41
Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones Allegheny 73390 SmithfieldBrPedRamp-Wharf C HRST STU 750,000 1,250,000 2,000,000 12/25/2025 E Allegheny 75341 Better. Resrv Allegheny F HRST STP 500,000 500,000 Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000 Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000 Allegheny 75341 Better. Resrv Allegheny C HRST STP 1,480,193 185 150,000 1,630,193 Allegheny 75341 Better. Resrv Allegheny C HRST 581 37,000 37,000 Allegheny 75341 Better. Resrv Allegheny C HRST STU 396,823 396,823 Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 842,876 185 300,000 1,142,876 Allegheny 75341 Better. Resrv Allegheny C HRST 581 1,918,994 1,918,994 Allegheny 75341 Better. Resrv Allegheny C HRST STP 45,544 45,544 Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 7,280,000 581 1,637,200 8,917,200 Allegheny 75341 Better. Resrv Allegheny C HRST STP 1,960,000 1,960,000 Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 2,320,000 581 12,774,000 15,094,000 Allegheny 75341 Better. Resrv Allegheny C HRST STP 431,000 431,000 Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000 Allegheny 75669 Slide Line Item C SAMI STP 500,000 500,000 Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000 Allegheny 75669 Slide Line Item C SAMI 581 1,000,000 1,000,000 Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 3,282,324 3,282,324 Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000 Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000 Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 31,809 31,809 Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000 Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000 Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 725,000 2,900,000 3,625,000 05/19/2016 E Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 1,000,000 4,000,000 5,000,000 05/19/2016 E Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 1,275,000 5,100,000 6,375,000 05/19/2016 E Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 Allegheny 100382 SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000 Allegheny 100382 SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000 Allegheny 100382 SPC - Traffic Signal 4 C SAMI CAQ 3,000,000 750,000 3,750,000 12/15/2016 E Allegheny 100434 D11 P3 Line Item P BRDG STP 2,064,000 185 173,000 2,237,000
Transcript
Page 1: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

1 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 73390 SmithfieldBrPedRamp-Wharf C HRST STU 750,000 1,250,000 2,000,000 12/25/2025 E

Allegheny 75341 Better. Resrv Allegheny F HRST STP 500,000 500,000

Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000

Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000

Allegheny 75341 Better. Resrv Allegheny C HRST STP 1,480,193 185 150,000 1,630,193

Allegheny 75341 Better. Resrv Allegheny C HRST 581 37,000 37,000

Allegheny 75341 Better. Resrv Allegheny C HRST STU 396,823 396,823

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 842,876 185 300,000 1,142,876

Allegheny 75341 Better. Resrv Allegheny C HRST 581 1,918,994 1,918,994

Allegheny 75341 Better. Resrv Allegheny C HRST STP 45,544 45,544

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 7,280,000 581 1,637,200 8,917,200

Allegheny 75341 Better. Resrv Allegheny C HRST STP 1,960,000 1,960,000

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 2,320,000 581 12,774,000 15,094,000

Allegheny 75341 Better. Resrv Allegheny C HRST STP 431,000 431,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000

Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000

Allegheny 75669 Slide Line Item C SAMI STP 500,000 500,000

Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000

Allegheny 75669 Slide Line Item C SAMI 581 1,000,000 1,000,000

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 3,282,324 3,282,324

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 31,809 31,809

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000

Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 725,000 2,900,000 3,625,000 05/19/2016 E

Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 1,000,000 4,000,000 5,000,000 05/19/2016 E

Allegheny 100367 PPC-Marine Eng RetrofitIV C IMOD CAQ 1,275,000 5,100,000 6,375,000 05/19/2016 E

Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000

Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000

Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000

Allegheny 100376 SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000

Allegheny 100382 SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000

Allegheny 100382 SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000

Allegheny 100382 SPC - Traffic Signal 4 C SAMI CAQ 3,000,000 750,000 3,750,000 12/15/2016 E

Allegheny 100434 D11 P3 Line Item P BRDG STP 2,064,000 185 173,000 2,237,000

Page 2: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

2 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 100434 D11 P3 Line Item P BRDG STP 800,000 185 200,000 1,000,000

Allegheny 100434 D11 P3 Line Item P BRDG 185 42,012 42,012

Allegheny 100434 D11 P3 Line Item P BRDG 185 1,000,000 1,000,000

Allegheny 100434 D11 P3 Line Item F BRDG STP 640,000 640,000

Allegheny 100434 D11 P3 Line Item F BRDG STP 800,000 185 200,000 1,000,000

Allegheny 100434 D11 P3 Line Item F BRDG 185 130,000 130,000

Allegheny 100434 D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000

Allegheny 100434 D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000

Allegheny 100434 D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000

Allegheny 100434 D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000

Allegheny 100434 D11 P3 Line Item R BRDG STP 800,000 185 200,000 1,000,000

Allegheny 100434 D11 P3 Line Item R BRDG STP 800,000 185 200,000 1,000,000

Allegheny 100434 D11 P3 Line Item R BRDG 185 50,000 50,000

Allegheny 100434 D11 P3 Line Item R BRDG 185 1,000,000 1,000,000

Allegheny 100434 D11 P3 Line Item C BRDG STP 73,586 185 45,000 118,586 12/25/2025 E

Allegheny 100434 D11 P3 Line Item C BRDG BOF 40,000 581 1,050,000 1,090,000 12/25/2025 E

Allegheny 100434 D11 P3 Line Item C BRDG STP 400,000 400,000 12/25/2025 E

Allegheny 100434 D11 P3 Line Item C BRDG BOF 1,520,000 185 337,000 1,857,000 12/25/2025 E

Allegheny 100434 D11 P3 Line Item C BRDG STP 2,000,000 185 625,500 2,625,500 12/25/2025 E

Allegheny 104375 RDIP (CableGuiderailRepl) C SAMI sHSIP 1,000,000 1,000,000 07/02/2015 E

Allegheny 104375 RDIP (CableGuiderailRepl) C SAMI HSIP 311,757 311,757 07/02/2015 E

Allegheny 104469 Gap to the Point C TENH STU 350,000 87,500 437,500 12/25/2025 E

Allegheny 104469 Gap to the Point C TENH STU 267,625 66,906 334,531 12/25/2025 E

Allegheny 104638 Dist Photogrametry/Survey P PRA 581 100,000 100,000

Allegheny 105053 Penn Circle Conversion P HRST STP 8 2 10

Allegheny 105281 Bike Garage, East Liberty C IMOD CAQ 316,668 79,142 395,810

Allegheny 27775 McKrell Road (DL06) C BRDG 6,209 6,209 07/14/2010 A

Allegheny 28169 ACTA TDM Performanc Pilot P PRA CAQ 40,000 10,000 50,000

Allegheny 28182 CBD Signals, Phase 2 C SAMI 500,000 500,000 04/24/2014 A

Allegheny 63378 CBD Signalization Upgrade C SAMI CAQ 800,000 833,366 1,633,366 12/25/2025 E

Allegheny 63378 CBD Signalization Upgrade C SAMI STU 3,200,000 3,200,000 12/25/2025 E

Allegheny 63378 CBD Signalization Upgrade C SAMI 166,634 166,634 12/25/2025 E

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 1,200,000 185 135,000 1,335,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG 185 100,000 100,000

Allegheny 76458 Bridge - Allegheny County C BRDG BOF 9,331 185 108,925 118,256

Page 3: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

3 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 76458 Bridge - Allegheny County C BRDG BOF 87,889 87,889

Allegheny 76458 Bridge - Allegheny County C BRDG STP 2,927,250 2,927,250

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 40,000 185 1,625,585 1,665,585

Allegheny 76458 Bridge - Allegheny County C BRDG BOF 2,000,000 185 20,742,523 22,742,523

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 1,440,000 1,440,000

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 261,146 261,146

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 583,329 583,329

Allegheny 86487 Allegheny Cty Local Rdwy C LRST STP 1,200,000 300,000 1,500,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,400,000 183 435,600 123,842 2,959,442

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 1,000,000 183 187,500 62,500 1,250,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,480,000 183 465,000 155,000 3,100,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,400,000 183 450,000 150,000 3,000,000

Allegheny 88424 PPC - Marine Diesel II C IMOD CAQ 355,361 355,361 03/27/2014 A

Allegheny 94698 SPC Smart Tr. Initiative C TENH STU 436,065 325,000 761,065

Allegheny 94698 SPC Smart Tr. Initiative C TENH STU 89,291 173,078 262,369

Allegheny 94878 PPC-Marine Diesel Eng III C IMOD 16,000,000 16,000,000 03/27/2014 A

Allegheny 94879 SPC - Traffic Signal 3 P SAMI CAQ 350,840 87,710 438,550

Allegheny 94879 SPC - Traffic Signal 3 C SAMI CAQ 2,533,508 633,377 3,166,885 12/03/2015 E

Allegheny 97843 Lower Hill Redev Interior C HCON 11,880,000 11,880,000

Allegheny 97844 Lower Hill Redev Exterior C HCON 9,720,000 9,720,000

Allegheny 99021 Bridge Wash 2016 C BRDG 185 158,994 158,994 04/07/2016 E

Allegheny 99021 Bridge Wash 2016 C BRDG 581 1,041,006 1,041,006 04/07/2016 E

Allegheny 99022 Bridge Wash 2017 C BRDG 185 1,200,000 1,200,000 04/15/2017 E

Allegheny 99024 Bridge Wash 2018 C BRDG NHPP 960,000 185 240,000 1,200,000 04/15/2018 E

Allegheny 99039 AWPM 2015 C HRST STP 330,000 330,000 04/23/2015 A

Allegheny 99647 2016 ADA Curb Ramp P HRST STP 160,000 160,000

Allegheny 99647 2016 ADA Curb Ramp C HRST STP 1,500,000 1,500,000 03/24/2016 E

Allegheny 99648 2017 ADA Curb Ramp Projec +C HRST STP 1,000,000 1,000,000 03/15/2017 E

Allegheny 99652 2018 ADA Curb Ramp Projec +C HRST STP 1,000,000 1,000,000 03/15/2018 E

Allegheny 99846 S. Hills Trans. Network S HRST 581 200,000 200,000

Allegheny f100316 PAAC-TransitSignalBRT C PT CAQ 1,565,760 391,440 1,957,200 12/25/2025 E

Allegheny BR 27859 Millers Run Br(MS-06) C BRDG 816,382 816,382 02/24/2010 A

Allegheny 014 104156 Bethel Park ARLE grant C SAMI 244 264,000 264,000 12/25/2025 E

Allegheny 014 104157 Brentwood ARLE 2014 C SAMI 244 137,000 137,000 12/25/2025 E

Allegheny 014 104159 Pittsburgh ARLE grant C SAMI 244 100,000 100,000 12/25/2025 E

Allegheny 014 104160 Coraopolis ARLE 2014 C SAMI 244 138,000 138,000 12/25/2025 E

Allegheny LOC 104228 Almono - EconDev ACT 89 C HCON e581 3,500,000 3,500,000 03/10/2016 E

Allegheny LOC 104228 Almono - EconDev ACT 89 C HCON e581 1,500,000 1,500,000 03/10/2016 E

Allegheny LOC 104229 Delafield - EconDev C HCON e581 500,000 500,000 01/14/2016 E

Allegheny LOC 104662 Middle Road Preservation C HRST STP 1,600,000 400,000 2,000,000 03/10/2016 E

Page 4: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

4 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny LOC 104662 Middle Road Preservation C HRST STP 400,000 100,000 500,000 03/10/2016 E

Allegheny LOC 105191 ACAA-McClaren Road Improv

C HRST 1,400,000 1,400,000 12/25/2025 E

Allegheny LOC 27219 Campbell's Run Road F HCON STU 1,864,000 466,000 2,330,000 03/30/2017 E

Allegheny LOC 27219 Campbell's Run Road U HCON STU 320,000 80,000 400,000

Allegheny LOC 27219 Campbell's Run Road R HCON STU 1,600,000 400,000 2,000,000

Allegheny LOC 27219 Campbell's Run Road C HCON STU 5,000,000 1,250,000 6,250,000 06/08/2017 E

Allegheny LOC 47011 Duquesne Flyover Brs U BRDG STU 135,000 135,000

Allegheny LOC 47203 Forbes Ave Safety Improve P SAMI CAQ 400,000 100,000 500,000

Allegheny LOC 47203 Forbes Ave Safety Improve U SAMI CAQ 20,000 5,000 25,000

Allegheny LOC 47203 Forbes Ave Safety Improve R SAMI CAQ 20,000 5,000 25,000

Allegheny LOC 47203 Forbes Ave Safety Improve C SAMI CAQ 1,275,000 818,750 2,093,750 05/15/2018 E

Allegheny LOC 58561 Wenzell Av/Carnahan Rd Br C LRST STU 1,600,000 400,000 2,000,000 01/26/2017 E

Allegheny LOC 58562 Penn Ave Reconstruction C HRST STU 960,000 240,000 1,200,000 05/02/2013 A

Allegheny LOC 61711 Brookline Boulevard C LRST STU 625,000 156,250 781,250 12/20/2012 A

Allegheny LOC 69837 TMA Annual Funding P IMOD CAQ 480,000 120,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000

Allegheny LOC 83133 City of Pgh Signal Update P SAMI CAQ 144,000 36,000 180,000

Allegheny LOC 83133 City of Pgh Signal Update C SAMI CAQ 1,296,000 324,000 1,620,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 P LRST STU 400,000 100,000 500,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 F LRST STU 400,000 100,000 500,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 C LRST STU 1,509,666 377,417 1,887,083 03/15/2018 E

Allegheny LOC 84240 Diesel Switchyrd Retrofit C IMOD CAQ 2,103,639 525,910 2,629,549

Allegheny LOC 84240 Diesel Switchyrd Retrofit C IMOD CAQ 296,361 74,090 370,451

Allegheny LOC 88708 CBD Signalization Phase1 C HRST STU 120,000 30,000 150,000 03/29/2012 A

Allegheny LOC 93908 Forbes2a/Smithfield-Grant C HCON STU 2,800,000 700,000 3,500,000 08/25/2016 E

Allegheny LOC 93908 Forbes2a/Smithfield-Grant C HCON STU 2,800,000 700,000 3,500,000 08/25/2016 E

Allegheny LOC 93922 AR01 - Armstrong Tunnel P LRST NHPP 160,000 40,000 200,000

Allegheny LOC 93922 AR01 - Armstrong Tunnel P LRST NHPP 529,600 132,400 662,000

Allegheny LOC 94889 Pittsburgh Route and Sign P SAMI CAQ 357,890 130,000 487,890

Allegheny LOC 94889 Pittsburgh Route and Sign C SAMI CAQ 436,102 105,998 542,100 06/09/2016 E

Allegheny PT fd100307 PAAC-Ross PNR Expansion P PT CAQ 594,816 148,704 743,520

Allegheny PT fd100307 PAAC-Ross PNR Expansion R PT CAQ 125,600 31,400 157,000

Allegheny PT fd100307 PAAC-Ross PNR Expansion C PT CAQ 2,690,784 672,696 3,363,480 12/25/2030 E

Allegheny PT fd100307 PAAC-Ross PNR Expansion C PT CAQ 5,356,800 1,914,200 7,271,000 12/25/2030 E

Allegheny PT fd77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000

Allegheny PT fd77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000

Allegheny PT fd77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000

Allegheny PT fd77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000

Page 5: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

5 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny PT fd77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200

Allegheny PT fd77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200

Allegheny PT fd77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200

Allegheny PT fd77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200

Allegheny RR 102758 Bridge Street RR (NS) +C SAMI RRX* 360,000 360,000 12/25/2025 E

Allegheny RR 102973 S. 4th Street (CSX) C SAMI RRX 125,000 125,000 12/15/2016 E

Allegheny RR 102973 S. 4th Street (CSX) C SAMI RRX 167,632 167,632 12/15/2016 E

Allegheny RRX 102720 Fairview St RR GradeXing +C SAMI RRX* 360,000 360,000 12/25/2025 E

Allegheny RRX 103818 Locust Street Railroad +C SAMI RRX 7,500 7,500 10/06/2014 A

Allegheny RRX 93682 POHC Grand Av x-ing +C SAMI RRX*

30,500 30,500 12/25/2025 E

Allegheny RRX 93683 POHC Thom Ave x-ing C SAMI RRX 35,000 35,000 12/25/2025 E

Allegheny TAP 102965 Pgh Faison SR2S - TAP C TENH TAU 117,809 117,809 12/25/2025 E

Allegheny TAP 102965 Pgh Faison SR2S - TAP C TENH TAU 132,191 132,191 12/25/2025 E

Allegheny TAP 104247 Joncaire St MultimodalTAP +C TENH TAP 384,000 384,000 12/25/2025 E

Allegheny TAP 104262 Lower Hill Element IIaTAP C TENH TAP 946,680 946,680 12/25/2025 E

Allegheny TAP 28173 Pgh Bic Facilities - TAP C TENH TAU 350,000 350,000 12/25/2025 E

Allegheny TEH 28243 Montour Trail ATA C IMOD STP 115,000 115,000 04/24/2014 A

Allegheny TEH 86974 Borough of Munhall FSRTS P TENH SRTSF 200,000 200,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +F XRST 581 500,000 500,000 12/01/2016 E

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +F XRST 581 1,000,000 1,000,000 12/01/2016 E

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +U XRST NHPP 50,000 50,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +R XRST NHPP 100,000 100,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +C XRST NHPP 5,000,000 5,000,000 02/09/2017 E

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +C XRST NHPP 2,500,000 2,500,000 02/09/2017 E

Allegheny 19 A64 96280 PerryHwy/Glenview-Longvue C HRST 581 12,464 12,464 05/22/2014 A

Allegheny 19 A66 97929 Cochran Road F HRST 581 125,000 125,000 12/10/2015 E

Allegheny 19 A66 97929 Cochran Road +U HRST NHPP 25,000 25,000

Allegheny 19 A66 97929 Cochran Road +R HRST NHPP 50,000 50,000

Allegheny 19 A66 97929 Cochran Road +C HRST 581 1,100,000 1,100,000 02/11/2016 E

Allegheny 22 A32 88393 SR 22 Over Potato Garden F BRDG 185 150,000 150,000 02/04/2016 E

Allegheny 22 A32 88393 SR 22 Over Potato Garden U BRDG 185 20,000 20,000

Allegheny 22 A32 88393 SR 22 Over Potato Garden R BRDG 185 30,000 30,000

Allegheny 22 A32 88393 SR 22 Over Potato Garden C BRDG NHPP 1,200,000 185 300,000 1,500,000 04/07/2016 E

Allegheny 22 A33 91781 SR 22/ Washington/N Fay C XRST NHPP 6,000,000 185 1,500,000 7,500,000 04/07/2016 E

Allegheny 28 A09 27179 PA 28 Widen/Troy-31st St C HCON CAQ 400,000 581 100,000 500,000 06/14/2011 A

Allegheny 28 A10 27180 PA 28 Widen/31st St-Millv C HRST sSXF 25,000 6,250 31,250 06/10/2010 A

Allegheny 28 A53 47103 PA 28 Widen/I579-E Ohio C HCON NHPP 1,800,000 1,800,000 10/10/2013 A

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co F XRST 581 350,000 350,000 12/22/2016 E

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co C XRST 581 12,000,000 12,000,000 03/15/2017 E

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co C XRST 581 4,000,000 4,000,000 03/15/2017 E

Page 6: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

6 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 28 A56 91845 SR28,Highland Pk Br/Ramps P XRST NHPP 200,000 200,000

Allegheny 28 A56 91845 SR28,Highland Pk Br/Ramps P XRST NHPP 400,000 400,000

Allegheny 28 DSI 74980 Ravine Street DSI Removal P HRST sSXF 200,000 581 50,000 250,000

Allegheny 28 TAP 28246 River Towns Bike-Ped TAP +C TENH TAP 383,781 383,781 12/25/2025 E

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave F BRDG NHPP 280,000 185 70,000 350,000 11/05/2015 E

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave U BRDG NHPP 64,000 185 16,000 80,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave R BRDG NHPP 132,000 185 33,000 165,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave C BRDG NHPP 2,320,000 2,320,000 11/05/2015 E

Allegheny 48 A28 28132 48/Boston Hollow Road Br F BRDG NHPP 320,000 185 80,000 400,000

Allegheny 48 A28 28132 48/Boston Hollow Road Br R BRDG NHPP 160,000 185 40,000 200,000

Allegheny 50 A24 103204 Grp 111-15-7135-1 C HRST 581 300,000 300,000 04/09/2015 A

Allegheny 50 A26 28010 50 -Thoms Run to Mayer St P SAMI CAQ 1,400,000 1,400,000

Allegheny 51 0 104470 TRH Trail Connector S TENH STU 40,000 10,000 50,000

Allegheny 51 0 104470 TRH Trail Connector C TENH STU 327,184 81,796 408,980 12/25/2025 E

Allegheny 51 0 95773 Ohio River Trail Ph 1TCSP P HRST TCS 200,000 50,000 250,000

Allegheny 51 A10 28000 PA 88/51 Brdge/Safety Imp C BRDG 185 1,110,000 1,110,000 05/02/2013 A

