Federal AviationAdministration
Data Communications Program
Departure Clearance (DCL) Trials
DCIT17
To: DCIT Plenary
From: Matt Maki, Trials Lead
Date: 08.23.2012
Federal AviationAdministration
Agenda
• DTAP Development Status
• Trials Activities/Schedule/Testing Status
• Questions
2
Federal AviationAdministration
DTAP Milestone Deliveries and CHI Design Review Summary• SE2020 Contract Deliverables/DTAP Development On-
going:- Initial Operational DTAP delivery to FAATC 8/20
- 2 DTAP machines delivered (3rd machine to Thane 8/27)- DTAP Functional testing commencing 8/23- FDIO Echo Port interface development ongoing- PTR process in place- DTAP System Training commencing 8/22
• OT&E Testing scheduled for Sept 10-14:- NATCA CHI reps early look last week in Aug- New NATCA reps participating in OT&E testing
Federal AviationAdministration
Boeing/Airbus DTAP Non-Formal Testing• Completed/On-going testing with Boeing and
Airbus B777, B747, B737, MD-11, A330/340 test benches:
- AFN, DM25/UM73 messaging
- pDTAP and DTAP configurations
• Upcoming live testing next week with aircraft:
- AFN, DM25/UM73 messaging
- Tuesday - UPS
- Wednesday – UPS / UAL / FDX / DAL
- Thursday - FDX (Sandy attending)
Federal AviationAdministration
DCL Trials Activities Status• Trials Activities In Process/Complete:
- Trials Test NCPs (3) – 2 approved, 1 pending- NAS CCB scheduled for 8/31
- Draft Training and Trials Planning materials complete- Oct 29 – Nov 9 MEM Training planned
- DTAP equipment site pre-installation work 8/28-8/31- CAT6, media converters, rack config, monitor/keyboard
- FAA ISSM/FTI approvals and provisioning- FTI provisioning ordered- FEP build out at ATL by 9/8- ISSM testing at FAATC 8/23
- Pilot, Controller Trials Feedback Surveys in development (Supports Analysis and Metrics)
Federal AviationAdministration
FAATC DTAP Test Status
• DTAP non-Formal Release TEST opportunities• Able to test with Boeing air lab utilizing multiple flight deck configurations
1. Successful ground / ground and air/ground connectivity verification
2. Successful AFN logons
3. Successful CPDLC message exchanges
4. Identified instances of problematic DTAP areas, which are accounted for in the formal release
• Able to test with Airbus air lab utilizing multiple flight deck configurations1. Successful ground / ground and air/ground connectivity verification
2. Successful AFN logons
3. Not able to establish CPDLC communications, which is accounted for in the formal DTAP release
• DTAP Formal Release• Install and check out 8/20/2012
• Begin formal end to end functional tests 8/23/2012
• Utilize Boeing and Airbus avionics flight decks
• Utilize FAA Laboratory avionics
• To the extent possible, utilize DCIT aircraft
6
DCL Trials Test Timeline (updated: 8/10/2012)
pDTAPpDTAP
• pDTAP / HADDS in box test• pDTAP / HADDS via FNTB
Failover / Rev # test• pDTAP / HADDS / CSP Interface
via FNTB + bench Avionics• pDTAP (applicable reqs/VRTM)
testing with bench avionics• pDTAP testing via Boeing +
Airbus air labs• PTR fixes / regression• Test Cases document final• pDTAP Quick Look Report
Thal
es in
stal
l & c
heck
out
Sept 17
Controller OT&E (35)
Dry
run
&
prep
Conduct
SAT @ MEMSAT @ MEM
Nov 12
Training
DTAP 1&2
DTAP 1&2
Tech Center DTAP E-E Functional Testing (DTAP 1)
Tech Center DTAP E-E Functional Testing (DTAP 1)
DTAP 1&2 setup/prepDTAP 1&2 setup/prep
Dry & PrepDry & Prep
ConductConduct
• Controller OT Prep / Dry run & Conduct
• System test case / bench avionics + TC aircraft
• System test case / Boeing air lab• System test case / Airbus air lab• System test case / DCIT aircraft• Error conditions / failover• PTR fixes / regression• 8/23/1012: Security Assessment• Regression with B2 (in lab)• DTAP Test Report
• Install & checkout• Training• SAT sub_test cases final• SAT sub_test cases functional
testing/ FedEx aircraft• E-E Operational scenarios based
on DCIT v1.0 doc / FedEx aircraft• Error conditions / failover in field
env.• Regression with B3 (in lab & in
field)• SAT Test Report
May 10(B1)Aug 17 Aug 22 Sept 7 Sept 14
DCL & AFN attempt with DCIT aircraft pre-arranged event (Aug 28, 29 & 30)
AFN and CPDLC connect with Boeing event (July 31, Aug 3, 7, 11)
Video crew @ Tech Center event (Sept. 13)
(B2)Sept 3
(B3)Oct 1
(B4)Nov 30
(B1) = CAF, UM73, CHI, AFN (B2) = Adds UM79, AOC CC (no ack) (B3) = Adds UM80, AOC CC ACK (B4) = Adds UM83, FDIO (possibly in B3)
AFN and CPDLC connect with Airbus event (Aug 6-8)
Controllers early look & feel (Aug. 29)
Oct 29
Federal AviationAdministration
Questions ?
KMEM