129
Level Process Goal Practice 1 - Initial N/A N/A N/A 2 - Managed 7 15 54 3 - Defined 11 26 86 4. Quan. Mgd. 2 3 12 5- Optimizing 2 5 15 Total 22 49 167 1 - Initial N/A N/A N/A Capability Maturity Mo Requirements Management (REQM) Manage Requirements Understand Requirements Obtain Commitment to Requirements Manage Requirements Changes Maintain Bidirectional Traceability of Requirements Ensure Alignment Between Project Work
Transcript

Level Process Goal Practice Subpractice1 - Initial N/A N/A N/A N/A

2 - Managed 7 15 54 2313 - Defined 11 26 86 411

4. Quan. Mgd. 2 3 12 665- Optimizing 2 5 15 71

Total 22 49 167 7791 - Initial N/A N/A N/A N/A

2- Managed

Negotiate and record commitments

Generate a requirements traceability matrix

Capability Maturity Model Integration© for Development Version 1.3 (CMMI-DEV-V1.3©)

Requirements Management

(REQM)Manage

Requirements

Understand Requirements

Establish criteria for distinguishing appropriate requirements providers

Establish objective criteria for the evaluation and acceptance of requirements

Analyze requirements to ensure that established criteria are metReach an understanding of requirements with requirements providers so that project participants can commit to them

Obtain Commitment to Requirements

Assess the impact of requirements on existing commitments

Manage Requirements

Changes

Document all requirements and requirements changes that are given to or generated by the projectMaintain a requirements change history, including the rationale for changesEvaluate the impact of requirement changes from the standpoint of relevant stakeholdersMake requirements and change data available to the project

Maintain Bidirectional

Traceability of Requirements

Maintain requirements traceability to ensure that the source of lower level (i.e., derived) requirements is documentedMaintain requirements traceability from a requirement to its derived requirements and allocation to work products

Ensure Alignment Between

Project Work and

Requirements

Review project plans, activities, and work products for consistency with requirements and changes made to them

Identify the source of the inconsistency (if any)

2- Managed

Initiate any necessary corrective actionsDevelop a WBS

Identify work products to be reused

Develop life cycle phases for each project

Identify major milestonesIdentify schedule assumptionsIdentify constraintsIdentify task dependencies

Establish corrective action criteriaIdentify risks

Document risks

Revise risks as appropriate

Requirements Management

(REQM)Manage

Requirements

Ensure Alignment Between

Project Work and

RequirementsIdentify any changes that should be made to plans and work products resulting from changes to the requirements baseline

Project Planning (PP)

Establish Estimates

Estimate the Scope of the

Project

Define the work packages in sufficient detail so that estimates of project tasks, responsibilities, and schedule can be specifiedIdentify products and product components to be externally acquired

Establish Estimates of

Work Product and Task Attributes

Determine the technical approach for the project

Use appropriate methods to determine the attributes of the work products and tasks to be used to estimate resource requirements

Estimate the attributes of work products and tasks

Develop Project

Lifecycle Phases

Estimate Effort and Cost

Collect models or historical data to be used to transform the attributes of work products and tasks into estimates of labor hours and costsInclude supporting infrastructure needs when estimating effort and costEstimate effort and cost using models, historical data, or a combination of both

Develop a Project Plan

Establish the Budget and Schedule Establish and maintain the budget and

schedule

Identify Project Risks Review and obtain agreement with relevant

stakeholders on the completeness and correctness of documented risks

2- Managed

Determine process requirements

Determine communication requirements

Determine staffing requirements

Assess the knowledge and skills available

Develop stakeholder involvement plan

Develop overall project plan

Renegotiate budgets when necessaryRevise schedules when necessaryRevise requirements when necessary

Project Planning (PP) Develop a

Project Plan

Plan Data Management

Establish requirements and procedures to ensure privacy and the security of data

Establish a mechanism to archive data and to access archived dataDetermine the project data to be identified, collected, and distributedDetermine the requirements for providing access to and distribution of data to relevant stakeholders

Decide which project data and plans require version control or other levels of configuration control and establish mechanisms to ensure project data are controlled

Plan the Project’s

Resources Determine facility, equipment, and component requirementsDetermine other continuing resource requirements

Plan Needed Knowledge and

Skills

Identify the knowledge and skills needed to perform the project

Select mechanisms for providing needed knowledge and skillsIncorporate selected mechanisms into the project plan

Plan Stakeholder InvolvementEstablish the Project Plan

Obtain Commitment to

the Plan

Review Plans That Affect the

ProjectReview interrelated plans that affect the project

Reconcile Work and Resource

Levels

Revise methods and estimating parameters when necessary

Renegotiate stakeholder agreements when necessary

Obtain Plan Commitment

Identify needed support and negotiate commitments with relevant stakeholders.

2- Managed

Monitor progress against the schedule

Monitor resources provided and used

Project Planning (PP)

Obtain Commitment to

the Plan

Obtain Plan Commitment

Document all organizational commitments, both full and provisional, ensuring the appropriate level of signatories

Review internal commitments with senior management as appropriateReview external commitments with senior management as appropriate

Identify commitments regarding interfaces between project elements and other projects and organizational units so that these commitments can be monitored

Project Monitoring and Control (PMC)

Monitor the Project Against

the Plan

Monitor Project Planning

Parameters

Monitor the project’s costs and expended effortMonitor the attributes of work products and tasks

Monitor the knowledge and skills of project staffDocument significant deviations in project planning parameters

Monitor Commitments

Regularly review commitments (both external and internal)Identify commitments that have not been satisfied or are at significant risk of not being satisfiedDocument the results of commitment reviews

Monitor Project Risks

Periodically review the documentation of risks in the context of the project’s current status and circumstancesRevise the documentation of risks as additional information becomes availableCommunicate the risk status to relevant stakeholders

Monitor Data Management

Periodically review data management activities against their description in the project planIdentify and document significant issues and their impactsDocument results of data management activity reviews

Monitor Stakeholder Involvement

Periodically review the status of stakeholder involvementIdentify and document significant issues and their impactsDocument the results of stakeholder involvement status reviews

2- Managed

Document the results of reviews

Track action items to closure

Analyze IssuesGather issues for analysis

Determine type of acquisition

Project Monitoring and Control (PMC)

Monitor the Project Against

the Plan

Conduct Progress Reviews

Regularly communicate status on assigned activities and work products to relevant stakeholdersReview the results of collecting and analyzing measures for controlling the projectIdentify and document significant issues and deviations from the plan

Document change requests and problems identified in work products and processes

Track change requests and problem reports to closure

Conduct Milestone Reviews

Conduct milestone reviews with relevant stakeholders at meaningful points in the project’s schedule, such as the completion of selected phasesReview commitments, the plan, status, and risks of the projectIdentify and document significant issues and their impactsDocument results of the review, action items, and decisions

Manage Corrective Action to Closure

Analyze issues to determine the need for corrective action

Take Corrective

Action

Determine and document the appropriate actions needed to address identified issues

Review and get agreement with relevant stakeholders on the actions to be takenNegotiate changes to internal and external commitments

Manage Corrective

Actions

Monitor corrective actions for their completionAnalyze results of corrective actions to determine the effectiveness of the corrective actions

Determine and document appropriate actions to correct deviations from planned results from performing corrective actions

Supplier Agreement

Management (SAM)

Establish Supplier

Agreements

Determine Acquisition

Type

2- Managed

Select the supplier

Document the supplier agreement

Supplier Agreement

Management (SAM)

Establish Supplier

Agreements

Select Suppliers

Establish and document criteria for evaluating potential suppliers

Identify potential suppliers and distribute solicitation material and requirements to themEvaluate proposals according to evaluation criteriaEvaluate risks associated with each proposed supplierEvaluate proposed suppliers’ abilities to perform the work

Establish Supplier

Agreements

Revise the requirements (e.g., product requirements, service level requirements) to be fulfilled by the supplier to reflect negotiations with the supplier when necessary

Document what the project will provide to the supplier

Periodically review the supplier agreement to ensure it accurately reflects the project’s relationship with the supplier and current risks and market conditions

Ensure that all parties to the supplier agreement understand and agree to all requirements before implementing the agreement or any changes

Revise the supplier agreement as necessary to reflect changes to the supplier’s processes or work products

Revise the project’s plans and commitments, including changes to the project’s processes or work products, as necessary to reflect the supplier agreement

Satisfy Supplier Agreements

Execute the Supplier

Agreement

Monitor supplier progress and performance (e.g., schedule, effort, cost, technical performance) as defined in the supplier agreement

Select, monitor, and analyze processes used by the supplier as defined in the supplier agreement

2- Managed

Define the acceptance procedures

Supplier Agreement

Management (SAM)

Satisfy Supplier Agreements

Execute the Supplier

Agreement

Select and evaluate work products from the supplier as defined in the supplier agreementConduct reviews with the supplier as specified in the supplier agreement

Conduct technical reviews with the supplier as defined in the supplier agreement

Conduct management reviews with the supplier as defined in the supplier agreement

Use the results of reviews to improve the supplier’s performance and to establish and nurture long-term relationships with preferred suppliersMonitor risks involving the supplier and take corrective action as necessary

Accept the Acquired Product

Review and obtain agreement from relevant stakeholders on the acceptance procedures before the acceptance review or testVerify that the acquired products satisfy their requirementsConfirm that the nontechnical commitments associated with the acquired work product are satisfiedDocument the results of the acceptance review or testEstablish an action plan and obtain supplier agreement to take action to correct acquired work products that do not pass their acceptance review or testIdentify, document, and track action items to closure.

Ensure Transition of

Products

Ensure that facilities exist to receive, store, integrate, and maintain the acquired products as appropriate

Ensure that appropriate training is provided for those who are involved in receiving, storing, integrating, and maintaining acquired products

Ensure that acquired products are stored, distributed, and integrated according to the terms and conditions specified in the supplier agreement or license

Measurement and Analysis

(MA)

Align Measurement and Analysis

Activities

Establish Measurement

Objectives

Document information needs and objectives

2- Managed

Prioritize information needs and objectives

Prioritize, review, and update measures

Measurement and Analysis

(MA)

Align Measurement and Analysis

Activities

Establish Measurement

Objectives

Document, review, and update measurement objectivesProvide feedback for refining and clarifying information needs and objectives as necessaryMaintain traceability of measurement objectives to identified information needs and objectives

Specify Measures

Identify candidate measures based on documented measurement objectivesMaintain traceability of measures to measurement objectivesIdentify existing measures that already address measurement objectives

Specify operational definitions for measures. Operational definitions are stated in precise and unambiguous terms

Specify Data Collection and

Storage Procedures

Identify existing sources of data that are generated from current work products, processes, or transactionsIdentify measures for which data are needed but are not currently availableSpecify how to collect and store the data for each required measureCreate data collection mechanisms and process guidanceSupport automatic collection of data as appropriate and feasiblePrioritize, review, and update data collection and storage proceduresUpdate measures and measurement objectives as necessary

Specify Analysis

Procedures

Specify and prioritize the analyses to be conducted and the reports to be prepared

Select appropriate data analysis methods and tools

Specify administrative procedures for analyzing data and communicating results

Review and update the proposed content and format of specified analyses and reportsUpdate measures and measurement objectives as necessary

2- Managed

Obtain data for base measuresGenerate data for derived measures

Refine criteria for future analyses

Measurement and Analysis

(MA)

Align Measurement and Analysis

Activities

Specify Analysis

Procedures

Specify criteria for evaluating the utility of analysis results and for evaluating the conduct of measurement and analysis activities

Provide Measurement

Results

Obtain Measurement

Data Perform data integrity checks as close to the source of data as possible

Analyze Measurement

Data

Conduct initial analyses, interpret results, and draw preliminary conclusions

Conduct additional measurement and analysis as necessary and prepare results for presentationReview initial results with relevant stakeholders

Store Data and Results

Review data to ensure their completeness, integrity, accuracy, and currency

Store data according to data storage procedures

Make stored contents available for use only to appropriate groups and staff members

Prevent stored information from being used inappropriately

Communicate Results

Keep relevant stakeholders informed of measurement results in a timely mannerAssist relevant stakeholders in understanding results

