Final 2019 Federal Transportation Improvement Program 100% Prior Years San Bernardino County Project Listing Local Highway, State Highway, Transit (in $000`s) ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment 20150003 San Bernardino MDAB REG0703 CAY76 L NON-EXEMPT 0 Description: PTC 14,129 Agency APPLE VALLEY IN APPLE VALLEY: YUCCA LOMA ROAD FROM EASTERN TERMINUS OF YUCCA LOMA BRIDGE TO APPLE VALLEY ROAD; WIDEN 2-4 LANES (INCLUDES APPLE VALLEY SAFE ROUTES TO SCHOOL ATP CYCLE 1 PROJECT 0540). THIS PROJECT IS THE EASTERN PHASE OF THE YUCCA LOMA BRIDGE/INTERSTATE 15 CONGESTION RELIEF PROJECT. (No scope change) Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 Total Section 125 - Surface Transportation Priorities 750 750 750 750 AGENCY 3,450 3,450 3,450 3,450 CITY FUNDS 740 100 4,397 5,237 5,237 5,237 SBD CO MEASURE I 3,597 3,597 3,597 3,597 ACTIVE TRANSPORTATION PROGRAM 1,095 1,095 1,095 1,095 20150003 Total 740 100 13,289 14,129 14,129 14,129 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment 20170802 San Bernardino MDAB SBDLS08 NCR36 L EXEMPT - 93.126 0 Description: PTC 2,591 Agency BARSTOW IN BARSTOW: N. 1ST AVENUE OVER BNSF RAILWAY UP RR AMTRAK 0.2 MI N. MAIN STREET (BRIDGE NO 54C0088) REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE. EXISTING BRIDGE TO BE REMOVED. Toll Credits to match EARREPU funds. Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 Total 2016 EARMARK REPURPOSING 2,591 2,591 2,591 2,591 20170802 Total 2,591 2,591 2,591 2,591 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment 200207 San Bernardino SCAB 200207 CAX66 L NON-EXEMPT 0 Description: PTC 25,000 Agency CHINO New roadway connection (0-4 lanes) from El Prado to SR71 and widening Pine Avenue from 2 to 4 lanes from El Prado to Euclid Avenue. Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 Total DEMO-SAFETEA-LU 2,560 4,300 6,860 6,860 6,860 DEVELOPER FEES 1,440 16,700 18,140 18,140 18,140 200207 Total 4,000 21,000 25,000 25,000 25,000 Print Date: 8/13/2018 11:28:21 AM Page: 1 of 15 NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose
Transcript
Page 1: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150003 San Bernardino MDAB REG0703 CAY76 L NON-EXEMPT 0

Description: PTC 14,129 Agency APPLE VALLEY

IN APPLE VALLEY: YUCCA LOMA ROAD FROM EASTERN TERMINUS OF YUCCA LOMA BRIDGE TO APPLE VALLEY ROAD; WIDEN 2-4 LANES (INCLUDES APPLE VALLEY SAFE ROUTES TO SCHOOL ATP CYCLE 1 PROJECT 0540). THIS PROJECT IS THE EASTERN PHASE OF THE YUCCA LOMA BRIDGE/INTERSTATE 15 CONGESTION RELIEF PROJECT. (No scope change)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSection 125 - Surface Transportation Priorities

750 750 750 750

AGENCY 3,450 3,450 3,450 3,450CITY FUNDS 740 100 4,397 5,237 5,237 5,237SBD CO MEASURE I 3,597 3,597 3,597 3,597ACTIVE TRANSPORTATION PROGRAM

1,095 1,095 1,095 1,095

20150003 Total 740 100 13,289 14,129 14,129 14,129

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20170802 San Bernardino MDAB SBDLS08 NCR36 L EXEMPT - 93.126 0

