+ All Categories
Home > Documents > Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester...

Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester...

Date post: 27-Mar-2015
Category:
Upload: jordan-arnold
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
30
Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division
Transcript
Page 1: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

Federal Accountability/AYP Update

Accountability TETNNovember 19, 2009

Shannon Housson and Ester Regalado

TEA, Performance Reporting Division

Page 2: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

2

AYP Topics

2009 Final Release Schedule

Preview of 2010

Use of TPM in AYP

Review of the Federal Cap

Title I Final Regulations/Graduation Rate

No Child Left Behind School Report Card

Page 3: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

3

2009 AYP Final Release Schedule

July 30th

August 6th

District and campus AYP results available on TEASE Accountability web application.

Public release of Preliminary AYP results.

September 4thAppeals and Federal Cap Exceptions Deadline.

Early December

Final 2009 AYP Status released.

Preview of NCLB School Report Card (SRC) data, Part I only.

January, 2010 Public release of NCLB SRC.

Page 4: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

4

2010 Preview

2010 AYP Performance Standards increase to:

73% in Reading/English language arts

67% in Mathematics

Participation Rate and Other Indicator standards remain unchanged.

No changes in state assessments used for 2010 AYP.

TPM will continue to be used for AYP 2010.

Annual review of the 2% Federal Cap on TAKS-M:

Application of the cap for TAKS-M TPM values projected to meet the passing standard.

Page 5: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

5

2010 Preview: Assessments

* Students in their First Year in U. S. Schools are counted as participants, but excluded from the performance calculation.

2010 Reading/ELA Assessments

Participation95% Standard

Performance ( Accountability Subset)73% Standard

Total Students

Number Participating

Number Tested

Met Standard or TPM

TAKS Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS(Accommodated)

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS-M /LAT TAKS-M *

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

(subject to 2% cap)

TAKS-Alt Yes If participant If in the

Accountability subset

If standard is met(subject to 1% cap)

No TPMavailable

TELPAS Reading*

YesNon-

ParticipantN/A Not Included Not included N/A

LAT version of TAKS*

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

Page 6: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

6

2010 Preview: Assessments (cont.)

* Students in their First Year in U. S. Schools are counted as participants, but excluded from the performance calculation.

2010 Mathematics AssessmentsParticipation95% Standard

Performance (Accountability Subset)67% Standard

Total Students

Number Participating

Number Tested

Met Standard or TPM

TAKS Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS(Accommodated)

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS-M /LAT TAKS-M *

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

(subject to 2% cap)

TAKS-Alt Yes If participant If in the

Accountability subset

If standard is met(subject to 1% cap)

No TPMavailable

LAT version of TAKS*

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

Page 7: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

7

2010 Preview: Use of TPM in AYP

Review of AYP Performance Calculation

Three steps for AYP Performance calculation:

1. AYP Proficiency Rate (without Growth)

2. Performance Improvement/Safe Harbor (without Growth)

3. AYP Performance Rate with Growth.

AYP Performance Rate with Growth:

(Students who Met the Passing Standard +

Students predicted to meet the Standard)

Total Number of Students Tested

Page 8: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

8

2010 Preview: Use of TPM in AYP (cont.)

Phase-in for the TAKS–M projection equations (TPM)

TPM projections are expected to be reported for TAKS–M tests in school year 2009-2010 for grades 4, 7, and 10.

If a student is tested on TAKS-M in one predictor subject (reading or mathematics) and tested in TAKS, TAKS (Accommodated), or LAT TAKS in the other subject, the student will not receive a TPM projection.

The Federal Cap process will include student results that are projected to meet the passing standard based on the TPM.

Priority will be given to students meeting the passing standard (will likely be included in the 2% federal cap first), followed by students projected to meet the passing standard by TPM.

Page 9: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

9

2010 Preview: AYP Federal Caps

Review of the 1% Federal Cap

Students are selected randomly from TAKS-Alt proficient results.

Exceptions to the 1% cap will be processed prior to the Preliminary AYP Release in August 2010 for:

School districts registered with the TEA Special Education Residential Facilities Tracking System (RF Tracker) for school year 2009-10.

School districts included in the 2009-10 Directory for Services for the Deaf in Texas, Regional Day School Programs for the Deaf (RDSPD).

