27
Fees & Charges Schedule 1 July 2014 – 30 June 2015 TABLE OF CONTENTS Aerodrome (Scone) ................................................. 1 Air Handling Systems ...............................................1 Art Show (Merriwa) ..................................................1 Building – Other .......................................................1 Business Papers ......................................................1 Camping Grounds ....................................................1 Caravan Park (Merriwa) ...........................................1 Cemeteries ...............................................................2 Certificates ...............................................................2 Childcare Services ...................................................3 Circus .......................................................................4 Community Bus (Merriwa) .......................................4 Community Plan ........................................................4 Community Profile ....................................................4 Companion Animals .................................................4 CTC@Murrurundi .....................................................5 Development Applications .......................................6 Government Information (Public Access) ..............10 Hall Hire .................................................................10 Horse Boxes ...........................................................12 Horse Sales ............................................................13 Hostel .....................................................................13 Impounded Articles ................................................13 Impounded Stock ...................................................13 Independent Living Units .......................................13 Inspection, License & Registration ........................14 Labour Hire Rates ................................................. 14 Laminating ............................................................. 14 Library Services ..................................................... 14 Local Environment Plan ........................................ 15 Photocopying & Printing ........................................ 15 Plan Printing .......................................................... 16 Plant Hire Rates .................................................... 16 Private Works ........................................................ 17 Rates Enquiries ..................................................... 17 Resource Centre (Merriwa) ................................... 17 Roads & Streets .................................................... 18 Road Materials ...................................................... 18 Rural Addressing ................................................... 19 Saleyards .............................................................. 19 Sewerage .............................................................. 19 Sewerage Plans .................................................... 20 Sporting Fields ...................................................... 20 Swimming Pool Act ............................................... 22 Swimming Pool Entrance Fees ............................. 22 Tender Documents ................................................ 23 Traffic Control Device Hire .................................... 23 Waste Disposal ..................................................... 23 Waste Management – Tipping Fees ..................... 23 Water Supply ......................................................... 25 Youth Services ...................................................... 25 UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 243
Transcript
Page 1: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

Fees & Charges Schedule

1 July 2014 – 30 June 2015

TABLE OF CONTENTS

Aerodrome (Scone) ................................................. 1

Air Handling Systems ............................................... 1

Art Show (Merriwa) .................................................. 1

Building – Other ....................................................... 1

Business Papers ...................................................... 1

Camping Grounds .................................................... 1

Caravan Park (Merriwa) ........................................... 1

Cemeteries ............................................................... 2

Certificates ............................................................... 2

Childcare Services ................................................... 3

Circus ....................................................................... 4

Community Bus (Merriwa) ....................................... 4

Community Plan ........................................................ 4

Community Profile .................................................... 4

Companion Animals ................................................. 4

CTC@Murrurundi ..................................................... 5

Development Applications ....................................... 6

Government Information (Public Access) .............. 10

Hall Hire ................................................................. 10

Horse Boxes ........................................................... 12

Horse Sales ............................................................ 13

Hostel ..................................................................... 13

Impounded Articles ................................................ 13

Impounded Stock ................................................... 13

Independent Living Units ....................................... 13

Inspection, License & Registration ........................ 14

Labour Hire Rates ................................................. 14

Laminating ............................................................. 14

Library Services ..................................................... 14

Local Environment Plan ........................................ 15

Photocopying & Printing ........................................ 15

Plan Printing .......................................................... 16

Plant Hire Rates .................................................... 16

Private Works ........................................................ 17

Rates Enquiries ..................................................... 17

Resource Centre (Merriwa) ................................... 17

Roads & Streets .................................................... 18

Road Materials ...................................................... 18

Rural Addressing ................................................... 19

Saleyards .............................................................. 19

Sewerage .............................................................. 19

Sewerage Plans .................................................... 20

Sporting Fields ...................................................... 20

Swimming Pool Act ............................................... 22

Swimming Pool Entrance Fees ............................. 22

Tender Documents ................................................ 23

Traffic Control Device Hire .................................... 23

Waste Disposal ..................................................... 23

Waste Management – Tipping Fees ..................... 23

Water Supply ......................................................... 25

Youth Services ...................................................... 25

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 243

Page 2: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

The following details provide a statement of the types of fees proposed to be charged by Council andthe amount of such fee. This is in accordance with Section 404(1) of the Local Government Act1993. Also, included in the list of fees and charges is a fee type. The fee types are described asfollows:

Fee Type A This is a fee charged under relevant legislation. Council is unable to varythe amount of these fees. (s 610)

Fee Type B This is generally an indicative fee which is recommended by the LocalGovernment and Shires Association of NSW and Department of LocalGovernment. This is done to maintain as much as possible a comparativefee for all Councils. It relates particularly to the supply of property andzoning certificates. (s 609)

Fee Type C These fees are for hire of Council premises and facilities. They havegenerally been reviewed by Council officers to gain the current marketvalue for lease properties on the commercial market.

Fee Type D These are fees and charges generally for documents and minor servicesprovided by the Council. In most cases, the amount fixed represents aminimal fee and is designed to basically cover the cost of materials andother fixed costs in providing the information.

Fee Type E This fee sets out to try and recover full cost of goods and services provided.

Fees & Charges Pricing PolicyUpper Hunter Shire Council

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 244

Page 3: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

AERODROME (Scone)Aircraft - up to 10,000 kg

Landing fee - minimum, per occasion 15.60 16.00 0.40 2.56% E YLanding fee - per tonne 15.60 16.00 0.40 2.56% E Y

Aircraft - over 10,000 kgLanding fee - minimum, per occasion 18.50 19.00 0.50 2.70% E YLanding fee - per tonne 18.50 19.00 0.50 2.70% E Y

Helicopters per landing 5.50 6.00 0.50 9.09% E YScone based commercial aircraft - per aircraft/per annum 1,190.00 1,232.00 42.00 3.53% E YScone based recreational aircraft - per aircraft/per annum 630.00 660.00 30.00 4.76% E YPCN advice and inspection following pavement concession landing 110.00 115.00 5.00 4.55% E YUltra light 0.00 0.00 0.00 0.00% E YFee exemptions or reductions:

- Scone based (commercial) aircraft Pays Air Service Warbirds (maximum of 2) 405.00 450.00 45.00 11.11% E Y

Parachuting operations - landing fees Per 1000kgs MTOW 15.10 15.50 0.40 2.65% E YPer parachutist (including instructors) 10.00 10.00 0.00 0.00% E Y

Exempt from chargesCareflight, Child Flight, Angel Flight, Air Ambulance, Westpace Helicopter 0.00 0.00 0.00 0.00% E YAircraft associated with s44 bushfires in local area 0.00 0.00 0.00 0.00% E Y

AIR HANDLING SYSTEMSInspection/registration of premises with water cooling towers and other types of 125.00 130.00 5.00 4.00% E Nregulated air handling systems capable of harbouring Legionella bacteria,per system plus $38.00 per additional system

ART SHOW (Merriwa)Entry fee - Paintings 15.00 16.00 1.00 6.67% E YEntry fee - Photographs 7.00 8.00 1.00 14.29% E Y

BUILDING - OTHERSearch of building returns - per hour 70.00 75.00 5.00 7.14% E NStamping of additional plans and specifications - each additional copy 10.00 10.00 0.00 0.00% D N (up to maximum 4 copies)

Drainage inspections - excl those associated with a Council approved Construction 125.00 130.00 5.00 4.00% E NCertificate

BUSINESS PAPERSAgenda papers - per month - hard copy N/A N/A N/A N/A D NAgenda papers - per annum - hard copy N/A N/A N/A N/A D NMinutes - per month - hard copy N/A N/A N/A N/A D NMinutes - per annum - hard copy N/A N/A N/A N/A D N

CAMPING GROUNDSMoonan Flat Camping GroundDaily (per person without power) 8.00 10.00 2.00 25.00% E Y

(per person with power) 10.00 12.00 2.00 20.00% E YWeekly (per site without power) 72.00 75.00 3.00 4.17% E Y

(per site with power) 85.00 85.00 0.00 0.00% E YStewarts Brook Recreation ReserveDaily (per site without power) 8.00 10.00 2.00 25.00% E YWeekly (per site without power) 48.00 50.00 2.00 4.17% E YWhite Park - see White Park section

CARAVAN PARK (Merriwa)Powered sites - per day (Children under 14 free)

1 or 2 persons, over 14 years 28.00 30.00 2.00 7.14% E YExtra person 8.00 8.00 0.00 0.00% E Y

Non-powered sites - per day (Children under 14 free)

1 or 2 persons, over 14 years 22.00 24.00 2.00 9.09% E Y

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 1

Page 4: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Extra person 8.00 8.00 0.00 0.00% E YCabin - per day (Children under 12 free)

1 or 2 persons, over 14 years 68.00 70.00 2.00 2.94% E YExtra person 8.00 10.00 2.00 25.00% E Y

Bulk booking of parkFlat fee 245.00 250.00 5.00 2.04% E YPer person 8.00 8.00 0.00 0.00% E YSecurity 115.00 120.00 5.00 4.35% E Y

Refundable Key Deposit 16.00 18.00 2.00 12.50% E NWashing Machine Hire 1.00 1.00 0.00 0.00% E Y

CEMETERIESInterment/Pre-purchase Permit for Burial/Reservation 200.00 225.00 25.00 12.50% B NPlaque Purchase At cost At cost E YPlaque handling and placement 200.00 250.00 50.00 25.00% E Y

Permission to erect headstone/masonry work 75.00 80.00 5.00 6.67% E YTransfer right of burial 0.00 50.00 50.00 100.00% E Y

ColumbariumPurchase or pre-purchase of Niche 170.00 300.00 130.00 76.47% E YVase 78.00 85.00 7.00 8.97% E YAshes interment and tree planting 775.00 800.00 25.00 3.23% E Y

General Cemetery

Purchase or pre-purchase of 2.4 x 1.2m plot 300.00 500.00 200.00 66.67% E YInterment - when requested for Council to complete - in any cemetery E Y

Single depth 500.00 525.00 25.00 5.00% E YDouble depth 600.00 625.00 25.00 4.17% E Y

Re-opening second interment 300.00 310.00 10.00 3.33% E Y

Perpetual maintenance - Merriwa area only Not available Not available E YAshes - interment in existing plot At cost At cost E Y

Lawn cemetery

Purchase or pre-purchase of single depth - 2.4 x 1.2 plot - includes perpetual maintenance 950.00 1,100.00 150.00 15.79% E Y

Purchase or pre-purchase of double depth - 2.4 x 1.2 plot - includes perpetual maintenance 1,075.00 1,200.00 125.00 11.63% E YInterment - when requested for Council to complete - in any cemetery

Single depth 500.00 525.00 25.00 5.00% E YDouble depth 600.00 625.00 25.00 4.17% E Y

Re-opening second interment 300.00 310.00 10.00 3.33% E YCERTIFICATES

Building certificate (s149D) - (From 1/8/04)Residential - per dwelling unit 250.00 250.00 0.00 0.00% A NOther less than 200 m2 250.00 250.00 0.00 0.00% A N

200 - 2000 m2 250.00 250.00 0.00 0.00% A N(plus $0.50 per each additional m2) 0.50 0.50 0.00 0.00% A Nmore than 2000 m2 1,165.00 1,165.00 0.00 0.00% A N(plus $0.075 per each additional m2) 0.075 0.075 0.00 0.00% A N

Reinspection for building certificates 90.00 90.00 0.00 0.00% A NAdditional copies of building certificate ($13.00 pre copy) 13.00 13.00 0.00 0.00% A Npy p peach 53.00 53.00 0.00 0.00% A N

125.00 130.00 5.00 4.00% E Yp pinspections where works have been found 125.00 130.00 5.00 4.00% E Y

to be unsatisfactoryCertificate Section 121ZP(EPAA) 80.00 85.00 5.00 6.25% E NCertificate 735(a) (LGA) 80.00 85.00 5.00 6.25% E N

Construction certificate / Complying Development Certificate (approvals)

Value of development up to $10,000 170.00 175.00 5.00 2.94% E YExceeding $10,001 up to $1,000,000 170.00 175.00 5.00 2.94% E Y

Plus

an additional $2.00 for each $1,000 (or part of $1,000) of the estimated costs exceeding $10,000 E YExceeding $1,000,001 - quote to be confirmed by Director or Manager ES Quote Quote E Y