Description: PTC 2,591 Agency BARSTOW

IN BARSTOW: N. 1ST AVENUE OVER BNSF RAILWAY UP RR AMTRAK 0.2 MI N. MAIN STREET (BRIDGE NO 54C0088) REPLACE EXISTING 2 LANE BRIDGE WITH 2 LANE BRIDGE. EXISTING BRIDGE TO BE REMOVED. Toll Credits to match EARREPU funds.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 Total2016 EARMARK REPURPOSING 2,591 2,591 2,591 2,59120170802 Total 2,591 2,591 2,591 2,591

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200207 San Bernardino SCAB 200207 CAX66 L NON-EXEMPT 0

Description: PTC 25,000 Agency CHINO

New roadway connection (0-4 lanes) from El Prado to SR71 and widening Pine Avenue from 2 to 4 lanes from El Prado to Euclid Avenue.

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEMO-SAFETEA-LU 2,560 4,300 6,860 6,860 6,860DEVELOPER FEES 1,440 16,700 18,140 18,140 18,140200207 Total 4,000 21,000 25,000 25,000 25,000

Print Date: 8/13/2018 11:28:21 AM Page: 1 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 2: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150901 San Bernardino SCAB REG0701 NCR30 L EXEMPT - 93.126 0

Description: PTC 886 Agency CHINO

IN THE CITY OF CHINO: MONTE VISTA AVE & UPRR INTERSECTION - ELIMINATE SAFETY HAZARDS; CONSTRUCT RAISED MEDIAN, INSTALLATION OF PEDESTRIAN SIDEWALK BARRICADE, CONCRETE PANEL SURFACING, FLASHING LIGHT SIGNAL WITH AUTOMATIC GATES.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSECTION 330 782 782 782 782CITY FUNDS 104 104 104 10420150901 Total 886 886 886 886

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment201157 San Bernardino SCAB 4A07106 CAX66 L NON-EXEMPT 0

Description: PTC 469 Agency COLTON

WASHINGTON ST. FROM 0.90 MILES WEST OF MT. VERNON AVE TO LA CADENA CONSTRUCT NEW 4 LANE ROADWAY (PA&ED ONLY)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEMO-SAFETEA-LU 375 375 375 375SBD CO MEASURE I 94 94 94 94201157 Total 469 469 469 469

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20170805 San Bernardino SCAB 4120116 CAY66 L NON-EXEMPT 0

Description: PTC 450 Agency COLTON

REALIGN RECHE CANYON ROAD TO HUNTS LANE/WASHINGTON STREET. CONSTRUCT NEW FOUR (4) LANE ROAD WITH TOTAL LENGTH OF 0.30 MILE. Toll credits to match EARREPU. (PA&ED ONLY)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 Total2016 EARMARK REPURPOSING 360 360 360 360CITY FUNDS 90 90 90 9020170805 Total 450 450 450 450

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150005 San Bernardino SCAB 200006 CAY76 L NON-EXEMPT 0

Description: PTC 6,365 Agency FONTANA

CITRUS AVENUE FROM JURUPA TO SLOVER - WIDEN FROM 2-4 LANES W/LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE & JURUPA-3 INTERSECTIONS)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 63 133 1,843 2,039 2,039 2,039SBD CO MEASURE I 135 283 3,908 4,326 4,326 4,32620150005 Total 198 416 5,751 6,365 6,365 6,365

Print Date: 8/13/2018 11:28:22 AM Page: 2 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 3: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20130306 San Bernardino SCAB REG0704 LUM06 L EXEMPT - 93.126 0

Description: PTC 42 Agency HIGHLAND

CITY CREEK LEVEE TRAILS - CONSTRUCT NON-MOTORIZED TRAILS ALONG THE EASTERLY AND WESTERLY CITY CREEK FLOOD CONTROL LEVEES BETWEEN HIGHLAND AVE AND BASE LINEFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalRECREATIONAL TRAILS 11 26 37 37 37CITY FUNDS 5 5 5 520130306 Total 11 31 42 42 42

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentSBD031294 San Bernardino SCAB SBD031294 NCRH1 L EXEMPT - 93.127 0