Allegheny 51 A10 28000 PA 88/51 Brdge/Safety Imp C BRDG 185 640,000 640,000 05/02/2013 A

Allegheny 51 A63 28126 West Carson St. Viaduct C BRDG NHPP 1,172,200 185 140,000 1,312,200 05/31/2013 A

Allegheny 51 A79 88335 Elizabeth Bridge F BRDG NHPP 720,000 185 180,000 900,000 03/02/2017 E

Allegheny 51 A79 88335 Elizabeth Bridge U BRDG NHPP 160,000 185 40,000 200,000

Allegheny 51 A79 88335 Elizabeth Bridge R BRDG 185 200,000 200,000

Allegheny 51 A79 88335 Elizabeth Bridge C BRDG 581 8,000,000 8,000,000 05/15/2017 E

Allegheny 51 A79 88335 Elizabeth Bridge C BRDG 581 8,000,000 8,000,000 05/15/2017 E

Allegheny 51 A82 96076 51 Safety/Midwood-Edgebro C SAMI HSIP 1,360,000 1,360,000 04/09/2015 A

Allegheny 51 A84 96707 2014 ADA Curb Ramp Projec C HRST STP 1,000,000 1,000,000 04/17/2014 A

Allegheny 51 A87 28397 Clairton Blvd/Saw Mill Rn C HRST NHPP 15,473,000 15,473,000 04/09/2015 A

Allegheny 51 A87 28397 Clairton Blvd/Saw Mill Rn C HRST HSIP 2,087,000 2,087,000 04/09/2015 A

Allegheny 51 A92 99646 2015 ADA Curb Ramp Projec +C HRST STP 4,000,000 4,000,000 10/22/2015 E

Allegheny 51 A93 97936 SR 51/Vine St -Thorn Run P HRST NHPP 150,000 150,000

Allegheny 51 A93 97936 SR 51/Vine St -Thorn Run C HRST 581 1,500,000 1,500,000 05/05/2016 E

Allegheny 60 A49 94656 Steubenville Pike C HRST NHPP 192,000 581 48,000 240,000 01/30/2014 A

Allegheny 65 A52 94888 65/19, Beaver Turnaround F BRDG NHPP 160,000 185 40,000 200,000 12/10/2015 E

Allegheny 65 A52 94888 65/19, Beaver Turnaround U BRDG NHPP 40,000 185 10,000 50,000

Allegheny 65 A53 92280 65/Ft Duq Br-McKees Rock F HCON 581 250,000 250,000 12/03/2015 E

Allegheny 65 A53 92280 65/Ft Duq Br-McKees Rock U HCON 581 50,000 50,000

Allegheny 65 A53 92280 65/Ft Duq Br-McKees Rock C HCON NHPP 9,960,000 9,960,000 02/11/2016 E

Allegheny 65 A53 92280 65/Ft Duq Br-McKees Rock C HCON STP 2,100,000 2,100,000 02/11/2016 E

Allegheny 65 A53 92280 65/Ft Duq Br-McKees Rock C HCON NHPP 400,000 400,000 02/11/2016 E

Allegheny 79 0 104496 I-79-Butler Cty to I-279 S HRST 581 500,000 500,000

Allegheny 88 A22 100967 SR 88/King School & Logan P SAMI NHPP 240,000 581 60,000 300,000

Page 7: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

7 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 88 A22 100967 SR 88/King School & Logan R SAMI NHPP 16,000 581 4,000 20,000

Allegheny 88 A22 100967 SR 88/King School & Logan C SAMI NHPP 1,920,000 581 480,000 2,400,000 02/09/2017 E

Allegheny 88 A23 102961 SR 88 &SR 3004 Widening P HRST 581 100,000 100,000

Allegheny 88 A23 102961 SR 88 &SR 3004 Widening P HRST 581 350,000 350,000

Allegheny 136 0 97948 Mon City Bridge P BRDG 581 300,000 300,000

Allegheny 286 A09 26564 PA 286/US 22 -Sagamore Rd C HCON 581 200,000 200,000 01/30/2014 A

Allegheny 376 0 77506 Bridge Paint Districtwide C BRDG STP 400,000 185 1,600,000 2,000,000 05/19/2016 E

Allegheny 376 0 87383 Bridge Wash 2015 C BRDG 185 1,190,000 1,190,000 03/26/2015 A

Allegheny 376 A51 94651 Pkwy East Corridor Transp P SAMI NHPP 2,000,000 2,000,000

Allegheny 376 A51 94651 Pkwy East Corridor Transp +C SAMI CAQ 2,837,119 2,837,119 05/15/2017 E

Allegheny 376 A51 94651 Pkwy East Corridor Transp +C SAMI CAQ 1,242,881 1,242,881 05/15/2017 E

Allegheny 376 A58 96316 I376EB/Brady St, Trail F BRDG 185 75,000 75,000

Allegheny 376 A59 97028 I376/Banksville Interchan P HRST CAQ 2,500,000 2,500,000

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum P HRST STP 200,000 200,000 10/29/2014 A

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum R HRST NHPP 165,000 165,000

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum C HCON NHPP 11,325,000 190,000 11,515,000 04/23/2015 A

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum C HCON HSIP 984,876 984,876 04/23/2015 A

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum C HCON NHPP 2,265,124 2,265,124 04/23/2015 A

Allegheny 579 A10 97846 I-579 "Cap" Project F BRDG TIGER 1,551,632 1,551,632

Allegheny 837 0 98105 SR 837, Carson Street C HRST NHPP 4,000,000 4,000,000 03/15/2017 E

Allegheny 837 A13 28544 Glenwood Bridge Ramps P BRDG NHPP 320,000 185 80,000 400,000 11/19/2014 A

Allegheny 837 A13 28544 Glenwood Bridge Ramps F BRDG NHPP 880,000 185 220,000 1,100,000 04/16/2015 E

Allegheny 837 A13 28544 Glenwood Bridge Ramps C BRDG NHPP 4,240,000 185 1,120,000 5,360,000 06/18/2015 A

Allegheny 837 A13 28544 Glenwood Bridge Ramps C BRDG NHPP 8,320,000 185 2,080,000 10,400,000 06/18/2015 A

Allegheny 837 A38 94648 837/7th Ave - Kennywood F XRST 581 800,000 800,000 12/03/2015 E

Allegheny 837 A38 94648 837/7th Ave - Kennywood U XRST 581 100,000 100,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood R XRST 581 100,000 100,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood C XRST STP 3,000,000 581 3,000,000 6,000,000 03/09/2017 E

Allegheny 837 A38 94648 837/7th Ave - Kennywood C XRST NHPP 3,000,000 581 6,300,000 9,300,000 03/09/2017 E

Allegheny 837 A42 98085 837/33rd St to Smithfield P SAMI CAQ 200,000 581 50,000 250,000

Allegheny 837 A42 98085 837/33rd St to Smithfield F SAMI CAQ 400,000 581 100,000 500,000

Allegheny 837 A42 98085 837/33rd St to Smithfield R SAMI CAQ 40,000 581 10,000 50,000

Allegheny 837 A42 98085 837/33rd St to Smithfield C SAMI CAQ 4,000,000 581 1,000,000 5,000,000 03/15/2018 E

Allegheny 910 A33 63322 SR 910 over Deer Creek F BRDG 185 250,000 250,000

Allegheny 910 A33 63322 SR 910 over Deer Creek C BRDG 581 4,900,000 4,900,000 04/15/2018 E

Allegheny 1001 A37 27266 Freeport Rd Br over RR F BRDG STP 400,000 185 100,000 500,000 03/16/2017 E

Allegheny 1001 A37 27266 Freeport Rd Br over RR U BRDG STP 240,000 185 60,000 300,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR R BRDG STP 80,000 185 20,000 100,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR C BRDG 581 5,000,000 5,000,000 05/18/2017 E

Allegheny 1001 TAP 102963 Etna Green Stretscape2TAP C TENH TAU 350,000 350,000 12/25/2025 E

Page 8: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

8 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 1002 0 69056 Wrong Way Ramps C SAMI HSIP 150,000 150,000 07/17/2014 A

Allegheny 1013 A14 63344 P3-Little Pine Creek Br R BRDG 185 97,000 97,000

Allegheny 1013 A16 78223 P3-1013,Saxonburg Blvd Br U BRDG 185 19,000 19,000

Allegheny 1013 A16 78223 P3-1013,Saxonburg Blvd Br R BRDG 185 30,000 30,000

Allegheny 1013 A18 102646 Saxonburg Blvd Rock Wall C BRDG 185 500,000 500,000 12/25/2025 E

Allegheny 1016 A02 27287 P3-Rich Hill Road Bridge U BRDG 185 53,000 53,000

Allegheny 1018 A01 78233 SR 1018 Alpha Drive C BRDG 185 100,000 100,000 07/03/2014 A

Allegheny 1019 A06 63351 Days Run Bridge F BRDG BOF 120,000 185 30,000 150,000 03/16/2017 E

Allegheny 1019 A06 63351 Days Run Bridge U BRDG BOF 40,000 185 10,000 50,000

Allegheny 1019 A06 63351 Days Run Bridge R BRDG BOF 40,000 185 10,000 50,000

Allegheny 1019 A06 63351 Days Run Bridge C BRDG BOF 800,000 185 200,000 1,000,000 05/15/2017 E

Allegheny 1020 A03 63353 Russellton-Dorseyville Br F BRDG 185 220,000 220,000

Allegheny 1020 A03 63353 Russellton-Dorseyville Br U BRDG 185 35,000 35,000

Allegheny 1020 A03 63353 Russellton-Dorseyville Br R BRDG 185 60,000 60,000

Allegheny 1028 A10 27292 Culmerville Truss Bridge P BRDG 185 300,000 300,000 12/12/2012 A

Allegheny 1028 A10 27292 Culmerville Truss Bridge C BRDG STP 4,240,000 185 1,060,000 12,500 5,312,500 03/26/2015 A

Allegheny 1028 A11 63356 P3-Bakerstown Road Bridge R BRDG 185 95,000 95,000

Allegheny 1031 A01 78269 1031 over Lardington Run F BRDG 185 290,000 290,000 11/13/2016 E

Allegheny 1031 A01 78269 1031 over Lardington Run U BRDG 185 35,000 35,000

Allegheny 1031 A01 78269 1031 over Lardington Run R BRDG 185 80,000 80,000

Allegheny 1031 A01 78269 1031 over Lardington Run C BRDG 185 900,000 900,000 01/15/2017 E

Allegheny 1034 A07 63513 P3-Bull Creek Rd Bridge U BRDG 185 25,000 25,000

Allegheny 1034 A07 63513 P3-Bull Creek Rd Bridge R BRDG 185 76,000 76,000

Allegheny 1038 000 63515 New Kensington Br P BRDG 581 500,000 500,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run F BRDG 185 150,000 150,000 05/26/2016 E

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run U BRDG 185 50,000 50,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run R BRDG 185 75,000 75,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run C BRDG 185 2,000,000 2,000,000 07/28/2016 E

Allegheny 2031 A02 61345 Lincoln Way Improvement C SAMI CAQ 1,450,000 1,450,000 07/18/2013 A

Allegheny 2037 A11 28117 2037 Tri-Boro Paint C BRDG NHPP 116,000 185 28,250 144,250 01/08/2015 A

Allegheny 2040 0 92370 District 11 2c SINC-UP C HRST CAQ 20,000 581 5,000 25,000 03/13/2014 A

Allegheny 2040 A10 26690 Brownsville@Broughton Rd R HRST STP 300,000 75,000 375,000

Allegheny 2040 A10 26690 Brownsville@Broughton Rd C HRST STU 424,000 106,000 530,000 12/16/2010 A

Allegheny 2040 A16 28025 2040/OlLebanon Church F HRST 581 250,000 250,000 01/19/2017 E

Allegheny 2040 A16 28025 2040/OlLebanon Church +C HRST NHPP 6,298,400 6,298,400 03/23/2017 E

Allegheny 2040 A16 28025 2040/OlLebanon Church +C HRST NHPP 7,000,000 7,000,000 03/23/2017 E

Allegheny 2040 A18 77348 Curry Hollow Rd Br/CSX U BRDG 185 75,000 75,000

Allegheny 2065 A08 27419 P3-Thompson Run Rd Br R BRDG 185 88,000 88,000

Allegheny 2082 A08 57100 Hulton Road Bridge C BRDG NHPP 3,078,500 3,078,500 08/01/2013 A

Allegheny 2085 A05 69070 SR 2085,Birmingham Br C HRST 581 500,000 500,000 07/17/2014 A

Page 9: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

9 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 2094 A04 28345 Jerome Street Bridge P BRDG 581 500,000 500,000

Allegheny 2114 A05 63583 McKeesport Duq Br P BRDG 581 600,000 600,000

Allegheny 2128 A02 81750 Tenth Street Bypass +F XRST NHPP 200,000 200,000

Allegheny 2128 A02 81750 Tenth Street Bypass +U XRST NHPP 50,000 50,000

Allegheny 2128 A02 81750 Tenth Street Bypass +R XRST NHPP 50,000 50,000

Allegheny 2128 A02 81750 Tenth Street Bypass +C XRST NHPP 4,000,000 4,000,000 12/25/2025 E

Allegheny 2128 A02 81750 Tenth Street Bypass +C XRST NHPP 3,000,000 3,000,000 12/25/2025 E

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R F BRDG STP 240,000 185 60,000 300,000 10/05/2017 E

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R R BRDG STP 40,000 185 10,000 50,000

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R C BRDG STP 960,000 185 240,000 1,200,000 12/15/2017 E

Allegheny 3003 A06 27666 SR 3003 over Coal Run U BRDG 185 450,000 450,000

Allegheny 3003 A06 27666 SR 3003 over Coal Run C BRDG 185 130,000 130,000 03/13/2014 A

Allegheny 3004 A12 100981 McMurray - Clifton Road P SAMI STP 20,000 581 5,000 25,000

Allegheny 3004 A12 100981 McMurray - Clifton Road C SAMI 581 300,000 300,000 03/10/2016 E

Allegheny 3004 A13 100963 McLaughlin Rn Rd@McMillia

S HCON 581 175,000 175,000

Allegheny 3004 A13 100963 McLaughlin Rn Rd@McMillia

S HCON 581 145,000 145,000

Allegheny 3004 A13 100963 McLaughlin Rn Rd@McMillia

P HCON 581 60,000 60,000

Allegheny 3004 A13 100963 McLaughlin Rn Rd@McMillia

P HCON 581 200,000 200,000

Allegheny 3005 A05 28520 Mayview Road Bridge P BRDG 185 350,000 350,000

Allegheny 3005 A05 28520 Mayview Road Bridge F BRDG 185 150,000 150,000 11/17/2016 E

Allegheny 3005 A05 28520 Mayview Road Bridge U BRDG 185 100,000 100,000

Allegheny 3005 A05 28520 Mayview Road Bridge R BRDG 185 100,000 100,000

Allegheny 3005 A05 28520 Mayview Road Bridge C BRDG 185 800,000 800,000 01/26/2017 E

Allegheny 3005 A05 28520 Mayview Road Bridge C BRDG 185 1,200,000 1,200,000 01/26/2017 E

Allegheny 3005 TAP 102964 MayviewRdSidewalk-TAP C TENH TAU 334,650 334,650 12/25/2025 E

Allegheny 3009 A20 100970 3009/South Park @Logan Rd P HRST 581 100,000 100,000

Allegheny 3009 A20 100970 3009/South Park @Logan Rd P HRST 581 300,000 300,000

Allegheny 3014 A04 28446 P3-3014 ov Piney Fork Ck U BRDG 185 31,000 31,000

Allegheny 3027 A05 28525 Smithfield St Bridge F BRDG 185 800,000 800,000 10/06/2016 E

Allegheny 3027 A05 28525 Smithfield St Bridge U BRDG 185 100,000 100,000

Allegheny 3027 A05 28525 Smithfield St Bridge R BRDG 185 400,000 400,000

Allegheny 3027 A05 28525 Smithfield St Bridge C BRDG STU 4,000,000 581 6,000,000 10,000,000 11/02/2017 E

Allegheny 3028 A02 78245 Preston Sygan ov Thoms Rn C BRDG BOF 100,000 100,000 09/01/2011 A

Allegheny 3039 000 26546 3039/ConrailRR,Robinson P BRDG 581 300,000 300,000

Allegheny 3044 A01 81668 3044/Washington Rd- Scott F HRST 581 130,000 130,000 01/22/2015 E

Allegheny 3044 A01 81668 3044/Washington Rd- Scott U HRST 581 20,000 20,000

Allegheny 3044 A01 81668 3044/Washington Rd- Scott C HRST 581 3,000,000 3,000,000 03/26/2015 A

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R F BRDG 185 200,000 200,000 10/05/2017 E

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R U BRDG 185 50,000 50,000

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R R BRDG 185 50,000 50,000

Page 10: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

10 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R C BRDG 185 1,250,000 1,250,000 12/15/2017 E

Allegheny 3057 BRR 101482 Bridge Demand Mtc 7, 2015 C BRDG 185 400,000 400,000 03/26/2015 A

Allegheny 3069 A14 74153 Liberty Tunnel Rehab Ph 4 C BRDG NHPP 1,300,000 1,300,000 02/22/2013 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge F BRDG NHPP 400,000 185 100,000 500,000 04/16/2015 E

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge U HRST NHPP 120,000 120,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG sNHPP 26,000,000 26,000,000 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 7,247,084 7,247,084 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG sNHPP 15,000,000 15,000,000 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 400,000 400,000 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG sNHPP 15,000,000 15,000,000 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 1,000,000 1,000,000 06/25/2015 A

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 21,648,000 21,648,000 06/25/2015 A

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 +F BRDG NHPP 600,000 600,000 01/28/2016 E

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 U BRDG NHPP 375,000 125,000 500,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 R BRDG NHPP 500,000 500,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 C BRDG NHPP 7,200,000 581 1,800,000 9,000,000 04/07/2016 E

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 C BRDG NHPP 8,000,000 581 2,000,000 10,000,000 04/07/2016 E

Allegheny 3069 A23 26614 LibertyTunnel Interchange P HRST STP 150,000 150,000

Allegheny 3069 A23 26614 LibertyTunnel Interchange C HRST STP 1,200,000 581 300,000 1,500,000 04/07/2016 E

Allegheny 3069 A23 26614 LibertyTunnel Interchange C HRST STP 1,160,000 581 290,000 1,450,000 04/07/2016 E

Allegheny 3069 NDT 105017 D11 SHRP2 Tunnel Inspect P SPFED SXF 250,000 250,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert F BRDG BOF 400,000 185 100,000 500,000 06/09/2016 E

Allegheny 3089 A14 73054 HookstownGrade &Flaughert U BRDG BOF 40,000 185 10,000 50,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert R BRDG BOF 80,000 185 20,000 100,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert C BRDG 185 4,400,000 4,400,000 08/11/2016 E

Allegheny 3098 A03 27431 SR 3098/Glass Run Bridge U BRDG 185 235,000 235,000

Allegheny 3098 A03 27431 SR 3098/Glass Run Bridge C BRDG STU 800,000 800,000 07/17/2014 A

Allegheny 3104 A03 28344 McKees Rocks Bridge P BRDG 581 600,000 600,000

Allegheny 3109 A12 104230 RMU turnlane - EconDev C HCON e581 242,550 242,550 06/18/2015 E

Allegheny 3110 A02 28141 Shaler Street over US 19 F BRDG BOF 160,000 185 40,000 200,000 12/01/2016 E

Allegheny 3110 A02 28141 Shaler Street over US 19 U BRDG BOF 40,000 185 10,000 50,000

Allegheny 3110 A02 28141 Shaler Street over US 19 R BRDG BOF 160,000 185 40,000 200,000

Allegheny 3110 A02 28141 Shaler Street over US 19 C BRDG BOF 800,000 185 200,000 1,000,000 02/09/2017 E

Allegheny 3160 A10 86859 Thorn Run Rd Interchange C HCON SXF 801,180 e581 2,000,000 2,801,180 01/14/2016 E

Allegheny 3160 A10 86859 Thorn Run Rd Interchange C HCON e581 1,300,000 1,300,000 01/14/2016 E

Allegheny 3160 A10 86859 Thorn Run Rd Interchange C HCON 2,900,000 2,900,000 01/14/2016 E

Allegheny 4003 A16 78410 McKnight Rd over Pine Ck P BRDG NHPP 108,000 185 27,000 135,000 02/11/2015 A

Allegheny 4003 A16 78410 McKnight Rd over Pine Ck C BRDG NHPP 4,800,000 185 1,200,000 6,000,000 05/07/2015 A

Allegheny 4003 A20 103838 4003 McKnight (AID) Proj. C SPFED SXF 720,000 581 180,000 900,000 07/30/2015 E

Allegheny 4003 A21 94658 4003McKnight Surveillance C SAMI CAQ 640,000 640,000 07/30/2015 E

Page 11: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

11 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys F BRDG NHPP 200,000 185 50,000 250,000 02/25/2016 E

