FEASIBILITY Technical Workgroup Call August 22, 2016 1:00 PM PDT SUNSPEC OPEN SOLAR DATA EXCHANGE
Transcript
Page 1: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

FEASIBILITY  

Technical  Workgroup  Call  

 

August  22,  2016  1:00  PM  PDT  

 

SUNSPEC  OPEN  SOLAR  DATA  EXCHANGE  

Page 2: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

2  

AnLtrust  &  Intellectual  Property  Policy  

•  All  SunSpec  meeLngs  are  conducted  in  accordance  with  the  SunSpec  AnLtrust  Policy  and  Intellectual  Property  Provisions  defined  in  the  SunSpec  Member  Agreement  and/or  the  SunSpec  Limited  ParLcipant  Agreement.  

•  Each  parLcipant  company  in  this  meeLng  has  executed  either  one  or  the  other  of  these  agreements  and  all  parLcipants  must  comply  with  the  policy  and  provisions.  

•  ConfidenLal  or  proprietary  informaLon  should  not  be  discussed  in  open  session.  Please  contact  SunSpec  management  if  you  have  any  quesLons.  

Page 3: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

3  

Agenda  

– Orange  Bu[on  Overview  – Describe  oSDX  Technical  Workgroup  Process,  Roles,  Enrollment  and  Schedule    

– Outline  Mission  and  Goals  of  the  Workgroup  – Workgroup  Topic  Areas  with  DefiniLons  – Workgroup  StarLng  Priority  with  Relevant  Standards  &  Documents  •  Decision:  PrioriLzed  list  of  use  cases  

– Next  Steps/Homework  

Page 4: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

4  

Standards  For  Solar  Bankability  

4  

Convene  

DS  

Data  Taxonomy  

Solar Industry

   

   

• Document  requirements  to  meet  industry  needs  • Manage  Stakeholder  Engagement  •  Strategy    

Data  Taxonomy  

 

Define  Integrate  • Data  Taxonomy  •  APIs  •  TesLng/Interoperability  

•  User-­‐friendly  so_ware  tools  and  capabiliLes  

•  Data  TranslaLon  and  Exchange  

Page 5: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

5  

SunSpec  Technical  Workgroup  Topics  

Page 6: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

6  

SGIP  and  SunSpec  Working  Groups  

               SunSpec  

SGIP  Opera9ons   Feasibility   Finance   Design   Construc9on  

Grid  Integra9on   ü      ü     Solar  O&M   ü     Deployment   ü      ü      ü     Financing   ü        ü     Real  Estate     ü      ü     

6  

Page 7: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

7  

SunSpec  Open  SpecificaLon  Development  Process  

7  

Market  Requirements  

Technical  Workgroup  FormaLon  

Use  Case  PrioriLzaLon  

Standards  EvaluaLon  

Detailed  Gap  

Analysis  

Intellectual  Property  

ContribuLons  

Taxonomy  &  Data  Model  Development  

CerLficaLon  Test  

Development  

API    Mapping  &    AdaptaLon  

SpecificaLon  Development  

Open  Data  Interchange  Specifica9on  

Market  AdopLon  

Page 8: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

8  

SunSpec  Technical  Workgroup  Roles  

•  TWG  Chair  o  Runs  calls,  records  issues,  assigns  tasks,  writes  agendas,  compile  

contribuLons,  master  of  the  specificaLon  o  Skip  Dise  ([email protected]  )  

•  Co-­‐Chair  o  Assist  Chair  o  Evelyn  Fisher  ([email protected])  

•  Authors/Contributors  o  Write  secLons  of  specificaLons  

•  Reviewers  o  A[end  calls,  comment  on  workgroup  deliverables  

•  SunSpec  o  Coach  Chair  &  Co-­‐Chair,  host  and  compile  documents,  manage  

parLcipants,  outreach,  record  meeLng  notes  and  a[endance  during  calls  

Page 9: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

9  

SunSpec  TWG  Enrollment    

•  ParLcipants  must  have  a  completed  IP  Agreement  o  h[p://sunspec.org/parLcipate-­‐sunspec-­‐osdx-­‐program/  

