1 Successful Implementation & Improved Operation Fieldbus Foundation Seminar Mumbai – 16 th Oct 2014 Enhancing Usability Through Physical Layer Diagnostics Arasu Thanigai
Transcript

11 Successful Implementation & Improved Operation

Fieldbus Foundation Seminar Mumbai – 16th Oct 2014

Enhancing Usability Through Physical Layer Diagnostics

Arasu Thanigai

22 Successful Implementation & Improved Operation

FF Usability

What is Usability

Usability is all about how easy, effective and pleasant the features are for a human to use

Simplicity, logical, orderly processes that are well defined and organized steps to use the digital network

The objective is to make FF easier than conventional instrumentations.

33 Successful Implementation & Improved Operation

FF Usability

44 Successful Implementation & Improved Operation

FF Usability - Simplicity

Iphone

Simple Apps usability and vendor participation Adaptability

Blackberry

The iPhone did not introduce anything particularly new or exciting to the mobile industry upon its release.

55 Successful Implementation & Improved Operation

FF Usability

Interoperability

Automated Device replacement

Backwards compatibility

PV Interchangeability

Device Templates

Managing Diagnostics

66 Successful Implementation & Improved Operation

FF Usability – HOST Profile Registration

77 Successful Implementation & Improved Operation

FF Usability – New ITK 6.2+ profile

New ITK 6 profile improves device commissioning

Improves Maintenance activities

Improves self monitoring and diagnostics of field devices ( diagnostics alerts)

Device replacement

Supports new EDDL features ( integrating data from multiple blocks, multiple views, mode control etc)

88 Successful Implementation & Improved Operation

FF Usability – Physical Layer Diagnostics

End users require actionable diagnostics information from physical layer

Expert systems advices

Components level diagnostics

Relevant tools to help the plant during installation / operation / maintenance

Integrating the physical layer diagnostics into the AMS.

99 Successful Implementation & Improved Operation

DeviceCoupler(Zone1 – Exd)

Fiel

d D

evic

es

Fiel

d D

evic

es

Fiel

d D

evic

es

TerminatorSurgeProtec.

SurgeProtect.

Fiel

d D

evic

es FieldbusProcessInterfaces

Fieldbus Physical layer

PowerSupplies

– Types and Causes of faults– Components with a view on availability– Assessment of risk of failure

DeviceCoupler(Zone2 – ExiC)

DeviceCoupler(Zone1 – Exia)

1010 Successful Implementation & Improved Operation

Corrosion

10

1111 Successful Implementation & Improved Operation

Hazardous safety rules not followed

– Ground faults– Fieldbus and power

cables tied together

1212 Successful Implementation & Improved Operation

Poor cable installation

1313 Successful Implementation & Improved Operation

Poor cable installations– Cable gland not tight– Seal missing

1414 Successful Implementation & Improved Operation

Poor Device Instalation

1515 Successful Implementation & Improved Operation

Poor maintenance

1616 Successful Implementation & Improved Operation

Typical locations and Fieldbus issues

1717 Successful Implementation & Improved Operation

1818 Successful Implementation & Improved Operation

Diagnostics Tools

Integrated single tool for commissioning, monitoring, and troubleshooting. Versions to suit your every need

1919 Successful Implementation & Improved Operation

Diagnostics Tools

Handheld tools

2020 Successful Implementation & Improved Operation

Advanced Diagnostic Options

A single tool for commissioning, monitoring, and troubleshooting. Versions to suit your every need

Handheld

Portable

Integrated version

2121 Successful Implementation & Improved Operation

Fieldbus Diagnostic Handheld

Display interface for stand-alone operation Multi-language support Intrinsically safe fieldbus interface (Ex ia)

FISCO, Entity, DART Operation in Zone 1/Div. 1 Focused on practical application Operating modes for novice and expert users With expert system advice Data backup and documentation on PC