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys R BRDG NHPP 40,000 185 10,000 50,000

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys C BRDG NHPP 1,600,000 185 400,000 2,000,000 05/05/2016 E

Allegheny 4017 A03 73055 4017 ov Little Pine Creek P BRDG 581 300,000 300,000

Allegheny 4017 A06 74338 P3-Pine Ck Rd Br/ Lt Pine U BRDG 185 20,000 20,000

Allegheny 4017 A06 74338 P3-Pine Ck Rd Br/ Lt Pine R BRDG 185 30,000 30,000

Allegheny 4022 A09 102874 4022/I79 - Arndt C HRST STU 2,000,000 2,000,000 4,000,000 01/28/2016 E

Allegheny 4052 A09 86922 Warrendale-Bayne Impr III C SAMI D4R 557,542 1,200,000 1,757,542 06/09/2016 E

Allegheny 4052 A09 86922 Warrendale-Bayne Impr III C SAMI STP 285,000 285,000 06/09/2016 E

Allegheny 4053 0 91596 4053/Wexford Run Road F BRDG 185 20,000 20,000

Allegheny 4084 A04 96561 4084/East St -Chestnut F XRST STU 874,965 874,965 03/19/2015 E

Allegheny 4084 A04 96561 4084/East St -Chestnut U XRST STU 25,000 25,000

Allegheny 4084 A04 96561 4084/East St -Chestnut R XRST STU 30,000 30,000

Allegheny 4084 A04 96561 4084/East St -Chestnut C BRDG STP 800,000 183 150,000 50,000 1,000,000 05/21/2015 A

Allegheny 4084 A04 96561 4084/East St -Chestnut C XRST STU 5,600,000 581 1,400,000 7,000,000 05/21/2015 A

Allegheny 4084 A04 96561 4084/East St -Chestnut C XRST 581 6,000,000 6,000,000 05/21/2015 A

Allegheny 4086 A05 102210 Pine Creek Road @ SR19 C SAMI CAQ 1,700,000 1,600,000 3,300,000 08/27/2015 E

Allegheny 7105 LOC 93913 Sutersville Bridge P BRDG STP 200,000 183 37,500 12,500 250,000

Allegheny 7105 LOC 93913 Sutersville Bridge P BRDG STP 440,000 183 82,500 27,500 550,000

Allegheny 7105 LOC 93913 Sutersville Bridge F BRDG STP 440,000 183 82,500 27,500 550,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. F BRDG NHPP 480,000 183 90,000 30,000 600,000 08/25/2016 E

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. U BRDG NHPP 8,000 183 1,500 500 10,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. R BRDG NHPP 32,000 183 6,000 2,000 40,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. C BRDG NHPP 6,400,000 183 1,200,000 400,000 8,000,000 11/17/2016 E

Allegheny 7115 LOC 88401 CM06 Campbells Run P BRDG 183 172,000 43,000 215,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 F BRDG 183 212,000 53,000 265,000 01/07/2016 E

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 U BRDG 183 24,000 6,000 30,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 R BRDG 183 24,000 6,000 30,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 C BRDG 183 1,000,000 250,000 1,250,000 03/10/2016 E

Allegheny 7116 LOC 83124 Levi Bird Duff Br. Pres. P BRDG 183 73,013 18,253 91,266 03/15/2011 A

Allegheny 7116 LOC 83124 Levi Bird Duff Br. Pres. F BRDG 183 132,837 33,209 166,046 01/12/2012 E

Allegheny 7116 LOC 83124 Levi Bird Duff Br. Pres. C BRDG 183 40,725 10,181 50,906 07/19/2012 A

Allegheny 7118 0 81705 PI09 Pine Creek #9 P BRDG 183 200,000 50,000 250,000

Allegheny 7118 LOC 27159 Pine Creek Br. #6 (PS06) C BRDG 183 1,200,000 300,000 1,500,000 03/10/2016 E

Allegheny 7119 0 88418 Robinson Run (RS04) F BRDG 183 244,000 61,000 305,000 01/07/2016 E

Allegheny 7119 0 88418 Robinson Run (RS04) U BRDG 183 12,000 3,000 15,000

Allegheny 7119 0 88418 Robinson Run (RS04) R BRDG 183 24,000 6,000 30,000

Allegheny 7119 0 88418 Robinson Run (RS04) C BRDG 183 1,200,000 300,000 1,500,000 03/10/2016 E

Allegheny 7123 0 88414 PA03 - Painters Run No. 3 P BRDG 183 176,000 44,000 220,000

Allegheny 7203 0 86186 Aten Road ov Industry Dr C BRDG BOF 2,000,000 183 375,000 125,000 2,500,000 06/18/2015 A

Page 12: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

12 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 7203 LOC 79894 MC07 McClarens Run #7 P BRDG 183 27,400 6,850 34,250 08/13/2014 A

Allegheny 7203 LOC 79894 MC07 McClarens Run #7 F BRDG 183 188,000 47,000 235,000

Allegheny 7203 LOC 79894 MC07 McClarens Run #7 R BRDG 183 16,000 4,000 20,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. U BRDG 183 12,800 3,200 16,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. R BRDG 183 17,600 4,400 22,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. C BRDG 183 680,000 170,000 850,000 02/11/2016 E

Allegheny 7204 LOC 62188 Pangburn Hollow Br#4 PG04 C BRDG 700,535 700,535 03/30/2011 A

Allegheny 7204 LOC 62189 Pangburn Hollow Br #PG03 C BRDG 679,535 679,535 03/30/2011 A

Allegheny 7214 LOC 27478 Robinson Run Bridge #3 P BRDG 183 200,000 50,000 250,000

Allegheny 7219 LOC 27321 Catfish #8 CT08 C BRDG 436,061 436,061 01/26/2011 A

Allegheny 7219 LOC 62190 Corrigan/Catfish CT03 F BRDG 183 14,400 26,158 40,558 12/16/2005 E

Allegheny 7219 LOC 95754 LN01 - Licks Run North 1 P BRDG 183 176,000 44,000 220,000

Allegheny 7301 0 76388 6th St Br Rehab F BRDG NHPP 400,000 183 75,000 25,000 500,000 09/04/2019 E

Allegheny 7301 0 76388 6th St Br Rehab F BRDG NHPP 400,000 183 75,000 25,000 500,000 09/04/2019 E

Allegheny 7301 0 88541 7th St Br Rehab F BRDG STU 800,000 183 150,000 50,000 1,000,000 11/26/2015 E

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 1,409,666 183 26,431 8,810 1,444,907 02/11/2016 E

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 4,422,544 183 829,227 276,409 5,528,180 02/11/2016 E

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 4,422,544 183 829,227 276,409 5,528,180 02/11/2016 E

Allegheny 7301 0 88719 9th St Br Rehab F BRDG NHPP 240,000 183 45,000 15,000 300,000 05/25/2017 E

Allegheny 7301 0 88719 9th St Br Rehab F BRDG NHPP 560,000 183 105,000 35,000 700,000 05/25/2017 E

Allegheny 7301 0 88719 9th St Br Rehab C BRDG NHPP 4,000,000 183 750,000 25,000 4,775,000 08/15/2017 E

Allegheny 7301 0 88719 9th St Br Rehab C BRDG NHPP 8,000,000 183 1,500,000 500,000 10,000,000 08/15/2017 E

Allegheny 7301 LOC 27144 28th Street Bridge P BRDG BOF 600,000 183 112,500 37,500 750,000

Allegheny 7301 LOC 27144 28th Street Bridge F BRDG BOF 413,600 183 77,550 25,850 517,000

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. F BRDG BOF 430,000 183 80,625 26,875 537,500 01/14/2016 E

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. R BRDG BOF 52,000 183 9,750 3,250 65,000

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. C BRDG BOF 1,568,000 183 294,000 98,000 1,960,000 03/24/2016 E

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. C BRDG STU 2,000,000 183 375,000 125,000 2,500,000 03/24/2016 E

Allegheny 7301 LOC 27462 Second Ave Bridge Repl F BRDG BOF 440,000 183 82,500 27,500 550,000 11/24/2016 E

Allegheny 7301 LOC 27462 Second Ave Bridge Repl U BRDG BOF 80,000 183 15,000 5,000 100,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl R BRDG BOF 40,000 183 7,500 2,500 50,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl C BRDG BOF 1,969,000 183 369,188 123,063 2,461,251 01/26/2017 E

Allegheny 7301 LOC 27462 Second Ave Bridge Repl C BRDG BOF 2,000,000 183 375,000 125,000 2,500,000 01/26/2017 E

Allegheny 7301 LOC 27747 Swinburne Bridge P BRDG BOF 640,000 183 120,000 40,000 800,000

Allegheny 7301 LOC 27747 Swinburne Bridge F BRDG BOF 520,000 183 97,500 32,500 650,000

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 R BRDG BOF 256,000 183 48,000 16,000 320,000

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG BOF 1,606,897 183 1,369,000 456,333 3,432,230 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STU 5,694,437 5,694,437 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG BOF 4,381,400 183 1,046,513 348,838 5,776,751 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STP 712,456 712,456 07/16/2015 E

Page 13: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

13 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STU 487,544 487,544 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG BOF 1,800,000 183 418,250 161,771 2,380,021 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STP 41,000 41,000 07/16/2015 E

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STU 389,666 389,666 07/16/2015 E

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab F BRDG NHPP 960,000 183 180,000 60,000 1,200,000 10/15/2015 E

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab R BRDG NHPP 132,000 183 24,750 8,250 165,000

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG STU 3,000,000 183 562,500 187,500 3,750,000 12/17/2015 E

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG NHPP 7,000,000 183 1,312,500 437,500 8,750,000 12/17/2015 E

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG NHPP 8,000,000 183 1,500,000 500,000 10,000,000 12/17/2015 E

Allegheny 7301 LOC 83137 South Negley Ave. Bridge F BRDG STU 400,000 183 75,000 25,000 500,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge F BRDG STU 400,000 183 75,000 25,000 500,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge U BRDG STU 80,000 183 15,000 5,000 100,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge R BRDG STU 40,000 183 7,500 2,500 50,000

Allegheny 7415 LOC 80025 CC06 Chartiers Creek Br#6 C BRDG BOF 741,240 741,240 04/24/2014 A

Allegheny 7420 LOC 28426 Coraopolis Bridge P BRDG STP 400,000 183 75,000 25,000 500,000

Allegheny 7423 0 70039 Mansfield Br Rehab-Ph 1 F BRDG 183 57,406 14,351 71,757 01/07/2010 E

Allegheny 7423 0 70039 Mansfield Br Rehab-Ph 1 C BRDG 183 35,370 8,843 44,213 07/15/2010 A

Allegheny 7423 LOC 69203 Mansfield Bridge Rehab C BRDG STU 200,000 50,000 250,000 09/29/2011 A

Allegheny 7446 LBB 92912 D11 Local Br Bundle Ph 1 P BRDG sSTP 425,000 425,000

Allegheny 7446 LBB 92912 D11 Local Br Bundle Ph 1 F BRDG sSTP 1,275,000 1,275,000

Allegheny 7446 LBB 92912 D11 Local Br Bundle Ph 1 U BRDG sSTP 60,000 60,000

Allegheny 7446 LBB 92912 D11 Local Br Bundle Ph 1 R BRDG sSTP 50,000 50,000

Allegheny 7446 LBB 92912 D11 Local Br Bundle Ph 1 C BRDG sSTP 5,000,000 5,000,000 02/25/2016 E

Allegheny 7448 LOC 79934 HV04 Homeville Cr. Br #4 C BRDG 183 3,200 800 4,000 01/08/2015 A

Allegheny 7449 LOC 76393 Dooker's Hollow Br (DK01) F BRDG STP 704,000 183 132,000 44,000 880,000 06/08/2017 E

Allegheny 7449 LOC 76393 Dooker's Hollow Br (DK01) R BRDG STP 416,000 183 78,000 26,000 520,000

Allegheny 7449 LOC 76393 Dooker's Hollow Br (DK01) C BRDG STP 3,000,000 183 562,500 187,500 3,750,000 08/10/2017 E

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge P BRDG BOF 400,000 183 75,000 25,000 500,000

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge P BRDG BOF 400,000 183 75,000 25,000 500,000

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge F BRDG BOF 400,000 183 75,000 25,000 500,000

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge F BRDG BOF 400,000 183 75,000 25,000 500,000

Allegheny 7463 BRG 27543 Kenmawr Br ov NS P BRDG NHPP 288,000 183 54,000 18,000 360,000 01/25/2004 E

Allegheny 7463 BRG 27543 Kenmawr Br ov NS F BRDG NHPP 800,000 183 100,000 100,000 1,000,000 03/17/2016 E

Allegheny 7463 BRG 27543 Kenmawr Br ov NS U BRDG NHPP 600,000 183 75,000 75,000 750,000

Allegheny 7463 BRG 27543 Kenmawr Br ov NS R BRDG NHPP 200,000 183 25,000 25,000 250,000

Allegheny 7463 BRG 27543 Kenmawr Br ov NS R BRDG NHPP 600,000 183 75,000 75,000 750,000

Allegheny 7463 BRG 27543 Kenmawr Br ov NS C BRDG NHPP 600,000 183 75,000 75,000 750,000 05/19/2016 E

Allegheny 7463 BRG 27543 Kenmawr Br ov NS C BRDG NHPP 2,000,000 183 250,000 250,000 2,500,000 05/19/2016 E

Allegheny 7463 BRG 27543 Kenmawr Br ov NS C BRDG NHPP 4,600,000 183 575,000 575,000 5,750,000 05/19/2016 E

Allegheny 7464 LOC 27544 Fourth Ave Bridge F BRDG 581 450,000 450,000

Page 14: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

14 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Allegheny 7464 LOC 27544 Fourth Ave Bridge +C BRDG 900,000 900,000 12/25/2025 E

Allegheny 7466 LOC 88417 Pucketa Creek No.5 (PO05) P BRDG 183 240,000 60,000 300,000

Allegheny 7467 LOC 27328 TE02 - Thompson Run #02 P BRDG 183 200,000 50,000 250,000

Allegheny 7467 LOC 27742 Greensburg Pk Br/Turtle C C BRDG 4,247 4,247 06/23/2011 A

Allegheny 7473 LOC 76447 Homeville Rd Viaduct TS05 C BRDG STU 5,520,000 183 1,035,000 345,000 6,900,000 05/07/2015 A

Allegheny 7473 LOC 76447 Homeville Rd Viaduct TS05 C BRDG STU 4,800,000 183 900,000 300,000 6,000,000 05/07/2015 A

Allegheny 7477 LOC 27739 Long Run Br #3 (LG03) P BRDG 183 200,000 50,000 250,000

Totals for: Allegheny 166,115,865 35,677,165 54,381,646 256,174,676 139,130,569 41,538,500 13,571,085 194,240,154 141,667,651 63,423,950 11,429,433 216,521,034 128,480,380 72,493,750 11,927,766 212,901,896 879,837,760

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG BOF 961,920 183 205,635 1,167,555

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 185 431,570 431,570

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 581 106,100 106,100

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG STP 1,591,400 1,591,400

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG NHPP 3,278,200 185 578,200 3,856,400

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG STU 336,830 336,830

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 185 65,084 65,084

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 185 1,398,500 1,398,500

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HCON 581 369,889 369,889

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HRST NHPP 670,960 670,960

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HRST NHPP 373,900 581 4,500,000 4,873,900

Armstrong 101886 ArmstrongHwy.ResufaceLine C HRST 581 3,134,000 3,134,000

Armstrong 101886 ArmstrongHwy.ResufaceLine C HRST 581 4,333,000 4,333,000

Armstrong 101896 2018 Amstrong DFB Line F BRDG 185 28,100 28,100

Armstrong 101896 2018 Amstrong DFB Line U BRDG 185 32,800 32,800

Armstrong 101896 2018 Amstrong DFB Line R BRDG 185 11,000 11,000

Armstrong 101896 2018 Amstrong DFB Line C BRDG 185 394,000 394,000

Armstrong 104378 D10-2015 Systematic RDIP C SAMI sHSIP 716,159 716,159 06/04/2015 A

Armstrong 104401 2015 Systematic Sig Safe C SAMI sHSIP 250,000 250,000 06/04/2015 A

Armstrong 104402 RDIP-2015 GuideRail Upg C SAMI sHSIP 1,542,476 1,542,476 06/04/2015 A

Armstrong 88779 SPC/D10 Br. PreCon Line P BRDG STP 865,320 185 446,615 1,311,935

Armstrong 88779 SPC/D10 Br. PreCon Line P BRDG BOF 120,480 185 121,935 242,415

Armstrong 88782 Arm. Co. Local Br. Line P BRDG BOF 240,400 183 45,075 15,025 300,500

Armstrong BR 23813 T-748 Lower Pine Run Br. C BRDG BOF 25,600 179 1,600 27,200 01/16/2014 A

Armstrong BR 23813 T-748 Lower Pine Run Br. C BRDG 183 4,800 4,800 01/16/2014 A

Armstrong 18A 102788 Jacob St Pave/Ped Improve C TENH TAU 217,297 217,297 07/02/2015 E

Armstrong 28 101 91262 Hays Run 3R F HRST 581 82,335 82,335

Armstrong 28 112 69141 Goheenville Dip U HRST 581 218,600 218,600

Armstrong 28 112 69141 Goheenville Dip C HRST 581 6,000,000 6,000,000 10/15/2017 E

Armstrong 28 168 102436 SR 28 AVE Bridges C BRDG NHPP 2,330,000 2,330,000 01/15/2015 A

Armstrong 28 197 104461 PA 28 AVE PM C HRST NHPP 3,310,000 3,310,000 05/07/2015 A

Armstrong 28 1S0 103662 Goheenville Slide ROW R HRST 581 12,000 12,000

Page 15: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

15 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Armstrong 56 153 74198 Apollo Bridge F BRDG 185 273,200 273,200

Armstrong 56 154 89973 Glorietta Bridge #1 F BRDG 185 273,200 273,200

Armstrong 56 155 90002 Glorietta Bridge #2 F BRDG 185 273,200 273,200

Armstrong 56 156 103146 SR56 Apollo Group Bridges P BRDG STP 556,320 185 139,080 695,400

Armstrong 66 156 96693 Guffy Run Group Bridges F BRDG 581 500,000 500,000

Armstrong 66 156 96693 Guffy Run Group Bridges U BRDG 581 79,600 79,600

Armstrong 66 156 96693 Guffy Run Group Bridges R BRDG 581 72,100 72,100

Armstrong 66 156 96693 Guffy Run Group Bridges C BRDG STP 2,098,080 185 524,520 2,622,600 10/15/2016 E

Armstrong 68 154 77930 Bradys Bend Bridge #2 C BRDG 185 83,000 83,000 02/27/2014 A

Armstrong 68 158 24009 Bradys Bend Bridge #6 C BRDG 185 68,000 68,000 02/27/2014 A

Armstrong 85 153 83200 Sunnyside Bridge #2 F BRDG 185 61,800 61,800

Armstrong 85 153 83200 Sunnyside Bridge #2 F HRST STP 247,200 247,200

Armstrong 85 153 83200 Sunnyside Bridge #2 U BRDG 581 53,100 53,100

Armstrong 85 153 83200 Sunnyside Bridge #2 R BRDG 185 10,300 10,300

Armstrong 85 153 83200 Sunnyside Bridge #2 R HRST STP 41,200 41,200

Armstrong 85 153 83200 Sunnyside Bridge #2 C BRDG 581 3,182,700 3,182,700 11/05/2015 E

Armstrong 422 116 102366 Shelocta to Whitesburg PM C HRST s581 2,953,000 2,953,000 10/24/2014 A

Armstrong 422 199 91252 Wray Road Cut P HRST 581 40,000 40,000

Armstrong 422 199 91252 Wray Road Cut F HRST 581 238,000 238,000

Armstrong 422 199 91252 Wray Road Cut F HRST 581 200,000 200,000

Armstrong 422 199 91252 Wray Road Cut U HRST 581 710,300 710,300

Armstrong 422 199 91252 Wray Road Cut R HRST 581 365,000 365,000

Armstrong 422 199 91252 Wray Road Cut R HRST 581 695,900 695,900

Armstrong 422 199 91252 Wray Road Cut C HRST 581 8,391,000 8,391,000 10/15/2016 E

Armstrong 422 199 91252 Wray Road Cut C HRST 581 8,000,000 8,000,000 10/15/2016 E

Armstrong 422 19A 91249 Kittanning Elementary Int F SAMI 581 248,000 248,000

Armstrong 422 19A 91249 Kittanning Elementary Int F SAMI 581 200,040 200,040

Armstrong 422 19A 91249 Kittanning Elementary Int U SAMI 581 67,600 67,600

Armstrong 422 19A 91249 Kittanning Elementary Int R SAMI 581 200,040 200,040

Armstrong 422 19A 91249 Kittanning Elementary Int R SAMI 581 12,160 12,160

Armstrong 422 19A 91249 Kittanning Elementary Int C SAMI NHPP 3,278,200 581 819,550 4,097,750 10/15/2016 E

