1/2"

37'-5

"19

'-11

1/2"

999999

999999

99

9

99

9

99

9

99

9

999

999

DATE:

LOCATION: SHEET NO.SHEET TITLE:

DRAWN BY: AMG SCALE: REV. DATE ISSUE

amy green designRegistered Architect & Interior Designer579 W 177th St #51New York, NY 10033amygreendesign@gmail.com503.438.5411architecturaldesignernewyork.com

1101 HOE AVE, 1173 & 1175 W FARMS ROADBRONX, NY

FEASIBILITY STUDY

03.16.2018 1/8" = 1'-0"

PROPOSED BULKHEAD FLOOR PLAN SK-4

PRELIMIN

ARY PLANS - N

OT FOR CONSTRUCTIO

N

NOR PERMITS

These plans & elevations are indicative of Tier 2 Services from amy green design for Schematic Design level Drawings in a Feasibility Study.

These were just some of the drawings and calculations of the feasibility study done for an 8 story multifamily Quality Housing project with under ground parking, commerical ground floor, 7 floors of residences, and a roof top terrace for residents.

Page 7: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

amygreendesign.com | 503.438.5411 | [email protected] | 579 W 177th St #51, NY,10033 page 8

living room improvementsexisting HVAC duct to remain? should lighting through out

be upgraded?

consider removing and patching/repairing/replacing wall finishes where they are outdated - such as living room

if living room floor is made level with adjacent floor level, new framing and flooring will be needed and sliding door opening will likely need to be reframed

walls separating kitchen from living could be removed with a minimal strip of floor repatching and new half glass wall divider

paint seems to be ok, need to repaint throughout?

to address any concerns of people tripping or pushing their chair off the floor change from dining to living - if not made level - glass divider wall with an opening (no door) could be utilized as shown above. for design consistency, whatever glass system is utilized here, could match what sliding doors are used at front room off foyer. Portions of glass partition could even be just partial height.

Feasibility Study Design Inspirations

Sometimes client’s want to focus more on the aesthetics of the feasibility study rather than the code/zoning/developmentaspects, in which case from both interior to exterior we can show them how we can renovate existing properties to make them the spaces they’ve been dreaming of.

amygreendesign.com | 503.438.5411 | [email protected] | 579 W 177th St #51, NY,10033 page 4

improving curb appeal

Original windows throughout are old/original and should be replaced

remove all shutters

repaint garage gray, battens could stay if in good condition

remove battens at entry/porch and reclad with natural wood

clad existing brick planters and lower facade in gray stone

furr/clad metal posts with new gray stone and lighting

consider replacing brick joints with new gray gravel stones

concept image below for gray garage, white typical, and wood entry feature

concept image above for gray stone clad planters which would also clad all existing brick

cconsider custom entry & garage door

existing white battens in main facade could remain as is

Page 8: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Examples of amy green design’s Services

Feasibility Study Drawings at Tier 3

above is a 3d model for a skyscraper a client wanted studied and designed to be as tall as possible while accommodating code required sky exposure planes that we also modeled as shown by the sloping purple panes

the 3d renderings on the left were for a home expansion where red indicated areas of the home to be demoed, green proposed expansion, and the study included full 3d interior modeling and 3d walk through animation (existing kitchen photo prior to feasibility study shown on the bottom right for reference)

PROJECT: 1515574-0006.15.2015

Client Logo (Removed for Privacy) AS-OF-RIGHT REDEVELOPMENTMASSING MODEL & SKY EXPOSURE CURVES

LEGENDRETAIL/COMMERCIALRESIDENTIALCIRCULATION COREROOF TERRACEROOFSKY EXPOSURE CURVE

Page 9: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Tier 1Basic ServicesIn this level of services the client will handle the bidding process themselves, simply providing AGD with the results of the bidding process and how the client wants to proceed given the results of bidding.

Tier 2Signature ServicesIn this level of services the client handles the bidding process themselves, but AGD will provide the client with quotes for needed consultants and host a call with the client to review the results of bidding with the client and advise the client on how to best move forward with the project at the end of the Feasibility Study.

