FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100816 VERTICAL
ROCKY SELMAN 940-229-1654 CLEARFrank Spann 806-777-3049
OPAL RESOURCES, LLC
0 11200
RIG UP
Martin TX 1
RIG UP & DRLG
08-15-10 06:00 8-31-10
140
8/7/2010 ROCKY SELMAN/TP 8 116.00
W/TRUCKER ON MOVEING RIG & RIG UP
N 32.5275 W -102.208
8-15-10
7-28-10 1000#
8/2/10 / 300 AM
8/1/10 /1.00 PM
8-16-2010
NO-NM OR ACC.
40.00 40.00 8 5/8 2028
0.00 0.00
H2O 10
NO F/S 210
6001800
1800600
11
12.012.0
TEAR DOWN & MOVE RIGRIG UP
24.0
24.0 24.0
24.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.6
16.6 G-105G-105
66 XH
XH
LP24272
3914
LP1132112122712
MP22956
4427
MP12970
4262
DW22233446178
DWIE2232446433
FROM PATRICIA,GO WEST ON 155 16MI., TURN RIGHT AT BLUE FBDC SIGN,GO .5 MI. TURN LEFT AND FOLLOW RDTO RIG, APPX .5 MI.
1167.0043.0043.00
THOMPSONOFF ROAD
1210.00
PASON 75
40
S/M-W/TRUCKER MOVEING RIG5 MIN- S.M W/ CREW= RIG UPDIESEL=19.5" 1,167.62 GALS
JOHN HANCOCK
BRIDLE LINE 8-UP & 8 DOWNSWIVEL HR.-0TON MILE -0 SILP & CUT 100' DRILL LINE
M-1000M-1000
1010
MAXIUMMAXIUM 24
0.000.000.000.00
US Pason 3.2.23
10
UNIVERSITY 6-14 # 6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100817 VERTICAL
SEC. 14, BLK. 6, SUR. UL
ROCKY SELMAN 940-229-1654 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 1 11200
DRLG
Gaines TX 2
DRLG
08-15-10 06:00 8-31-10
1
8-16-10 DUB CASTLEBERRY/FH 48.00
RIGGING UP & PPE
N 32.5276 W -102.209
8-17-108-17-10
NM-MOUSE HOLE COVER
660 640.00 77.5 8.0
70 75 65 70
0.00 0.00500 8.6 28
10
NO F/S 210 W/WELL
180019302100200230300330
19302100200230300330600
212227282
1.51.55.00.50.50.52.5
SAFETY INSPECT & AIR OUT PUMPS & HOOK UP FLOW LINESTRAP BHA & PICK UP BHADRILL F/40-300LUBRICATE RIGDRLG F/ 300-331REPAIR ROT- CHAINDRLG F/331-660
8.0
0.50.5
1.51.5
12.0
0.50.5
1.51.5
12.0
8.0
OTHER
DRILFORMANCE 311MM / 184 5X16 /2X15 81 12.25 DF513 40 620 80.000.000.00
4 1/2 16.60 G-105
LP24272121212
LP11321121212
MP22956
4427
MP12970121212
DW22233242424
DW12232242424
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
737.7660.000
230480 .5
.5
918.00249.00249.00
THOMPSONOFF ROAD
1167.00
40 660 D 2075
5 MIN- S.M W/ CREW=PICKING UP DCCK C.O.M=OKDIESEL=16.5 918.78 GALSNEAR MISS=MOUSE HOLE COVER
RONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEY
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-8TON MILE-21
3300.000.000.000.00
40 - 660 6 110 6 0
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100818 VERTICAL
SEC. 14, BLK. 6, SUR. UL
ROCKY SELMAN 940-229-1654 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 2 11200
DRLG
Gaines TX 3
DRLG
08-15-10 06:00 8-31-10
1
8-16-10 DUB CASTLEBERRY/FH 108.00
AIR HOIST#041-MIXING#027-PICKING UP DRILLPIPE#024
3 N 32.5275 W -102.209
8-18-108-18-10
NO NM OR ACC.
1397 737 50.828 14.5
75 77 72 75
0.00
0.00
1.0
0.00
0.00
1.0
500 9 33
F/W 10
NO F/S 210 W/WELL
0.00
0.00
60070073093010001200140014301600163018002000
70073093010001200140014301600163018002000600
210210337210332
1.00.52.00.52.02.00.51.50.51.52.010.0
ROT. F/660 T/779DEVIATION SURVEY @ 779 0 DEGREEROT. F/779 T/1057DEVIATION SURVEY @ 1057 3 DEGREEBACK REAM & L/D 10 JTS. TO 779WASH & REAM TO BOTTOM TO 1057LUBRICATE RIGROT. F/1057 T/1150DEVIATION SURVEY@ 1127 SURVEY DEPTHWASH & REAM @ 1150 & WOOBACK REAM & REAM 220 FTDRLG F/ 1150-1397
14.57.5
0.5
1.5
24.0
1.00.5
1.5
1.51.5
36.0
7.522.5
OTHER
DRILFORMANCEDRILFORMANCE
311MM / 184311MM / 184
5X16 /2X155X16 /2X15
12.5022.5
11 12.25
12.25 DF513DF513
4040
11101357
20.5030.500.000.00
4 1/24 1/2 16.60
16.60G 105 6 1/4 XH
G-105
LP24272122424
LP11321122424
MP2295624244451
MP12970243636
DW2223302424
DW12232244848
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
62
421397.29
555.6061.93
75.00022.0
779112710571127118912501322
2.52.52.52
330
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5929.00989.001238.00
THOMPSONOFF ROAD
6000.00
660
1151
1150
1397
D
D
15
5
110
120
SAFETY MTG:PICKING UP DRILL PIPEP/U:80,000 S/O:70,000 ROT:72,000COM. OKPU.77 SO.72 ROT.755 MIN- S.M W/ CREW=CONN-, AIR HOIST,MIXING,CLEANINGSPR #2 @ 67 SPM=205 PSIDIESEL=66 1/2" 5,929.12 GALS
JOHN HANCOCKJOHN HANCOCKJOHN HANCOCKRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105FULL CREWS
550460
RS1000M1000
1010
MAXIUMMAXIUM
0.000.000.000.00
660 - 11501151 - 1397
66 0
66
110110
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100819 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 3 11200
DRLG
Gaines TX 4
DRLG
08-15-10 06:00 8-31-10
2
8-16-10 DUB CASTLEBERRY/FH 108.00
washing & cleaning rig
N 32.5277 W -102.209
8-18-108-18-10
Nut and cotter pin off shackle in turnbuckle on kelly spinners
2301 904 45.2 20.0
75 77 72 75
0.00
0.00
2.0
0.00
0.00
2.0
500 9.1 32
F/W 10
NO F/S 210 W/WELL
0.00
0.00
600830103011001130130013301500153016001800
830103011001130130013301500153016001800600
28210210271022
2.52.00.50.51.50.51.50.50.52.012.0
ROT. F/1397 T/1502REPAIR RIG CIRC. WAIT ON ELECTRIANROT. F/1502 T/1522DEVIATION SURVEY @ 1499 2 DEGREEROT. F/1522 T/1615DEVIATION SURVEY @ 1592ROT. F/1615 T/1709RIG SERVICEDEVIATION SURVEY@ 1686 2 DEGROT. F/1709 T/1771DRLG F/ 1771-2301
20.0
0.52.0
1.5
24.0
1.52.5
3.0
1.51.5
60.0
7.542.5
OTHER
DRILFORMANCEDRILFORMANCE
311MM / 184311MM / 184
5X16 /2X155X16 /2X15
30.5042.50
11 12.25
12.25 DF513DF513
4040
17312261
61.0073.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 49 301 0
LP242720241014
LP113212448349
MP229560241199
MP1297024601130
DW2223324481339
DW1223224721325
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
161
422301.51
1491.0230.73
90.00042.0
149916861592177918721967
1.51.51
2.5022
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5014.85914.152152.15
THOMPSONOFF ROAD
1397
1771
1771
2301
D
D
10
12
120
118
SAFTEY MTG: POWER WASH RIGCOM. OKPU.92 SO.88 ROT.90 ROP. 445 MIN- S.M W/ CREW=CONN-,CLEANING,MIXINGCK C.O.M=OKSPR #1 @67 SPM=234DIESEL=57" 5014.85 GALS
RONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105FULL CREWS
445
RS1000M1000
1010
MAXIUMMAXIUM 0
24 24.000.000.000.00
234 671397 - 17711771 - 2301
66 110
66
1100
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100820 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 4 11200
DRLG
Gaines TX 5
DRLG
08-15-10 06:00 8-31-10
3
8-16-10 DUB CASTLEBERRY/FH 108.00
making connections, mixing chemicals &
N 32.5275 W -102.209
8-18-108-18-10
none
3328 1027 48.905 21.0
75 77 72 75
0.00
0.00
3.0
0.00
0.00
3.0
500 9.9 34
F/W 10
NO F/S 210 W/WELL
0.00
0.00
60063083090093010001230130015301600180018301900
63083090093010001230130015301600180018301900600
7282102102102252
0.52.00.50.50.52.50.52.50.52.00.50.511.0
LUBRICATE RIGROT. F/2301 T/2425REPAIR ROTARY CHAINROT. F/2425 T/2456DEVIATION SURVEY@ 2433 1 DEGROT. F/2456 T/2612DEVIATION SURVEY @ 2589 1/2 DEG.ROT. F/2612 T/2831DEVIATION SURVEY @ 2808 1 1/2 DEG.ROT. F/2831 T/2924DRLG F/ 2924-2955CONDITION MUD & CIRCULATEDRLG F/ 2955-3328
21.0
0.5
0.50.5
1.5
24.0
0.5
2.03.0
4.5
1.51.5
84.0
7.563.5
OTHER
DRILFORMANCE 311MM / 184 5X16 /2X15 5263.5
1 12.25 DF513 40 3288 125.0063.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 82 268 0
LP24272
241014
LP113212472373
MP229563271202
MP1297021811151
DW2223324721363
DW1223224961349
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
271
423328.84
2518.5330.55
100.00063.0
243328082589294230573181
1.51.5.5
.501.501
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4063.98950.873103.02
THOMPSONOFF ROAD
2301
2924
2924
3328
D
D
28
15
110
110
SAFETY MTG: MAKING CONN.P/U:95,000 S/O:92,000 ROT.95,000COM, OKPU.103 SO.97 ROT.100 ROP.355 MIN- S.M W/ CREW=CONN,AIR HOIST,MIXINGSPR #2 @ 68 SPM=230 PSI (@ 3142)DIESEL=48" =4,063.98 GALS
JOHN HANCOCKJOHN HANCOCKJOHN HANCOCKRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105Short one driller - on medical leave
720RS1000M1000
1010
MAXIUMMAXIUM 3
21 45.003.000.000.00
234230
67682924 - 3328 6 115 6 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100821 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 5 11200
T.I.H W/new bit
Gaines TX 6
DRLG
08-15-10 06:00 8-31-10
4
8-16-10 DUB CASTLEBERRY/FH 111.00
Tripping pipe
N 32.5275 W -102.209
8-18-108-18-10
1 acc/2 near misses
3516 188 28.923 6.5
75 77 72 75
0.00
0.00
4.0
0.00
0.00
4.0
1800 10 34
F/W 10
NO F/S 210 W/WELL
0.00
0.00
6001230130013301500173018001900193020302100213022002230200300430
1230130013301500173018001900193020302100213022002230200300430600
210563768226212186836
6.50.50.51.52.50.51.00.51.00.50.50.50.53.51.01.51.5
ROT. F/3328 T/3516DEVIATION SURVEY @ 3493 1/2 DEG.CONDITION MUD & CIRCULATEPOOH WITH BIT #1BACK REAM 10 JTS.LUBRICATE RIGSET COM TOHREPAIR COLLAR CLAMPDERRICK HAND REINJURED ARMTOHCLEAN & BREAK BITM/U NEW BITREPAIR PIPE SPINNERTIH WASH & REAMTIGHTEN BOLTS IN DRAWWORKSW/R 120'TIH.
