REVISED 12/01/01 A2
U6 Unit 6 Boiler CD19-22 SCR, dry ESP, wet FGD, and WESPU7 Unit 7 Boiler CD23-26 SCR, dry ESP, wet FGD, and WESPAux Auxiliary Boiler NACT1 & CT2 Cooling Towers (2) NAC19 Unit 6 & 7 Coal Reclaim HoppersC20-23 Coal Reclaim ConveyorsC24-C26 Unit 6 & 7 Crusher House and Reclaim Conveyors CD27 BaghouseC27-30 Unit 6 Boilerhouse Coal Handling CD28 BaghouseC31-34 Unit 7 Boilerhouse Coal Handling CD29 BaghouseA1-A6 Ash Handling Point Source Unit 6 CD30 BaghouseA8-A11, & A13 Ash Handling Point Source Unit 7 CD31, 33 BaghouseA7, A12, A14 Ash Handling Fugitive Source Units 6 & 7 NAVF1 - VF32 Coal Reclaim FeedersLSBM3 Limestone Ball Mill Train No. 3LS13-3 Limestone Silo No. 3 CD32-3 Bin Vent Filter (on silo)LS15 Limeston Reclaim ConveyorGS10 Gypsum - Belt Filter
FVehicle Fugitive Vehicle EmissionsC1 Coal UnloadingC2, C4, C6, C8 Coal Handling ConveyorsC3, C5, C7, C9 Coal Stacking TubesC13 Coal Handling - Reclaim ConveyorsGS3, GS4 Gypsum Handling - Stockout Conveyor and Radial StackerGS7, GS9 Gypsum Truck LoadingG8 Gypsum Rail Car LoadingLS1 Limestone Rail Car UnloadingLS2, LS3 Limestone Stockout Conveyor and Transfer House (existing)LS6, LS7 Limestone Stockout Conveyor and Radial StackerFLandfill Landfill Activities - Active Cell
U1 Unit 1 Boiler CD1 ESPU2 Unit 2 Boiler CD2 ESPU3 Unit 3 Boiler CD3 ESPU4 Unit 4 Boiler CD4 ESP
Is your facility subject to 40 CFR Part 68 "Prevention of Accidental Releases" - Section 112(r) of the Federal Clean Air Act? Yes / NoIf No, please specify in detail how your facility avoided applicability:
If your facility is Subject to 112(r), please complete the following: A. Have you already submitted a Risk Management Plan (RMP) to EPA Pursuant to 40 CFR Part 68.10 or Part 68.150?
Yes No Specify required RMP submittal date: _____________ If submitted, RMP submittal date: _ 6/8/2004 B. Are you using administrative controls to subject your facility to a lesser 112(r) program standard?
Yes No If yes, please specify:
Facility Name: Duke Cliffside Steam StationMailing Address Line 573 Duke Power Road Mailing Address Line 2:City: Cliffside State: NC Zip Code: 28114 County: Rutherford & ClevelandPhone No. (828) 657-2339 Fax No. (828) 657-2060 Email Address:
SO2 51,742,000 35,130,000 C19-U5 WFGDSO2 10,918,000 C19-U1-4 RetireNOx 2,816,000 C19-U1-4 RetirePM 698,000 C19-U1-4 RetireCO 130,000 C19-U1-4 Retire
Attach Additional Sheets As Necessary
For assistance with Section A4, please contact the North Carolina Division of Pollution Prevention and Environmental Assistance at 1-800-763-0136 or [email protected]
112(r) APPLICABILITY INFORMATION
SURVEY OF FACILITY REDUCTION & RECYCLING ACTIVITIES
Planned Source ReductionActivities (Enter Code)Activities (Enter Code) Reduction (lb/yr) Reduction (lb/yr)
Pollutant Ongoing Source Reduction Qty. Emitted Before Qty. Emitted After
Equipment To Be ADDED By This Application (New, Previously Unpermitted, or Replacement)
Existing Permitted Equipment To Be MODIFIED By This Application
Equipment To Be DELETED By This Application
ID NO. DESCRIPTION ID NO. DESCRIPTIONEMISSION SOURCE EMISSION SOURCE CONTROL DEVICE CONTROL DEVICE
FORMs A2, A3, A4
SURVEY OF FACILITY REDUCTION & RECYCLING ACTIVITIES - A4 NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
EMISSION SOURCE LISTING: New, Modified, Previously Unpermitted, Replaced, Deleted
EMISSION SOURCE LISTING FOR THIS APPLICATION - A2112r APPLICABILITY INFORMATION - A3
A 3
A 4
REVISED 12/01/01 BEMISSION SOURCE ID NO: U6CONTROL DEVICE ID NO(S): CD 19-22EMISSION POINT (STACK) ID NO(S): EP-U6
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
X Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Da, HHHH NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) Vendor 117.8 515.7 2 2 117.8 515.7PARTICULATE MATTER<10 MICRONS (PM10) Vendor 188.4 825.2 2 2 188.4 825.2PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) Vendor 1178 5157.5 2 2 1178 5157.5NITROGEN OXIDES (NOx) Vendor 628 2750.6 2 2 628 2750.6CARBON MONOXIDE (CO) Vendor 1177.5 5157.5 2 2 1177.5 5157.5VOLATILE ORGANIC COMPOUNDS (VOC) Vendor 31.4 137.5 2 2 31.4 137.5
Vendor 0.2 0.8 2 2 0.2 0.8OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrHydrogen Chloride Mass Balance 6.53E+01 1.72E+02 - - 6.53E+01 1.72E+02Hydrogen Fluoride Mass Balance 1.16E+01 2.24E+01 - - 1.16E+01 2.24E+01Antimony AP-42 7.54E-03 3.30E-02 - - 7.54E-03 3.30E-02Arsenic AP-42 1.72E-01 7.52E-01 - - 1.72E-01 7.52E-01Beryllium AP-42 8.79E-03 3.85E-02 - - 8.79E-03 3.85E-02Cadmium AP-42 2.13E-02 9.35E-02 - - 2.13E-02 9.35E-02Chromium AP-42 1.09E-01 4.77E-01 - - 1.09E-01 4.77E-01Cobalt AP-42 4.19E-02 1.83E-01 - - 4.19E-02 1.83E-01Lead AP-42 1.76E-01 7.70E-01 - - 1.76E-01 7.70E-01Manganese AP-42 2.05E-01 8.98E-01 - - 2.05E-01 8.98E-01Mercury 1 NSPS Da 3.36E-02 1.47E-01 - - 3.36E-02 1.47E-01Nickel AP-42 1.17E-01 5.13E-01 - - 1.17E-01 5.13E-01Selenium AP-42 5.44E-01 2.38E+00 - - 5.44E-01 2.38E+00Acetaldehyde AP-42 2.39E-01 1.05E+00 - - 2.39E-01 1.05E+00Acetophenone AP-42 6.28E-03 2.75E-02 - - 6.28E-03 2.75E-02Acrolein AP-42 1.21E-01 5.32E-01 - - 1.21E-01 5.32E-01Anthracene AP-42 8.79E-05 3.85E-04 - - 8.79E-05 3.85E-04Benzene AP-42 5.44E-01 2.38E+00 - - 5.44E-01 2.38E+00Benzo(g,h,i)perylene AP-42 1.13E-05 4.95E-05 - - 1.13E-05 4.95E-05Benzyl Chloride AP-42 2.93E-01 1.28E+00 - - 2.93E-01 1.28E+00Biphenyl AP-42 7.12E-04 3.12E-03 - - 7.12E-04 3.12E-03Bis(2-ethylhexyl)phthalate AP-42 3.06E-02 1.34E-01 - - 3.06E-02 1.34E-01Bromoform AP-42 1.63E-02 7.15E-02 - - 1.63E-02 7.15E-02Carbon Disulfide AP-42 5.44E-02 2.38E-01 - - 5.44E-02 2.38E-012-Chloroacetophenone AP-42 2.93E-03 1.28E-02 - - 2.93E-03 1.28E-02Chlorobenzene AP-42 9.21E-03 4.03E-02 - - 9.21E-03 4.03E-02Chloroform AP-42 2.47E-02 1.08E-01 - - 2.47E-02 1.08E-01Cumene AP-42 2.22E-03 9.72E-03 - - 2.22E-03 9.72E-03Cyanide AP-42 1.05E+00 4.58E+00 - - 1.05E+00 4.58E+00
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 6 Boiler
Nominal 800 MW pulverized coal (PC) boiler fired with bituminous coal or a blend of bituminous and sub-bituminous coals. The boiler will be equipped with the following control devices to reduce air emissions during normal operations: low NOx burners, SCR, dry ESP, wet FGD, and WESP. See Appendix G for process diagram.
OPERATING SCENARIO ______1___________OF ________1__________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
2,4-Dinitrotoluene AP-42 1.17E-04 5.13E-04 - - 1.17E-04 5.13E-04Dimethyl Sulfate AP-42 2.01E-02 8.80E-02 - - 2.01E-02 8.80E-02Ethyl benzene AP-42 3.94E-02 1.72E-01 - - 3.94E-02 1.72E-01Ethyl Chloride (Chloroethane) AP-42 1.76E-02 7.70E-02 - - 1.76E-02 7.70E-02Ethylene Dichloride AP-42 1.67E-02 7.33E-02 - - 1.67E-02 7.33E-02Ethylene Dibromide AP-42 5.02E-04 2.20E-03 - - 5.02E-04 2.20E-03Formaldehyde AP-42 1.00E-01 4.40E-01 - - 1.00E-01 4.40E-01Hexane AP-42 2.80E-02 1.23E-01 - - 2.80E-02 1.23E-01Isophorone AP-42 2.43E-01 1.06E+00 - - 2.43E-01 1.06E+00Methyl Bromide (Bromomethane) AP-42 6.70E-02 2.93E-01 - - 6.70E-02 2.93E-01Methyl Chloride (Chloromethane) AP-42 2.22E-01 9.72E-01 - - 2.22E-01 9.72E-01Methyl Ethyl Ketone AP-42 1.63E-01 7.15E-01 - - 1.63E-01 7.15E-01Methyl Hydrazine AP-42 7.12E-02 3.12E-01 - - 7.12E-02 3.12E-01Methyl Methacrylate AP-42 8.37E-03 3.67E-02 - - 8.37E-03 3.67E-02Methyl tert-butyl ether AP-42 1.47E-02 6.42E-02 - - 1.47E-02 6.42E-02Methylene Chloride AP-42 1.21E-01 5.32E-01 - - 1.21E-01 5.32E-01Naphthalene AP-42 5.44E-03 2.38E-02 - - 5.44E-03 2.38E-02Phenanthrene AP-42 1.13E-03 4.95E-03 - - 1.13E-03 4.95E-03Phenol AP-42 6.70E-03 2.93E-02 - - 6.70E-03 2.93E-02Propionaldehyde AP-42 1.59E-01 6.97E-01 - - 1.59E-01 6.97E-01Styrene AP-42 1.05E-02 4.58E-02 - - 1.05E-02 4.58E-02Tetrachloroethylene AP-42 1.80E-02 7.88E-02 - - 1.80E-02 7.88E-02Toluene AP-42 1.00E-01 4.40E-01 - - 1.00E-01 4.40E-011,1,1-Trichloroethane AP-42 8.37E-03 3.67E-02 - - 8.37E-03 3.67E-02Vinyl Acetate AP-42 3.18E-03 1.39E-02 - - 3.18E-03 1.39E-02Xylene AP-42 1.55E-02 6.78E-02 - - 1.55E-02 6.78E-02Total PCDD/PCDF AP-42 7.37E-07 3.23E-06 - - 7.37E-07 3.23E-06
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEHydrogen Chloride Mass Balance 65.29 1566.85 571898.56Hydrogen Fluoride Mass Balance 11.63 279.20 101907.58Arsenic AP-42 0.17 4.12 1503.52Beryllium AP-42 0.01 0.21 77.01Cadmium AP-42 0.02 0.51 187.02Chromium AP-42 0.11 2.61 953.45Manganese AP-42 0.21 4.92 1796.89Mercury AP-42 0.03 0.81 294.34Nickel AP-42 0.12 2.81 1026.80Acetaldehyde AP-42 0.24 5.73 2090.26Acrolein AP-42 0.12 2.91 1063.47Benzene AP-42 0.54 13.06 4767.27Benzyl Chloride AP-42 0.29 7.03 2566.99Carbon Disulfide AP-42 0.05 1.31 476.73Chlorobenzene AP-42 0.01 0.22 80.68Chloroform AP-42 0.02 0.59 216.36Ethylene Dichloride AP-42 0.02 0.40 146.69Ethylene Dibromide AP-42 0.00 0.01 4.40Formaldehyde AP-42 0.10 2.41 880.11Hexane AP-42 0.03 0.67 245.70Methyl Ethyl Ketone AP-42 0.16 3.92 1430.18Methylene Chloride AP-42 0.22 5.32 1943.58Phenol AP-42 0.01 0.16 58.67Styrene AP-42 0.01 0.25 91.68Toluene AP-42 0.10 2.41 880.11Xylene AP-42 0.02 0.37 135.68Sulfuric Acid Vendor 47.10 1130.40 412596.00Ammonia Vendor 31.40 753.60 275064.00
1 Calculated based on NSPS Subpart Da, Sub-bituminous units w/ wet FGD - see emission calculation notes2 Emissions provided are based on preliminary design. Information based on final design will be provided to NC DAQ.
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/dayINDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONS
lb/yr
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED 12/01/01 B1EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: U6
CONTROL DEVICE ID NO(S): CD 19-22
OPERATING SCENARIO: ______1________ OF ______1________ EMISSION POINT (STACK) ID NO(S): EP-U6
DESCRIBE USE: PROCESS HEAT SPACE HEAT X ELECTRICAL GENERATION
CONTINUOUS US STAND BY/EMERGENCY OTHER (DESCRIBE): _________
HEATING MECHANISM: X INDIRECT DIRECT
MAX. FIRING RATE (MMBTU/HOUR): 7850
BARK WOOD/BARK WET WOOD DRY WOOD OTHER (DESCRIBE): __________
PERCENT MOISTURE OF FUEL:_________________
UNCONTROLLED CONTROLLED WITH FLYASH REINJECTION CONTROLLED W/O REINJECTION
FUEL FEED METHOD: HEAT TRANSFER MEDIA: STEAM AIR OTHER
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF BOILER IF OTHER DESCRIBE:
PULVERIZED
WET BED UNCONTROLLED UNCONTROLLED UNCONTROLLED CIRCULATING
X DRY BED CONTROLLED CONTROLLED FLYASH REINJECTION RECIRCULATING
NO FLYASH REINJECTION
METHOD OF LOADING: CYCLONE HANDFIRED TRAVELING GRATE X OTHER (DESCRIBE): Supercritical PC Unit
METHOD OF TUBE CLEANING: TBD CLEANING SCHEDULE: As needed
TYPE OF BOILER: UTILITY INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: NORMAL TANGENTIAL LOW NOX BURNERS NO LOW NOX BURNER
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF FUEL: ____________________________ PERCENT MOISTURE: _____________ TYPE OF BOILER: UTILITY INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: _______________ TYPE OF CONTROL (IF ANY): ___________________________ FUEL FEED METHOD: ________
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
No. 2 Fuel Oil (Start-up) mmBTU 2747.5 NA
Coal mmBTU 7850 NA
No. 2 Fuel Oil (Start-up) 137000 BTU/gal 0.05 NA
Coal 9376 BTU/lb 3 11.29
COMMENTS:
SAMPLING PORTS, COMPLIANT WITH EPA METHOD 1 WILL BE INSTALLED ON THE STACKS: X YES NO
Attach Additional Sheets As Necessary
ASH CONTENT
(% BY WEIGHT)
SULFUR CONTENT
FUEL TYPE
SPECIFIC
BTU CONTENT (% BY WEIGHT)
Fuel oil will be combusted along with coal for start-up, up to 35% of maximum capacity, where the fuel will be switched to coal. Fuel oil may also be used when the pulverizer is brought into service. Coal will be a blend from various regions and coal specs. given ore conservative.
LIMITATION (UNIT/HR)
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE)
MAXIMUM DESIGN
CAPACITY (UNIT/HR)
REQUESTED CAPACITY
FUEL TYPE UNITS
COAL-FIRED BURNER
OIL/GAS-FIRED BURNER
WOOD TYPE:
FORM B1EMISSION SOURCE (WOOD, COAL, OIL, GAS, OTHER FUEL-FIRED BURNER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
WOOD-FIRED BURNER
Nominal 800 MW pulverized coal (PC) boiler fired with bituminous coal or a blend of bituminous and sub-bituminous coals. Boiler is controlled by SCR system, a dry electrostatic precipitator (ESP), a wet-flue gas desulfurization unit, and a wet ESP.
FUEL USAGE (INCLUDE STARTUP/BACKUP FUELS)
SPREADER STOKER FLUIDIZED BEDOVERFEED STOKER UNDERFEED STOKER
OTHER FUEL-FIRED BURNER
REVISED 12/01/01
CONTROL DEVICE ID NO: CD19 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S)U6
EMISSION POINT (STACK) ID NO(S) EP-U6 POSITION IN SERIES OF CONTROLS NO. 1 OF 4 UNITS
MANUFACTURER: TBD MODEL NO: TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED CONSTRUCTION DATE: 2007
TYPE: AFTERBURNER REGENERATIVE THERMAL OXIDATION RECUPERATIVE THERMAL OXIDATION
CATALYTIC OXIDATIONEXPECTED LIFE OF CATALYST (YRS): METHOD OF DETECTING WHEN CATALYST NEEDS REPLACMENT:CATALYST MASKING AGENT IN AIR STREAM: HALOGEN SILICONE PHOSPHOROUS COMPOUND HEAVY METAL
SULFUR COMPOUND OTHER_________________ NONE
TYPE OF CATALYST: Vanadium pentoxide CATALYST VOL (FT3): TBD VELOCITY THROUGH CATALYST (FPS): TDB
SCFM THROUGH CATALYST:
DESCRIBE CONTROL SYSTEM, INCLUDING RELATION TO OTHER CONTROL DEVICES AND SOURCES, AND ATTACH DIAGRAM OF SYSTEM:
POLLUTANT(S) COLLECTED: NOx
BEFORE CONTROL EMISSION RATE (LB/HR): 2355 lb/hr(to SCR; 0.30 lb/mmbtu)
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
OVERALL SYSTEM EFFICIENCY: % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR) : 628 lb/hr (after SCR; 0.08 lb/mmbtu)
PRESSURE DROP (IN. H2O OUTLET TEMPERATURE (oF):
INLET TEMPERATURE (oF RESIDENCE TIME (SECONDS):
INLET AIR FLOW RATE (ACFM):4,500,000 to SCR COMBUSTION TEMPERATURE (oF):
COMBUSTION CHAMBER VOLUME (FT3): INLET MOISTURE CONTENT (%):
% EXCESS AIR: CONCENTRATION (ppmv) ______INLET ______OUTLET
AUXILIARY FUEL USED: No. 2 Fuel Oil TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): 7850 lb/mmbtu
MAXIMUM ANNUAL FUEL USE: UNITS: MAXIMUM HOURLY FUEL USE: UNITS:
ACTUAL ANNUAL FUEL USE: UNITS: ACTUAL HOURLY FUEL USE: 418.6 UNITS: ton/hr design coal
DESCRIBE METHOD USED TO INCREASE MIXING:
DESCRIBE METHOD TO INSURE ADEQUATE START-UP TEMPERATURE:
DESCRIBE TEMPERATURE MONITORING DEVICES AND PROCEDURES:
STACK TESTING PORTS: NO YES (INLET AND OUTLET)
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
ATTACH A DIAGRAM OF THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):See Appendix G
FORM C3 CONTROL DEVICE (THERMAL OR CATALYTIC)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate C3AS REQUIRED BY 15A NCAC 2Q .0112, THIS FORM MUST BE SEALED BY A PROFESSIONAL ENGINNER (P.E.) LICENSED IN NORTH CAROLINA.
