+ All Categories
Home > Documents > FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2....

FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2....

Date post: 24-Mar-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
18
FESAus – New Technology Forum 11 th September 2012 Baker Hughes Drilling & Evaluation aXcelerate- High-Speed Telemetry Martin Jacobs Applications/Engineering Manager Drilling Systems, Baker Hughes
Transcript
Page 1: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

FESAus – New Technology Forum

11th September 2012Baker Hughes Drilling & Evaluation

aXcelerate™ - High-Speed Telemetry

Martin JacobsApplications/Engineering ManagerDrilling Systems, Baker Hughes

Page 2: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

Mud Pulse Telemetry (MPT)

Principle

Pressure builds by reducing flow cross-section

– Mud pulse travels to surface

– Propagation speed approx. 1200 - 1500m/sec

Pressure fluctuation detected on surface– transducer installed in standpipe

Page 3: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

© 2010 Baker HughesIncorporated. All RightsReserved.

MPT Challenges: Interfering Noise

Page 4: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

MPT Challenges: Signal Attenuation

Pulse Attenuation according to Lamb (extended reach example)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Depth (m)

Psu

rface

/P

do

wnh

ole

10Hz Water

40Hz Water

10Hz OBM

40Hz OBM

Page 5: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

MPT Challenges: Signal Reflection

signal generated downhole

signal received on surface

transmission channel

reflection

attenuation

Page 6: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

MUD CHANNEL PUMPS

Pump noisecancellation

Dualpressure

transducer

De-modulation Advantage

SARA II

HSTDecode

PULSER

Mud-Pulse Telemetry – Noise removal

Page 7: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

SARA II and Advantage v2.x/HSTDecode

Improved signal resolution and processing (DSP)

Supports all pulser modulation and encoding schemes at Baker Hughes

Mud-Pulse Telemetry - Receiver

Includes BCPM2/NRZ support (Bi-directional Communication and Power Module)

Improved algorithms for more robust decoding

Improved synchronization with new coding schemes

Improved error detection/correction capabilities (protect bits from channel noise)

Telemetry data base for statistical analysis, problem tracking and problem solving(correlation with drilling parameters,…)

Networked – BEACON

Page 8: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

• Surface

– New dual pressure processing

– Advanced signal reconstructiontechniques

– New acquisition system

• Downhole

– Next generation pulser

– Adjustable to channelconditions

– 4 ¾”, 6 ¾” Pulservalve

Turbine / Alternator

Baker Hughes Overall Approach to MPT

Data rates up to40 bps

Page 9: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

Baker Hughes Approach to MPT (BCPM 1)

Action: Poppet Valve reciprocating

Data rates up to 10bps (offshore Australia, commonly

4-6bps is expected without decoding issues)

Parameters fully adjustable via downlinks

Telemetry system limitation is the PoppetValve (relaxation time of the MVA body)

9

Page 10: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

10

Page 11: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

Oscillating Shear Valve

signalamplitude

time

Phase modulated NRZ

Highlights

• Data rates of up to 40 bps

• High pulse pressure for ultra-deep wells

• All parameters fully adjustable via downlinks

• Fully open valve for LCM operations

signalamplitude

time

Advantage Combinatorial

Baker Hughes Approach to MPT (BCPM 2)

Page 12: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

12

Page 13: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

Realtime Data Density v’s ROP

0

100

200

300

400

500

600

1 2 3 4 5 6

3

6

12

20

30

Points per Foot

RO

Pft/

hrD

ataR

ate(B

PS

)Estimated for an LWD suite to include Gamma, Resistivity, Density, Neutron data

Page 14: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

BCPM2: 15bpsAutoTrak® X-treme™ / LithoTrak™ / CoPilot™4 Sector Gamma Imaging + High resolution CoPilot data11,000 ft – 17000 ft MD

Telemetry Example – 15bps

Page 15: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

High Speed Telemetry – Example

BCPM2: 20bpsAutoTrak® / LithoTrak™ / StarTrak™4 Sector Density Imaging + High resolution STK data+ 3 curve Resistivity10,000 ft MD

Telemetry Example – 20bps

Page 16: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

BCPM2 Summary

Increased RT data density allowing for either:

i. Increased ROP

ii. More data RT

Reduced drilling risk due to a clearer picture of down-holedynamics

Improved tolerance against LCM plugging – less NPT

Greater flexibility on decoding issues

16

Page 17: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

aXcelerate Mud-pulse Telemetry

• 30 bps from 9,865 ft, onshore North America

• 27 bps from 11,394 ft, offshore Brazil

(40 bps off bottom)

• 20 bps from 20,991 ft, offshore Norway

• 10 bps from 28,372 ft, onshore Middle East(4 ¾” tool)

• 3.5 bps from 34,570 ft, Sakhalin*

• 3.0 bps from 38,320 ft, Sakhalin* * Not a technical limitation

• Australia – first run at 15bps (40bps off-bottom on clean-up

run), looking to 25 bps next well.

aXcelerate Achievements

Page 18: FESAus – New Technology Forumfesaus.org/webcast/2012/09/NTF/7_aXcelerate_MWD... · 2018. 2. 2. · Baker Hughes Drilling & Evaluation aXcelerate™- High-Speed Telemetry Martin

!


Recommended