Compliance inspection certificate (Critical Point Inspections, ie. pre-commencement, internal drainage, footings/piers, slab/piers, frame, wet areas, external drainage, stormwater, occupation)

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 2

Page 5: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Plus

an additional $2.00 for each $1,000 (or part of $1,000) of the estimated costs exceeding $1,000,000

OR

Full cost recovery for service where referred to external party for determination. Full Cost Full Cost E Y

Occupation Certificate 110.00 115.00 5.00 4.55% E YConstruction/Occupation certificate - private certifier 36.00 36.00 0.00 0.00% A NAmended Construction Certificate

Modification to a Construction Certificate 110.00 115.00 5.00 4.55% E YResubmission of a Construction Certificate following previous refusal

50% of original fee

50% of original fee E Y

Amended Complying Development Certificate

Modification to a Complying Development certificate 110.00 110.00 0.00 0.00% E Y

Resubmission of a Complying Development Certificate following previous refusal

50% of original fee

50% of original fee E Y

Essential Services compliance certificate 28.00 30.00 2.00 7.14% E YExisting holdings search for building entitlement 55.00 60.00 5.00 9.09% E N

Planning certificates149 (2) certificate 53.00 53.00 0.00 0.00% A Ns149 (5) certificate 80.00 80.00 0.00 0.00% A NAdditional urgency fee, if certificate is required within 48 hours 80.00 85.00 5.00 6.25% E N

Rating certificate (s603, Local Government Act 1993) 70.00 70.00 0.00 0.00% A N

Additional urgency fee, if certificate is required within 48 hours 80.00 85.00 5.00 6.25% E N

Subdivision CertificatesBoundary Adjustment 130.00 135.00 5.00 3.85% E NConsolidation 130.00 135.00 5.00 3.85% E NSubdivision (2 lots) 130.00 135.00 5.00 3.85% E NSubdivision (3 lots) 240.00 250.00 10.00 4.17% E NSubdivision (4 lots) 360.00 370.00 10.00 2.78% E NSubdivision (5 lots) 460.00 470.00 10.00 2.17% E NSubdivision (6 lots or more) 580.00 600.00 20.00 3.45% E NCompliance Certificate - associated with follow up site inspection*

120.00 125.00 5.00 4.17% E Y

CHILDCARE SERVICESFamily Day CareParent administration levy - per child per hour 0.90 1.00 0.10 11.11% E NEducator administration levy - per Educator per week 9.00 9.30 0.30 3.33% E NFamily enrolment fee - new enrolments (Non Refundable) 40.00 41.50 1.50 3.75% E NAdditional new siblings N/A N/A N/A N/A E NAnnual re-enrolment Fee per family and Return to service within 6 months 20.00 21.00 1.00 5.00% E NPlaygroup fee - per child in attendance 3.00 3.00 0.00 0.00% E NProspective Educator Registration (Non Refundable) 300.00 350.00 50.00 16.67% E YRelief/Dual Educator Registration Fees (Non Refundable) 200.00 200.00 100.00% E Y

Record / Information Administration fee - per hour (calculated in 15 minute increments) 60.00 60.00 0.00 0.00% E Y(no charge under 15 minutes)

Educator RemunerationCare Security Payment Up to two weeks full feesStandard Core Hours (any care between 8am - 6pm Mon to Fri) $6.20 to $12.50 max per child per hourCasual Care $6.20 to $15.00 max per child per hourOut of Core Hours (before 8am / after 6pm Mon to Fri) $6.20 - $20.00 max per child per hourWeekend $6.20 - $22.50 max per child per hourPublic Holiday $6.20 - $25.00 max per child per hour

y p p ybe required. This will attract an additional fee of $120(this is based on the projected fee for a Compliance Certificate for 2010/11)

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 3

Page 6: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Meals $1.00 - $10.00 max per mealTravel $1.00 - $5.00 max per trip or as per applicable tax

office rates per kmLaundry $1.00 - $5.00 per rinse/washNappies / Wipes $0.20 - $1.00 per change

Early arrival / late collection penalty $0.30 - $3.00 max per minute (can be charged in increments of 15 min or part thereof)

Late payment penalty $5.00 - $20.00 max per child per dayIn Home Care (Educator hourly rate) $15.00 - $30.00 max per hour

Out Of School Hours serviceFamily Annual Enrolment Fee (Vacation Care) 35.00 37.50 2.50 7.14% E NFamily Annual Enrolment Fee (Out of School Care) 35.00 37.50 2.50 7.14% E NVacation Care (per day) 42.00 44.00 2.00 4.76% E N

Before School Care (per session booked) 16.00 17.50 1.50 9.38% E N

Before School Care (per session casual) 17.00 20.00 3.00 17.65% E N

After School Care (per session, booked) 19.00 21.00 2.00 10.53% E NAfter School Care (per session, casual) 20.00 25.00 5.00 25.00% E NLate fee (per 15 minutes after 6 pm) Vacation Care 11.00 15.00 4.00 36.36% E NLate fee (per 15 minutes after 6 pm) After School Care 11.00 15.00 4.00 36.36% E N

Long Day Care servicesEnrolment Fees (per family) 54.00 55.00 1.00 1.85% E NDaily Fees Nursery 76.00 80.00 4.00 5.26% E NDaily Fees Pre Kindy 73.50 77.50 4.00 5.44% E NDaily Fees Preschool 71.00 75.00 4.00 5.63% E N

CIRCUS (on Council owned land)

Large circus operations which may include exotic animals

Rent - up to 2 nights 465.00 480.00 15.00 3.23% E NRent - each subsequent night 210.00 215.00 5.00 2.38% E NTent fees - per night 65.00 67.00 2.00 3.08% E NRefundable Security Deposit 500.00 520.00 20.00 4.00% E N

Rent - up to 2 nights 265.00 275.00 10.00 3.77% E NRent - each subsequent night 110.00 114.00 4.00 3.64% E NRefundable Security Deposit 300.00 310.00 10.00 3.33% E N

COMMUNITY BUS (Merriwa)General users charge per km 1.60 1.60 0.00 0.00% C YDay Care/Senior Citizens (Around Merriwa town, return trip) 2.50 2.50 0.00 0.00% C YCleaning deposit (refundable) 100.00 100.00 0.00 0.00% C N

COMMUNITY PLANCopy available for purchase 30.00 30.00 0.00 0.00% D NCopy available in the Abn, Mdi, Mwa, Cassilis and Scn libraries for review 0.00 0.00 0.00 0.00% D N

COMMUNITY PROFILECopy available for purchase 30.00 30.00 0.00 0.00% D NCopy available in the Abn, Mdi, Mwa, Cassilis and Scn libraries for review 0.00 0.00 0.00 0.00% D N

COMPANION ANIMALSRegistration fee (s95 Companion Animals Act 1998)

Desexed 40.00 49.00 9.00 22.50% A NDesexed - owned by an eligible pensioner 15.00 19.00 4.00 26.67% A NNot desexed 150.00 182.00 32.00 21.33% A N

Not desexed - owned by an eligible pensioner 150.00 182.00 32.00 21.33% A N

Not desexed - kept by a recognised breeder 40.00 49.00 9.00 22.50% A N

p y yanimals such as dogs and horses etc.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 4

Page 7: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Assistance animals 0.00 0.00 0.00 0.00% A NGreyhounds, working dogs and other 0.00% A N

- refer to the Companion Animal Regulations

Dangerous dog enclosure Certificate of Compliance 100.00 150.00 50.00 50.00% A NMicrochip fee in advance for impounded animals

Per animal by Council staff 42.00 44.00 2.00 4.76% E YPer animal on special microchipping days 22.00 24.00 2.00 9.09% E YPer animal by Veterinarian POA POA E Y

Impounding feesRelease fee - first day or part thereof 52.00 54.00 2.00 3.85% E NSecond & subsequent release 52.00 54.00 2.00 3.85% E NRelease fee - each subsequent day or part thereof 22.00 24.00 2.00 9.09% E NTreating sick or injured animals Actual Actual N/A N/A E NSurrender of companion animal for disposal (delivered by owner) 58.00 60.00 2.00 3.45% E NSurrender of companion animal with litter under 6 months 48.00 50.00 2.00 4.17% E N

(Additional fees for pick up beyond 10 km radius from Aberdeen, Merriwa, Murrurundi or Scone based on time & km travelled) At cost At cost N/A N/A E N

Sale of companion animal - under six months 28.00 30.00 2.00 7.14% E Y

Sale of companion animal - other 35.00 35.00 0.00 0.00% E YTraps hire (refundable security deposit) 75.00 100.00 25.00 33.33% E N

CTC@MURRURUNDIAdvertising Front and back cover of The Links 70.00 75.00 5.00 7.14% E Y

Inside The Links 35.00 37.00 2.00 5.71% E YComputer access - Adult (per half hour) 3.00 3.20 0.20 6.67% D YComputer access - Adult (per hour) 5.00 5.25 0.25 5.00% D Y

Computer access - Children (per half hour) 2.50 2.60 0.10 4.00% D YComputer access - Children (per hour) 4.00 4.20 0.20 5.00% D YComputer access - Quick Jump (15 minutes) 2.50 2.60 0.10 4.00% D YComputer access - Student in School Holidays (2 hr block) 4.00 4.20 0.20 5.00% D Y

CD writer staff assisted (per hour) 40.00 42.00 2.00 5.00% D YOne-on-one tuition (per hour) 55.00 57.00 2.00 3.64% D Y

Black & white printing (see photocopying)Scanning - staff assisted (per page) 1.00 1.05 0.05 5.00% D YDisks & CDs CD-R 4.00 4.20 0.20 5.00% D YDisks & CDs CD-W 6.00 6.30 0.30 5.00% D YData Projector Per day 62.00 65.00 3.00 4.84% D YMinimum 3 hours 36.00 38.00 2.00 5.56% D YRefundable Security Deposit 100.00 100.00 0.00 0.00% D NDigital Camera Four hours hire 26.00 27.00 1.00 3.85% D YEight hours hire 50.00 52.00 2.00 4.00% D YRefundable Security Deposit 100.00 100.00 0.00 0.00% D NFacsimiles To send Australia first page (then $0.80 per page thereafter) 2.50 2.60 0.10 4.00% D YTo send overseas first page (then $0.80 per page thereafter) 6.00 6.20 0.20 3.33% D YTo receive (per page) 0.90 1.00 0.10 11.11% D YLaminating Business card size 2.00 2.10 0.10 5.00% D YA4 size 3.50 3.60 0.10 2.86% D YA3 size 5.00 5.20 0.20 4.00% D YFoils 3.50 3.60 0.10 2.86% D YPhotocopying A4 (RC) paper (per page) (B & W) 0.50 0.55 0.05 10.00% D Y

A4 (RC) paper dbl sided (per page) (B & W) 0.70 0.75 0.05 7.14% D YA4 own paper (per page) (B & W) 0.40 0.45 0.05 12.50% D Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 5

Page 8: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

A4 paper double sided (per page) (B & W) own paper 0.50 0.55 0.05 10.00% D YA4 (RC) paper (per page) (Colour) 1.20 1.25 0.05 4.17% D YA4 (RC) paper (per page) (Part Colour) 0.90 1.00 0.10 11.11% D YA4 (RC) paper double sided (part colour)(per page) 1.80 2.00 0.20 11.11% D YA3 (RC) paper double sided(B & W) (per page) 1.60 1.80 0.20 12.50% D YA3 (RC) paper double sided (colour)(per page) 2.30 2.50 0.20 8.70% C YA3 (RC) single sided (B&W)(per page) 1.00 1.10 0.10 10.00% D Y

A3 (RC) Single sided (Colour)(per page) 2.40 2.50 0.10 4.17% E YBulk photocopy over 50 sheets (per 50 pages)S/S 14.00 14.50 0.50 3.57% E YBulk photocopy over 50 sheets (per 50 pages) D/S 19.00 20.00 1.00 5.26% D YBulk photocopy over 50 sheets (per 50 pages) -Colour 50.00 55.00 5.00 10.00% D NBulk photocopy over 50 sheets (per 50 pages) -Colour D/S 70.00 75.00 5.00 7.14% D YTraining Room Hire (Room hire includes training facilities) Commercial (per hour) 40.00 42.00 2.00 5.00% D Y

Community groups (per hour) 15.00 15.00 0.00 0.00% D Y

- half day 23.00 24.00 1.00 4.35% D Y

- full day 34.00 36.00 2.00 5.88% D Y

Typing Per hour - customer to provide content & layout 40.00 42.00 2.00 5.00% D YWork involving layout and design (brochures etc)

Quotes provided

Quotes provided D Y

Printing

Colour Inkjet Printing A4 photo printing text only A4 0.90 1.00 0.10 11.11% D Y

text & graphics A4 3.50 4.00 0.50 14.29% D Y

Laminating - Own sheets A4 1.50 1.60 0.10 6.67% D YA3 2.50 2.70 0.20 8.00% D Y

Printing - Own Paper A4 B&W single sided 0.40 0.40 0.00 0.00% D YA4 B&W double sided 0.90 0.90 0.00 0.00% D YA4 double side colour 1.60 1.80 0.20 12.50% D YA4 colour single sided 1.10 1.20 0.10 9.09% D Y

DEVELOPMENT APPLICATIONS

Up to $5000 110.00 110.00 0.00 0.00% A N$5,000 - $ 50,000 170.00 170.00 0.00 0.00% A N

plusan additional $3 for each $1,000 (or part of $1,000) of the estimated cost.