Process and Product Quality

Assurance (PPQA)

Objectively Evaluate

Processes and Work Products

Objectively Evaluate

Processes

Promote an environment (created as part of project management) that encourages staff participation in identifying and reporting quality issues

Establish and maintain clearly stated criteria for evaluationsUse the stated criteria to evaluate selected performed processes for adherence to process descriptions, standards, and proceduresIdentify each noncompliance found during the evaluationIdentify lessons learned that could improve processes

Objectively Evaluate Work

Products

Select work products to be evaluated based on documented sampling criteria if sampling is used

2- Managed

Track noncompliance issues to resolution

Process and Product Quality

Assurance (PPQA)

Objectively Evaluate

Processes and Work Products

Objectively Evaluate Work

Products

Establish and maintain clearly stated criteria for the evaluation of selected work productsUse the stated criteria during evaluations of selected work productsEvaluate selected work products at selected timesIdentify each case of noncompliance found during evaluationsIdentify lessons learned that could improve processes

Provide Objective

Insight

Communicate and Resolve

Noncompliance Issues

Resolve each noncompliance with the appropriate members of the staff if possible

Document noncompliance issues when they cannot be resolved in the project

Escalate noncompliance issues that cannot be resolved in the project to the appropriate level of management designated to receive and act on noncompliance issues

Analyze noncompliance issues to see if there are quality trends that can be identified and addressedEnsure that relevant stakeholders are aware of results of evaluations and quality trends in a timely manner

Periodically review open noncompliance issues and trends with the manager designated to receive and act on noncompliance issues

Establish Records

Record process and product quality assurance activities in sufficient detail so that status and results are knownRevise the status and history of quality assurance activities as necessary

Configuration Management

(CM)

Establish Baselines

Identify Configuration

Items

Select configuration items and work products that compose them based on documented criteriaAssign unique identifiers to configuration itemsSpecify the important characteristics of each configuration itemSpecify when each configuration item is placed under configuration managementIdentify the owner responsible for each configuration item

2- Managed

Categorize and prioritize change requests.

Configuration Management

(CM)

Establish Baselines

Identify Configuration

Items

Specify relationships among configuration items

Establish a Configuration Management

System

Establish a mechanism to manage multiple levels of controlProvide access control to ensure authorized access to the configuration management systemStore and retrieve configuration items in a configuration management systemShare and transfer configuration items between control levels in the configuration management systemStore and recover archived versions of configuration itemsStore, update, and retrieve configuration management records

Create configuration management reports from the configuration management system

Preserve the contents of the configuration management systemRevise the configuration management structure as necessary

Create or Release

Baselines

Obtain authorization from the CCB before creating or releasing baselines of configuration itemsCreate or release baselines only from configuration items in the configuration management systemDocument the set of configuration items that are contained in a baselineMake the current set of baselines readily available

Track and Control Changes

Track Change Requests

Initiate and record change requests in the change request databaseAnalyze the impact of changes and fixes proposed in change requests

Review change requests to be addressed in the next baseline with relevant stakeholders and get their agreementTrack the status of change requests to closure

Control Configuration

Items

Control changes to configuration items throughout the life of the product or service.

2- Managed

Specify the latest version of baselines

Assess the integrity of baselines

Track action items from the audit to closure

Configuration Management

(CM)

Track and Control Changes

Control Configuration

Items

Obtain appropriate authorization before changed configuration items are entered into the configuration management system.

Check in and check out configuration items in the configuration management system for incorporation of changes in a manner that maintains the correctness and integrity of configuration items.

Perform reviews to ensure that changes have not caused unintended effects on the baselines (e.g., ensure that changes have not compromised the safety or security of the system)

Record changes to configuration items and reasons for changes as appropriate

Establish Integrity

Establish Configuration Management

Records

Record configuration management actions in sufficient detail so the content and status of each configuration item is known and previous versions can be recovered

Ensure that relevant stakeholders have access to and knowledge of the configuration status of configuration items

Identify the version of configuration items that constitute a particular baselineDescribe differences between successive baselinesRevise the status and history (i.e., changes, other actions) of each configuration item as necessary

Perform Configuration

Audits

Confirm that configuration management records correctly identify configuration items

Review the structure and integrity of items in the configuration management system

Confirm the completeness, correctness, and consistency of items in the configuration management systemConfirm compliance with applicable configuration management standards and procedures

3 - Defined

Elicit Needs

Allocate requirements to functions

Requirements Development

(RD)

Develop Customer

Requirements

Engage relevant stakeholders using methods for eliciting needs, expectations, constraints, and external interfaces.

Transform Stakeholder Needs into Customer

Requirements

Translate stakeholder needs, expectations, constraints, and interfaces into documented customer requirementsEstablish and maintain a prioritization of customer functional and quality attribute requirementsDefine constraints for verification and validation

Develop Product Requirements

Establish Product and

Product Component

Requirements

Develop requirements in technical terms necessary for product and product component designDerive requirements that result from design decisions

Develop architectural requirements capturing critical quality attributes and quality attribute measures necessary for establishing the product architecture and design

Establish and maintain relationships between requirements for consideration during change management and requirements allocation

Allocate Product

Component Requirements

Allocate requirements to product components and the architectureAllocate design constraints to product components and the architectureAllocate requirements to delivery incrementsDocument relationships among allocated requirements

Identify Interface

Requirements

Identify interfaces both external to the product and internal to the product (e.g., between functional partitions or objects)Develop the requirements for the identified interfaces

Analyze and Validate

Requirements

Establish Operational

Concepts and Scenarios

Develop operational concepts and scenarios that include operations, installation, development, maintenance, support, and disposal as appropriate

Define the environment in which the product or product component will operate, including boundaries and constraints

3 - Defined

Requirements Development

(RD)

Analyze and Validate

Requirements

Establish Operational

Concepts and Scenarios

Review operational concepts and scenarios to refine and discover requirements

Develop a detailed operational concept, as products and product components are selected, that defines the interaction of the product, the end user, and the environment, and that satisfies the operational, maintenance, support, and disposal needs

Establish a Definition of

Required Functionality and Quality Attributes

Determine key mission and business driversIdentify desirable functionality and quality attributesDetermine architecturally significant quality attributes based on key mission and business driversAnalyze and quantify functionality required by end users

Analyze requirements to identify logical or functional partitions (e.g., subfunctions)

Partition requirements into groups, based on established criteria (e.g., similar functionality, similar quality attribute requirements, coupling), to facilitate and focus the requirements analysis

Allocate customer requirements to functional partitions, objects, people, or support elements to support the synthesis of solutionsAllocate requirements to functions and subfunctions (or other logical entities)

Analyze Requirements

Analyze stakeholder needs, expectations, constraints, and external interfaces to organize them into related subjects and remove conflicts

Analyze requirements to determine whether they satisfy the objectives of higher level requirementsAnalyze requirements to ensure that they are complete, feasible, realizable, and verifiableIdentify key requirements that have a strong influence on cost, schedule, performance, or riskIdentify technical performance measures that will be tracked during the development effort

3 - Defined

Generate alternative solutions

Requirements Development

(RD)

Analyze and Validate

Requirements

Analyze Requirements

Analyze operational concepts and scenarios to refine the customer needs, constraints, and interfaces and to discover new requirements

Analyze Requirements

to Achieve Balance

Use proven models, simulations, and prototyping to analyze the balance of stakeholder needs and constraintsPerform a risk assessment on the requirements and definition of required functionality and quality attributesExamine product lifecycle concepts for impacts of requirements on risksAssess the impact of the architecturally significant quality attribute requirements on the product and product development costs and risks

Validate Requirements

Analyze the requirements to determine the risk that the resulting product will not perform appropriately in its intended use environment

Explore the adequacy and completeness of requirements by developing product representations (e.g., prototypes, simulations, models, scenarios, storyboards) and by obtaining feedback about them from relevant stakeholders

Assess the design as it matures in the context of the requirements validation environment to identify validation issues and expose unstated needs and customer requirements

Technical Solution (TS)

Select Product Component Solutions

Develop Alternative

Solutions and Selection Criteria

Identify screening criteria to select a set of alternative solutions for considerationIdentify technologies currently in use and new product technologies for competitive advantageIdentify candidate COTS products that satisfy the requirements

Identify re-usable solution components or applicable architecture patterns. For product lines, the organization’s core assets can be used as a basis for a solution

Obtain a complete requirements allocation for each alternativeDevelop the criteria for selecting the best alternative solution

3 - Defined

Document the design

Technical Solution (TS)

Select Product Component Solutions

Select Product Component Solutions

Evaluate each alternative solution/set of solutions against the selection criteria established in the context of the operational concepts and scenarios

Based on the evaluation of alternatives, assess the adequacy of the selection criteria and update these criteria as necessaryIdentify and resolve issues with the alternative solutions and requirements

Select the best set of alternative solutions that satisfy the established selection criteria

Establish the functional and quality attribute requirements associated with the selected set of alternatives as the set of allocated requirements to those product components

Identify the product component solutions that will be reused or acquired

Establish and maintain the documentation of the solutions, evaluations, and rationale

Develop the Design

Design the Product or

Product Component

Establish and maintain criteria against which the design can be evaluatedIdentify, develop, or acquire the design methods appropriate for the productEnsure that the design adheres to applicable design standards and criteriaEnsure that the design adheres to allocated requirements

Establish a Technical Data

Package

Determine the number of levels of design and the appropriate level of documentation for each design levelDetermine the views to be used to document the architecture

Base detailed design descriptions on the allocated product component requirements, architecture, and higher level designs

Document the design in the technical data packageDocument the key (i.e., significant effect on cost, schedule, or technical performance) decisions made or defined, including their rationaleRevise the technical data package as necessary

3 - Defined

Define interface criteria

Adhere to applicable standards and criteria

Technical Solution (TS)

Develop the Design

Design Interfaces

Using Criteria

Identify interfaces associated with other product componentsIdentify interfaces associated with external itemsIdentify interfaces between product components and the product related lifecycle processesApply the criteria to the interface design alternativesDocument the selected interface designs and the rationale for the selection

Perform Make, Buy, or Reuse

Analyses

Develop criteria for the reuse of product component designsAnalyze designs to determine if product components should be developed, reused, or purchased

Analyze implications for maintenance when considering purchased or nondevelopmental (e.g., COTS, government off the shelf, reuse) items

Implement the Product Design

Implement the Design

Use effective methods to implement the product components

Conduct peer reviews of the selected product componentsPerform unit testing of the product component as appropriateRevise the product component as necessary

Develop Product Support

Documentation

Review the requirements, design, product, and test results to ensure that issues affecting the installation, operation, and maintenance documentation are identified and resolved

Use effective methods to develop the installation, operation, and maintenance documentationAdhere to the applicable documentation standards

Develop preliminary versions of the installation, operation, and maintenance documentation in early phases of the project lifecycle for review by the relevant stakeholders

Conduct peer reviews of the installation, operation, and maintenance documentation

3 - Defined

Select the best integration strategy

Technical Solution (TS)

Implement the Product Design

Develop Product Support

Documentation

Revise the installation, operation, and maintenance documentation as necessary

Product Integration (PI)

Prepare for Product

Integration

Establish an Integration

Strategy

Identify the product components to be integratedIdentify the verifications to be performed during the integration of the product componentsIdentify alternative product component integration strategies

Periodically review the product integration strategy and revise as neededRecord the rationale for decisions made and deferred

Establish the Product

Integration Environment

Identify the requirements for the product integration environment

Identify verification procedures and criteria for the product integration environment

Decide whether to make or buy the needed product integration environmentDevelop an integration environment if a suitable environment cannot be acquiredMaintain the product integration environment throughout the projectDispose of those portions of the environment that are no longer useful

Establish Product

Integration Procedures and Criteria

Establish and maintain product integration procedures for the product components

Establish and maintain criteria for product component integration and evaluation

Establish and maintain criteria for validation and delivery of the integrated product

Ensure Interface Compatibility

Review Interface

Descriptions for

Completeness

Review interface data for completeness and ensure complete coverage of all interfaces

Ensure that product components and interfaces are marked to ensure easy and correct connection to the joining product componentPeriodically review the adequacy of interface descriptions

Manage Interfaces

Ensure the compatibility of the interfaces throughout the life of the productResolve conflict, noncompliance, and change issues

3 - Defined

Record the evaluation results

Identify work products for verification.

