+ All Categories
Home > Technology > Filming Updates

Filming Updates

Date post: 25-Jul-2015
Category:
Upload: anisa-ganie
View: 115 times
Download: 0 times
Share this document with a friend
Popular Tags:
4
Regular Filming Updates
Transcript
Page 1: Filming Updates

Regular Filming Updates

Page 2: Filming Updates

Early start on a Monday morning! 7am! Our filming begins at Greenwich with scenes of Matthew Singing to Anisa. A nice sunny morning helped! We also done our shooting at canary wharf that morning. Went very well and got very good shots of the ‘couple’ running across the bridge and him singing to her by the vertical fountain. Although some of us {Matthew} had a good nap on the tube

Page 3: Filming Updates

Filming at Embankment was actually Magical! A great atmosphere at night and especially with the lights of London everywhere! Got some very good shots by Big Ben, But lighting was an issue and our camera didn't seem very well equipped for the lack of lighting! We tried our best though and had a good Sunday evening!

Page 4: Filming Updates

Getting ready to shoot come of the local scenes such as Anisa walking past Matthew for the first time and her giving him her number. Red Lipstick!!.. To keep in order with our motif of the colour red.


Recommended