$50,001 - $250,000 352.00 352.00 0.00 0.00% A N

plusan additional $3.64 for each $1,000 (or part of $1,000) of the estimated cost.

$ 250,001 - $ 500,000 1,160.00 1,160.00 0.00 0.00% A N

plus

an additional $2.34 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000.

$ 500,001 - $ 1,000,000 1,745.00 1,745.00 0.00 0.00% A N

plus

an additional $1.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000.

$ 1,000,001 - $ 10,000,000 2,615.00 2,615.00 0.00 0.00% A N

plus

an additional $1.44 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1m.

More than $ 10,000,000 15,875.00 15,875.00 0.00 0.00% A N

plus

an additional $1.19 for each $1,000 (or part of ($1,000) by which the estimated cost exceeds $10m.

a)Dep't Planning fee for DAs exceeding $50,000

(for development involving the erection of a building other than a dwelling house, the carrying out of work or the demolition of a work or a building)

P=0.64 x E - 5 / 1,000 where P represents the $ to be set aside, expressed in $ rounded down to the nearest $, and E represents the estimated cost of development expressed in $ rounded up to the nearest thousand.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 6

Page 9: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Erection of a dwelling house with an estimated value of $100,000 or less 455.00 455.00 0.00 0.00% A N

285.00 285.00 0.00 0.00% A NAdvertising signs (for 1 only) 285.00 285.00 0.00 0.00% A Nplus for each additional sign (if any) 93.00 93.00 0.00 0.00% A N

b)Subdivisions/Consolidations/Boundary Adjustment(for development involving the subdivision of land)New roads 665.00 665.00 0.00 0.00% A Nplus each additional lot 65.00 65.00 0.00 0.00% A NNo new roads 330.00 330.00 0.00 0.00% A Nplus each additional lot 53.00 53.00 0.00 0.00% A NStrata title 330.00 330.00 0.00 0.00% A Nplus each additional lot 65.00 65.00 0.00 0.00% A N

c) AdvertisingDevelopment Application advertising/notification fee 115.00 120.00 5.00 4.35% E NNotice fees - when required for the development:Advertised development 1,105.00 1,105.00 0.00 0.00% A NDesignated development 2,220.00 2,220.00 0.00 0.00% A NProhibited development 1,105.00 1,105.00 0.00 0.00% A N

830.00 1,105.00 275.00 33.13% A Nd) Designated Development

920.00 920.00 0.00 0.00% A N

e) Integrated DevelopmentAn additional fee per approval body 140.00 140.00 0.00 0.00% A N

320.00 320.00 0.00 0.00% A N

What if two or more fees are applicable to a single development application?

f)

Modification of a consent for local development or State significant developmentApplication under s96 (1) EP&A Act (maximum) 71.00 71.00 0.00 0.00% A N

645.00 645.00 0.00 0.00% A NApplication under s96 (2) or S96 AA (1) EP&A Act:If the original application fee was less than $100.00, 50% of that fee, or

190.00 190.00 0.00 0.00% A NIn all other cases:Up to $5000 55.00 55.00 0.00 0.00% A N$5001 - $ 250,000 85.00 85.00 0.00 0.00% A N

plusan additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost

$ 250,001 - $ 500,000 500.00 500.00 0.00 0.00% A N

plus

an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000.

$ 500,001 - $ 1,000,000 712.00 712.00 0.00 0.00% A N

plus

an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000.

$ 1,000,001 - $ 10,000,000 987.00 987.00 0.00 0.00% A N

plus

an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1m.

More than $ 10,000,000 4,737.00 4,737.00 0.00 0.00% A N

plus

an additional $0.27 for each $1,000 (or part of ($1,000) by which the estimated cost exceeds $10m

In addition to any other fees payable, a maximum fee of $920 is payable for designated development.

A further fee for the referral and provision of advice in respect to the general terms of approval to be granted by Council, per approval body.

Other, for example, not involving the erection of a building, the carrying out of work or the subdivision of land.

Despite the provisions of Fees for Development Applications there is a minimum fee of $555 for designated development.

In the case of a development application that involves the erection of a dwelling house of $100,000 or less

When an environmental planning instrument requires notice to be given (other than developments above). Council will refund so much of the fee paid.

pp ( ) ( )50% of original DA fee, which ever is the lesser.

If two or more fees are applicable to a single development application (such as to subdivide land and erect a building on one or more lots created by the subdivision), the maximum fee payable for the development is the sum of those fees.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 7

Page 10: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

f)(i) Request for a review of a determination under Section 82A(3) of the Act50% of DA

fee50% of DA

fee

190.00 190.00 0.00 0.00% A NIn all other cases:Up to $5000 55.00 55.00 0.00 0.00% A N$5001 - $ 250,000 85.00 85.00 0.00 0.00% A N

plusan additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost

$ 250,001 - $ 500,000 500.00 500.00 0.00 0.00% A N

plus

an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000.

$ 500,001 - $ 1,000,000 712.00 712.00 0.00 0.00% A N

plus

an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000.

$ 1,000,001 - $ 10,000,000 987.00 987.00 0.00 0.00% A N

plus

an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1m.

More than $ 10,000,000 4,737.00 4,737.00 0.00 0.00% A N

plus

an additional $0.27for each $1,000 (or part of ($1,000) by which the estimated cost exceeds $10m

f)(ii) Request for a review of a determination under Section 82B of the Act

If the estimated costs of the development is less than $100,000 55.00 55.00 0.00 0.00% A N

150.00 150.00 0.00 0.00% A NIf the estimated costs of the development is more than $1,000,000 250.00 250.00 0.00 0.00% A N

g)Exceptions to development standards (Clause 4.6 of UHLEP 2013)Referral to Department of Planning

(variation >10% of Council standard delegated authority) 160.00 140.00 (20.00) (12.50%) A Nplus Concurrence Fee (if required) 320.00 320.00 0.00 0.00% A N

h) Development ContributionsMerriwa

S94

Bushfire fighting facilities per additional lot 284.00 291.00 7.00 2.46% E NSocial & Community facilities per additional lot 370.00 380.00 10.00 2.70% E NPublic Open Space per additional lot 370.00 380.00 10.00 2.70% E N

Road Network Contribution per additional lot 2,215.00 2,273.00 58.00 2.62% E NS64 contributions per equivalent tenementWater (Cassilis) per additional lot 618.00 634.00 16.00 2.59% E NWater (Merriwa) per additional lot 3,090.00 3,170.00 80.00 2.59% E NSewerage (Merriwa) per additional lot 1,545.00 1,585.00 40.00 2.59% E N

Murrurundi

S94Bush Fire Fighting Services - Per dwelling/allotment Rural, Blandford, Murrurundi 412.00 423.00 11.00 2.67% E N

If the estimated costs of the development is $100,000 or more and less than or equal to $1,000,000

Development contributions for water and sewer are based on additional lots created with access to Council's water and sewerage systems.

Development contributions for water and sewer are based on additional lots created with access to Council's water and sewerage systems.

NB an additional amount of not more than $665 if notice of the application is required under s96 (2) of the Act. Council will refund so much of the additional amount as is not spent in giving the notice under s96 (2) of the Act.

NB an additional amount of not more than $620 if notice of the application is required under s96 (2) of the Act. Council will refund so much of the additional amount as is not spent in giving the notice under s96 (2) of the Act.

In the case of a development application that involves the erection of a dwelling house of $100,000 or less

In the case of a development that does not involve the erection of a building, the carrying out of a work or the demolition of a work or building, 50% of that fee, or

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 8

Page 11: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

258.00 265.00 7.00 2.71% E NPublic Open SpaceRural, Blandford, Murrurundi (Per dwelling/allotment) 824.00 845.00 21.00 2.55% E NRural, Blandford, Murrurundi 351.00 360.00 9.00 2.56% E NWaste DisposalPer dwelling/allotment Blandford, Murrurundi, Rural 66.00 68.00 2.00 3.03% E NS64 contributions per equivalent tenementWater - Murrurundi 3,090.00 3,170.00 80.00 2.59% E NSewerage - Murrurundi 1,545.00 1,585.00 40.00 2.59% E Ns94 Roads

Aberdeen & Scone

Residential subdivisionS64 contributions per equivalent tenementWater 6,747.00 6,922.00 175.00 2.59% E NHigh Level Reservoir - East Scone (above 230 AHD) 6,386.00 6,552.00 166.00 2.60% E NSewerage 1,504.00 1,543.00 39.00 2.59% E NS94Recreation and community facilities (within 20 km radius of Scone) 1,030.00 1,057.00 27.00 2.62% E NOpen space embellishment 206.00 211.00 5.00 2.43% E N(applies to subdivisions of 4 lots or more, if no open space is provided)Cycleway - applies to subdivision or additional residential units of 4 or more 577.00 592.00 15.00 2.60% E NCar Parking in lieu of the provision of off-street car parking rate determined by council E NS94A Levy Contributionsypercentage of the estimated cost of

0.00% 0.00% 0.00 0.00% E N

0.50% 0.50% 0.00 0.00% E N1.0% 1.0% 0.00 0.00% E N

Other fees and chargesFire safety inspection fee 155.00 160.00 5.00 3.23% E NObjection to application of Regulations and Local Policies (s82 LG Act) 285.00 290.00 5.00 1.75% E N

2,000.00 2,000.00 0.00 0.00% E N

5,000.00 5,000.00 0.00 0.00% E N

4,000.00 4,000.00 0.00 0.00% E N

3,000.00 3,000.00 0.00 0.00% E N

3,000.00 3,000.00 0.00 0.00% E N

Development consent list - per month 35.00 36.00 1.00 2.86% E YDevelopment consent list - per annum 175.00 180.00 5.00 2.86% E YBushfire Attack Level Risk Assessment Certificate 365.00 370.00 5.00 1.37% E YFlood Risk Certificate 55.00 57.00 2.00 3.64% E Y

The Director of Technical Services will undertake an assessment of the proposed road at the time of lodgement of the relevant application, calculate existing usage and maintenance costs over a six (6) year period, determine the appropriate standard (degree of upgrading) required to cater for new development and associated cost. The contribution will be apportioned between the cost normally attributed to Council given existing usage/maintenance program and that which results as a consequence of the development.

Development contributions for water & sewer are based on additional lots created with access to Council's systems. Developments in Satur & along Moobi and Alan Cunningham Rds are serviced by the Satur trunk water main & attract an additional contribution.

All development where the estimated cost of carrying out the development is greater than $100,000 and up to $200,000.

Per employee engaged in mining extractive industries (excluding coal mines), tourism and intensive agricultural enterprises.

p y g p gthan $200,000.

Rezoning Application/Planning Proposal - where the proposed minimum lot size would allow for up to 3 additional lots

Following gateway approval and lodgement of final documents for exhibition

g pp g p pproposal does not create the potential for subdivision and additional lots.