Product Integration (PI)

Ensure Interface Compatibility

Manage Interfaces

Maintain a repository for interface data accessible to project participants.

Assemble Product

Components and Deliver the

Product

Confirm Readiness of

Product Components

for Integration

Track the status of all product components as soon as they become available for integration

Ensure that product components are delivered to the product integration environment in accordance with the product integration strategy and procedures

Confirm the receipt of each properly identified product componentEnsure that each received product component meets its descriptionCheck the configuration status against the expected configurationPerform a pre-check (e.g., by a visual inspection, using basic measures) of all the physical interfaces before connecting product components together

Assemble Product

Components

Ensure the readiness of the product integration environmentConduct integration in accordance with the product integration strategy, procedures, and criteriaRevise the product integration strategy, procedures, and criteria as appropriate

Evaluate Assembled

Product Components

Conduct the evaluation of assembled product components following the product integration strategy, procedures, and criteria

Package and Deliver the Product or

Product Component

Review the requirements, design, product, verification results, and documentation to ensure that issues affecting the packaging and delivery of the product are identified and resolved

Use effective methods to package and deliver the assembled productSatisfy the applicable requirements and standards for packaging and delivering the productPrepare the operational site for installation of the productDeliver the product and related documentation and confirm receiptInstall the product at the operational site and confirm correct operation

Verification (VER)

Prepare for Verification

Select Work Products for Verification

3 - Defined

Identify verification equipment and tools

Verification (VER)

Prepare for Verification

Select Work Products for Verification

Identify requirements to be satisfied by each selected work productIdentify verification methods available for useDefine verification methods to be used for each selected work productSubmit for integration with the project plan the identification of work products to be verified, the requirements to be satisfied, and the methods to be used

Establish the Verification

Environment

Identify verification environment requirementsIdentify verification resources that are available for reuse or modification

Acquire verification support equipment and an environment (e.g., test equipment, software)

Establish Verification Procedures and Criteria

Generate a set of comprehensive, integrated verification procedures for work products and commercial off-the-shelf products, as necessaryDevelop and refine verification criteria as necessaryIdentify the expected results, tolerances allowed, and other criteria for satisfying the requirements

Identify equipment and environmental components needed to support verification

Perform Peer Reviews

Prepare for Peer Reviews

Determine the type of peer review to be conductedDefine requirements for collecting data during the peer reviewEstablish and maintain entry and exit criteria for the peer reviewEstablish and maintain criteria for requiring another peer reviewEstablish and maintain checklists to ensure that work products are reviewed consistently

Develop a detailed peer review schedule, including the dates for peer review training and for when materials for peer reviews will be available

Ensure that the work product satisfies the peer review entry criteria prior to distribution.

3 - Defined

Collect peer review data

Analyze the peer review data

Record the results of verification activities

Compare actual results to expected results

Analyze defect data

Verification (VER) Perform Peer

Reviews

Prepare for Peer Reviews

Distribute the work product to be reviewed and related information to participants early enough to enable them to adequately prepare for the peer reviewAssign roles for the peer review as appropriatePrepare for the peer review by reviewing the work product prior to conducting the peer review

Conduct Peer Reviews

Perform the assigned roles in the peer reviewIdentify and document defects and other issues in the work productRecord results of the peer review, including action items

Identify action items and communicate issues to relevant stakeholdersConduct an additional peer review if neededEnsure that the exit criteria for the peer review are satisfied

Analyze Peer Review Data

Record data related to the preparation, conduct, and results of the peer reviewsStore the data for future reference and analysisProtect the data to ensure that peer review data are not used inappropriately

Verify Selected Work Products

Perform Verification

Perform the verification of selected work products against their requirements

Identify action items resulting from the verification of work productsDocument the “as-run” verification method and deviations from available methods and procedures discovered during its performance

Analyze Verification

Results

Based on the established verification criteria, identify products that do not meet their requirements or identify problems with methods, procedures, criteria, and the verification environment

3 - Defined

Record all results of the analysis in a report

Validation (VAL)

Identify customer supplied productsIdentify test equipment and tools

Plan the availability of resources in detail

Identify validation cross reference matrixPerform operational demonstrations

Verification (VER)

Verify Selected Work Products

Analyze Verification

Results

Use verification results to compare actual measurements and performance to technical performance parameters

Provide information on how defects can be resolved (including verification methods, criteria, and verification environment) and initiate corrective action

Prepare for Validation

Select Products for

Validation

Identify the key principles, features, and phases for product or product component validation throughout the life of the project

Determine which categories of end user needs (operational, maintenance, training, or support) are to be validatedSelect the product and product components to be validatedSelect the evaluation methods for product or product component validation

Review the validation selection, constraints, and methods with relevant stakeholders

Establish the Validation

Environment

Identify requirements for the validation environment

Identify validation resources that are available for reuse and modification

Establish Validation

Procedures and Criteria

Review the product requirements to ensure that issues affecting validation of the product or product component are identified and resolved

Document the environment, operational scenario, procedures, inputs, outputs, and criteria for the validation of the selected product or product component

Assess the design as it matures in the context of the validation environment to identify validation issues

Validate Product or Product

Components

Perform Validation

Log results of performing validation procedures

3 - Defined

Validation (VAL)

Record formal results of validation activities

Compare actual results to expected results

Analyze validation data for defects

Define the scope of the process appraisal

Conduct the process appraisal

Validate Product or Product

Components

Perform Validation

Communicate validation results to stakeholders

Analyze Validation

Results

Based on the established validation criteria, identify products and product components that do not perform suitably in their intended operating environments, or identify problems with methods, criteria, or the environment

Record results of the analysis and identify issuesUse validation results to compare actual measurements and performance to the intended use or operational need

Provide information on how defects can be resolved (including validation methods, criteria, and validation environment) and initiate corrective action

Organizational Process Focus

(OPF)

Determine Process

Improvement Opportunities

Establish Organizational Process Needs

Identify policies, standards, and business objectives that are applicable to the organization’s processesExamine relevant process standards and models for best practicesDetermine the organization’s process performance objectivesDefine essential characteristics of the organization’s processesDocument the organization’s process needs and objectivesRevise the organization’s process needs and objectives as needed

Appraise the Organization’s

Processes

Obtain sponsorship of the process appraisal from senior management

Determine the method and criteria to be used for the process appraisalPlan, schedule, and prepare for the process appraisal

Document and deliver the appraisal’s activities and findings

3 - Defined

Prioritize candidate process improvements

Document process action plans

Revise process action plans as necessary

Organizational Process Focus

(OPF)

Determine Process

Improvement Opportunities

Identify the Organization’s

Process Improvements

Determine candidate process improvements

Identify and document the process improvements to be implementedRevise the list of planned process improvements to keep it current

Plan and Implement

Process Actions

Establish Process Action

Plans

Identify strategies, approaches, and actions to address identified process improvements

Establish process action teams to implement actions

Review and negotiate process action plans with relevant stakeholders

Implement Process Action

Plans

Make process action plans readily available to relevant stakeholdersNegotiate and document commitments among process action teams and revise their process action plans as necessaryTrack progress and commitments against process action plans

Conduct joint reviews with process action teams and relevant stakeholders to monitor the progress and results of process actions

Plan pilots needed to test selected process improvementsReview the activities and work products of process action teamsIdentify, document, and track to closure issues encountered when implementing process action plans

Ensure that results of implementing process action plans satisfy the organization’s process improvement objectives

Deploy Organizational Process Assets and Incorporate

Experiences

Deploy Organizational Process Assets

Deploy organizational process assets across the organization

Document changes to organizational process assetsDeploy changes that were made to organizational process assets across the organization

3 - Defined

Organizational Process Focus

(OPF)

Deploy Organizational Process Assets and Incorporate

Experiences

Deploy Organizational Process Assets

Provide guidance and consultation on the use of organizational process assets

Deploy Standard

Processes

Identify projects in the organization that are starting up

Identify active projects that would benefit from implementing the organization’s current set of standard processesEstablish plans to implement the organization’s current set of standard processes on the identified projectsAssist projects in tailoring the organization’s set of standard processes to meet their needsMaintain records of tailoring and implementing processes on the identified projects

Ensure that the defined processes resulting from process tailoring are incorporated into plans for process compliance audits

As the organization’s set of standard processes is updated, identify which projects should implement the changes

Monitor the Implementation

Monitor the projects’ use of organizational process assets and changes to them

Review selected process artifacts created during the life of each projectReview results of process compliance audits to determine how well the organization’s set of standard processes has been deployed

Identify, document, and track to closure issues related to implementing the organization’s set of standard processes

Incorporate Experiences

into Organizational Process Assets

Conduct periodic reviews of the effectiveness and suitability of the organization’s set of standard processes and related organizational process assets relative to the process needs and objectives derived from the organization’s business objectives

Obtain feedback about the use of organizational process assetsDerive lessons learned from defining, piloting, implementing, and deploying organizational process assets

3 - Defined

Manage process improvement proposals

Document descriptions of lifecycle models

Conduct peer reviews on lifecycle models

Organizational Process Focus

(OPF)

Deploy Organizational Process Assets and Incorporate

Experiences

Incorporate Experiences

into Organizational Process Assets

Make lessons learned available to people in the organization as appropriateAnalyze measurement data obtained from the use of the organization’s common set of measures

Appraise processes, methods, and tools in use in the organization and develop recommendations for improving organizational process assets

Make the best of the organization’s processes, methods, and tools available to people in the organization as appropriate

Establish and maintain records of the organization’s process improvement activities

Organizational Process

Definition (OPD)

Establish Organizational Process Assets

Establish Standard

Processes

Decompose each standard process into constituent process elements to the detail needed to understand and describe the process

Specify the critical attributes of each process elementSpecify relationships among process elements

Ensure that the organization’s set of standard processes adheres to applicable policies, standards, and models

Ensure that the organization’s set of standard processes satisfies process needs and objectives of the organization

Ensure that there is appropriate integration among processes that are included in the organization’s set of standard processes

Document the organization’s set of standard processesConduct peer reviews on the organization’s set of standard processesRevise the organization’s set of standard processes as necessary

Establish Lifecycle Model

Descriptions

Select lifecycle models based on the needs of projects and the organization

Revise the descriptions of lifecycle models as necessary.

3 - Defined

Revise tailoring guidelines as necessary

Make items available for use by projects

Organizational Process

Definition (OPD)

Establish Organizational Process Assets

Establish Tailoring

Criteria and Guidelines

Specify selection criteria and procedures for tailoring the organization’s set of standard processesSpecify the standards used for documenting defined processes

Specify the procedures used for submitting and obtaining approval of waivers from the organization’s set of standard processes

Document tailoring guidelines for the organization’s set of standard processesConduct peer reviews on the tailoring guidelines

Establish the Organization’s Measurement

Repository

Determine the organization’s needs for storing, retrieving, and analyzing measurements.Define a common set of process and product measures for the organization’s set of standard processes

Design and implement the measurement repository

Specify procedures for storing, updating, and retrieving measuresConduct peer reviews on definitions of the common set of measures and procedures for storing, updating, and retrieving measuresEnter specified measures into the repositoryMake the contents of the measurement repository available for use by the organization and projects as appropriate

Revise the measurement repository, the common set of measures, and procedures as the organization’s needs change

Establish the Organization’s Process Asset

Library

Design and implement the organization’s process asset library, including the library structure and support environmentSpecify criteria for including items in the librarySpecify procedures for storing, updating, and retrieving itemsEnter selected items into the library and catalog them for easy reference and retrieval

3 - Defined

Periodically review the use of each item

Establish the content of the planEstablish commitments to the plan

Organizational Process

Definition (OPD)

Establish Organizational Process Assets

Establish the Organization’s Process Asset

Library

Revise the organization’s process asset library as necessary

Establish Work Environment

Standards

Evaluate commercially available work environment standards appropriate for the organization

Adopt existing work environment standards and develop new ones to fill gaps based on the organization’s process needs and objectives

Establish Rules and Guidelines

for Teams

Establish and maintain empowerment mechanisms to enable timely decision making.

