Tested Accepted Rejected Accepted Rejected
(mm) (A) (R) (A) (R)
1 1260 R
2 1971 A
3 2350 R
4 628 A
5 620 R
6 540 A
7 540 R
8 540 A
9 540 A
10 830 A
11 2000 A
12 2420 A
13 2000 R
Yes
10 - 15 mins.
AWS D1.1
San Tierra Clubhouse Bldg. 2
February 07, 2013
Spot
Weld NDT Procedure No.
Sample Card No.
S-10;SNAC-B2-A-Portal1;SNAC-1B-A-Stair I I12mm
SKC-S / Solvent Removable
Findings / Defect Type & Size
Manufacturing / Brand
Part No. / Weld Joint
Identification
Penetrant
ECDI / RLB
Laboratory No.
Acceptance Code
INSPECTION PROCESS
Item
No.
No Relevant Indication
Rounded Indication
Material Thickness
No Relevant Indication
Grid Line K4
Grid Line J3
Developer Type
Cleaner Type
LIQUID PENETRANT TESTING REPORT
Address
Drwng. Ref. No.
Carbon Steel
Location / Site
ASME V
Tested Item / Part
Visible
Client
Project Name
Date of Inspection
Inspection
Part Type
Inspection Procedure
Material Specification
Sta. Rosa, Laguna
XWELL-LPT-2009-02
Sto. Domingo, Sta.Rosa, Laguna
2013-02-LPT-001M
2013-02-005M
Wide Flange
Method Technique
Surface Condition
No Relevant Indication
No Relevant Indication
Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
Performed / Evaluated By: Witnessed By: Authorized Signatory:
For and On-Behalf of X'Well Testing Services Inc.
NDT Level II / NDT Manager
Grid Line C1
Dwell Time
Surface Temperature
Canopy 10
Stair
Portal Shed
******Nothing Follows******
Rounded Indication
Examination Result
Clean / Smooth
Ambient
No Relevant Indication
Repair
Post Cleaning
Magnaflux
SKL-SP1 / Visible Dye
SKD-S2 / Non Aqueous
Grid Line D2
Grid Line H'11
Excell Contractors and Developers Inc.
Eric Atienza / Benjamin Aguilar Jr.
Emul Time N / A
No Relevant Indication
Grid Line G12 No Relevant Indication
Total Length Tested = 16, 239mm
Grid Line G10
Grid Line M2
Grid Line A1
GridLine L'3'
No Relevant Indication
Rounded Indication
Grid Line H10
Grid Line B2 Rounded Indication
Grid Line L5 Linear Indication
NDT Inspector
X'WELL Form Rev.1 Page 1 of 10
SCE
SCE
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
Performed / Evaluated By: Witnessed By: Authorized Signatory:
LEGEND:
Accepted
Rejected
GRID LINE J3
BUTT WELD @ JOINT CONNECTION AT GRID LINE J3
GLJ3
LEFT SIDE
RIGHT SIDE
GLJ3
GL J 3BOTTOM
GLJ3TOP
GRID LINE K4
FILLET WELD @ JOINT CONNECTION AT GRID LINE J3
X'WELL Form Rev.1 Page 2 of 10
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Edison A. Walit / Nima Khatib
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
Authorized Signatory:
X'WELL Form Rev.1 Page 2 of 10
SCE
SCE
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
GLL5
GRID LINE L5
BUTT WELD @ JOINT CONNECTION AT GRID LINE L5
RIGHT SIDE LEFT SIDE
GLL5
FILLET WELD @ JOINT CONNECTION AT GRID LINE L5
GLL5TOP
GLL5BOTTOM
GRID LINE L'3'
FILLET WELD @ JOINT CONNECTION AT GRID LINE L'3'
GLL'3'
X'WELL Form Rev.1 Page 3 of 10
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Authorized Signatory:
Edison A. Walit / Nima Khatib
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
X'WELL Form Rev.1 Page 3 of 10
SCE
SCE
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE M2
BUTT WELD @ JOINT CONNECTION AT GRID LINE M2
GLL3
GRID LINE A1
FILLET WELD @ JOINT CONNECTION AT GRID LINE A1
GLA1
X'WELL Form Rev.1 Page 4 of 10
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Authorized Signatory:
Edison A. Walit / Nima Khatib
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
X'WELL Form Rev.1 Page 4 of 10
SCE
SCE
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE B2
FILLET WELD @ JOINT CONNECTION AT GRID LINE B2
GRID LINE C1
FILLET WELD @ JOINT CONNECTION AT GRID LINE C1
GRID LINE D2
FILLET WELD @ JOINT CONNECTION AT GRID LINE D2
GRID LINE G10
FILLET WELD @ JOINT CONNECTION AT GRID LINE G10
GLG10
GLB2 GLC1 GLD2
X'WELL Form Rev.1 Page 5 of 10
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Authorized Signatory:
Edison A. Walit / Nima Khatib
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
WELD @ JOINT CONNECTION AT GRID LINE D2
X'WELL Form Rev.1 Page 5 of 10
SCE
SCE
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
GRID LINE G12
FILLET WELD @ JOINT CONNECTION AT GRID LINE G12
GLG12 BOTTOM
GRID LINE H10
BUTT WELD @ JOINT CONNECTION AT GRID LINE H10
GLH10
RIGHT SIDE
GLH10
LEFT SIDE
X'WELL Form Rev.1 Page 6 of 10
LIQUID PENETRANT TESTING REPORT
Sketch Detail / Part / Joint Location
Authorized Signatory:
Edison A. Walit / Nima Khatib
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
X'WELL Form Rev.1 Page 6 of 10
SCE
SCE
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
GRID LINE H'11
FILLET WELD @ JOINT CONNECTION AT GRID LINE H'11
GLH'11
GLH'11
GLH'11
BUTT WELD @ JOINT CONNECTION AT GRID LINE H'11
X'WELL Form Rev.1 Page 7 of 10
NDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
Authorized Signatory:
Edison A. Walit / Nima Khatib
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
X'WELL Form Rev.1 Page 7 of 10
SCE
SCE
NDT Inspector ECDI / RLBNDT Level II / NDT Manager
For and On-Behalf of X'Well Testing Services Inc.
Performed / Evaluated By: Witnessed By: Authorized Signatory:
Eric Atienza / Benjamin Aguilar Jr. Mario Valdez / Dean Valencia Edison A. Walit / Nima Khatib
LEGEND:
Accepted
Rejected
Sketch Detail / Part / Joint Location
LIQUID PENETRANT TESTING REPORT
X'WELL Form Rev.1 Page 8 of 10