Rezoning Applications/Planning Proposal - where the proposed minimum lot size would allow for more than 3 additional lots

Initial Lodgement of Planning Proposal application

Council support and referral to Department of Planning (gateway)

All development where the proposed cost of carrying out the development is less than $100,000.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 9

Page 12: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Flood information 185.00 190.00 5.00 2.70% E Y88B Variation 125.00 130.00 5.00 4.00% E YHoarding Application (Type A) Maximum of 4 weeks 110.00 110.00 0.00 0.00% E Y

Renewal (every 4 weeks there after) 55.00 55.00 0.00 0.00% E YRetrieve Files from Hunter Records per file 20.00 20.00 0.00 0.00% E Y

Approvals under S68 LGAInstall manufactured home, moveable dwelling on land 320.00 325.00 5.00 1.56% E N

165.00 170.00 5.00 3.03% E N

220.00 225.00 5.00 2.27% E N

Onsite Sewer Management

220.00 225.00 5.00 2.27% E N

360.00 370.00 10.00 2.78% E N

Approval to operate - residential (annual) - refer to Revenue Policy 34.00 45.00 11.00 32.35% E NApproval to operate - Commercial (annual) - refer to Revenue Policy 34.00 45.00 11.00 32.35% E NInspection fee per system (Additional and reinspections) 48.00 50.00 2.00 4.17% E NInspection fee of primary system at request of owner/solicitor, etc 125.00 125.00 0.00 0.00% E N

Miscellaneous Approvals under Section 68 LGAUse community land 155.00 160.00 5.00 3.23% E NSwing hoist goods over road 250.00 260.00 10.00 4.00% E N

General approvals not mentioned above 200.00 210.00 10.00 5.00% E NInspections associated with approvals 125.00 130.00 5.00 4.00% E N

Approvals under Section 138 Roads ActIn conjunction with DA, CC or CDC lodged with Council 70.00 75.00 5.00 7.14% E NNot in conjunction with DA, CC, or CDC 175.00 180.00 5.00 2.86% E NInspections associated with approvals 125.00 130.00 5.00 4.00% E N

GOVERNMENT INFORMATION PRIVATE ACCESS (GIPA)Standard application - each 30.00 30.00 0.00 0.00% A NNon-standard application - per hour 30.00 30.00 0.00 0.00% A NSearch fee - per hour 30.00 30.00 0.00 0.00% A NInternal review 40.00 40.00 0.00 0.00% A N

HALL HIREAberdeen Community HallHire of building - casual user, per day 20.00 20.00 0.00 0.00% C Y

Hire of building - casual user, per half-day 10.00 10.00 0.00 0.00% C YHire of building - casual user, per night 20.00 20.00 0.00 0.00% C YHire of building - regular user, per day 15.00 15.00 0.00 0.00% C Y

Hire of building - regular user, per half-day 10.00 10.00 0.00 0.00% C YRefundable Security Deposit - casual user, no alcohol 25.00 25.00 0.00 0.00% E NRefundable Security Deposit - casual user, with alcohol 250.00 250.00 0.00 0.00% E N

Refundable Security Deposit - regular user n/a n/a E NCassilis Community CentreMain Hall (per day) 40.00 40.00 0.00 0.00% C YSupper room (per day) 35.00 35.00 0.00 0.00% C YHall & Supper Room (per day) 58.00 58.00 0.00 0.00% C YKitchen (no cutlery or crockery) (per day) 42.00 42.00 0.00 0.00% C YKitchen - Commercial Use (per day) 73.00 73.00 0.00 0.00% C YCutlery & Crockery 35.00 35.00 0.00 0.00% C YTables (each) 15.00 15.00 0.00 0.00% C YChairs (each) 5.00 5.00 0.00 0.00% C YRefundable Security Deposit - tables & chairs 270.00 270.00 0.00 0.00% C NRehearsals 10.00 10.00 0.00 0.00% C Y

Application to install, construct, modify a commercial onsite sewer management systems greater than 10 persons - includes preliminary inspection

Application to install, construct, modify onsite sewer management systems up to 10 persons - includes preliminary inspection

Sewerage and stormwater drainage work in conjunction with DA, CC or CDC lodged with Council plus an additional $25.00 for each closet proposal

Sewerage and stormwater drainage work not in conjunction with DA, CC or CDC lodgedwith Council plus an additional $25.00 for each closet proposal

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 10

Page 13: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Overnight Auction storage charges 60.00 60.00 0.00 0.00% C YRefundable Security Deposit - hall use 320.00 320.00 0.00 0.00% E N

Merriwa OfficeNot for profit organisations 0.00 0.00 0.00 0.00% C YChambers (per day) 72.00 100.00 28.00 38.89% C YChambers (per hour) 16.00 17.00 1.00 6.25% C YKitchen use (per hour) 10.00 11.00 1.00 10.00% C YScone OfficeNot for profit organisations 0.00 0.00 0.00 0.00% C YChambers (per hour) 17.00 18.00 1.00 5.88% C Y

Barry Rose Committee Room (per hour) 12.00 13.00 1.00 8.33% C YUse of video and/or teleconferencing facilities (first hour) 50.00 50.00 0.00 0.00% C Y

(each additional hour) 15.00 15.00 0.00 0.00% C YCommittee Room No.2 (per hour) 12.00 13.00 1.00 8.33% C YUse of video and/or teleconferencing facilities (first hour) 50.00 50.00 0.00 0.00% C Y

(each additional hour) 15.00 15.00 0.00 0.00% C YTraining Room (per hour) 25.00 26.00 1.00 4.00% C YKitchen use (per hour) 10.00 11.00 1.00 10.00% C YInterview Room No. 1 (per hour) 10.00 11.00 1.00 10.00% C Y

SNRC/Library(Old Admin Building - Scone)Exhibition RoomCommunity Groups (per hour) 12.00 12.00 0.00 0.00% C YFull Day 30.00 30.00 0.00 0.00% C YCancellation 12.00 12.00 0.00 0.00% C YGovt/Corp per day 65.00 65.00 0.00 0.00% C YRefundable Security Deposit 100.00 100.00 0.00 0.00% E NTenants 0.00 0.00 0.00 0.00% E NMeeting RoomsRoom Hire (per hour) 7.00 7.00 0.00 0.00% C Y1/2 day 15.00 15.00 0.00 0.00% C YFull Day 30.00 30.00 0.00 0.00% C YCancellation 7.00 7.00 0.00 0.00% C YTenants 0.00 0.00 0.00 0.00% E N

Merriwa School of ArtsMain Hall (per day) 78.00 80.00 2.00 2.56% C YMain Hall (1/2 day) - minimum charge 36.00 37.00 1.00 2.78% C YMain Hall (per hour) NA NA C YSupper room (per day) 40.00 41.00 1.00 2.50% C YHall & Supper Room (per day) 85.00 87.00 2.00 2.35% C YSmall Room at rear 25.00 26.00 1.00 4.00% C YKitchen (no cutlery or crockery) (per day) 83.00 85.00 2.00 2.41% C YKitchen - Commercial Use (no cutlery or crockery (per day) 105.00 110.00 5.00 4.76% C YCutlery & Crockery 40.00 40.00 0.00 0.00% C YTables (each) 15.00 15.00 0.00 0.00% C YChairs (each) 5.00 5.00 0.00 0.00% C YRefundable Security Deposit - tables & chairs 250.00 250.00 0.00 0.00% C NRehearsals 10.00 10.00 0.00 0.00% C YOvernight Auction storage charges 55.00 60.00 5.00 9.09% C YCancellation fee 55.00 55.00 0.00 0.00% E YRefundable Security Deposit - hall use 350.00 350.00 0.00 0.00% E N

Murrurundi RSL HallRetail Sales - per day 275.00 280.00 5.00 1.82% C YBalls, Markets, Birthdays, Dances, Shows, Weddings, Concerts - per day 135.00 140.00 5.00 3.70% C YExhibits, Fashion Parades, Displays, Classes (commercial) per day 70.00 70.00 0.00 0.00% C YUse by non-profit organisations - Shire based 0.00 0.00 0.00 0.00% C YSchool Functions including rehearsals 0.00 0.00 0.00 0.00% C YPre-School Kindergarten - per week 9.50 9.50 0.00 0.00% C Y

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 11

Page 14: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Refundable Security & Key Deposit - no alcohol 100.00 100.00 0.00 0.00% E NRefundable Security & Key Deposit - with alcohol 210.00 210.00 0.00 0.00% E NMinimum hourly rate 16.50 17.00 0.50 3.03% C Y

Old Court Theatre (Scone)Daily use 135.00 135.00 0.00 0.00% C YHalf day use 70.00 70.00 0.00 0.00% C YRefundable Security Deposit - hall use 200.00 200.00 0.00 0.00% E N

Senior Citizens Centre (Scone)Small meeting room - community groups, per hour 7.50 7.70 0.20 2.67% C YSmall meeting room - other organisations, per hour 10.00 10.50 0.50 5.00% C YLarge meeting room - community groups, per hour 9.50 9.75 0.25 2.63% C YLarge meeting room - other organisations, per hour 13.00 13.50 0.50 3.85% C YLarge entertainment area - community groups, per hour 10.50 10.75 0.25 2.38% C YLarge entertainment area - other organisations, per hour 18.00 19.00 1.00 5.56% C Y

Settlement Hall (20km south west of Merriwa)Party Hire 60.00 60.00 0.00 0.00% C YMeeting Hire 34.00 34.00 0.00 0.00% C YB & S Ball or Ute Muster 500.00 500.00 0.00 0.00% C YToy box Hire (per use) 34.00 34.00 0.00 0.00% C YRefundable Security Deposit -party hire 200.00 200.00 0.00 0.00% E NRefundable Security Deposit - B & S Ball or Ute Muster 500.00 500.00 0.00 0.00% E N

Refundable Cleaning Bond for meetings 30.00 30.00 0.00 0.00% E N

Scone Youth Club (Hall at rear) - Hall HireHire of building - casual user, per day 20.00 20.00 0.00 0.00% C Y

Hire of building - casual user, per half-day 10.00 10.00 0.00 0.00% C YHire of building - casual user, per night 17.00 17.00 0.00 0.00% C YHire of building - regular user, per day 15.00 15.00 0.00 0.00% C Y

Hire of building - regular user, per half-day 9.00 9.00 0.00 0.00% C YRefundable Security Deposit - casual user, no alcohol 30.00 30.00 0.00 0.00% E N

Refundable Security Deposit - regular user 15.00 15.00 0.00 0.00% E NLittle Rascals Playgroup, per session 0.00 0.00 0.00 0.00% C Y

Scone Youth Club (Kitchen/Meeting area in new Building)Hire of building - casual user, per day 0.00 30.00 30.00 100.00% C Y

Hire of building - casual user, per half-day 0.00 20.00 20.00 100.00% C YHire of building - casual user, per night 0.00 20.00 20.00 100.00% C YHire of building - regular user, per day 0.00 20.00 20.00 100.00% C Y

Hire of building - regular user, per half-day 0.00 10.00 10.00 100.00% C Y

HORSE BOXESPermanent hire - weekly-bedding not included 18.10 18.50 0.40 2.21% E Y

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

Condition of hire - incorporated bodies, sporting clubs or associations of any kind must provide their own public liability insurance ($10 million).

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 12

Page 15: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Store room hire - weekly-bedding not included 10.40 10.75 0.35 3.37% E YOvernight hire-bedding not included 12.40 13.00 0.60 4.84% E Y

Overnight hire - bedding included (reused up to 3 times) - must be cleaned before exit 22.80 24.00 1.20 5.26% E YClub/Committee hire - per day/night up to three days-bedding not included 8.80 9.20 0.40 4.55% E Y

Club/Committee hire - weekly over 3 days 24.80 30.00 5.20 20.97% E Y

NOTE:

Discounts for Club/Committee hire will only apply when bulk bookings and stall allocations are carried out by Club/Committee secretaries, etc.

Horse sales - per day/night 13.10 13.50 0.40 3.05% E Y

(additional commission is paid, see below)Bedding All users

Type and cost of material (ie rice husks/wood shavings) subject to availability. approximately $20 per bag of materials Cost + 10% Cost + 10% E YCleaning fee 41.50 43.00 1.50 3.61% E Y

HORSE SALES - commissionsHorse sales - commission calculated on gross of the sale value (excl GST), 1% + GST 1% + GST E Ythen GST is added to the base commission value

HOSTEL

Refundable Accomodation Deposits (RAD) (formerly Accommodation Bonds ) 144,000.00 200,000.00 56,000.00 38.89% E N

E NAnnual Retention amount Maximum set by Dept of Health & Aging 3,588.00 3,972.00 384.00 10.70% E NResidents Fees (set by the Department of Health & Ageing) Set by DHA Set by DHA E N

IMPOUNDED ARTICLES - eg cars, trolleys, signs etc.