Establish and maintain rules and guidelines for structuring and forming teams

Define the expectations, rules, and guidelines that guide how teams work collectively

Organizational Training (OT)

Establish an Organizational

Training Capability

Establish Strategic

Training Needs

Analyze the organization’s strategic business objectives and process improvement plan to identify potential training needs

Document the strategic training needs of the organizationDetermine the roles and skills needed to perform the organization’s set of standard processesDocument the training needed to perform roles in the organization’s set of standard processesDocument the training needed to maintain the safe, secure, and continued operation of the businessRevise the organization’s strategic needs and required training as necessary

Determine Which Training Needs Are the Responsibility

of the Organization

Analyze the training needs identified by projects and support groups

Negotiate with projects and support groups on how their training needs will be satisfied

Document commitments for providing training support to projects and support groups

Establish an Organizational

Training Tactical Plan

Revise the plan and commitments as necessary.

Establish a Training

Capability

Select appropriate approaches to satisfy organizational training needs

3 - Defined

Develop or obtain training materials

Provide Training

Deliver the training

Organizational Training (OT)

Establish an Organizational

Training Capability

Establish a Training

Capability

Determine whether to develop training materials internally or to acquire them externally

Develop or obtain qualified instructors, instructional designers, or mentorsDescribe the training in the organization’s training curriculumRevise training materials and supporting artifacts as necessary

Deliver Training

Select those who will receive the training necessary to perform their roles effectively

Schedule the training, including any resources, as necessary (e.g., facilities, instructors)

Track the delivery of training against the plan

Establish Training Records

Keep records of all students who successfully complete each training course or other approved training activity as well as those who are unsuccessfulKeep records of all staff who are waived from trainingKeep records of all students who successfully complete their required trainingMake training records available to the appropriate people for consideration in assignments

Assess Training

Effectiveness

Assess in-progress or completed projects to determine whether staff knowledge is adequate for performing project tasks

Provide a mechanism for assessing the effectiveness of each training course with respect to established organizational, project, or individual learning (or performance) objectives

Obtain student evaluations of how well training activities met their needs

Integrated Project

Management (IPM)

Use the Project’s

Defined Process

Establish the Project’s Defined Process

Select a lifecycle model from the ones available in organizational process assets.

Select standard processes from the organization’s set of standard processes that best fit the needs of the project

3 - Defined

Document the project’s defined process

Integrate Plans

Integrated Project

Management (IPM)

Use the Project’s

Defined Process

Establish the Project’s Defined Process

Tailor the organization’s set of standard processes and other organizational process assets according to tailoring guidelines to produce the project’s defined process

Use other artifacts from the organization’s process asset library as appropriate

Conduct peer reviews of the project’s defined processRevise the project’s defined process as necessary

Use Organizational Process Assets

for Planning Project

Activities

Use the tasks and work products of the project’s defined process as a basis for estimating and planning project activitiesUse the organization’s measurement repository in estimating the project’s planning parameters

Establish the Project’s Work Environment

Plan, design, and install a work environment for the projectProvide ongoing maintenance and operational support for the project’s work environmentMaintain the qualification of components of the project’s work environmentPeriodically review how well the work environment is meeting project needs and supporting collaboration, and take action as appropriateIntegrate other plans that affect the project with the project plan

Incorporate into the project plan the definitions of measures and measurement activities for managing the project

Identify and analyze product and project interface risksSchedule tasks in a sequence that accounts for critical development and delivery factors and project risksIncorporate plans for performing peer reviews on work products of the project’s defined process.Incorporate the training needed to perform the project’s defined process in the project’s training plans.

3 - Defined

Integrate Plans

Establish and maintain the team structure

Establish and maintain each team

Integrated Project

Management (IPM)

Use the Project’s

Defined Process

Establish objective entry and exit criteria to authorize the initiation and completion of tasks described in the work breakdown structure (WBS)

Ensure that the project plan is appropriately compatible with the plans of relevant stakeholdersIdentify how conflicts will be resolved that arise among relevant stakeholders

Manage the Project Using

Integrated Plans

Implement the project’s defined process using the organization’s process asset library

Monitor and control the project’s activities and work products using the project’s defined process, project plan, and other plans that affect the project

Obtain and analyze selected measurements to manage the project and support organization needs

Periodically review and align the project’s performance with current and anticipated needs, objectives, and requirements of the organization, customer, and end users as appropriate

Address causes of selected issues that can affect project objectives

Establish Teams

Establish and maintain the project’s shared vision

Periodically evaluate the team structure and composition

Contribute to Organizational Process Assets

Propose improvements to the organizational process assets

Store process and product measures in the organization’s measurement repository

Submit documentation for possible inclusion in the organization’s process asset libraryDocument lessons learned from the project for inclusion in the organization’s process asset library

Provide process artifacts associated with tailoring and implementing the organization’s set of standard processes in support of the organization’s process monitoring activities

3 - Defined

Conduct reviews with relevant stakeholders

Identify each critical dependency

Identify and document issues

Resolve issues with relevant stakeholders

Track issues to closure

Determine risk sourcesDetermine risk categories

Define thresholds for each risk category

Integrated Project

Management (IPM)

Coordinate and Collaborate with

Relevant Stakeholders

Manage Stakeholder Involvement

Coordinate with relevant stakeholders who should participate in project activities

Ensure work products that are produced to satisfy commitments meet the requirements of the recipients

Develop recommendations and coordinate actions to resolve misunderstandings and problems with requirements

Manage Dependencies

Establish need dates and plan dates for each critical dependency based on the project schedule

Review and get agreement on commitments to address each critical dependency with those who are responsible for providing or receiving the work product

Document critical dependencies and commitmentsTrack the critical dependencies and commitments and take corrective action as appropriate

Resolve Coordination

Issues

Communicate issues to relevant stakeholders

Escalate to appropriate managers the issues not resolvable with relevant stakeholders

Communicate with relevant stakeholders on the status and resolution of issues

Risk Management

(RSKM)

Prepare for Risk Management

Determine Risk Sources and Categories

Define Risk Parameters

Define consistent criteria for evaluating and quantifying risk likelihood and severity levels

3 - Defined

Identify Risks

Prioritize risks for mitigation

Mitigate RisksMonitor risk status

Risk Management

(RSKM)

Prepare for Risk Management

Define Risk Parameters

Define bounds on the extent to which thresholds are applied against or within a category

Establish a Risk

Management Strategy

Establish a project risk management strategy

Identify and Analyze Risks

Identify the risks associated with cost, schedule, and performance

Review environmental elements that can affect the projectReview all elements of the work breakdown structure as part of identifying risks to help ensure that all aspects of the work effort have been considered

Review all elements of the project plan as part of identifying risks to help ensure that all aspects of the project have been consideredDocument the context, conditions, and potential consequences of each riskIdentify the relevant stakeholders associated with each risk

Evaluate, Categorize, and Prioritize Risks

Evaluate identified risks using defined risk parametersCategorize and group risks according to defined risk categories

Develop Risk Mitigation

Plans

Determine the levels and thresholds that define when a risk becomes unacceptable and triggers the execution of a risk mitigation plan or contingency plan

Identify the person or group responsible for addressing each riskDetermine the costs and benefits of implementing the risk mitigation plan for each risk

Develop an overall risk mitigation plan for the project to orchestrate the implementation of individual risk mitigation and contingency plans

Develop contingency plans for selected critical risks in the event their impacts are realized

Implement Risk Mitigation

Plans

Provide a method for tracking open risk handling action items to closure

3 - Defined

Mitigate Risks

Rank the criteria

Perform a literature search

Document proposed alternatives

Risk Management

(RSKM)

Implement Risk Mitigation

Plans

Invoke selected risk handling options when monitored risks exceed defined thresholds

Establish a schedule or period of performance for each risk handling activity that includes a start date and anticipated completion date

Provide a continued commitment of resources for each plan to allow the successful execution of risk handling activities

Collect performance measures on risk handling activities

Decision Analysis and Resolution

(DAR)

Evaluate Alternatives

Establish Guidelines for

Decision Analysis

Establish guidelines for when to use a formal evaluation processIncorporate the use of guidelines into the defined process as appropriate

Establish Evaluation

Criteria

Define the criteria for evaluating alternative solutionsDefine the range and scale for ranking the evaluation criteria

Assess the criteria and their relative importanceEvolve the evaluation criteria to improve their validityDocument the rationale for the selection and rejection of evaluation criteria

Identify Alternative Solutions

Identify alternatives for consideration in addition to the alternatives that may be provided with the issue

Select Evaluation Methods

Select methods based on the purpose for analyzing a decision and on the availability of the information used to support the method

Select evaluation methods based on their ability to focus on the issues at hand without being overly influenced by side issuesDetermine the measures needed to support the evaluation method

Evaluate Alternative Solutions

Evaluate proposed alternative solutions using the established evaluation criteria and selected methodsEvaluate assumptions related to the evaluation criteria and the evidence that supports the assumptions

3 - Defined

Document the results of the evaluation.

Revise the selection as necessary

Decision Analysis and Resolution

(DAR)

Evaluate Alternatives

Evaluate Alternative Solutions

Evaluate whether uncertainty in the values for alternative solutions affects the evaluation and address these uncertainties as appropriate

Perform simulations, modeling, prototypes, and pilots as necessary to exercise the evaluation criteria, methods, and alternative solutions

Consider new alternative solutions, criteria, or methods if proposed alternatives do not test well; repeat evaluations until alternatives do test well

Select Solutions

Assess the risks associated with implementing the recommended solutionDocument and communicate to relevant stakeholders the results and rationale for the recommended solution

4 - Quantitativ

ely Managed

Organizational Process

Performance (OPP)

Establish Performance Baselines and

Models

Establish Quality and

Process Performance Objectives

Review the organization’s business objectives related to quality and process performance

Define the organization’s quantitative objectives for quality and process performanceDefine the priorities of the organization’s objectives for quality and process performance

Review, negotiate, and obtain commitment to the organization’s quality and process performance objectives and their priorities from relevant stakeholders

Revise the organization’s quantitative objectives for quality and process performance as necessary

Select Processes

Establish the criteria to use when selecting subprocesses

Select the subprocesses and document the rationale for their selection

Establish and maintain traceability between the selected subprocesses, quality and process performance objectives, and business objectives

Revise the set of measures as necessary

4 - Quantitativ

ely Managed

Organizational Process

Performance (OPP)

Establish Performance Baselines and

Models

Establish Process

Performance Measures

Select measures that reflect appropriate attributes of the selected processes or subprocesses to provide insight into the organization’s quality and process performance

Establish operational definitions for the selected measures

Incorporate selected measures into the organization’s set of common measures

Analyze Process

Performance and Establish

Process Performance

Baselines

Collect the selected measurements for the selected processes and subprocesses

Analyze the collected measures to establish a distribution or range of results that characterize the expected performance of selected processes or subprocesses when used on a project

Establish and maintain the process performance baselines from collected measurements and analysesReview and get agreement with relevant stakeholders about the process performance baselines

Make the process performance information available across the organization in the measurement repository

Compare the process performance baselines to associated quality and process performance objectives to determine if those quality and process performance objectives are being achieved

Revise the process performance baselines as necessary

Establish Process

Performance Models

Establish process performance models based on the organization’s set of standard processes and process performance baselines

Calibrate process performance models based on the past results and current needsReview process performance models and get agreement with relevant stakeholdersSupport the projects’ use of process performance models

4 - Quantitativ

ely Managed

Organizational Process

Performance (OPP)

Establish Performance Baselines and

Models

Establish Process

Performance Models

Revise process performance models as necessary

Quantitative Project

Management (QPM)

Prepare for Quantitative Management

Establish the Project’s

Objectives

Review the organization's objectives for quality and process performance

Identify the quality and process performance needs and priorities of the customer, suppliers, end users, and other relevant stakeholders

