+ All Categories
Home > Documents > Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Date post: 18-Jan-2018
Category:
Upload: lizbeth-sherman
View: 216 times
Download: 0 times
Share this document with a friend
Description:
Feedback from the LAMAS WG  Content of the future LFS (Income, Health/disability, Eight yearly modules)  Measurement of employment/unemployment (model questionnaire; lay-offs)  Flows data  Household sub-sampling  Standardised variables  Monthly unemployment  New issues to be discussed in December 2015 LAMAS (Feasibility studies; Proxy interviews; Roadmap for the discussion of the IESS regulation) 3 3
13
Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015
Transcript
Page 1: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from Working Group meetings

Agenda point 8

DSS Meeting15-17 September 2015

Page 2: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the LAMAS Working Group

2

Page 3: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the LAMAS WG Content of the future LFS (Income, Health/disability, Eight

yearly modules) Measurement of employment/unemployment

(model questionnaire; lay-offs) Flows data Household sub-sampling Standardised variables Monthly unemployment New issues to be discussed in December

2015 LAMAS (Feasibility studies; Proxy interviews; Roadmap for the discussion of the IESS regulation)

33

Page 4: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the ILC (Income and Living

Conditions) Working Group

4

Page 5: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the ILC working group Progress in the SILC content

core and periodic components, variables for detailed topics Module 2017 as test (regulation + ESSC agreement) Next TF in October

Timeliness High expectations Two strands

Improved delivery Estimations techniques

Regional precision New policy context post 2020 Including AROPE in fund allocations Need for data about 2018 and then yearly

Consultation over the summer on several aspects

55

Page 6: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the Population and Housing Census Working Group

6

Page 7: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the Population and Housing Census Working Group

Discussion about 2021 census round (already under point 5)

Census Hub 2011 revisions, data retention usage NSIs asked for more information about the validation procedures used in other

Member States.

77

Page 8: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the Population Group

8

Page 9: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the POPULATION WG Data Collection requirements of reg. 1260/2013 & 862/2007

New data collection workflow (not earlier than Dec 2016) Csv Provision for remote validation by countries and automatic rejection

(based on commonly agreed rules) MSs will be informed in advance.

Should land area data be provided with demography data? Options of status quo and new automated methodology based on

satellite photos discussed (with spatial stat unit). Consultation of the countries (mixed responses) forwarded to spatial stat

unit for their WG consideration.

99

Page 10: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the Education and Training

Statistics Working Group

10

Page 11: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the ETS WG

Modernisation: IESS and future AES, standardisation of core variables

Learning mobility: results of the 2014 pilot data collection (ESS agreement) for IVET & Youth in general

Implementation of ISCED 2011 in 2014 data collection (especially LFS, for EU2020 indicators)

Education expenditure: improvement of data quality & develpment of links with national accounts

1111

Page 12: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the Social Protection

Statistics Working Group

12

Page 13: Feedback from Working Group meetings Agenda point 8 DSS Meeting 15-17 September 2015.

Feedback from the ESSPROS WG

(already reported at DSS meeting in February 2015)

Top priorities:1. Methodological review of the existing ESSPROS system2. Links between ESSPROS and NA

Other developments:1. Number of beneficiaries (beyond pension beneficiaries, already

collected)2. Module on net benefits

Public Health WG: 26-27 November 2015Accidents at Work WG: postponed to 2016

1313


Recommended