OPERATING SCENARIO:
_____1__ OF __1_____
NOx emissions from the boiler will be controlled using a combination of low-NOx burners, over-fire air and a selective catalytic reduction (SCR) system. The combustion system applies air-staging in combination with low-NOx burners to minimize NOx formation in the furnace to minimze the amount of SCR catalyst required and reduce the consumption of reagent.
The Selective Catalytic Reduction (SCR) system catalytically reduces boiler flue gas nitrogen oxide (NOx) emissions to nitrogen and water using anydrous ammonia (NH3) as a reducing agent. Flue gas exiting the ecomonizer outlet flows through two flow paths prior to entering the ammonia / air injection zone. Each flue has a dedicated ammonia injection grid fed by a manifold valve station. Following the ammonia injection the gas enters the SCR reactor were the NOx reacts with the ammonia and is converted to nitrogen and water. The flue gas exiting the reactor is directed into the air heater.
MIN MAX AVE:4.3 across SCR MIN MAX 750 at SCR outlet
Attach Additional Sheets As Necessary
MIN 600 MAX 750 at econ. Outlet
The ammonia injection grid has multiple zones for injecting ammonia across the flue gas path. Each injection pipe has numerous injection orifices for optimim ammonia-flue gas mixing.
Steam coil air heaters are designed to preheat the combustion air during initial firing. Ammonia is injected once the catalst bed temperature has been elevated above the estimated minimum injection temperature of 600 F. Temp. to be confirmed by SCR supplier.
REVISED 12/01/01 C2CONTROL DEVICE ID NO: CD 20 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE U6
EMISSION POINT (STACK) ID NO(S)EP-U6 POSITION IN SERIES OF CONTROL NO. 2 OF 4 UNITS
MANUFACTURER: TBD MODEL NO. TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
GAS DISTRIBUTION GRIDS: YES NO
TYPE: WET DRY SINGLE-STAGE TWO-STAGE
TOTAL COLLECTION PLATE AREA (FT2): 1,130,000 NO. FIELDS5 NO. COLLECTOR PLATE PER FIELD:
COLLECTOR PLATES SIZE (FT): LENGTH: 50 WIDTH: SPACING BETWEEN COLLECTOR PLATES (INCHES): 16
TOTAL DISCHARGE ELECTRODE LENGTH(FT): GAS VISCOSITY (POISE):
NUMBER OF DISCHARGE ELECTRODES: NUMBER OF COLLECTING ELECTRODE RAPPERS:
MAXIMUM INLET AIR FLOW RATE (ACFM): 3,000,000 ave. PARTICLE MIGRATION VELOCITY (FT/SEC):
MINIMUM GAS TREATMENT TIME (SEC): 15
FIELD STRENGTH (VOLTS) CHARGING: COLLECTING: CORONA POWER (WATTS/1000 CFM):
ELECTRICAL USAGE (kw/HOUR): 1400 kW
CLEANING PROCEDURES: RAPPING PLATE VIBRATING WASHING OTHER____________
PRESSURE DROP (IN. H20): MIN MAX AVE:.2 WARNING ALARM? YES NO
RESISTIVITY OF POLLUTANT (OHM-CM): GAS CONDITIONING: YES NO TYPE OF AGENT (IF YES):
INLET GAS TEMPERATURE (oF): MIN MAX AV 300 OUTLET GAS TEMPERATURE (oF): MIN MAX AVE: 298
VOLUME OF GAS HANDLED (ACFM 3,000,000 INLET MOISTURE PERCENT: MIN MAX
TBD TBD TBD TBD TBD
filterable PM10
BEFORE CONTROL EMISSION RATE (LB/HR):
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.1 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 118 lb/hr (0.015 lb/mmbtu)
DESCRIBE STARTUP PROCEDURES:
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
DESCRIBE ANY MONITORING DEVICES, GAUGES, OR TEST PORTS AS ATTACHMENTS:
SIZE
POLLUTANT(S) COLLECTED:
POWER REQUIREMENTS
CUMULATIVE
10-25
PARTICLE SIZE DISTRIBUTION
IS AN ENERGY MANAGEMENT SYSTEM USED? YES NO
WEIGHT %
0-11-10
(MICRONS)
OPERATING PARAMETERS
EQUIPMENT SPECIFICATIONS
OPERATING SCENARIO:
BULK PARTICLE DENSITY (LB/FT3):
25-50
Attach Additional Sheets As Necessary
OF TOTAL
50-100
and indicate the electrode type), AND THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
ATTACH A DIAGRAM OF THE TOP VIEW OF THE ESP WITH DIMENSIONS (include at a minimum the plate spacing and wire spacing
%
>100TOTAL = 100
FORM C2CONTROL DEVICE (Electrostatic Precipitator)
NO. OF SETS CHARGING EACH TRANSFORMER (kVA) EACH RECTIFIER Kv Ave/Peak Ma DcFIELD NO.
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
____1___ OF ___1___ P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
N
FORM C8CONTROL DEVICE (WET PARTICULATE SCRUBBER)
REVISED 12/01/01 NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate C8CONTROL DEVICE ID NO: CD21 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): U6
EMISSION POINT ID NO(S): EP-U6 POSITION IN SERIES OF CONTROLS: NO. 3 OF 4 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED: PROPOSED OPERATION DATE: 2011OPERATING SCENARIO: PROPOSED CONSTRUCTION DATE: 2007
_______ OF _______ P.E. SEAL NEEDED (PER 2Q .0112)? YES NO
DESCRIBE CONTROL SYSTEM:
The proposed flue gas desulfurization (FGD) system is a wet limestone, forced oxidation, system with a vertical, countercurrent, spray tower absorber. The flue gas enters the spray tower near the bottom through the absorber inlet nozzle. Once in the absorber, the hot flue gas is immediately quenched as it travels upward countercurrent to a continuous spray of process/recycle slurry produced by multiple spray banks. The recycle slurry extracts the sulfur dioxide from the flue gas and collects it in the bottom of the absorber where it is oxidized to calcium sulfate. The proposed system will treat 100% of the flue gas from the unit. The unit will be designed for 99% removal efficiency.
POLLUTANT(S) COLLECTED: SO2
BEFORE CONTROL EMISSION RATE (LB/HR): 39,238
CAPTURE EFFICIENCY: % % %
CONTROL DEVICE EFFICIENCY: % % %
CORRESPONDING EFFICIENCY: 99 % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 1178 lb/hr (0.15 lb/mmbtu - 30 day average)
PRESSURE DROP (IN. H20): MIN MAX AVE: 11 WARNING ALARM? YES NO
INLET TEMPERATURE (oF): MIN MAX AVE: 300 OUTLET TEMPERATURE (oF): MIN MAX AVE: 120
INLET AIR FLOW RATE (ACFM): 2,550,000 MOISTURE CONTENT : INLET % OUTLET %
THROAT VELOCITY (FT/SEC): THROAT TYPE: FIXED VARIABLE
TYPE OF SYSTEM: Wet Limestone, forced oxidation TYPE OF PACKING USED IF ANY: n/aADDITIVE LIQUID SCRUBBING MEDIUM: limestone slurry PERCENT RECIRCULATED:
MINIMUM LIQUID INJECTION RATE (GAL/MI 313 FLOW RATE GAUGE INSTALLED? YES NO
MAKE UP RATE (GAL/MIN): 1300 FOR ADDITIVE (GAL/MIN):DESCRIBE MAINTENANCE PROCEDURES: PARTICLE SIZE DISTRIBUTION
SIZE WEIGHT % CUMULATIVE(MICRONS) OF TOTAL %
0-1
DESCRIBE ANY MONITORING DEVICES, GAUGES, TEST PORTS, ETC: 1-1010-2525-50
50-100>100
TOTAL = 100
ATTACH A DIAGRAM OF THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
Attach Additional Sheets As Necessary
REVISED 12/01/01 C2CONTROL DEVICE ID NO: Unit 6 Wet ESP CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE U6
EMISSION POINT (STACK) ID NO(S) EP-U6 POSITION IN SERIES OF CONTROL NO. 4 OF 4 UNITS
MANUFACTURER: TBD MODEL NO. TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
GAS DISTRIBUTION GRIDS: YES NO
TYPE: WET DRY SINGLE-STAGE TWO-STAGE
TOTAL COLLECTION PLATE AREA (FT2): 612,000 NO. FIELDS3 NO. COLLECTOR PLATE PER FIELD:
COLLECTOR PLATES SIZE (FT): LENGTH: 29.53 WIDTH: SPACING BETWEEN COLLECTOR PLATES (INCHES): 9.75
TOTAL DISCHARGE ELECTRODE LENGTH(FT): GAS VISCOSITY (POISE):
NUMBER OF DISCHARGE ELECTRODES: NUMBER OF COLLECTING ELECTRODE RAPPERS:
MAXIMUM INLET AIR FLOW RATE (ACFM): 2,200,000 ave. PARTICLE MIGRATION VELOCITY (FT/SEC):
MINIMUM GAS TREATMENT TIME (SEC):
FIELD STRENGTH (VOLTS) CHARGING: COLLECTING: CORONA POWER (WATTS/1000 CFM):
ELECTRICAL USAGE (kw/HOUR):
CLEANING PROCEDURES: RAPPING PLATE VIBRATING WASHING OTHER____________
PRESSURE DROP (IN. H20): MIN MAX AVE: 2 WARNING ALARM? YES NO
RESISTIVITY OF POLLUTANT (OHM-CM): GAS CONDITIONING: YES NO TYPE OF AGENT (IF YES):
INLET GAS TEMPERATURE (oF): MIN MAX AVE: 128 OUTLET GAS TEMPERATURE (oF): MIN MAX AVE: 128
VOLUME OF GAS HANDLED (ACFM 2,200,000 INLET MOISTURE PERCENT: MIN MAX
TBD TBD TBD TBD TBD
Total PM10 Filterable PM10 H2SO4
BEFORE CONTROL EMISSION RATE (LB/HR):
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 188 lb/hr(0.024lb/mmbtu) 117.8 lbhr(0.015 lb/mmbtu) 47.1 lb/hr (0.006lb/mmbtu)
DESCRIBE STARTUP PROCEDURES:
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
DESCRIBE ANY MONITORING DEVICES, GAUGES, OR TEST PORTS AS ATTACHMENTS:
FORM C2CONTROL DEVICE (Electrostatic Precipitator)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
____1___ OF ___1___ P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
EQUIPMENT SPECIFICATIONS
BULK PARTICLE DENSITY (LB/FT3):
OPERATING PARAMETERS
POWER REQUIREMENTS IS AN ENERGY MANAGEMENT SYSTEM USED? YES NO
FIELD NO. NO. OF SETS CHARGING EACH TRANSFORMER (kVA) EACH RECTIFIER Kv Ave/Peak Ma Dc
POLLUTANT(S) COLLECTED:
PARTICLE SIZE DISTRIBUTION
SIZE WEIGHT % CUMULATIVE(MICRONS) OF TOTAL %
0-11-1010-2525-5050-100
and indicate the electrode type), AND THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
Attach Additional Sheets As Necessary
>100TOTAL = 100
ATTACH A DIAGRAM OF THE TOP VIEW OF THE ESP WITH DIMENSIONS (include at a minimum the plate spacing and wire spacing
REVISED 12/01/01 BEMISSION SOURCE ID NO: U7CONTROL DEVICE ID NO(S): CD 23-26EMISSION POINT (STACK) ID NO(S): EP-U7
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
X Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Da, HHHH NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) Vendor 117.8 515.7 2 2 117.8 515.7PARTICULATE MATTER<10 MICRONS (PM10) Vendor 188.4 825.2 2 2 188.4 825.2PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) Vendor 1178 5157.5 2 2 1178 5157.5NITROGEN OXIDES (NOx) Vendor 628 2750.6 2 2 628 2750.6CARBON MONOXIDE (CO) Vendor 1177.5 5157.5 2 2 1177.5 5157.5VOLATILE ORGANIC COMPOUNDS (VOC) Vendor 31.4 137.5 2 2 31.4 137.5
Vendor 0.2 0.8 2 2 0.2 0.8OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrHydrogen Chloride Mass Balance 6.53E+01 1.72E+02 - - 6.53E+01 1.72E+02Hydrogen Fluoride Mass Balance 1.16E+01 2.24E+01 - - 1.16E+01 2.24E+01Antimony AP-42 7.54E-03 3.30E-02 - - 7.54E-03 3.30E-02Arsenic AP-42 1.72E-01 7.52E-01 - - 1.72E-01 7.52E-01Beryllium AP-42 8.79E-03 3.85E-02 - - 8.79E-03 3.85E-02Cadmium AP-42 2.13E-02 9.35E-02 - - 2.13E-02 9.35E-02Chromium AP-42 1.09E-01 4.77E-01 - - 1.09E-01 4.77E-01Cobalt AP-42 4.19E-02 1.83E-01 - - 4.19E-02 1.83E-01Lead AP-42 1.76E-01 7.70E-01 - - 1.76E-01 7.70E-01Manganese AP-42 2.05E-01 8.98E-01 - - 2.05E-01 8.98E-01Mercury 1 NSPS Da 3.36E-02 1.47E-01 - - 3.36E-02 1.47E-01Nickel AP-42 1.17E-01 5.13E-01 - - 1.17E-01 5.13E-01Selenium AP-42 5.44E-01 2.38E+00 - - 5.44E-01 2.38E+00Acetaldehyde AP-42 2.39E-01 1.05E+00 - - 2.39E-01 1.05E+00Acetophenone AP-42 6.28E-03 2.75E-02 - - 6.28E-03 2.75E-02Acrolein AP-42 1.21E-01 5.32E-01 - - 1.21E-01 5.32E-01Anthracene AP-42 8.79E-05 3.85E-04 - - 8.79E-05 3.85E-04Benzene AP-42 5.44E-01 2.38E+00 - - 5.44E-01 2.38E+00Benzo(g,h,i)perylene AP-42 1.13E-05 4.95E-05 - - 1.13E-05 4.95E-05Benzyl Chloride AP-42 2.93E-01 1.28E+00 - - 2.93E-01 1.28E+00Biphenyl AP-42 7.12E-04 3.12E-03 - - 7.12E-04 3.12E-03Bis(2-ethylhexyl)phthalate AP-42 3.06E-02 1.34E-01 - - 3.06E-02 1.34E-01Bromoform AP-42 1.63E-02 7.15E-02 - - 1.63E-02 7.15E-02Carbon Disulfide AP-42 5.44E-02 2.38E-01 - - 5.44E-02 2.38E-012-Chloroacetophenone AP-42 2.93E-03 1.28E-02 - - 2.93E-03 1.28E-02Chlorobenzene AP-42 9.21E-03 4.03E-02 - - 9.21E-03 4.03E-02Chloroform AP-42 2.47E-02 1.08E-01 - - 2.47E-02 1.08E-01Cumene AP-42 2.22E-03 9.72E-03 - - 2.22E-03 9.72E-03Cyanide AP-42 1.05E+00 4.58E+00 - - 1.05E+00 4.58E+00
LEAD
EXPECTED ACTUAL POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 7 Boiler
Nominal 800 MW pulverized coal (PC) boiler fired with bituminuous or a blend of bituminous and sub-bituminous coals. The boiler will be equipped with the following control devices to reduce air emissions during normal operations: low NOx burners, SCR, dry ESP, wet FGD, and WESP. See Appendix G for process diagram.