Conveyance of impounded article to pound - labour and plant

Refer to Council's "labour & plant hire rates" Cost+10% Cost+10% N/A N/A E NStorage of an impounded articlePer item 36.00 37.00 1.00 2.78% E NNotice advising the owner of an impounded item 36.00 37.00 1.00 2.78% E N

133.00 135.00 2.00 1.50% E N

IMPOUNDED STOCKConveyance of impounded stock to pound orother approved site Cost+10% Cost+10% N/A N/A E N(See "labour hire rates" and "plant hire rates")Temporary facility hire Cost+10% Cost+10% N/A N/A E N

Stock vehicle equipment charge per hour 20.00 20.00 0.00 0.00% E NCharge for loss or trespassing of stock per incident Cost+10% Cost+10% N/A N/A E NNotice advising the owner of impounded stock 35.00 35.00 0.00 0.00% E N

Advertising of stock prior to sale, where necessary and when the owner not known. 135.00 135.00 0.00 0.00% E NSustenance and maintenanceSmall animal (sheep, goat, pig etc) - per head per day 35.00 40.00 5.00 14.29% E NLarge animal (horse, cow etc) - per head per day 45.00 50.00 5.00 11.11% E N

INDEPENDENT LIVING UNITSLiverpool Lodge, unit (per fortnight) 189.00 218.92 29.92 15.83% C NLiverpool Lodge, cottage (per fortnight) 197.00 218.92 21.92 11.13% C N

Daily Access Payments (DAP) -RAD times Maximum Daily Inerest Rate(MDIR) divided by 365 . Note MDIR fixed by Dept Health & ageing quarterly

Advertising of article/vehicle prior to sale, where necessary and when the owner not known.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 13

Page 16: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Bettington & Vennacher Sts (variable rate based on 25% of household income) Variable Variable C NLangley Street (variable rate based on 25% of household income) Variable Variable C N

INSPECTION, LICENCE and REGISTRATION FEESCaravan Parks (per site) Licence 7.00 8.00 1.00 14.29% E NPublic halls inspection n/a n/a

Combined inspection - Schools (ie places of public entertainment and food shop) 175.00 180.00 5.00 2.86% E N

40.00 42.00 2.00 5.00% E N

Health Premises

Annual Administration Fee - General (other than Food Shops) 65.00 67.00 2.00 3.08% E N - Skin Penetration Premises 65.00 67.00 2.00 3.08% E N - Food Shops - Charitable organisation food stalls 0.00 0.00 0.00 0.00% E N - Temporary Food Stall 65.00 67.00 2.00 3.08% E N - Minor food (P4) 85.00 87.00 2.00 2.35% E N - Major food (P1-3) 125.00 128.00 3.00 2.40% E N

Inspection Fees - General (other than Food Shops) 85.00 88.00 3.00 3.53% E N - Skin Penetration Premises 85.00 88.00 3.00 3.53% E N - Food Shops - Charitable organisations 0.00 0.00 0.00 0.00% E N - Temporary Food Stalls 85.00 88.00 3.00 3.53% E N - Minor food (P4) 115.00 120.00 5.00 4.35% E N - Major food (P1-3) 155.00 160.00 5.00 3.23% E N - Reinspection fee (after 2nd inspection if deemed necessary) 155.00 160.00 5.00 3.23% E N* as per Food Authority classificationWater carters licence 122.00 125.00 3.00 2.46% E NWater sampling - private (exclusive of water analysis costs) 122.00 125.00 3.00 2.46% E N

LABOUR HIRE RATES

Engineering assessment - senior engineer 165.00 171.60 6.60 4.00% E YEngineering assessment - assistant engineer 125.00 130.00 5.00 4.00% E YHealth and building assessment 137.00 142.50 5.50 4.01% E YPlant operator - Normal Time (7am - 4pm Mon-Fri) 44.00 45.75 1.75 3.98% E Y

Plant operator - Overtime (all other times) 67.50 70.25 2.75 4.07% E YRate and administrative enquiries 72.00 75.00 3.00 4.17% E YLabourer 39.25 41.00 1.75 4.46% E YOther labour is at cost plus an administrative overhead and GST.

LAMINATING (at Council Administration Buildings)Business card size 3.00 3.50 0.50 16.67% E YA4 size 4.00 4.50 0.50 12.50% E YA3 size 7.00 7.50 0.50 7.14% E Y

LIBRARY SERVICESBorrowersReciprocal Borrowers FREE FREENon Residential Borrowers (Refundable Deposit) 25.00 25.00 0.00 0.00% E NFax MachineSending - for the first page 2.50 2.50 0.00 0.00% E YSending - for each additional page 2.00 2.00 0.00 0.00% E Y

Footpath Trading Licence (charities exempt) annual fee per article incl chair, table, A frames, etc

Estimate per hour including on-costs. This information is provided to assist in determining costs where the services of a Council officer are involved.

General: includes Food shops, Mobile vending, Bed & Breakfast, Hairdressers, Barbers , Beauty Salons etcSkin Penetration Premises: includes Hairdressers, Tattooists, Barbers, Beauty Salons, Chemists etc who perform body piercing

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 14

Page 17: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Receiving - for the first page 2.00 2.00 0.00 0.00% E YReceiving - for each additional page 2.00 2.00 0.00 0.00% E YOverseas- sending & receiving 6.00 6.00 0.00 0.00% E YLaminatingSized Pouch 60mm x 95mm Per card 2.00 2.00 0.00 0.00% E YSized Pouch 216mm x 303mm Per A4 3.50 3.50 0.00 0.00% E YSized Pouch - 203mm x 426mm Per A3 5.00 5.00 0.00 0.00% E YLost and Damaged MaterialWhere information on the purchase cost is available, the replacementcost will be that price , plus a processing fee of 6.00 6.00 0.00 0.00% E NWhere purchase price is unavailable the cost shall be the default feefrom UHRL database, plus 6.00 6.00 0.00 0.00% E N

Borrowers Cards and Barcode Labels 2.50 2.50 0.00 0.00% E NAdult Non -Fiction 58.80 58.80 0.00 0.00% E NAdult Fiction 58.80 58.80 0.00 0.00% E NAdult Paper backs 32.00 32.00 0.00 0.00% E N

Large Print 53.10 53.10 0.00 0.00% E NHear - A - Books, per cassette 11.90 11.90 0.00 0.00% E NCassettes 17.00 17.00 0.00 0.00% E NCompact Discs 35.10 35.10 0.00 0.00% E NJunior Non-Fiction 37.15 37.15 0.00 0.00% E NYoung Adult and Junior Fiction 21.70 21.70 0.00 0.00% E NYoung Adult and Junior Paperbacks 16.00 16.00 0.00 0.00% E NEasies 32.00 32.00 0.00 0.00% E NMagazines 10.80 10.80 0.00 0.00% E NVideos 32.00 32.00 0.00 0.00% E NPosters 12.90 12.90 0.00 0.00% E NCD-ROM 37.15 37.15 0.00 0.00% E NDVD 40.25 40.25 0.00 0.00% E NILL Jackets 2.50 2.50 0.00 0.00% E NCD/DVD Cases 2.50 2.50 0.00 0.00% E N

Overdues

Per Item per day immediately it is overdue Per item per day n/a n/a N/A N/A E NProcessing Fee from second notice 4.00 4.00 0.00 0.00% E N

PhotocopyingB/W, per copy A4 0.50 0.55 0.05 10.00% E YColour, per copy A4, (At HQ only) 1.20 1.25 0.05 4.17% E YB/W, per copy A3 1.60 1.80 0.20 12.50% E YColour, per copy A3, (At HQ only) 3.00 2.50 (0.50) (16.67%) E Y

Public Access Computers - incl. Word ProcessingBooking Fee Per Hour 5.00 5.00 0.00 0.00% E Y

Per Half Hour 3.50 3.50 0.00 0.00% E YPer 15 minutes 2.50 2.50 0.00 0.00% E Y

Printing (Branch Charges) Per A4 Page of Text 0.50 0.50 0.00 0.00% E YPer A4 Page of

Graphics/pictures- Colour 1.20 1.20 0.00 0.00% E Y

Book ReservationsAll books held in the Upper Hunter Library Network to be reserved Per request 0.00 0.00 0.00 0.00% E YInter-Library Loan Requests Per request 6.00 6.00 0.00 0.00% E Y

Inter-Library Loan RequestsPensioners and School/ Uni Students, per request 3.00 3.00 0.00 0.00% E Y

ILRS Charges passed on when Library charged Per Request 16.80 16.80 0.00 0.00% E Y

LOCAL ENVIRONMENT PLANUpper Hunter LEP 2013 Document 0.00 35.00 35.00 100.00% E N

Upper Hunter LEP 2013 Maps (per sheet) 0.00 6.00 6.00 100.00% E NDevelopment control plans 30.00 35.00 5.00 16.67% E N

PHOTOCOPYING & PRINTING (ADMINISTRATION OFFICES)A4 size, B&W per copy single sided 0.75 0.80 0.05 6.67% D Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 15

Page 18: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

per copy double sided 0.90 1.00 0.10 11.11% D Yper 50 copies 17.00 18.00 1.00 5.88% D Yper 50 copies double sided 23.00 25.00 2.00 8.70% D Y

A4 size, Colour per copy single sided (text & graphics) 3.20 3.40 0.20 6.25% D Yper copy single sided (heavy graphics 8.40 8.75 0.35 4.17% D Yper 50 copies (text & graphics) 72.00 75.00 3.00 4.17% D Yper 50 copies (heavy graphics) 180.00 195.00 15.00 8.33% D Y

A3 size, B&W per copy single sided 0.90 0.95 0.05 5.56% D Yper copy double sided 1.20 1.30 0.10 8.33% D Yper 50 copies 23.00 25.00 2.00 8.70% D Yper 50 copies double sided 29.00 32.00 3.00 10.34% D Y

A3 size, Colour per copy single sided (text & graphics) 5.40 5.70 0.30 5.56% D Yper copy single sided (heavy graphics 14.00 15.00 1.00 7.14% D Yper 50 copies (text & graphics) 120.00 125.00 5.00 4.17% D Yper 50 copies (heavy graphics) 310.00 330.00 20.00 6.45% D Y

PLAN COPYING (Plotter)A2 size, B&W per copy 4.20 4.50 0.30 7.14% D YA1 size, B&W per copy 7.75 8.00 0.25 3.23% D YA0 size, B&W per copy 10.50 11.00 0.50 4.76% D Y

PLANT HIRE RATES

Per HourBackhoe 109.00 112.50 3.50 3.21% E YDozer 158.00 163.00 5.00 3.16% E YExcavator 142.00 146.50 4.50 3.17% E YGrader 142.00 146.50 4.50 3.17% E YKerb & Guttering Machine 93.00 96.00 3.00 3.23% E YLoader - rubber tyred 120.00 124.00 4.00 3.33% E YPrime Mover & Float per hour 103.00 106.50 3.50 3.40% E Y

per km both ways 2.07 2.14 0.07 3.38% E YRoller 111.00 114.50 3.50 3.15% E YSewer Viewer 71.00 73.50 2.50 3.52% E YSkid Steer Loader 82.00 84.50 2.50 3.05% E YTractor 70HP - bare 77.00 79.50 2.50 3.25% E YTractor 90HP - bare 93.00 96.00 3.00 3.23% E YSlasher 16.00 16.50 0.50 3.13% E YUtility per hour 49.00 50.50 1.50 3.06% E Y

per km both ways 0.67 0.69 0.02 2.99% E YTruck (2 tonne Crew Cab) per hour 51.00 52.50 1.50 2.94% E Y

per km both ways 0.83 0.86 0.03 3.61% E Y

Truck (3- 6 tonne Tippers and Crew Cabs) per hour 59.00 61.00 2.00 3.39% E Yper km both ways 0.83 0.86 0.03 3.61% E Y

Truck (6 - 9 tonne Tippers) per hour 59.00 61.00 2.00 3.39% E Yper km both ways 1.10 1.14 0.04 3.64% E Y