Recommendations from AGD at the end of the Study typically include an updated estimated project schedule, phasing plan, and total project budget to demonstrate to the client how those should move forward as a result of the findings of the Feasibility Study.

Tier 3Premium ServicesIn this level of services AGD handles the bidding process for the client including hosting bid walkthroughs for the Owner to meet each bidder on-site along with the Architect to answer all questions from bidders. AGD will also help the client select contractors to bid, negotiate with contractors, and help advise the client on how to select the best contractor for the project based on bid results.

Many clients elect for this level of service given the fact that if our 20 years experience in the industry can save you less than just 1% of your construction costs, then our expertise and negotiations in this process covers our fee to manage the bidding process for our clients.

Step 4: Bids from Contractors & Quotes from ConsultantsGathering quotes from contractors needed to complete the construction, and quotes from consultants needed to complete services such as engineering or testing on the project; allows clients to evaluate early on in the building design process exactly where budget and timeline for the project is coming in at in the current market.

Sample Bidding & Negotiation Service Tiers

Step 5: EvaluateAt the end of the Feasibility Study, AGD and the client will have a discussion about the next best steps for the client and their potential project based on the findings of the Feasibility Study. Most clients elect to move straight into a full scope proposal from AGD to complete the project.

The goal at the end of the Feasibility Study is typically for one of the following to occur:• request AGD provide a proposal for the remaining services needed to take the project into construction documents,

permitting, construction, and completion • request an addendum for AGD to adjust the Feasibility Study due to changes to project goals, schedule, and/or

budget prior to the client electing to move the project forward• place the project on hold while client secures additional financing or other resources needed to allow the client to

complete the project such as purchasing the land, leasing the space, combining lots, or other outcomes

amy green design’s services each build upon one another, so each service, such as a Feasibility Study, is a stepping stone helping bring clients closer towards successful completion of their project

clients can take everything learned during a Feasibility Study and apply it to moving their project forward

Page 10: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

Additional Services and Understanding Your Level of ServiceAt any point in your project you can elect to add services or revise the level of services you are contracted with amy green design at. Simply send us an email indicating what services you’re interested in revisiting, and we can then provide you with a quick 1-2 page addendum for your review indicating how the revision will impact your project fees, schedule, budget, and services. You can then decide whether or not to approve the addendum to change your services from the original contract or continue under the original contract.

Common Reasons Clients Add or Need Additional Services• wanting additional meetings, presentations, or site visits with amy green design• adding time to their project beyond what was originally allocated in their proposal• adding additional scope to their project such as deciding to renovate all units in the project when the original proposal

only covered renovating one unit• changes to their design or drawings after already giving amy green design their approval of the design• adding services they thought they’d cover on their own that were not included in the original contract, such as bidding

& negotiations with contractors, that they found they now need support from amy green design on and want to add• increase the tier level of services they are receiving such as increasing construction administration services to include

more support such as certifying contractor requests for payments or adding on-site inspections• adding 3d renderings

Tier 1Basic ServicesThese services provide the bare minimum services required from your Architect. This level of service is best suited to those looking to take more of the project responsibilities on their own or who are more focused on the fees of the project than achieving the best process or most support from their Architect during the project.

Tier 2Signature ServicesThese services best support the needs of the majority of our clients. This level of services ensures clients receive our expertise in areas where they will benefit from our twenty years in the industry and allows us to manage most services for the client related to their project rather than burdening clients with managing those services on their own.

Tier 3Premium ServicesThese services are best suited for clients who want their Architect to handle all aspects of the project for them. This level of service allows AGD to best oversee a project’s success under the full capabilities of our expert direction and provides premium services such as 3d renderings and other expanded services to help clients achieve the most of their services with AGD.

Architectural Service Tiers

Let AGD know if you’d like to discuss revising the level of services you’re interested in receiving from amy green design.

We’re here as your personal expert Architect & Interior Designer to support you in a successful project from start to finish --- and the more premium level of services you elect, the more fully we can support you in achieving that success.

Page 11: FEASIBILITY STUDIES - amy green design · 2019-10-02 · Feasibility studies in Tier 1 Services are diagrammatic and focus on quick calculations and simple diagrams showing what would

We look forward to working with you and being your personal expert Architect & Interior Designer!