Define and document measurable quality and process performance objectives for the projectDerive interim objectives to monitor progress toward achieving the project’s objectivesDetermine the risk of not achieving the project’s quality and process performance objectives

Resolve conflicts among the project’s quality and process performance objectives (e.g., if one objective cannot be achieved without compromising another)

Establish traceability to the project’s quality and process performance objectives from their sourcesDefine and negotiate quality and process performance objectives for suppliersRevise the project’s quality and process performance objectives as necessary

Compose the Defined Process

Establish the criteria to use in evaluating process alternatives for the projectIdentify alternative processes and subprocesses for the projectAnalyze the interaction of alternative subprocesses to understand relationships among the subprocesses, including their attributesEvaluate alternative subprocesses against the criteriaSelect the alternative subprocesses that best meet the criteriaEvaluate the risk of not achieving the project’s quality and process performance objectives

Select Subprocesses and Attributes

Analyze how subprocesses, their attributes, other factors, and project performance results relate to each other

4 - Quantitativ

ely Managed

Quantitative Project

Management (QPM)

Prepare for Quantitative Management

Select Subprocesses and Attributes

Identify criteria to be used in selecting subprocesses that are key contributors to achieving the project’s quality and process performance objectivesSelect subprocesses using the identified criteria

Identify product and process attributes to be monitored

Select Measures and

Analytic Techniques

Identify common measures from the organizational process assets that support quantitative management

Identify additional measures that may be needed to cover critical product and process attributes of the selected subprocessesIdentify the measures to be used in managing subprocessesSpecify the operational definitions of measures, their collection points in subprocesses, and how the integrity of measures will be determined

Analyze the relationship of identified measures to the project quality and process performance objectives and derive subprocess quality and process performance objectives that state targets (e.g., thresholds, ranges) to be met for each measured attribute of each selected subprocess

Identify the statistical and other quantitative techniques to be used in quantitative managementDetermine what process performance baselines and models may be needed to support identified analyses

Instrument the organizational or project support environment to support collection, derivation, and analysis of measures

Revise measures and statistical analysis techniques as necessary

Quantitatively Manage the

Project

Monitor the Performance of

Selected Subprocesses

Collect data, as defined by the selected measures, on the subprocesses as they executeMonitor the variation and stability of the selected subprocesses and address deficiencies

Identify and analyze potential actions

Implement selected actions

4 - Quantitativ

ely Managed

Quantitative Project

Management (QPM)

Quantitatively Manage the

Project

Monitor the Performance of

Selected Subprocesses

Monitor the capability and performance of the selected subprocesses and address deficiencies

Manage Project Performance

Periodically review the performance of subprocessesMonitor and analyze suppliers’ progress toward achieving their quality and process performance objectivesPeriodically review and analyze actual results achieved against established interim objectives

Use process performance models calibrated with project data to assess progress toward achieving the project’s quality and process performance objectives

Identify and manage risks associated with achieving the project’s quality and process performance objectives

Determine and implement actions needed to address deficiencies in achieving the project’s quality and process performance objectives

Perform Root Cause Analysis

Perform root cause analysis, as appropriate, to diagnose process performance deficiencies

Assess the impact of the actions on subprocess performance

5 - Optimizing

Organizational Performance Management

(OPM)

Manage Business

Performance

Maintain Business

Objectives

Evaluate business objectives periodically to ensure they are aligned with business strategies

Compare business objectives with actual process performance results to ensure they are realistic

Prioritize business objectives based on documented criteria, such as the ability to win new business, retain existing clients, or accomplish other key business strategies

Maintain quality and process performance objectives to address changes in business objectivesRevise process performance measures to align with quality and process performance objectives

Elicit suggested improvements

5 - Optimizing

Organizational Performance Management

(OPM)

Manage Business

Performance

Analyze Process

Performance Data

Periodically compare quality and process performance objectives to current process performance baselines to evaluate the ability of the organization to meet its business objectives

Identify shortfalls where the actual process performance is not satisfying the business objectivesIdentify and analyze risks associated with not meeting business objectivesReport results of the process performance and risk analyses to organizational leadership

Identify Potential Areas

for Improvement

Identify potential improvement areas based on the analysis of process performance shortfalls. Performance shortfalls include not meeting productivity, cycle time, or customer satisfaction objectives

Document the rationale for the potential improvement areas, including references to applicable business objectives and process performance data

Document anticipated costs and benefits associated with addressing potential improvement areasCommunicate the set of potential improvement areas for further evaluation, prioritization, and use

Select Improvements

Elicit Suggested

Improvements

Identify suggested improvements as incremental or innovativeInvestigate innovative improvements that may improve the organization's processes and technologies

Analyze Suggested

Improvements

Analyze the costs and benefits of suggested improvementsIdentify potential barriers and risks to deploying each suggested improvementEstimate the cost, effort, and schedule required for implementing, verifying, and deploying each suggested improvement

Select suggested improvements for validation and possible implementation and deployment based on the evaluations

Document the evaluation results of each selected improvement suggestion in an improvement proposal

Document results of the selection process

Plan the validation

Track validation against validation plans

Prioritize improvements for deploymentSelect improvements to be deployed

Document results of the selection process

Update the organizational process assets

5 - Optimizing

Organizational Performance Management

(OPM)

Select Improvements

Analyze Suggested

Improvements

Determine the detailed changes needed to implement the improvement and document them in the improvement proposal

Determine the validation method that will be used before broad-scale deployment of the change and document it in the improvement proposal

Validate Improvements

Review and get relevant stakeholder agreement on validation plansConsult with and assist those who perform the validationCreate a trial implementation, in accordance with the validation plan, for selected improvements to be piloted

Perform each validation in an environment that is similar to the environment present in a broad scale deployment

Review and document the results of validation

Select and Implement

Improvements for Deployment

Determine how to deploy each improvement

Review any changes needed to implement the improvements

Deploy Improvements

Plan the Deployment

Determine how each improvement should be adjusted for deploymentIdentify strategies that address the potential barriers to deploying each improvement that were defined in the improvement proposalsIdentify the target project population for deployment of the improvement

Establish measures and objectives for determining the value of each improvement with respect to the organization’s quality and process performance objectives

Document the plans for deploying selected improvements

Gather relevant data.

5 - Optimizing

Organizational Performance Management

(OPM)

Deploy Improvements

Plan the Deployment

Review and get agreement with relevant stakeholders on the plans for deploying selected improvementsRevise the plans for deploying selected improvements as necessary

Manage the Deployment

Monitor the deployment of improvements using deployment plansCoordinate the deployment of improvements across the organizationDeploy improvements in a controlled and disciplined mannerCoordinate the deployment of improvements into the projects’ defined processes as appropriateProvide consulting as appropriate to support deployment of improvementsProvide updated training materials or develop communication packages to reflect improvements to organizational process assets

Confirm that the deployment of all improvements is completed in accordance with the deployment planDocument and review results of improvement deployment

Evaluate Improvement

Effects

Measure the results of each improvement as implemented on the target projects, using the measures defined in the deployment plans

Measure and analyze progress toward achieving the organization’s quality and process performance objectives using statistical and other quantitative techniques and take corrective action as needed

Causal Analysis and Resolution

(CAR)

Determine Causes of Selected

Outcomes

Select Outcomes for

Analysis

Determine which outcomes to analyze further

Formally define the scope of the analysis, including a clear definition of the improvement needed or expected, stakeholders affected, target affected, etc.

Analyze Causes

Conduct causal analysis with those who are responsible for performing the task.Analyze selected outcomes to determine their root causesCombine selected outcomes into groups based on their root causes

Select action proposals to be implemented

Implement action plans

5 - Optimizing

Causal Analysis and Resolution

(CAR)

Determine Causes of Selected

Outcomes

Analyze Causes

Create an action proposal that documents actions to be taken to prevent the future occurrence of similar outcomes or to incorporate best practices into processes

Address Causes of Selected Outcomes

Implement Action

Proposals

Analyze action proposals and determine their priorities

Create action plans for implementing the selected action proposals

Look for similar causes that may exist in other processes and work products and take action as appropriate.

Evaluate the Effect of

Implemented Actions

Measure and analyze the change in process performance of the project’s affected processes or subprocessesDetermine the impact of the change on achieving the project’s quality and process performance objectives

Determine and document appropriate actions if the process or subprocess improvements did not result in expected project benefits

Record Causal Analysis Data

Record causal analysis data and make the data available so that other projects can make appropriate process changes and achieve similar results

Submit process improvement proposals for the organization when the implemented actions are effective for the project as appropriate

Work Product Concept Detailed Modular Info Map Usable EvidenceN/A N/A N/A N/A N/A N/A N/A231 100% 100% 100% 100% 100% 100%411 100% 100% 100% 100% 100% 100%66 100% 100% 100% 100% 100% 100%71 100% 100% 100% 100% 100% 100%

779 100% 100% 100% 100% 100% 100%N/A N/A N/A N/A N/A N/A N/A

1 2 4 8 16 32

1 2 4 8 16 32

Results of analyses against criteria 1 2 4 8 16 32

A set of approved requirements 1 2 4 8 16 32

Requirements impact assessments 1 2 4 8 16 32

1 2 4 8 16 32

Requirements change requests 1 2 4 8 16 32

Requirements change impact reports 1 2 4 8 16 32

Requirements status 1 2 4 8 16 32

Requirements database 1 2 4 8 16 32

Requirements traceability matrix 1 2 4 8 16 32

Requirements tracking system 1 2 4 8 16 32

Requirements traceability report 1 2 4 8 16 32

1 2 4 8 16 32

Sources of inconsistency 1 2 4 8 16 32

Capability Maturity Model Integration© for Development Version 1.3 (CMMI-DEV-V1.3©)

Lists of criteria for distinguishing appropriate requirements providers

Criteria for evaluation and acceptance of requirements

Documented commitments to requirements and requirements changes

Documentation of inconsistencies between requirements and project plans and work products, including sources and conditions

Changes to resolve inconsistencies 1 2 4 8 16 32

Corrective actions 1 2 4 8 16 32WBS 1 2 4 8 16 32

Task descriptions 1 2 4 8 16 32

Product and component list 1 2 4 8 16 32

Reusable work product list 1 2 4 8 16 32

Technical approach 1 2 4 8 16 32

Estimating models and inputs 1 2 4 8 16 32

Attribute estimates 1 2 4 8 16 32

Project lifecycle phases 1 2 4 8 16 32

Estimating models and historical data 1 2 4 8 16 32

Supporting infrastructure needs 1 2 4 8 16 32

Project effort and cost estimates 1 2 4 8 16 32

Project milestones 1 2 4 8 16 32Project assumptions 1 2 4 8 16 32Project constraints 1 2 4 8 16 32Schedule dependencies 1 2 4 8 16 32

Project budget and schedule 1 2 4 8 16 32

Corrective action criteria 1 2 4 8 16 32Identified risks 1 2 4 8 16 32

Risk impacts and probability of occurrence 1 2 4 8 16 32

Risk agreements 1 2 4 8 16 32

Revised risks 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

List of project data to be collected 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Status reports 1 2 4 8 16 32

1 2 4 8 16 32

Critical facilities and equipment list 1 2 4 8 16 32

Project administration requirements list 1 2 4 8 16 32

Inventory of skill needs 1 2 4 8 16 32

Databases (e.g., skills, training, etc.) 1 2 4 8 16 32

Training plans 1 2 4 8 16 32

Staffing and new hire plans 1 2 4 8 16 32

Stakeholder involvement plan 1 2 4 8 16 32

Overall project plan 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Renegotiated budgets 1 2 4 8 16 32Revised schedules 1 2 4 8 16 32Revised requirements list 1 2 4 8 16 32

Renegotiated stakeholder agreements 1 2 4 8 16 32

Documented requests for commitments 1 2 4 8 16 32

Privacy and security requirements and procedures

Mechanisms for data retrieval, reproduction, and distribution

Lists of data requirements for acquirers and suppliers

Version and configuration control requirements and mechanisms

Process and workflow definitions and diagrams

Staffing requirements based on project size and scope

Record of the reviews of plans that affect the project

Revised methods and corresponding estimating parameters (e.g., better tools, the use of off-the-shelf components)