Armstrong 422 19A 91249 Kittanning Elementary Int C SAMI NHPP 5,900,760 581 1,475,190 7,375,950 10/15/2016 E

Armstrong 422 19B 85574 Margaret Rd Intersection F HCON 581 795,700 795,700

Armstrong 422 19B 85574 Margaret Rd Intersection +U HCON NHPP 65,600 65,600

Armstrong 422 19B 85574 Margaret Rd Intersection +R HCON NHPP 437,100 437,100

Armstrong 422 19C 99671 US 422-SR 8012 to SR 8010 C HRST 409 3,800,000 3,800,000 03/12/2015 A

Armstrong 422 19C 99671 US 422-SR 8012 to SR 8010 C HRST 581 259,000 259,000 03/12/2015 A

Armstrong 839 151 24085 South of Dayton #2 Bridge U BRDG 185 50,000 50,000

Armstrong 1020 150 83221 Banjo Road Bridge F BRDG 185 51,500 51,500

Armstrong 1021 153 23765 Eddyville Bridge #2 U BRDG 185 16,900 16,900

Page 16: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

16 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Armstrong 1021 153 23765 Eddyville Bridge #2 C BRDG 185 1,800,900 1,800,900 10/15/2017 E

Armstrong 1029 150 24016 Mount Zion Church Bridge F BRDG 185 25,800 25,800

Armstrong 1029 150 24016 Mount Zion Church Bridge R BRDG 185 11,400 11,400

Armstrong 1029 150 24016 Mount Zion Church Bridge C BRDG 185 403,200 403,200 04/25/2016 E

Armstrong 1037 151 23792 Echo Bridge U BRDG 185 45,100 45,100

Armstrong 1037 151 23792 Echo Bridge C BRDG 185 1,913,400 1,913,400 10/15/2017 E

Armstrong 1038 192 104690 Market Street Resurfacing C HRST s581 400,000 400,000

Armstrong 1038 193 105076 Kittanning Revitalize Ph2 C TENH STU 500,000 125,000 625,000

Armstrong 1039 151 79606 Bryan Bridge U BRDG 185 50,000 50,000

Armstrong 1040 190 102640 Water Street Resurfacing C HRST s581 300,000 300,000 04/09/2015 A

Armstrong 1040 190 102640 Water Street Resurfacing C HRST s581 300,000 300,000 04/09/2015 A

Armstrong 1422 191 91279 Indiana Hill PM C HRST 581 1,054,107 1,054,107 04/09/2015 A

Armstrong 2012 190 105040 Silvis Hollow Rd Slide #2 R HRST 581 12,000 12,000

Armstrong 2027 151 91794 Fagley Run Bridge #2 F BRDG 185 25,000 25,000

Armstrong 2027 151 91794 Fagley Run Bridge #2 F BRDG 185 25,000 25,000

Armstrong 2027 151 91794 Fagley Run Bridge #2 U BRDG 185 31,900 31,900

Armstrong 2027 151 91794 Fagley Run Bridge #2 R BRDG 185 10,700 10,700

Armstrong 2027 151 91794 Fagley Run Bridge #2 C BRDG 185 381,500 381,500 04/19/2018 E

Armstrong 2029 150 94600 Logansport Bridge U BRDG 185 60,000 60,000

Armstrong 2029 150 94600 Logansport Bridge C BRDG BOF 166,669 185 623,613 790,282 12/11/2014 A

Armstrong 2029 150 94600 Logansport Bridge C BRDG BOF 2,327,783 2,327,783 12/11/2014 A

Armstrong 3013 150 24153 Nichola #1 Bridge U BRDG 185 50,000 50,000

Armstrong 3017 152 83284 Center Hill #6 Bridge U BRDG 185 100,000 100,000

Armstrong 4002 150 74201 Queenstown Road Bridge C BRDG 185 314,200 314,200 01/29/2015 A

Armstrong 4003 150 77924 Bradys Bend Bridge #16 F BRDG 185 371,400 371,400

Armstrong 7206 0 67132 T-746 Nu Mine Bridge C BRDG BOF 521,040 183 136,500 45,500 703,040 11/06/2014 A

Armstrong 7206 0 67132 T-746 Nu Mine Bridge C BRDG BOF 206,960 206,960 11/06/2014 A

Armstrong 7206 0 95856 T-720 Hoosicks Bridge F BRDG BOF 247,200 183 46,350 15,450 309,000

Armstrong 7206 0 95856 T-720 Hoosicks Bridge U BRDG BOF 26,240 183 4,920 1,640 32,800

Armstrong 7206 0 95856 T-720 Hoosicks Bridge R BRDG BOF 12,000 183 2,250 750 15,000

Armstrong 7206 0 95856 T-720 Hoosicks Bridge C BRDG BOF 731,280 183 137,115 45,705 914,100 10/01/2016 E

Armstrong 7206 0 95856 T-720 Hoosicks Bridge C BRDG BOF 580,000 183 108,750 36,250 725,000 10/01/2016 E

Armstrong 8010 150 23896 Garretts Ramp Bridge C BRDG NHPP 20,000 20,000 08/28/2014 A

Totals for: Armstrong 12,737,904 12,378,413 61,700 25,178,017 3,724,280 7,615,140 125,000 11,464,420 11,357,250 16,279,795 62,370 27,699,415 6,975,140 30,175,275 36,250 37,186,665 101,528,517

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000

Beaver 75342 Betterment Reserve Beaver C HRST STP 1,000,000 1,000,000

Beaver 75342 Betterment Reserve Beaver C HRST STP 300,000 300,000

Beaver 75342 Betterment Reserve Beaver C HRST STP 2,000,000 2,000,000

Page 17: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

17 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Beaver 75342 Betterment Reserve Beaver C HRST 581 5,250,000 5,250,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 400,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 800,000 800,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 704,000 185 182,000 886,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 800,000 185 1,047,000 1,847,000

Beaver 76582 Beaver - Bridge Line Item C BRDG 185 1,820,000 1,820,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000

Beaver 102594 Aliquippa Tin Mill Site C IMOD 581 2,487,536 2,487,536 05/21/2015 A

Beaver LOC 102058 Economy Way Extension S LRST 250,000 250,000

Beaver PT f75075 BCTA Bus Replacement C PT CAQ 1,990,400 497,600 2,488,000

Beaver RR 102759 School House Rd (NS) C SAMI RRX 180,250 180,250 12/25/2025 E

Beaver RR 102759 School House Rd (NS) C SAMI RRX 180,250 180,250 12/25/2025 E

Beaver 18 B45 91582 18/32nd St - SR 551 U HCON 581 150,000 150,000

Beaver 18 B45 91582 18/32nd St - SR 551 C HCON NHPP 200,000 200,000 04/10/2014 A

Beaver 18 B47 101828 I-376/SR 18 Interchg Proj C HCON 60,000,000 60,000,000 12/25/2025 E

Beaver 18 LOC 28898 Veterans Memorial Bridge C BRDG BOF 520,000 179 32,500 552,500 08/05/2010 A

Beaver 18 LOC 28898 Veterans Memorial Bridge C BRDG 183 97,500 97,500 08/05/2010 A

Beaver 30 B07 29045 TR 30 Upgrade P XRST SXF 50,000 50,000 09/30/2002 A

Beaver 30 B07 29045 TR 30 Upgrade F XRST sSXF 450,000 450,000 05/19/2016 E

Beaver 30 B07 29045 TR 30 Upgrade R XRST sSXF 500,000 500,000

Beaver 30 B07 29045 TR 30 Upgrade C XRST sSXF 1,503,200 581 2,496,800 4,000,000 07/28/2016 E

Beaver 30 B07 29045 TR 30 Upgrade C XRST 581 4,000,000 4,000,000 07/28/2016 E

Beaver 30 B20 28953 SR 30 over Little Hill Cr F BRDG 185 100,000 100,000 01/07/2016 E

Beaver 30 B20 28953 SR 30 over Little Hill Cr U BRDG 185 50,000 50,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr R BRDG 185 50,000 50,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr C BRDG 185 1,600,000 1,600,000 03/10/2016 E

Beaver 65 B28 75773 65/Mercer & Zelienople Rd C HRST 581 5,900,000 5,900,000 01/15/2015 A

Beaver 65 B28 75773 65/Mercer & Zelienople Rd C HRST 581 1,700,000 1,700,000 01/15/2015 A

Beaver 65 B29 29032 65/CrowsRun-SR 18 P HRST NHPP 200,000 200,000

Beaver 65 B29 29032 65/CrowsRun-SR 18 C HRST NHPP 3,840,000 581 1,710,000 5,550,000 02/25/2016 E

Beaver 65 B29 29032 65/CrowsRun-SR 18 C HRST STP 3,000,000 3,000,000 02/25/2016 E

Beaver 65 B29 29032 65/CrowsRun-SR 18 C HRST NHPP 2,440,000 581 610,000 3,050,000 02/25/2016 E

Beaver 68 B35 88455 68/Buffalo - B&O Rail C XRST 581 750,000 750,000 05/22/2014 A

Beaver 168 B16 70797 168 Salem Church Rd Br F BRDG STP 160,000 185 40,000 200,000 06/23/2016 E

Page 18: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

18 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Beaver 168 B16 70797 168 Salem Church Rd Br R BRDG STP 40,000 185 10,000 50,000

Beaver 168 B16 70797 168 Salem Church Rd Br +C BRDG STP 550,000 550,000 08/25/2016 E

Beaver 251 B15 89069 PA 251 Blackhawk Road Br F BRDG 185 175,000 175,000 10/01/2015 E

Beaver 251 B15 89069 PA 251 Blackhawk Road Br U BRDG 185 80,000 80,000

Beaver 251 B15 89069 PA 251 Blackhawk Road Br R BRDG 185 80,000 80,000

Beaver 251 B15 89069 PA 251 Blackhawk Road Br C BRDG 581 1,600,000 1,600,000 12/03/2015 E

Beaver 351 B10 28734 PA 351/Koppel Bridge F BRDG STP 1,600,000 185 400,000 2,000,000 02/04/2016 E

Beaver 351 B10 28734 PA 351/Koppel Bridge R BRDG STP 200,000 185 50,000 250,000

Beaver 351 B10 28734 PA 351/Koppel Bridge C BRDG 581 7,500,000 7,500,000 04/07/2016 E

Beaver 376 B07 101534 376 Beaver Joint Repl C BRDG NHPP 260,000 260,000 09/11/2014 A

Beaver 588 B18 91922 Stiffen Hill Road Br F BRDG STP 160,000 185 40,000 200,000 04/20/2017 E

Beaver 588 B18 91922 Stiffen Hill Road Br U BRDG STP 8,000 185 2,000 10,000

Beaver 588 B18 91922 Stiffen Hill Road Br R BRDG STP 40,000 185 10,000 50,000

Beaver 588 B18 91922 Stiffen Hill Road Br C BRDG STP 1,000,000 1,000,000 06/22/2017 E

Beaver 1016 B03 78305 Anderson, Blockhouse F BRDG BOF 320,000 185 80,000 400,000 09/03/2015 E

Beaver 1016 B03 78305 Anderson, Blockhouse U BRDG BOF 10,000 185 40,000 50,000

Beaver 1016 B03 78305 Anderson, Blockhouse R BRDG BOF 80,000 185 20,000 100,000

Beaver 1016 B03 78305 Anderson, Blockhouse C BRDG 185 1,200,000 1,200,000 11/05/2015 E

Beaver 1016 B04 29139 Tulip Drive Bridge F BRDG BOF 160,000 185 40,000 200,000 09/24/2015 E

Beaver 1016 B04 29139 Tulip Drive Bridge R BRDG BOF 40,000 185 10,000 50,000

Beaver 1016 B04 29139 Tulip Drive Bridge C BRDG 185 1,500,000 1,500,000 12/03/2015 E

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream P BRDG 185 2,156 2,156 03/21/2014 A

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream F BRDG 185 300,000 300,000 05/14/2015 E

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream U BRDG 185 72,844 72,844

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream R BRDG 185 85,000 85,000

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream C BRDG 185 750,000 750,000 07/16/2015 E

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON sSXF 400,000 581 100,000 500,000 12/08/2005 A

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON s581 2,000,000 2,000,000 12/08/2005 A

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON s581 2,000,000 2,000,000 12/08/2005 A

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C F HCON s581 2,500,000 2,500,000 10/22/2020 E

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C F HCON s581 1,000,000 1,000,000 10/22/2020 E

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C U HCON s581 2,000,000 2,000,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C U HCON s581 1,500,000 1,500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C R HCON s581 2,500,000 2,500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C C HCON s581 12,000,000 12,000,000 12/25/2020 E

Beaver 2004 B08 82615 Freedom Rd Upgrade - Ph A R HRST s581 8,000,000 8,000,000

Beaver 2004 B08 82615 Freedom Rd Upgrade - Ph A C HCON s581 30,000,000 30,000,000 03/10/2016 E

Beaver 2004 B09 82616 Freedom Rd Upgrade - Ph B C HCON s581 18,000,000 18,000,000 08/24/2017 E

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln P HRST 581 60,000 60,000 01/13/2015 A

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln C HRST STU 2,000,000 2,000,000 03/12/2015 A

Page 19: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

19 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln C HRST STU 1,000,000 1,000,000 03/12/2015 A

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +P HRST STP 80,000 80,000

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +F HRST STP 140,000 140,000 12/10/2015 E

Beaver 3002 B01 96713 3002/Frankfort -Broadhead R HRST STP 75,000 75,000

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +C HRST 581 3,000,000 3,000,000 02/11/2016 E

Beaver 3016 0 102661 East End Gateway, Ph 1 S LRST 100,000 100,000

Beaver 3016 B08 88373 3016/Brodhead-Sheffield P HRST 581 50,000 50,000 11/25/2014 A

Beaver 3016 B08 88373 3016/Brodhead-Sheffield F HRST 581 500,000 500,000 04/16/2015 E

Beaver 3016 B08 88373 3016/Brodhead-Sheffield C HRST 581 7,000,000 7,000,000 06/18/2015 A

Beaver 3016 B10 104377 ISIP Signals Project C SAMI sHSIP 2,200,000 2,200,000 09/17/2015 E

Beaver 3020 B04 28892 Service Creek Rd Bridge F BRDG BOF 80,000 185 20,000 100,000

Beaver 3020 B04 28892 Service Creek Rd Bridge U BRDG BOF 80,000 185 20,000 100,000

Beaver 3020 B04 28892 Service Creek Rd Bridge R BRDG BOF 20,000 185 5,000 25,000

Beaver 3020 B04 28892 Service Creek Rd Bridge C BRDG 185 2,250,000 2,250,000 11/06/2014 A

Beaver 3026 B02 70798 Tomlinson Run Bridge P BRDG 185 125,000 125,000

Beaver 3026 B02 70798 Tomlinson Run Bridge F BRDG 185 125,000 125,000 01/07/2016 E

Beaver 3026 B02 70798 Tomlinson Run Bridge U BRDG 185 50,000 50,000

Beaver 3026 B02 70798 Tomlinson Run Bridge R BRDG 185 50,000 50,000

Beaver 3026 B02 70798 Tomlinson Run Bridge C BRDG 185 750,000 750,000 03/10/2016 E

Beaver 4020 000 29075 Dutch Ridge Rd Br/I-376 P BRDG 581 300,000 300,000

Beaver 4034 B03 89096 4034Westwood/Upper Dry Ru F BRDG 185 100,000 100,000 11/10/2016 E

Beaver 4034 B03 89096 4034Westwood/Upper Dry Ru C BRDG BOF 400,000 185 100,000 500,000 01/15/2017 E

Beaver 7206 LOC 92314 Lancaster Rd over Camp Rn C BRDG BOF 720,000 179 180,000 900,000 11/05/2015 E

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 F BRDG 179 34,400 34,400 01/07/2016 E

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 F BRDG 183 146,600 146,600 01/07/2016 E

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 U BRDG 179 1,200 1,200

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 U BRDG 183 4,800 4,800

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 R BRDG 179 7,000 7,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 R BRDG 183 28,000 28,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 C BRDG 179 120,000 120,000 03/10/2016 E

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 C BRDG 183 480,000 480,000 03/10/2016 E

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 P BRDG BOF 235,000 235,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +F BRDG BOF 168,000 179 42,000 210,000 04/06/2017 E

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +U BRDG BOF 16,000 179 4,000 20,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +R BRDG BOF 28,000 7,000 35,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +C BRDG BOF 600,000 150,000 750,000 06/15/2017 E

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. F BRDG BOF 280,000 183 52,500 17,500 350,000 05/14/2015 E

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. U BRDG BOF 8,000 183 1,500 500 10,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. R BRDG BOF 32,000 183 6,000 2,000 40,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG BOF 938,594 183 225,000 60,000 1,223,594 08/13/2015 E

Page 20: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

20 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG STP 261,406 261,406 08/13/2015 E

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG STP 1,600,000 183 300,000 100,000 2,000,000 08/13/2015 E

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge F BRDG BOF 116,000 179 29,000 145,000 10/13/2016 E

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge U BRDG BOF 120,000 179 30,000 150,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge R BRDG BOF 280,000 70,000 350,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge C BRDG BOF 480,000 120,000 600,000 12/15/2016 E

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge C BRDG BOF 480,000 120,000 600,000 12/15/2016 E

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct F BRDG 179 400,000 400,000 04/20/2017 E

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct F BRDG 183 1,600,000 1,600,000 04/20/2017 E

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct U BRDG 179 40,000 40,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct U BRDG 183 160,000 160,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct R BRDG 179 187,540 187,540

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct R BRDG 183 1,040,000 1,040,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct R BRDG 179 72,460 72,460

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct C BRDG STP 800,000 200,000 1,000,000 06/22/2017 E

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct C BRDG STP 2,800,000 700,000 3,500,000 06/22/2017 E

Beaver 7423 BR 28904 Pittsfield Br - NB5 P BRDG BOF 200,000 183 37,500 12,500 250,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 F BRDG BOF 168,000 183 31,500 10,500 210,000 07/28/2015 E

Beaver 7423 BR 28904 Pittsfield Br - NB5 U BRDG BOF 16,000 183 3,000 1,000 20,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 R BRDG BOF 28,000 183 5,250 1,750 35,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 C BRDG BOF 640,000 183 120,000 40,000 800,000 06/15/2018 E

Beaver 7424 LOC 57103 Washington Ave Br/Jordan C BRDG BOF 845,600 179 211,400 1,057,000 05/21/2015 A

Beaver 8029 B01 95554 Ramp A Rd ov SR 65 F BRDG 185 250,000 250,000 12/03/2015 E

Beaver 8029 B01 95554 Ramp A Rd ov SR 65 C BRDG NHPP 1,600,000 185 400,000 2,000,000 02/11/2016 E

Beaver 8031 B01 29082 RAMP C @ PA 65 F BRDG 185 225,000 225,000 12/03/2015 E

Beaver 8031 B01 29082 RAMP C @ PA 65 R BRDG 185 50,000 50,000

Beaver 8031 B01 29082 RAMP C @ PA 65 C BRDG NHPP 1,280,000 185 320,000 1,600,000 02/11/2016 E

Totals for: Beaver 14,995,600 31,078,436 60,442,500 106,516,536 16,360,650 52,420,500 608,100 69,389,250 13,065,450 33,009,590 549,750 46,624,790 4,600,000 30,862,460 860,000 36,322,460 258,853,036

Butler 69972 Butler Hwy.Resurface Line C HRST 581 3,134,000 3,134,000

Butler 69972 Butler Hwy.Resurface Line C HRST 581 4,333,000 4,333,000

Butler 101923 2017 Butler DFB Line Item U BRDG 185 31,900 31,900

Butler 101923 2017 Butler DFB Line Item R BRDG 185 10,700 10,700

Butler 101923 2017 Butler DFB Line Item C BRDG 185 382,500 382,500

Butler 101926 2018 Butler DFB Line Item F BRDG 185 53,100 53,100

Butler 101926 2018 Butler DFB Line Item U BRDG 185 32,800 32,800

Butler 101926 2018 Butler DFB Line Item R BRDG 185 11,000 11,000

Butler 101926 2018 Butler DFB Line Item C BRDG 185 394,000 394,000

Butler 103087 T-451 MainStreet Crossing C SAMI RRX 254,616 254,616 09/17/2015 E

Butler 104304 KeisterRdCorridorSafetyIm +C TENH SRTSF 661,250 661,250 01/14/2016 E

Butler 104305 ButlerFreeportComTrlRepav +C TENH TAP 426,880 426,880 01/14/2016 E

Page 21: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

21 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Butler 94877 Butler Local Bridge Line P BRDG BOF 240,400 183 45,075 15,025 300,500

Butler f88988 B&P RR Diesel Retrofit #2 C IMOD CAQ 2,304,800 576,200 2,881,000

Butler f88989 Butler Multi-Modal Center C SAMI CAQ 2,300,000 2,300,000

Butler f88990 Butler Transit Service C PT CAQ 250,000 250,000

Butler f88990 Butler Transit Service C PT CAQ 250,000 250,000

Butler 8 252 24724 Adams Corner Bridge U BRDG 185 25,877 25,877

Butler 8 253 83305 Harrisville Bridge U BRDG 185 25,800 25,800

Butler 8 253 83305 Harrisville Bridge C BRDG 185 888,985 888,985 12/11/2014 A

Butler 8 257 24723 Near Stone House Bridge C BRDG NHPP 1,230,000 1,230,000 02/12/2015 A