OPERATING SCENARIO ______1___________OF ________1__________
2,4-Dinitrotoluene AP-42 1.17E-04 5.13E-04 - - 1.17E-04 5.13E-04Dimethyl Sulfate AP-42 2.01E-02 8.80E-02 - - 2.01E-02 8.80E-02Ethyl benzene AP-42 3.94E-02 1.72E-01 - - 3.94E-02 1.72E-01Ethyl Chloride (Chloroethane) AP-42 1.76E-02 7.70E-02 - - 1.76E-02 7.70E-02Ethylene Dichloride AP-42 1.67E-02 7.33E-02 - - 1.67E-02 7.33E-02Ethylene Dibromide AP-42 5.02E-04 2.20E-03 - - 5.02E-04 2.20E-03Formaldehyde AP-42 1.00E-01 4.40E-01 - - 1.00E-01 4.40E-01Hexane AP-42 2.80E-02 1.23E-01 - - 2.80E-02 1.23E-01Isophorone AP-42 2.43E-01 1.06E+00 - - 2.43E-01 1.06E+00Methyl Bromide (Bromomethane) AP-42 6.70E-02 2.93E-01 - - 6.70E-02 2.93E-01Methyl Chloride (Chloromethane) AP-42 2.22E-01 9.72E-01 - - 2.22E-01 9.72E-01Methyl Ethyl Ketone AP-42 1.63E-01 7.15E-01 - - 1.63E-01 7.15E-01Methyl Hydrazine AP-42 7.12E-02 3.12E-01 - - 7.12E-02 3.12E-01Methyl Methacrylate AP-42 8.37E-03 3.67E-02 - - 8.37E-03 3.67E-02Methyl tert-butyl ether AP-42 1.47E-02 6.42E-02 - - 1.47E-02 6.42E-02Methylene Chloride AP-42 1.21E-01 5.32E-01 - - 1.21E-01 5.32E-01Naphthalene AP-42 5.44E-03 2.38E-02 - - 5.44E-03 2.38E-02Phenanthrene AP-42 1.13E-03 4.95E-03 - - 1.13E-03 4.95E-03Phenol AP-42 6.70E-03 2.93E-02 - - 6.70E-03 2.93E-02Propionaldehyde AP-42 1.59E-01 6.97E-01 - - 1.59E-01 6.97E-01Styrene AP-42 1.05E-02 4.58E-02 - - 1.05E-02 4.58E-02Tetrachloroethylene AP-42 1.80E-02 7.88E-02 - - 1.80E-02 7.88E-02Toluene AP-42 1.00E-01 4.40E-01 - - 1.00E-01 4.40E-011,1,1-Trichloroethane AP-42 8.37E-03 3.67E-02 - - 8.37E-03 3.67E-02Vinyl Acetate AP-42 3.18E-03 1.39E-02 - - 3.18E-03 1.39E-02Xylene AP-42 1.55E-02 6.78E-02 - - 1.55E-02 6.78E-02Total PCDD/PCDF AP-42 7.37E-07 3.23E-06 - - 7.37E-07 3.23E-06
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEHydrogen Chloride Mass Balance 65.29 1566.85 571898.56Hydrogen Fluoride Mass Balance 11.63 279.20 101907.58Arsenic AP-42 0.17 4.12 1503.52Beryllium AP-42 0.01 0.21 77.01Cadmium AP-42 0.02 0.51 187.02Chromium AP-42 0.11 2.61 953.45Manganese AP-42 0.21 4.92 1796.89Mercury AP-42 0.03 0.81 294.34Nickel AP-42 0.12 2.81 1026.80Acetaldehyde AP-42 0.24 5.73 2090.26Acrolein AP-42 0.12 2.91 1063.47Benzene AP-42 0.54 13.06 4767.27Benzyl Chloride AP-42 0.29 7.03 2566.99Carbon Disulfide AP-42 0.05 1.31 476.73Chlorobenzene AP-42 0.01 0.22 80.68Chloroform AP-42 0.02 0.59 216.36Ethylene Dichloride AP-42 0.02 0.40 146.69Ethylene Dibromide AP-42 0.00 0.01 4.40Formaldehyde AP-42 0.10 2.41 880.11Hexane AP-42 0.03 0.67 245.70Methyl Ethyl Ketone AP-42 0.16 3.92 1430.18Methylene Chloride AP-42 0.22 5.32 1943.58Phenol AP-42 0.01 0.16 58.67Styrene AP-42 0.01 0.25 91.68Toluene AP-42 0.10 2.41 880.11Xylene AP-42 0.02 0.37 135.68Sulfuric Acid Vendor 47.10 1130.40 412596.00Ammonia Vendor 31.40 753.60 275064.00
1 Calculated based on NSPS Subpart Da, Sub-bituminous units w/ wet FGD - see emission calculation notes2 Emissions provided are based on preliminary design. Information based on final design will be provided to NC DAQ.
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates)and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED 12/01/01 B1EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: U7
CONTROL DEVICE ID NO(S): CD 23-26
OPERATING SCENARIO: ______1________ OF ______1________ EMISSION POINT (STACK) ID NO(S): EP-U7
DESCRIBE USE: PROCESS HEAT SPACE HEAT X ELECTRICAL GENERATION
CONTINUOUS US STAND BY/EMERGENCY OTHER (DESCRIBE): _________
HEATING MECHANISM: X INDIRECT DIRECT
MAX. FIRING RATE (MMBTU/HOUR): 7850
BARK WOOD/BARK WET WOOD DRY WOOD OTHER (DESCRIBE): __________
PERCENT MOISTURE OF FUEL:_________________
UNCONTROLLED CONTROLLED WITH FLYASH REINJECTION CONTROLLED W/O REINJECTION
FUEL FEED METHOD: HEAT TRANSFER MEDIA: STEAM AIR OTHER
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF BOILER IF OTHER DESCRIBE:
PULVERIZED
WET BED UNCONTROLLED UNCONTROLLED UNCONTROLLED CIRCULATING
X DRY BED CONTROLLED CONTROLLED FLYASH REINJECTION RECIRCULATING
NO FLYASH REINJECTION
METHOD OF LOADING: CYCLONE HANDFIRED TRAVELING GRATE X OTHER (DESCRIBE): Supercritical PC Unit
METHOD OF TUBE CLEANING: TBD CLEANING SCHEDULE: As needed
TYPE OF BOILER: UTILITY INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: NORMAL TANGENTIAL LOW NOX BURNERS NO LOW NOX BURNER
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF FUEL: ____________________________ PERCENT MOISTURE: _____________ TYPE OF BOILER: UTILITY INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: _______________ TYPE OF CONTROL (IF ANY): ___________________________ FUEL FEED METHOD: ________
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
No. 2 Fuel Oil (Start-up) mmBTU 2747.5 NA
Coal mmBTU 7850 NA
No. 2 Fuel Oil (Start-up) 137000 BTU/gal 0.05 NA
Coal 9376 BTU/lb 3.0 11.29
COMMENTS:
Fuel oil will be combusted along with coal for start-up, up to 35% of maximum capacity, where the fuel will be switched to coal. Fuel oil may also be usedwhen the pulverizer is brought into service. Coal will be a blend from various regions and coal specs. given are conservative.
FUEL USAGE (INCLUDE STARTUP/BACKUP FUELS)
SPREADER STOKER FLUIDIZED BEDOVERFEED STOKER UNDERFEED STOKER
OTHER FUEL-FIRED BURNER
COAL-FIRED BURNER
OIL/GAS-FIRED BURNER
WOOD TYPE:
FORM B1EMISSION SOURCE (WOOD, COAL, OIL, GAS, OTHER FUEL-FIRED BURNER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
WOOD-FIRED BURNER
Nominal 800 MW pulverized coal (PC) boiler fired with bituminous or a blend of bituminous and sub-bituminous coals. Boiler is controlled by SCR system, a dry electrostatic precipitator (ESP), a wet-flue gas desulfurization unit, and a wet ESP.
LIMITATION (UNIT/HR)
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE)
MAXIMUM DESIGN
CAPACITY (UNIT/HR)
REQUESTED CAPACITY
FUEL TYPE UNITS
SAMPLING PORTS, COMPLIANT WITH EPA METHOD 1 WILL BE INSTALLED ON THE STACKS: X YES NO
Attach Additional Sheets As Necessary
ASH CONTENT
(% BY WEIGHT)
SULFUR CONTENT
FUEL TYPE
SPECIFIC
BTU CONTENT (% BY WEIGHT)
REVISED 12/01/01
CONTROL DEVICE ID NO: CD23 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S U7
EMISSION POINT (STACK) ID NO(S)EP-U7 POSITION IN SERIES OF CONTROLS NO. 1 OF 4 UNITS
MANUFACTURER: TBD MODEL NO: TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED CONSTRUCTION DATE 2007
TYPE: AFTERBURNER REGENERATIVE THERMAL OXIDATION RECUPERATIVE THERMAL OXIDATION
CATALYTIC OXIDATIONEXPECTED LIFE OF CATALYST (YRS): METHOD OF DETECTING WHEN CATALYST NEEDS REPLACMENT:CATALYST MASKING AGENT IN AIR STREAM: HALOGEN SILICONE PHOSPHOROUS COMPOUND HEAVY METAL
SULFUR COMPOUND OTHER_________________ NONE
TYPE OF CATALYST: Vanadium pentoxide CATALYST VOL (FT3): TBD VELOCITY THROUGH CATALYST (FPS): TDB
SCFM THROUGH CATALYST:
DESCRIBE CONTROL SYSTEM, INCLUDING RELATION TO OTHER CONTROL DEVICES AND SOURCES, AND ATTACH DIAGRAM OF SYSTEM:
POLLUTANT(S) COLLECTED: NOx
BEFORE CONTROL EMISSION RATE (LB/HR): 2355 lb/hr(to SCR; 0.30 lb/mmbtu)
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
OVERALL SYSTEM EFFICIENCY: % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR) : 628 lb/hr (after SCR; 0.08 lb/mmbtu)
PRESSURE DROP (IN. H2 OUTLET TEMPERATURE (oF):
INLET TEMPERATURE (oF RESIDENCE TIME (SECONDS):
INLET AIR FLOW RATE (ACFM):4,500,000 to SCR COMBUSTION TEMPERATURE (oF):
COMBUSTION CHAMBER VOLUME (FT3): INLET MOISTURE CONTENT (%):
% EXCESS AIR: CONCENTRATION (ppmv) ______INLET ______OUTLET
AUXILIARY FUEL USED: No. 2 Fuel Oil TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): 7850 lb/mmbtu
MAXIMUM ANNUAL FUEL USE: UNITS: MAXIMUM HOURLY FUEL USE: UNITS:
ACTUAL ANNUAL FUEL USE: UNITS: ACTUAL HOURLY FUEL USE: 418.6 UNITS:ton/hr design coal
DESCRIBE METHOD USED TO INCREASE MIXING:
DESCRIBE METHOD TO INSURE ADEQUATE START-UP TEMPERATURE:
DESCRIBE TEMPERATURE MONITORING DEVICES AND PROCEDURES:
STACK TESTING PORTS: NO YES (INLET AND OUTLET)
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
ATTACH A DIAGRAM OF THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
C3
___1____ OF __1_____
AS REQUIRED BY 15A NCAC 2Q .0112, THIS FORM MUST BE SEALED BY A PROFESSIONAL ENGINNER (P.E.) LICENSED IN NORTH CAROLINA.
OPERATING SCENARIO:
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
MIN 600 MAX 750 at econ.
MIN MAX AVE:4.3 across SCR MIN MAX 750 at SCR outlet
The Selective Catalytic Reduction (SCR) system catalytically reduces boiler flue gas nitrogen oxide (NOx) emissions to nitrogen and water using anydrous ammonia (NH3) as a reducing agent. Flue gas exiting the ecomonizer outlet flows through two flow paths prior to entering the ammonia / air injection zone. Each flue has a dedicated ammonia injection grid fed by a manifold valve station. Following the ammonia injection the gas enters the SCR reactor were the NOreacts with the ammonia and is converted to nitrogen and water. The flue gas exiting the reactor is directed into the air heater.
NOx emissions from the boiler will be controlled using a combination of low-NOx burners, over-fire air and a selective catalytic reduction (SCR) system. The combustion system applies air-staging in combination with low-NOx burners to minimize NOx formation in the furnace to minimze the amount of SCR catalyst required and reduce the consumption of reagent.
Attach Additional Sheets As Necessary
FORM C3 CONTROL DEVICE (THERMAL OR CATALYTIC)
Steam coil air heaters are designed to preheat the combustion air during initial firing. Ammonia is injected once the catalst bed temperature has been elevated above the estimated minimum injection temperature of 600o. Temp. to be confirmed by catalyst supplier.
The ammonia injection grid has multiple zones for injecting ammonia across the flue gas path. Each injection pipe has numerous injection orifices for optimim ammonia-flue gas mixing.
REVISED 12/01/01 C2CONTROL DEVICE ID NO: CD24 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): U7
EMISSION POINT (STACK) ID NO(S)EP-U7 POSITION IN SERIES OF CONTROL NO. 2 OF 4 UNITS
MANUFACTURER: TBD MODEL NO. TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
GAS DISTRIBUTION GRIDS: YES NO
TYPE: WET DRY SINGLE-STAGE TWO-STAGE
TOTAL COLLECTION PLATE AREA (FT2): 1,130,000 NO. FIELDS5 NO. COLLECTOR PLATE PER FIELD:
COLLECTOR PLATES SIZE (FT): LENGTH: 50 WIDTH: SPACING BETWEEN COLLECTOR PLATES (INCHES): 16TOTAL DISCHARGE ELECTRODE LENGTH(FT): GAS VISCOSITY (POISE):
NUMBER OF DISCHARGE ELECTRODES: NUMBER OF COLLECTING ELECTRODE RAPPERS:
MAXIMUM INLET AIR FLOW RATE (ACFM): 3,000,000 ave. PARTICLE MIGRATION VELOCITY (FT/SEC):
MINIMUM GAS TREATMENT TIME (SEC): 15
FIELD STRENGTH (VOLTS) CHARGING: COLLECTING: CORONA POWER (WATTS/1000 CFM):
ELECTRICAL USAGE (kw/HOUR): 1400 kW
CLEANING PROCEDURES: RAPPING PLATE VIBRATING WASHING OTHER____________
PRESSURE DROP (IN. H20): MIN MAX AVE:.2 WARNING ALARM? YES NO
RESISTIVITY OF POLLUTANT (OHM-CM): GAS CONDITIONING: YES NO TYPE OF AGENT (IF YES):
INLET GAS TEMPERATURE (oF): MIN MAX AV300 OUTLET GAS TEMPERATURE (oF): MIN MAX AVE: 298
VOLUME OF GAS HANDLED (ACFM 3,000,000 INLET MOISTURE PERCENT: MIN MAX
TBD TBD TBD TBD TBD
filterable PM10
BEFORE CONTROL EMISSION RATE (LB/HR):
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.1 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 118 lb/hr (0.015 lb/mmbtu)
DESCRIBE STARTUP PROCEDURES:
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
DESCRIBE ANY MONITORING DEVICES, GAUGES, OR TEST PORTS AS ATTACHMENTS:
FORM C2CONTROL DEVICE (Electrostatic Precipitator)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
_____1__ OF ___1____ P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
EQUIPMENT SPECIFICATIONS
BULK PARTICLE DENSITY (LB/FT3):
OPERATING PARAMETERS
POWER REQUIREMENTS IS AN ENERGY MANAGEMENT SYSTEM USED? YES NO
FIELD NO. NO. OF SETS CHARGING EACH TRANSFORMER (kVA) EACH RECTIFIER Kv Ave/Peak Ma Dc
POLLUTANT(S) COLLECTED:
PARTICLE SIZE DISTRIBUTION
SIZE WEIGHT % CUMULATIVE(MICRONS) OF TOTAL %
0-11-1010-2525-5050-100>100
TOTAL = 100
REVISED 12/01/01 C8CONTROL DEVICE ID NO: CD25 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): U7
EMISSION POINT ID NO(S): EP-U7 POSITION IN SERIES OF CONTROLS: NO. 3 OF 4 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED: TBD PROPOSED OPERATION DATE: 2011
PROPOSED CONSTRUCTION DATE: 2007
DESCRIBE CONTROL SYSTEM:
POLLUTANT(S) COLLECTED: SO2
BEFORE CONTROL EMISSION RATE (LB/HR): 39,250
CAPTURE EFFICIENCY: % % %
CONTROL DEVICE EFFICIENCY: % % %
CORRESPONDING EFFICIENCY: 99 % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 1178 lb/hr (0.15 lb/mmbtu - 30 day average)
PRESSURE DROP (IN. H20): MIN MAX AVE: 11 YES NO
INLET TEMPERATURE (oF): MIN MAX AVE: 300 OUTLET TEMPERATURE (oF): MIN MAX AVE: 120
INLET AIR FLOW RATE (ACFM): MOISTURE CONTENT : INLET % OUTLET %
THROAT VELOCITY (FT/SEC): THROAT TYPE: FIXED VARIABLE
TYPE OF SYSTEM: Wet Limestone, forced oxidation TYPE OF PACKING USED IF ANY: n/aADDITIVE LIQUID SCRUBBING MEDIUM: limestone slurry PERCENT RECIRCULATED:
MINIMUM LIQUID INJECTION RATE (GAL/MIN 313 FLOW RATE GAUGE INSTALLED? YES NO
MAKE UP RATE (GAL/MIN): FOR ADDITIVE (GAL/MIN):DESCRIBE MAINTENANCE PROCEDURES:
WEIGHT %OF TOTAL
DESCRIBE ANY MONITORING DEVICES, GAUGES, TEST PORTS, ETC:
ATTACH A DIAGRAM OF THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
____1___ OF ___1____ P.E. SEAL NEEDED (PER 2Q .0112)? YES NO
The proposed flue gas desulfurization (FGD) system is a wet limestone, forced oxidation, system with a vertical, countercurrent, spray tower absorber. The flue gas enters the spray tower near the bottom through the absorber inlet nozzle. Once in the absorber, the hot flue gas is immediately quenched as it travels upward countercurrent to a continuous spray of process/recycle slurry produced by multiple spray banks. The recycle slurry extracts the sulfur dioxide from the flue gas and collects it in the bottom of the absorber where it is oxidized to calcium sulfate. The proposed system will treat 100% of the flue gas from the unit. The unit will be designed for 99% removal efficiency.
FORM C8CONTROL DEVICE (WET PARTICULATE SCRUBBER)
OPERATING SCENARIO:
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
2,550,000
1300
Attach Additional Sheets As Necessary
>100TOTAL = 100
50-100
CUMULATIVE%
0-1
25-50
WARNING ALARM?