Page 10: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

10

2010 Preview: AYP Federal Caps (cont.)

Review of the 2% Federal Cap

Step 1) TEA prioritizes campuses by grades served and proportion of students with disabilities enrolled. School districts have the opportunity to review and/or modify the campus rankings.

Step 2) Student results are selected in order to maximize the number of campuses that Meet AYP beginning with the campuses assigned the highest priority.

Page 11: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

11

2010 Preview: AYP Federal Caps (cont.)

Reminder: The federal cap relates to counting students as proficient for AYP purposes only and does not limit the number of students that may take an alternate assessment.

State policies and procedures related to assessment decision-making are detailed in the TEA publication titled Admission, Review, and Dismissal (ARD) Committee Decision-Making Process for the Texas Assessment Program.

A review of the federal cap process will be provided through a Texas Education Telecommunications Network (TETN) session accessible by ESC and school district staff in spring 2010.

Page 12: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

12

2010 Preview: Texas AYP Workbook

Final Title I regulations were implemented to provide a Uniform, Comparable Graduation Rate.

On November 19, 2009, the Title I Committee of Practitioners (COP) reviewed the recommended changes to the 2010 AYP Workbook and Federal Cap process for 2010.

The proposed amendments include:

The state’s definition of graduation rate,

A description of the state’s reporting plans,

The state’s goal and targets, and

Possible use of the Extended-Year Graduation Rate.

Page 13: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

13

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Graduation Rates: Regulations require a four-year graduation rate for the AYP 2010 calculations; an extended-year (5 or 6 year) rate is optional.

Decision to be made Texas will use a 4-year rate alone, or

Texas will use 4-year and 5-year graduation rates

Page 14: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

14

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Graduation Rate calculation for AYP: Examples for use of 4-year and 5-year rates can be found in US Department of Education, NCLB High School Graduation Rate, Non-Regulatory Guidance, December 22, 2008.

Decision to be made Districts and campuses must meet either:

annual target for the 4-year rate, or

annual target for the 5-year rate

Page 15: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

15

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

State Goal: a State must set a single graduation rate goal that represents the rate the State expects all high schools in the State to meet.

Decision to be made

Graduation rate goal of either:80% / 85% / 90%

Page 16: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

16

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Annual Graduation Rate Targets: a State must set annual graduation rate targets.

Decision to be made Calculation for the 4-year rate could include three

alternatives: Absolute standard of 70.0%, or Improvement standard, similar to safe harbor calculation

(10% decline in the difference between the prior year rate and the goal), or

1.0 percentage point increase in rate.

Page 17: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

17

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Annual Graduation Rate Targets: Federal regulations specify if an extended-year rate is used, the target must be higher than the target for the 4-year rate.

Decision to be made

Calculation for the 5-year rate could require meeting:

An absolute standard of 75.0%.

Page 18: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

18

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Targets for 2011 and beyond:

Decision to be made

Propose that absolute standards for 2011 and beyond not be included in this proposal, although the improvement standard would apply to 2011 and beyond.

Plan for the submission of proposed amendments to the 2011 Texas AYP Workbook that could include a transition plan for new End of Course assessments with annual graduation rate targets submitted as part of the transition plan.

Page 19: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

19

2010 Preview: Texas AYP Workbook (cont.)

Proposed Amendments:

Student group definition changes: Federal regulations allow states to develop business rules for the definition of student groups used for AYP.

Decision to be made

Apply the current definition of LEP student group, defined as students in the LEP program during their final (4th) year in the longitudinal cohort.

Page 20: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

20

AYP Preview: Final Title I Regulations

Regulations also require:

Disaggregating Graduation Rate Data √ Report the four-year adjusted cohort graduation

rate or a transitional graduation rate reported for school, district, and state levels by student groups prior to school year 2010–11;

√ States report the four-year adjusted cohort graduation rate by the 2010–11 school year; and

Use the cohort graduation rate by student group in 2012 AYP.

Page 21: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

21

No Child Left Behind School Report Card

Section 1111(h)(1) and (2) of the ESEA amended by the NCLB Act requires the annual reporting of student achievement and AYP information.

For 2008-09, and beyond, the US Department of Education requires that Texas’ state, district, and campus reports be accessible by stakeholders in one document.