Butler 19 0 105109 D10 3c SINC-UP Project P SAMI CAQ 316,799 79,200 395,999

Butler 19 0 105109 D10 3c SINC-UP Project P SAMI CAQ 64,241 16,060 80,301

Butler 19 0 105109 D10 3c SINC-UP Project F SAMI CAQ 118,480 29,620 148,100

Butler 19 253 24677 Scholars Run Bridge U BRDG 185 445,000 445,000

Butler 19 253 24677 Scholars Run Bridge C BRDG STP 431,943 431,943 10/09/2014 A

Butler 19 297 102171 US 19/Rochester Rd. Int. C SAMI CAQ 982,030 982,030 1,964,060 10/15/2017 E

Butler 19 299 102882 ZelienopleRevital/EconDev C TENH TAU 480,000 480,000

Butler 38 000 83307 PA38TribOfConnoquenessing P BRDG STP 191,040 185 47,760 238,800

Butler 38 000 83307 PA38TribOfConnoquenessing F BRDG 185 281,400 281,400

Butler 38 254 83969 Bridge South of Hooker U BRDG 185 24,000 24,000

Butler 38 254 83969 Bridge South of Hooker C BRDG 185 890,500 890,500 12/11/2014 A

Butler 38 254 83969 Bridge South of Hooker C BRDG 185 500,000 500,000 12/11/2014 A

Butler 38 256 24732 Greece City Bridge C BRDG 185 733,285 733,285 12/11/2014 A

Butler 38 257 24736 Sandy Point Bridge C BRDG 185 487,577 487,577 12/11/2014 A

Butler 38 258 24730 PA38 over Connoquenessing P BRDG STP 295,200 185 73,800 369,000

Butler 38 258 24730 PA38 over Connoquenessing F BRDG STP 280,000 185 70,000 350,000

Butler 58 254 24803 Blacks Creek Bridge U BRDG 185 15,500 15,500

Butler 58 254 24803 Blacks Creek Bridge R BRDG 185 138 138

Butler 58 254 24803 Blacks Creek Bridge C BRDG STP 795,000 795,000 02/12/2015 A

Butler 68 252 24680 Cunningham Street Bridge C BRDG NHPP 1,047,500 185 261,875 1,309,375 01/08/2015 A

Butler 68 253 86105 Karns Crossing Bridge P BRDG 185 50,000 50,000 01/13/2010 A

Butler 68 255 24806 Zelienople Boro #2 Bridge U BRDG 185 230,000 230,000

Butler 228 0 104231 PA 228/UPMC Enhancements P HCON e581 375,000 375,000

Butler 228 0 104231 PA 228/UPMC Enhancements F HCON e581 625,000 625,000

Butler 228 0 92908 Mars RR Br West Expansion P HCON 581 530,500 530,500

Butler 228 271 90309 Cox's Corner Intersection F SAMI 581 455,000 455,000

Butler 228 271 90309 Cox's Corner Intersection R SAMI 581 150,000 150,000

Butler 228 271 90309 Cox's Corner Intersection C SAMI STU 3,564,640 581 891,160 4,455,800 03/24/2016 E

Butler 228 298 86833 228 Southbound Loop Ramp R HRST STP 36,000 581 9,000 45,000

Butler 228 29A 91285 Pittsburgh Street Int. F SAMI 581 450,000 450,000

Butler 228 29A 91285 Pittsburgh Street Int. +U SAMI NHPP 506,500 506,500

Page 22: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

22 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Butler 228 29A 91285 Pittsburgh Street Int. R SAMI 581 1,803,600 1,803,600

Butler 228 29A 91285 Pittsburgh Street Int. C SAMI NHPP 5,807,680 581 1,451,920 7,259,600 10/15/2017 E

Butler 228 29B 91286 Three Degree Rd Intersec P SAMI 581 200,000 200,000

Butler 228 29B 91286 Three Degree Rd Intersec F SAMI 581 515,000 515,000

Butler 228 29B 91286 Three Degree Rd Intersec R SAMI 581 1,394,700 1,394,700

Butler 268 0 24755 PA 268 over Lowrey Run P BRDG STP 218,560 185 54,640 273,200

Butler 268 0 24755 PA 268 over Lowrey Run F BRDG 185 281,400 281,400

Butler 268 251 24409 State Game Lands 95 Br R BRDG 185 360,600 360,600

Butler 308 255 24568 PA 308 W. Sunbury Bridge R BRDG 185 1,500 1,500

Butler 308 255 24568 PA 308 W. Sunbury Bridge C BRDG 185 42,600 42,600 10/22/2015 E

Butler 308 255 24568 PA 308 W. Sunbury Bridge C BRDG 185 859,400 859,400 10/22/2015 E

Butler 356 252 24667 Caldwell Drive Bridge U BRDG 185 50,000 50,000

Butler 422 205 88984 Prospect West Resurfacing C HRST 409 1,500,000 1,500,000 03/12/2015 A

Butler 422 205 88984 Prospect West Resurfacing C HRST 581 837,500 837,500 03/12/2015 A

Butler 422 258 24770 Bridge SE of East Butler +U BRDG NHPP 21,900 21,900

Butler 422 258 24770 Bridge SE of East Butler +C BRDG NHPP 2,938,000 2,938,000 01/08/2015 A

Butler 422 259 83611 US 422 Shawood Pipe F BRDG 185 328,600 328,600

Butler 422 259 83611 US 422 Shawood Pipe F BRDG 185 371,400 371,400

Butler 422 259 83611 US 422 Shawood Pipe R BRDG NHPP 180,160 185 45,040 225,200

Butler 422 29A 24523 Moraine State Park Access P HRST 581 353,000 353,000

Butler 422 29A 24523 Moraine State Park Access F HCON NHPP 440,000 440,000

Butler 422 29A 24523 Moraine State Park Access F HCON 581 110,000 110,000

Butler 422 29A 24523 Moraine State Park Access U HCON 581 82,000 82,000

Butler 422 29A 24523 Moraine State Park Access R HCON 581 106,100 106,100

Butler 422 29A 24523 Moraine State Park Access C HCON 581 4,261,700 4,261,700 10/13/2016 E

Butler 528 258 24774 Lindsey Road Bridge C BRDG STP 1,358,000 185 339,500 1,697,500 10/01/2015 E

Butler 1002 250 74221 Cherry Valley Bridge #4 F BRDG 185 20,000 20,000

Butler 1002 250 74221 Cherry Valley Bridge #4 U BRDG 185 30,900 30,900

Butler 1002 250 74221 Cherry Valley Bridge #4 R BRDG 185 11,400 11,400

Butler 1002 250 74221 Cherry Valley Bridge #4 C BRDG 185 270,600 270,600 04/25/2016 E

Butler 1004 250 74225 Bruin Bridge #6 U BRDG 185 6,200 6,200

Butler 1004 250 74225 Bruin Bridge #6 C BRDG 185 365,700 365,700 01/08/2015 A

Butler 1010 253 24692 Bridge East of Hooker F BRDG 185 51,500 51,500

Butler 1016 250 24694 Henricks Road Bridge +F BRDG BOF 25,000 25,000

Butler 1016 250 24694 Henricks Road Bridge U BRDG STP 40,000 185 17,000 57,000

Butler 1016 250 24694 Henricks Road Bridge C BRDG BOF 1,427,200 185 356,800 1,784,000 07/02/2015 E

Butler 1016 250 24694 Henricks Road Bridge C BRDG BOF 592,800 185 148,200 741,000 07/02/2015 E

Butler 1019 251 24817 West Winfield Bridge #1 F BRDG 185 371,400 371,400

Butler 2002 250 78022 Herman Road Bridge P BRDG 185 28,000 28,000

Butler 2002 250 78022 Herman Road Bridge F BRDG STP 329,600 185 82,400 412,000

Page 23: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

23 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Butler 2002 250 78022 Herman Road Bridge U BRDG STP 63,680 185 15,920 79,600

Butler 2002 250 78022 Herman Road Bridge R BRDG STP 61,840 185 15,460 77,300

Butler 2002 250 78022 Herman Road Bridge C BRDG STP 1,527,760 185 381,940 1,909,700 10/01/2015 E

Butler 2007 250 78002 Saxonburg Blvd #1 Bridge U BRDG 185 25,000 25,000

Butler 2010 252 24697 Cabot Bridge +U BRDG STP 127,400 127,400

Butler 2010 252 24697 Cabot Bridge R BRDG STP 212,000 185 53,000 265,000

Butler 2010 252 24697 Cabot Bridge +C BRDG STU 1,967,000 1,967,000 01/15/2017 E

Butler 3007 270 103078 Three Degree Rd Crossing C SAMI RRX 200,000 200,000 06/04/2015 E

Butler 3007 270 103078 Three Degree Rd Crossing C SAMI RRX 67,800 67,800 06/04/2015 E

Butler 3007 290 105041 AdamsTwpSchool-Park Trail S TENH STU 128,000 32,000 160,000

Butler 3012 250 83335 Cruikshank Road Bridge U BRDG 185 50,000 50,000

Butler 3015 254 96687 SR 3015 Group Bridges U BRDG 185 7,000 7,000

Butler 3015 254 96687 SR 3015 Group Bridges R BRDG 185 79,600 79,600

Butler 3015 254 96687 SR 3015 Group Bridges C BRDG 185 3,278,200 3,278,200 10/01/2016 E

Butler 3015 270 90562 Mars-Evans City Rd X-ing C SAMI RRX 283,250 283,250 06/04/2015 E

Butler 3017 251 24830 Myoma Bridge #1 F BRDG 185 15,000 15,000

Butler 3017 251 24830 Myoma Bridge #1 U BRDG 185 55,000 55,000

Butler 3020 250 67185 Freedom Rd Turnpike Bridg P BRDG STP 310,000 310,000

Butler 3020 250 67185 Freedom Rd Turnpike Bridg F BRDG STP 13,890 581 106,100 119,990

Butler 3020 250 67185 Freedom Rd Turnpike Bridg F BRDG STU 410,510 410,510

Butler 3020 250 67185 Freedom Rd Turnpike Bridg R BRDG STU 1,103,360 581 275,840 1,379,200

Butler 3020 296 94932 Freedom Road Int. Improve C SAMI CAQ 447,915 111,979 559,894 01/15/2016 E

Butler 3025 270 94601 Little Ck Road Safety Imp U SAMI 581 123,500 123,500

Butler 3025 270 94601 Little Ck Road Safety Imp C SAMI STU 3,059,680 581 764,920 3,824,600 01/15/2017 E

Butler 3031 250 24793 SR 3031 Lions Road Bridge P BRDG BOF 300,000 185 75,000 375,000

Butler 7213 BR 77973 T-830 Rattigan Bridge F BRDG BOF 247,200 183 46,350 15,450 309,000

Butler 7213 BR 77973 T-830 Rattigan Bridge U BRDG BOF 27,040 185 5,070 1,690 33,800

Butler 7213 BR 77973 T-830 Rattigan Bridge R BRDG BOF 24,720 183 4,635 1,545 30,900

Butler 7213 BR 77973 T-830 Rattigan Bridge C BRDG BOF 1,350,640 183 253,245 84,415 1,688,300 10/01/2017 E

Butler 7301 BR 24522 West New Castle St. Br. U BRDG 3,300 3,300

Butler 7301 BR 24522 West New Castle St. Br. C BRDG 183 865,200 216,300 1,081,500 01/08/2015 A

Totals for: Butler 11,836,852 10,909,282 923,995 23,670,129 12,748,662 9,938,020 157,659 22,844,341 8,650,340 12,679,135 15,025 21,344,500 9,104,050 7,045,075 1,068,135 17,217,260 85,076,230

Fayette 101968 D12 Pvmt Presv Design P HRST 581 450,000 450,000

Fayette 101968 D12 Pvmt Presv Design P HRST 581 250,000 250,000

Fayette 102034 Fayette DFB-2015 C BRDG 581 150,000 150,000

Fayette 102812 Univ Bus Park Access Road C HCON APL 500,000 500,000

Fayette 103118 D12 Stormwater Management C HRST NHPP 1,000,000 1,000,000

Fayette 105073 D12 SD Bridge Reduction P BRDG 581 3,000,000 3,000,000

Fayette 81229 D12 Bridge Preservation F BRDG 185 200,000 200,000

Fayette 81229 D12 Bridge Preservation F BRDG 185 200,000 200,000

Page 24: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

24 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Fayette 81229 D12 Bridge Preservation C BRDG 185 1,000,000 1,000,000

Fayette 97978 D12 Wetland/Steam Monitor C HRST 581 10,000 10,000

Fayette BMR 96657 Bruceton Mills Rd. T-311 P HRST STP 140,000 140,000

Fayette BMR 96657 Bruceton Mills Rd. T-311 +C HRST STP 3,000,000 3,000,000 02/11/2016 E

Fayette DTB 98239 Dunbar Twp Business Park C HCON APL 300,000 250,000 550,000 06/04/2015 A

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 9,432 185 428,553 437,985

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 2,473,989 185 310,944 2,784,933

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 2,228,272 185 1,345,209 3,573,481

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 1,312,982 185 6,022,864 7,335,846

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 60,392 581 51,426 111,818

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST NHPP 4,554,386 581 3,580,965 8,135,351

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 83,506 83,506

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST NHPP 828,111 581 570,142 1,398,253

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 31,885 31,885

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST NHPP 3,000,000 581 1,833,224 4,833,224

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 1,006,641 1,006,641

Fayette 21 0 98144 12-14-RPM C HRST 581 246,090 246,090 05/22/2014 A

Fayette 21 A10 29785 Masontown Bridge F HRST STP 250,000 250,000 11/04/2010 E

Fayette 21 SIG 94953 FACO Signals-1 P SAMI CAQ 100,000 100,000

Fayette 21 SIG 94953 FACO Signals-1 U SAMI CAQ 80,000 581 20,000 100,000

Fayette 21 SIG 94953 FACO Signals-1 R SAMI CAQ 82,500 581 27,500 110,000

Fayette 21 SIG 94953 FACO Signals-1 C SAMI CAQ 1,172,000 581 293,000 1,465,000

Fayette 40 0 98418 US 40: US 119 to SR 4039 +C HRST NHPP 2,253,749 2,253,749 02/23/2017 E

Fayette 40 10B 75056 US 40/PA 381 Intersection C HRST sSXF 1,569,359 581 736,984 2,306,343 07/30/2015 E

Fayette 40 10B 75056 US 40/PA 381 Intersection C HRST NHPP 1,378,578 1,378,578 07/30/2015 E

Fayette 40 136 29949 Torchlight Intersection C SAMI HSIP 566,739 566,739 07/31/2014 A

Fayette 51 0 103359 District 12 Slide Repair C HRST 581 1,500,000 1,500,000 05/07/2015 A

Fayette 51 0 103359 District 12 Slide Repair C HRST 581 2,000,000 2,000,000 05/07/2015 A

Fayette 51 0 98145 12-14-LCSIP C HRST 581 400,000 400,000 09/11/2014 A

Fayette 51 24R 87370 PA 51 Uniontown to Bitner +C HRST NHPP 3,933,817 3,933,817 02/25/2016 E

Fayette 119 20K 96661 McClure Road Intersection P HCON 581 1,000,000 1,000,000

Fayette 119 20K 96661 McClure Road Intersection P HCON 581 1,200,000 1,200,000

Fayette 119 25R 103360 Dist12 Concrete Patching C HRST 581 1,000,000 1,000,000 06/18/2015 A

Fayette 119 25R 103360 Dist12 Concrete Patching C HRST 581 1,000,000 1,000,000 06/18/2015 A

Fayette 166 03R 99535 PA 166: PA 21 to SR 4002 C HRST STP 3,300,000 3,300,000 04/23/2015 A

Fayette 166 04R 98423 PA 166: Nilan Rd to 3006 C HRST STP 1,000,000 1,000,000 01/28/2016 E

Fayette 166 04R 98423 PA 166: Nilan Rd to 3006 C HRST STP 2,484,649 2,484,649 01/28/2016 E

Fayette 166 05R 98411 PA 166: Masontown to 3006 C HRST 581 3,696,750 3,696,750 09/21/2017 E

Fayette 381 0 98424 PA381:Kooser Rd to PA 711 +C HRST 581 2,996,667 2,996,667 01/26/2017 E

Fayette 381 0 98425 PA 381:MillerRdtoKooserRd +C HRST 581 3,253,329 3,253,329

Page 25: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

25 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Fayette 381 X00 29813 PA 381over Mill Run C BRDG STP 165,000 165,000 06/17/2010 A

Fayette 906 0 103392 PA 906 ER Slide Repair C HRST 581 700,000 700,000

Fayette 906 A10 95794 PA906 Slide & Realignment P HRST 581 850,000 850,000

Fayette 906 A10 95794 PA906 Slide & Realignment F HRST 581 750,000 750,000

Fayette 906 A10 95794 PA906 Slide & Realignment U HRST 581 437,091 437,091

Fayette 906 A10 95794 PA906 Slide & Realignment R HRST 581 218,545 218,545

Fayette 906 A10 95794 PA906 Slide & Realignment +C HRST 581 3,824,545 3,824,545

Fayette 1042 0 95768 SR 1042 Grade Crossing C SAMI RRX 275,000 275,000 05/07/2014 E

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run P BRDG 185 327,818 327,818

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run F BRDG 185 225,102 225,102

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run U BRDG 185 56,275 56,275

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run R BRDG 185 109,273 109,273

Fayette 2040 0 93507 SR 2040 over Redstone Ck P BRDG 185 358,216 358,216

Fayette 3010 0 81935 SR 3010 over York Run +C BRDG 185 200,000 200,000

Fayette 4003 0 74344 Cast Iron Bridge P BRDG 185 470,000 470,000

Fayette 4003 0 74344 Cast Iron Bridge P BRDG 185 500,000 500,000

Fayette 4028 D10 29852 SR 4028 over Redstone Ck F BRDG 185 102,000 102,000

Fayette 4028 D10 29852 SR 4028 over Redstone Ck R BRDG 185 135,000 135,000

Fayette 4028 D10 29852 SR 4028 over Redstone Ck C BRDG 185 1,371,800 1,371,800 07/28/2016 E

Fayette 4028 D10 29852 SR 4028 over Redstone Ck C BRDG 185 750,000 750,000 07/28/2016 E

Fayette 4028 D11 79336 SR 4028 over Rowes Run R BRDG 185 50,000 50,000

Fayette 4028 D11 79336 SR 4028 over Rowes Run C BRDG 185 1,091,350 1,091,350 07/28/2016 E

Fayette 4028 D11 79336 SR 4028 over Rowes Run C BRDG 185 500,000 500,000 07/28/2016 E

Fayette 4038 0 81192 Layton Bridge P BRDG 185 1,000,000 1,000,000

Fayette 4038 0 81192 Layton Bridge P BRDG 185 1,000,000 1,000,000

Fayette 4046 D10 51494 SR 4046 o Lutz/RR C BRDG 185 1,545,000 1,545,000 01/15/2015 A

Fayette 4046 D10 51494 SR 4046 o Lutz/RR C BRDG 185 57,000 57,000 01/15/2015 A

Fayette 7202 0 104643 Fayette County #73 P BRDG BOF 200,000 50,000 250,000

Fayette 7206 BR 29839 Weaver Mill #95 P BRDG BOF 16,000 16,000

Fayette 7206 BR 29839 Weaver Mill #95 P HRST 179 12,000 12,000

Fayette 7206 BR 29839 Weaver Mill #95 F BRDG BOF 72,000 179 18,000 90,000

Fayette 7206 BR 29839 Weaver Mill #95 C BRDG BOF 824,000 179 206,000 1,030,000 03/24/2016 E

Fayette 7206 102 29840 Fayette Co Bridge #102 P BRDG BOF 164,800 179 41,200 206,000

Fayette 7206 102 29840 Fayette Co Bridge #102 P BRDG BOF 75,200 179 18,800 94,000

Fayette 7206 102 29840 Fayette Co Bridge #102 F BRDG BOF 174,836 43,709 218,545

Fayette 7206 102 29840 Fayette Co Bridge #102 U BRDG BOF 8,000 2,000 10,000

Fayette 7206 102 29840 Fayette Co Bridge #102 R BRDG BOF 8,000 2,000 10,000

Fayette 7206 162 29980 Mountain Creek 162 F BRDG 183 45,600 45,600

Fayette 7206 162 29980 Mountain Creek 162 F HRST 179 11,400 11,400

Fayette 7206 162 29980 Mountain Creek 162 C BRDG BOF 906,400 179 220,000 1,126,400 03/24/2016 E

Page 26: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

26 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Fayette 7224 F43 101958 Fayette County #43 P BRDG BOF 180,000 45,000 225,000