PARTICLE SIZE DISTRIBUTION
1-1010-25
SIZE(MICRONS)
REVISED 12/01/01 C2CONTROL DEVICE ID NO: CD26 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): U7
EMISSION POINT (STACK) ID NO(S) EP-U7 POSITION IN SERIES OF CONTROL NO. 4 OF 4 UNITS
MANUFACTURER: TBD MODEL NO. TBD
MANUFACTURE DATE: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
GAS DISTRIBUTION GRIDS: YES NO
TYPE: WET DRY SINGLE-STAGE TWO-STAGE
TOTAL COLLECTION PLATE AREA (FT2): 612,000 NO. FIELDS3 NO. COLLECTOR PLATE PER FIELD:
COLLECTOR PLATES SIZE (FT): LENGTH: 29.53 WIDTH: SPACING BETWEEN COLLECTOR PLATES (INCHES): 9.75
TOTAL DISCHARGE ELECTRODE LENGTH(FT): GAS VISCOSITY (POISE):
NUMBER OF DISCHARGE ELECTRODES: NUMBER OF COLLECTING ELECTRODE RAPPERS:
MAXIMUM INLET AIR FLOW RATE (ACFM): 2,200,000 ave. PARTICLE MIGRATION VELOCITY (FT/SEC):
MINIMUM GAS TREATMENT TIME (SEC):
FIELD STRENGTH (VOLTS) CHARGING: COLLECTING: CORONA POWER (WATTS/1000 CFM):
ELECTRICAL USAGE (kw/HOUR):
CLEANING PROCEDURES: RAPPING PLATE VIBRATING WASHING OTHER____________
PRESSURE DROP (IN. H20): MIN MAX AVE: 2 WARNING ALARM? YES NO
RESISTIVITY OF POLLUTANT (OHM-CM): GAS CONDITIONING: YES NO TYPE OF AGENT (IF YES):
INLET GAS TEMPERATURE (oF): MIN MAX AVE: 128 OUTLET GAS TEMPERATURE (oF): MIN MAX AVE: 128
VOLUME OF GAS HANDLED (ACFM 2,200,000 INLET MOISTURE PERCENT: MIN MAX
TBD TBD TBD TBD TBD
Total PM10 Filterable PM10 H2SO4
BEFORE CONTROL EMISSION RATE (LB/HR):
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 188 lb/hr(0.024lb/mmbtu) 117.8 lbhr(0.015 lb/mmbtu) 47.1 lb/hr (0.006lb/mmbtu)
DESCRIBE STARTUP PROCEDURES:
DESCRIBE MAINTENANCE PROCEDURES:
DESCRIBE ANY AUXILIARY MATERIALS INTRODUCED INTO THE CONTROL SYSTEM:
DESCRIBE ANY MONITORING DEVICES, GAUGES, OR TEST PORTS AS ATTACHMENTS:
FORM C2CONTROL DEVICE (Electrostatic Precipitator)
NO. OF SETS CHARGING EACH TRANSFORMER (kVA) EACH RECTIFIER Kv Ave/Peak Ma DcFIELD NO.
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
_____1__ OF ___1____ P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
25-50
Attach Additional Sheets As Necessary
OF TOTAL
50-100
and indicate the electrode type), AND THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
ATTACH A DIAGRAM OF THE TOP VIEW OF THE ESP WITH DIMENSIONS (include at a minimum the plate spacing and wire spacing
%
>100TOTAL = 100
EQUIPMENT SPECIFICATIONS
OPERATING SCENARIO:
BULK PARTICLE DENSITY (LB/FT3):
CUMULATIVE
10-25
PARTICLE SIZE DISTRIBUTION
IS AN ENERGY MANAGEMENT SYSTEM USED? YES NO
WEIGHT %
0-11-10
(MICRONS)
OPERATING PARAMETERS
SIZE
POLLUTANT(S) COLLECTED:
POWER REQUIREMENTS
REVISED 12/01/01 BEMISSION SOURCE ID NO: Aux 6&7CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Aux 6&7
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
X Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Db NESHAP (SUBPART?):________ MACT (SUBPART?):DDDDD_
EXPECTED ANNUAL HOURS OF OPERATIO 2500
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) BACT 1 2.66 3.33 2.66 11.67 2.66 3.33PARTICULATE MATTER<10 MICRONS (PM10) BACT 1 4.56 5.70 4.56 19.97 4.56 5.70PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) AP-42 9.85 12.31 9.85 43.13 9.85 12.31NITROGEN OXIDES (NOx) BACT 1 19.00 23.75 19.00 83.22 19.00 23.75CARBON MONOXIDE (CO) BACT 1 6.84 8.55 6.84 29.96 6.84 8.55VOLATILE ORGANIC COMPOUNDS (VOC) BACT 1 0.46 0.57 0.46 2.00 0.46 0.57
AP-42 0.00 0.00 0.00 0.01 0.00 0.00SULURIC ACID AP-42 0.17 0.21 0.17 0.74 0.17 0.21
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrBenzene AP-42 2.97E-04 3.71E-04 2.97E-04 1.30E-03 2.97E-04 3.71E-04Ethylbenzene AP-42 8.82E-05 1.10E-04 8.82E-05 3.86E-04 8.82E-05 1.10E-04Formaldehyde AP-42 8.46E-02 1.06E-01 8.46E-02 3.71E-01 8.46E-02 1.06E-01Naphthalene AP-42 1.57E-03 1.96E-03 1.57E-03 6.86E-03 1.57E-03 1.96E-031,1,1-Trichloroethane AP-42 3.27E-04 4.09E-04 3.27E-04 1.43E-03 3.27E-04 4.09E-04Toluene AP-42 8.60E-03 1.07E-02 8.60E-03 3.77E-02 8.60E-03 1.07E-02o-Xylene AP-42 1.51E-04 1.89E-04 1.51E-04 6.62E-04 1.51E-04 1.89E-04Acenaphthene AP-42 2.93E-05 3.66E-05 2.93E-05 1.28E-04 2.93E-05 3.66E-05Acenaphthylene AP-42 3.51E-07 4.39E-07 3.51E-07 1.54E-06 3.51E-07 4.39E-07Anthracene AP-42 1.69E-06 2.11E-06 1.69E-06 7.41E-06 1.69E-06 2.11E-06Benz(a)anthracene AP-42 5.56E-06 6.95E-06 5.56E-06 2.44E-05 5.56E-06 6.95E-06Benzo(b.k)fluoranthene AP-42 2.05E-06 2.57E-06 2.05E-06 8.99E-06 2.05E-06 2.57E-06Benzo(g,h,i)perylene AP-42 3.13E-06 3.92E-06 3.13E-06 1.37E-05 3.13E-06 3.92E-06Chrysene AP-42 3.30E-06 4.13E-06 3.30E-06 1.45E-05 3.30E-06 4.13E-06Dibenzo(a,h)anthracene AP-42 2.32E-06 2.90E-06 2.32E-06 1.01E-05 2.32E-06 2.90E-06Fluoranthene AP-42 6.71E-06 8.39E-06 6.71E-06 2.94E-05 6.71E-06 8.39E-06Fluorene AP-42 6.20E-06 7.75E-06 6.20E-06 2.72E-05 6.20E-06 7.75E-06Indo(1,2,3-cd)pyrene AP-42 2.97E-06 3.71E-06 2.97E-06 1.30E-05 2.97E-06 3.71E-06Phenanthrene AP-42 1.46E-05 1.82E-05 1.46E-05 6.38E-05 1.46E-05 1.82E-05Pyrene AP-42 5.89E-06 7.37E-06 5.89E-06 2.58E-05 5.89E-06 7.37E-06OCDD AP-42 4.30E-09 5.37E-09 4.30E-09 1.88E-08 4.30E-09 5.37E-09
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEBenzene AP-42 2.97E-04 7.12E-03 2.60Formaldehyde AP-42 8.46E-02 2.03E+00 741.08Toluene AP-42 8.60E-03 2.06E-01 75.32Arsenic AP-42 7.60E-04 1.82E-02 6.66Beryllium AP-42 5.70E-04 1.37E-02 4.99Cadmium AP-42 5.70E-04 1.37E-02 4.99Chromium AP-42 5.70E-04 1.37E-02 4.99Lead AP-42 1.71E-03 4.10E-02 14.98Mercury AP-42 5.70E-04 1.37E-02 4.99Manganese AP-42 1.14E-03 2.74E-02 9.99Nickel AP-42 5.70E-04 1.37E-02 4.99Selenium AP-42 2.85E-03 6.84E-02 24.97
1 Emission factor based on the proposed BACT emission rates for distillate oil-fired boilers.
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
EXPECTED OP. SCHEDULE: _7__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Auxiliary Boiler
Distillate fuel oil-fired 190mmBTU/hr auxiliary steam boiler will meet the steam demand during start up of the main steam generators.
OPERATING SCENARIO _______1__________OF ________1__________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
LEAD
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
REVISED 12/01/01 B1EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: Aux 6&7
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF ________1______ EMISSION POINT (STACK) ID NO(S): Aux 6&7
DESCRIBE USE: PROCESS HEAT SPACE HEAT ELECTRICAL GENERATION
CONTINUOUS US STAND BY/EMERGENCY X OTHER (DESCRIBE): _Process Steam__
HEATING MECHANISM: X INDIRECT DIRECT
MAX. FIRING RATE (MMBTU/HOUR): 190
BARK WOOD/BARK WET WOOD DRY WOOD OTHER (DESCRIBE): __________
PERCENT MOISTURE OF FUEL:_________________
UNCONTROLLED CONTROLLED WITH FLYASH REINJECTION CONTROLLED W/O REINJECTION
FUEL FEED METHOD: HEAT TRANSFER MEDIA: STEAM AIR OTHER
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF BOILER IF OTHER DESCRIBE:
PULVERIZED
WET BED UNCONTROLLED UNCONTROLLED UNCONTROLLED CIRCULATING
DRY BED CONTROLLED CONTROLLED FLYASH REINJECTION RECIRCULATING
NO FLYASH REINJECTION
METHOD OF LOADING: CYCLONE HANDFIRED TRAVELING GRATE OTHER (DESCRIBE): _________________
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
TYPE OF BOILER: UTILITY X INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: NORMAL TANGENTIAL X LOW NOX BURNERS NO LOW NOX BURNER
METHOD OF TUBE CLEANING: NA CLEANING SCHEDULE: NA
TYPE OF FUEL: ____________________________ PERCENT MOISTURE: _____________ TYPE OF BOILER: UTILITY INDUSTRIAL COMMERCIAL RESIDENTIAL
TYPE OF FIRING: _______________ TYPE OF CONTROL (IF ANY): ___________________________ FUEL FEED METHOD: ________
METHOD OF TUBE CLEANING: CLEANING SCHEDULE:
No. 2 Fuel Oil mmBTU 190 NA
No. 2 Fuel Oil (Start-up) 137000 BTU/gal 0.05 NA
COMMENTS:
FUEL USAGE (INCLUDE STARTUP/BACKUP FUELS)
SPREADER STOKER FLUIDIZED BEDOVERFEED STOKER UNDERFEED STOKER
OTHER FUEL-FIRED BURNER
COAL-FIRED BURNER
OIL/GAS-FIRED BURNER
WOOD TYPE:
FORM B1EMISSION SOURCE (WOOD, COAL, OIL, GAS, OTHER FUEL-FIRED BURNER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
WOOD-FIRED BURNER
Distillate fuel oil-fired 190mmBTU/hr auxiliary steam boiler will meet the steam demand during start up of the main steam generators.
LIMITATION (UNIT/HR)
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE)
MAXIMUM DESIGN
CAPACITY (UNIT/HR)
REQUESTED CAPACITY
FUEL TYPE UNITS
SAMPLING PORTS, COMPLIANT WITH EPA METHOD 1 WILL BE INSTALLED ON THE STACKS: YES NO
Attach Additional Sheets As Necessary
ASH CONTENT
(% BY WEIGHT)
SULFUR CONTENT
FUEL TYPE
SPECIFIC
BTU CONTENT (% BY WEIGHT)
Emissions will be controlled by the following: only burning low sulfur (0.05 percent sulfur) distillate oil using low-NOx burners, good combustion, and limiting operation to 2500 hours/year. Propane used for initial light-off.
REVISED 12/01/01 BEMISSION SOURCE ID NO: CT1 & CT 2CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): CT1 & CT 2
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 2.61 11.43 2.61 11.43PARTICULATE MATTER<10 MICRONS (PM10) AP-42 2.61 11.43 2.61 11.43PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Two Multi-Cell Cooling Towers
Two multi-cell (up to 24 cells each) mechanical draft cooling towers will be installed as part of a wet cooling system for proposed Units 6 & 7. Emission Provided below are for one cooling tower.
OPERATING SCENARIO ______1___________OF _________1_________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPT Two Multi-Cell Cooling Towers EMISSION SOURCE ID NO: CT1 & CT2
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): CT1 & CT2
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
Two multi-cell (up to 24 cells each) mechanical draft cooling towers will be installed as part of a wet cooling system for proposed Units 6 & 7
UNITS
Cooling Tower Water Gallons 347,434 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
OPERATING SCENARIO: ____1__________ OF _____1_________
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
The cooling towers will be equipped with specially designed drift eliminators that will act to remove droplets from the cooling tower plume, which will both conserve water and reduce drift and resultant particulate emissions.
MAX. DESIGN REQUESTED CAPACITY
REVISED 12/01/0 BEMISSION SOURCE ID NO: C19CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2 Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE:January 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.65 5.73 0.65 5.73PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.32 2.79 0.32 2.79PARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
PLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SO
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Unit 6&7 Reclaim Hopper Emissions
See Appendix G for process diagrams. Fugitive emissions include bulldozing coal to hoppers. (Emissions were already provided in Unit 5 Application for Bulldozing and Unit 5 Reclaim Hopper C11 and C12). Assumptions for coal bulldozing are as follows : 2 Bulldozers operating 24 hrs/day each and 365 days/yr. Dust suppression agents will be used to control fugitive emissions.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: C19
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Coal (Reclaim Hoppers) 500
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagrams. Fugitive coal handling emissions include material handling from bulldozing. (Emissions were already provided in Unit 5 Application for Bulldozing and Unit 5 Reclaim Hopper). Assumptions for coal bulldozing are as follows : 2 Bulldozers operating 24 hrs/day each and 365 days/yr. Dust suppression agents will be used to control fugitive emissions.
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Reclaim Hopper Emissions
REVISED 12/01/01 BEMISSION SOURCE ID NO: C20-C23CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Reclaim Conveyors (4)
See Appendix G for process diagrams. Fugitive emissions from reclaim conveyors to the transfer house. The reclaim conveyors to the transfer house are located underground. No emissions are expected from these sources. The length of each of the conveyors is as follows: C20 : Reclaim Conveyor RC5 - U6&7 - 700 ft C21 : Reclaim Conveyor RC6 - U6&7 - 700 ft C22 : Reclaim Conveyor RC7 - U6&7 - 1100 ft C23 : Reclaim Conveyor RC8 - U6&7 - 1100 ftBelt Widths are 48 inches.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C20-C23
Fugitive Coal Handling - Reclaim Conveyors (4) CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
See Appendix G for process diagrams. Fugitive emissions from reclaim conveyors to the transfer house. The reclaim conveyors to the transfer house are located underground. No emissions are expected from these sources. The length of each of the conveyors is as follows: C20 : Reclaim Conveyor RC5 - U6&7 - 700 ft C21 : Reclaim Conveyor RC6 - U6&7 - 700 ft C22 : Reclaim Conveyor RC7 - U6&7 - 1100 ft C23 : Reclaim Conveyor RC8 - U6&7 - 1100 ftBelt Widths are 48 inches.
Coal 1500
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/01 BEMISSION SOURCE ID NO: C24-C26CONTROL DEVICE ID NO(S): CD27EMISSION POINT (STACK) ID NO(S): EP-C26
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Y NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 2.57 11.26 2.57 11.26PARTICULATE MATTER<10 MICRONS (PM10)
1 2.57 11.26 2.57 11.26PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
1 Emissions are based on control device outlet concentration design and exhaust fan parameters.
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Coal Reclaim Conveyors (2) & Unit 6&7 Crusher House
See Appendix G for process diagram. Emissions include Unit 6&7 Crusher House and the following reclaim conveyors controlled by a partially enclosed hood:C24: Reclaim Conveyor RC9 to U6& Crusher House (750 ft)C25: Reclaim Conveyor RC10 to U6&7 Crusher House (750 ft)Belt Widths are 48 inches.
OPERATING SCENARIO _________1________OF ________1__________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C24-C26
Coal Reclaim Conveyors (2) & Unit 6&7 Crusher House CONTROL DEVICE ID NO(S): CD27
EMISSION POINT (STACK) ID NO(S): EP-C26
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Coal tons 1500 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagram. Emissions include Unit 6&7 Crusher House and the following reclaim conveyors controlled by a partially enclosed hood:C24: Reclaim Conveyor RC9 to U6& Crusher House (750 ft)C25: Reclaim Conveyor RC10 to U6&7 Crusher House (750 ft)Belt Widths are 48 inches.
REVISED 12/01/01 BEMISSION SOURCE ID NO: C27-C30CONTROL DEVICE ID NO(S): C28EMISSION POINT (STACK) ID NO(S): EP-C27-C30
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Y NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 3.43 15.02 3.43 15.02PARTICULATE MATTER<10 MICRONS (PM10)
1 3.43 15.02 3.43 15.02PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 6 Boiler House Coal Handling: Reclaim Conveyors (2) & Tripper Conveyors (2)
See Appendix G for process diagram. Emissions represent the following coal reclaim conveyors controlled by partially enclosed hood/filter and tripper conveyors that are controlled by enclosed room/filter:C27: Reclaim Conveyor RC11 to Unit 6 Boiler Building (600 ft)C28: Reclaim Conveyor RC12 to Unit 6 Boiler Building (600 ft)Belt Widths are 48 inches.C29: Unit 6 Tripper Conveyor TR2 (300 ft)C30: Unit 6 Tripper Conveyor TR3 (300 ft)Belt Widths are 54 inches.
OPERATING SCENARIO ______1___________OF ________1__________
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _< 20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C27-C30
Unit 6 Boiler House Coal Handling: Reclaim Conveyors (2) & Tripper Conveyors (2) CONTROL DEVICE ID NO(S): C28
EMISSION POINT (STACK) ID NO(S): EP-C27-C30
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Coal tons 1500 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagram. Emissions represent the following coal reclaim conveyors controlled by partially enclosed hood/filter and tripper conveyors that are controlled by enclosed room/filter:C27: Reclaim Conveyor RC11 to Unit 6 Boiler Building (600 ft)C28: Reclaim Conveyor RC12 to Unit 6 Boiler Building (600 ft)Belt Widths are 48 inches.C29: Unit 6 Tripper Conveyor TR2 (300 ft)C30: Unit 6 Tripper Conveyor TR3 (300 ft)Belt Widths are 54 inches.
REVISED 12/01/01 BEMISSION SOURCE ID NO: C31-C34CONTROL DEVICE ID NO(S): C29EMISSION POINT (STACK) ID NO(S): EP-C31-C34
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Y NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 3.43 15.02 3.43 15.02PARTICULATE MATTER<10 MICRONS (PM10)
1 3.43 15.02 3.43 15.02PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 7 Boiler House Coal Handling: Transfer Conveyors (2) & Tripper Conveyors (2)
See Appendix G for process diagram. Emissions represent the following coal transfer conveyors controlled by partially enclosed hood/filter and tripper conveyors that are controlled by enclosed room/filter:C31: Reclaim Conveyor RC13 to Unit 7 Boiler Building (300 ft)C32: Reclaim Conveyor RC14 to Unit 7 Boiler Building (300 ft)Belt Widths are 48 inches.C33: Unit 7 Tripper Conveyor TR4 (300 ft)C34: Unit 7 Tripper Conveyor TR5 (300 ft)Belt Widths are 54 inches.