Description: PTC 6,000 Agency LOMA LINDA

REDLANDS BOULEVARD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE AND CURB AND GUTTERS

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 90 1,000 1,090 1,090 1,090SBD CO MEASURE I 100 100 100 100SBD031294 Total 90 1,100 1,190 1,190 1,190

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20112007 San Bernardino MDAB 4A0801 NCR91 L EXEMPT - 93.126 0

Description: PTC 5,521 Agency NEEDLES

I-40 NEEDLES CONNECTOR: RDWAY/SIDEWALK IMPRVMTS ALONG 6,300FT: J ST FROM I-40 OFF/RMPS TO W BROADWAY; W BROADWAY FROM J ST TO NEEDLES HWY; NEEDLES HWY FROM W BROADWAY TO N K ST; N K ST TO S/ABUTMENT OF CO RIVR BRDGE INTRSCT IMPRVMTS AT J ST/W BROADWAY, W BROADWAY/NEEDLES HWY, NEEDLES HWY/N K ST W/ INCL TRAFFIC SIGS, TURN LNS, STRIPING/SIGNAGE/SIDEWALK(Toll Credits; STPL14/15 $277, CBIP14/15 $190)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalFHWA CORRIDORS AND BORDERS PROGRAM

1,505 461 947 2,913 2,913 2,913

STP LOCAL 1,980 1,980 1,980 1,980CITY FUNDS 350 60 218 628 628 62820112007 Total 1,855 521 3,145 5,521 5,521 5,521

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150109 San Bernardino SCAB 7120004 NCR25 L TCM 0

Description: PTC 8,603 Agency OMNITRANS

PEDESTRIAN & BICYCLE ACCESS IMPROVEMENTS WITHIN 1/2 MILE OF RAPID TRANSIT STATIONS, INCLUDING SIDEWALK AND CURB RAMP REPLACEMENT & BIKE PARKING AT STATIONS (Termini at Pomona Downtown Metrolink Station & Kaiser Medical Center Fontana, following Holt Ave/Blvd, Archibald Ave, Milliken Ave, Foothill Blvd, & Sierra Ave).Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalLOCAL TRANS FUNDS 765 4,338 5,103 5,103 5,103

Print Date: 8/13/2018 11:28:22 AM Page: 3 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 4: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ACTIVE TRANSPORTATION PROGRAM

525 2,975 3,500 3,500 3,500

20150109 Total 1,290 7,313 8,603 8,603 8,603

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200405 San Bernardino SCAB 200405 NCN31 L EXEMPT - 93.126 0

Description: PTC 81,986 Agency ONTARIO

S. MILLIKEN AVE. GRADE SEPARATION - ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT RR-REALIGNMENT OF STS TO MEET O/CROSSING & INTERSTN IMPROVMTSFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEVELOPER FEES 1,199 1,044 16,855 19,098 19,098 19,098PRIVATE FUNDS 2,482 2,482 2,482 2,482SBD CO MEASURE I 4,296 4,177 16,510 24,983 24,983 24,983STATE LOCAL PARTNER 7,210 7,210 7,210 7,210TRADE CORRIDOR PROGRAM 28,213 28,213 28,213 28,213200405 Total 5,495 5,221 71,270 81,986 81,986 81,986

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200805 San Bernardino SCAB 4GL04 NCN31 L EXEMPT - 93.126 0

Description: PTC 55,195 Agency ONTARIO

NORTH VINEYARD AVE. GRADE SEPARATION - BETWEEN HOLT BLVD AND AIRPORT DR. BUILDING RR BRIDGE FLYOVER-NO LANES ADDED TO ARTERIALS. THE GRADE SEP. IS AT THE UP RR ALHAMBRA LINEFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEVELOPER FEES 859 120 9,745 10,724 10,724 10,724PRIVATE FUNDS 2,074 2,074 2,074 2,074SBD CO MEASURE I 2,936 480 19,491 22,907 22,907 22,907STATE LOCAL PARTNER 19,490 19,490 19,490 19,490200805 Total 3,795 600 50,800 55,195 55,195 55,195