Truck (10 - 13 tonne Tippers) per hour 76.50 79.00 2.50 3.27% E Yper km both ways 1.24 1.28 0.04 3.23% E Y

Truck and Dog (25 tonne) per hour 90.50 93.50 3.00 3.31% E Yper km both ways 1.24 1.28 0.04 3.23% E Y

Water Snorter 63.00 65.00 2.00 3.17% E YWater Tanker 93.00 96.00 3.00 3.23% E YWorkshop Truck plus Mechanic 120.50 124.50 4.00 3.32% E YPlant Compliance Inspection 61.00 63.00 2.00 3.28% E YGrading Crew (already on site) - **Includes grader, roller and water cart 340.00 350.00 10.00 2.94% E Y

Tar Patching Truck (includes 2 operators) per hour 208.00 240.00 32.00 15.38% E Yper km both ways 1.24 1.30 0.06 4.84% E Y

Street sweeper 120.00 124.00 4.00 3.33% E YHire of Generator Refundable Security Deposit 220.00 227.00 7.00 3.18% E NHire of shower/toilet block Refundable Security Deposit 215.00 220.00 5.00 2.33% E NHire of Mobile Shower/Toilet block per event 205.00 210.00 5.00 2.44% E Y

Idle and travelling time are charged at the rate of hire. All plant is hired with an operator. These rates are for 'normal' time (7am - 4pm Mon - Fri). For hire outside these hours add $25 per hour for penalty rates. Rates are subject to variation.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 16

Page 19: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

PRIVATE WORKS

Commercial Rates

Commercial Rates N/A N/A E Y

RATE ENQUIRIESSearch fee - per hour 72.00 74.00 2.00 2.78% E YSearch fee - per hour (overtime) 100.00 102.00 2.00 2.00% E YSearch fee - minimum fee 35.00 36.00 1.00 2.86% E Y

Computer listing of assessments/ratepayers 122.00 125.00 3.00 2.46% D NSales register (valuers only) 62.00 63.00 1.00 1.61% D NMapInfo document thematically coloured maps, each 80.00 82.00 2.00 2.50% D Y

black and white maps, each 64.00 65.00 1.00 1.56% D Yin addition, a search fee applies 25.00 26.00 1.00 4.00% D Y

Exponaire Maps (Not owners) 0.00 5.00 5.00 100.00% D YCopy of rate notice 5.00 5.00 0.00 0.00% D NInstalment notice 5.00 5.00 0.00 0.00% D NWater account 5.00 5.00 0.00 0.00% D NSundry debtor invoice 5.00 5.00 0.00 0.00% D YValuation search (valuers only) 5.00 5.00 0.00 0.00% D YValuation listings (valuers only) 200.00 205.00 5.00 2.50% D N

Inspection of Notices of Sale (valuers only) 5.00 5.00 0.00 0.00% D NInterest on overdue rates and charges (including water usage charges) 9.0% 8.5% (0.50%) A NCourt attendance (staff) - see Labour Hire Rates Various Various N/A N/A E YLegal fees - as set out by Court House At Cost At Cost N/A N/A E Y

RESOURCE CENTRE (Merriwa)Computer access - Adult (per half hour) 3.00 3.20 0.20 6.67% D YComputer access - Adult (per hour) 5.00 5.25 0.25 5.00% D Y

Computer access - Children (per half hour) 2.50 2.60 0.10 4.00% D YComputer access - Children (per hour) 4.00 4.20 0.20 5.00% D YComputer access - Quick Jump (15 minutes) 2.50 2.60 0.10 4.00% D Y

Computer access - Child in School Holidays (2hr block) 4.00 4.20 0.20 5.00% D Y

CD writer staff assisted (per hour) 40.00 42.00 2.00 5.00% D YOne-on-one tuition (per hour) 55.00 57.00 2.00 3.64% D Y

Black & white printing (see photocopying)Scanning - staff assisted (per page) 1.00 1.05 0.05 5.00% D YDisks & CD's CD-R 4.00 4.20 0.20 5.00% D YDisks & CD's CD-W 6.00 6.30 0.30 5.00% D YData ProjectorPer day 62.00 65.00 3.00 4.84% D YMinimum 3 hours 36.00 38.00 2.00 5.56% D YRefundable Security Deposit 100.00 100.00 0.00 0.00% D NDigital Camera Four hours hire 26.00 27.00 1.00 3.85% D YEight hours hire 50.00 52.00 2.00 4.00% D YRefundable Security Deposit 100.00 100.00 0.00 0.00% D NFacsimilesTo send Australia first page (then $0.80 per page thereafter) 2.50 2.60 0.10 4.00% D YTo send overseas first page (then $0.80 per page thereafter) 6.00 6.20 0.20 3.33% D YTo receive (per page) 0.90 1.00 0.10 11.11% D YLaminatingBusiness card size 2.00 2.10 0.10 5.00% D YA4 size 3.50 3.60 0.10 2.86% D YA3 size 5.00 5.20 0.20 4.00% D YFoils 3.50 3.60 0.10 2.86% D YPhotocopyingA4 (RC) paper (per page) (B & W) 0.50 0.55 0.05 10.00% D Y

A4 (RC) paper dbl sided (per page) (B & W) 0.70 0.75 0.05 7.14% D YA4 own paper (per page) (B & W) 0.40 0.45 0.05 12.50% D YA4 paper double sided (per page) (B & W) own paper 0.50 0.55 0.05 10.00% D YA4 (RC) paper (per page) (Colour) 1.20 1.25 0.05 4.17% D YA4 (RC) paper (per page) (Part Colour) 0.90 1.00 0.10 11.11% D Y

Idle and travelling time are charged at the rate of hire. (Note, all plant is hired with an operator)

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 17

Page 20: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

A4 (RC) paper double sided (part colour)(per page) 1.80 2.00 0.20 11.11% D YA3 (RC) paper double sided(B & W) (per page) 1.60 1.80 0.20 12.50% D YA3 (RC) paper double sided (colour)(per page) 2.30 2.50 0.20 8.70% D YA3 (RC) single sided (B&W)(per page) 1.00 1.10 0.10 10.00% D Y

A3 (RC) Single sided (Colour)(per page) 2.40 2.50 0.10 4.17% D YBulk photocopy over 50 sheets (per 50 pages)S/S 14.00 14.50 0.50 3.57% D YBulk photocopy over 50 sheets (per 50 pages) D/S 19.00 20.00 1.00 5.26% D YBulk photocopy over 50 sheets (per 50 pages) -Colour 50.00 55.00 5.00 10.00% D YBulk photocopy over 50 sheets (per 50 pages) -Colour D/S 70.00 75.00 5.00 7.14% D YPrinting

Colour Inkjet Printing A4 photo printing text only A4 0.90 1.00 0.10 11.11% D Y

text & graphics A4 3.50 4.00 0.50 14.29% D Y

Laminating - Own sheets A4 1.50 1.60 0.10 6.67% D Y

A3 2.50 2.70 0.20 8.00% D Y

Printing - Own Paper A4 B&W single sided 0.40 0.40 0.00 0.00% D Y

A4 B&W double sided 0.90 0.90 0.00 0.00% D Y

A4 double side colour 1.60 1.80 0.20 12.50% D Y

A4 colour single sided 1.10 1.20 0.10 9.09% D YTraining Room Hire (Room hire includes training facilities)Commercial (per hour) 40.00 42.00 2.00 5.00% D YCommunity groups (per hour) 15.00 15.00 0.00 0.00% D Y - half day 23.00 24.00 1.00 4.35% D Y - full day 34.00 36.00 2.00 5.88% D YTypingPer hour - customer to provide content & layout 40.00 42.00 2.00 5.00% D YWork involving layout and design (brochures etc)

Quotes provided

Quotes provided D Y

ROADS & STREETSBore site - rent per annum 182.00 190.00 8.00 4.40% E NFootpath opening fee - Minimum 99.00 103.00 4.00 4.04% E N

Footpath/road opening fee - Restoration At cost At cost E N

Refundable Security Deposit - road opening 700.00 725.00 25.00 3.57% E NGravel road opening fee 210.00 220.00 10.00 4.76% E NSealed road opening fee - Minimum 365.00 380.00 15.00 4.11% E NGrids and gates - application fee, inspection and advertising 1,015.00 1,050.00 35.00 3.45% E N

Kerb, guttering and footpath - 47.5% of the cost of new work, s217 Roads Act, 1993

47.5% of cost

47.5% of cost E N

Inspection of levels for layback & driveway construction (minimum) 160.00 166.00 6.00 3.75% E NLocal facility sign - annual charge 60.00 62.00 2.00 3.33% E YLocal facility sign - initial charge 180.00 186.00 6.00 3.33% E Y

Permanent closure & transfer of land title Cost + 40% Cost + 40% E N

Advertising permanent closure (minimum charge, actual costs charged) 365.00 400.00 35.00 9.59% E N

Temporary Closure - advertising & signage Cost + 40% Cost + 40% E NTraffic Control Plans Cost + 40% Cost + 40% E YRoads repairs Cost + 40% Cost + 40% E YRoads Ancillary Install Kerb & Gutter Cost + 40% Cost + 40% E Y

Install Footpath Cost + 40% Cost + 40% E YSaw cutting Cost + 40% Cost + 40% E Y

Gutter Crossings/Pipe Entrances

Inspection fee when Council not contractor 200.00 210.00 10.00 5.00% E NReinspection fee 200.00 210.00 10.00 5.00% E N

ROAD MATERIALSBombo dust - (ex pit) per cubic metre 1m³ = 2 tonne 31.50 32.50 1.00 3.17% E Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 18

Page 21: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Bombo dust - (ex depot) per cubic metre 1m³ = 2 tonne 78.50 81.00 2.50 3.18% E Y

Gravel - (ex pit stockpile) per cubic metre 1m³ = 2 tonne 18.10 30.00 11.90 65.75% E YPremix - (ex bin) per cubic metre 1m³ = 2.4 tonne 672.10 692.50 20.40 3.04% E YRoad metal 7mm Aggregate - (ex bin) per cubic metre 1m³ = 2.2 tonne cost+20% cost+20% E YEmulsion - per litre (minimum 200L) 1.80 2.20 0.40 22.22% E YSubject to variation throughout the year due to variations in oil prices)

RURAL ADDRESSINGBacking plate Free Free N/A N/A E YIndividual numbers (each) Free Free N/A N/A E Y

Combined backing plate & up to 4 numbers Free Free N/A N/A E YPostage or delivery At cost At cost N/A N/A E Y

SALEYARDSYard dues Cattle 2.05 2.10 0.05 2.44% E Y

Stud Cattle 4.50 4.75 0.25 5.56% E Y

Weighing fees - all cattle sold live weight 1.20 1.30 0.10 8.33% E Y

Capital Works Loan repayment fee per head 2.00 2.00 0.00 0.00% E YEuropean Union (EU) scanning fee - fat 2.50 2.60 0.10 4.00% E Y

- store 1.25 1.30 0.05 4.00% E YNLIS scanning fee - fat 1.40 1.45 0.05 3.57% E Y

- pre sale 0.40 0.40 0.00 0.00% E Y- store - per unit 1.40 1.45 0.05 3.57% E Y

Issue of emergency NLIS tags (each) 22.50 23.50 1.00 4.44% E YHire of portable scanner - per head 1.40 1.50 0.10 7.14% E YAgent selling fees Cattle 1.40 1.40 0.00 0.00% E Y

Stud Cattle 2.20 2.30 0.10 4.55% E YOvernight Use of Saleyards Cattle per head 0.80 0.85 0.05 6.25% E YSpecial Weighings per head 1 to 99 4.10 4.20 0.10 2.44% E Y

per head 100+ 3.15 3.25 0.10 3.17% E Y

Other charges Use of yards for assessing schools per day 77.00 80.00 3.00 3.90% E YNew agents entry licence fee 6,960.00 7,200.00 240.00 3.45% E Y

Truck Wash per minute 0.45 0.75 0.30 66.67% E Yminimum charge 4.50 10.00 5.50 122.22% E YIssue of truck wash key 50.00 52.00 2.00 4.00% E Y

Signage (fence panels/buildings)Large 415.00 430.00 15.00 3.61% E YSmall 150.00 155.00 5.00 3.33% E Y