OPERATING SCENARIO ______1___________OF ________1__________
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C31-C34
Unit 7 Boiler House Coal Handling: Transfer Conveyors (2) & Tripper Conveyors (2) CONTROL DEVICE ID NO(S): C29
EMISSION POINT (STACK) ID NO(S): EP-C31-C34
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Coal tons 1500 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagram. Emissions represent the following coal transfer conveyors controlled by partially enclosed hood/filter and tripper conveyors that are controlled by enclosed room/filter:C31: Reclaim Conveyor RC13 to Unit 7 Boiler Building (300 ft)C32: Reclaim Conveyor RC14 to Unit 7 Boiler Building (300 ft)Belt Widths are 48 inches.C33: Unit 7 Tripper Conveyor TR4 (300 ft)C34: Unit 7 Tripper Conveyor TR5 (300 ft)Belt Widths are 54 inches.
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
REVISED 12/01/01 BEMISSION SOURCE ID NO: A1-A6CONTROL DEVICE ID NO(S): C30EMISSION POINT (STACK) ID NO(S): EPA1-A6
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) X Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 0.0013 0.01 0.0013 0.01PARTICULATE MATTER<10 MICRONS (PM10)
1 0.0013 0.01 0.0013 0.01PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 6 Fly Ash Handling (Controlled)
See Appendix G for process diagram. Sources include the following:A1: Wet Botton Ash Transfer and Pickup - Botton ash has consistency of wet sand - no emissions expected.A2: Wet Botton Ash Transfer and Pickup - Botton ash has consistency of wet sand - no emissions expected.A3: Dry Fly Ash Pickup at Boiler Economizer - Fly ash pneumatically conveyed to silo A4: Dry Fly Ash Pickup at Precipitator - Fly ash pneumatically conveyed to silo A5: Dry Fly Ash Piping to Fly Ash Silo - Fly ash pneumatically conveyed to siloA6: Fly Ash Silo
OPERATING SCENARIO ______1___________OF ________1__________
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED 12/01/01 B6EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: A1-A6
Unit 6 Fly Ash Silo and conveyors CONTROL DEVICE ID NO(S): CD30
OPERATING SCENARIO: ________1______ OF ______1_________ EMISSION POINT(STACK) ID NO(S): EP-A1-A6
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
See Appendix G for process diagram.
MATERIAL STORED: Fly Ash DENSITY OF MATERIAL (LB/FT3): 80
CUBIC FEET: TONS:
HEIGHT: 100 DIAMETER: 30 (OR) LENGTH: WIDTH: HEIGHT:
ACTUAL: ~284,000/each MAXIMUM DESIGN CAPACITY:
BLOWER SCREW CONVEYOR RAILCAR
COMPRESSOR BELT CONVEYOR TRUCK
OTHER: BUCKET ELEVATOR STORAGE PILE
OTHER: OTHER:
NO. FILL TUBES:
MAXIMUM ACFM:
MATERIAL IS FILLED TO:
BY WHAT METHOD IS MATERIAL UNLOADED FROM SILO?
Material is mixed with water and dropped into an open bed truck. The truck is then tarpped for transport.
Material can also be withdrawn through a dustless unloader into an enclosed pneumatic tank truck for shipment.
MAXIMUM DESIGN FILLING RATE OF MATERIAL (TONS/HR): 20
MAXIMUM DESIGN UNLOADING RATE OF MATERIAL (TONS/HR): 200
COMMENTS:
MOTOR HP:
Attach Additional Sheets As Necessary
FORM B6EMISSION SOURCE (STORAGE SILO/BINS)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FILLED FROMPNEUMATICALLY FILLED MECHANICALLY FILLEDANNUAL PRODUCT THROUGHPUT (TONS)
CAPACITY
DIMENSIONS (FEET)
REVISED 12/01/01 C1CONTROL DEVICE ID NO: C30 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): A3-A6
EMISSION POINT (STACK) ID NO(S): EPA3-A6 POSITION IN SERIES OF CONTROLS NO. 1 OF 1 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
___1____ OF ___1____
Bin Vent fabric filter to control emissions from the Unit #6 fly ash silo
POLLUTANT(S) COLLECTED: Particulates
BEFORE CONTROL EMISSION RATE (LB/HR): 1.3
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.9 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 0.0013
PRESSURE DROP (IN. H20): MIN: 4 MAX: 7 GAUGE?
BULK PARTICLE DENSITY (LB/FT3): 50 - 60 INLET TEMPERATURE (oF): MIN MAX ambient
POLLUTANT LOADING RATE: 10 LB/HR GR/FT3 OUTLET TEMPERATURE (oF): MIN MAX ambientINLET AIR FLOW RATE (ACFM): N/A FILTER MAX OPERATING TEMP. (oF): 275
NO. OF COMPARTMENTS: 1 NO. OF BAGS PER COMPARTMENT: 124 LENGTH OF BAG (IN.): 144
DIAMETER OF BAG (IN.): 3"x6" oval DRAFT: INDUCED/NEG. FORCED/POS. FILTER SURFACE AREA (FT2): 1911
AIR TO CLOTH RATIO: 5.2 : 1 FILTER MATERIAL: 16 oz polyester felt WOVEN FELTED
DESCRIBE CLEANING PROCEDURES Either Air Pulse or Reverse Flow AIR PULSE SONIC
REVERSE FLOW SIMPLE BAG COLLAPSE
MECHANICAL/SHAKER RING BAG COLLAPSE - OTHER 20
DESCRIBE INCOMING AIR STREAM: 25Pnumatic transfer to cyclone seperator that drops the ash out of the air stream 25and into the silo. Air is displaced from the silo throught the filter as it fills with ash. 30Air is drawn into the silo through the filter as ash is removed from the silo. -
METHOD FOR DETERMINING WHEN TO CLEAN: Ether Automatic or Timed
AUTOMATIC TIMED MANUAL
METHOD FOR DETERMINING WHEN TO REPLACE THE BAGS:
ALARM INTERNAL INSPECTION VISIBLE EMISSION OTHER
SPECIAL CONDITIONS: MOISTURE BLINDING CHEMICAL RESISTIVITY OTHER
EXPLAIN: N/A
>100
TOTAL = 100
1-10
10-25
25-50
Attach Additional Sheets As Necessary
PARTICLE SIZE DISTRIBUTION
CUMULATIVE
(MICRONS)
50-100
OF TOTAL %WEIGHT %
0-1
ON A SEPARATE PAGE, ATTACH A DIAGRAM SHOWING THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
FORM C1CONTROL DEVICE (FABRIC FILTER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
SIZE
P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
YES NO WARNING ALARM? YES NO
DESCRIBE MAINTENANCE PROCEDURES: Check Filter Bag, Bag Cage and Housing Condition. Replace worn or teared bags. Replace and repair defective components.
DESCRIBE CONTROL SYSTEM:
REVISED 12/01/01 BEMISSION SOURCE ID NO: A8-A11& A13CONTROL DEVICE ID NO(S): C31, C33EMISSION POINT (STACK) ID NO(S): EPA8-A11
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) X Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 0.0013 0.01 0.0013 0.01PARTICULATE MATTER<10 MICRONS (PM10)
1 0.0013 0.01 0.0013 0.01PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 7 Fly Ash Handling (Controlled)
See Appendix G for process diagram. Sources include the following:A8: Dry Fly Ash Pickup at Boiler Economizer - Fly ash pneumatically conveyed to silo A9: Dry Fly Ash Pickup at Precipitator - Fly ash pneumatically conveyed to silo A10: Dry Fly Ash Piping to Fly Ash Silo - Fly ash pneumatically conveyed to siloA11: Fly Ash Silo to truck loadingA13: Fly Ash Silo to rail car loading
OPERATING SCENARIO ______1___________OF ________1__________
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
lb/hr
REVISED 12/01/01 B6EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: A8-A11 & A13
Unit 7 Fly Ash Silo and conveyors CONTROL DEVICE ID NO(S): CD31
OPERATING SCENARIO: ________1______ OF ______1_________ EMISSION POINT(STACK) ID NO(S): EP-A8-A11
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
See Appendix G for process diagram. Sources include the following:
A8: Dry Fly Ash Pickup at Boiler Economizer - Fly ash pneumatically conveyed to silo
A9: Dry Fly Ash Pickup at Precipitator - Fly ash pneumatically conveyed to silo
A10: Dry Fly Ash Piping to Fly Ash Silo - Fly ash pneumatically conveyed to silo
A11: Fly Ash Silo to truck loading
A13: Fly Ash Silo to rail car loading
MATERIAL STORED: Fly Ash DENSITY OF MATERIAL (LB/FT3): 80
CUBIC FEET: TONS:
HEIGHT: 100 DIAMETER: 30 (OR) LENGTH: WIDTH: HEIGHT:
ACTUAL: ~284,000/each MAXIMUM DESIGN CAPACITY:
BLOWER SCREW CONVEYOR RAILCAR
COMPRESSOR BELT CONVEYOR TRUCK
OTHER: BUCKET ELEVATOR STORAGE PILE
OTHER: OTHER:
NO. FILL TUBES:
MAXIMUM ACFM:
MATERIAL IS FILLED TO:
BY WHAT METHOD IS MATERIAL UNLOADED FROM SILO?
Material is mixed with water and dropped into an open bed truck. The truck is then tarpped for transport.
Material can also be withdrawn through a dustless unloader into an enclosed pneumatic tank truck or rail car for shipment.
MAXIMUM DESIGN FILLING RATE OF MATERIAL (TONS/HR): 20
MAXIMUM DESIGN UNLOADING RATE OF MATERIAL (TONS/HR): 200
COMMENTS:
FORM B6EMISSION SOURCE (STORAGE SILO/BINS)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FILLED FROMPNEUMATICALLY FILLED MECHANICALLY FILLEDANNUAL PRODUCT THROUGHPUT (TONS)
CAPACITY
DIMENSIONS (FEET)
MOTOR HP:
Attach Additional Sheets As Necessary
REVISED 12/01/01 C1CONTROL DEVICE ID NO: C31 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): A8-A11
EMISSION POINT (STACK) ID NO(S): EPA8-A11 POSITION IN SERIES OF CONTROLS NO. 1 OF 1 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
___1____ OF __1_____
Bin Vent fabric filter to control emissions from the Unit #7 fly ash silo.
POLLUTANT(S) COLLECTED: Particulates
BEFORE CONTROL EMISSION RATE (LB/HR): 1.3
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.9 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 0.0013
PRESSURE DROP (IN. H20): MIN: 4 MAX: 7 GAUGE?
BULK PARTICLE DENSITY (LB/FT3): 50 - 60 INLET TEMPERATURE (oF): MIN MAX ambient
POLLUTANT LOADING RATE: 10 LB/HR GR/FT3 OUTLET TEMPERATURE (oF): MIN MAX ambientINLET AIR FLOW RATE (ACFM): NA FILTER MAX OPERATING TEMP. (oF): 275
NO. OF COMPARTMENTS: 1 NO. OF BAGS PER COMPARTMENT: 124 LENGTH OF BAG (IN.): 144
DIAMETER OF BAG (IN.): 3"x6" oval DRAFT: INDUCED/NEG. FORCED/POS. FILTER SURFACE AREA (FT2): 1911
AIR TO CLOTH RATIO: 5.2 : 1 FILTER MATERIAL: 16 oz polyester felt WOVEN FELTED
DESCRIBE CLEANING PROCEDURES Either Air Pulse or Reverse Flow AIR PULSE SONIC
REVERSE FLOW SIMPLE BAG COLLAPSE
MECHANICAL/SHAKER RING BAG COLLAPSE - OTHER 20
DESCRIBE INCOMING AIR STREAM: 25Pnumatic transfer to cyclone seperator that drops the ash out of the air stream 25and into the silo. Air is displaced from the silo throught the filter as it fills with ash. 30Air is drawn into the silo through the filter as ash is removed from the silo. -
METHOD FOR DETERMINING WHEN TO CLEAN: Ether Automatic or Timed
AUTOMATIC TIMED MANUAL
METHOD FOR DETERMINING WHEN TO REPLACE THE BAGS:
ALARM INTERNAL INSPECTION VISIBLE EMISSION OTHER
SPECIAL CONDITIONS:
MOISTURE BLINDING CHEMICAL RESISTIVITY OTHER
EXPLAIN: N/A
ON A SEPARATE PAGE, ATTACH A DIAGRAM SHOWING THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
FORM C1CONTROL DEVICE (FABRIC FILTER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
SIZE
P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
YES NO WARNING ALARM? YES NO
DESCRIBE MAINTENANCE PROCEDURES: Check Filter Bag, Bag Cage and Housing Condition. Replace worn or teared bags. Replace and repair defective components.
DESCRIBE CONTROL SYSTEM:
Attach Additional Sheets As Necessary
PARTICLE SIZE DISTRIBUTION
CUMULATIVE
(MICRONS)
50-100
OF TOTAL %WEIGHT %
0-1
>100
TOTAL = 100
1-10
10-25
25-50
REVISED 12/01/01 C1CONTROL DEVICE ID NO: C33 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): A13
EMISSION POINT (STACK) ID NO(S): EP- A13 POSITION IN SERIES OF CONTROLS NO. 1 OF 1 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED: TBD PROPOSED OPERATION DATE: 2011
PROPOSED START CONSTRUCTION DATE: 2007
___1____ OF __1_____
Bin Vent fabric filter to control emissions from the rail car fly ash silo.
POLLUTANT(S) COLLECTED: Particulates
BEFORE CONTROL EMISSION RATE (LB/HR): 1.3
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.9 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 0.0013
PRESSURE DROP (IN. H20): MIN: 4 MAX: 7 GAUGE?
BULK PARTICLE DENSITY (LB/FT3): 50 - 60 INLET TEMPERATURE (oF): MIN MAX ambient
POLLUTANT LOADING RATE: 10 LB/HR GR/FT3 OUTLET TEMPERATURE (oF): MIN MAX ambientINLET AIR FLOW RATE (ACFM): NA FILTER MAX OPERATING TEMP. (oF): 275
NO. OF COMPARTMENTS: 1 NO. OF BAGS PER COMPARTMENT: 124 LENGTH OF BAG (IN.): 144
DIAMETER OF BAG (IN.): 3"x6" oval DRAFT: INDUCED/NEG. FORCED/POS. FILTER SURFACE AREA (FT2): 1911
AIR TO CLOTH RATIO: 5.2 : 1 FILTER MATERIAL: 16 oz polyester felt WOVEN FELTED
DESCRIBE CLEANING PROCEDURES Either Air Pulse or Reverse Flow AIR PULSE SONIC
REVERSE FLOW SIMPLE BAG COLLAPSE
MECHANICAL/SHAKER RING BAG COLLAPSE - OTHER 20
DESCRIBE INCOMING AIR STREAM: 25Pnumatic transfer to cyclone seperator that drops the ash out of the air stream 25and into the silo. Air is displaced from the silo throught the filter as it fills with ash. 30Air is drawn into the silo through the filter as ash is removed from the silo. -
METHOD FOR DETERMINING WHEN TO CLEAN: Ether Automatic or Timed
AUTOMATIC TIMED MANUAL
METHOD FOR DETERMINING WHEN TO REPLACE THE BAGS:
ALARM INTERNAL INSPECTION VISIBLE EMISSION OTHER
SPECIAL CONDITIONS:
MOISTURE BLINDING CHEMICAL RESISTIVITY OTHER
EXPLAIN: N/A
>100
TOTAL = 100
1-10
10-25
25-50
Attach Additional Sheets As Necessary
PARTICLE SIZE DISTRIBUTION
CUMULATIVE
(MICRONS)
50-100
OF TOTAL %WEIGHT %
0-1
ON A SEPARATE PAGE, ATTACH A DIAGRAM SHOWING THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
FORM C1CONTROL DEVICE (FABRIC FILTER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
SIZE
P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
YES NO WARNING ALARM? YES NO
DESCRIBE MAINTENANCE PROCEDURES: Check Filter Bag, Bag Cage and Housing Condition. Replace worn or teared bags. Replace and repair defective components.
DESCRIBE CONTROL SYSTEM:
REVISED 12/01/01 BEMISSION SOURCE ID NO: A7, A12, A14CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: TBDMANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.1 0.08 0.1 0.08PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.05 0.04 0.05 0.04PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency;
lb/day
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Two Fly Ash Discharges to Truck
See Appendix G for process diagram. Emissions provided below are for one truck discharge or one rail discharge. Only one dischage point will be used at any one time.
OPERATING SCENARIO ______1___________OF ________1__________
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: A7, A12, A14
Two Fly Ash Discharges to Truck CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM): See Appendix G for process diagram. Process rates for one truck discharge.
UNITS
Fly Ash tons 200 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
REVISED 12/01/01 BEMISSION SOURCE ID NO: VF1-VF32CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): NA
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): Y NESHAP (SUBPART?):________ MACT (SUBPART?):_
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Coal Reclaim Feeders for Coal Stacking Tubes
See Appendix G for process diagram. No emissions are expected from the reclaim feeders as they are enclosed devices that discharge to a belt that is enclosed underground in a tunnel. The following feeders service the following stacking tubes:VF1-VF8: Reclaim Feeder for Stacking Tube 1 (ST1)VF9-VF16: Reclaim Feeder for Stacking Tube 2 (ST2)VF17-VF24: Reclaim Feeder for Stacking Tube 3 (ST3)VF25-VF32: Reclaim Feeder for Stacking Tube 4 (ST4)
OPERATING SCENARIO ______1___________OF ________1__________
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: VF1-VF32
Coal Reclaim Feeders for Coal Stacking Tubes CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): NA
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Coal tons 500 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagram. No emissions are expected from the reclaim feeders as they are enclosed devices that discharge to a belt that is enclosed underground in a tunnel. The following feeders service the following stacking tubes:VF1-VF8: Reclaim Feeder for Stacking Tube 1 (ST1)VF9-VF16: Reclaim Feeder for Stacking Tube 2 (ST2)VF17-VF24: Reclaim Feeder for Stacking Tube 3 (ST3)VF25-VF32: Reclaim Feeder for Stacking Tube 4 (ST4)
REVISED 12/01/01 BEMISSION SOURCE ID NO: LSBM-3CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): NA
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) X Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<10__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Limestone Handling - Limestone Ball Mill Train No 3
See Appendix G for process diagram. Two ball mill trains will be installed with the Unit 5 modification. An additional ball mill train will be added for the Unit 6&7 project. No emissions are expected from the ball mill trains.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: LSBM-3
Limestone Handling - Limestone Ball Mill Train No 3 CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): NA
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Limestone tons 60 NA
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagram. Two ball mill trains will be installed with the Unit 5 modification. An additional ball mill train will be added for the Unit 6&7 project. No emissions are expected from the ball mill trains.
