13
FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas December 16, 2008
Transcript
Page 1: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

FERC Scoping MeetingProject No. 2305

Federal Energy Regulatory Commission

Sabine River Authority State of Louisiana &

Sabine River Authority of TexasDecember 16, 2008

Page 2: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

• Length – 560 miles

• Drainage Area – 9,952 sq. mi.25% -Louisiana75% in Texas

• Boundary reach covered by Sabine River Compact.

• Available water is split equally between States.

• Toledo Bend Dam is located 147 miles from top of Sabine Lake.

Sabine River Basin Facts

Page 3: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Project

• Owned jointly by – Sabine River Authority

State of Louisiana – Sabine River Authority

of Texas

• Operated by the Toledo Bend Joint Operation

Page 4: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Joint Operation

6 Member Executive Committee

• 2 Board members appoint from the SRA-TX Board of Directors

• 2 Board members appoint from the SRA-LA Board of Directors

• The General Managers of SRA-TX and SRA-LA

Page 5: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Joint Operation

Responsible for setting policy for the operations and maintenance and power sales of the jointly held assets which include the spillway, dam and power house and other related facilities.

Page 6: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

• 65 mile long reservoir

• 185,000 surface acres

• 1263 miles of shoreline

• 4,477,000 acre-feet controlled storage

• Water Supply and Hydro-Electric

Toledo Bend Project

Page 7: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Dam

• 11,250 feet long.• Max height 112 feet.• Top width 25 feet. • Rolled earth fill with

soil-cement on upstream slope for erosion control.

Page 8: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Dam Spillway

• Length – 838 Feet• 11 40X28 Foot tainter

gates.• Low flow sluiceway • Design discharge

capacity 290,000 cfs

Page 9: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Hydroelectric Operations

• Two Vertical Units utilizing Kaplan turbines

• Authorized installed capacity of 81MW

Page 10: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Toledo Bend Dam HydroelectricProposed Mini-Hydro Unit

• Designed to capture energy associated with routine spillway flow releases.

• Horizontal Kaplan machine

• Electric Capacity of 0.875 MW

• Annually 5.4 to 7.0 million kW-hrs produced

Page 11: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

TurbineTransformer and Control System

Page 12: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

FERC License

• Current license issued in October, 1963

• Project became operational in 1968.

• License expires September 30, 2013.

• Filed NOI/PAD September 22, 2008

• Prepare relicensing application 2008-2011

• File license application September, 2011

Page 13: FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Additional Information

Public Web site

http://www.tbpjo.org

Melvin Swoboda409-746-2192 or

[email protected]