Dead beast removal Transport & waste disposal fees 325.00 335.00 10.00 3.08% E Y

Mulch and soil productsAccepted product from waste areas (per tonne eg mulch/straw) 0.00 30.00 30.00 100.00% E YSale of products (m3) 0.00 16.00 16.00 100.00% E YLoading fee - per 1/2 hour 0.00 40.00 40.00 100.00% E Y

SEWERAGE - Aberdeen, Murrurundi, Scone

Connection fee At private

works rateAt private

works rate N/A N/A E NSewerage inspection (per inspection) 135.00 140.00 5.00 3.70% E N

Sewer Junction or Sewer Mains Location Onsite Works including equipment

At private works rate

At private works rate N/A N/A E N

Septic waste disposal at Scone Sewerage Treatment Works (waste accepted from Upper Hunter Shire area only) first 3 kilolitres (minimum charge) 45.24 47.00 1.76 3.89% E N each kilolitre thereafter per load 11.00 12.50 1.50 13.64% E NDisposal of bulk effluent at Merriwa Treatment Works 215.70 222.50 6.80 3.15% E NRecycled sewerage effluent (kl) Refer Water Supply

Liquid Trade WasteApplication for discharge license (Catergory 1) 0.00 296.00 296.00 100.00% E NApplication for discharge license (Catergory 2 & 3) 0.00 702.00 702.00 100.00% E NRe-Inspection Fee 0.00 145.00 145.00 100.00% E N

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 19

Page 22: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Environmental audit inspection fee (where not compliant on reinspection 0.00 175.00 175.00 100.00% E NApplication for renewal of a lapsed agreement where there is not change in Approval Conditions 0.00 250.00 250.00 100.00% E NVariation to agreement 0.00 107.00 107.00 100.00% E NExcess Mass Charges for Category C Discharges (large volumes) per kgAluminium 0.00 0.62 0.62 100.00% E NAmmonia (asN) 0.00 1.80 1.80 100.00% E NArsenic 72.10 72.10 0.00 0.00% E NBarium 36.05 36.05 0.00 0.00% E NBiochemical Oxygen Demand (BOD) 72.10 72.10 0.00 0.00% E NBoron 72.10 72.10 0.00 0.00% E NBromine 14.15 14.15 0.00 0.00% E NCadmium 329.60 329.60 0.00 0.00% E NChloride No Charge No Charge 0.00 0.00% E NChlorinated Hydrocarbons 36.05 36.05 0.00 0.00% E NChlorinated Phenolics 0.00 1,243.55 1,243.55 100.00% E NChlorine 1.40 1.40 0.00 0.00% E NChromium 23.70 23.70 0.00 0.00% E NCobalt 14.25 14.25 0.00 0.00% E NCopper 14.25 14.25 0.00 0.00% E NCyanide 71.10 71.10 0.00 0.00% E NFluoride 3.50 3.50 0.00 0.00% E NFormaldehyde 1.40 1.40 0.00 0.00% E NOil & Grease (Total O and G) 1.20 1.20 0.00 0.00% E NHerbicides / Defoliants 715.80 715.80 0.00 0.00% E NIron 1.40 1.40 0.00 0.00% E NLead 36.05 36.05 0.00 0.00% E NLithium 7.00 7.00 0.00 0.00% E NManganese 7.00 7.00 0.00 0.00% E NMercepians 72.10 72.10 0.00 0.00% E NMercury 2,372.80 2,372.80 0.00 0.00% E N

Methylene Blue Active Substances (MBAS) 0.70 0.70 0.00 0.00% E NMolybdenum 0.70 0.70 0.00 0.00% E NNickel 23.70 23.70 0.00 0.00% E N

Nitrogen (as TKN - Total Kjeidahi Nitrogen) 0.20 0.20 0.00 0.00% E NOrgano arsenic Compounds 715.80 715.80 0.00 0.00% E N

Pesticides General (excludes organochlorins and organophosphates) 300.50 300.50 0.00 0.00% E N

Petroleum Hydrocarbons (non-flammable) 0.00 2.20 2.20 100.00% E NPhenolic Compounds (non-chlorinated) 7.00 7.00 0.00 0.00% E NPhosphorous (Total P) 1.40 1.40 0.00 0.00% E N

Polynuclear Aromatic Hydrocarbons (PAHs) 14.10 14.10 0.00 0.00% E NSelenium 50.45 50.45 0.00 0.00% E NSilver 2.00 2.00 0.00 0.00% E NSulphate (SO4) 0.10 0.10 0.00 0.00% E NSulphide 1.50 1.50 0.00 0.00% E NSulphite 1.50 1.50 0.00 0.00% E NSuspended Solids (SS) 0.90 0.90 0.00 0.00% E NThiosulphate 31.00 31.00 0.00 0.00% E NTin 7.00 7.00 0.00 0.00% E NTotal Dissolved Solids (TDS) 0.10 0.10 0.00 0.00% E NUranium 7.10 7.10 0.00 0.00% E NZinc 14.20 14.20 0.00 0.00% E N

SEWERAGE PLANSAlterations to plans 121.00 125.00 4.00 3.31% E NCopy of prepaid plan (Water/Drainage diagram) 48.00 49.50 1.50 3.13% D N

SPORTING FIELDS USER FEESIssue of keys to sporting bodies (2 sets) 31.00 35.00 4.00 12.90% E Y

Merriwa ShowgroundOther functions/sports where no gate charge (as per sports oval) 45.00 47.00 2.00 4.44% E Y

Where a user group is not listed below a fee is determined on a case by case basis.

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 20

Page 23: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Refundable Security Deposit 228.00 230.00 2.00 0.88% E N

Fees for lights / power usage (casual hire) 34.00 40.00 6.00 17.65% E Y

Merriwa Sports OvalDaytime hire minimum fee all sports (Casual hire) 45.00 47.00 2.00 4.44% E Y

Fees for lights / power usage (casual hire) 34.00 40.00 6.00 17.65% E YDaytime hire hourly fee fitness training (Casual hire) 16.00 17.00 1.00 6.25% E YRosedale Complex, MurrurundiRosedale ground users combined annual usage fee 1,160.00 1,200.00 40.00 3.45% E YRough riding or campdraft (arena/day) (for non-profit groups) 150.00 175.00 25.00 16.67% E Y

(for profit groups) 512.00 550.00 38.00 7.42% E Y

Ground User Fees for Clover Leaf Cruisers 543.00 570.00 27.00 4.97% E YRosedale Complex - Designated AreasWhole area (excluding campdraft & rodeo arenas) - per day 204.00 215.00 11.00 5.39% E YPer designated area - per day 150.00 160.00 10.00 6.67% E Y

White Park, SconeArena UseRough riding or campdraft (arena/day) (for non-profit groups) 172.00 175.00 3.00 1.74% E Y

(for profit groups) 501.50 550.00 48.50 9.67% E YDressage arena (per horse, per day or part thereof) 13.00 15.00 2.00 15.38% E YDesignated AreasWhole area (excluding campdraft & rodeo arenas) - per day 204.00 215.00 11.00 5.39% E YPer designated area, or part thereof (Attachment 2) - per day 150.00 160.00 10.00 6.67% E YHire of chutes (per event) 2,500.00 2,600.00 100.00 4.00% E Y

Horse Events Aberdeen Pony club 562.00 580.00 18.00 3.20% E YAberdeen Bushman's and Roughriders Association (Annual) 341.00 360.00 19.00 5.57% E YMerriwa Pony Club 562.00 580.00 18.00 3.20% E YMerriwa PAH & I Exhibition and Bushmen's Carnival (Annual) 341.00 360.00 19.00 5.57% E YMurrurundi Pony Club 562.00 580.00 18.00 3.20% E YScone Campdraft & Rodeo Association 341.00 380.00 39.00 11.44% E YScone Grammar Horse Sports 209.00 300.00 91.00 43.54% E YScone Pony Club 209.00 300.00 91.00 43.54% E YUpper Hunter Dressage Club Scone 1,023.00 1,060.00 37.00 3.62% E YUpper Hunter Team Penning 562.00 580.00 18.00 3.20% E YCamping - associated with horse shows etc -overnight, per powered site 11.50 15.00 3.50 30.43% E Y

Sports GroundsHire of Council ground for non sporting events eg family fun day 57.00 60.00 3.00 5.26% E YRefundable Bond for Carnivals etc 562.00 580.00 18.00 3.20% E NOther Sports Associated FeesAberdeen Golf Club Lease Lease N/A N/A E YAberdeen Junior Cricket 341.00 350.00 9.00 2.64% E YAberdeen Junior Rugby League 512.00 530.00 18.00 3.52% E YAberdeen Little Athletics 512.00 530.00 18.00 3.52% E YAberdeen Senior Rugby League 2,324.00 2,400.00 76.00 3.27% E YAberdeen Tennis Club 569.00 590.00 21.00 3.69% E YMerriwa Junior Rugby League 510.00 530.00 20.00 3.92% E YMerriwa Little Athletics 510.00 530.00 20.00 3.92% E YMerriwa Netball 341.00 360.00 19.00 5.57% E YMerriwa Senior Cricket 341.00 350.00 9.00 2.64% E YMerriwa Senior Rugby League 967.00 1,000.00 33.00 3.41% E YMerriwa Tennis 569.00 590.00 21.00 3.69% E YMerriwa Touch Football Association - combined comp 635.00 680.00 45.00 7.09% E YMurrurundi Senior Cricket 341.00 350.00 9.00 2.64% E YMurrurundi Senior Rugby League 967.00 1,000.00 33.00 3.41% E YMurrurundi Touch Football Association - Junior comp 524.00 540.00 16.00 3.05% E Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 21

Page 24: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Murrurundi Touch Football Association - Senior comp 2,675.00 2,750.00 75.00 2.80% E YScone Athletics Association 1,420.00 1,470.00 50.00 3.52% E YScone Basketball Association 794.00 820.00 26.00 3.27% E YScone Golf Club Lease Lease N/A N/A E YScone Junior Cricket 910.00 940.00 30.00 3.30% E YScone Junior Hockey 510.00 530.00 20.00 3.92% E YScone Junior Rugby League 998.00 1,050.00 52.00 5.21% E YScone Junior Soccer 1,824.00 1,879.00 55.00 3.02% E YScone Netball Association 1,704.00 1,800.00 96.00 5.63% E YScone Rugby Union (use of Scone Park amenities) 341.00 360.00 19.00 5.57% E YScone Senior Cricket (Upper Hunter) 1,500.00 1,560.00 60.00 4.00% E YScone Senior Hockey 1,250.00 1,300.00 50.00 4.00% E YScone Senior Rugby League 2,324.00 2,400.00 76.00 3.27% E YScone Soccer Club 2,725.00 2,810.00 85.00 3.12% E YScone Tennis Club 1,135.00 1,170.00 35.00 3.08% E YScone Touch Football Association - Junior comp 1,550.00 1,600.00 50.00 3.23% E YScone Touch Football Association - senior comp 5,285.00 5,500.00 215.00 4.07% E YAll schools within Shire - per annumAll schools < 250 students within Shire - per annum 300.00 320.00 20.00 6.67% E YAll schools > 250 and < 500 students within Shire - per annum 408.00 430.00 22.00 5.39% E YAll schools >500 students within Shire - per annum 570.00 600.00 30.00 5.26% E Y

Austag teams (all locations) Scone, Aberdeen, Merriwa and Murrurundi 200.00 200.00 100.00% E Y

SWIMMING POOL ACT Pool Posters 35.00 38.00 3.00 8.57% E YSwimming pool inspection fee 150.00 150.00 0.00 0.00% A YSwimming pool re-inspection fee 100.00 100.00 0.00 0.00% A Y

SWIMMING POOL ENTRANCE FEESMerriwaCarers for Learner to Swim Classes free freeCasual entry 3.50 3.70 0.20 5.71% E YSpectator 1.70 1.80 0.10 5.88% E YSchool sport 2.10 2.20 0.10 4.76% E YPensioner - per entrance 2.10 2.20 0.10 4.76% E YPensioner Pass - per season 65.00 70.00 5.00 7.69% E YAdult Pass - per season 118.00 125.00 7.00 5.93% E YFamily Pass - per season 235.00 250.00 15.00 6.38% E YChild Pass (2 - 16 yrs inclusive) - per season 87.00 90.00 3.00 3.45% E YPool hire (eg carnivals/special events) 120.00 130.00 10.00 8.33% E YMurrurundiCarers for Learner to Swim Classes free freeCasual entry 3.50 3.70 0.20 5.71% E YSpectator 1.70 1.80 0.10 5.88% E YSchool Sport 2.10 2.20 0.10 4.76% E YPensioner - per entrance 2.10 2.20 0.10 4.76% E YPensioner Pass - per season 65.00 70.00 5.00 7.69% E YAdult Pass - per season 118.00 125.00 7.00 5.93% E YFamily Pass - per season 195.00 220.00 25.00 12.82% E YChild Pass (2 - 16 yrs inclusive) - per season 87.00 90.00 3.00 3.45% E Y