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
REVISED 12/01/01 BEMISSION SOURCE ID NO: LS13-3CONTROL DEVICE ID NO(S): CD32-3EMISSION POINT (STACK) ID NO(S): LS13-3
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) X Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) 1 0.01 0.007 0.01 0.007PARTICULATE MATTER<10 MICRONS (PM10)
1 0.01 0.007 0.01 0.007PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<7__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Limestone Silo No. 3
See Appendix G for process diagram. Emissions from one limestone silo equiped with a bin vent filter.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
1 Emissions are based on material charge rate and density of material charged.Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED 12/01/01 B6EMISSION SOURCE ID NO: LS13-3
CONTROL DEVICE ID NO(S): CD32-3
OPERATING SCENARIO: _______1_______ OF ______1_________ EMISSION POINT(STACK) ID NO(S): LS13-3
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
MATERIAL STORED: Limestone DENSITY OF MATERIAL (LB/FT3): 85
CUBIC FEET: TONS: 1,100
HEIGHT: 100 DIAMETER: 24 (OR) LENGTH: WIDTH: HEIGHT:
ACTUAL: #### MAXIMUM DESIGN CAPACITY:
BLOWER SCREW CONVEYOR RAILCAR
COMPRESSOR X BELT CONVEYOR TRUCK
OTHER: BUCKET ELEVATOR X STORAGE PILE
OTHER: OTHER:
NO. FILL TUBES:
MAXIMUM ACFM:
MATERIAL IS FILLED TO: Limestone Prep System
BY WHAT METHOD IS MATERIAL UNLOADED FROM SILO?
Gravity
MAXIMUM DESIGN FILLING RATE OF MATERIAL (TONS/HR): 300
MAXIMUM DESIGN UNLOADING RATE OF MATERIAL (TONS/ 80
COMMENTS:
MOTOR HP:
Attach Additional Sheets As Necessary
FORM B6EMISSION SOURCE (STORAGE SILO/BINS)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FILLED FROMPNEUMATICALLY FILLED MECHANICALLY FILLEDANNUAL PRODUCT THROUGHPUT (TONS)
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Limestone Silo No. 3
CAPACITY
See Appendix G for process diagram. Emissions from one limestone silo equiped with a bin vent filter.
DIMENSIONS (FEET)
REVISED 12/01/01 C1CONTROL DEVICE ID NO: CD32-3 CONTROLS EMISSIONS FROM WHICH EMISSION SOURCE ID NO(S): LS13-3
EMISSION POINT (STACK) ID NO(S): LS13-3 POSITION IN SERIES OF CONTROLS NO. 1 OF 1 UNITS
MANUFACTURER: TBD MODEL NO: TBD
DATE MANUFACTURED 2007 PROPOSED OPERATION DATE:2011
PROPOSED START CONSTRUCTION DATE: January 2007
___1___ OF ____1___
One bin vent fabric filter to control emissions from the limestone silo.
POLLUTANT(S) COLLECTED: Particulates
BEFORE CONTROL EMISSION RATE (LB/HR): 0.1
CAPTURE EFFICIENCY: % % % %
CONTROL DEVICE EFFICIENCY: % % % %
CORRESPONDING OVERALL EFFICIENCY: 99.9 % % % %
EFFICIENCY DETERMINATION CODE:
TOTAL EMISSION RATE (LB/HR): 0.01
PRESSURE DROP (IN. H20): MIN: 4 MAX: 7 GAUGE?
BULK PARTICLE DENSITY (LB/FT3): 50 - 60 INLET TEMPERATURE (oF): MIN MAX ambient
POLLUTANT LOADING RATE: 10 LB/HR GR/FT3 OUTLET TEMPERATURE (oF): MIN MAX ambientINLET AIR FLOW RATE (ACFM): 10,000 FILTER MAX OPERATING TEMP. (oF): 275
NO. OF COMPARTMENTS: 1 NO. OF BAGS PER COMPARTMENT: 124 LENGTH OF BAG (IN.): 144
DIAMETER OF BAG (IN.): 3"x6" oval DRAFT: INDUCED/NEG. FORCED/POS. FILTER SURFACE AREA (FT2): 1911
AIR TO CLOTH RATIO: 5.2 : 1 FILTER MATERIAL: 16 oz polyester felt WOVEN FELTED
DESCRIBE CLEANING PROCEDURES:
AIR PULSE OR SONIC
REVERSE FLOW SIMPLE BAG COLLAPSE
MECHANICAL/SHAKER RING BAG COLLAPSE - OTHER 20
DESCRIBE INCOMING AIR STREAM: 25
Remove particles from LS Prep Bldg prior to exhausting building air to atmosphere. 25
30
-
METHOD FOR DETERMINING WHEN TO CLEAN: Ether Automatic or Timed
AUTOMATIC OR TIMED MANUAL
METHOD FOR DETERMINING WHEN TO REPLACE THE BAGS:
ALARM INTERNAL INSPECTION VISIBLE EMISSION OTHER
SPECIAL CONDITIONS:
MOISTURE BLINDING CHEMICAL RESISTIVITY OTHER
EXPLAIN: N/A
>100
TOTAL = 100
1-10
10-25
25-50
Attach Additional Sheets As Necessary
PARTICLE SIZE DISTRIBUTION
CUMULATIVE
(MICRONS)
50-100
OF TOTAL %WEIGHT %
0-1
ON A SEPARATE PAGE, ATTACH A DIAGRAM SHOWING THE RELATIONSHIP OF THE CONTROL DEVICE TO ITS EMISSION SOURCE(S):
FORM C1CONTROL DEVICE (FABRIC FILTER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
OPERATING SCENARIO:
SIZE
P.E. SEAL REQUIRED (PER 2Q .0112)? YES NO
YES NO WARNING ALARM? YES NO
DESCRIBE MAINTENANCE PROCEDURES: Check Filter Bag, Bag Cage and Housing Condition. Replace worn or teared bags. Replace and repair defective components.
DESCRIBE CONTROL SYSTEM:
REVISED 12/01/01 BEMISSION SOURCE ID NO: LS15CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<10__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Hydraulic Conveyor to FGD Area Emissions
See Appendix G for process diagrams. Fugitive emissions from hydraulic conveyor to FGD area. Limestone is transferred in a slurry. No emissions are expected from process.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: LS15
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Limestone 300
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagrams. Fugitive limestone handling emissions include material handling from hydraulic conveyor to FGD area. Limestone is transferred in a slurry.
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Hydraulic Conveyor to FGD Area Emissions
REVISED 12/01/01 BEMISSION SOURCE ID NO: GS10CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Belt Filter Discharge
See Appendix G for process diagrams. Fugitive emissions from discharge of the two gypsum belt filters. Gypsum is transferred using screw conveyors. No emissions are expected from this source.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: GS10
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Belt Filter Discharge
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
See Appendix G for process diagrams. Fugitive emissions from discharge of the two gypsum belt filters. Gypsum is transferred using screw conveyors. No emissions are expected from this source.
Gypsum 142
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/01 BEMISSION SOURCE ID NO: FvehicleCONTROL DEVICE ID NO(S): NAEMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):All roads are currently assumed to be paved. Facility is assumed to have a road washing/cleaning program.Coal and limestone are provided via rail. Fugitive dust emissions from these deliveries are assumed insignificant.For delivery vehicles of fuel oil, acid/caustic, and ammonia, the number of deliveries (per substance) was estimated at 2 deliveries per day.
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE NA OPERATION DATE: NA DATE MANUFACTURED: NAMANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):______
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 32.01 128.7 32.01 128.7PARTICULATE MATTER<10 MICRONS (PM10) AP-42 6.09 24.5 6.09 24.5PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Vehicle Emissions
OPERATING SCENARIO ______1___________OF ________1__________
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency;
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: Fvehicle
Fugitive Vehicle Emissions CONTROL DEVICE ID NO(S): NA
EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):All roads are currently assumed to be paved. Facility is assumed to have a road washing/cleaning program.Coal and limestone are provided via rail. Fugitive dust emissions from these deliveries are assumed insignificant.For delivery vehicles of fuel oil, acid/caustic, and ammonia, the number of deliveries (per substance) was estimated at 2 deliveries per day.
UNITS
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR):
MAX. CAPACITY HOURLY FUEL USE: REQUESTED CAPACITY ANNUAL FUEL USE:COMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
REVISED 12/01/0 BEMISSION SOURCE ID NO: C1CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DAJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):_______
EXPECTED ANNUAL HOURS OF OPER< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 1.56 1.58 1.56 1.58PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.74 0.75 0.74 0.75PARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Unloading Emissions
See Appendix G for process diagrams. Fugitive emissions from rail car unloading.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
ETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH S
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTIOFugitive Coal Handling - Unloading Emissions EMISSION SOURCE ID NO: C1
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagrams. Fugitive emissions from rail car unloading.
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Coal 5000
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/0 BEMISSION SOURCE ID NO: C2, C4, C6, C8CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NOFugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DAJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):_______
EXPECTED ANNUAL HOURS OF OPER< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 1.56 1.58 1.56 1.58PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.74 0.75 0.74 0.75PARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
ETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH S
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Conveyor Emissions
See Appendix F for process diagrams. Fugitive emissions from coal handling conveyors. The length of each of the conveyors is as follows: C2 : Stockout conveyor SC1 - 900 ft C4 : Stockout conveyor SC2 - 400 ft C6 : Stockout conveyor SC3 - 450ft C8 : Stockout conveyor SC4 - 550 ft
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTIOFugitive Coal Handling - Conveyor Emissions EMISSION SOURCE ID NO: C2, C4, C6, C8
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Coal 5000
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix F for process diagrams. Fugitive emissions from coal handling conveyors. The length of each of the conveyors is as follows: C2 : Stockout conveyor SC1 - 900 ft C4 : Stockout conveyor SC2 - 400 ft C6 : Stockout conveyor SC3 - 450ft C8 : Stockout conveyor SC4 - 550 ft
REVISED 12/01/0 BEMISSION SOURCE ID NO: C3, C5, C7, C9CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DAJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):_______
EXPECTED ANNUAL HOURS OF OPER< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 1.56 1.58 1.56 1.58PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.74 0.75 0.74 0.75PARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Stacking Tube Emissions
See Appendix F for process diagrams. Fugitive emissions from coal stacking tubes. Each stacking tube is 130 ft high and the capacities are as follows : C3 : Stacking Tube ST1 - 98, 000 ton @ 50 PCF (conical pile) C5 : Stacking Tube ST2 - 98, 000 ton @ 50 PCF (conical pile) C7 : Stacking Tube ST3 - 98,000 ton @ 50 PCF (conical pile) C9 : Stacking Tube ST4 - 98, 000 ton @ 50 PCF (conical pile)
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
ETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH S
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C3, C5, C7, C9
Fugitive Coal Handling - Stacking Tube Emissions CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix F for process diagrams. Fugitive emissions from coal stacking tubes. Each stacking tube is 130 ft high and the capacities are as follows : C3 : Stacking Tube ST1 - 98, 000 ton @ 50 PCF (conical pile) C5 : Stacking Tube ST2 - 98, 000 ton @ 50 PCF (conical pile) C7 : Stacking Tube ST3 - 98, 000 ton @ 50 PCF (conical pile) C9 : Stacking Tube ST4 - 98, 000 ton @ 50 PCF (conical pile)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Coal 5,000
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/0 BEMISSION SOURCE ID NO: C13CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DAJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):_______
EXPECTED ANNUAL HOURS OF OPER< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NA NA NA NAPARTICULATE MATTER<10 MICRONS (PM10) NA NA NA NAPARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
ETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH S
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Coal Handling - Reclaim Conveyor Emissions
See Appendix F for process diagrams. Fugitive emissions from reclaim conveyor to the transfer house. The reclaim conveyor to the transfer house is located underground. No emissions are expected from this source.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: C13
Fugitive Coal Handling - Reclaim Conveyor Emissions CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
See Appendix F for process diagrams. Fugitive emissions from reclaim conveyor to the transfer house. The reclaim conveyor to the transfer house is located underground. No emissions are expected from this source.
Coal 1000
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
REVISED 12/01/01 BEMISSION SOURCE ID NO: GS3, GS4CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.03 0.06 0.03 0.06PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.01 0.03 0.01 0.03PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Stockout Conveyor and Radial Stacker Emissions
See Appendix G for process diagrams. Fugitive emissions from gypsum stockout conveyor and radial stacker. The stockout conveyor (GSC1) is 850 ft in length. The radial stacker is 70 ft high and has capacity of 10, 000 tons @ 70 PCF. Belt width is 30 inches.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: GS3, GS4
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Gypsum 300
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Stockout Conveyor and Radial Stacker Emissions
See Appendix G for process diagrams. Fugitive emissions from gypsum stockout conveyor and radial stacker. The stockout conveyor (GSC1) is 850 ft in length. The radial stacker is 70 ft high and its capacity is 10, 000 tons @ 70 PCF. Belt width is 30 inches.
REVISED 12/01/01 BEMISSION SOURCE ID NO: GS7CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.12 0.23 0.12 0.23PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.06 0.11 0.06 0.11PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Truck Loading Emissions
See Appendix G for process diagrams. Fugitive emissions from gypsum truck loading.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: GS7
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
EMISSION SOURCE DESCRIPTION:Fugitive Gypsum Handling - Truck Loading Emissions
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
See Appendix G for process diagrams. Fugitive emissions from gypsum truck loading.
Gypsum 300
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/01 BEMISSION SOURCE ID NO: GS8CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):___Y____ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.09 0.23 0.09 0.23PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.04 0.11 0.04 0.11PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<20__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Gypsum to Rail Car Emissions
See Appendix G for process diagrams. Fugitive emissions from gypsum loading to rail car.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: GS8
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Gypsum 300
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagrams. Fugitive emissions from gypsum loading to rail car.
EMISSION SOURCE DESCRIPTION: Fugitive Gypsum Handling - Gypsum to Rail Car Emissions
REVISED 12/01/01 BEMISSION SOURCE ID NO: LS1CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 0.42 0.06 0.42 0.06PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.14 0.02 0.14 0.02PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<10__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Rail Car Unloading Emissions
See Appendix G for process diagrams. Fugitive emissions from limestone rail car unloading.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: LS1
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
See Appendix G for process diagrams. Fugitive emissions from limestone rail car unloading.
Limestone 2800
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Rail Car Unloading Emissions
REVISED 12/01/01 BEMISSION SOURCE ID NO: LS2, LS3 (existing)CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATEJanuary 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO< 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 2.10 0.31 2.10 0.31PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.77 0.11 0.77 0.11PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52__ WK/Y
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<10__ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Stockout Conveyor and existing Transfer House
See Appendix G for process diagrams. Fugitive emissions from limestone stockout conveyor and existing transfer house. The stockout conveyor LSC1 is 250 ft in length. Belt width is 54 inches.
OPERATING SCENARIO __________1_______OF __________1________
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
COMPLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SOURC
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: LS2, LS3
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Stockout Conveyor and Transfer House
See Appendix G for process diagrams. Fugitive emissions from limestone stockout conveyor and existing transfer house. The stockout conveyor LSC1 is 250 ft in length. Belt width is 54 inches.
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Limestone 2800
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
REVISED 12/01/0 BEMISSION SOURCE ID NO: LS6, LS7CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): Fugitive
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1 Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2 Coating/finishing/printing (Form Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE:January 2007 OPERATION DATE: 2011 DATE MANUFACTURE 2007MANUFACTURER / MODEL NO. NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?):_OOO______ NESHAP (SUBPART?):________ MACT (SUBPART?):_______
EXPECTED ANNUAL HOURS OF OPERATI < 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 2.1 0.31 2.1 0.31PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.77 0.11 0.77 0.11PARTICULATE MATTER<2.5 MICRONS (PM2.5)SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
PLETE THIS FORM AND COMPLETE AND ATTACH APPROPRIATE B1 THROUGH B9 FORM FOR EACH SO
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) describe any monitoring devices, gauges, or test ports for this source.
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
BEFORE CONTROLS / LIMITS
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
EXPECTED OP. SCHEDULE: __24__ HR/DAY __7_ DAY/WK ___52_
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: ___<10__ % OPACPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Stockout Conveyor and Radial Stacker Emissions
See Appendix G for process diagrams. Fugitive emissions from limestone stockout conveyor and radial stacker. The stockout conveyor LSC2 is 100 ft in length and 54 inches wide. The stacking tube ST5 is 80 ft high and has capacity of 60,000 tons at 65 PCF.
OPERATING SCENARIO __________1_______OF __________1________
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONSBEFORE CONTROLS / LIMITS
Attach Additional Sheets As Necessary
(AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE ID NO: LS6, LS7
CONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
tons
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ________1______
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
Fugitive
Limestone 2800
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
See Appendix G for process diagrams. Fugitive emissions from limestone stockout conveyor and radial stacker. The stockout conveyor LSC2 is 100 ft in length and 54 inches wide. The stacking tube ST5 is 80 ft high and has capacity of 60,000 tons at 65 PCF.
EMISSION SOURCE DESCRIPTION: Fugitive Limestone Handling - Stockout Conveyor Emissions
REVISED 12/01/01 BEMISSION SOURCE ID NO: FLandfillCONTROL DEVICE ID NO(S):
EMISSION POINT (STACK) ID NO(S):DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) X Other (Form B9)
START CONSTRUCTION DATE NA OPERATION DATE: NA DATE MANUFACTURED: NAMANUFACTURER / MODEL NO.: NAIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): NESHAP (SUBPART?):________ MACT (SUBPART?):
EXPECTED ANNUAL HOURS OF OPERATIO 8760
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) AP-42 1.5 6.8 1.5 6.8PARTICULATE MATTER<10 MICRONS (PM10) AP-42 0.8 3.4 0.8 3.4PARTICULATE MATTER<2.5 MICRONS (PM2.5)
SULFUR DIOXIDE (SO2)NITROGEN OXIDES (NOx)CARBON MONOXIDE (CO)VOLATILE ORGANIC COMPOUNDS (VOC)
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCE
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Landfill Emissions
Increased fugitive emissions are expected from the addition of Units 6 & 7. Landfill emissions include dumping of material from delivery vehicle to active landfill cell and active cell storage.