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150009 San Bernardino MDAB 4G0167 CAX76 L NON-EXEMPT 0

Description: PTC 3,145 Agency SAN BERNARDINO COUNTY

SHADOW MT RD FROM HELENDALE RD EAST TO NTH; CONSTRUCT AND EXTEND FROM 2-4 LNS - INCLUDING 4 LANE BRIDGE OVER MOJAVE RIVER & GRADE SEP OVER RAIL TRACKS WITH ADDITIONAL CONNECT TO VISTA RD ON W SIDE OF TRACKS (PA&ED ONLY)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSTP LOCAL 1 1 1 1DEVELOPER FEES 884 884 884 884SBD CO MEASURE I 2,260 2,260 2,260 2,26020150009 Total 3,145 3,145 3,145 3,145

Print Date: 8/13/2018 11:28:22 AM Page: 4 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 5: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150102 San Bernardino MDAB 7120004 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,834 Agency SAN BERNARDINO COUNTY

PAVEMENT PRESERVATION/REHABILITATION MORONGO BASIN-JOSHUA TREE AREA ROADS: YUCCA TRAIL, ALTA LOMA DR, QUAIL SPRINGS RD, ABERDEEN DR (Project will use Toll Credits for STPL funds).Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSTP LOCAL 66 1,768 1,834 1,834 1,83420150102 Total 66 1,768 1,834 1,834 1,834

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150701 San Bernardino MDAB SBD031426 NCRH4 L EXEMPT - 93.127 0

Description: PTC 4,651 Agency SAN BERNARDINO COUNTY

SEGMENT 1A: NEEDLES HIGHWAY FROM 600 FT NORTH OF BALBOA PLACE, TO 500 FT SOUTH OF PARK ROAD; REALIGN AND REPROFILING ROADWAY. (Remains 1 lane each direction)(Segment of project SBD031426)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalPUBLIC LAND HWYS 4,651 4,651 4,651 4,65120150701 Total 4,651 4,651 4,651 4,651

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200622 San Bernardino MDAB 200622 CAX61 L NON-EXEMPT 0

Description: PTC 31,590 Agency SANBAG

LENWOOD GRADE SEPARATION - NORTH OF WEST MAIN ST; APPROX.400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF-WAY-4 TRAVEL LANE GRADE SEPARATION (CA627)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalFFY 2009 Appropriations Earmarks 238 238 238 238DEMO-SAFETEA-LU 1,080 1,080 1,080 1,080STP LOCAL 2,547 9,786 12,333 12,333 12,333CITY FUNDS 974 556 465 1,995 1,995 1,995COUNTY 2,500 2,500 2,500 2,500PRIVATE FUNDS 1,036 1,036 1,036 1,036SBD CO MEASURE I 935 457 2,161 3,553 3,553 3,553TRADE CORRIDOR PROGRAM 8,855 8,855 8,855 8,855200622 Total 4,409 3,560 23,621 31,590 31,590 31,590

Print Date: 8/13/2018 11:28:22 AM Page: 5 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 6: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150108 San Bernardino SCAB 7120004 NCN25 L TCM Committed 0

Description: PTC 4,679 Agency SANBAG

BICYLE AND PEDESTRIAN ACCESSIBILITY IMPROVEMENTS ALONG SIX METROLINK TRANSIT STATIONS (Montclair, Upland, Rancho Cucamonga, Fontana, Rialto, and San Bernardino) PHASE I. (Toll Credit to match ATP in all phases)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalACTIVE TRANSPORTATION PROGRAM

576 4,103 4,679 4,679 4,679

20150108 Total 576 4,103 4,679 4,679 4,679

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20010135 San Bernardino SCAB RRC0702 NCN31 L EXEMPT - 93.126 0