•  Or  be  a  member  of  SunSpec  Alliance  o  h[p://sunspec.org/join-­‐sunspec-­‐today/  

•  Forward  enrollment  quesLons  to  [email protected]  OR  send  to  above  link  

Page 10: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

10  

SunSpec  Tools  

•  Teamwork  o  Repository  for  working  documents  o  Accessible  by  formally  enrolled  parLcipants  

– SunSpec  manages  access  •  SunSpec  Website  

o Workgroup  specific  pages  o  Links  to  Teamwork  o  Host  content  ready  for  public  consumpLon  

•  Microso_  Word,  Excel,  PDF  

Page 11: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

11  

SunSpec  TWG  Schedule  

•  (Updated)  •  OperaLons  -­‐  Monday,  August  22  @  9:00  am  PT  

o  h[ps://global.gotomeeLng.com/join/690132277  •  Project  Feasibility  -­‐  Monday,  August  22  @  1:00  pm  PT  

o  h[ps://global.gotomeeLng.com/join/771605509  •  Finance  -­‐  Monday,  August  22  @  10:30  am  PT  

o  h[ps://global.gotomeeLng.com/join/257567365  •  Design  -­‐  Tuesday,  August  23  @  10:00  am  PT  

o  h[ps://global.gotomeeLng.com/join/126583301  •  ConstrucLon  -­‐  Tuesday,  August  23  @  11:30  am  PT  

o  h[ps://global.gotomeeLng.com/join/383550005  

Page 12: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

12  

Feasibility  TWG  Mission  

Dra_  to  be  discussed    Develop  and  publish  Distributed  Energy  Resources  (DER)  project   feasibility   data   taxonomy,   informaLon   models  and  interchange  standards,  based  on  the  SWG-­‐generated  Market   Requirements   Document   (MRD),   harmonized  with   each   of   the   funcLonal   categories   of   Design,  ConstrucLon,   OperaLons   and   Finance,   resulLng   in   a  specificaLon  that   is   ready   to  use,  allows  data  portability  across   the   value   chain,   increases   solar   bankability  through   data   transparency,   allows   for   richer   analyLcs,  and  will  enable  the  industry  to  grow  fast  and  thrive.    

Page 13: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

13  

Goals  –  Major  Milestones  

 •  Review  MRD  and  perform  standards  evaluaLon  and  GAP  analysis  

o  IniLal  review  by  November  1,  2016  •  Develop  Product  Requirements  Document  (PRD)  

o  IniLal  dra_  by  December  1,  2016      •  Develop  data  standards  and  technical  dra_s    

o  IniLal  dra_s  by  January  1,  2017  •  Develop  API’s  and  compliance  test  framework    

o  IniLal  release  by  February  1,  2017  •  IteraLve  process  running  through  November  2017  

o  Work  in  close  coordinaLon  with  SWG  while  MRD  is  being  developed  o  Address  as  many  use  cases  from  MRD  as  is  feasible  

Page 14: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

14  

Feasibility  TWG  Topics  &  DefiniLons  

•  Sub-­‐Topic  Areas  (aka  “Use  Cases”):  Is  it  complete?  o  Real  Estate  o  Economic  Analysis  o  InterconnecLon  o  Perminng  o  Off-­‐Taker  Credit  o  Customer  Assessment  o  Taxes  

•  DefiniLon:    o  What  does  this  encompass  and  how  does  it  affect  bankability    

•  Relevant  Standards:    o  Weighted  by  use  in  industry  

•  Relevant  Documents:    o  Other  supplemental  informaLon  that  supports  the  use  case  

•  QuesLons:    o  What  do  we  need  to  learn  to  move  forward?  