Fayette 7224 F43 101958 Fayette County #43 F BRDG BOF 180,000 45,000 225,000

Fayette 7224 F43 101958 Fayette County #43 U BRDG BOF 8,000 2,000 10,000

Fayette 7224 F43 101958 Fayette County #43 R BRDG BOF 8,000 2,000 10,000

Fayette 7224 F43 101958 Fayette County #43 C BRDG BOF 800,000 200,000 1,000,000

Totals for: Fayette 9,773,700 10,423,253 250,000 20,446,953 12,391,081 15,686,859 95,000 28,172,940 13,109,819 4,759,214 296,709 18,165,742 7,491,623 25,106,336 32,597,959 99,383,594

Greene 102035 Greene DFB-2015 C BRDG 581 150,000 150,000

Greene 102035 Greene DFB-2015 C BRDG 581 150,000 150,000

Greene 86903 D12 Open Plan Agreement P HRST 581 50,000 50,000

Greene 91258 GRCO Airport Access Rd C HCON APL 800,000 250,000 1,050,000

Greene 95602 MeadowRidge Business Park C HRST APL 250,000 250,000 500,000

Greene BR 30079 County Bridge #78 U BRDG 179 2,000 2,000

Greene BR 30079 County Bridge #78 U BRDG 183 8,000 8,000

Greene BR 30079 County Bridge #78 R BRDG 179 5,000 5,000

Greene BR 30079 County Bridge #78 R BRDG 183 20,000 20,000

Greene BR 30079 County Bridge #78 C BRDG 179 150,000 150,000 12/17/2015 E

Greene BR 30079 County Bridge #78 C BRDG 183 600,000 600,000 12/17/2015 E

Greene 18 0 73513 PA 18: PA 21 to Browns Ck C HRST STP 2,200,000 2,200,000 09/22/2016 E

Greene 18 0 73513 PA 18: PA 21 to Browns Ck C HRST STP 2,200,000 2,200,000 09/22/2016 E

Greene 18 0 94683 Brdg Preserve 2014-1 C BRDG 185 1,064,000 1,064,000 01/15/2015 A

Greene 18 17R 98406 PA 18: PA 21 to Co Line +C HRST STP 6,947,200 6,947,200 05/05/2016 E

Greene 19 P02 30272 US 19 Safety Improvements C HRST NHPP 2,708,516 2,708,516 07/11/2013 A

Greene 21 10D 84234 Bailey's Crossroads F HRST STP 40,000 581 10,000 50,000

Greene 21 10D 84234 Bailey's Crossroads R HRST 581 400,000 400,000

Greene 21 10D 84234 Bailey's Crossroads C HRST sSXF 1,068,200 581 437,050 1,505,250 07/30/2015 E

Greene 21 10D 84234 Bailey's Crossroads C HRST STP 680,000 680,000 07/30/2015 E

Greene 21 10D 84234 Bailey's Crossroads C HRST STP 2,651,800 581 662,950 3,314,750 07/30/2015 E

Greene 21 15R 82914 PA21:Ridge Rd to Gwynn Rd C HRST NHPP 1,459,965 1,459,965 01/15/2015 A

Greene 79 0 94685 D12 Expansion Dam 2014 C HRST 185 300 300 08/28/2014 A

Greene 79 0 95358 D12 Slides 2012-2 P HRST 581 50,000 50,000 07/30/2012 A

Greene 79 0 95358 D12 Slides 2012-2 C HRST 581 2,400,000 2,400,000 02/14/2013 A

Greene 218 0 100284 PA218:Bluff Ridge to Cook +C HRST STP 4,112,083 4,112,083 09/21/2017 E

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 P BRDG BOF 388,209 388,209

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 P BRDG BOF 11,791 11,791

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 F BRDG BOF 265,225 265,225

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +U BRDG BOF 53,045 53,045

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +R BRDG BOF 79,568 79,568

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +C BRDG BOF 2,000,000 2,000,000 02/09/2017 E

Greene 2003 0 96659 Sugar Run Road Intersect P HRST 581 400,000 400,000

Greene 2003 0 96659 Sugar Run Road Intersect F HRST 581 477,406 477,406

Page 27: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

27 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Greene 2003 0 96659 Sugar Run Road Intersect U HRST 581 159,135 159,135

Greene 2003 0 96659 Sugar Run Road Intersect R HRST 581 159,135 159,135

Greene 2003 0 96659 Sugar Run Road Intersect +C HRST 581 2,000,000 2,000,000 02/23/2017 E

Greene 2003 03M 76032 Greene Metal Pipe Pres C BRDG 185 395,000 395,000 03/26/2015 A

Greene 3001 01A 30134 SR 3001 over Wheeling Ck P BRDG 185 309,000 309,000

Greene 3001 01A 30134 SR 3001 over Wheeling Ck F BRDG STP 236,494 185 59,123 295,617

Greene 3001 01A 30134 SR 3001 over Wheeling Ck U BRDG 185 51,500 51,500

Greene 3001 01A 30134 SR 3001 over Wheeling Ck R BRDG 185 77,250 77,250

Greene 3001 01A 30134 SR 3001 over Wheeling Ck C BRDG 185 1,000,000 1,000,000 01/25/2018 E

Greene 7203 C15 51393 County Bridge #15 F BRDG BOF 132,000 179 33,000 165,000

Greene 7203 C15 51393 County Bridge #15 U BRDG BOF 12,000 179 3,000 15,000

Greene 7203 C15 51393 County Bridge #15 R BRDG BOF 40,000 179 10,000 50,000

Greene 7203 C15 51393 County Bridge #15 C BRDG BOF 480,000 120,000 600,000 01/11/2018 E

Greene 7205 0 96658 Cook Ave. (T-529) P HRST STP 250,000 250,000

Greene 7205 0 96658 Cook Ave. (T-529) F BRDG 185 212,180 212,180

Greene 7205 0 96658 Cook Ave. (T-529) U BRDG 185 218,545 218,545

Greene 7205 0 96658 Cook Ave. (T-529) R BRDG 185 106,090 106,090

Greene 7205 0 96658 Cook Ave. (T-529) C BRDG STP 2,318,549 2,318,549 01/26/2017 E

Greene 7207 C55 93247 County Bridge #55 F BRDG BOF 140,000 179 35,000 175,000

Greene 7207 C55 93247 County Bridge #55 U BRDG BOF 8,000 179 2,000 10,000

Greene 7207 C55 93247 County Bridge #55 R BRDG BOF 20,000 179 5,000 25,000

Greene 7207 C55 93247 County Bridge #55 C BRDG BOF 480,000 120,000 600,000 01/12/2017 E

Greene 7213 0 86232 Burson Brdg Greene Co #99 C BRDG 183 240,000 240,000 09/25/2014 A

Greene 7213 0 86232 Burson Brdg Greene Co #99 C HRST 179 60,000 60,000 09/25/2014 A

Greene 7219 0 86236 County Bridge #36 U BRDG 179 2,000 2,000

Greene 7219 0 86236 County Bridge #36 U BRDG 183 8,000 8,000

Greene 7219 0 86236 County Bridge #36 R BRDG 179 5,000 5,000

Greene 7219 0 86236 County Bridge #36 R BRDG 183 20,000 20,000

Greene 7219 0 86236 County Bridge #36 C BRDG 179 120,200 120,200 02/11/2016 E

Greene 7219 0 86236 County Bridge #36 C BRDG 183 480,800 480,800 02/11/2016 E

Greene 7219 0 86236 County Bridge #36 C BRDG 179 65,182 65,182 02/11/2016 E

Greene 7219 0 86236 County Bridge #36 C BRDG 183 260,728 260,728 02/11/2016 E

Greene 7220 0 96660 Whiteley Creek Bridge F BRDG 185 212,180 212,180

Greene 7220 0 96660 Whiteley Creek Bridge U BRDG 185 106,090 106,090

Greene 7220 0 96660 Whiteley Creek Bridge R BRDG 185 106,090 106,090

Greene 7220 0 96660 Whiteley Creek Bridge +C BRDG BOF 2,251,018 2,251,018 02/23/2017 E

Totals for: Greene 6,248,690 6,110,660 500,000 12,859,350 9,341,523 2,533,988 11,875,511 7,331,800 1,913,286 120,000 9,365,086 11,361,650 3,000,000 120,000 14,481,650 48,581,597

Indiana 69986 IndianaHwy.Resurface Line C HRST 581 1,878,430 1,878,430

Indiana 69986 IndianaHwy.Resurface Line C HRST 581 3,399,162 3,399,162

Indiana 101937 2018 Indiana DFB Line F BRDG 185 53,100 53,100

Page 28: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

28 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Indiana 101937 2018 Indiana DFB Line U BRDG 185 32,800 32,800

Indiana 101937 2018 Indiana DFB Line R BRDG 185 11,000 11,000

Indiana 101937 2018 Indiana DFB Line C BRDG 185 394,000 394,000

Indiana 103091 BPRR Corridor C SAMI RRX 636,540 636,540 09/17/2015 E

Indiana 103091 BPRR Corridor C SAMI RRX 636,540 636,540 09/17/2015 E

Indiana 88841 Indiana Local Br. Line #1 P BRDG BOF 240,400 183 45,075 15,025 300,500

Indiana 88992 IndianaBoro/White Twp Int +C SAMI CAQ 1,786,480 1,786,480 10/15/2016 E

Indiana 473 92824 11th Street Crossing C SAMI RRX 13,740 13,740 08/15/2011 E

Indiana 22 453 105193 US22 Blairsville #1 Truss F BRDG 185 336,331 336,331

Indiana 22 453 105193 US22 Blairsville #1 Truss F BRDG 185 63,669 63,669

Indiana 22 498 105047 Route 22 Ped/Bike Bridge P TENH STU 290,000 70,000 360,000

Indiana 56 457 83206 Brush Valley Bridge #3 F BRDG 581 400,000 400,000

Indiana 56 457 83206 Brush Valley Bridge #3 U BRDG 581 106,100 106,100

Indiana 56 457 83206 Brush Valley Bridge #3 R BRDG 581 300,000 300,000

Indiana 56 457 83206 Brush Valley Bridge #3 R BRDG 581 165,000 165,000

Indiana 56 457 83206 Brush Valley Bridge #3 C BRDG 581 2,143,100 2,143,100 01/14/2016 E

Indiana 56 470 90194 United High School Curve F HRST 581 11,000 11,000

Indiana 56 470 90194 United High School Curve F SAMI HSIP 99,000 99,000

Indiana 56 470 90194 United High School Curve U HRST 581 21,500 21,500

Indiana 56 470 90194 United High School Curve U SAMI HSIP 193,500 193,500

Indiana 56 470 90194 United High School Curve R HRST 581 600 600

Indiana 56 470 90194 United High School Curve R SAMI HSIP 5,400 5,400

Indiana 56 470 90194 United High School Curve C SAMI HSIP 3,263,710 581 712,835 3,976,545 03/12/2015 A

Indiana 56 470 90194 United High School Curve C SAMI HSIP 4,542,890 581 154,565 4,697,455 03/12/2015 A

Indiana 85 450 83210 Plumville Bridge #1 P BRDG STP 14,400 185 3,600 18,000

Indiana 85 450 83210 Plumville Bridge #1 F BRDG STP 430,000 430,000

Indiana 85 450 83210 Plumville Bridge #1 +U BRDG STP 106,100 106,100

Indiana 85 450 83210 Plumville Bridge #1 R BRDG STP 592,000 592,000

Indiana 85 450 83210 Plumville Bridge #1 C BRDG STP 1,923,200 185 480,800 2,404,000 10/15/2016 E

Indiana 119 454 25513 Home Railroad Bridge F BRDG 185 88,000 88,000

Indiana 119 454 25513 Home Railroad Bridge U BRDG NHPP 120,000 185 30,000 150,000

Indiana 119 454 25513 Home Railroad Bridge C BRDG NHPP 6,362,320 185 1,590,580 7,952,900 08/13/2015 E

Indiana 119 454 25513 Home Railroad Bridge C BRDG NHPP 3,737,520 185 934,380 4,671,900 08/13/2015 E

Indiana 119 462 99514 US 119 Blais Bridges C BRDG NHPP 3,467,902 3,467,902 08/13/2015 E

Indiana 119 462 99514 US 119 Blais Bridges C BRDG NHPP 572,098 572,098 08/13/2015 E

Indiana 119 463 95848 Home Bridge #3 F BRDG 185 318,300 318,300

Indiana 119 464 95847 Pollock Bridge F BRDG 185 318,300 318,300

Indiana 119 465 101483 US 119 Three Bridges +F BRDG NHPP 618,000 618,000

Indiana 119 465 101483 US 119 Three Bridges R BRDG NHPP 164,800 185 41,200 206,000

Indiana 119 465 101483 US 119 Three Bridges C BRDG NHPP 3,528,860 185 882,215 4,411,075 07/28/2016 E

Page 29: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

29 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Indiana 119 465 101483 US 119 Three Bridges C BRDG NHPP 1,563,460 185 390,865 1,954,325 07/28/2016 E

Indiana 119 495 25472 Grove Chapel Climb. Lane F HRST 581 500,000 500,000 01/26/2001 E

Indiana 119 495 25472 Grove Chapel Climb. Lane C HCON 581 6,502,700 6,502,700 12/17/2015 E

Indiana 119 495 25472 Grove Chapel Climb. Lane C HCON 581 5,962,900 5,962,900 12/17/2015 E

Indiana 119 498 91256 US 119 Homer City North F HRST NHPP 129,840 581 32,460 162,300

Indiana 119 498 91256 US 119 Homer City North U HRST NHPP 360,000 581 90,000 450,000

Indiana 119 498 91256 US 119 Homer City North R HCON 581 27,000 27,000

Indiana 119 498 91256 US 119 Homer City North R HRST NHPP 108,000 108,000

Indiana 119 498 91256 US 119 Homer City North C HRST 581 7,900,500 7,900,500 12/17/2015 E

Indiana 119 498 91256 US 119 Homer City North C HRST 581 1,149,500 1,149,500 12/17/2015 E

Indiana 217 452 86022 Grange Bridge F BRDG 581 412,000 412,000

Indiana 217 452 86022 Grange Bridge U BRDG 581 42,500 42,500

Indiana 217 452 86022 Grange Bridge R BRDG STP 112,000 185 28,000 140,000

Indiana 217 452 86022 Grange Bridge C BRDG 581 3,223,600 3,223,600 10/15/2016 E

Indiana 286 410 100092 PA286-TanomaRd.toFranklin C HRST 581 3,416,140 3,416,140 01/15/2015 A

Indiana 286 411 104500 PA 286 3R W of White Twp. P HRST 581 50,000 50,000

Indiana 286 460 25595 PA286ovrTrib.to CushCreek P BRDG STP 223,200 185 55,800 279,000

Indiana 286 460 25595 PA286ovrTrib.to CushCreek F BRDG 185 327,900 327,900

Indiana 286 462 83309 PA 286 over Horton Run P BRDG STP 231,200 185 57,800 289,000

Indiana 286 462 83309 PA 286 over Horton Run F BRDG 185 327,900 327,900

Indiana 286 471 95898 Edgewood Int. Improvement U SAMI 581 21,300 21,300

Indiana 286 471 95898 Edgewood Int. Improvement R SAMI 581 257,329 257,329

Indiana 286 471 95898 Edgewood Int. Improvement C SAMI 581 1,400,400 1,400,400 10/01/2015 E

Indiana 286 499 104458 Rt 286: 422 Intrchng West C HCON 581 4,908,200 4,908,200 07/30/2015 E

Indiana 286 499 104458 Rt 286: 422 Intrchng West C HCON 581 491,800 491,800 07/30/2015 E

Indiana 286 49A 104459 Rt 286: 422 Intrchng East P HCON 581 309,000 309,000

Indiana 403 454 89918 Cramer Bridge #4 U BRDG 185 11,000 11,000

Indiana 422 45A 25696 US422 Cunningham Culverts F BRDG NHPP 424,000 424,000

Indiana 422 45A 25696 US422 Cunningham Culverts U BRDG NHPP 250,000 250,000

Indiana 422 45A 25696 US422 Cunningham Culverts R BRDG NHPP 159,000 159,000

Indiana 422 45A 25696 US422 Cunningham Culverts +C BRDG 581 3,660,700 3,660,700 01/15/2017 E

Indiana 422 462 25699 Ewings Mill Bridge #1 +U BRDG NHPP 82,000 82,000

Indiana 422 462 25699 Ewings Mill Bridge #1 R BRDG NHPP 53,100 53,100

Indiana 422 462 25699 Ewings Mill Bridge #1 +C BRDG NHPP 305,020 305,020 01/15/2017 E

Indiana 422 462 25699 Ewings Mill Bridge #1 +C BRDG STP 1,334,080 1,334,080 01/15/2017 E

Indiana 422 463 25693 Shelocta Bridge #1 U BRDG NHPP 40,000 40,000

Indiana 422 464 96961 US422 S.6th St. EB/WB Br C BRDG NHPP 1,142,240 185 129,360 1,271,600 10/09/2014 A

Indiana 422 464 96961 US422 S.6th St. EB/WB Br C BRDG NHPP 1,141,662 185 433,331 1,574,993 10/09/2014 A

Indiana 422 464 96961 US422 S.6th St. EB/WB Br C HRST 409 2,975,861 2,975,861 10/09/2014 A

Indiana 422 465 95849 US422 ov Br of Carney Run F BRDG 185 290,000 290,000

Page 30: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

30 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Indiana 422 465 95849 US422 ov Br of Carney Run F BRDG 185 25,000 25,000

Indiana 422 465 95849 US422 ov Br of Carney Run R BRDG 185 75,000 75,000

Indiana 954 456 83361 PA954over N.Br.Plum Creek P BRDG 185 30,000 30,000 05/04/2015 A

Indiana 1005 451 25546 Onberg Bridge U BRDG BOF 18,080 185 4,520 22,600

Indiana 1005 451 25546 Onberg Bridge C BRDG BOF 1,575,760 185 393,940 1,969,700 10/01/2017 E

Indiana 1005 453 92666 Ruffner Church Bridge F BRDG 185 200 200

Indiana 1005 453 92666 Ruffner Church Bridge U BRDG 185 30,000 30,000

Indiana 1005 453 92666 Ruffner Church Bridge U BRDG 185 15,000 15,000

Indiana 1005 453 92666 Ruffner Church Bridge R BRDG 185 11,400 11,400

Indiana 1005 453 92666 Ruffner Church Bridge C BRDG 185 655,700 655,700 10/01/2017 E

Indiana 1006 450 25782 SR 1006 over US 119 NB/SB C BRDG STP 1,200,000 185 300,000 1,500,000 08/28/2014 A

Indiana 1012 450 83369 SR 1012 over Penn Run F BRDG 185 51,500 51,500

Indiana 1012 450 83369 SR 1012 over Penn Run U BRDG 185 30,000 30,000

Indiana 1012 450 83369 SR 1012 over Penn Run R BRDG 185 10,000 10,000

Indiana 1012 450 83369 SR 1012 over Penn Run C BRDG 185 359,600 359,600 04/25/2016 E

Indiana 1012 451 25588 Dixonville Bridge #1 P BRDG STP 64,000 185 16,000 80,000

Indiana 1033 450 25786 Gipsy Bridge #2 U BRDG BOF 21,600 185 5,400 27,000

Indiana 1033 450 25786 Gipsy Bridge #2 C BRDG BOF 942,000 942,000 01/15/2015 A

Indiana 1038 450 83352 Brewer Run Bridge C BRDG 185 293,600 293,600 01/29/2015 A

Indiana 1045 452 25790 Upper Juneau Bridge P BRDG BOF 260,000 260,000

Indiana 1045 452 25790 Upper Juneau Bridge F BRDG 185 250,000 250,000

Indiana 1045 452 25790 Upper Juneau Bridge F BRDG 185 50,000 50,000

Indiana 1056 450 74307 Gipsy Bridge #1 U BRDG 185 28,200 28,200

Indiana 1056 450 74307 Gipsy Bridge #1 C BRDG 185 1,688,300 1,688,300 10/12/2017 E

Indiana 2013 450 74310 Wehrum Bridge C BRDG BOF 1,282,880 185 320,720 1,603,600 10/22/2015 E

Indiana 2013 450 74310 Wehrum Bridge C BRDG BOF 726,240 185 528,000 1,254,240 10/22/2015 E

Indiana 2013 450 74310 Wehrum Bridge C BRDG STP 1,385,760 1,385,760 10/22/2015 E

Indiana 2019 4S1 102115 Fire Academy Road Slides R HRST 581 25,000 25,000

Indiana 3029 450 83362 Clune Bridge #1 F BRDG 185 50,000 50,000

Indiana 3035 48D 102881 Main St. Enhancement C TENH TAU 502,344 502,344

Indiana 3043 491 25834 Rose Street Extension #2 C HCON STP 7,825,000 581 3,297,128 11,122,128 10/15/2017 E

Indiana 3043 491 25834 Rose Street Extension #2 C HCON STU 5,363,510 5,363,510 10/15/2017 E