* subject to variation on lease agreementSconeCarers for Learner to Swim Classes free freeCasual entry 3.50 3.70 0.20 5.71% E YSpectator - per entrance 1.70 1.80 0.10 5.88% E YSchool Sport 2.10 2.20 0.10 4.76% E YPensioner - per entrance 2.10 2.20 0.10 4.76% E YPensioner Pass - per season 65.00 70.00 5.00 7.69% E YSingle Pass - per season 118.00 125.00 7.00 5.93% E YFamily Pass - per season 235.00 250.00 15.00 6.38% E YChild Pass (2 - 16 yrs inclusive) - per season 87.00 90.00 3.00 3.45% E Y

* subject to variation on lease agreement

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 22

Page 25: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

TENDER DOCUMENTSCopies where value of tender less than $150,000;Electronic copy 0.00 0.00 0.00 0.00% E NHard copy 130.00 135.00 5.00 3.85% E NCopies where value of tender greater than $150,000;Electronic copy 0.00 0.00 0.00 0.00% E NHard copy 250.00 255.00 5.00 2.00% E N

TRAFFIC CONTROL DEVICE HIRERefundable Security Deposit 310.00 320.00 10.00 3.23% E NBarricades including legs (each) Per Event (Max 1 week) 0.00 10.00 10.00 100.00% E Y

Flashing lights including batteries (each) Per Event (Max 1 week) 27.00 30.00 3.00 11.11% E YSigns (each) Per Event (Max 1 week) 49.50 60.00 10.50 21.21% E Y

WASTE DISPOSALFor residents within collection district only including replacement bins:Mobile garbage bin (MGB) (Red or Yellow Lid) 116.00 120.00 4.00 3.45% E Y

WASTE MANAGEMENT - TIPPING FEES (UHSC LGA only) Waste from outside of LGA will not be acceptedClean fill - per tonne

Small Vehicles

A - Car/Station Wagon $6.50 $7.00 0.50 7.69% E YB - Van/Ute/Trailer (6x4, single axle) $32.50 $33.00 0.50 1.54% E YB1- Trailer - dual axle $55.75 $56.00 0.25 0.45% E YOpen Trucks

C - Single rear axle, two rear wheels (or four small rear) $154.00 $187.00 33.00 21.43% E YD - Single rear axle, with four normal size wheels $367.00 $442.00 75.00 20.44% E YE - Tandem rear axle (bogie drive) $564.00 $705.00 141.00 25.00% E YF - Twin steer with twin rear axles $675.00 $720.00 45.00 6.67% E YG - Tipping semi trailer $973.00 $1,174.00 201.00 20.66% E Y

Green Waste (Lawn clippings, tree prunings, straw)

Small Vehicles

A - Car/Station Wagon $6.80 $7.50 0.70 10.29% E YB - Van/Ute/Trailer (6x4, single axle) $20.60 $24.50 3.90 18.93% E YB1- Trailer - dual axle $25.75 $30.00 4.25 16.50% E YOpen Trucks

C - Single rear axle, two rear wheels (or four small rear) $78.60 $88.00 9.40 11.96% E YD - Single rear axle, with four normal size wheels $123.00 $140.00 17.00 13.82% E YE - Tandem rear axle (bogie drive) $311.50 $364.00 52.50 16.85% E YF - Twin steer with twin rear axles $449.00 $527.00 78.00 17.37% E YG - Tipping semi trailer $497.00 $578.00 81.00 16.30% E Y

Construction & Demolition - Minimum 1/2 load

Small Vehicles

A - Car/Station Wagon $6.80 $7.50 0.70 10.29% E YB - Van/Ute/Trailer (6x4, single axle) $27.85 $32.00 4.15 14.90% E YB1- Trailer - dual axle $36.00 $40.50 4.50 12.50% E YOpen Trucks C - Single rear axle, two rear wheels (or four small rear) $91.50 $106.00 14.50 15.85% E YD - Single rear axle, with four normal size wheels $237.50 $276.00 38.50 16.21% E YE - Tandem rear axle (bogie drive) $542.00 $640.00 98.00 18.08% E YF - Twin steer with twin rear axles $592.00 $697.00 105.00 17.74% E YG - Tipping semi trailer $1,112.00 $1,317.00 205.00 18.44% E Y

Small Vehicles

A - Car/Station Wagon $10.70 $11.50 0.80 7.48% E YB - Van/Ute/Trailer (6x4, single axle) $31.00 $35.00 4.00 12.90% E YB1- Trailer - dual axle $41.25 $46.00 4.75 11.52% E YMGB - per mobile garbage bin $10.70 $11.50 0.80 7.48% E Y

Mixed Waste/Compacted Commercial - Minimum 1/2 load - 20% discount if sorted on site

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 23

Page 26: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

Open Trucks

C - Single rear axle, two rear wheels (or four small rear) $107.50 $118.00 10.50 9.77% E YD - Single rear axle, with four normal size wheels $196.00 $216.00 20.00 10.20% E YE - Tandem rear axle (bogie drive) $544.00 $605.00 61.00 11.21% E YF - Twin steer with twin rear axles $805.00 $895.00 90.00 11.18% E YG - Tipping semi trailer $825.00 $918.00 93.00 11.27% E Y

Compacted WasteH - single steer with single rear axle $490.50 $538.00 47.50 9.68% E YI - single steer with tandem rear axle $1,124.00 $1,234.00 110.00 9.79% E YJ - twin steer with tandem rear axles $1,310.00 $1,444.00 134.00 10.23% E YK - Waste Transfer Truck $3,462.00 $3,804.00 342.00 9.88% E Y

AsbestosSmall Vehicles

A - Car/Station Wagon $36.80 $38.50 1.70 4.62% E YB - Van/Ute/Trailer (6x4, single axle) $80.00 $86.00 6.00 7.50% E YB1- Trailer - dual axle $115.00 $122.00 7.00 6.09% E YMGB - per mobile garbage bin $37.00 $39.00 2.00 5.41% E YOpen Trucks C - Single rear axle, two rear wheels (or four small rear) $374.00 $398.00 24.00 6.42% E YD - Single rear axle, with four normal size wheels $770.00 $828.00 58.00 7.53% E YE - Tandem rear axle (bogie drive) $1,328.00 $1,454.00 126.00 9.49% E YF - Twin steer with twin rear axles $1,818.00 $1,966.00 148.00 8.14% E YG - Tipping semi trailer $3,107.00 $3,382.00 275.00 8.85% E Y

(must meet Work Cover and EPA standards)

(waste not accepted if non properly wrapped and transported)

Penalty for not declaring and wrapping asbestos $222.50 $230.00 7.50 3.37% E YBuriel Fee (additional charge per load or per day $0.00 $215.00 215.00 100.00% E Y

Other WasteBattery 0.00 0.00 0.00 0.00% E YRecyclables sorted glass/plastic/metal containers 0.00 0.00 0.00 0.00% E Y

commercial loads / loads larger than 1 mgb 0.00 6.50 6.50 100.00% E YClean scrap metal 0.00 0.00 0.00 0.00% E YCar bodies 0.00 10.00 10.00 100.00% E YDead animals dog/cat 18.00 18.50 0.50 2.78% E Y

large dog/sheep/goat/pig 43.00 45.00 2.00 4.65% E Y

cattle/horse (Aberdeen Only) - requiring burial 195.00 205.00 10.00 5.13% E YRefrigerators/air conditioners 25.00 43.50 18.50 74.00% E Y

with degassing certificate 12.00 0.00 (12.00) (100.00%) E YTyres - no commercial disposals

car 10.50 11.00 0.50 4.76% E Ysmall truck / large 4WD 25.00 26.00 1.00 4.00% E Ytruck 50.00 52.00 2.00 4.00% E Y

tractor/loader

Not accepted

Not accepted

shredded (per m3)

Not accepted

Not accepted

Oil by volume free freeRural Tip Ticket 52 x 240 litre plus 1 trailer load 338.00 345.00 7.00 2.07% E Y

Sale of Items ( plus $50 hour loader fee if required)

Shredded Mulch (m3) 15.75 16.00 0.25 1.59% E Y

Straw (m3) 19.50 20.00 0.50 2.56% E Y

Skip bins

up to 2m3 70.00 72.00 2.00 2.86% E Y2m3 to 3m3 102.00 105.00 3.00 2.94% E Y3m3 to 4m3 136.00 140.00 4.00 2.94% E Y4m3 to 6m3 209.00 215.00 6.00 2.87% E Y6m3 to 8m3 282.50 290.00 7.50 2.65% E Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 24

Page 27: Fees & Charges Schedule 1 July 2014 – 30 June …...2013/14 2014/15 change ($) change (%) Fee GST $$ Type (Y/N) FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015 Description

2013/14 2014/15 change ($) change (%) Fee GST$ $ Type (Y/N)

FEES AND CHARGES SCHEDULE 1 July 2014 to 30 June 2015

Description of Fees and Charges

8m3 to 10m3 376.50 388.00 11.50 3.05% E Y10 m3 to 15m3 546.50 565.00 18.50 3.39% E Y15m3 to 20m3 736.00 760.00 24.00 3.26% E Y

WATER SUPPLYConnections 20mm including meter (standard) 958.00 986.00 28.00 2.92% E N

25 mm including meter 1,345.00 1,385.00 40.00 2.97% E N32 mm including meter 3,205.00 3,300.00 95.00 2.96% E N40 mm including meter 3,986.00 4,105.00 119.00 2.99% E N50 mm including meter 4,525.00 4,660.00 135.00 2.98% E N

Non standard connections

Private Work Rates

Private Work Rates N/A N/A E N

Road crossings required 4,875.00 5,000.00 125.00 2.56% E N

Reduction or increasing connection sizes

Private Work Rates

Private Work Rates N/A N/A E N

20mm water meter only 190.00 195.00 5.00 2.63% E NMeter testing (refundable if defective) 57.50 160.00 102.50 178.26% E NWater meter reading fee 57.20 66.00 8.80 15.38% E NRe-reading of meter (refundable if original reading error) 57.20 90.00 32.80 57.34% E N

Disconnection of meterPrivate Work

RatesPrivate Work

Rates N/A N/A E NReplacement of meter damaged by ratepayer

Private Work Rates

Private Work Rates NA NA E N

Water standpipe - Refundable key deposit 69.50 72.00 2.50 3.60% E NWater standpipe - water (per kilolitre) - (minimum charge $15) 2.28 2.45 0.17 7.46% E N

Effluent water standpipe - annual licence fee 0.00 63.00 63.00 100.00% E NEffluent water standpipe - effluent water (per kilolitre) 1.55 1.65 0.10 6.45% E NFire Flow test 159.60 280.00 120.40 75.44% E NRestrictor charge (includes both installation & removal) 105.60 110.00 4.40 4.17% E N

Water Mains Location Onsite works including equipment

Private Work Rates

Private Work Rates N/A N/A E N

Testing Max/Min Pressure supplied ( at property service line only) Onsite works including equipment

Private Work Rates

Private Work Rates N/A N/A E N

YOUTH SERVICES

Entry Fees - SconeAnnual membership 10.00 10.00 0.00 0.00% D YMembers - per session 1.00 1.00 0.00 0.00% D YNon-members - per session 4.00 2.00 (2.00) (50.00%) D YEntry Fees - MurrurundiAnnual membership 10.00 10.00 0.00 0.00% D YMembers - per session 1.00 1.00 0.00 0.00% D YEntry Fees - MerriwaAnnual membership 10.00 10.00 0.00 0.00% D YMembers - per session 1.00 1.00 0.00 0.00% D Y

UPPER HUNTER SHIRE COUNCIL | Delivery Program & Operational Plan 2014/15 - 2017/18 25