2222 Successful Implementation & Improved Operation

Suitability check for existing cable

2323 Successful Implementation & Improved Operation

Failure margin check

Communications check

2424 Successful Implementation & Improved Operation

Device coupler short-circuit check

2525 Successful Implementation & Improved Operation

Oscilloscope

Built into the FDH-1 Many trigger conditions selectable Operation on the display or via software Trigger output for external oscilloscope

2626 Successful Implementation & Improved Operation

Intuitive Handling

One-button, quick check with NAMUR signals (NE 107)

Recording and storage for32 segments with 32 devices each

Data backup on laptop/PC

Multi language support: ENG+GER

2727 Successful Implementation & Improved Operation

Expert system on board

Interprets raw physical layer measurements Translates into possible causes Suggests corrective action NAMUR NE 107 status

2828 Successful Implementation & Improved Operation

Handheld Power

Power modes for every situation: segment power, intrinsically safe USB port internal rechargeable battery:

power for an entire work day

Selectable power modes

2929 Successful Implementation & Improved Operation

Mobile Diagnostic Module– Portable module for 1 segment, mainly for

field usage– Powered via USB or bulk power– Nearly identical to the Power Hub

Diagnostic Module

USB interface

Bulk PowerFieldbus interface

3030 Successful Implementation & Improved Operation

Diagnostic Manager Software

User interface in the control room:– Display of values – Warnings with actionable information– Color coding for easy recognition

Value-add:– Automated commissioning procedures

and documentation– Live segment monitoring with alarms– Expert troubleshooting tools

Embedded expert-knowledge

3131 Successful Implementation & Improved Operation

One Plant Asset Management – Includes fieldbus now as asset– Customary look and feel– Reduces required training – Reduces potential for errors

Open Architecture Integration:– AMS Suite– PRM– FieldCare – FieldMate– PACTware– OPC Interface

Asset Management Integration

3232 Successful Implementation & Improved Operation

Example ADM and DCS integration

Diagnostics atDCS Station

Rel

ay c

onta

ctop

tiona

l)

RS485

Industrial Switch

Ethernet or FF H1

Address switches

3333 Successful Implementation & Improved Operation

Example ADM and DCS integration

Operatorstation

Rel

ay c

onta

ctop

tiona

l)

RS485

EthernetVnetIP

AMS

3434 Successful Implementation & Improved Operation

Operatorstation

Rel

ay c

onta

ctop

tiona

l)

RS485

Ethernet

Example ADM and DCS integration

VnetIP

AMS

3535 Successful Implementation & Improved Operation

The Solution

Operatorstation

Rel

ay c

onta

ctop

tiona

l)

RS485

EthernetEthernet (optional)

AMS

3636 Successful Implementation & Improved Operation

Example

3737 Successful Implementation & Improved Operation

Cabinet Control via Diagnostic Gateway

– Inputs for monitoring the control cabinet• Namur sensors / Frequency input (6x)• Analog input for temperature (2x)• Humidity sensor on board

– Power outputs (240 V, 2x)– On/Off controller – Configurable via Foundation

Fieldbus H1– Fan is not working– Door not closed– Water ingress

3838 Successful Implementation & Improved Operation

Diagnostic Device Couplers

Measures in the field:– Measures fieldbus signal conditions at the spur level– Reports changes all the way to Plant Asset

Management– Feeds the expert system

– Better advice – better knowledge – focused plant upkeep – fewer trips to the field

3939 Successful Implementation & Improved Operation

Diagnostic Segment Protector

Improved and innovative spur fault protection: – Progressive spur short-circuit protection– Jabber protection – cuts off devices talking too much– Maintenance work causing contact bounce or short-circuits– Reliable containment of gradual overload conditions– Protects operations from manual intervention and device

failure– Loose wire strands– Bad installations causing multiple devices to talk at the same

time– Water ingress with ground faults or corrosion

4040 Successful Implementation & Improved Operation

Water Ingress

4141 Successful Implementation & Improved Operation

Water Ingress Sensor

Monitoring the inside of the enclosure– Placed inside the enclosure of choice– Connects in parallel to the fieldbus segment– Sends alarm all the way to plant asset management– Know what the housing looks like on the inside