6.54.0
0.58.00.52.0
0.5
1.01.0
24.0
1.08.02.55.0
5.0
2.52.5
108.0
11.570.0
OTHER
63.5 63.500.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 82 268 0
LP242720241014
LP113212496397
MP229567341209
MP129700811151
DW2223324961387
DW12232241201373
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
291
423516.57
2705.5331.28
100.00073.5
3493 .5*
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3321.00742.983846.00
THOMPSONOFF ROAD
SAFETY MTG:P/U:110,000 S/O:100,000 ROT.:102,000COM. OKBOP DRILL @ 800 AM 1 1/2 MIN.N/M:EMPLOYEE DRIVEING FORK LIFT WITH OUT SEAT BELT ONFUNCTION TESTED C.O.M S/M OVER TOHRIG FUEL 41.5 3,321 GALS
JOHN HANCOCKJOHN HANCOCKJOHN HANCOCKJOHN HANCOCKJOHN HANCOCKBrian WestBrian WestBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105Short one driller - on medical leaveneed derrick hand for tonite
800RS1000M1000
1010
MAXIUMMAXIUM 3
21 66.006.000.000.00
234230
67683328 - 3516 6 6 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100822 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 6 11200
T.I.H W/new bit
Gaines TX 7
DRLG
08-15-10 06:00 8-31-10
5
8-16-10 DUB CASTLEBERRY/FH 93.00
N 32.5275 W -102.208
8-18-108-18-10
1 N/M - hands left v door chains down after connection
4291 775 36.905 21.0
75 77 72 75
0.00
0.00
5.0
0.00
0.00
5.0
1200 10.2 35 7 4 11
F/W 11 890 9.5
NO F/S 210
150,000.12
6
.2
W/WELL
0.00
3474.89 3474.89
60063016301700173018001900
630163017001730180019000600
32710882
0.510.00.50.50.51.011.0
WASHED 60 FEET TO BOTT.DRILL F/3516- T/ 3951LUBRICATE RIG GREASE CROWNDEVIATION SURVEYREPAIR JACK SHAFT CHIANREPAIR CATSHAFT CHAINDRLG 3951' / 4291'
21.00.5
0.51.5
0.5
24.0
1.08.03.06.5
5.5
2.52.5
132.0
12.091.0
OTHER
DRILFORMANCEDRILFORMANCE
221221
7X167X16
1021
22 12 1/4
12 1/4 DF 513DF 513
35163516 4291
435775.00
10210.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 113 237 0
LP24272
241014
LP1132124120421
MP22956
341209
MP12970241051175
DW22233241201411
DW12232241441397
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
372
424291.49
3451.0860.65
11895.0
3640376740174202 2.5
2.50.51.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2290.001031.004877.00
THOMPSONOFF ROAD
3516
3951
3951
4291
D
D
25
23
65
80
S.M. FIRST DAY BACK HANN PLACEMENT & TEAM WORKCHECK C.O.M.FUELFUNCTION TESTED C.O.MS/M OVER WORKING NEW HANDS. JSA ON PINCH POINTS1 N/M NEW HAND LEFT V/D GATE DOWN. ROT118 . PU 119 SO 116.RIG FUEL 31.5 GALLONS 2290
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERBrian WestBrian WestBrian WestBrian WestBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-81Short one driller - on medical leaveneed derrick hand for tonite
331 650RS1000M1000
1010
MAXIUMMAXIUM 0
24 90.006.000.000.00
234230
67684291 6 100 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100823 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 7 11200
T.I.H W/new bit
Gaines TX 8
DRLG
08-15-10 06:00 8-31-10
6
8-16-10 DUB CASTLEBERRY/FH 104.00
POOH, Pinch points, overhead loads &
N 32.5275 W -102.209
8-18-10 8-19-10 - 120 sec.8-18-10
1 near miss -
4600 309 25.75 12.0
75 77 72 75
0.00
0.00
6.0
0.00
0.00
6.0
1800 10.3 33
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600133014001800183021002300200300500
133014001800183021002300200300500600
272256562112
7.50.54.00.52.52.03.01.02.01.0
DRILL F/ 4291- T/ 4448LUBRICATE RIGDRILL f/4448- t/4572DRLG 4572' / 4600' T/DCONDITION MUD & CIRCULATESET C.O.M & TOH 31 STDS OUT TIGHTP/U KELLY PUMP OUT OF HOLETOHR/U. L/D TRUCK & L/D 8'' DCR/U CSNG CREW
12.0
5.53.00.5
1.0
2.0
24.0
6.511.03.56.5
5.5
1.0
4.52.5
156.0
12.0103.0
OTHER
DRILFORMANCE 221 7X16 2133
2 12 1/4 DF 513 3516 4600 1084.00 42.0033.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 113 237 0
LP242720241014
LP1132124144445
MP2295612461222
MP1297001051175
DW22233241441435
DW12232241681421
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
41
4600.73
3824.9738
118107.0
4291 3.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1802.50487.505364.50
THOMPSONOFF ROAD
0.00
4291
4572 4600
D
D
25
23
95
84
s.m. mixing mud & chem. wear all p.pe.check c.o.m.FUNCTION TESTED & SET C.O.M FOR TOHPRETOUR OVER TOH.PINCH POINTS OVERHEAD LOADS & WORKING NEW HANDS.MANNUEL & JARED WALKED OFF @ 845PM1 N/M BREAK OUT LINE BROKE NEARLEY HIT BW.
KENNETH BUTLERKENNETH BUTLERDOMINIC MONTOYADOMINIC MONTOYADOMINIC MONTOYADOMINIC MONTOYA
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318Short derrick hand & floor hand for tonite
119 850797
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 102.506.000.000.00
234230
67684291 -
4572 - 460066
119115
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100824 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 8 11200
T.I.H W/new bit
Gaines TX 9
DRLG
08-15-10 06:00 8-31-10
7
8-16-10 DUB CASTLEBERRY/FH 108.00
Avoiding accs, running csg, cemnting csg.
N 32.5276 W -102.208
8-18-10 8-19-10 - 120 sec.8-18-10
! near miss
4600 0 0.0
75 77 72 75
0.00
0.00
7.0
0.00
0.00
7.0
0600 T H
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
60070011001130120014001500180018300030
700110011301200140015001800183000300600
1212217122012121321
1.04.00.50.52.01.03.00.56.05.5
R/U CSNG CREW & HELD S/MRUN CASINGHAD S.M. WITH. SUPT. OVER AVIODING ACCIDENTSLUBRICATE RIGRUN CASINGRIG DOWN L.D. MACHINE & CSG CREWHELD S.M. WITH CEMENTERS RIG UP CEMENTERS & CEMENT SURFACE CSG.R/D CEMENTERSW O C. PUT ON NEW ROT CHAIN GUARD. JET & CLEAN PITSCUT CSNG & WELD ON WELL HEAD.