Indiana 3056 470 103689 Warren Rd. Safety Improve R HRST 581 30,000 30,000

Indiana 4035 25523 SR 4035over N.Br.Plum Cr. P BRDG STP 254,640 185 63,660 318,300

Indiana 4035 25523 SR 4035over N.Br.Plum Cr. F BRDG 185 337,700 337,700

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 F BRDG BOF 214,240 183 40,170 13,390 267,800

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 R BRDG BOF 32,960 183 6,180 2,060 41,200

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 C BRDG BOF 874,240 183 163,920 54,640 1,092,800 10/22/2016 E

Totals for: Indiana 14,489,076 19,366,766 85,450 33,941,292 19,681,090 21,461,840 41,142,930 14,594,940 18,460,070 69,665 33,124,675 14,782,350 10,198,650 24,981,000 133,189,897

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000

Page 31: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

31 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 1,000,000 1,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 2,000,000 2,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 4,000,000 4,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST 581 4,000,000 4,000,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 200,000 1,000,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 200,000 1,000,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 300,000 1,100,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 300,000 1,100,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000

Lawrence TEH 29491 Neshannock Creek Trail C TENH STP 340,000 85,000 425,000 06/04/2015 A

Lawrence 18 L26 91595 18/SR 351 - SR 108 C HRST NHPP 2,000,000 2,000,000 06/19/2014 A

Lawrence 18 L26 91595 18/SR 351 - SR 108 C HRST NHPP 2,000,000 2,000,000 06/19/2014 A

Lawrence 18 L27 29441 18/Craig-Maitland Lane +C HRST 581 3,000,000 3,000,000 02/25/2016 E

Lawrence 18 L28 29526 18/Mahoning Viaduct F BRDG 185 775,000 775,000 02/11/2016 E

Lawrence 18 L28 29526 18/Mahoning Viaduct U BRDG 185 25,000 25,000

Lawrence 18 L28 29526 18/Mahoning Viaduct R BRDG NHPP 160,000 185 40,000 200,000

Lawrence 18 L28 29526 18/Mahoning Viaduct C BRDG NHPP 8,000,000 185 2,000,000 10,000,000 04/21/2016 E

Lawrence 19 L05 29453 19/Br. Slippery Rock Crk F BRDG 185 300,000 300,000 08/20/2015 E

Lawrence 19 L05 29453 19/Br. Slippery Rock Crk C BRDG 185 1,200,000 1,200,000 10/22/2015 E

Lawrence 65 L25 29485 SR65 ov abandon railroad F BRDG 185 250,000 250,000 03/16/2017 E

Lawrence 65 L25 29485 SR65 ov abandon railroad U BRDG 185 45,000 45,000

Lawrence 65 L25 29485 SR65 ov abandon railroad R BRDG 185 25,000 25,000

Lawrence 65 L25 29485 SR65 ov abandon railroad C BRDG STP 880,000 185 220,000 1,100,000 05/15/2017 E

Lawrence 65 L26 91575 65/Fridays Hill - 422Ramp +R HRST STP 100,000 100,000

Lawrence 65 L26 91575 65/Fridays Hill - 422Ramp +C XRST 581 3,000,000 3,000,000 02/11/2016 E

Lawrence 108 0 104468 Neshannock Trail/North St F TENH STU 44,100 50,000 94,100

Lawrence 108 0 104468 Neshannock Trail/North St C TENH STU 315,900 30,000 345,900 12/25/2025 E

Page 32: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

32 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Lawrence 208 L06 29314 Pulaski-New Bedford Br P BRDG 185 100,000 100,000 10/29/2014 A

Lawrence 208 L06 29314 Pulaski-New Bedford Br F BRDG 185 200,000 200,000 03/03/2016 E

Lawrence 208 L06 29314 Pulaski-New Bedford Br U BRDG 185 60,000 60,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br R HRST 185 75,000 75,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br C BRDG 185 500,000 500,000 05/05/2016 E

Lawrence 208 L06 29314 Pulaski-New Bedford Br C BRDG 185 600,000 600,000 05/05/2016 E

Lawrence 224 0 100756 Fall Street Bridge P BRDG 581 300,000 300,000

Lawrence 224 L08 88278 224, State St/SR 422 - 18 C HRST STP 305,000 305,000 05/02/2013 A

Lawrence 288 L03 29301 Wampum Ave Bridge Replace C BRDG 185 6,000,000 6,000,000 03/09/2017 E

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson P HRST STP 80,000 80,000 10/23/2014 A

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson F HRST STP 120,000 120,000 02/05/2015 E

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson C HRST 581 3,500,000 3,500,000 05/07/2015 A

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson C HRST 581 400,000 400,000 05/07/2015 A

Lawrence 488 L05 91921 Portersville Rd/Slip Rock F BRDG 185 300,000 300,000 09/22/2016 E

Lawrence 488 L05 91921 Portersville Rd/Slip Rock U BRDG 185 100,000 100,000

Lawrence 488 L05 91921 Portersville Rd/Slip Rock R BRDG 185 200,000 200,000

Lawrence 488 L05 91921 Portersville Rd/Slip Rock C BRDG 185 5,000,000 5,000,000 12/01/2016 E

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge F BRDG 185 300,000 300,000 09/01/2016 E

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge U BRDG 185 75,000 75,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge R BRDG 185 150,000 150,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge C BRDG STP 1,200,000 185 300,000 1,500,000 11/03/2016 E

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br F BRDG 185 250,000 250,000 01/07/2016 E

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br U BRDG 185 50,000 50,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br R BRDG 185 80,000 80,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br C BRDG 185 1,500,000 1,500,000 03/10/2016 E

Lawrence 2012 L02 29388 SR 2012 over McKee Run F BRDG 185 125,000 125,000 12/24/2015 E

Lawrence 2012 L02 29388 SR 2012 over McKee Run U BRDG 185 25,000 25,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run R BRDG 185 100,000 100,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run C BRDG 185 1,250,000 1,250,000 02/25/2016 E

Lawrence 2014 L01 29487 Hemmerle Road Bridge F BRDG 185 300,000 300,000 08/31/2017 E

Lawrence 2014 L01 29487 Hemmerle Road Bridge U BRDG 185 200,000 200,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge R BRDG 185 200,000 200,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge C BRDG 185 1,200,000 1,200,000 11/15/2017 E

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge F BRDG 185 250,000 250,000 10/05/2017 E

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge U BRDG 185 50,000 50,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge R BRDG 185 200,000 200,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge C BRDG BOF 921,000 185 230,250 1,151,250 12/15/2017 E

Lawrence 2022 L03 29481 Heinz Camp Road Bridge C BRDG BOF 45,000 45,000 09/12/2013 A

Lawrence 2030 L03 29393 Mountville Road Bridge P BRDG 185 250,000 250,000

Lawrence 2030 L03 29393 Mountville Road Bridge F BRDG 185 500,000 500,000 01/05/2017 E

Page 33: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

33 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Lawrence 2030 L03 29393 Mountville Road Bridge R BRDG 185 300,000 300,000

Lawrence 2030 L03 29393 Mountville Road Bridge C BRDG 581 3,000,000 3,000,000 03/09/2017 E

Lawrence 3001 L01 29290 East Poland Ave Bridge C BRDG STP 2,000,000 2,000,000 05/07/2015 A

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek F BRDG 185 100,000 100,000 11/13/2016 E

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek F BRDG 185 100,000 100,000 11/13/2016 E

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek R BRDG 185 50,000 50,000

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek C BRDG 581 1,400,000 1,400,000 01/15/2017 E

Lawrence 3010 L03 73162 W.Washington St. Bridge F BRDG 185 350,000 350,000 02/02/2017 E

Lawrence 3010 L03 73162 W.Washington St. Bridge U BRDG 185 100,000 100,000

Lawrence 3010 L03 73162 W.Washington St. Bridge R BRDG 185 100,000 100,000

Lawrence 3010 L03 73162 W.Washington St. Bridge C BRDG 185 3,000,000 3,000,000 04/15/2017 E

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge F BRDG 185 400,000 400,000 11/13/2016 E

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge U BRDG 185 100,000 100,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge R BRDG 185 100,000 100,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge C BRDG 185 3,000,000 3,000,000 01/15/2017 E

Lawrence 7202 LOC 84045 Rogers Road Bridge T-533 C BRDG 183 46,049 10,356 56,405 06/19/2014 A

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 F BRDG BOF 280,000 179 70,000 350,000 04/20/2017 E

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 U BRDG BOF 40,000 179 10,000 50,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 R BRDG BOF 40,000 179 10,000 50,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 C BRDG BOF 400,000 100,000 500,000 07/01/2017 E

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 C BRDG BOF 400,000 100,000 500,000 07/01/2017 E

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 P BRDG BOF 120,000 183 22,500 7,500 150,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 P BRDG BOF 40,000 183 7,500 2,500 50,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 F BRDG BOF 120,000 183 22,500 7,500 150,000 04/20/2017 E

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 U BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 R BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 C BRDG BOF 680,000 183 127,500 42,500 850,000 07/01/2017 E

Lawrence 7206 0 88721 Hickory View Drive Bridge F BRDG 183 120,000 30,000 150,000 04/20/2017 E

Lawrence 7206 0 88721 Hickory View Drive Bridge U BRDG 183 20,000 5,000 25,000

Lawrence 7206 0 88721 Hickory View Drive Bridge R BRDG 183 20,000 5,000 25,000

Lawrence 7206 0 88721 Hickory View Drive Bridge C BRDG 183 680,000 170,000 850,000 07/01/2017 E

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br F BRDG BOF 120,000 183 22,500 7,500 150,000 04/20/2017 E

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br U BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br R BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br C BRDG BOF 800,000 183 150,000 50,000 1,000,000 07/01/2017 E

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 P BRDG BOF 120,000 183 22,500 7,500 150,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 P BRDG BOF 40,000 183 7,500 2,500 50,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 F BRDG BOF 120,000 183 22,500 7,500 150,000 04/20/2017 E

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 U BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 R BRDG BOF 20,000 183 3,750 1,250 25,000

Page 34: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

34 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 C BRDG BOF 680,000 183 127,500 42,500 850,000 07/01/2017 E

Lawrence 7209 0 88428 Coffee Run Road Br T-567 F BRDG 183 120,000 30,000 150,000 04/20/2017 E

Lawrence 7209 0 88428 Coffee Run Road Br T-567 U BRDG 183 20,000 5,000 25,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 R BRDG 183 20,000 5,000 25,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 C BRDG 183 680,000 170,000 850,000 07/01/2017 E

Lawrence 7301 LOC 29278 North Street Bridge C BRDG STU 1,224,713 179 867,500 2,092,213 09/25/2014 A

Lawrence 7405 LOC 78358 Maple St ov McClures Run F BRDG BOF 120,000 183 22,500 7,500 150,000

Lawrence 7405 LOC 78358 Maple St ov McClures Run U BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7405 LOC 78358 Maple St ov McClures Run R BRDG BOF 20,000 183 3,750 1,250 25,000

Lawrence 7405 LOC 78358 Maple St ov McClures Run C BRDG BOF 680,000 183 127,500 42,500 850,000 07/01/2018 E

Totals for: Lawrence 7,478,813 15,238,549 200,356 22,917,718 16,275,900 15,355,000 145,000 31,775,900 4,360,000 23,740,000 485,000 28,585,000 9,721,000 2,362,750 302,500 12,386,250 95,664,868

Washington 102036 Washington DFB-2015 C HRST 581 150,000 150,000

Washington 102154 D12 Construction Mgt C BRDG 581 500,000 500,000

Washington 102154 D12 Construction Mgt C BRDG 581 500,000 500,000

Washington 103183 Monongahela Corridor +C SAMI RRX 506,479 506,479

Washington 103185 SR 1006 Grade Crossing +C SAMI RRX 136,591 136,591

Washington 103185 SR 1006 Grade Crossing +C SAMI RRX 136,591 136,591

Washington 103186 Dunlevy Corridor +C SAMI RRX 546,364 546,364

Washington 103186 Dunlevy Corridor +C SAMI RRX 546,363 546,363

Washington 103187 Besco St. Grade Crossing +C SAMI RRX 281,377 281,377

Washington 105012 Wetland Mitigation SGL302 F HRST 581 700,000 700,000

Washington 105175 D12 3c SINC-UP Project P SAMI CAQ 123,360 30,840 154,200

Washington 105175 D12 3c SINC-UP Project F SAMI CAQ 98,400 24,600 123,000

Washington 105175 D12 3c SINC-UP Project C HRST CAQ 394,372 98,593 492,965

Washington 95056 D12 Utility Agreement U HRST 581 150,000 150,000

Washington 95056 D12 Utility Agreement U HRST 581 150,000 150,000

Washington f105278 Donora Bus Garage Reno C IMOD CAQ 458,560 114,640 573,200

Washington f105279 Washington Bus Replace C IMOD CAQ 360,000 90,000 450,000

Washington CTP 102993 Cal Tech Park Access Rd C HCON APL 300,000 300,000

Washington 18 0 102063 District 12 RDIP C SAMI sHSIP 47,060 47,060 01/08/2015 A

Washington 18 0 98368 PA 18:McJ Dr to Maiden St C HRST 581 1,379,170 1,379,170 05/05/2016 E

Washington 18 MS2 73365 HS City of Wash. CBD-Ph 3 +C TENH STU 398,685 499,801 898,486

Washington 18 T10 88829 PA 18 Signal Upgrades F SAMI CAQ 460,000 581 115,000 575,000

Washington 18 T10 88829 PA 18 Signal Upgrades U SAMI CAQ 1,391,129 581 347,782 1,738,911

Washington 18 T10 88829 PA 18 Signal Upgrades R SAMI CAQ 1,350,611 581 337,653 1,688,264

Washington 18 T10 88829 PA 18 Signal Upgrades C SAMI CAQ 2,628,000 581 657,000 3,285,000 07/02/2018 E

Washington 19 19R 94729 US19:Walnut St to Mall Rd +C HRST NHPP 2,408,573 2,408,573 01/26/2017 E

Washington 19 19R 94729 US19:Walnut St to Mall Rd +C HRST NHPP 3,819,971 3,819,971 01/26/2017 E

Washington 40 0 98363 US 40: US 19 to Chestnut C HRST NHPP 2,970,520 2,970,520 06/18/2015 A

Washington 40 19R 98362 US 40:PA 917 to Maiden St +C HRST NHPP 4,243,600 4,243,600 09/08/2016 E

Page 35: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

35 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Washington 70 22M 94684 Belle Vernon Brdg Preserv F BRDG 185 500,000 500,000

Washington 70 22M 94684 Belle Vernon Brdg Preserv U BRDG 185 50,000 50,000

Washington 70 22M 94684 Belle Vernon Brdg Preserv C BRDG NHPP 14,229,531 14,229,531 03/12/2015 A

Washington 70 22M 94684 Belle Vernon Brdg Preserv C BRDG NHPP 8,150,719 8,150,719 03/12/2015 A

Washington 88 0 103184 SR 0088 Grade Xing +C SAMI RRX 132,612 132,612

Washington 88 0 103184 SR 0088 Grade Xing +C SAMI RRX 132,612 132,612

Washington 88 127 47432 PA 88 & 837 Carroll Twp F HRST 581 650,000 650,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp U HRST 581 115,000 115,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp R HRST 581 600,000 600,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp C HRST 581 1,060,000 1,060,000 02/25/2016 E

Washington 88 127 47432 PA 88 & 837 Carroll Twp C HRST 581 1,000,000 1,000,000 02/25/2016 E

Washington 88 SIP 96936 WashCo Surface Impvmt-14 C HRST 581 3,000,000 3,000,000 04/24/2014 A

Washington 88 SIP 96936 WashCo Surface Impvmt-14 C HRST 581 2,290,200 2,290,200 04/24/2014 A

Washington 136 E10 94559 D12 Small Bridge 2012-2 C BRDG STP 150,000 150,000 09/27/2012 A

Washington 136 G10 30749 B&O Railroad Bridge F BRDG 185 20,000 20,000

Washington 136 G10 30749 B&O Railroad Bridge F HRST STP 80,000 80,000

Washington 136 G10 30749 B&O Railroad Bridge U HRST STP 94,760 94,760

Washington 136 G10 30749 B&O Railroad Bridge R HRST STP 140,080 140,080

Washington 136 G10 30749 B&O Railroad Bridge C BRDG 185 2,000,000 2,000,000 12/17/2015 E

Washington 136 G10 30749 B&O Railroad Bridge C BRDG 185 3,304,500 3,304,500 12/17/2015 E

Washington 519 0 95769 PA 519 Grade Crossing C SAMI RRX 280,000 280,000 04/07/2014 E

Washington 519 138 30949 PA 519/SR 1055 Intersect. C SAMI HSIP 803,027 803,027 06/19/2014 A

Washington 519 K20 57201 SR 519 at SR 980 and I-79 F SAMI 581 1,957,000 1,957,000

Washington 519 K20 57201 SR 519 at SR 980 and I-79 U SAMI 581 530,450 530,450

Washington 519 K20 57201 SR 519 at SR 980 and I-79 R SAMI 581 1,591,350 1,591,350

Washington 519 K20 57201 SR 519 at SR 980 and I-79 C SAMI 581 14,000,000 14,000,000 01/26/2017 E

Washington 519 K20 57201 SR 519 at SR 980 and I-79 C SAMI 581 11,735,278 11,735,278 01/26/2017 E

Washington 837 0 98364 PA837:SecondSt to ScottSt C HRST NHPP 2,156,419 2,156,419 09/21/2017 E

Washington 837 09R 95287 Donora/Webster Area Roads C HRST STP 100,000 100,000 03/27/2014 A

Washington 980 139 31194 PA 980 Approach To PA 50 R HRST 581 250,000 250,000

Washington 980 139 31194 PA 980 Approach To PA 50 C HRST 581 2,700,000 2,700,000 10/09/2014 A

Washington 980 B02 30746 Chartiers Creek Bridge U BRDG 185 125,000 125,000

Washington 980 B02 30746 Chartiers Creek Bridge C BRDG 185 1,250,000 1,250,000 10/09/2014 A

Washington 980 B02 30746 Chartiers Creek Bridge C BRDG 185 1,700,000 1,700,000 10/09/2014 A

Washington 1002 0 98344 SR1002: Morganza to US 19 C HRST 581 1,592,708 1,592,708

Washington 1006 K10 48137 Venetia Road Bridge C BRDG 185 2,838,790 2,838,790 07/16/2015 E

Washington 1006 K10 48137 Venetia Road Bridge C BRDG 185 1,000,000 1,000,000 07/16/2015 E

Washington 1009 000 30687 SR 1009 over Chartiers Ck P BRDG 185 327,818 327,818

Washington 1009 000 30687 SR 1009 over Chartiers Ck F BRDG 185 441,799 441,799

Washington 1009 000 30687 SR 1009 over Chartiers Ck U BRDG 185 89,554 89,554

Page 36: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

36 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Washington 1009 000 30687 SR 1009 over Chartiers Ck R BRDG 185 149,257 149,257

Washington 1009 187 83446 SR 1009 Signal Upgrades +C SAMI CAQ 1,054,319 1,054,319 06/30/2016 E

Washington 1009 C10 77383 SR 1009/4049 Intersection C HRST 581 325,000 325,000 06/26/2014 A

Washington 1010 149 48483 Valleybrook @ Bebout Rd S HRST 581 200,000 200,000

Washington 1059 B10 83445 SR 1059 over Mingo Creek P BRDG 185 218,545 218,545

Washington 1059 B10 83445 SR 1059 over Mingo Creek F BRDG 185 225,102 225,102

Washington 1059 B10 83445 SR 1059 over Mingo Creek U BRDG 185 56,275 56,275

Washington 1059 B10 83445 SR 1059 over Mingo Creek R BRDG 185 168,826 168,826

Washington 2027 0 98291 SR 2027 over I-70 P BRDG 185 500,000 500,000

Washington 2027 0 98291 SR 2027 over I-70 F BRDG 185 400,000 400,000

Washington 2027 0 98291 SR 2027 over I-70 F BRDG 185 400,000 400,000

Washington 2027 0 98291 SR 2027 over I-70 U BRDG 185 100,000 100,000

Washington 2027 0 98291 SR 2027 over I-70 R BRDG 185 100,000 100,000

Washington 2073 0 100447 SR 2073 & 2083 Resurface C HRST STP 975,000 975,000 06/05/2014 A

Washington 3003 0 97454 SR 3003 Brdg Preservation C HRST 581 848,266 848,266 05/07/2015 A

Washington 4007 C10 76073 SR 4007 over US 22 P BRDG 185 609,219 609,219

Washington 4007 C10 76073 SR 4007 over US 22 P BRDG 185 600,000 600,000

Washington 4007 C10 76073 SR 4007 over US 22 F BRDG 185 1,240,424 1,240,424

Washington 4007 C10 76073 SR 4007 over US 22 U BRDG 185 109,273 109,273

Washington 4007 C10 76073 SR 4007 over US 22 R BRDG 185 273,181 273,181

Washington 4007 C10 76073 SR 4007 over US 22 C BRDG 581 2,000,000 2,000,000 02/22/2018 E

