Ferry Free E39 at NTNU Carl ChristianThodesen
Transcript
Page 1: Ferry free E39 at NTNU

Ferry Free E39 at NTNU

Carl Christian Thodesen

Page 2: Ferry free E39 at NTNU
Page 3: Ferry free E39 at NTNU

In the beginning…

Page 4: Ferry free E39 at NTNU

Coastal Highway Route E39

E39 Kristiansand - Trondheim

1100 km 8 (7) Ferry links remaining 8 of 10 national ferry links US$ 25 billion

Page 5: Ferry free E39 at NTNU
Page 6: Ferry free E39 at NTNU
Page 7: Ferry free E39 at NTNU

A different kind of project!

Page 8: Ferry free E39 at NTNU

An interdisciplinary technology project!

Page 9: Ferry free E39 at NTNU

What are we doing about it?

Page 10: Ferry free E39 at NTNU

NTNU research strategy

Two principal thematic areas:

Fjord Crossings

Roads and Transportation

Page 11: Ferry free E39 at NTNU

Post Doc

PhD student PhD student PhD student

MSc

MSc MSc

MSc

MSc

MSc

RA

NTNU

Professor SINTEF

Scientist(s)

Industry

Professional(s)

Post Doc

Increasing research experience

Page 12: Ferry free E39 at NTNU

Fjord crossings

Misson statement: Enable design of long span fjord crossing structures

– Model the environmental loading on the fjord crossing structures

– Establish computational tools to simulate dynamic reponse

– Establish design criteria for safety and comfort

– Establish service life criteria and prediction tools

Page 13: Ferry free E39 at NTNU

Roads and Transportation

Mission statement: Develop knowledge for sustainable design, construction, operation, and maintenance of E39

– Develop safer solutions for road lifecycle

– Develop lower energy solutions for road lifecycle

– Develop environmentally friendly solutions for road lifecycle

Page 14: Ferry free E39 at NTNU

Research effort (PhD and Post Doc Positions)

Fjord crossings; 12

Traffic management;

3

Road Planning and pavement technology; 3

Project management and contracts;

3

Materials; 2

Life cycle analysis; 2

*Research administration is also included

Page 15: Ferry free E39 at NTNU

Dynamic modelling and analysis of long span cable-supported bridges subjected to wind loading with emphasis on field measurements Dynamic modelling and analysis of long span cable-supported bridges subjected to wind loading with emphasis on wind tunnel measurements Force identification using measured dynamic response Experimental investigation of hydrodynamic behavior of slender submerged bodies Ship collisions Explosion loads and load effects on submerged floating tunnels Deep foundations Dynamic response of cable-supported bridges with floating towers Moored floating bridges and submerged floating tunnels subjected to parametric excitation Modelling and analysis of damping in structural systems Dynamic response of floating bridges

Page 16: Ferry free E39 at NTNU

PhDs and Post Docs from 13 countries represented

Page 17: Ferry free E39 at NTNU

7 Post Docs

19 PhDs

Page 18: Ferry free E39 at NTNU

Thinking (sustainably) ahead...

Page 19: Ferry free E39 at NTNU
Page 20: Ferry free E39 at NTNU
Page 21: Ferry free E39 at NTNU

Research cooperation

Page 22: Ferry free E39 at NTNU
Page 23: Ferry free E39 at NTNU

Power Roads concept

Page 24: Ferry free E39 at NTNU
Page 25: Ferry free E39 at NTNU

Where are we today?

Page 26: Ferry free E39 at NTNU
Page 27: Ferry free E39 at NTNU

“A person who never made a mistake never tried anything new.”

- Albert Einstein

Page 28: Ferry free E39 at NTNU

Thank you!