0.5
10.56.0
1.06.0
24.0
6.511.04.06.5
5.5
11.56.0
1.010.52.5
180.0
12.0103.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 113 237 0
LP242720241014
LP1132124168469
MP229560461222
MP1297001051175
DW22233101541445
DW12232101781431
121/488
6 1/47 3/48
2 3/42 3/8
2 3/833
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
0.005364.50
THOMPSONOFF ROAD
0.00
4600 4600
S/M ON RUNNING CASING W/ 3RD PARTY/ TOOLPUSHERS/M W/T.P & SUPER OVER AVOIDING ACCIDENTS/ 100% SAFETY (15MIN.S/M)PRETOUR OVER HELPING WELDER.N/M CATLINE BROKE WHILE TRYIN TO PULL MOUSE HOLE. NO ACC!RIGFUEL 23'' 1,822 GALLONS
KENNETH BUTLERKENNETH BUTLER
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318Short derrick hand & floor hand for tonite
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 115.006.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100825 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 9 11200
T.I.H W/new bit
Gaines TX 10
DRLG
08-15-10 06:00 8-31-10
8
8-16-10 DUB CASTLEBERRY/FH 96.00
Nipple up, !00% tie off, pinch points
6 N 32.5275 W -102.209
8-18-10 8-19-10 - 120 sec.8-18-10
1 N/M -
0 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
8.0
0.00
0.00
8.0
6:00 H2O H2O
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600630103014301800190021000000100130230400430
630103014301800190021000000100130230400430600
21148141415212115206156
0.54.04.03.51.02.03.01.00.51.01.50.51.5
weld head on test headNIPPLE UP choke manf.stwelded new well head on where b.o.p. hit well headNIPPLE UP B.O.P.NIPPLE UP B.O.P.TEST B.O.P. COLLAR LEAK ON WELLHEADWAIT WELDER TO FIX LEAKWELD ON WELDHEADTEST B.O.P.M/U BHATIH W/SLMTEST B.O.P.TIH W/SLM
3.0
4.0
8.53.0
1.04.5
24.0
6.514.04.010.5
5.5
11.56.08.53.0
2.015.02.5
204.0
12.0103.0
OTHER
D/F 370 5/16. 2/143 7/78 40.000.000.00
4 1/2 16.60 G-105 6 1/4 XH 350
LP24272
241014
LP1132124192493
MP22956
461222
MP12970
1051175
DW2223341581448
DW1223241821434
111
20
111
tele driftstabcollarstabcollars
tri collarbit
5.1129.785.65599.47
8.1130.981.00
6 3/86 1/2
6 1/46 1/86 1/46 1/8
2 .94
2 1/2
2 .43
680.10
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1254.00-1254.004110.50
THOMPSONOFF ROAD
0.00
s.m. nipple up & test 100% tie off-hand placementpinch pointsS/M ON NIPPLE UP, N/M AIR HOIST TOOK OFF & LIFTED COLLAR RACK UPRIG FUEL 2O.5'' 1,254
KENNETH BUTLERKENNETH BUTLERBrian WestBrian West
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 127.506.000.000.00
234230
67686 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100826 VERTICAL
SEC. 14, BLK. 6, SUR. UL
ROCKY SELMAN 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 10 11200
REPAIR ON D.W.
Gaines TX 11
REPAIR ON D.W.
08-15-10 06:00 8-31-10
9
8-16-10 DUB CASTLEBERRY/FH 84.00
TIH & REPAIR ON D.W. & FORKLIFT
N 32.5275 W -102.208
8-25-10 8-19-10 - 120 sec.8-26-10
NO-NM
4600.00 0.00 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
9.0
0.00
0.00
9.0
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600630
1800
6301800
0600
68
8
0.511.50.012.0
STRAP IN HOLEREPAIR RIG ROMOVED ALL CHIANS FROM DRAWORKS REMOVE COMPOUND SPROKETSREMOVED JACK SHAFT & SER. RIGREPAIR RIG & CLEAN ON RIG
0.5
23.5
0.024.0
6.514.54.034.0
5.5
11.56.08.53.0
2.015.02.5
228.0
12.0103.0
OTHER
DRILFORMANC 3702 7 7/8 DF613R2 46000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH
LP24272
241014
LP1132124216517
MP229560461222
MP1297001051175
DW2223311591449
DW1223211831435
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
Tri CollarBIT
5.1229.785.67599.41
8.1130.98.707 7/8
6 1/46 1/4
6 1/46 1/46 1/46 1/4
2 3/8NA
2 1/42 3/82 1/42 3/8
679.77
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5879.00-625.003485.50
THOMPSONOFF ROAD
0.00
4000.00
4600
4600 0
S/M-TIHDIESEL-5879
KENNETH BUTLERJACK FREEMAN
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318
0
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 140.006.000.000.00
234230
67684600 -
4600 - 66 0
66 0
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100827 VERTICAL
SEC. 14, BLK. 6, SUR. UL
ROCKY SELMAN 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 11 11200
REPAIR ON D.W.
Gaines TX 12
REPAIR ON D.W.
08-15-10 06:00 8-31-10
10
8-16-10 DUB CASTLEBERRY/FH 89.00
100 % TIES OFF & CLEAN ON RIG
N 32.5275 W -102.208
8-25-10 8-19-10 - 120 sec.8-26-10
NM-PUTTING ON HYD. CHAIN ROPE BROKE F.H. ALMOST FULL BACKWARD
0 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
10.0
0.00
0.00
10.0
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600
1800
1800
0600
8
8
12.00.00.00.00.00.00.00.00.00.00.012.0
INSTALLED TRANS. CHIANS- HYD. CHIAN CHG. OIL ROT.TABLE- SWIVEL- COMP. AIR COMP.INSTALLED ROT. DRIVE CHIAN REMOUNTED C.O.M. RESET VALVEFIXED AIR LEAK DRILLERS CONSOLECHANGED AIR FILTERS FLORR MTRS. CHECKED & TOPED OFF COOLANT ALL MTRS.CHANGED OUT AIRHOIST INSTALLED ROT. CLUTCH SPROKET & ROT. CHIANPUT TOGETHER TRAN INPUT-HIGH DRUM-LOW DRUM -JACK SHAFT CHIANSINSTALLED NEW HOSE FROM FLOOR AIR COMP. TO AIR TANKCLEANED OUT DRAWORKS - COMPOUND TO INSTALL NEW JACK SHAFT& COMPOUND SPROKETSREMOUNTD LIGHTS LOWER DIR.REPLACED COP. TB. LOW & HIGH DRUM CLUTCHESREPLACED GREASE LINES FOR BEARINGS IN TRANSMISIONSERVICE RIG.REPAIR RIG
24.0
0.024.0
6.514.54.058.0
5.5
11.56.08.53.0
2.015.02.5
252.0
12.0103.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH
LP24272
241014
LP1132124216517
MP229560461222
MP1297011051175
DW2223301591449
DW1223201831435
7 7/86 1/46 1/4
6 1/46 1/46 1/46 1/4
2 3/8NA
2 1/42 3/82 1/42 3/8
107.0
4600
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5780.0099.003584.50
THOMPSONOFF ROAD
0.00
S.M. WASHING ON SUB. WEAR ALL P.P.E. 100% TIE OFFFORKLIFT SAFETY GOOD SIGNALS CARRY LOADS AS LOW TO GROUND AS POSSPUTTING HYDROMATIC CHIAN TOGETHER ROPE BROKE FLOORHAND ALLMOSTFELL BACKWARDSFUELDIESEL-5780S/M-CLEANING ON RIG & TIE OFF 100 %
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERKENNETH BUTLERKENNETH BUTLERJACK FREEMANJACK FREEMANBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 152.506.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100828 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 12 11200
REPAIR ON D.W.
Gaines TX 13
REPAIR ON D.W.
08-15-10 06:00 8-31-10
11
8-16-10 DUB CASTLEBERRY/FH 96.00
CLEANING ON RIG 100% TIE OFF / INSTALL SHAFTS & CHAINS
3 N 32.5276 W -102.208
8-25-10 8-19-10 - 120 sec.8-26-10
WHEN PUTTING GUARD ON DRAW WORKS GAURD SLIPED OUT OF PLACE
0 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
11.0
0.00
0.00
11.0
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
6006301800
6301800600
788
0.511.50.0
LUBRICATE RIGw.o. jack shaft cleaning on rigREPLACE MTR SHAFTS BOTH CLUTCHS & CAT HEAD SHAFT & ALL CHAINS IN DRAWWORKS
0.511.5
12.0
6.514.54.569.5
5.5
11.56.08.53.0
2.015.02.5
264.0
12.0103.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH
LP242720241014
LP1132124240541
MP229560461222
MP1297001051175
DW2223301591449
DW1223201831435
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
679.70
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5680.9599.053683.55
THOMPSONOFF ROAD
0.00
S.M. CLEANING ON RIG 100% TIE OFFHAND PLACEMENT LAST DAY OF HITCH WATCHING OUT FOR EACH OTHERS.M. W/CREW / INSTALL SHAFTS & CHAINSDIESEL-5680.95
KENNETH BUTLERKENNETH BUTLERRONNIE MCCAULEYRONNIE MCCAULEY
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 165.006.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100829 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 13 11200
DRILLING 40 FT. HR. AT 5013'FT.
Gaines TX 14
DRILLING AND MUD UP
08-15-10 06:00 8-31-10
12
8-16-10 DUB CASTLEBERRY/FH 84.00
WORKING ON DRAW WORKS/ TRIPPING PIPE/ MIXING MUD
3 N 32.5274 W -102.208
8-25-10 8-19-10 - 120 sec.8-26-10
TAILING PIPE FROM MOUSEHOLE TO STUMP PIPE HIT THE TONGS
5013.00 333.00 549.412 8.5
127 129 125 127
8 5/8 4604
0.00
0.00
12.0
0.00
0.00
12.0
F/W 11 890 10
NO F/S 210
40,000.12 .2
W/WELL
0.00
3474.89
600930133015001800190019302100213000300100
930133015001800190019302100213000300100600
862122102102102
3.54.01.53.01.00.51.50.53.00.55.0
CHK ALL GREASE LINES,REPLACE ALL GUARDSTRIPS/PU 12 JTS DP-PU KELLY-INSTALL ROT HEADDRILL OUT CMT / FLOAT EQUIPMENTDRILL ACTUAL/F-4604- T4670DRLG F/ 4670 - 4701DEVIATION SURVEY @ 4627 DEG 2.5DRLG F/ 4701 - 4763DEVIATION SURVEY @ 4689 DEG 2.5DRLG F/ 4763 - 4856DEVIATION SURVEY @ 4782 DEG 2.5DRLG F/ 4856 -5013
8.5
4.0
3.5
1.5
1.5
19.0
6.518.54.585.0
7.0
11.56.08.53.0
2.016.52.5
295.0
12.0111.5
OTHER
DRILFORMA 370 5-16/2-14 132 7 7/8 DF613R2 4600 413 13.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 138 213 0
LP24272
241014
LP1132124240541
MP2295624701246
MP12970241291199
DW22233241831473
DW12232242071459
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
46
425013.65
4291.95
147000115.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4857.95823.004506.55
THOMPSONOFF ROAD
0.00
S/M WORKING ON DW/TRIPPING PIPEPU WT, 125,000, SO WT.122,000. ROT. WT. 122,000DIESEL 56' ROT. WT. 127, SO WT. 125, PU WT. 129JSA- MIXING MUD, MAKING CONNECTION
RICARDO ALANIZRICARDO ALANIZMIGUER SOTOMIGUER SOTO
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
750RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 177.506.000.000.00
234230
67685013 6 6 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100830 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 14 11200
DRILLING 40 FT. HR. AT 5512'FT.