Washington 4007 C10 76073 SR 4007 over US 22 C BRDG 581 3,000,000 3,000,000 02/22/2018 E

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 P BRDG 185 327,818 327,818

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 F BRDG 185 327,818 327,818

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 U BRDG 185 28,138 28,138

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 R BRDG 185 57,964 57,964

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 C BRDG 185 1,842,876 1,842,876 12/15/2016 E

Washington 4018 E10 76075 SR 4018 over Cross Creek C BRDG 185 1,500,000 1,500,000 12/17/2015 E

Washington 4018 E10 76075 SR 4018 over Cross Creek C BRDG 185 685,454 685,454 12/17/2015 E

Washington 4029 0 88074 4029 ov Br North Fk Cross P BRDG 185 337,653 337,653

Washington 7206 0 70284 Millers Run #3 F BRDG STP 148,000 183 27,750 9,250 185,000

Washington 7206 0 70284 Millers Run #3 U BRDG STP 24,000 183 4,500 1,500 30,000

Washington 7206 0 70284 Millers Run #3 R BRDG STP 16,000 183 3,000 1,000 20,000

Washington 7206 0 70284 Millers Run #3 C BRDG STP 880,000 183 165,000 55,000 1,100,000 01/28/2016 E

Washington 7220 0 95829 Chartiers Creek #12 P BRDG BOF 200,000 50,000 250,000

Washington 7220 0 95829 Chartiers Creek #12 F BRDG BOF 200,000 50,000 250,000

Washington 7220 0 95829 Chartiers Creek #12 U BRDG BOF 8,000 2,000 10,000

Washington 7220 0 95829 Chartiers Creek #12 R BRDG BOF 8,000 2,000 10,000

Washington 7220 0 95829 Chartiers Creek #12 C BRDG BOF 1,600,000 183 300,000 100,000 2,000,000

Washington 7302 C61 30995 Chartier's Creek #61 F BRDG 183 170,000 38,018 208,018

Page 37: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

37 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Washington 7302 C61 30995 Chartier's Creek #61 C BRDG STP 960,000 183 180,000 60,000 1,200,000 04/09/2015 A

Washington 7403 0 105162 Pigeon Creek #26 P BRDG BOF 200,000 50,000 250,000

Washington 7403 0 105162 Pigeon Creek #26 F BRDG BOF 200,000 50,000 250,000

Washington 7403 0 105162 Pigeon Creek #26 U BRDG BOF 8,000 2,000 10,000

Washington 7403 0 105162 Pigeon Creek #26 R BRDG BOF 8,000 2,000 10,000

Washington 7403 0 105162 Pigeon Creek #26 C BRDG BOF 800,000 200,000 1,000,000

Washington 8042 0 81650 SR 8042 over US 40 P BRDG 185 300,000 300,000

Washington 8042 0 81650 SR 8042 over US 40 F BRDG 185 355,136 355,136

Washington 8042 0 81650 SR 8042 over US 40 U BRDG 185 54,636 54,636

Washington 8042 0 81650 SR 8042 over US 40 R BRDG 185 109,273 109,273

Washington 8042 0 81650 SR 8042 over US 40 C BRDG 185 2,315,142 2,315,142 02/08/2018 E

Totals for: Washington 20,888,063 15,227,553 1,050,049 37,165,665 13,740,942 18,218,880 173,193 32,133,015 10,241,480 25,963,675 8,000 36,213,155 12,475,200 22,911,470 300,000 35,686,670 141,198,505

Westmoreland 103188 Sutersville Corridor +C SAMI RRX 257,500 257,500

Westmoreland 103188 Sutersville Corridor +C SAMI RRX 257,500 257,500

Westmoreland 103189 Eureka Hill Rd Grade Xing +C SAMI RRX 132,613 132,613

Westmoreland 103189 Eureka Hill Rd Grade Xing +C SAMI RRX 132,612 132,612

Westmoreland 103190 Vine Street Grade Xing +C SAMI RRX 281,377 281,377

Westmoreland 103911 Irwin Phase 2- PA Avenue C TENH TAU 221,900 221,900

Westmoreland 103912 HeritageTrail Ph3 C TENH TAU 750,000 750,000

Westmoreland 103912 HeritageTrail Ph3 C TENH TAP 221,900 221,900

Westmoreland 104421 Dist 12-15-RSA C SAMI HSIP 500,000 500,000 03/10/2016 E

Westmoreland 105063 Lincoln Ave Trail C TENH STU 72,850 18,213 91,063

Westmoreland 105064 HCD Bike/Ped Path S TENH STU 174,400 43,600 218,000

Westmoreland 94945 Transit Commuter Center C PT CAQ 2,400,000 600,000 3,000,000

Westmoreland BR 31669 Fairwood Manor Br P BRDG STP 200,000 183 37,500 12,500 250,000

Westmoreland EHS 31918 East Hillis Street P BRDG BOF 200,000 183 37,500 12,500 250,000

Westmoreland LBS 77374 Westmoreland Loc Br Line P BRDG BOF 20,000 183 60,000 320,000 400,000

Westmoreland LBS 77374 Westmoreland Loc Br Line P BRDG 37,500 37,500

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG BOF 584,000 183 109,500 36,500 730,000

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG STP 600,000 183 112,500 37,500 750,000

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG STP 800,000 275,000 1,075,000

Westmoreland SCT 87086 Scottdale SRTS C TENH SRTSF 32,500 32,500 07/31/2014 A

Westmoreland 22 15R 101370 US 22 Concrete Patching C HRST NHPP 2,180,000 2,180,000 03/12/2015 A

Westmoreland 22 CCP 102257 US22 Corridor Signal Upgd C HRST STP 217,000 217,000 12/04/2014 A

Westmoreland 30 134 31872 Jeannette - Amos K Bypass C HRST STP 300,000 581 211,734 511,734 12/01/2011 A

Westmoreland 30 134 31872 Jeannette - Amos K Bypass C HRST 581 238,266 238,266 12/01/2011 A

Westmoreland 30 28R 91083 BeattyCrossrds-St.Vincent C HRST NHPP 2,330,000 2,330,000 01/29/2015 A

Westmoreland 30 A10 32040 US 30 Corridor Impvmts S HRST 581 1,000,000 1,000,000

Westmoreland 30 RPM 103304 12-15-RPM C HRST NHPP 244,000 244,000 04/23/2015 A

Westmoreland 30 RPM 103304 12-15-RPM C HRST STP 101,000 101,000 04/23/2015 A

Page 38: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

38 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Westmoreland 30 SIG 101493 Jeanette/Hempfield CMAQ P SAMI CAQ 500,000 500,000

Westmoreland 30 SIG 101493 Jeanette/Hempfield CMAQ R SAMI CAQ 120,000 581 30,000 150,000

Westmoreland 31 RDI 104423 Dist 12-15 RDIP-3 C SAMI HSIP 1,300,000 1,300,000 08/13/2015 E

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int F HRST 581 400,000 400,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int F HRST 581 2,300,000 2,300,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int U HRST 581 206,000 206,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int R HRST 581 1,545,000 1,545,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int C HRST 581 5,000,000 5,000,000 06/30/2016 E

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int C HRST 581 10,000,000 10,000,000 06/30/2016 E

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int C HRST 581 5,000,000 5,000,000 06/30/2016 E

Westmoreland 51 0 98300 PA 51: PA 201 to Co Line +C HRST NHPP 4,370,908 4,370,908 04/21/2016 E

Westmoreland 56 04M 96123 PA 56 Metal Culvrt Preser C BRDG 185 300,000 300,000 01/16/2014 A

Westmoreland 56 22R 93072 PA 56, Poplar St to River C HRST NHPP 400,000 400,000 02/06/2014 A

Westmoreland 56 B10 76089 PA 56 over Little Pucketa R BRDG 185 24,320 24,320

Westmoreland 56 N00 31587 Seward Bridge C BRDG STP 75,000 75,000 08/19/2010 A

Westmoreland 66 24R 94852 PA66 :Mamont Dr to PA 366 +C HRST 581 3,200,000 3,200,000 06/04/2015 A

Westmoreland 70 BAT 104331 DistrictWide Tree Triming C HRST 581 50,000 50,000

Westmoreland 119 A02 32079 US 119/PA 819 Interchange C BRDG 185 60,000 60,000 09/27/2012 A

Westmoreland 119 A02 32079 US 119/PA 819 Interchange C HRST STP 240,000 240,000 09/27/2012 A

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd F HRST 581 890,000 890,000

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST NHPP 5,000,000 581 1,250,000 6,250,000 01/28/2016 E

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST NHPP 1,590,334 581 2,655,903 4,246,237 01/28/2016 E

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST STU 9,033,280 9,033,280 01/28/2016 E

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST NHPP 14,023,610 581 5,405,903 19,429,513 01/28/2016 E

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST STU 7,600,004 7,600,004 01/28/2016 E

Westmoreland 130 0 32118 Harrison City-Export F HRST STP 80,000 20,000 100,000

Westmoreland 130 0 32118 Harrison City-Export R HRST STP 80,000 20,000 100,000

Westmoreland 130 182 57455 PA 130 @ Pleasant Valley C HRST sSXF 2,303,652 581 575,913 2,879,565 05/05/2016 E

Westmoreland 136 0 98299 PA136: PA201 to PA 31 C HRST 581 2,167,248 2,167,248 09/22/2016 E

Westmoreland 136 29R 98298 PA 136: US 30 to SR 3099 +C HRST STP 1,092,727 1,092,727 05/04/2017 E

Westmoreland 136 RDI 104422 Dist12-15RDIP-2 C SAMI HSIP 1,700,000 1,700,000 12/17/2015 E

Westmoreland 217 E10 74251 Derry Borough Bridge F BRDG 185 8,000 8,000 01/08/2015 E

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 1,000,000 1,000,000 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG sSTP 2,000,000 2,000,000 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 1,121,800 1,121,800 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STU 553,280 553,280 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG sSTP 4,000,000 4,000,000 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG sSTP 1,229,000 1,229,000 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 339,000 339,000 02/26/2015 A

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STU 1,433,276 1,433,276 02/26/2015 A

Page 39: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

39 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Westmoreland 259 D11 31601 PA 259 over Coalpit Run R BRDG 185 37,808 37,808

Westmoreland 356 0 96654 PA 356 Safety Improvement P SAMI 581 2,832,500 2,832,500

Westmoreland 356 0 96654 PA 356 Safety Improvement F SAMI 581 1,909,620 1,909,620

Westmoreland 356 0 96654 PA 356 Safety Improvement U SAMI 581 530,450 530,450

Westmoreland 356 0 96654 PA 356 Safety Improvement R SAMI 581 1,750,000 1,750,000

Westmoreland 356 0 96654 PA 356 Safety Improvement R SAMI 581 371,800 371,800

Westmoreland 356 0 96654 PA 356 Safety Improvement C SAMI 581 10,000,000 10,000,000 03/23/2017 E

Westmoreland 356 0 96654 PA 356 Safety Improvement C SAMI 581 6,390,905 6,390,905 03/23/2017 E

Westmoreland 356 06M 31338 Freeport Bridge C HRST STP 300,000 300,000 06/04/2010 A

Westmoreland 356 06M 31338 Freeport Bridge C HRST 581 500,000 500,000 06/04/2010 A

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln P SAMI 581 1,000,000 1,000,000

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln F SAMI 581 1,166,990 1,166,990

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln U SAMI 581 530,450 530,450

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln R SAMI 581 1,750,000 1,750,000

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln R SAMI 581 371,800 371,800

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln C SAMI NHPP 4,370,908 581 1,092,727 5,463,635 03/23/2017 E

Westmoreland 366 0 76115 SR 366 over Pucketa Ck P BRDG 185 207,635 207,635

Westmoreland 366 0 76115 SR 366 over Pucketa Ck F BRDG 185 230,000 230,000

Westmoreland 366 20R 98449 PA366: SR 4107 to SR 4109 C HRST NHPP 4,612,553 4,612,553 06/18/2015 A

Westmoreland 366 20R 98449 PA366: SR 4107 to SR 4109 C HRST NHPP 700,000 700,000 06/18/2015 A

Westmoreland 366 21R 101813 PA 366: SR 4085-SR 4109 C HRST NHPP 2,624,375 2,624,375 10/01/2015 E

Westmoreland 381 M11 31826 PA 381 over Linn Run R BRDG 185 82,183 82,183

Westmoreland 381 Q10 31614 PA 381/Laughlintown Run R BRDG 185 19,994 19,994

Westmoreland 711 R10 76122 PA 711 over Mill Creek #2 R BRDG 185 115,443 115,443

Westmoreland 819 M10 31756 PA 819 Sewickley Ck Br C BRDG STP 120,000 185 30,000 150,000 12/09/2010 A

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck F BRDG 185 400,000 400,000

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck U BRDG 185 281,377 281,377

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck R BRDG 185 131,377 131,377

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck C BRDG 185 2,000,000 2,000,000 03/24/2016 E

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck C BRDG 185 2,834,950 2,834,950 03/24/2016 E

Westmoreland 981 20F 88073 SR 981 over Unity Run P BRDG 185 150,000 150,000

Westmoreland 981 20F 88073 SR 981 over Unity Run P BRDG 185 300,000 300,000

Westmoreland 981 20F 88073 SR 981 over Unity Run F BRDG 185 500,000 500,000

Westmoreland 981 20F 88073 SR 981 over Unity Run U BRDG 185 75,000 75,000

Westmoreland 981 20F 88073 SR 981 over Unity Run R BRDG 185 250,000 250,000

Westmoreland 981 20F 88073 SR 981 over Unity Run C BRDG 185 1,450,000 1,450,000

Westmoreland 981 SIG 94952 PA 981 Signals - Latrobe P SAMI CAQ 250,000 250,000

Westmoreland 981 SIG 94952 PA 981 Signals - Latrobe F SAMI CAQ 240,000 581 60,000 300,000

Westmoreland 981 SIG 94952 PA 981 Signals - Latrobe U SAMI CAQ 40,000 581 10,000 50,000

Westmoreland 981 SIG 94952 PA 981 Signals - Latrobe R SAMI CAQ 80,000 581 20,000 100,000

Page 40: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

40 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Westmoreland 981 TIP 31828 Laurel Vly Trans Imp Proj S HCON 581 2,000,000 2,000,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal U HRST STP 2,000,000 2,000,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal R HRST STP 2,000,000 581 200,000 2,200,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal C HRST STU 8,000,000 581 2,000,000 10,000,000 06/23/2016 E

Westmoreland 982 N10 69256 PA 982 over US 30 C BRDG 185 4,441,000 4,441,000 01/29/2015 A

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +P BRDG BOF 100,000 100,000

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +F BRDG BOF 152,982 152,982

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +U BRDG BOF 81,955 81,955

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +R BRDG BOF 81,955 81,955

Westmoreland 1017 B00 31611 SR 1017 over Mill Creek R BRDG 185 104,591 104,591

Westmoreland 1034 02S 31304 SR 1034 over Beaver Run R BRDG 185 37,658 37,658

Westmoreland 1046 01M 98657 WE BR PRES 14/15-1 C BRDG 185 525,000 525,000 07/16/2015 E

Westmoreland 1046 01M 98657 WE BR PRES 14/15-1 C BRDG 185 675,000 675,000 07/16/2015 E

Westmoreland 1060 A20 81747 Salina Bridge +P BRDG 185 1,500,000 1,500,000

Westmoreland 1060 A20 81747 Salina Bridge +F BRDG 185 1,748,364 1,748,364

Westmoreland 1060 A20 81747 Salina Bridge U BRDG 185 327,818 327,818

Westmoreland 1060 A20 81747 Salina Bridge R BRDG 185 327,818 327,818

Westmoreland 2013 B10 79418 SR 2013 over Slate Creek R BRDG 185 37,808 37,808

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ

P SAMI CAQ 800,000 800,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ

F SAMI CAQ 368,000 581 92,000 460,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ

U SAMI CAQ 200,000 581 50,000 250,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ

R SAMI CAQ 240,000 581 60,000 300,000

Westmoreland 3073 G01 31622 SR 3073 over Buffalo Run P BRDG 185 575,000 575,000

Westmoreland 3073 G01 31622 SR 3073 over Buffalo Run F BRDG 185 394,000 394,000

Westmoreland 3093 F10 31929 SR 3093 ov RR/Sewickly Ck C BRDG STP 4,900,666 185 1,225,166 6,125,832 06/18/2015 A

Westmoreland 3101 0 74434 SR 3101 over Jacks Run F BRDG 185 95,100 95,100

Westmoreland 3101 0 74434 SR 3101 over Jacks Run C BRDG 185 500,000 500,000

Westmoreland 3101 0 74434 SR 3101 over Jacks Run C BRDG 185 1,466,556 1,466,556

Westmoreland 4019 C10 89066 SR 4019 over Brush Creek P BRDG BOF 450,000 450,000

Westmoreland 4019 C10 89066 SR 4019 over Brush Creek F BRDG BOF 450,000 450,000

Westmoreland 4019 C10 89066 SR 4019 over Brush Creek U BRDG BOF 100,000 100,000

Westmoreland 4019 C10 89066 SR 4019 over Brush Creek +R BRDG BOF 150,000 150,000

Westmoreland 4019 C11 31550 Bridge over Conrail RR +C BRDG BOF 2,731,818 2,731,818 08/25/2016 E

Westmoreland 4019 C11 31550 Bridge over Conrail RR +C BRDG BOF 461,182 461,182 08/25/2016 E

Westmoreland 4022 A20 76096 SR 4022 over Brush Run P BRDG 185 250,000 250,000

Westmoreland 4022 A20 76096 SR 4022 over Brush Run F BRDG 185 247,612 247,612

Westmoreland 4022 A20 76096 SR 4022 over Brush Run U BRDG 185 32,619 32,619

Westmoreland 4022 A20 76096 SR 4022 over Brush Run R BRDG 185 65,239 65,239

Westmoreland 4022 A20 76096 SR 4022 over Brush Run C BRDG 185 2,595,230 2,595,230 02/08/2018 E

Westmoreland 4028 A10 32018 SR 4028 over Steels Run P BRDG 185 375,000 375,000

Page 41: FFY 2015 SPC TIP 1 / 41 FFY 2015 Costs FFY 2016 Costs FFY ... · Jun 29, 2015 7:54 AM Rpt# TIP200 FFY 2015 SPC TIP 1 / 41 d Discretionary e Economic Development f Flex fd Flexed s

Jun 29, 2015 7:54 AMRpt# TIP200

FFY 2015 SPC TIP

41 / 41

d Discretionary e Economic Development f Flex fd Flexed s Spike + Indicates phase qualifies for TOLL funds * Includes Conversion Amount On Obligation Plan Obligations have occurred ^PE-NEPA, FD-PSE CO, UTL-FnL UTL Clr, ROW-Cond ROW, CON-Let

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total ^Milestones

Westmoreland 4028 A10 32018 SR 4028 over Steels Run F BRDG 185 218,545 218,545

Westmoreland 4028 A10 32018 SR 4028 over Steels Run U BRDG 185 56,275 56,275

Westmoreland 4028 A10 32018 SR 4028 over Steels Run R BRDG 185 168,826 168,826

Westmoreland 4028 A10 32018 SR 4028 over Steels Run C BRDG 185 1,264,464 1,264,464 02/25/2016 E

Westmoreland 4048 01M 103362 12-5 Metal Culvert Prev C BRDG 185 500,000 500,000 10/22/2015 E

Westmoreland 4053 A10 91189 SR 4053 over Turtle Creek R BRDG 185 107,947 107,947

Westmoreland 7214 W14 101917 West Co #14- Beaver Run P BRDG STP 240,000 183 45,000 15,000 300,000

Westmoreland 7214 W14 101917 West Co #14- Beaver Run F BRDG STP 200,000 183 37,500 12,500 250,000

Westmoreland 7214 W14 101917 West Co #14- Beaver Run U BRDG STP 8,000 183 1,500 500 10,000

Westmoreland 7214 W14 101917 West Co #14- Beaver Run R BRDG STP 8,000 183 1,500 500 10,000

Westmoreland 7214 W14 101917 West Co #14- Beaver Run C BRDG STP 1,200,000 183 225,000 75,000 1,500,000

Westmoreland 7302 BR 31508 Alley #1 Bridge C BRDG BOF 695,550 183 130,594 43,472 869,616 01/15/2015 A

Westmoreland 7421 FSB 31554 Fourth Street Br P BRDG BOF 240,000 183 45,000 15,000 300,000

Totals for: Westmoreland 28,788,571 17,641,934 825,285 47,255,790 25,524,402 22,975,437 370,000 48,869,839 30,603,000 42,714,461 50,000 73,367,461 28,678,994 23,677,194 350,000 52,706,188 222,199,278

Overall Totals: 293,353,134 174,052,011 118,720,981 586,126,126 268,919,099 207,744,164 15,245,037 491,908,300 254,981,730 242,943,176 13,085,952 511,010,858 233,670,387 227,832,960 14,964,651 476,467,998 2,065,513,282