Description: PTC 31,325 Agency VARIOUS AGENCIES

MONTE VISTA AVENUE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION PART OF ALAMEDA CORRIDOR GRADE SEPARATION PROJECTS FUNDED WITH TCRP #55.1(CA552)(Toll Credits: DEMO FY14/15, PNRS FY15/16)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEMO-SAFETEA-LU 1,440 1,440 1,440 1,440PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE

15,699 15,699 15,699 15,699

CITY FUNDS 700 1,752 2,452 2,452 2,452PRIVATE FUNDS 2,500 1,076 3,576 3,576 3,576SBD CO MEASURE I 1,045 1,045 1,045 1,045SECTION 190 GRADE SEPARATION PROGRAM

5,000 5,000 5,000 5,000

TRADE CORRIDOR PROGRAM 2,113 2,113 2,113 2,11320010135 Total 4,640 26,685 31,325 31,325 31,325

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20131103 San Bernardino MDAB REG0704 LUM06 L EXEMPT - 93.126 0

Description: PTC 953 Agency VARIOUS AGENCIES

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES FUNDED BY RECREATIONAL TRAILS PROGRAM: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalRECREATIONAL TRAILS 817 817 817 817AGENCY 136 136 136 13620131103 Total 953 953 953 953

Print Date: 8/13/2018 11:28:22 AM Page: 6 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 7: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20151503 San Bernardino SCAB 7120004 NCR25 L EXEMPT - 93.126 0

Description: PTC 5,076 Agency VARIOUS AGENCIES

Grouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (MPO - Non SRTS): Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (both motorized and Non-motorized). Toll credits to match ATP.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 1,015 1,015 1,015 1,015ACTIVE TRANSPORTATION PROGRAM

4,061 4,061 4,061 4,061

20151503 Total 5,076 5,076 5,076 5,076

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20151504 San Bernardino SCAB 7120004 NCR25 L EXEMPT - 93.126 0

Description: PTC 4,980 Agency VARIOUS AGENCIES

Grouped Prjcts for Sfty Imprvmnts (MPO - SRTS): Projects consistent with 40 CFR Part 93.126 Exempt Tables 2/3 categories - railroad/highway crossing, safer non-Fed-aid system rds, shlder imprvmnts, traffic control devices and op. assistance other than signalization projects, Intersection signalization projects at individual intersections, pavement marking demo. Tolls credit to match ATP.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 264 264 264 264ACTIVE TRANSPORTATION PROGRAM

4,716 4,716 4,716 4,716

20151504 Total 4,980 4,980 4,980 4,980

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20170101 San Bernardino MDAB REG0704 LUM06 L EXEMPT - 93.126 0

Description: PTC 876 Agency VARIOUS AGENCIES

Grouped Projects for Purchase of office, shop, and operating equipment for existing facilities funded by the Recreational Trails Program: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Purchase of office, shop, and operating equipment for existing facilities (Both motorized and non-motorized)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalRECREATIONAL TRAILS 771 771 771 771AGENCY 105 105 105 10520170101 Total 876 876 876 876

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20131101 San Bernardino MDAB REG0704 NCN25 L EXEMPT - 93.126 0

Description: PTC 5,783 Agency VICTORVILLE

IN THE CITY OF VICTORVILLE - MOJAVE RIVERWALK: CONSTRUCT A 9.5 MILE (CLASS I, II, III) BIKE AND PED PATH CONNECTING THE VICTOR VALLEY TRANSPORTATION CENTER (6TH ST), MOJAVE NARROWS REGIONAL PARK (YATES RD) AND VICTOR VALLEY COLLEGE (BEAR VALLEY RD).Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 583 50 910 1,543 1,543 1,543COUNTY 75 75 75 75

Print Date: 8/13/2018 11:28:22 AM Page: 7 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 8: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

LOCAL TRANS FUNDS 150 150 150 150TDA ARTICLE #3 75 180 255 255 255ACTIVE TRANSPORTATION PROGRAM

3,760 3,760 3,760 3,760

20131101 Total 883 50 4,850 5,783 5,783 5,783

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20151505 San Bernardino SCAB 4A07248 CAX63 L NON-EXEMPT 0