Documented commitments 1 2 4 8 16 32

Record of reviewing internal commitments 1 2 4 8 16 32

Record of reviewing external commitments 1 2 4 8 16 32

Commitments regarding interfaces 1 2 4 8 16 32

Schedule performance reports 1 2 4 8 16 32

Cost performance reports 1 2 4 8 16 32

Records of project performance 1 2 4 8 16 32

Resource consumption reports 1 2 4 8 16 32

Staff knowledge and skill reports 1 2 4 8 16 32

Records of significant deviations 1 2 4 8 16 32

Records of prior commitments 1 2 4 8 16 32

Status of commitments 1 2 4 8 16 32

Records of commitment reviews 1 2 4 8 16 32

Risk management documentation 1 2 4 8 16 32

Updated risk documentation 1 2 4 8 16 32

Records of project risk monitoring 1 2 4 8 16 32

Data management activity status 1 2 4 8 16 32

Data management issues 1 2 4 8 16 32

Records of data management 1 2 4 8 16 32

Stakeholder involvement reports 1 2 4 8 16 32

Stakeholder involvement issues 1 2 4 8 16 32

Records of stakeholder involvement 1 2 4 8 16 32

1 2 4 8 16 32

Collected and analyzed measures 1 2 4 8 16 32

Issues and deviations from the plan 1 2 4 8 16 32

Documented change requests 1 2 4 8 16 32

Documented project review results 1 2 4 8 16 32

Change request and problem report status 1 2 4 8 16 32

Milestone review records 1 2 4 8 16 32

Milestone review data 1 2 4 8 16 32

Milestone issues and impacts 1 2 4 8 16 32

Documented milestone review results 1 2 4 8 16 32

Milestone action item status 1 2 4 8 16 32List of issues requiring corrective actions 1 2 4 8 16 32

Analysis of issues for corrective action 1 2 4 8 16 32

Corrective action plans 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Corrective action results 1 2 4 8 16 32

Analysis of corrective actions 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Status on assigned activities and work products

Stakeholder agreement on corrective actionsChanges to internal and external commitments

Actions for deviations from corrective actions

List of the acquisition types that will be used for all products and product components to be acquired

1 2 4 8 16 32

1 2 4 8 16 32

Supplier proposals and market studies 1 2 4 8 16 32

Supplier risks 1 2 4 8 16 32

Supplier evaluations 1 2 4 8 16 32

Preferred supplier list 1 2 4 8 16 32

Supplier requirement revisions 1 2 4 8 16 32

Requirements for customer supplied items 1 2 4 8 16 32

1 2 4 8 16 32

Records of reviewing supplier agreements 1 2 4 8 16 32

Supplier agreement commitments 1 2 4 8 16 32

Supplier agreement revisions 1 2 4 8 16 32

Project plan and commitment revisions 1 2 4 8 16 32

1 2 4 8 16 32

Supplier process performance reports 1 2 4 8 16 32

Trade study or other record of evaluation criteria, advantages and disadvantages of candidate suppliers, and rationale for selection of suppliers

List of candidate suppliers, solicitation materials, and requirements

Statements of work, contracts, memoranda of agreement, and licensing agreement

Supplier progress reports and performance measures

1 2 4 8 16 32

Records of supplier reviews 1 2 4 8 16 32

Records of technical supplier reviews 1 2 4 8 16 32

Records of management supplier reviews 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Acceptance procedures 1 2 4 8 16 32

Agreements on acceptance procedures 1 2 4 8 16 32

Results of reviewing acquired products 1 2 4 8 16 32

1 2 4 8 16 32

Acceptance reviews or test results 1 2 4 8 16 32

Corrective action plans 1 2 4 8 16 32

Discrepancy reports and action items 1 2 4 8 16 32

Transition plans 1 2 4 8 16 32

Training reports 1 2 4 8 16 32

Support and maintenance reports 1 2 4 8 16 32

Measurement objectives 1 2 4 8 16 32

Supplier review materials and reports, and product and documentation deliveries

Supplier performance improvement action plans

Risks, action items, and corrective actions tracked to closure

Results of reviewing non-technical commitments

Measurement priorities 1 2 4 8 16 32

1 2 4 8 16 32

Feedback on measurement objectives 1 2 4 8 16 32

Traceability of measurement objectives 1 2 4 8 16 32

List of candidate measures 1 2 4 8 16 32

Traceability of measures to objectives 1 2 4 8 16 32

List of existing measures 1 2 4 8 16 32

1 2 4 8 16 32

Updated measures 1 2 4 8 16 32

Existing sources of data 1 2 4 8 16 32

Measurement data not currently available 1 2 4 8 16 32

Data collection and storage procedures 1 2 4 8 16 32

Data collection mechanisms and guidance 1 2 4 8 16 32

Data collection tools 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Prioritized analyses and reports 1 2 4 8 16 32

Data analysis tools 1 2 4 8 16 32

Analysis specifications and procedures 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Results of documenting and reviewing measurement objectives

Specifications of base and derived measures

Prioritized data collection and storage proceduresUpdated measures and measurement objectives

Updated analysis and report content and reports

Updated measures and measurement objectives

Criteria for evaluating analyses 1 2 4 8 16 32

Base measurement data sets 1 2 4 8 16 32Derived measurement data sets 1 2 4 8 16 32

Results of data integrity tests 1 2 4 8 16 32

Analysis results and draft reports 1 2 4 8 16 32

1 2 4 8 16 32

Records of reviewing initial results 1 2 4 8 16 32

Refined criteria for future analyses 1 2 4 8 16 32

Data to be reviewed 1 2 4 8 16 32

Stored data inventory 1 2 4 8 16 32

Access to stored data inventory 1 2 4 8 16 32

Access controls for stored data inventory 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Criteria for evaluations 1 2 4 8 16 32

Evaluation reports 1 2 4 8 16 32

Noncompliance reports 1 2 4 8 16 32

Lessons learned and corrective actions 1 2 4 8 16 32

List of work products to be evaluated 1 2 4 8 16 32

Additional measurement and analysis results

Delivered reports and related analysis resultsContextual information or guidance to help interpret analysis results

Policy for identifying and reporting quality issues

Criteria for evaluating work products 1 2 4 8 16 32

Evaluation reports 1 2 4 8 16 32

Schedule for evaluating work products 1 2 4 8 16 32

Noncompliance reports 1 2 4 8 16 32

Lessons learned and corrective actions 1 2 4 8 16 32

Results of resolving noncompliances 1 2 4 8 16 32

List of noncompliance issues 1 2 4 8 16 32

List of unresolvable noncompliance issues 1 2 4 8 16 32

Analysis of noncompliance issues 1 2 4 8 16 32

Evaluation reports 1 2 4 8 16 32

Quality trends 1 2 4 8 16 32

Corrective action reports 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Selected configuration items 1 2 4 8 16 32

List of unique identifiers 1 2 4 8 16 32

List of important characteristics 1 2 4 8 16 32

Identified configuration items 1 2 4 8 16 32

Configuration item owner 1 2 4 8 16 32

Status reports of corrective actions and evaluation logs

Reports of quality trends and quality assurance reports

Configuration item relationships 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Change request database 1 2 4 8 16 32

Shared configuration items 1 2 4 8 16 32

Archived versions of configuration items 1 2 4 8 16 32

Configuration management records 1 2 4 8 16 32

Configuration management reports 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Baselines 1 2 4 8 16 32

Description of baselines 1 2 4 8 16 32

List of available baselines 1 2 4 8 16 32

Change requests 1 2 4 8 16 32

Impacts of changes 1 2 4 8 16 32

Categorized change requests 1 2 4 8 16 32

Reviewed change requests 1 2 4 8 16 32

Status of change requests 1 2 4 8 16 32

Revision history of configuration items 1 2 4 8 16 32

Configuration management system with controlled work products

Configuration management system access control procedures

Contents of configuration management systemRevised configuration management structure

Authorization to create and release baselines

Authorization to change configuration items 1 2 4 8 16 32

Records of access to configuration items 1 2 4 8 16 32

Results of reviewing baselines 1 2 4 8 16 32

Archives of baselines 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Latest versions of baselines 1 2 4 8 16 32

Versions of configuration items 1 2 4 8 16 32

Differences between baselines 1 2 4 8 16 32

Revision history of configuration items 1 2 4 8 16 32

Results of assessing baseline integrity 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Action items 1 2 4 8 16 32

Change request records, change log, and status of configuration items

Access list to configuration status and items

Results of confirming configuration management records

Results of confirming configuration management structure

Results of confirming configuration management completeness

Results of confirming configuration management compliance

Results of requirements elicitation activities 1 2 4 8 16 32

1 2 4 8 16 32

Prioritized customer requirements 1 2 4 8 16 32

1 2 4 8 16 32

Product requirements 1 2 4 8 16 32

Derived requirements 1 2 4 8 16 32

1 2 4 8 16 32

Relationships between requirements 1 2 4 8 16 32

Requirement allocation sheets 1 2 4 8 16 32

Product component requirements 1 2 4 8 16 32

Design constraints 1 2 4 8 16 32

1 2 4 8 16 32

Relationships among derived requirements 1 2 4 8 16 32

List of internal and external interfaces 1 2 4 8 16 32

Interface requirements 1 2 4 8 16 32

Operational concepts and scenarios 1 2 4 8 16 32

Environment in which product operates 1 2 4 8 16 32

Customer constraints on the conduct of verification

Customer constraints on the conduct of validation

Architectural requirements, which specify or constrain the relationships among product components

Requirements allocated to delivery increments

1 2 4 8 16 32

Detailed operational concept 1 2 4 8 16 32

Key mission and business drivers 1 2 4 8 16 32

Functionality and quality attributes 1 2 4 8 16 32

Architecturally significant quality attributes 1 2 4 8 16 32

Functionality required by end-users 1 2 4 8 16 32

1 2 4 8 16 32

Logical and functional partitions 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Related subjects and removed conflicts 1 2 4 8 16 32

Requirements defects reports 1 2 4 8 16 32

List of analyzed requirements 1 2 4 8 16 32

Key requirements 1 2 4 8 16 32

Technical performance measures 1 2 4 8 16 32

Results of reviewing operational concepts and scenarios

Results of analyzing functional and quality requirements

Requirements allocated to partitions, objects, people, and support elements

Requirements allocated to functions and subfunctions

1 2 4 8 16 32

1 2 4 8 16 32

Results of risk assessment 1 2 4 8 16 32

Impacts of product life cycle concept risks 1 2 4 8 16 32

1 2 4 8 16 32

Results of validating requirements 1 2 4 8 16 32

Results of exploring requirements 1 2 4 8 16 32

Record of analysis methods and results 1 2 4 8 16 32

Alternative solution screening criteria 1 2 4 8 16 32

Evaluation reports of new technologies 1 2 4 8 16 32

Evaluation reports of COTS products 1 2 4 8 16 32

Reusable solution components 1 2 4 8 16 32

Alternative solutions 1 2 4 8 16 32

Requirements allocation 1 2 4 8 16 32

Selection criteria for final selection 1 2 4 8 16 32

Proposed requirements changes to resolve defects

Results of analyzing stakeholder needs and constraints

Assessment of risks related to requirements

Evaluation of alternative solutions 1 2 4 8 16 32

Updated criteria for evaluating alternatives 1 2 4 8 16 32

1 2 4 8 16 32

Best set of alternative solutions 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Criteria for evaluating design 1 2 4 8 16 32

Design methods 1 2 4 8 16 32

Results of evaluating designs 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Views needed to document architecture 1 2 4 8 16 32

Detailed design descriptions 1 2 4 8 16 32

Technical data package 1 2 4 8 16 32

Key decisions 1 2 4 8 16 32

Revised technical data package 1 2 4 8 16 32

Identified and resolved issues for alternatives

Documented relationships between requirements and product components

Product component selection decisions and rationale

Documented solutions, evaluations, and rationale

Results of allocating design to requirementsProduct architecture and component design

Number of levels of design and documentation

Interface specification criteria 1 2 4 8 16 32

Interface control documents 1 2 4 8 16 32

External interfaces 1 2 4 8 16 32

Internal interfaces 1 2 4 8 16 32

Interface design alternatives 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Make-or-buy analyses 1 2 4 8 16 32

1 2 4 8 16 32

Implement component design 1 2 4 8 16 32

List of design standards and criteria applied 1 2 4 8 16 32

Peer reviews of component design 1 2 4 8 16 32

Unit testing of component design 1 2 4 8 16 32

Revised product component design 1 2 4 8 16 32

List of documentation requirements 1 2 4 8 16 32

Methods for developing documentation 1 2 4 8 16 32

Applicable documentation standards 1 2 4 8 16 32

1 2 4 8 16 32

Peer reviews of documentation 1 2 4 8 16 32

Interface design specifications and rationaleCriteria for design and product component reuse

Guidelines for choosing COTS product components

End-user training materials, user's manual, operator manual, maintenance manual, online help, etc.