OPERATING SCENARIO ______1___________OF ________1__________Fugitive
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
EXPECTED OP. SCHEDULE: _24__ HR/DAY __7_ DAY/WK _52__ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
lb/hr
REVISED: 12/01/01 B9EMISSION SOURCE DESCRIPTION: EMISSION SOURCE ID NO: FLandfill
Landfill Emissions CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
UNITS
Coal Combustion Products acres 12
UNITS
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR): (BATCHES/YR):
FUEL USED: NA TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR): NA
MAX. CAPACITY HOURLY FUEL USE: NA REQUESTED CAPACITY ANNUAL FUEL USE: NACOMMENTS:
MAX. DESIGN REQUESTED CAPACITY
OPERATING SCENARIO: _______1_______ OF ______1________
Attach Additional Sheets as Necessary
TYPE CAPACITY (UNIT/BATCH) LIMITATION (UNIT/BATCH)
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MATERIALS ENTERING PROCESS - BATCH OPERATION
REQUESTED CAPACITY
FORM B9EMISSION SOURCE (OTHER)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
LIMITATION(UNIT/HR)
MAX. DESIGN
TYPE CAPACITY (UNIT/HR)
Increased fugitive emissions are expected from the addition of Units 6 & 7. Landfill emissions include dumping of material from delivery vehicle to active landfill cell and active cell storage.
Fugitive
REVISED 12/01/01 BEMISSION SOURCE ID NO: QP6CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): EP-QP6
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
X Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): IIII NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 100
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NSPS 0.23 0.01 - - 0.23 0.01PARTICULATE MATTER<10 MICRONS (PM10) 2 1.16 0.06 - - 1.16 0.06PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) 8 0.01 4.00E-04 - - 0.01 4.00E-04NITROGEN OXIDES (NOx) NSPS 4.63 0.23 - - 4.63 0.23CARBON MONOXIDE (CO) NSPS 4.01 0.20 - - 4.01 0.20VOLATILE ORGANIC COMPOUNDS (VOC) NSPS 4.63 0.23 - - 4.63 0.23
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEDuke Power is not proposing changes to previously permitted TAP emission due to this modification.
EXPECTED OP. SCHEDULE: ___ HR/DAY ___ DAY/WK ___ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 6 Emergency Quench Water Pump
A new 700 hp diesel engine driven emergency quench water pump for Unit 6 will be installed. Duke requests an annual operation limit of 100 hours (including testing)
OPERATING SCENARIO ______1___________OF ________1__________
(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED 12/01/01 B2EMISSION SOURCE DESCRIPTIONUnit 6 Emergency Quench Water Pump EMISSION SOURCE ID NO: QP6
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF _____1_________ EMISSION POINT (STACK) ID NO(S): EP-QP6
CHECK ALL THAT APPLY X EMERGENCY SPACE HEAT ELECTRICAL GENERATION
PEAK SHAVER OTHER (DESCRIBE): ___________________
GENERATOR OUTPUT (KW): ANTICIPATED ACTUAL HOURS OF OPERATION AS PEAK SHAVER (HRS/YR):
ENGINE OUTPUT (HP): 700
TYPE ICE: GASOLINE ENGINE DIESEL ENGINE UP TO 600 H X DIESEL ENGINE GREATER THAN 600 HP DUAL FUEL ENGINE
OTHER (DESCRIBE): _________________________________________ (complete below)
ENGINE TYPE RICH BURN LEAN BURN
EMISSION REDUCTION MODIFICATIONS INJECTION TIMING RETAR PREIGNITION CHAMBER COMBUSTION OTHER _________
OR STATIONARY GAS TURBINE (complete below NATURAL GAS PIPELINE COMPRESSOR OR TURBINE (complete below)
FUEL NATURAL GAS OIL ENGINE TYPE: 2-CYCLE LEAN BURN 4-CYCLE LEAN TURBINE
OTHER (DESCRIBE):____________ 4-CYCLE RICH BURN OTHER (DESCRIBE): _______________
CYCLE: COGENERATION SIMPLE CONTROLS: COMBUSTION MODIFICATIONS (DESCRIBE): __________________
REGENERATIVE COMBINED NONSELECTIVE CATALYTIC REDUCTION SELECTIVE CATALYTIC REDUCTION
CONTROLS: WATER-STEAM INJECTION CLEAN BURN AND PRECOMBUSTION CHAMBER UNCONTROLLED
UNCONTROLLED LEAN-PREMIX
No 2 Fuel Oil Gallons 35.8 NA
No. 2 Fuel Oil 137,000 Gallon 0.0015
- - - - -
DESCRIBE METHODS TO MINIMIZE VISIBLE EMISSIONS DURING IDLING, OR LOW LOAD OPERATIONS:
COMMENTS:
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FORM B2EMISSION SOURCE (INTERNAL COMBUSTION ENGINES/GENERATORS)
FUEL TYPE UNITSBTU/UNIT
FUEL USAGE (INCLUDE STARTUP/BACKUP FUEL)REQUESTED CAPACITY
FUEL TYPE UNITSMAXIMUM DESIGN
CAPACITY (UNIT/HR) LIMITATION (UNIT/HR)
Attach Additional Sheets As Necessary
CO PM PM10 VOCPOLLUTANT
EMISSION FACTOR LB/UNIT
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE) SULFUR CONTENT
(% BY WEIGHT)
UNIT
NOX OTHER
MANUFACTURER'S SPECIFIC EMISSION FACTORS (IF AVAILABLE)
REVISED 12/01/01 BEMISSION SOURCE ID NO: QP7CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): EP-QP7
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
X Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): IIII NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 100
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NSPS 0.23 0.01 - - 0.23 0.01PARTICULATE MATTER<10 MICRONS (PM10) 2 1.16 0.06 - - 1.16 0.06PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) 8 0.01 4.00E-04 - - 0.01 4.00E-04NITROGEN OXIDES (NOx) NSPS 4.63 0.23 - - 4.63 0.23CARBON MONOXIDE (CO) NSPS 4.01 0.20 - - 4.01 0.20VOLATILE ORGANIC COMPOUNDS (VOC) NSPS 4.63 0.23 - - 4.63 0.23
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEDuke Power is not proposing changes to previously permitted TAP emission due to this modification.
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Unit 7 Emergency Quench Water Pump
A new 700 hp diesel engine driven emergency quench water pump for Unit 7 will be installed. Duke requests an annual operation limit of 100 hours (including testing)
OPERATING SCENARIO ______1___________OF ________1__________
EXPECTED OP. SCHEDULE: ___ HR/DAY ___ DAY/WK ___ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL
REVISED 12/01/01 B2EMISSION SOURCE DESCRIPTIONUnit 7 Emergency Quench Water Pump EMISSION SOURCE ID NO: QP7
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF _____1_________ EMISSION POINT (STACK) ID NO(S): EP-QP7
CHECK ALL THAT APPLY X EMERGENCY SPACE HEAT ELECTRICAL GENERATION
PEAK SHAVER OTHER (DESCRIBE): ___________________
GENERATOR OUTPUT (KW): ANTICIPATED ACTUAL HOURS OF OPERATION AS PEAK SHAVER (HRS/YR):
ENGINE OUTPUT (HP): 700
TYPE ICE: GASOLINE ENGINE DIESEL ENGINE UP TO 600 H X DIESEL ENGINE GREATER THAN 600 HP DUAL FUEL ENGINE
OTHER (DESCRIBE): _________________________________________ (complete below)
ENGINE TYPE RICH BURN LEAN BURN
EMISSION REDUCTION MODIFICATIONS INJECTION TIMING RETAR PREIGNITION CHAMBER COMBUSTION OTHER _________
OR STATIONARY GAS TURBINE (complete below NATURAL GAS PIPELINE COMPRESSOR OR TURBINE (complete below)
FUEL NATURAL GAS OIL ENGINE TYPE: 2-CYCLE LEAN BURN 4-CYCLE LEAN TURBINE
OTHER (DESCRIBE):____________ 4-CYCLE RICH BURN OTHER (DESCRIBE): _______________
CYCLE: COGENERATION SIMPLE CONTROLS: COMBUSTION MODIFICATIONS (DESCRIBE): __________________
REGENERATIVE COMBINED NONSELECTIVE CATALYTIC REDUCTION SELECTIVE CATALYTIC REDUCTION
CONTROLS: WATER-STEAM INJECTION CLEAN BURN AND PRECOMBUSTION CHAMBER UNCONTROLLED
UNCONTROLLED LEAN-PREMIX
No 2 Fuel Oil Gallons 35.8 NA
No. 2 Fuel Oil 137,000 Gallon 0.0015
- - - - -
DESCRIBE METHODS TO MINIMIZE VISIBLE EMISSIONS DURING IDLING, OR LOW LOAD OPERATIONS:
COMMENTS:
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE) SULFUR CONTENT
(% BY WEIGHT)
UNIT
NOX OTHER
MANUFACTURER'S SPECIFIC EMISSION FACTORS (IF AVAILABLE)
MAXIMUM DESIGNCAPACITY (UNIT/HR) LIMITATION (UNIT/HR)
Attach Additional Sheets As Necessary
CO PM PM10 VOCPOLLUTANT
EMISSION FACTOR LB/UNIT
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FORM B2EMISSION SOURCE (INTERNAL COMBUSTION ENGINES/GENERATORS)
FUEL TYPE UNITSBTU/UNIT
FUEL USAGE (INCLUDE STARTUP/BACKUP FUEL)REQUESTED CAPACITY
FUEL TYPE UNITS
REVISED 12/01/01 BEMISSION SOURCE ID NO: EG1CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): EP-EG1
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
X Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): IIII NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 100
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NSPS 0.33 0.02 - - 0.33 0.02PARTICULATE MATTER<10 MICRONS (PM10) 2 1.65 0.08 - - 1.65 0.08PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) 8 0.01 1.00E-03 - - 0.01 1.00E-03NITROGEN OXIDES (NOx) NSPS 10.58 0.53 - - 10.58 0.53CARBON MONOXIDE (CO) NSPS 5.73 0.29 - - 5.73 0.29VOLATILE ORGANIC COMPOUNDS (VOC) NSPS 10.58 0.53 - - 10.58 0.53
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEDuke Power is not proposing changes to previously permitted TAP emission due to this modification.
EXPECTED OP. SCHEDULE: ___ HR/DAY ___ DAY/WK ___ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Emergency Diesel Fired Generator No. 1
A new 750 kw (1000 hp) emergency diesel fired generator will be used for emergency power at the facility.
OPERATING SCENARIO ______1___________OF ________1__________
(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED 12/01/01 B2EMISSION SOURCE DESCRIPTIONEmergency Diesel Fired Generator No. 1 EMISSION SOURCE ID NO: EG1
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF _____1_________ EMISSION POINT (STACK) ID NO(S): EP-EG1
CHECK ALL THAT APPLY X EMERGENCY SPACE HEAT X ELECTRICAL GENERATION
PEAK SHAVER OTHER (DESCRIBE): ___________________
GENERATOR OUTPUT (KW): ANTICIPATED ACTUAL HOURS OF OPERATION AS PEAK SHAVER (HRS/YR):
ENGINE OUTPUT (HP): 1000
TYPE ICE: GASOLINE ENGINE DIESEL ENGINE UP TO 600 H X DIESEL ENGINE GREATER THAN 600 HP DUAL FUEL ENGINE
OTHER (DESCRIBE): _________________________________________ (complete below)
ENGINE TYPE RICH BURN LEAN BURN
EMISSION REDUCTION MODIFICATIONS INJECTION TIMING RETAR PREIGNITION CHAMBER COMBUSTION OTHER _________
OR STATIONARY GAS TURBINE (complete below NATURAL GAS PIPELINE COMPRESSOR OR TURBINE (complete below)
FUEL NATURAL GAS OIL ENGINE TYPE: 2-CYCLE LEAN BURN 4-CYCLE LEAN TURBINE
OTHER (DESCRIBE):____________ 4-CYCLE RICH BURN OTHER (DESCRIBE): _______________
CYCLE: COGENERATION SIMPLE CONTROLS: COMBUSTION MODIFICATIONS (DESCRIBE): __________________
REGENERATIVE COMBINED NONSELECTIVE CATALYTIC REDUCTION SELECTIVE CATALYTIC REDUCTION
CONTROLS: WATER-STEAM INJECTION CLEAN BURN AND PRECOMBUSTION CHAMBER UNCONTROLLED
UNCONTROLLED LEAN-PREMIX
No 2 Fuel Oil Gallons 51 NA
No. 2 Fuel Oil 137,000 Gallon 0.0015
- - - - -
DESCRIBE METHODS TO MINIMIZE VISIBLE EMISSIONS DURING IDLING, OR LOW LOAD OPERATIONS:
COMMENTS:
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FORM B2EMISSION SOURCE (INTERNAL COMBUSTION ENGINES/GENERATORS)
FUEL TYPE UNITSBTU/UNIT
FUEL USAGE (INCLUDE STARTUP/BACKUP FUEL)REQUESTED CAPACITY
FUEL TYPE UNITSMAXIMUM DESIGN
CAPACITY (UNIT/HR) LIMITATION (UNIT/HR)
Attach Additional Sheets As Necessary
CO PM PM10 VOCPOLLUTANT
EMISSION FACTOR LB/UNIT
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE) SULFUR CONTENT
(% BY WEIGHT)
UNIT
NOX OTHER
MANUFACTURER'S SPECIFIC EMISSION FACTORS (IF AVAILABLE)
REVISED 12/01/01 BEMISSION SOURCE ID NO: EG2CONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): EP-EG2
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
X Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): IIII NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 100
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NSPS 0.33 0.02 - - 0.33 0.02PARTICULATE MATTER<10 MICRONS (PM10) 2 1.65 0.08 - - 1.65 0.08PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) 8 0.01 1.00E-03 - - 0.01 1.00E-03NITROGEN OXIDES (NOx) NSPS 10.58 0.53 - - 10.58 0.53CARBON MONOXIDE (CO) NSPS 5.73 0.29 - - 5.73 0.29VOLATILE ORGANIC COMPOUNDS (VOC) NSPS 10.58 0.53 - - 10.58 0.53
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEDuke Power is not proposing changes to previously permitted TAP emission due to this modification.
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Emergency Diesel Fired Generator No. 2
A new 750 kw (1000 hp) emergency diesel fired generator for emergency power at the facility.
OPERATING SCENARIO ______1___________OF ________1__________
EXPECTED OP. SCHEDULE: ___ HR/DAY ___ DAY/WK ___ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL
REVISED 12/01/01 B2EMISSION SOURCE DESCRIPTIONEmergency Diesel Fired Generator No. 2 EMISSION SOURCE ID NO: EG2
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF _____1_________ EMISSION POINT (STACK) ID NO(S): EP-EG2
CHECK ALL THAT APPLY X EMERGENCY SPACE HEAT X ELECTRICAL GENERATION
PEAK SHAVER OTHER (DESCRIBE): ___________________
GENERATOR OUTPUT (KW): ANTICIPATED ACTUAL HOURS OF OPERATION AS PEAK SHAVER (HRS/YR):
ENGINE OUTPUT (HP): 1000
TYPE ICE: GASOLINE ENGINE DIESEL ENGINE UP TO 600 H X DIESEL ENGINE GREATER THAN 600 HP DUAL FUEL ENGINE
OTHER (DESCRIBE): _________________________________________ (complete below)
ENGINE TYPE RICH BURN LEAN BURN
EMISSION REDUCTION MODIFICATIONS INJECTION TIMING RETAR PREIGNITION CHAMBER COMBUSTION OTHER _________
OR STATIONARY GAS TURBINE (complete below NATURAL GAS PIPELINE COMPRESSOR OR TURBINE (complete below)
FUEL NATURAL GAS OIL ENGINE TYPE: 2-CYCLE LEAN BURN 4-CYCLE LEAN TURBINE
OTHER (DESCRIBE):____________ 4-CYCLE RICH BURN OTHER (DESCRIBE): _______________
CYCLE: COGENERATION SIMPLE CONTROLS: COMBUSTION MODIFICATIONS (DESCRIBE): __________________
REGENERATIVE COMBINED NONSELECTIVE CATALYTIC REDUCTION SELECTIVE CATALYTIC REDUCTION
CONTROLS: WATER-STEAM INJECTION CLEAN BURN AND PRECOMBUSTION CHAMBER UNCONTROLLED
UNCONTROLLED LEAN-PREMIX
No 2 Fuel Oil Gallons 51 NA
No. 2 Fuel Oil 137,000 Gallon 0.0015
- - - - -
DESCRIBE METHODS TO MINIMIZE VISIBLE EMISSIONS DURING IDLING, OR LOW LOAD OPERATIONS:
COMMENTS:
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE) SULFUR CONTENT
(% BY WEIGHT)
UNIT
NOX OTHER
MANUFACTURER'S SPECIFIC EMISSION FACTORS (IF AVAILABLE)
MAXIMUM DESIGNCAPACITY (UNIT/HR) LIMITATION (UNIT/HR)
Attach Additional Sheets As Necessary
CO PM PM10 VOCPOLLUTANT
EMISSION FACTOR LB/UNIT
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FORM B2EMISSION SOURCE (INTERNAL COMBUSTION ENGINES/GENERATORS)
FUEL TYPE UNITSBTU/UNIT
FUEL USAGE (INCLUDE STARTUP/BACKUP FUEL)REQUESTED CAPACITY
FUEL TYPE UNITS
REVISED 12/01/01 BEMISSION SOURCE ID NO: FWPCONTROL DEVICE ID NO(S):EMISSION POINT (STACK) ID NO(S): EP-FWP
DESCRIBE IN DETAILTHE EMISSION SOURCE PROCESS (ATTACH FLOW DIAGRAM):
Coal,wood,oil, gas, other burner (Form B1) Woodworking (Form B4) Manufact. of chemicals/coatings/inks (Form B7)
X Int.combustion engine/generator (Form B2) Coating/finishing/printing (Form B5) Incineration (Form B8) Liquid storage tanks (Form B3) Storage silos/bins (Form B6) Other (Form B9)
START CONSTRUCTION DATE January 2007 OPERATION DATE: 2011 DATE MANUFACTURED: 2007MANUFACTURER / MODEL NO.: TBDIS THIS SOURCE SUBJECT TO? NSPS (SUBPART?): IIII NESHAP (SUBPART?):________ MACT (SUBPART?):__________
EXPECTED ANNUAL HOURS OF OPERATIO 100
SOURCE OFEMISSION
AIR POLLUTANT EMITTED FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yrPARTICULATE MATTER (PM) NSPS 0.40 0.02 - - 0.40 0.02PARTICULATE MATTER<10 MICRONS (PM10) 2 1.98 0.10 - - 1.98 0.10PARTICULATE MATTER<2.5 MICRONS (PM2.5) NA NA NA NA NA NASULFUR DIOXIDE (SO2) 8 0.02 7.00E-04 - - 0.02 7.00E-04NITROGEN OXIDES (NOx) NSPS 12.70 0.63 - - 12.70 0.63CARBON MONOXIDE (CO) NSPS 6.88 0.34 - - 6.88 0.34VOLATILE ORGANIC COMPOUNDS (VOC) NSPS 12.70 0.63 - - 12.70 0.63
OTHER
SOURCE OFEMISSION
HAZARDOUS AIR POLLUTANT AND CAS NO. FACTOR lb/hr tons/yr lb/hr tons/yr lb/hr tons/yr
TOXIC AIR POLLUTANT AND CAS NO. EF SOURCEDuke Power is not proposing changes to previously permitted TAP emission due to this modification.