NCLB School Report Cards (SRC) will be available for easy dissemination by school districts on one website in January, 2010.

Page 22: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

22

NCLB School Report Card (cont.)

There are five sections that make up the NCLB SRC:

Part I – Percent of Students Tested, Student Achievement by Proficiency Level Achievement Trend Data

Part II, a. – Comparison Between Student Achievement and the State's Academic Expectations as measured by Adequate Yearly Progress (AYP)

Part II, b. – Number of Recently Arrived LEP Students Who Are Not Assessed on the State's Reading/ELA Test

Part III – Information on Adequate Yearly Progress (AYP) and School Improvement Program (SIP) for districts and campuses receiving Title I, Part A funds

Page 23: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

23

NCLB School Report Card (cont.)

Sections of the NCLB SRC, continued:

Part IV, a. – Professional Qualifications of All Public Elementary and Secondary Teachers, As Defined by the State (Teacher Degree)

Part IV b. – Percentage of Public Elementary and Secondary Teachers With Emergency/Provisional Credentials

Part IV c. – Percentage of Classes Not Taught by Highly Qualified Teachers by High Poverty Compared to Low Poverty Campuses

Page 24: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

24

NCLB School Report Card (cont.)

Sections of the NCLB SRC, continued:

Part V – NAEP-2007 (Based on a Statewide Sample)

a. State-level percentages at NAEP achievement levels

b. State-level actual participation rates

Page 25: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

25

NCLB School Report Card (cont.)

TEA will provide a confidential unmasked NCLB SRC Part I: Student Achievement Preview Report to school districts via TEASE in December, 2009.

Appendix E of the 2009 AYP Guide (page 137) describes the relationship between the Part I of the NCLB SRC and AYP performance results.

Difference between AYP and NCLB SRC Part I: Student Achievement:

Does not include students that were projected to meet the standard by TPM.

The LEP student group does not include Monitored LEP students.

Page 26: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

26

NCLB School Report Card (cont.)

Difference between AYP and NCLB SRC Part I: Student Achievement :

Includes all TAKS-M and TAKS-Alt passing results (federal caps are not applied),

Includes mobile students (students that are not in the accountability subset),

Includes all students reported for each school district, including data reported on any campuses designated as TYC or Texas Juvenile Probation Commission (TJPC) campuses (see page 52 of the 2009 AYP Guide).

Page 27: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

27

NCLB School Report Card (cont.)

A preview of the NCLB SRC website will be presented in this TETN.

For more information on the performance results included in the NCLB School Report Card, please contact the Performance Reporting Division at (512) 463-9704.

For more information on the distribution requirements of the NCLB School Report Card, please contact the Division of NCLB Program Coordination at (512) 463-9374.

Page 28: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

28

TEA Security Environment (TEASE)Accountability Website

Each superintendent and charter school executive director may apply for access or may designate others in their district (including ESC Region staff) to also have access.

Multi-District User Access is available for certain charter operators and Education Service Center (ESC) staff that have the unique situation of requiring access to multiple school district or charter operator information.

Access for Multi-District Users is obtained through the school district superintendent’s authorization on the required access forms.

TEASE access forms are available at: http://ritter.tea.state.tx.us/webappaccess/AppRef.htm

Page 29: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

29

SIP Resources SIP History Website

Districts and campuses can view their Title I School Improvement Program (SIP) status history reports from 2003 through the present. See the AYP guide for the appropriate year for descriptions of any of the AYP or SIP status labels shown. The SIP history reports are accessible at http://ritter.tea.state.tx.us/ayp/index_multi.html.

Page 30: Federal Accountability/ AYP Update Accountability TETN November 19, 2009 Shannon Housson and Ester Regalado TEA, Performance Reporting Division.

30

AYP Resources

For more information on AYP, see the 2009 AYP Guide, accessible at http://ritter.tea.state.tx.us/ayp.

The current Texas AYP Workbook of June 12, 2009 is accessible at http://ritter.tea.state.tx.us/ayp/txworkbook09.pdf.

Frequently Asked Questions about AYP are available at http://ritter.tea.state.tx.us/ayp/faq/faq.html.

U.S. Department of Education information is available at www.ed.gov/nclb/.

Contact the Division of Performance Reporting by email at [email protected], or phone at (512) 463-9704.


Recommended