4242 Successful Implementation & Improved Operation

Older way of Commissioning– Always on the critical path– Manual, step-by-step procedure– Labor intensive– Requires

• Screw driver• Check sheet• Pencil• Multimeter• Oscilloscope

– Connect one device at a time– Disconnect after testing

Test Report

4343 Successful Implementation & Improved Operation

Simple Commissioning Steps with ADM– Verify address setting– Wire up devices in the right location– Check shielding– Activate communication– Use automated work procedures

• Testing • Documentation

– All devices at once– Wiring remains undisturbed Commissioning Wizard

Test Report

4444 Successful Implementation & Improved Operation

Commissioning Wizard

With Expert System Support– Takes snapshot– Identifies wiring errors– Ensures compliance with

AG181 and IEC 61158-2– Recommends limits for ADM messages– Stores limits in non-volatile memory

Automatic Tag ReadoutCreates baseline report:

– Snapshot of all measurements – Complete documentation

Saves significant (almost 80%) of pre-commissioning time

4545 Successful Implementation & Improved Operation

Online monitoring as per NAMUR

ADM increases the number of detectable faults– Displays measurement values – Issues warnings and alarms– Highlights violations with color coding:

Good valueMaintenance required

Out of specification

The segment is still operating with good performance

4646 Successful Implementation & Improved Operation

Diagnostic Menu

ADM delivers actionable information for fast fault finding

1 Active messages2 Actionable information with

solution guideance based on expert knowledge

3 History with timestampsWhen the failure…

… occured… disappeared

– Export function for external analysis and storage

11

222

33

4747 Successful Implementation & Improved Operation

Spurs

Field Instruments

Basic Principles: Typical Topology

Segment Protectors

Trunk

Surge Protector

Terminator

Plant Asset Management

Diagnostic Gateway

4848 Successful Implementation & Improved Operation

Poor Wiring

4949 Successful Implementation & Improved Operation

Poor Wiring

5050 Successful Implementation & Improved Operation

Practical Example of Frequencey disturbance

In this example the frequency of noise was approx. 150Hz

7 ms

5151 Successful Implementation & Improved Operation

Not a good device location

FF Device Moved away from Drive

5252 Successful Implementation & Improved Operation

Surge Protection

5353 Successful Implementation & Improved Operation

5454 Successful Implementation & Improved Operation

Diagnostic in Surge Protector

Condition-based replacement– Monitors strike severity and count – Reports end of functional reserve to AMS– Instead of repetitive scheduled maintenance– Surely protects you from the next strike

At Junction box Trunk input At junction box Spur output

At Power supply output at Control room

5555 Successful Implementation & Improved Operation

Diagnostic Surge Protection On Device Coupler

5656 Successful Implementation & Improved Operation

Diagnostic Surge Protection On IS Device Coupler

5757 Successful Implementation & Improved Operation

Surge Protection at PowerHub

5858 Successful Implementation & Improved Operation

Integrated Diagnostic

5959 Successful Implementation & Improved Operation

Summary

– Advanced Diagnostics tools and components for physical layer have reduced physical layer commissiong time and provide online monitoring and reporting system that brings savings at CAPEX and OPEX

– Most problems at early bus installations were due to poor installation. However, simple, user-friendly, Fieldbus testers are now available, allowing the installation crew to easily check the wiring, and the device commissioning crew to check network operation, spotting any problems early

– Many contractors and Technicians are trained and are skilled in Fieldbus installation and commissioning, and have the test equipment and in-house procedures to ensure reliable operation

– USABILITY of Foundation Fieldbus physical is greatly improved

6060 Successful Implementation & Improved Operation

Thank you

03.11.2014 60