EXPECTED OP. SCHEDULE: ___ HR/DAY ___ DAY/WK ___ WK/YR
VISIBLE STACK EMISSIONS UNDER NORMAL OPERATION: _<20___ % OPACITYPERCENTAGE ANNUAL THROUGHPUT (%): DEC-FEB 25 MAR-MAY 25 JUN-AUG 25 SEP-NOV 25
Attachments: (1) emissions calculations and supporting documentation; (2) indicate all requested state and federal enforceable permit limits (e.g. hours of operation, emission rates) and describe how these are monitored and with what frequency; and (3) de
lb/day
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(BEFORE CONTROLS / LIMITS)
POTENTIAL EMSSIONSEXPECTED ACTUAL
FORM BSPECIFIC EMISSIONS SOURCE INFORMATION (REQUIRED FOR ALL SOURCES)
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
TYPE OF EMISSION SOURCE (CHECK AND COMPLETE APPROPRIATE FORM B1-B9 ON THE FOLLOWING PAGES):
EMISSION SOURCE DESCRIPTION: Emergency Diesel Fired Fire Water Pump
A new 1200 hp emergency diesel fired fire water pump. Duke requests an annual operation limit of 100 hours.
OPERATING SCENARIO ______1___________OF ________1__________
(AFTER CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
(AFTER CONTROLS / LIMITS)
LEAD
EXPECTED ACTUAL
INDICATE EXPECTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONSlb/yr
POTENTIAL EMSSIONS(BEFORE CONTROLS / LIMITS) (AFTER CONTROLS / LIMITS)
TOXIC AIR POLLUTANT EMISSIONS INFORMATION FOR THIS SOURCE
lb/hr
REVISED 12/01/01 B2EMISSION SOURCE DESCRIPTIONEmergency Diesel Fired Fire Water Pump EMISSION SOURCE ID NO: FWP
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO: ______1________ OF _____1_________ EMISSION POINT (STACK) ID NO(S): EP-FWP
CHECK ALL THAT APPLY X EMERGENCY SPACE HEAT ELECTRICAL GENERATION
PEAK SHAVER OTHER (DESCRIBE): ___________________
GENERATOR OUTPUT (KW): ANTICIPATED ACTUAL HOURS OF OPERATION AS PEAK SHAVER (HRS/YR):
ENGINE OUTPUT (HP): 1200
TYPE ICE: GASOLINE ENGINE DIESEL ENGINE UP TO 600 H X DIESEL ENGINE GREATER THAN 600 HP DUAL FUEL ENGINE
OTHER (DESCRIBE): _________________________________________ (complete below)
ENGINE TYPE RICH BURN LEAN BURN
EMISSION REDUCTION MODIFICATIONS INJECTION TIMING RETAR PREIGNITION CHAMBER COMBUSTION OTHER _________
OR STATIONARY GAS TURBINE (complete below NATURAL GAS PIPELINE COMPRESSOR OR TURBINE (complete below)
FUEL NATURAL GAS OIL ENGINE TYPE: 2-CYCLE LEAN BURN 4-CYCLE LEAN TURBINE
OTHER (DESCRIBE):____________ 4-CYCLE RICH BURN OTHER (DESCRIBE): _______________
CYCLE: COGENERATION SIMPLE CONTROLS: COMBUSTION MODIFICATIONS (DESCRIBE): __________________
REGENERATIVE COMBINED NONSELECTIVE CATALYTIC REDUCTION SELECTIVE CATALYTIC REDUCTION
CONTROLS: WATER-STEAM INJECTION CLEAN BURN AND PRECOMBUSTION CHAMBER UNCONTROLLED
UNCONTROLLED LEAN-PREMIX
No 2 Fuel Oil Gallons 61.2 NA
No. 2 Fuel Oil 137,000 Gallon 0.0015
- - - - -
DESCRIBE METHODS TO MINIMIZE VISIBLE EMISSIONS DURING IDLING, OR LOW LOAD OPERATIONS:
COMMENTS:
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
FORM B2EMISSION SOURCE (INTERNAL COMBUSTION ENGINES/GENERATORS)
FUEL TYPE UNITSBTU/UNIT
FUEL USAGE (INCLUDE STARTUP/BACKUP FUEL)REQUESTED CAPACITY
FUEL TYPE UNITSMAXIMUM DESIGN
CAPACITY (UNIT/HR) LIMITATION (UNIT/HR)
Attach Additional Sheets As Necessary
CO PM PM10 VOCPOLLUTANT
EMISSION FACTOR LB/UNIT
FUEL CHARACTERISTICS (COMPLETE ALL THAT ARE APPLICABLE) SULFUR CONTENT
(% BY WEIGHT)
UNIT
NOX OTHER
MANUFACTURER'S SPECIFIC EMISSION FACTORS (IF AVAILABLE)
REVISED 12/01/01 D1
AIR POLLUTANT EMITTED
HAZARDOUS AIR POLLUTANT EMITTED CAS NO.
Hydrogen Chloride 3.44E+02 - 3.44E+02
Hydrogen Fluoride 4.48E+01 - 4.48E+01
Antimony 6.60E-02 - 6.60E-02
Arsenic 1.50E+00 - 1.50E+00
Beryllium 7.80E-02 - 7.80E-02
Cadmium 1.88E-01 - 1.88E-01
Chromium 9.54E-01 - 9.54E-01
Cobalt 3.67E-01 - 3.67E-01
Lead 1.54E+00 - 1.54E+00
Manganese 1.80E+00 - 1.80E+00Mercury 2.95E-01 - 2.95E-01
Nickel 1.03E+00 - 1.03E+00
Selenium 4.77E+00 - 4.77E+00
Acenapthene 5.43E-05 - 5.43E-05
Acenapththylene 1.44E-05 - 1.44E-05
Acetaldehyde 2.09E+00 - 2.09E+00
Acetophenone 5.50E-02 - 5.50E-02
Acrolein 1.06E+00 - 1.06E+00
Aldehydes 2.10E-01 - 2.10E-01
Ammonia 2.24E+02 - 2.24E+02
Anthracene 7.78E-04 - 7.78E-04
Benzene 4.77E+00 - 4.77E+00
Benz(a)Anthracene 1.42E-05 - 1.42E-05
Benz(A)Pyrene 5.20E-07 - 5.20E-07
Benzo(b)Fluoranthene 3.80E-06 - 3.80E-06
Benzo(g,h,i)perylene 1.06E-04 - 1.06E-04
Benzo(k)Fluoranthene 4.25E-07 - 4.25E-07
Benzyl Chloride 2.57E+00 - 2.57E+00
Biphenyl 6.23E-03 - 6.23E-03
Bis(2-ethylhexyl)phthalate 2.68E-01 - 2.68E-01
Bromoform 1.43E-01 - 1.43E-01
Carbon Disulfide 4.77E-01 - 4.77E-01
2-Chloroacetophenone 2.57E-02 - 2.57E-02
Chlorobenzene 8.07E-02 - 8.07E-02
Chloroform 2.16E-01 - 2.16E-01
(AFTER CONTROLS / LIMITATIONS)
HAZARDOUS AIR POLLUTANT EMISSIONS INFORMATION - FACILITY-WIDE
CRITERIA AIR POLLUTANT EMISSIONS INFORMATION - FACILITY-WIDE
FORM D1
tons/yr
3,069.44
tons/yr tons/yr
- 3,069.44PARTICULATE MATTER (PM)
FACILITY-WIDE EMISSIONS SUMMARY
45,284.30
13419.67 to 13977.67
45,284.30 -
-
-
SULFUR DIOXIDE (SO2)
NITROGEN OXIDES (NOx)1
CARBON MONOXIDE (CO) 11,275.64
VOLATILE ORGANIC COMPOUNDS (VOC)
1.69LEAD
2,562.87
NA
PARTICULATE MATTER < 10 MICRONS (PM10)
PARTICULATE MATTER < 2.5 MICRONS (PM2.5)
2,562.87
NA -
(BEFORE CONTROLS / LIMITATIONS)
(AFTER CONTROLS /LIMITATIONS)
tons/yrtons/yrtons/yr
NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate
EXPECTED ACTUAL EMISSIONS POTENTIAL EMISSIONS POTENTIAL EMISSIONS
EXPECTED ACTUAL EMISSIONS POTENTIAL EMISSIONS POTENTIAL EMISSIONS(AFTER CONTROLS /
LIMITATIONS)
13419.67 to 13977.67
345.08-
1.69-
345.08
11,275.64
-
(BEFORE CONTROLS / LIMITATIONS)
(AFTER CONTROLS /LIMITATIONS)
Cumene 1.94E-02 - 1.94E-02
Cyanide 9.17E+00 - 9.17E+00
2,4-Dinitrotoluene 1.03E-03 - 1.03E-03
Dimethyl Sulfate 1.76E-01 - 1.76E-01
Ethyl benzene 3.45E-01 - 3.45E-01
Ethyl Chloride (Chloroethane) 1.54E-01 - 1.54E-01
Ethylene Dichloride 1.47E-01 - 1.47E-01
Ethylene Dibromide 4.40E-03 - 4.40E-03
Formaldehyde 1.03E+00 - 1.03E+00
Hexane 2.46E-01 - 2.46E-01
Isophorone 2.13E+00 - 2.13E+00
Methyl Bromide (Bromomethane) 5.87E-01 - 5.87E-01
Methyl Chloride (Chloromethane) 1.94E+00 - 1.94E+00
Methyl Ethyl Ketone 1.43E+00 - 1.43E+00
Methyl Hydrazine 6.23E-01 - 6.23E-01
Methyl Methacrylate 7.33E-02 - 7.33E-02
Methyl tert-butyl ether 1.28E-01 - 1.28E-01
Methylene Chloride 1.06E+00 - 1.06E+00
Naphthalene 5.04E-02 - 5.04E-02
Phenanthrene 9.93E-03 - 9.93E-03
Phenol 5.87E-02 - 5.87E-02
Propionaldehyde 1.39E+00 - 1.39E+00
Styrene 9.17E-02 - 9.17E-02
Tetrachloroethylene 1.58E-01 - 1.58E-01
Toluene 8.95E-01 - 8.95E-01
1,1,1-Trichloroethane 7.39E-02 - 7.39E-02
Vinyl Acetate 2.79E-02 - 2.79E-02
Xylene 1.36E-01 - 1.36E-01
Total PCDD/PCDF 6.46E-06 - 6.46E-06
TOXIC AIR POLLUTANT EMITTED CAS NO. lb/hr lb/day lb/year Yes No
Hydrogen Chloride 78.51 1884.18 687726.11 No
Hydrogen Fluoride 10.22 245.36 89555.15 No
Arsenic 0.34 8.25 3009.85 No
Beryllium 0.02 0.43 156.07 No
Cadmium 0.04 1.03 376.01 No
Chromium 0.22 5.23 1908.87 No
Manganese 0.41 9.86 3597.71 No
Mercury 0.07 1.62 590.63 No
Nickel 0.23 5.63 2055.55 No
Acetaldehyde 0.48 11.47 4184.75 No
Acrolein 0.24 5.83 2127.44 No
Benzene 1.09 26.14 9540.86 No
Benzyl Chloride 0.59 14.07 5133.98 No
Carbon Disulfide 0.11 2.61 953.45 No
Chlorobenzene 0.02 0.44 161.35 No
Chloroform 0.05 1.19 432.72 No
Ethylene Dichloride 0.03 0.80 293.37 No
Ethylene Dibromide 0.00 0.02 8.80 No
Formaldehyde 0.23 5.62 2051.31 No
Hexane 0.06 1.35 491.40 No
Methyl Ethyl Ketone 0.33 7.84 2860.36 No
Methylene Chloride 0.44 10.65 3887.16 No
INDICATE REQUESTED ACTUAL EMISSIONS AFTER CONTROLS / LIMITATIONS. EMISSIONS ABOVE THE TOXIC PERMIT EMISSION RATE (TPER) IN 15A NCAC 2Q .0711 MAY REQUIRE AIR DISPERSION MODELING. USE NETTING FORM D2 IF NECESSARY.
Modeling Required ?
TOXIC AIR POLLUTANT EMISSIONS INFORMATION - FACILITY-WIDE
Phenol 0.01 0.32 117.35 No
Styrene 0.02 0.50 183.36 No
Toluene 0.20 4.90 1789.81 No
Xylene 0.03 0.74 271.37 No
Sulfuric Acid 94.27 2262.48 825806.54 Yes
Ammonia 62.80 1507.20 550128.00 Yes
Attach Additional Sheets As Necessary
1 Nox emissions are provided as a range reflecting operation of Unit 5 during the 5 month ozone season.
COMMENTS:
Revised:12/01/01 NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate D2
AIR POLLUTANT: Sulfuric Acid
EMISSION SOURCE ID NOS.: U6 & U7
LB/YEAR LB/DAY
MODIFICATION 2262 94.2
INCREASE
- MINUS - - MINUS - - MINUS - - MINUS -
MODIFICATION
DECREASE
= EQUALS = = EQUALS = = EQUALS = = EQUALS =
NET CHANGE
FROM MODIFICATION
CREDITABLE
INCREASE
- MINUS - - MINUS - - MINUS - - MINUS -
= EQUALS = = EQUALS = = EQUALS = = EQUALS =
NET CREDITABLE
CHANGE
TOTAL FACILITY
2262 94.2
TPER LEVELS (2Q .0711) 0.25 0.025
CHECK HERE IF AN AIR DISPERSION MODELING ANALYSIS IS REQUIRED
CAS NO.:
PURPOSE OF NETTING: AIR TOXICS PSD (100/250 tons per year) PSD SIGNIFICANT LEVELS
EMISSIONS
Attach Additional Sheets As Necessary
LB/HR
COMMENTS:
FORM D2AIR POLLUTANT NETTING WORKSHEET
SECTION C - FACILITY-WIDE EMISSIONS
Summarize in this sectionusing the B forms
CREDITABLE
DECREASE
EMISSIONS - USE APPROPRIATE COLUMNS ONLY
SECTION A - EMISSION OFFSETTING ANALYSIS FOR MODIFIED/NEW SOURCES
SECTION B - FACILITY-WIDE EMISSION NETTING ANALYSIS
Revised:12/01/01 NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate D2
AIR POLLUTANT: ammonia
EMISSION SOURCE ID NOS.: U6 & U7
LB/YEAR LB/DAY
MODIFICATION
INCREASE 62.8
- MINUS - - MINUS - - MINUS - - MINUS -
MODIFICATION
DECREASE
= EQUALS = = EQUALS = = EQUALS = = EQUALS =
NET CHANGE
FROM MODIFICATION
CREDITABLE
INCREASE
- MINUS - - MINUS - - MINUS - - MINUS -
= EQUALS = = EQUALS = = EQUALS = = EQUALS =
NET CREDITABLE
CHANGE
TOTAL FACILITY
62.8
TPER LEVELS (2Q .0711) 0.68
CHECK HERE IF AN AIR DISPERSION MODELING ANALYSIS IS REQUIRED
FORM D2AIR POLLUTANT NETTING WORKSHEET
SECTION C - FACILITY-WIDE EMISSIONS
Summarize in this sectionusing the B forms
CREDITABLE
DECREASE
EMISSIONS - USE APPROPRIATE COLUMNS ONLY
SECTION A - EMISSION OFFSETTING ANALYSIS FOR MODIFIED/NEW SOURCES
SECTION B - FACILITY-WIDE EMISSION NETTING ANALYSIS
CAS NO.:
PURPOSE OF NETTING: AIR TOXICS PSD (100/250 tons per year) PSD SIGNIFICANT LEVELS
EMISSIONS
Attach Additional Sheets As Necessary
LB/HR
COMMENTS:
REVISED: 12/01/01
1. Two Emergency Generators 1000 hp each 2Q.0503(8)(Limited to 500 operating hours each)
2. One Emergency Firewater Pump Engine 1200 hp 2Q.0503(8)
3. Two WFGD Emergency Quench Water Pumps 700 hp each 2Q.0503(8)
4. Unit 6 & 7 Start-Up/Aux. Boiler Fuel Oil Tank 168,000 gallons 2Q.0503(8)
5. Two Emergency Diesel Generator Fuel Oil Tanks 1,640 gallons each 2Q.0503(8)
6. Emergency Fire Water Pump Fuel Oil Tank 350 gallons 2Q.0503(8)
7.
8.
9.
10.
Attach Additional Sheets As Necessary
DESCRIPTION OF EMISSION SOURCEBASIS FOR EXEMPTION OR
INSIGNIFICANT ACTIVITY
SIZE OR PRODUCTION
RATE
FORM D4
INSIGNIFICANT ACTIVITIES PER 2Q .0503 FOR TITLE V SOURCESACTIVITIES EXEMPTED PER 2Q .0102 OR
EXEMPT AND INSIGNIFICANT ACTIVITIES SUMMARY NCDENR/Division of Air Quality - Application for Air Permit to Construct/Operate D4