Gaines TX 15
DRILLING
08-15-10 06:00 8-31-10
13
8-16-10 DUB CASTLEBERRY/FH 108.00
MAKING CONN./NEW HAND ON FLOOR/MIX MUD/RIG SERVICEWORK ON SHAK
2 N 32.5275 W -102.209
8-25-10 8-19-10 - 120 sec.8-26-10
NONE
5512.00 499.00 336.774 15.5
135 139 131 135
8 5/8 4604
550.00
42.31
550.00
13.0
0.00
0.00
13.0
1200 8.8 28 4 3 6
F/W 11 890 10
NO F/S 210
40,000.12
3
.2
W/WELL
0.00
2200.86 5675.75
60011001130120015301600180018001930200023300000
110011301200153016001800
1930200023300000600
27102102
2102102
5.00.50.53.50.52.00.01.50.53.50.50.0
DRILL ACTUAL f-4960-t-5076 ROP 23.2LUBRICATE RIG/BLOCKS-SWIVEL-CROWN-KBDEVIATION SURVEY @ 5001/ 2.5 DEGDRILL ACTUAL F- 5076/ T- 5171 ROP 27DEVIATION SURVEY @ 5097 / 2.5 DEGDRILL ACTUAL F-6171/ T-5220
DRILL ACTUAL F/ 5220 - 5264DEVIATION SURVEY @ 5188 DEG 2.0DRILL ACTUAL F/ 5264 - 5356DEVIATION SURVEY @ 5313 DEG 2.0DRILL ACTUAL F/ 5356 -5512
15.5
0.5
2.0
0.018.0
6.518.55.085.0
9.0
11.56.08.53.0
2.016.52.5
313.0
12.0127.0
OTHER
14.25DRILFORMADRILFORMA
370370
5-16/ 2-145-16/ 2-14
23.530.5
22 7 7/8
7 7/8 DF613R2DF613R2
46004600 5512
620620
36.5043.500.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351351
138154 197
213 00
LP2427220241014
LP113214240541
MP2295624701246
MP12970241291199
DW22233241831473
DW12232242071459
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
511
42.005512.93
4759.1432.09
135000131.0
5001509751905313 2.0
2.02.52.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3904.51953.445459.99
THOMPSONOFF ROAD
0.00
4960
5220
5220
5512
D
D
25
22
75
75
SAF MTG/MAK CONN /NEW HAND ON FLOORJSA RIG SERVICE/MIX MUDROT 130000/ SO 128000/ PU 132000JSA - STRAPING PIPE, JSA - WORKING ON SHAKERS, DIESEL 47"ROT WT 135, SO WT 131, PU WT 139
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
750800
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 190.006.000.000.00
234230
67684960 - 5220
5220 - 551266
66
115115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100831 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 15 11200
TRIP IN HOLE
Gaines TX 16
DRILLING
08-15-10 06:00 8-31-10
14
8-16-10 DUB CASTLEBERRY/FH 72.00
CLEANING,TRIP PIPE,CUTT DRILL LINE
3 N 32.5274 W -102.208
8-31-10 8-19-10 - 120 sec.8-26-10
LIFT SUB FELL OVER ON FLOOR
5708 5708 518.909 45.0
135 139 131 135
8 5/8 4604
39.29
550.00
14.0
0.00
0.00
14.0
1200 9.1 32
F/W 11 890 10
NO F/S 210
40,000.12 .2
W/WELL
0.00
5675.75
600900930120012301800100300
900930120012301800100300600
272102696
3.00.52.50.55.57.02.03.0
DRILL ACTUAL -F/5512-T5575 ROP21LUBRICATE RIGDRILL ACTUAL- F-5575- T-5638 ROP 25DEVIATION SURVEY /5537-2 DEGDRILL ACTUAL F-5638/T-5708TRIPS OUT HOLE MAKE UP BHACUT OFF DRILLING LINE 90 FT.TRIPS IN HOLE
11.0
10.00.5
2.00.5
24
6.525.55.585.0
9.5
11.56.08.53.0
2.016.52.5
332.0
12.0138.0
OTHER
14.25DRILFORMADRILFORMADRILFORMA
370370292
5-16/ 2-145-16/ 2-146X15
45450
223 7 7/8
7 7/87 7/8 DF613R2
DF613R2DF513R
460046005708
570811081108.000
88.50450.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351351
161161 190
190 00
LP2427218421032
LP113216246547
MP2295624941270
MP12970241531223
DW22233242071497
DW12232242311483
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
532
20.005708.52
4946.9861.84
134000142.0
5537 2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3268.61635.906095.89
THOMPSONOFF ROAD
0.00
5512
5708
5708 D
D
22
25
75
75
SAFETY MTG-CLEANINGROTWT134000-SOWT128000-PUWT140000DIESEL " RO WT 134 / PU WT 138 / SO WT 130JSA TRIPPING PIPE / JSA CUTTING DRILLING LINE
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR142.50TON MILE41/ CUTT 90 FT.
825850
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 202.506.000.000.00
234230
67685512 - 5708
5708 - 66
115 66 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100901 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 16 11200
DRILLING 51 FT. AN HR.
Gaines TX 17
DRILLING
08-15-10 06:00 8-31-10
15
8-16-10 DUB CASTLEBERRY/FH 112.00
SCRUBBING ON RIG TAILING PIPE AND TRIPPING IN HOLE
3 N 32.5276 W -102.209
8-31-10 8-19-10 - 120 sec.8-26-10
TRIPPED ON SOAP BUCKET ON THE PITS
6351 643 32.15 20.0
135 139 131 135
8 5/8 4604
36.67
550.00
15.0
0.00
0.00
15.0
1700 8.9 38 5 3 7
F/W 4.7 890 10
NO F/S 210
25,000.1.75
4
.2
W/WELL
0.00
2212.39 7888.14
60070080010001030110016001630180023002330
700800100010301100160016301800230023300600
621271021022102
1.01.02.00.50.55.00.51.55.00.56.5
TRIPSWASH TO BOTTOMDRILL ACTUAL F-5708 T-5761 ROP 26.5LUBRICATE RIGDEVIATION SURVEYDRILL ACTUAL F-5761 T-5916 ROP 31DEVIATION SURVEY@ 5845- 2 DEG/TVD 5916DRILL ACTUAL F-5916 T- 5962 ROP 30DRILL ACTUAL F/ 5962 - 6132DEVIATION SURVEY @ 6128 DEG .5DRILL ACTUAL F/ 6132 - 6351
20.0
1.00.5
1.5
1.0
24.0
6.526.56.085.0
11.0
11.56.08.53.0
2.017.52.5
356.0
12.0158.0
OTHER
DRILFORMADRILFORMA
292292
6 X 156 X 15
8.520
33 7 7/8
7 7/8 DF513RDF513R
57085708
254643
8.5020.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351351
161181 170
190 00
LP2427210521042
LP1132114260561
MP22956241181294
MP12970241771247
DW22233242311521
DW12232242551507
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
601
426351.43
5598.7430.99
142000162.0
569058456128 .5
22
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2340.61928.007023.89
THOMPSONOFF ROAD
0.00
5708
5962
5962
6351
D
D
20
22
80
80
JSA TRIPPING PIPEROT WT.136000 PU WT.140000SO WT 130000JSA - STRAPPING PIPE, JSA - CLEANING ON RIGROT WT 142, SO WT 138, PU WT 146, DIESEL 32"
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR162.50TON MILE41/ CUTT 90 FT.
800750
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 215.006.000.000.00
234230
67685708 - 5962
5962 - 635166
100100
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100902 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 17 11200
DRILLING 51 FT. AN HR.