Real Estate Economic Analysis Interconnection Permitting Off-Taker Credit Customer Assessment

FEASIBILITY

WHAT  IS  THE  ORDER  OF  PRIORITY  FOR  THE  WG  =  WHAT  COMES  FIRST    

Page 15: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

15  

Feasibility  TWG  Topic  Details  

•  Topic  –  Real  Estate  o  DefiniLon:  Anything  that  impacts  the  asset  or  taxable  value  of  the  PV  system  

on  a  property  and  the  associated  process  of  asset  sizing,  both  residenLal  and  commerical.  (Property  assessors/appraisers,  real  estate  agents,  lenders  (PACE,  Epad  or  REAP  grants),  underwriter  (Fannie  Mae),  developers,  homeowner)  

o  Relevant  Standards  –  Sandia  PV  Value  tool  –  tool  to  assess  value  of  new  or  exisLng  PV  systems  on  resi/comm  

buildings.  –  Appraisal  InsLtute  ResidenLal  Green  and  Energy  Efficiency  Addendum  –  ASTM  E1527  

o  Relevant  Documents  –  SWG  Generated  Scoping  Study  Document  –  Real  Estate  Standards  OrganizaLon  (RESO)  –  Add  solar  as  a  data  field  in  mulLple  lisLng  

service  (MLS)  –  EPA  ECHO  –  Property  designaLon  or  zoning  

o  QuesLons  to  be  answered  –  Q1  –  Q2  –  Q3  

Page 16: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

16  

Feasibility  TWG  Topic  Details  

•  Topic  –  Economic  Analysis  o  DefiniLon:  Related  to  the  economic  engagement  between  the  buyer  

and  the  seller.  (financer,  developer,  off-­‐taker(home/building  owner))  o  Relevant  Standards  

–  Green  Bu[on  –  SunSpec  Doc  #12042  (Plant  Info  Exchange)  

o  Relevant  Documents  –  SAPC  Standard  Contracts  –  Standardized  contracts  for  residenLal  lease  and  

PPA  agreements  –  SWG  Generated  Scoping  Study  Document  –  DSIRE  incenLves  database  –  ULlity  incenLves  (reducing  demand,  installing  solar)  –  ULlity  rate  database  (OpenEI)  –  SAM/PVWa[s,  PVSyst  –  PV  simulaLon  tools  –  Buyer’s  weighted  average  cost  of  capital  

o  QuesLons  to  be  answered  –  Q1  –  Q2  –  Q3  

Page 17: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

17  

Feasibility  TWG  Topic  Details  

•  Topic  -­‐  InterconnecLon  o  DefiniLon:  RequesLng  interconnecLon  permission  from  home/

building  owner  electric  uLlity.  (ULlity,  building  owner,  developer)  o  Relevant  Standards  

–  FERC  InterconnecLon  Agreements  for  Smaller  Generators  –  SEPA  Solar  InterconnecLon  Report  and  Best  PracLces  –  UL  1741  –  Standard  for  InterconnecLng  Devices  (Inverters)  

o  Relevant  Documents  –  SWG  Generated  Scoping  Study  Document  –  Modules:  h[p://www.gosolarcalifornia.ca.gov/equipment/pv_modules.php  –  Inverters:  h[p://www.gosolarcalifornia.ca.gov/equipment/inverters.php  –  ULlity  InterconnecLon  Agreements  –  specific  to  each  uLlity  –  IREC  (2013)  Model  InterconnecLon  Document  

o  QuesLons  to  be  answered  –  Q1  –  Q2  –  Q3  

Page 18: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

18  

Feasibility  TWG  Topic  Details  

•  Topic  -­‐  Perminng  o  DefiniLon:  RequesLng  interconnecLon  permission  from  home/building  owner  authority-­‐having  jurisdicLon  (AHJ).  (ULlity,  building  owner,  developer)  

o  Relevant  Standards  – OpenEI  Regulatory  and  Perminng  Desktop  Toolkit  (RAPID)  

o  Relevant  Documents  –  SWG  Generated  Scoping  Study  Document  –  Applicable  jurisdicLon  standard  permit  –  specific  to  jurisdicLon  

o  QuesLons  to  be  answered  – Q1:  What  is  a  good  source  of  reference  for  perminng  documents  related  to  solar  PV?  