Revised documentation 1 2 4 8 16 32

List of product components to be integrated 1 2 4 8 16 32

Verifications to be performed 1 2 4 8 16 32

1 2 4 8 16 32

Product integration strategy 1 2 4 8 16 32

Reviews of product integration strategies 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Verification procedures for environment 1 2 4 8 16 32

Decisions to make or by environment 1 2 4 8 16 32

Verified environment for product integration 1 2 4 8 16 32

1 2 4 8 16 32

Disposed environment elements 1 2 4 8 16 32

Product integration procedures 1 2 4 8 16 32

Product integration criteria 1 2 4 8 16 32

Product integration maintenance criteria 1 2 4 8 16 32

Results of reviewing interface data 1 2 4 8 16 32

Product component and interface markings 1 2 4 8 16 32

Adequacy of interface descriptions 1 2 4 8 16 32

Compatibility of interfaces 1 2 4 8 16 32

Resolution of interface issues 1 2 4 8 16 32

Alternative product component integration strategies

Rationale for selecting or rejecting alternative product integration strategiesRequirements for product integration environment

Support documentation for the product integration environment

Repository of accessible interface data 1 2 4 8 16 32

1 2 4 8 16 32

Delivery receipts 1 2 4 8 16 32

Checked packing lists 1 2 4 8 16 32

Exception reports 1 2 4 8 16 32

Checked configuration status 1 2 4 8 16 32

Results of pre-checks 1 2 4 8 16 32

1 2 4 8 16 32

Results of conducting integration 1 2 4 8 16 32

Revised product integration strategy 1 2 4 8 16 32

Exception reports 1 2 4 8 16 32

Product integration summary reports 1 2 4 8 16 32

Delivery requirements 1 2 4 8 16 32

Delivery methods 1 2 4 8 16 32

Implemented delivery methods 1 2 4 8 16 32

Operational site for installation 1 2 4 8 16 32

Delivery receipts 1 2 4 8 16 32

Installation results 1 2 4 8 16 32

1 2 4 8 16 32

Acceptance documents for the received product components

Readiness of product integration environment

Lists of work products selected for verification

Work product requirements 1 2 4 8 16 32

Verification methods available for use 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Verification environment requirements 1 2 4 8 16 32

Verification environment resources 1 2 4 8 16 32

Verification equipment and tools 1 2 4 8 16 32

Verification environment 1 2 4 8 16 32

Verification procedures 1 2 4 8 16 32

Verification criteria 1 2 4 8 16 32

Expected verification results 1 2 4 8 16 32

Verification equipment and environment 1 2 4 8 16 32

Types of peer reviews 1 2 4 8 16 32

Peer review data collection requirements 1 2 4 8 16 32

Entry and exit criteria for work products 1 2 4 8 16 32

Criteria for requiring another peer review 1 2 4 8 16 32

Peer review checklist 1 2 4 8 16 32

Peer review schedule 1 2 4 8 16 32

Peer review entry criteria 1 2 4 8 16 32

Verification methods for each selected work product

Work product verification data for project plan

Selected work products to be reviewed 1 2 4 8 16 32

Peer review roles 1 2 4 8 16 32

Peer review training material 1 2 4 8 16 32

Results of peer review roles 1 2 4 8 16 32

Peer review defects 1 2 4 8 16 32

Peer review results 1 2 4 8 16 32

Peer review data 1 2 4 8 16 32

Peer review action items and issues 1 2 4 8 16 32

Results of additional peer reviews 1 2 4 8 16 32

Results of checking peer review exit criteria 1 2 4 8 16 32

Peer review data 1 2 4 8 16 32

Peer review database 1 2 4 8 16 32

Peer review data access control 1 2 4 8 16 32

Analysis of peer review data 1 2 4 8 16 32

Demonstrations and verification results 1 2 4 8 16 32

Verification reports 1 2 4 8 16 32

Verification action items 1 2 4 8 16 32

As-run procedures log 1 2 4 8 16 32

Actual vs. expected verification results 1 2 4 8 16 32

1 2 4 8 16 32

Analysis of verification defect data 1 2 4 8 16 32

Trouble reports and change requests for verification methods, criteria, and the environment

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Validation environment requirements 1 2 4 8 16 32

Customer-supplied validation products 1 2 4 8 16 32Validation test equipment and tools 1 2 4 8 16 32

Validation resources available for use 1 2 4 8 16 32

Detailed validation environment plan 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Validation issues 1 2 4 8 16 32

Validation cross reference matrix 1 2 4 8 16 32Operational demonstrations 1 2 4 8 16 32

As-run procedures log 1 2 4 8 16 32

Analysis report (e.g., statistics on performance, causal analysis of nonconformances, comparison of the behavior between the real product and models, trends)

Actual measurements vs. technical performance parameters

Defect resolution information and corrective actions

Key validation principles, features, and phases

Categories of end-user needs to be validated

Lists of products and product components selected for validationValidation methods for each product or product component

Validation constraints for each product or product component

Review of product requirements for validation

Validation criteria and procedures and test and evaluation procedures for maintenance, training, and support

Validation results 1 2 4 8 16 32

Validation reports 1 2 4 8 16 32

Validation deficiency reports 1 2 4 8 16 32

Procedure change request 1 2 4 8 16 32

Validation issues 1 2 4 8 16 32

Records of validation results 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Relevant process standards and models 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Process appraisal sponsorship 1 2 4 8 16 32

Process appraisal scope 1 2 4 8 16 32

Process appraisal methods and criteria 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Results of validation measurement and performance

Information on how to resolve validation defects and corrective actions

Organization's policies, standards, and objectives

Organization's process performance objectivesEssential organizational process characteristicsOrganization's process needs and objectivesRevised organizational process needs and objectives

Plans for the organization’s process appraisalsAppraisal findings that address strengths and weaknesses of the organization’s processesImprovement recommendations for the organization’s processes

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Process action teams 1 2 4 8 16 32

Process action plans 1 2 4 8 16 32

Reviewed process action plans 1 2 4 8 16 32

1 2 4 8 16 32

Process action plans for stakeholders 1 2 4 8 16 32

Commitments among process action teams 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Plans for pilots 1 2 4 8 16 32

1 2 4 8 16 32

Issues from process action teams 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Analysis of candidate process improvementsPrioritized candidate process improvementsIdentification of improvements for the organization’s processesRevised list of planned process improvements

Process improvement strategies, approaches, and mechanisms

The organization’s approved process action plans

Status and results of implementing process action plans

Results of joint reviews with process action teams

Review of activities and work products from process action teams

Results of ensuring process action teams satisfy objectives

Plans for deploying organizational process assets and changes to them across the organizationDocumentation of changes to organizational process assetsTraining materials for deploying organizational process assets and changes to them

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Results of verifying process tailoring 1 2 4 8 16 32

List of updated set of standard processes 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

List of process compliance issues 1 2 4 8 16 32

1 2 4 8 16 32

Feedback on use of standard processes 1 2 4 8 16 32

Process lessons learned 1 2 4 8 16 32

Support materials for deploying organizational process assets and changes to themThe organization’s list of projects and the status of process deployment on each (i.e., existing and planned projects)

List of active projects for implementing organization's standard processes

Guidelines for deploying the organization’s set of standard processes on new projects

Records of tailoring and implementing the organization’s set of standard processes

Records of tailoring and implementing processes

Results of monitoring process implementation on projects

Status and results of process compliance audits

Results of reviewing selected process artifacts created as part of process tailoring and implementation

Results of periodic reviews of standard processes

Results of communicating lessons learned 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Process improvement proposals 1 2 4 8 16 32

1 2 4 8 16 32

Standard process elements 1 2 4 8 16 32

Standard process element attributes 1 2 4 8 16 32

Standard process element relationships 1 2 4 8 16 32

Results of verifying standard processes 1 2 4 8 16 32

Results of validating standard processes 1 2 4 8 16 32

Results of integrating standard processes 1 2 4 8 16 32

Organization’s set of standard processes 1 2 4 8 16 32

1 2 4 8 16 32

Revised standard processes 1 2 4 8 16 32

Selected lifecycle models 1 2 4 8 16 32

Descriptions of lifecycle models 1 2 4 8 16 32

Peer review results of lifecycle models 1 2 4 8 16 32

Revised descriptions of lifecycle models 1 2 4 8 16 32

Measurements of organizational process assets

Improvement recommendations for organizational process assets

Information on organizational process assets and improvements to them

Records of the organization’s process improvement activities

Results of peer reviews of standard processes

Criteria for tailoring standard processes 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Peer review results of tailoring guidelines 1 2 4 8 16 32

Revised tailoring guidelines 1 2 4 8 16 32

Organization's measurement needs 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Organization’s measurement data 1 2 4 8 16 32

Access control of measurement repository 1 2 4 8 16 32

Revised measurement repository 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Access control of process asset library 1 2 4 8 16 32

Standards for documenting defined processes

Procedures for approving standard processes

Tailoring guidelines for the organization’s set of standard processes

Definition of the common set of product and process measures for the organization’s set of standard processes

Design and implementation of the organization’s measurement repository (i.e., the repository structure, support environment)Procedures for managing organization's measures

Peer review results of measurement definitions and procedures

Design and implementation of the organization’s process asset library

Criteria for including process assets in libraryProcedures for including process assets in library

Catalog and selected items to be included in the organization’s process asset library

Review results of process asset library 1 2 4 8 16 32

Revised organization process asset library 1 2 4 8 16 32

Commercially work environment standards 1 2 4 8 16 32

Work environment standards 1 2 4 8 16 32

Empowerment mechanisms 1 2 4 8 16 32

1 2 4 8 16 32

Operating rules for teams 1 2 4 8 16 32

Analysis of organization's training needs 1 2 4 8 16 32

Strategic training needs 1 2 4 8 16 32

Needed roles and skills 1 2 4 8 16 32

Documented training for roles 1 2 4 8 16 32

Documented training needs for operations 1 2 4 8 16 32

Revised training needs 1 2 4 8 16 32

1 2 4 8 16 32

Methods for satisfying training needs 1 2 4 8 16 32

Training commitments 1 2 4 8 16 32

Organizational training tactical plan 1 2 4 8 16 32Commitments to training plan 1 2 4 8 16 32

Revised training plan 1 2 4 8 16 32

Approaches to satisfy training needs 1 2 4 8 16 32

Rules and guidelines for structuring and forming teams

Common project and support group training needs

Decision to in source or outsource training 1 2 4 8 16 32

Training materials and supporting artifacts 1 2 4 8 16 32

Identify qualified training instructors 1 2 4 8 16 32

Develop organization's training curriculum 1 2 4 8 16 32

1 2 4 8 16 32

List of personnel to receive training 1 2 4 8 16 32

Schedule for delivering training 1 2 4 8 16 32

Delivered training course 1 2 4 8 16 32

Status of training schedule 1 2 4 8 16 32

1 2 4 8 16 32

List of staff with training waivers 1 2 4 8 16 32

List of staff with completed training 1 2 4 8 16 32

Training record access control 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Training effectiveness surveys 1 2 4 8 16 32

