+ All Categories
Home > Documents > FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June...

FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June...

Date post: 03-Jan-2016
Category:
Upload: evelyn-fleming
View: 222 times
Download: 0 times
Share this document with a friend
Popular Tags:
27
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008
Transcript

FERC Order No. 698

Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines

June 20, 2008

FERC Order No. 698Communication Requirements

• FERC Order No. 698 adopted the NAESB Standards on communication between natural gas pipelines and gas powered generators, which pipelines implemented on November 1, 2007. Spectra Energy Transmissions Gas – Electric Coordination procedures were originally posted on November 1, 2007 and were reposted on February 1, 2008.

• Order 698 requires pipelines and gas fired power generators to provide the following information:– Gas Fired Power Plant Operators are required to communicate material

changes in circumstances that may affect hourly gas flows, to ensure that pipelines will have relevant information to run their systems.

– Pipelines will confirm with gas fired plant operators as to whether flow deviations can be honored.

FERC Order No. 698Communication Requirements

• Upon request by the pipeline, the Power Plant Operator will provide all the information required by Order No. 698. Spectra will issue a posting when Order No. 698 is enacted.

• Effective June 20, 2008 Spectra Energy has streamlined and simplified the procedure by which Power Plant Operators shall update hourly consumption profile information to Spectra Energy.

FERC Order No. 698Communication Requirements• The information can be submitted in one of two manners:

– Option 1: Uploading the standardized Spectra Energy Order 698 Spreadsheet into user

interface on the LINK® system– Option 2: Manually enter data directly into the user

interface on the LINK® system.

• For both options, the individual uploading or entering the hourly consumption profile must have a LINK® System logon and password. In addition, they must have adequate LINK® privileges to view measurement information for the specified meter.

– Contact your Capacity Service Account Representative or LINK® group at 1-800-827-5465 if you have any questions.

FERC Order No. 698Communication Requirements• Spectra requires the hourly consumption profile information to be

submitted prior to the beginning of the appropriate gas day (9:00 am Central Clock Time).

• The Profile shall be re-submitted to Spectra by the Power Plant Operator when material changes in hourly gas flows are anticipated for current or future gas days. Previous hour’s consumption profile will not be allowed to be altered or changed after the hour has passed.

• The submission of the hourly profile does not relieve operator from nominating adequate quantities to meet demand, nor does it constitute the acceptance of such profile.

• The following slides provide the user step by step instructions to submit hourly profile information into the LINK® system. The procedures provided here-in are the same for all Spectra Energy pipelines.

FERC Order No. 698Hourly Profile Instructions

Select the appropriateSpectra Energy Pipeline (business unit)and Log-in

Under “Customer Activities”,“Flowing Gas”, “Measurement”Click on “Order 698 – Power Plant Profile”

FERC Order No. 698Hourly Profile Instructions

FERC Order No. 698Hourly Profile Instructions

Select Date

FERC Order No. 698Hourly Profile Instructions

Select Meter Number fromdrop down menu. Only metersassociated with your log-in will be available for selection.

FERC Order No. 698Data Entry Option 1: Upload from Spreadsheet

Click the Upload Button

Option 1: Upload from Spreadsheet

If necessary, a new template can be obtained by right-clicking the Template link and click“Save Target As”.

Save the file in theappropriate directory.

Option 1: Upload from Spreadsheet

Click the Browse button.

Option 1: Upload from SpreadsheetSelect the file from the appropriate directory and select Open.

Note: This file must be the same as the Spectra Energy Order 698 template. SeeAppendix ‘A’ for details.

Option 1: Upload from Spreadsheet

If you have multiple profileswithin the file, select theappropriate worksheet toupload.

Option 1: Upload from Spreadsheet

You can choose to updateprofile information only, contact information only or both by selectingthe appropriate radio button.

Option 1: Upload from Spreadsheet

When you select the submit buttonyou have automatically updated andsaved the profile. (and you are complete!)

Option 2: Enter Directly into User Interface

Enter Power Plant 24-hour contact information

Option 2: Enter Directly into User Interface

Enter Gas Supplycontact information

Option 2: Enter Directly into User Interface

Enter gas flow consumptionfor each hour in Dths / hr.

Option 2: Enter Directly into User Interface

Click submit and you are done.

Appendix A

Standardized Spreadsheet

Uploading Standardized Spreadsheet•When the on-line process (Option 1) is implemented by

Spectra Energy, the standardized spreadsheet will be attached on the posting on the Link® system.

• Do not re-format or alter the layout of the spreadsheet (e.g. do not add or delete rows or columns within the spreadsheet). However, you can utilize typical spreadsheet functionality in each cell or elsewhere on the spreadsheet.

• Multiple profiles can be saved on the same spreadsheet by utilizing different worksheets. When uploading the file, ensure the correct worksheet is selected under “Worksheet”.

Click save and you are done.

Enter Directly into User Interface

Enter any comments in cell B48. Comments donot carry over from one day to the next.

Enter hourly consumption datain Dths / hr. For example: 9:00 am is the consumption between 9:00 am to 10:00 am

Enter appropriate contact information for Gas Supply and Power Plant.

Meter number in spreadsheet must match the meter number selected in the user interface.

Appendix B

Other Helpful Hints

FERC Order No. 698Hourly Profile Instructions

In the event the power plant will NOThave any consumption for several days,check the “No Flow Until Further Notice” box. • The profile will remain zero for future days until a new profile is submitted.• No profile is required to be submitted for subsequent Gas Days until flow re-commences or is expected to re-commence.

FERC Order No. 698Hourly Profile Instructions

Each Power Plant Operator cancompare the total expected profile to the total scheduled quantities for the Gas Day.

Note: the scheduled quantities are not Real-Time Values but are updated every 20 minutes. The quantities areapproved scheduled quantities notrequested quantities.

FERC Order No. 698Hourly Profile Instructions

To review the most up-to dateinstructions on how to submit a 698 Power Plant Profile on to the LINK® system click the “698 Tutorial” Link.


Recommended