– Q2  – Q3  

Page 19: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

19  

Feasibility  TWG  Topic  Details  

•  Topic  –  Off-­‐taker  Credit  o  DefiniLon:  Credit  quality  of  the  off-­‐taker  (homeowner,  commercial  tenant  or  owner,  developer/EPC,  financier)  and  also  possibly  of  the  equipment  provider/EPC  or  ESCo.  

o  Relevant  Standards  o  Relevant  Documents  

–  SWG  Generated  Scoping  Study  Document  o  QuesLons  to  be  answered  

– Q1:  For  PPA  installed  solar  systems,  if  the  ovaker  credit  is  not  good,  one  may  use  asset-­‐based  lending,  which  looks  at  the  cashflow  of  the  system  when  Led  to  a  PPA  contract.  

– Q2  – Q3  

Page 20: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

20  

Feasibility  TWG  Topic  Details  

•  Topic  –  Customer  Assessment  o  DefiniLon:  [proposed  dra_  inserted  by  WG]  o  Relevant  Standards  

– PVWa[s  API  – PowerBill  API  

o  Relevant  Documents  – SWG  Generated  Scoping  Study  Document  

o  QuesLons  to  be  answered  – Q1  – Q2  – Q3  

Page 21: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

21  

Feasibility  TWG  Topic  Details  

•  Topic  –  Taxes  o  DefiniLon:  [proposed  dra_  inserted  by  WG]  o  Relevant  Standards  o  Relevant  Documents  

– SWG  Generated  Scoping  Study  Document  

o  QuesLons  to  be  answered  – Q1  – Q2  – Q3  

Page 22: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

22  

Next  Steps/Homework  

•  Enroll  in  the  workgroup  and  start  collaboraLng  h[p://sunspec.org/parLcipate-­‐sunspec-­‐osdx-­‐program/  

•  Review  SWG  generated  Scoping  Study  document  •  Review  and  compile  further  relevant  data,  documents  

and  standards  •  Consider  the  topics,  propose  other  topics  •  Consider  the  quesLons,  propose  other  quesLons  •  Join  one  or  more  SGIP  WGs  to  help  produce  a  complete  

and  meaningful  Market  Requirements  Document  (MRD)  o  While  the  SGIP  Deployment  WG  is  most  perLnent  to  Design  Data,  all  SGIP  WGs  are  important.  

Page 23: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

Feasibility  Technical  Workgroup  Call  

August  15,  2016  9:00  AM  PDT  

 

Key  Slides  From  Last  Call  

Page 24: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

24  

QuesLons  to  be  Answered  

•  Do  we  have  the  right  topics  aligned  with  Project  Feasibility?    (All  WGs  will  coordinate  through  PMs  at  SunSpec,  but  are  we  missing  anything?)  

•  How  does  Part  A  w/SGIP  work  with  SunSpec’s  Part  B?  

•  Should  both  data  and  digital  documents    be  considered  as  necessary?  

Page 25: FEASIBILITY* Technical*Workgroup*Call* …sunspec.org/wp-content/uploads/2016/08/oSDXFeasibilityWorkgroup...Standards*&*Documents* ... Market Requirements* Document (MRD),* harmonized*

25  

InternaLonal  Standards,  Best  PracLces,  and  ExisLng  Taxonomies  (parLal  list)  

o  NREL  PVWa[s  o  CEC  Equipment  List  o  CPR  APIs  (PowerClerk,  PowerBill  and  SolarAnywhere)  

o  SunSpec  documents  – SunSpec  Plant  InformaLon  Exchange  specificaLon  

 


Recommended