Selected lifecycle model 1 2 4 8 16 32

Selected standard processes 1 2 4 8 16 32

Revised training materials and supporting artifacts

Updates to training records in organizational repository

Training program performance assessments

Training examinations and instructor evaluation forms

Tailor standard processes 1 2 4 8 16 32

Other standard artifacts 1 2 4 8 16 32

The project’s defined process 1 2 4 8 16 32

1 2 4 8 16 32

Revision of project's defined process 1 2 4 8 16 32

Project estimates 1 2 4 8 16 32

Project plans 1 2 4 8 16 32

Equipment and tools for the project 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Integrated plans 1 2 4 8 16 32

1 2 4 8 16 32

Product and project interface risks 1 2 4 8 16 32

1 2 4 8 16 32

Plans for performing peer reviews 1 2 4 8 16 32

1 2 4 8 16 32

Results of reviewing project's defined process

Installation, operation, and maintenance manuals for the project work environment

Support services for the project’s work environment

User surveys and results, and use performance, and maintenance records

Definitions of measures and measurement activities

Schedule tasks, delivery factors, and project risks

Training needed to perform project's defined process

1 2 4 8 16 32

1 2 4 8 16 32

Methods for resolving stakeholder conflicts 1 2 4 8 16 32

1 2 4 8 16 32

Integrated plans 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Documented shared vision 1 2 4 8 16 32

List of members assigned to each team 1 2 4 8 16 32

Team charters 1 2 4 8 16 32

Periodic team status reports 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Objective entry and exit criteria to initiate and complete tasks

Compatibility of plan with relevant stakeholders

Work products created by performing the project’s defined process

Collected measures (i.e., actuals) and status records or reports

Revised requirements, plans, and commitments

Causes of issues that affect project objectives

Proposed improvements to organizational process assets

Actual process and product measures collected from the project

Documentation (e.g., exemplary process descriptions, plans, training modules, checklists, lessons learned)

Lessons learned from using process asset library

Process artifacts associated with tailoring and implementing the organization’s set of standard processes on the project

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Critical dependencies 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Status of critical dependencies 1 2 4 8 16 32

Relevant stakeholder coordination issues 1 2 4 8 16 32

1 2 4 8 16 32

Resolved issues with relevant stakeholders 1 2 4 8 16 32

Stakeholder issues for escalation 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Risk source lists (external and internal) 1 2 4 8 16 32Risk categories list 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Agendas and schedules for collaborative activities

Documented issues (e.g., issues with stakeholder requirements, product and product component requirements, product architecture, product design)

Recommendations for resolving relevant stakeholder issues

Defects, issues, and action items resulting from reviews with relevant stakeholders

Need dates for reviewing critical dependencies

Results of agreements on critical dependencies

Commitments to address critical dependencies

Reports for communicating stakeholder issues

Status of relevant stakeholder coordination issuesReports for communicating status and issues

Risk evaluation, categorization, and prioritization criteria

Risk management requirements (e.g., control and approval levels, reassessment intervals)

1 2 4 8 16 32

Project risk management strategy 1 2 4 8 16 32

1 2 4 8 16 32

Environmental elements that affect project 1 2 4 8 16 32

1 2 4 8 16 32

Results of reviewing project plan for risks 1 2 4 8 16 32

1 2 4 8 16 32

Stakeholders associated with each risk 1 2 4 8 16 32

Evaluation of identified risks 1 2 4 8 16 32

Categorized and grouped risks 1 2 4 8 16 32

Prioritized list of risks for mitigation 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Risk mitigation plans 1 2 4 8 16 32

Contingency plans 1 2 4 8 16 32

Updated lists of risk status 1 2 4 8 16 32

Method for tracking open risks to closure 1 2 4 8 16 32

Bounds on extent to which thresholds are applied

List of identified risks, including the context, conditions, and consequences of risk occurrence

Results of reviewing work breakdown structure

Context, conditions, and consequences of risks

Documented handling options for each identified risk

List of those who are responsible for tracking and addressing each risk

Costs and benefits of implementing risk mitigation plan

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Records verifying use of defined process 1 2 4 8 16 32

Documented evaluation criteria 1 2 4 8 16 32

1 2 4 8 16 32

Rankings of criteria importance 1 2 4 8 16 32

1 2 4 8 16 32

Changes to evaluation criteria 1 2 4 8 16 32

Rationale for selection of evaluation criteria 1 2 4 8 16 32

Results of searching for alternatives 1 2 4 8 16 32

Identified alternatives for consideration 1 2 4 8 16 32

Proposed alternatives 1 2 4 8 16 32

1 2 4 8 16 32

Selected methods based on issues at hand 1 2 4 8 16 32

Measures to support evaluation method 1 2 4 8 16 32

Proposed alternative solutions 1 2 4 8 16 32

Assumptions related to evaluation criteria 1 2 4 8 16 32

Updated list of risk handling options and actions

Risk mitigation plans of risk handling options

Resources for risk handling activities such as updating assessments of risk likelihood, consequence, and thresholds

Performance measures on risk handling activitiesGuidelines for when to apply a formal evaluation process

Range and scale of rankings for evaluation criteria

Results of assessing criteria and their importance

Selected methods based on information available

1 2 4 8 16 32

1 2 4 8 16 32

New alternative solutions 1 2 4 8 16 32

Evaluation results 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Organization's business objectives 1 2 4 8 16 32

Organization's quantitative objectives 1 2 4 8 16 32

Organization's prioritized objectives 1 2 4 8 16 32

Commitment to organization's objectives 1 2 4 8 16 32

1 2 4 8 16 32

Criteria for selecting subprocesses 1 2 4 8 16 32

1 2 4 8 16 32

Traceability between subprocesses 1 2 4 8 16 32

1 2 4 8 16 32

Impact of uncertainty on alternative solutions

Simulation, modeling, prototyping, and pilot results

Risks of implementing recommended solutions

Recommended solutions to address significant issues

Organization’s quality and process performance objectives

List of processes or subprocesses identified for process performance analyses with rationale for their selection including traceability to business objectives

Revised list of processes and subprocesses

Selected measures of process performance 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Revised measures of process performance 1 2 4 8 16 32

Collection of selected measurements 1 2 4 8 16 32

Analysis of process performance data 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Revised process performance baselines 1 2 4 8 16 32

Process performance models 1 2 4 8 16 32

Calibrated process performance models 1 2 4 8 16 32

Reviewed process performance models 1 2 4 8 16 32

1 2 4 8 16 32

Definitions of selected measures of process performance with rationale for their selection including traceability to selected processes or subprocesses Incorporated measures of process performance

Baseline data on the organization’s process performance

Agreements on process performance baseline

Communicate process performance information

Compare actual vs. expected process performance baselines

Support to projects' use of process performance models

Revised process performance models 1 2 4 8 16 32

1 2 4 8 16 32

Quality and process performance needs 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Alternative processes and subprocesses 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Analysis of how subprocesses interact 1 2 4 8 16 32

Objectives for quality and process performance

Measurable quality and process performance objectives

Interim quality and process performance objectives

Quality and process performance objective risks

Quality and process performance objective conflicts

Quality and process performance objective traceability

Supplier quality and process performance objectivesRevised quality and process performance objectivesCriteria used to evaluate alternatives for the project

Interactions between alternative processes and subprocesses

Evaluations of alternative processes and subprocessesSubprocesses to be included in the project’s defined process

Assessment of risk of not achieving the project’s objectives

1 2 4 8 16 32

Selected subprocesses 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Criteria used to select subprocesses that are key contributors to achieving the project’s objectives

Attributes of selected subprocesses that help in predicting future project performance

Common measures for quantitative management

Additional measures for quantitative management

Selected measures for quantitative management

Definitions of measures and analytic techniques to be used in quantitative management

Traceability of measures back to the project’s quality and process performance objectives

Statistical techniques for quantitative management

Process performance baselines and models for use by the project

Instrumented environment for quantitative management

Revised measures and statistical analysis techniques

Measurement data from subprocess execution

Natural bounds of process performance for each selected subprocess attribute

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Review and analysis of actual performance 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Results of implementing actions 1 2 4 8 16 32

1 2 4 8 16 32

Results of evaluating business objectives 1 2 4 8 16 32

1 2 4 8 16 32

Prioritized business objectives 1 2 4 8 16 32

1 2 4 8 16 32

Updated process performance measures 1 2 4 8 16 32

The actions needed to address deficiencies in the process stability or capability of each selected subprocessResults of reviewing subprocess performanceGraphical displays and data tabulations for other subprocesses, which support quantitative management

Predictions of results to be achieved relative to the project’s quality and process performance objectives

Assessment of risks of not achieving the project’s quality and process performance objectives

Actions needed to address deficiencies in achieving project objectives

Graphical displays of data used to understand subprocess and project performance and performance trendsIdentified root causes and potential actions to take

Subprocess and project performance measurements and analyses (including statistical analyses) recorded in the organization’s measurement repository

Comparison of business objectives with actual process performance results

Quality and process performance objectives

1 2 4 8 16 32

Process performance shortfalls 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Potential areas for improvement 1 2 4 8 16 32

Rationale for potential improvement areas 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Suggested improvement proposals 1 2 4 8 16 32

Incremental and innovative improvements 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Selected improvements to be validated 1 2 4 8 16 32

1 2 4 8 16 32

Analysis of current capability vs. business objectives

Risks associated with meeting business objectives

Results of reporting process performance and risk analyses

Costs and benefits of potential improvement areas

Results of communicating potential improvement areas

Results of investigating innovative improvements

Costs and benefits of suggested improvementsBarriers and risks to suggested improvements

Cost, effort, and schedule of suggested improvements

Results of evaluating suggested improvements

1 2 4 8 16 32

1 2 4 8 16 32

Results of the selection process 1 2 4 8 16 32

Validation plans 1 2 4 8 16 32

Stakeholder agreement on validation plans 1 2 4 8 16 32

1 2 4 8 16 32

Results of trial implementation 1 2 4 8 16 32

1 2 4 8 16 32

Results of tracking validation activities 1 2 4 8 16 32

Validation evaluation reports 1 2 4 8 16 32

Prioritized improvements for deployment 1 2 4 8 16 32Improvements selected for deployment 1 2 4 8 16 32

Methods for deploying each improvement 1 2 4 8 16 32

Results of selecting improvements 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Methods for adjusting deployments 1 2 4 8 16 32

1 2 4 8 16 32

Target population for deployment 1 2 4 8 16 32

Measures and objectives for deployments 1 2 4 8 16 32

1 2 4 8 16 32

Detailed changes for suggested improvements

Validation method for suggested improvements

Results of consulting and assisting with validation

Documented lessons learned from validation

Results of reviewing suggested improvementsUpdated process documentation and training

Strategies for addressing deployment barriers

Deployment plans for selected improvements

Agreements on deployment plans 1 2 4 8 16 32

Revisions to deployment plans 1 2 4 8 16 32

Results of monitoring deployment plans 1 2 4 8 16 32

Results of coordinating improvements 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Data to be used in the initial analysis 1 2 4 8 16 32

Outcomes selected for further analysis 1 2 4 8 16 32

Scope of the analysis 1 2 4 8 16 32

Root cause analysis results 1 2 4 8 16 32

Analysis of selected outcomes 1 2 4 8 16 32

Combined and grouped outcomes 1 2 4 8 16 32

Results of deploying controlled and disciplined improvements

Results of deploying improvements into projects' defined process

Results of consulting on deployed improvements

Updated training materials (to reflect deployed improvements)

Results of confirming deployed improvements

Documented results of improvement deployment activities

Documented measures of the effects resulting from deployed improvements

Results of measuring progress towards organization's quality and process performance objectives

Action proposal 1 2 4 8 16 32

Analysis of action proposals and priorities 1 2 4 8 16 32

1 2 4 8 16 32

Action plans 1 2 4 8 16 32

Results of implementing action plans 1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

1 2 4 8 16 32

Causal analysis and resolution records 1 2 4 8 16 32

Organizational improvement proposals 1 2 4 8 16 32

Action proposals selected for implementation

Analysis and actions as a result of similar causes from other processes and work products

Analysis of process performance and change in process performance

Impact of changes to achieve quality and process performance objectives

Actions if process and subprocess improvements do not work

TotalN/A

100%100%100%100%100%N/A

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

©)

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%100%100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%


Recommended