Gaines TX 18
DRILLING
08-15-10 06:00 8-31-10
16
8-16-10 DUB CASTLEBERRY/FH 108.00
Changing radiator fluilds, Changing kelly spinner motors
N 32.5275 W -102.209
8-31-10 8-19-10 - 120 sec.8-26-10
1 incident, 2 N/M
7122 771 34.267 22.5
135 139 131 135
8 5/8 4604
34.38
550.00
16.0
0.00
0.00
16.0
0600 8.9 38 8 5 11 10
F/W 3.1 96.90 8
NO F/S 210
19,000.1.75
7
.2
W/WELL
0.00
7888.14
6001700173018002030210001300200
17001730180020302100013002000600
2102272102
11.00.50.52.50.54.50.54.0
DRILL ACTUAL F- 6351/ T-6752 ROP 39DEVIATION SURVEYDRILL ACTUAL F-6752/ T- 6783DRILL ACTUAL F/ 6783 - 6843LUBRICATE RIG / WORK ON KELLY SPINNERDRILL ACTUAL F/ 6843 - 6966DEVIATION SURVEY @ 6892 DEG 1DRILL ACTUAL F/ 6966 - 7122
22.5
0.5
1.0
24.0
6.526.56.585.0
12.0
11.56.08.53.0
2.017.52.5
380.0
12.0180.5
OTHER
DRILFORMADRILFORMA
292292
6 X 156 X 15
31.542.50
33 7 7/8
7 7/8 DF513RDF513R
57085708
10751414
51.5062.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 206 145 0
LP242720521042
LP1132124284585
MP2295601181294
MP12970242011271
DW22233242551545
DW12232242791531
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
682
427122.01
6338.4061.91
147000184.5
628066816892 1
1.5.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1476.86863.757887.64
THOMPSONOFF ROAD
0.00
6351
6783
6783
7122
D
D
20
23
80
75
SAFETY MTG CONNECTIONSJSA CLEANING RIG/MOVING PIPE WITH FORKLIFTROT WT. 146000/ SO WT 140000/ PU WT. 150000ROT WT 147, SO WT 142, PU WT 153, DIESEL 23"JSA - CHANGING PIPE SPINNER MOTORS, JSA - CHANGING RADIATOR FLUIDN/M - tongs almost hit handN-M - hands left v door gate down
RICARDO ALANIZRICARDO ALANIZRICARDO ALANIZMIGUER SOTOMIGUER SOTO
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR162.50TON MILE - 95
800930
RS1000M1000
1010
MAXIUMMAXIUM 0
24 239.006.000.000.00
234230
67686351 - 6783
6783 - 712266
100100
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100903 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 18 11200
DRILLING 51 FT. AN HR.
Gaines TX 19
DRILLING
08-15-10 06:00 8-31-10
17
8-16-10 DUB CASTLEBERRY/FH 108.00
Placing drill pipe in mouse hole, making connection
N 32.5275 W -102.209
8-31-10 8-19-10 - 120 sec.8-26-10
N/M - Hand almost stepped in kelly shuck
7710 588 28.683 20.5
135 139 131 135
8 5/8 4604
32.35
550.00
17.0
0.00
0.00
17.0
0600 8.6 32
F/W 3.1 96.90 10
NO F/S 210
19,000.1.75 .2
W/WELL
0.00
7888.14
600800830100011301630170018000100
0200
8008301000113016301700180001000200
0600
2728210225
2
2.00.51.51.55.00.51.07.01.00.00.04.0
DRILL ACTUAL F-7122/ T-7183 ROP 30.5LUBRICATE RIGDRILL ACTUAL F- 7183 / T-7245 ROP 41.3REPAIR RIG/ WORK ON KELLY SPINNERSDRILL ACTUAL F- 7245 / T- 7370 ROP 25DEVIATION SURVEYDRILL ACTUAL F- 7370 / T-7401DRILL ACTUAL F/ 7401 - 7585CONDITION MUD & CIRCULATE (LOST RETURNS @ 758585 BBLS LOST DOWN HOLE ( RETURNS LOST @ 0100 RETURNED @ 0200)WORKED STRING 2 TIMES BEFORE FULL RETURNS (HEAVY RAIN LIGHTNING)DRILL ACTUAL F/ 7585 - 7710
20.5
1.0
0.51.5
0.5
0.024.0
7.526.57.086.5
12.5
11.56.08.53.0
2.017.52.5
404.0
12.0201.0
OTHER
DRILFORMA 292 6 X 15 5263
3 7 7/8 DF513R 5708 1693 114.5063.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 225 126 0
LP2427224761066
LP113210284585
MP22956241421318
MP1297002011271
DW22233242791569
DW12232243031555
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
75
427710.79
6989.09
154000205.0
7299 1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5376.75-3899.893987.75
THOMPSONOFF ROAD
0.00
7122
7401
7401
7710
D
D
22
24
80
75
SAFETYMTG DANGEROUS ANIMALSJSA - MIXING MUD, DIESEL 61"ROT WT 154, SO WT 150, PU WT 158.
RICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR162.50TON MILE - 95
800900
RS1000M1000
1010
MAXIUMMAXIUM 0
24 263.006.000.000.00
234230
67687122 - 7401
7401 - 771066 100
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100904 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 19 11200
DRILLING 51 FT. AN HR.
Gaines TX 20
DRILLING
08-15-10 06:00 8-31-10
18
8-16-10 DUB CASTLEBERRY/FH 102.00
N 32.527 W -102.208
8-31-10 8-19-10 - 120 sec.8-26-10
7961 251 27.889 9.0
135 139 131 135
8 5/8 4604
30.56
550.00
18.0
0.00
0.00
18.0
1700
F/W 3.1 96.90 10
NO F/S 210
19,000.1.75 .2
W/WELL
0.00
7888.14
60070073093010001600180023000030
700730930100016001800230000300600
27210266216
1.00.52.00.56.02.05.01.55.5
DRILL ACTUAL F- 7710 / T- 7742 ROP 32LUBRICATE RIGDRILL ACTUAL F- 7742 / T- 7804 ROP 31DEVIATION SURVEYDRILL ACTUAL F- 7804 / T-7961 ROP 26.1T.O.O.HT. O. H. FOR BITLAY DOWN/PICK UP B.H.A./CHECK TELLIDRIFT/SWAP TLDMAKE UP BIT / T.I.H. / PICK UP KELLY BREAK CIRCULATION / T.I.H.
9.0
12.50.5
0.5
1.5
24.0
7.539.07.586.5
13.0
11.56.08.53.0
2.019.02.5
428.0
12.0210.0
OTHER
DRILFORMAQUANTEC
2927128754
6 X 156 X 15
7234 7 7/8
7 7/8 DF513RQ506FX
57087961
2253 186.50
0.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 225 126 0
LP24272241001090
LP113210284585
MP2295661481324
MP1297002011271
DW22233243031593
DW12232243271579
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1229.785.65599.41
8.114.041.00
653.11
214.0
7804 1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4700.20676.554664.30
THOMPSONOFF ROAD
0.00
ROT WT -162000/ SO WT 158000/ PU WT 170000SAFTY MEETING / TRIPPING PIPENEAR MISS / TONGS COME OFF DRILL PIPE ALMOST HIT HANDDIESEL - 54 1/2
JACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMAN
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR168.50TON MILE - 95
850RS1000M1000
1010
MAXIUMMAXIUM 0
24 287.006.000.000.00
234230
67687710 - 7961 6 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100905 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 20 11200
DRILLING 51 FT. AN HR.
Gaines TX 21
DRILLING
08-15-10 06:00 8-31-10
19
8-16-10 DUB CASTLEBERRY/FH 114.00
1st day back, tripping in hole, pinch points, pulling & setting slips, connections
5 N 32.5274 W -102.209
8-31-10 9-4-10 - 8-26-10
2 Near Misses
8710 749 33.663 22.25
135 139 131 135
8 5/8 4604
28.95
550.00
19.0
0.00
0.00
19.0
0600 8.3 34 6 2 7
F/W 3 970 10.5
NO F/S 210
15,0002120.1.75
4
.2
W/WELL
0.00
7888.14
60070014001430180023450000
700140014301800234500000600
62722102
1.07.00.53.55.750.256.0
T.i.h.DRILL f/ 7961- t/ 8211LUBRICATE RIGDRILL f/8211- t/8304DRLG F /8304 -8491DEVIATION SURVEY @8491 1 1/2DRLG F /8491 -8710
22.25
1.00.5
0.25
24.0
7.540.08.086.5
13.25
11.56.08.53.0
2.019.02.5
452.0
12.0232.25
OTHER
QUANTECQUANTEC
71287547128754
6 X 156 X 15 22.5
44 7 7/8
7 7/8 Q506FXQ506FX
79617961 714
0.0022.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 257 94 0
LP24272
1001090
LP1132124308609
MP22956241721348
MP12970
2011271
DW22233243271617
DW12232243511603
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1229.785.65599.41
8.114.041.00
852
428679.57
7921.2163.25
165000236.25
799682428492
11
1 1/2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3904.51795.695459.99
THOMPSONOFF ROAD
0.00
7961
8304
8304
8710
D
D
20
21
70
70
s.m. first day back t.i.h. hand placement pinchpoints pulling & setting slips use legs not backnear miss breaking jam nut on brakes pipe wrench sliped allmosthit floorhandSAFTY MEETING - MAKEING CONECTION / CLEANINGNEAR MISS - PULLING CELLAR JET HOSE OFF BOTTOM OF CELLAR FLOORDIESEL -47 INCHES
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERKENNETH BUTLERJack FreemanJack FreemanJack FreemanBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR192.50TON MILE - 95
110 1000900
RS1000M1000
1010
MAXIUMMAXIUM 24
287.0030.000.000.00
234230
67687961 - 8304
8304 - 871066 0
66
110110
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100906 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 21 11200
DRILLING 51 FT. AN HR.
