TM FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See www.Tstud.com for updates
Transcript
Page 1: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

TM

FIELD GUIDEHow to Construct a Structure

Using 5.5” Deep Tstuds™

July 2018 - Subject to changes. See www.Tstud.com for updates

Page 2: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

QUICK TIPS• Most nail guns that shoot 4” and longer nails require

120 psi (min.) at the gun.

• Use 3/8” diameter hose and fittings

• 3 nails are required to fasten the plates to the Tstuds™,2 into one wood member and 1 into the other.

• Nails must be 4”, and provide 1-1/2” of penetration.

• Screws can be (2) #12 x 4 1/2" screws, one into eachwood flange of the Tstud™ or (because of their high withdrawal values) 2 - 4" FastenMaster HeadLok screws or 4" SFS intec ConnexTite Countersunk Head screws.

• In order to fasten the bottom plate to the floor truss orfloor joist, you will need to use 4-1/2” long nails or screws that have the required withdrawal value, similar to how you nail down a 2x6 or 2x4 bottom plate. The reason for the 4-1/2” length is that you have to have 1” of penetration into the floor joist system, and only nailing into the plywood is unacceptable.

Note: This is only a quick field guide, the TER for the Tstud™ will govern in all instances for design loads and values.

1

Page 3: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

The required 4-1/2" nail gun will require a larger gulp of air, so use 3/8” diameter hose and fittings. 120 psi is required at the gun.

2

Page 4: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

You may need 2 regulators - one for the larger4-1/2" nail guns set at 120+ psi, and the otherset to a lesser amount for your 3-1/2” guns. In

the winter, the cold ground sucks the life out ofthe hose, so you made need to up the pressure at

the tank to 135 psi to get 120 psi at the gun.

3

Page 5: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Fastening to Concrete: These plates are available from your lumber supplier

or you can make your own using this diagram.

4

Page 6: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Permanent and Temporary Splices: All permanent splices require 1.5”x18” steel

banding strips on the inside and outside of a wall including all exterior wall connections

where one wall adjoins the apposing wall. Or you can use a Tstud™ block as shown below.

Temporary blocking used as a stiffner when standing up the wall.

5

Page 7: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

If you are using the design values of the top plate as part of the overall header design,

you cannot put a splice above the header in the top plate. No splices are allowed in any header design. This splice (below) is not

allowed if the top plate is designed as part of the header structural capacity. The splice

also needs to be strapped.

6

Page 8: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example of how tight the header should be.

7

Page 9: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Strapping: All outside corners are required to be strapped according to the building code,

1.5”x18” strap, for advanced framing that is in effect in your area. Please consult your

building officials.

8

Page 10: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Nails:3 nails are required to fasten the plates to the Tstuds™. 2 into one wood member and 1 into the other. Nails must be 4”, and provide 1-1/2” of penetration.

Screws:Plate to Tstud™ connection can be (2) #12 x 4-1/2" screws, one into each wood flange of the Tstud™ or (because of their high withdrawal values) 2 - 4" FastenMaster HeadLok screws or 4" SFS intec ConnexTite Countersunk Head screws.

9

Page 11: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Use a 2x block of wood under the header and on top of the Tstud™ jack studs or

cripples to support the weight of the of the header over the foam core of the Tstud™.

10

Page 12: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

temporary stiffener

NEEDS TO BE STRAPPED!

11

Page 13: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example:

12

Page 14: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example:

Shown for example:

13

Page 15: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example:

14

Page 16: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example:

15

Page 17: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Don’t forget a 2x4 drywall nailer in the corner!

Shown for example:

16

Page 18: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Don’t forget a 2x4 drywall nailer or drywall clips!

Shown for example:

17

Page 19: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Top plate is designed as part of the overallheader and is constructed correctly without

a splice.

18

Page 20: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Needs 1.5”x18” steel splice on inside and outside of corner.

19

Page 21: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Shown for example:

20

Page 22: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

NO dowels can be cut for placing pipes in walls or for any reason. See Tstud.com for how

to make repairs in the field.

21

Page 23: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Interior wall attaching to Tstud™ exterior wall.

22

Page 24: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

All corners need to be strapped on the inside and the outside.

Consult your engineer or designer on how to fasten an interior corner in your area of the country. Wind and Seismic conditions vary

the fastening required.

23

Page 25: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Inside corner:Product # - RTA2Z

Use and warnings at strongtie.com/info

24

Page 26: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Splicing above the headers is not allowed unless the header is not part of the overall load capacity of the design.

25

Page 27: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Make sure to order the correct electrical boxes. The box fasteners should be located so as to avoid needing to attach a 2x nailer on the Tstud™before nailing on the box.

26

Page 28: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Please verify with the code in your area: It is usually required that you hold electrical wires 1.5” back from the front edge of the drywall.

27

Page 29: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

Plumbers and Carpenters:Be sure to line up dowels in theTstuds™for outside wall plumbing runs so the plumber doesn’t have to cut into a dowel. There is a field repair for a single dowel cut, but you cannot cut more than one dowel.

See www.Tstud.com for the field repair.

dowelsaligned.

28

Page 30: FIELD GUIDE · 2020. 1. 29. · FIELD GUIDE How to Construct a Structure Using 5.5” Deep Tstuds™ July 2018 - Subject to changes. See  for updates

If you have any other questions, contact us at

[email protected] visit Tstud.com