Description: PTC 2,338 Agency YUCAIPA

Avenue E Improvements: Widen Avenue E, 2-4 lanes, from 5th St to 4th St. Install Roundabouts along Ave E at 5th, 4th, 3rd, 2nd, and Byrant St.. Install Roundabout at Yucaipa Blvd & Bryant St. (Phased Project)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 280 280 280 280DEVELOPER FEES 300 692 992 992 992SBD CO MEASURE I 1,066 1,066 1,066 1,06620151505 Total 280 300 1,758 2,338 2,338 2,338

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20130102 San Bernardino SCAB SBD41339 CARH3 10 20.1 22 S NON-EXEMPT 0

Description: PTC 10,111 Agency SANBAG

REPLACE PEPPER AVENUE BRIDGE STRUCTURE OVER I-10 WIDEN FROM 3-5 LANES TO PROVIDE FOR ONE ADDITIONAL THROUGH LANE, ONE ADDITIONAL SOUTHBOUND TURN LANE AND CONSTRUCT MINOR RAMP IMPROVEMENTS, MINOR ARTERIAL STREET IMPROVEMENTS, AND ANCILLARY IMPROVEMENTS. (Toll Credits: FY14/15 CON; DEMO & IMD)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEMO - TEA 21 64 6,128 6,192 6,192 6,192INTERSTATE MAINTENANCE DISCRETIONARY

904 904 904 904

DEVELOPER FEES 190 597 787 787 787PRIVATE FUNDS 700 700 700 700SBD CO MEASURE I 370 370 370 370TRADE CORRIDOR PROGRAM 1,158 1,158 1,158 1,15820130102 Total 624 9,487 10,111 10,111 10,111

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment44812 San Bernardino SCAB 44810 CARH3 10 26 27.3 S NON-EXEMPT 0

Description: PTC 57,358 Agency SANBAG

I-10 TIPPECANOE RECONFIGURE INTERCHANGE & LOCAL RD IMP/MOD (HP 1366)(WESTBOUND - PHASE II)(FORMERLY PART OF RTP ID 44810)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEMO-SAFETEA-LU 5,517 6,001 11,518 11,518 11,518DEMO - TEA 21 515 5,818 457 6,790 6,790 6,790INTERSTATE MAINT. HR4818 2,108 2,108 2,108 2,108SECTION 115 2,999 2,999 2,999 2,999

Print Date: 8/13/2018 11:28:22 AM Page: 8 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 9: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

SECTION 117 4,914 4,914 4,914 4,914SECTION 330 1,490 1,490 2,980 2,980 2,980CITY FUNDS 6,855 622 7,477 7,477 7,477LOCAL ADVANCE CONSTRUCTIONSBD CO MEASURE I 4,674 1,931 276 6,881 6,881 6,881NATIONAL HWY SYSTEM - IIP 3,000 3,000 3,000 3,000TRADE CORRIDOR PROGRAM 8,691 8,691 8,691 8,69144812 Total 5,189 34,632 17,537 57,358 57,358 57,358

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20131504 San Bernardino SCAB 4M07003 NCRH1 10 31.02 31.92 S EXEMPT - 93.127 0

Description: PTC 5,100 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY

I-10 @ University St Interchange: Intersection improvements with on/off ramp widening. (No Capacity enhancements)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalDEVELOPER FEES 79 47 788 914 914 914SBD CO MEASURE I 361 213 3,612 4,186 4,186 4,18620131504 Total 440 260 4,400 5,100 5,100 5,100

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200048 San Bernardino SCAB 200048 CARH3 15 6.3 7.1 S NON-EXEMPT 0