Gaines TX 22
DRILLING
08-15-10 06:00 8-31-10
20
8-16-10 DUB CASTLEBERRY/FH 114.00
chipping & grinding, general cleaning & forklift safety
3 N 32.5275 W -102.208
8-31-10 9-4-10 - 8-26-10
1 near Miss
9361 651 28.615 22.75
135 139 131 135
8 5/8 4604
27.50
550.00
20.0
0.00
0.00
20.0
0600 8.4 32 6 2 7 n/a n/a
F/W 3 970 9
NO F/S 210
15,0002120.1
n/a n/a
.75
4
.2
W/WELL
0.00
7888.14
60016001630180018152100211500000015
160016301800181521002115000000150600
272102102102
10.00.51.50.252.750.252.750.255.75
DRILL F/ 8710 - T/ 8989LUBRICATE RIGDRILL f/ 8989- t/ 9020DEVIATION SURVEY @ 9020 DEG. 2 1/2DRLG F/9020 -9112DEVIATION SURVEY @ 9112 DEG. 1DRLG F/9112 - 9205DEVIATION SURVEY @ 9205 DEG. 1/2DRLG F/9205 -9361
22.75
0.5
0.75
0.024.0
7.540.08.586.5
14.0
11.56.08.53.0
2.019.02.5
476.0
12.0255.0
OTHER
QUANTECQUANTEC
71287547128754
6 X 156 X 15
22.545.5
44 7 7/8
7 7/8 Q506FXQ506FX
79617961
7141365
45.0068.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 11056.50 278 73 0
LP2427261061096
LP1132118326627
MP22956181901366
MP1297062071277
DW22233243511641
DW12232243751627
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1229.785.65599.41
8.114.041.00
922
429331.34
857462.23
176000259.0
874288348927902092059112
2.51/21
113
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3006.72897.796357.78
THOMPSONOFF ROAD
0.00
8710
9020
9020
9361
D
D
12
16
75
75
S.M. FORKLIFT SAFETY & GENERAL CLEANINGfuel - 43" - 3479.81 galSAFTY MEETING - CHIPPING AND GRINDINGNEAR MISS - HAND WAS GRINDING WITH BAGIE SHIRT ON WHEEL SLIPED OFFHAND RAil ALMOST CATCHING SHIRTDIESEL - 38 1/2
KENNETH BUTLERKENNETH BUTLERJACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMAN
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR - 216.50TON MILE - 428
115 10001000
RS1000M1000
1010
MAXIUMMAXIUM 18
6 293.0048.000.000.00
234230
67688710 - 9020
9020 - 936166
1150
66 111
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100907 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTFrank Spann 806-777-3049
OPAL RESOURCES, LLC
08-16-10 21:30 22 11200
Out of hole waiting on tools
Gaines TX 23
Fishing
08-15-10 06:00 8-31-10
21
9-4--10 Glen Glass 96.00
Pinch points, Hand placement, picking up drill pipe, Proper PPE
N 32.5275 W -102.208
8-31-10 9-4-10 - 8-26-10
1 Near Miss
9895 534 35.6 15.0
135 139 131 135
8 5/8 4604
26.19
550.00
21.0
0.00
0.00
21.0
1800 8.4 30 2 1 2 N/A N/A
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25
1
.2
W/WELL
0.00
7888.14
6001630170018001800213023300430
163017001800
2130233004300600
272
25621
10.50.51.00.03.52.05.01.5
DRLG F / 9361 -9708LUBRICATE RIGDRILL f/ 9708- t/ 9739
DRLG F / 9739 - 9895 / LOST 50K WHILE REAMING TO BOTTOMCIRCULATE SWEEPT.O.H - 94 STANDS AND A DOUBBLEWAIT ON COLLARS
15.0
2.05.00.5
1.5
0.024.0
9.545.09.086.5
14.0
11.56.08.53.0
2.020.52.5
500.0
12.0270.0
OTHER
QUANTEC 7128754 6 X 15 45.560.5
4 7 7/8 Q506FX 7961 1934 113.5060.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 11056.50 278 73 0
LP24272241301120
LP113210326627
MP2295631931369
MP1297002071277
DW22233243751665
DW12232243991651
111
201
111
TELEDRIFTREAMER6" DCREAMER6" DCD.P.
BIT SUBBIT
5.1229.785.65599.4130.51
8.114.041.00
981
429894.97
913831.35
179000274.0
95559667 0.5
1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2141.70865.027222.80
THOMPSONOFF ROAD
0.00
9361
9739
9739
9895
D
D
12
16
75
75
S/M ON HAND PLACEMENT/PROPER P.P.E/T.P PRESENT....fuel 34 inches 2593DIESEL ON LOCATIONSAFTY MEETING - PICKING UP DRILL PIPENEAR MISS - HAND WAS CLEANING PAINT BRUSH THINNER FEEL OFF WIRELINE MACHINE ALMOST SPLASHED FACE.DIESEL - 30 INCHES
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERJACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMANBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR - 216.50TON MILE - 428
1111000
RS1000M1000
1010
MAXIUMMAXIUM 18
6 299.0066.000.000.00
234230
67689361 - 9739
9739 - 989566
66
111112
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100908 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 23 11200
POOH W/drill collars
Gaines TX 24
Tripping
08-15-10 06:00 8-31-10
22
9-4--10 Glen Glass 100.00
N 32.5275 W -102.209
8-31-10 9-4-10 - 8-26-10
1 Near Miss
9897.00 2.00 0.0 0
135 139 131 135
8 5/8 4604
25.00
550.00
22.0
0.00
0.00
22.0
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
60063070080015301630180002000330
630700800153016301800020003300600
192119636666
0.50.51.07.51.01.58.01.52.5
BROKE TWISTED OFF D.P. L.D. 2 JTS. D.P.PICK UP OVER SHOT JARS& SUBSW.O. 4 1/2 GRAF.& DRILLCOLLORSMAKE UP FISHING TOOLS STRAP & CAL. D.C. P.U. D.C.T.I.H.WASHED DOWN TO FISH LATCHED ON TO FISHT.O.H.T.O.H. TO FISHT.O.H. WITH SIX 6INCH D.C. AND REST OF FISH / LAY DOWN FISHING TOOLST.O.H.
1.0
21.0
1.5
0.5
24.0
9.566.09.086.5
14.0
11.56.08.53.0
1.52.021.02.5
524.0
13.0270.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 11056.50 278 73 0
LP24272241541144
LP113210326627
MP2295601931369
MP1297002071277
DW22233243991689
DW12232244231675
275.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1754.88386.827609.62
THOMPSONOFF ROAD
0.00
S.M. P.UP FISHING TOOL - T.I.H. HAND PLACEMENTPINCH PIONTSA WORKING WITH 3rd RARTYS.M. - T.O.H.NEAR MISS - BREAKING FISHING TOOL DOWN IN MOUSE HOLE TONG BROKEAROUND CAME ALMOST HITTING DRILLERDIESEL - 26 INCHES
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR - 216.50TON MILE - 1013
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100909 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 24 11200
DRLG. 59 FT. HR.
Gaines TX 25
DRILLING
08-15-10 06:00 8-31-10
23
9-4--10 Glen Glass 114.00
HANDEL BHA, TIH,CHECK COM, TRIPPING IN HOLE
2 N 32.5275 W -102.208
9-8-2010 9-4-10 - 8-26-10
PICKING UP JOINT OF PIPE, PIPE ROLL OFF CAT WALK
10170 281.00 31.2 9.0
202 215 188 202
8 5/8 4604
23.91
550.00
23.0
0.00
0.00
23.0
0600 8.4 34
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
600630800103013301530160018001830193020302345000002150230
6308001030133015301600180018301930203023450000021502300600
621621976621212102102
0.51.52.53.02.00.52.00.51.01.03.250.252.250.253.5
T.O.H.L.D. 6 D.C.& CLEAN CUTTINGS OUT OF STABILIZERSCHANGED OUT B.H.A. & T.I.H. TO 4600 FEET STRAP IN HOLElay down bent d.p. out or dir.slip & cut 120 ft. drlg. lineLUBRICATE RIGT.i.h.T.I.HPICK UP SINGLES WHICH WERE LD OUT OF DERRICK FOR FISHIN G & BENTWASH & REAM F/ 9570' 9889' --- LOST CIRC WASH TO BOTTOM & MIX LCM TO REGAIN CIRDRLG F / 9889 - 9982 FULL RETURNS @ 9890'DEVIATION SURVEY@9982 1 1/2 DEG.DRLG F / 9982 - 10075DEVIATION SURVEY@ 10075 1 1/2 DEG.DRLG F / 10075 -10170
9.0
5.50.5
2.00.5
6.5
24.0
9.571.59.586.52.014.5
11.56.08.53.0
1.52.027.52.5
548.0
13.0279.0
OTHER
QUANTEC 7128754 6X15 94 7 7/8 Q506FX 7961 2209 90.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351350 11056.50
11056.50 278305 45
73 00
LP24272241781168
LP11321
326627
MP22956242171393
MP12970242311301
DW22233244231713
DW12232244471699
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1227.975.65594.64
8.114.041.00
1012
4210170.36
9418.6263.21
201000284.0
998210075
1 1/21 1/2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5580.26174.627784.24
THOMPSONOFF ROAD
0.00
4000.00
9889 10170 D 1275
S.M. HANDEL B.H.A.- T.I.H. check c.o.m.S.M. - TRIPPING IN THE HOLENEAR MISS -PICKING UP A JOINT OF DRILL PIPE PIPE ROLLED OF CATWALK ALMOST HITTING HANDDIESEL -63" IN.
KENNETH BUTLERJACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMAN
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR - 225.50TON MILE -123
1300RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
67689889 - 10170
9889 - 66
66
115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100910 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 25 11200
DRLG.42 FT. HR.
Gaines TX 26
TD CIR FOR LOGS
08-15-10 06:00 8-31-10
24
9-4--10 Glen Glass 104.00
PICKING UP DRILL PIPE/MAKING CONN.
2 N 32.5275 W -102.208
9-10-2010 9-4-10 - 8-26-10
MOTORHAND SLIPED ON BACK STAIRS ALMOST FELL
10975 805 34.624 23.25
208 224 206 208
8 5/8 4604
22.92
550.00
24.0
0.00
0.00
24.0
0600 8.8 34
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
60012001230
180001150130
120012301800
011501300600
272
2102
6.00.55.50.07.250.254.5
DRILL F/ 10170-T/ 10325LUBRICATE RIGDRILL 10325-T/ 10602STARTED MUD UP AT 10505DRLG F/ 10602 - 10880DEVIATION SURVEY @ 10880 1/2 DEG.DRLG F/ 10880 - 10975
23.25
0.5
0.25
0.024.0
9.571.510.086.52.014.75
11.56.08.53.0
1.52.027.52.5
572.0
13.0302.25
OTHER
QUANTECQUANTEC
71289587128958
6X156X15
20.534.25
55 7 7/8
7 7/8 Q 506 FXQ 506 FX
98899889
7131086
20.534.250.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 305331 19
45 00
LP24272242021192
LP113210326627
MP22956242411417
MP12970242551325
DW22233244471737
DW12232244711723
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1227.975.65594.64
8.114.041.00
1101
4210975.58
10255.0831.97
206000307.25
101701044710880
10.5
1/2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4647.46932.808717.04
THOMPSONOFF ROAD
0.00
10170
10602
10602
10975
D
D
18
20
75
75
S/M WEAR ALL P.P.E. GOOD COMN. TEAM WORKREPLACED 3 SWABS 1 VALVE- PONY ROD # 2 PUMPS.M. PICKING UP DRILL PIPENEAR MISS - MOTOR HAND WAS WALKING UP BACK STEPS ABOUT THETHIRD STEP SLIPED ALMOST FALLING DOWNDIESEL -54S.W. 210 / P.W. 224 / R.W. 208
KENNETH BUTLERKENNETH BUTLERJACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMANBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -248.75TON MILE -123
115 11501365
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
676810170 - 10602
10602 - 1097566
115116
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100911 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 26 11200
LAYING DOWN DRILL PIPE
Gaines TX 27
LOG HOLE
08-15-10 06:00 8-31-10
25
9-4--10 Glen Glass 56.00
CHECK C.O.M. ADJUST BRAKES, LAYING DOWN DRILL PIPE
2 N 32.5275 W -102.208
9-10-2010 9-4-10 - 8-26-10
N/A
11250 275 32.353 8.5
208 224 206 208
8 5/8 4604
22.00
550.00
25.0
0.00
0.00
25.0
600 8.4 34
F/W 1.5 98.50 10
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
600143015001700
18001900
1430150017001800
1900600
27521
56
8.50.52.01.00.01.011.0
DRILL F/ 10975- T/ 11250LUBRICATE RIGCIRCULATE TO L.D. DRILL PIPEHELD SAFETY MEETING WITH L.D. CREW- RIG UP L.D. MACHINET.D. 11250 @ 1415CONDITION MUD & CIRCULATELAYDOWN DRILL PIPE
8.5
3.011.00.5
1.0
0.024.0
12.582.510.586.52.014.75
11.56.08.53.0
1.52.028.52.5
596.0
13.0310.75
OTHER
QUANTECQUANTEC
71289587128958
6X156X15
34.2534.25
55 7 7/8
7 7/8 Q 506 FXQ 506 FX
98899889 11250
10861086
68.5068.500.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 331331 19
19 00
LP24272242261216
LP11321
326627
MP22956242651441
MP12970242791349
DW22233244711761
DW12232244951747
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1227.975.65594.64
8.114.041.00
1101
4210975.58
10255.0831.97
206000315.75
11250 0.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3851.26796.209513.24
THOMPSONOFF ROAD
0.00
10975 11250 D 1875
S.M.CHECK C.O.M.ADJUST BRAKES INSTALLED NEW LOW& HIGH DRUM CLUTCH VALVEDIESEL 46.5 IN.SAFTEY MEATING LAYDOWN DRILLPIPE
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLER
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -123
115 1300RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
676810975 - 11250 6
6115 6
6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100912 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 27 11200
FISHING, PICKING UP D.P. WAITING ON FISH HAND, AT 4600' AT THE SHOE
Gaines TX 28
FISH FOR LOG
08-15-10 06:00 8-31-10
26
9-4--10 Glen Glass 108.00
LAY DOWN D.P. RUNNING LOGS, GENERAL CLEANING
2 N 32.5276 W -102.209
9-10-2010 9-4-10 - 8-26-10
N/A
11250.00 0.00 0.0
32
8 5/8 4604
21.15
550.00
26.0
0.00
0.00
26.0
600 8.4 33
F/W 1.5 98.50 10
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
600113012001330180019302000
113012001330180019302000600
61111111121
5.50.51.54.51.50.510.00.0
LAYDN DRILL PIPE/DRILL COLLARSRIG DN LAYDN TRUCKRIG UYP LOGGERSWIRELINE LOGS/ELTD - 11230WIRELINE LOGSWIRELINE LOGS STUCK AT 4603, WORK STUCK LOGGING TOOL STRINGWAIT ON FISHERMANLOAD PIPE RACKS, STRAP PIPE, CLAMP DOWN WIRELINE, MAKE UP STANDS
2.0
5.5
6.5
10.0
0.024.0
12.588.010.586.52.014.756.511.56.08.53.0
1.52.038.52.5
620.0
13.0310.752.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11056.50 50 300 0
LP24272242501240
LP11321
326627
MP22956242891465
MP12970243031373
DW22233244951785
DW12232245191771
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3426.82424.449937.68
THOMPSONOFF ROAD
0.00
SAFETY MTG/LAY DN DRILL PIPE / DRILL COLLARSJSA - LOGGING, JSA - SCRUBBING, DIESEL"
RICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -445
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100913 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 28 11200
RIG UP CASING CREW RUN CASING
Gaines TX 29
RUN CASING AND CEMENT
08-15-10 06:00 8-31-10
27
9-4--10 Glen Glass 108.00
TIH, LAYING DOWN DRILL PIPE, RIG UP LAY DOWN TRUCK
2 N 32.5274 W -102.208
9-10-2010 9-4-10 - 8-26-10
11250.00 0.00 0.0
32
8 5/8 4604
20.37
550.00
27.0
0.00
0.00
27.0
600 8.6 34
F/W 1.5 98.50 10
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
6007008008309001300173018002000210023300030013003300430
7008008309001300173018002000210023300030013003300430600
2121191965619191162162212
1.01.00.50.54.04.50.52.01.02.51.01.02.01.01.5
WAIT ON FISHING TOOLSSTRAP PIPE-LOAD RACKSHANG SHEVE CLOSE TO CROWNFISHING-CUT WIRELINE/BUILD ROPESOCKET-SINKER BARSFISHING/PULL TESTT.I.H /20 STANDS DRILL PIPE 12 SINGLESCONDITION MUD/JETTED PITS MUD CONTAMINATED-HIGH CLORIDES/LIVE OILT.O.O.HFISHINGTRIP OUT OPF THE HOLE WITH OVERSHOTBREAK DOWN FISHING TOOLSCUT WIRE LINE IN TWO AND RESPLICE, COME OUT OF THE HOLE WITH WIRELINE AND TOOLSTRIP IN THE HOLERIG UP LAYDOWN MACHINETRIP OUT OF THE HOLE LAYING DOWNWAIT ON CASERSRUN CASING & CEMEN
4.57.5
2.5
1.5
4.0
3.01.0
24
17.095.510.586.52.014.759.011.56.08.53.0
5.52.041.53.5
642.5
13.0310.752.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 00 350
350 00
LP24272242741264
LP113210326627
MP22956243131489
MP12970243271397
DW22233245191809
DW12232245431795
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3058.94367.8810305.56
THOMPSONOFF ROAD
0.00
SAFETY MTG / T.I.H.DIESEL 41"JSA - LAYING DOWN PIPE, JSA - RIGGING UP LAY DOWNDIESEL 39"
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -493
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100914 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 29 11200
JET PITS AND RIG DOWN
Gaines TX 30
RIG DOWN
08-15-10 06:00 8-31-10
28
9-4--10 Glen Glass 108.00
NIPPLE DOWN ,RIGGING DOWN
2 N 32.5275 W -102.208
9-10-2010 9-4-10 - 8-26-10
11250.00 0.00 0.0
32
8 5/8 4604
19.64
550.00
28.0
0.00
0.00
28.0
F/W 1.5 98.50 10
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
600133014001530180023000030
133014001530180023000030600
1221151211
7.50.51.52.55.01.55.5
RUN CASINGWASH TO BOTTOMRIG DN LAYDN TRUCK AND CASING CREWCONDITION MUD & CIRCULATECEMENTING / O - TEX / PLUG DOWN 2245NIPPLE DOWN / SET SLIPS / 146KJET PITS / RIG DOWN
8.5
2.5
12.5
0.5
24
19.595.510.586.52.014.759.024.06.08.53.0
5.52.042.03.5
661.0
13.0310.755.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 00 350
350 00
LP24272242981288
LP113210326627
MP22956243371513
MP12970243511421
DW22233245431833
DW12232245671819
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2644.74414.2010719.76
THOMPSONOFF ROAD
0.00
SAFETY MTG / PUSHER- RUN CASINGDIESEL 38"JSA- NIPPLE DOWN, JSA - RIGGING DOWNDIESEL "
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -645
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100915 VERTICAL
SEC. 14, BLK. 6, SUR. UL
CODY PITTS 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 30 11200
WAITING ON TRUCKS
Gaines TX 31
MOVE RIG
08-15-10 06:00 8-31-10
29
9-4--10 Glen Glass 80.00
RIG DOWN AND 100 % TIED OFF
2 N 32.5274 W -102.208
9-10-2010 9-4-10 - 8-26-10
0 0.0
32
8 5/8 4604
18.97
550.00
29.0
0.00
0.00
29.0
F/W 1.5 98.50 10
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
6001800
1800600
11
12.012
RIG DN FLOOR/DERRICK/GROUNDRIG DN AND CLEAN RIG
12.0
12.0
19.595.510.586.52.014.759.024.06.08.53.0
5.52.042.03.5
673.0
13.0310.7517.0
OTHER
0.000.000.000.00
LP24272
2981288
LP11321
326627
MP22956
3371513
MP12970
3511421
DW22233
5431833
DW12232
5671819
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2441.22203.5210923.28
THOMPSONOFF ROAD
0.00
5 PULLED THREADS ON PIN END OF COLLAR
BRIDLE LINE 9-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -645
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-20-10 DAY: 1OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: MARCO DAVIS DC:$ 6250 CC:$ 6250UNIT SIZE: SPM: STROKE LENGTH: BIG D $2500ANDREWS ANCHOR $1250J-W WIRELINE $2500
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDBIG D CLEAN LOCATION AFTER DRILLING RIG MOVED. ANDREWS ANCHOR SET UP THE DEAD MANS.R/U J-W WIRELINE TO RAN GAUGE RING BECAUSE WELL DOES NOT HAVE A DV TOOL. TAGGED UP 11140'. TOP OF FLOAT 11227'. RIH WIT 4.5" GAUGE RING. SDFN
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-21-10 DAY: 2OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 5,950.00 CC:$ 12,200.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 4,000.00 BASIC $ 750.00LOMAC $ 1,200.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J&J WELL SERVICE INSTALL BOP, SET TBG RACKS, UNLOAD AND TALLY TBG. PU AND RIH W/ 4 3/4", 6-3 1/8"DRILL COLLARS, X-OVER AND 2 3/8" N-80 TBG. TIH TO 11,145', PU SWIVEL, BREAK CIRCULATION BEGIN DRILLINGCEMENT TO 11,207', PU OFF BTTM, CIRCULATE CLEAN, SDON.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-22-10 DAY: 2OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 5,950.00 CC:$ 12,200.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 4,000.00 BASIC $ 750.00LOMAC $ 1,200.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J&J WELL SERVICE INSTALL BOP, SET TBG RACKS, UNLOAD AND TALLY TBG. PU AND RIH W/ 4 3/4", 6-3 1/8"DRILL COLLARS, X-OVER AND 2 3/8" N-80 TBG. TIH TO 11,145', PU SWIVEL, BREAK CIRCULATION BEGIN DRILLINGCEMENT TO 11,207', PU OFF BTTM, CIRCULATE CLEAN, SDON.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-23-10 DAY: 3OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 7,350.00 CC:$ 19,550.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 3,500.00 BASIC $ 750.00LOMAC $700.00J&W WELLHEAD $1,200.00BASIN TESTERS $ 1,200.00ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDOPEN BOP, TIH TO 11,207', PU SWIVEL, BREAK CIRCULATION, DRILL 20' OF CEMENT TO 11,227' CIRCULATE CLEANRACK SWIVEL, POOH LAYING DOWN ALL TBG, DRILL COLLARS, AND BIT, RDSU, REMOVE EQUIPMENT FROMLOCATION, ND BOP, NU FRAC STACK, RU BASIN TESTERS, TEST STACK TO 6000PSI, TEST IS GOOD. SDON
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-24-10 DAY: 4OBJECTIVE: CBL & PERF CONTRACTOR: J-W WIRELINESUPERVISOR: RODNEY LONG DC:$ CC:$ 19,550.00UNIT SIZE: SPM: STROKE LENGTH: J-W WIRELINE$KEY$ 750.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J-W WIRELINE, PU AND RIH W/ GR-CCL-CBL, TO 11,252', RU KEY, PRESSURE UP CASING TO 1000PSI, PULLCBL UNDER PRESSURE, FIND TOC @ 7,560', REPORT FINDINGS TO OFFICE. RD KEY, POOH W/ LOGGING TOOLSPU AND RIH W/ PERFORATING GUNS, SHOOT FIRST STAGE AS DIRECTED FROM 11,089' TO 10,736', 120 SHOTS4-JSPF. POOH W/ GUNS, SDON
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL: UNIV BLK6-14#6 DATE:9-27-10 DAY: 1OBJECTIVE: NEW COMPLETION CONTRACTOR: FRAC TECHSUPERVISOR: Oscar Dominguez DC:$ CC:$ UNIT SIZE: SPM: STROKE LENGTH: J&W $ 5,900.00BASIC $ 750.00MUSTANG$ 500.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
TP-BP-
CIBP-
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMED
5 TH STAGE L. Spraybrerry B. W/4 SPF9350-9518BREAK DOWN PERFSW/ 48 BBLS 15% HCL, 2047 BBLS FLUID 203821LBS 20/40 SAND AVG PRESS=2805PSI AVG RATE=60.1 BPM
6TH STAGE L. Sprayberry A.. . W/4 SPF 9000-9285 BREAK DOWN PERFSW//48 BBLS 15% HCL 2084 BBLS FLUID 211505 LBS 20/40 SAND AVG PRESS=2274 PSI AVG RATE=59.8 BPM
MIRU J&W WIRELINE, PU AND RIH W/ PERF GUN, GET ON DEPTH, PERFORATE 1ST STAGE AS FOLLOWS:
1ST STAGE: ‘L. WOLFCAMP B’ W/ 4 SPF10736-11089. BREAK DOWN PERFS W/ 142 BBLS 15% HCL,3221Bbls FLUID 199125Lbs 20/40 SAND, AVG PRESS =4812 PSI AVG RATE =55.6 BPM
2ND STAGE: ‘Lower Wolfcamp A’ W/ 4 SPF10382-10645. BREAK DOWN PERFS
W/ 71 BBLS 15% HCL, 2662 BBLS FLUID 232476Lbs 20/40 SAND, AVG PRESS =2878 PSI AVG RATE =60.4 BPM
W/71 BBLS 15% HCL,2734Bbls FLUID 200402Lbs 20/40 SAND, AVG PRESS =4523PSI AVG RATE =56.8 BPM
3TH STAGE: ‘. U. wolfcamp’ W/ 4 SPF 9928-10165. BREAK DOWN PERFSW/ 71 BBLS 15% HCL,2585 BBLS FLUID 231014 Lbs 20/40 SAND, AVG PRESS =3698PSI AVG RATE =59.8 BPM
4TH STAGE 'Dean W/4 SPF9624-9839.BREAK DOWN PERFS
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL: UL6-14#6 DATE:09-28-10 DAY: 2OBJECTIVE: NEW COMPLETION CONTRACTOR: FRAC TECHSUPERVISOR: Oscar Dominguez DC:$ CC:$ UNIT SIZE: SPM: STROKE LENGTH: J&W $ 5,900.00BASIC $ 750.00MUSTANG$ 500.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
AVG PRESS-BP-
CIBP-
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMED7TH STAGE U. Sprayberry B. W/4 SPF 8638-8925 BREAK DOWN PERFS W/48 BBLS 15% HCL2119BBLS FLUID 203857 LBS 20/40 SAND AVG PRESS=1974 PSI AVG RATE=60.2BPM
8TH STAGE U. Sprayberry A. W/4 SPF8320-8326 BREAK DOWN PERFSW/ 48 BBLS 15% HCL1989 BBLS FLUID201210LBS 20/40 SAND AVG PRESS=1080 AVG RATE=45.8 BPM
9TH STAGE Clearfork C. W/4 SPF 7910-8205 BREAK DOWN PERFSW/ 48 BBLS. 15% HCL 1834 BBLS FLUID 207950LBS. 20/40 SAND AVG PRESS=1941 AVG RATE=59.4
10TH STAGE Clearfork C. W/4 SPF 7857-7944 BREAK DOWN PERFSW/ 0BBLS. 15% HCL86BBLS FLUID 0 LBS. 20/40 SAND AVG PRESS=713 AVG RATE=10 bpmSD due to pressure communication on 8-5/8" casing, 75 psi climbing. CBL log indicates no cement above 7580'.Set safety plug @ 7357'.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-29-10 DAY: 1OBJECTIVE: DRILL FRAC. PLUGS CONTRACTOR: J&JSUPERVISOR: BRYAN DC:$ 7100 CC:$ 7100UNIT SIZE: SPM: STROKE LENGTH: J-J$7100
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU. J&J WSR. AND PS. PU. RIH. NW/ 4 3/4 HURRICANE BIT. AND TBG. TAG PLUG #1 @ 7354' DRILL PLUG IN 30MIN. TAG @ 7962' WASH 2' SAND TO PLUG #2 @ 7964' DRILL PLUG IN 60 MIN. TAG @ 8286' WASH 2' SAND TO PLUG #3 @ 8288' DRILL PLUG IN 80 MIN. CIRC. CLEAN POOH. ABOVE PERFS. SION.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-30-10 DAY: 2OBJECTIVE: DRILL FRAC. PLUGS CONTRACTOR: J&JSUPERVISOR: BRYAN DC:$ 7100 CC:$ 14200UNIT SIZE: SPM: STROKE LENGTH: J-J$7100\
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
2 3/8 N-80 TBG 7345 2264 3/4 HURRICANE BIT 1 1 * S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDRIH. TAG PLUG#4 @ 8549' DRILL PLUG IN 40 MIN. TAG @ 8880' WASH 60' SAND TO PLUG #5 @ 8940' DRILL PLUG IN40 MIN. TAG PLUG #6 @ 9321' NO SAND DRILL PLUG IN 70 MIN. TAG @ 9525' WASH 15' SAND TO PLUG #7 @ 9540'DRILL PLUG IN 60 MIN. TAG @ 9845' WASH 19' SAND TO PLUG #8 @ 9864' DRILL PLUG IN 30 MIN. TAG @ 10100'WASH 90' SAND TO PLUG #9 @ 10190' DRILL PLUG IN 30 MIN. TAG @ 10676' WASH 4' SAND TO PLUG #10 @ 10680'DRILL PLUG IN 15 MIN. WASH SAND TO PBTD. 11252' CIRC. CLEAN. POOH. ABOVE PERFS. RD. J&J. LEFT WELL FLOWING TO EMPTY TEST TANKS AT 9PM. 26/64 CHOKE TBG. PSI. 250, CSG. PSI. 380. RECOVERED 3200 BBLSLOAD DURING THE DRILLING OF PLUGS. -18161 LOAD TO REC.