Description: PTC 57,504 Agency RANCHO CUCAMONGA

I-15 AT BASELINE INTERCHANGE - FROM 1,800 N/O BASELINE TO 2,400FT S/O; 1800FT w/o EAST AVE. TO 1500FT E/O EAST AVE-WIDEN RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LNS, WIDEN EAST AVE. FROM 2-4 LNS, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDG BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LNS, AND OPERATIONAL IMPRVMNTS (EA497100)(CA435)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalBRIDGE DISCRETIONARY - REPLACEMENT/REHABILITATION

428 428 428 428

DEMO-SAFETEA-LU 3,600 3,600 3,600 3,600INTERSTATE MAINT. DISCRETIONARY - H.R. 2764

752 752 752 752

INTERSTATE MAINT. HR4818 3,002 3,002 3,002 3,002DEVELOPER FEES 2,398 6,723 18,747 27,868 27,868 27,868SBD CO MEASURE I 477 18,147 18,624 18,624 18,624STATE LOCAL PARTNER 2,230 1,000 3,230 3,230 3,230200048 Total 5,808 7,200 44,496 57,504 57,504 57,504

Print Date: 8/13/2018 11:28:22 AM Page: 9 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 10: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20061201 San Bernardino SCAB 20061201 NCRH3 15 14 16.4 S NON-EXEMPT 0

Description: PTC 324,669 Agency CALTRANS

I-15/I-215 I/C IMPROVMTS-DEVORE I/C S/O GLEN HELEN PARKWY TO N/O KENWOOD & I-215 FROM S/O DEVORE RD. I/C TO I-15 (16.0-17.8) ADD 1 M/F LN IN EA DIR TO EXISTG 3 M/F LNS FROM 3800 FT S/O GLEN HELEN PARKWY TO 3100 FT N/O I-215 I/C ADD 1 DECEL LN FROM 3200 FT S/O 15/215I/C OFFRMP TO S/B DEVORE ON I-215, CONSTRUCT TRUCK BYPASS LNS.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalFEDERAL LANDS HIGHWAYS PROGRAM

2,000 2,000 2,000 2,000

INTERSTATE MAINTENANCE DISCRETIONARY

3,341 3,341 3,341 3,341

STP LOCAL 6,385 59,323 65,708 65,708 65,708LOCAL ADVANCE CONSTRUCTIONPRIVATE FUNDS 7,017 7,017 7,017 7,017SBD CO MEASURE I 10,295 34,359 19,196 63,850 63,850 63,850CORRIDOR MOBILITY PROGRAM 53,743 53,743 53,743 53,743NATIONAL HWY SYSTEM - RIP 45,145 45,145 45,145 45,145SHOPP ADVANCE CONSTRUCTION (AC) - CT MINOR

83,865 83,865 83,865 83,865

20061201 Total 16,680 41,376 266,613 324,669 324,669 324,669

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150015 San Bernardino MDAB 4M01041 CAY70 15 67 67.5 S NON-EXEMPT 0

Description: PTC 43,000 Agency BARSTOW

IN BARSTOW: I-15/MORTON STREET INTERCHANGE; CONSTRUCT NEW INTERCHANGE. INCLUDES A 6 LN BRIDGE OVER I-15, 2 THROUGH LNS EACH WAY, TURN LANES, AND EMERGENCY LANE. CONSTRUCTION OF NEW 4 LN ROADWAY FROM 100 FT WEST OF IC TO OUTLET CENTER DRIVE (PA&ED ONLY)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCITY FUNDS 800 800 800 80020150015 Total 800 800 800 800

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment34011 San Bernardino SCAB 34011 CAX63 138 2.9 15.2 S NON-EXEMPT 0

Description: PTC 87,181 Agency CALTRANS

NEAR WRIGHTWOOD FROM PHELAN RD TO I-15 WIDEN FROM 2 TO 4 LANES WITH MEDIAN(EA3401U)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalNATIONAL HWY SYSTEM - IIP 11,459 11,459 11,459 11,459STATE CASH - IIP 10,633 10,633 10,633 10,633STIP ADVANCE CON-IIP 49,639 49,639 49,639 49,639STIP ADVANCE CON-RIP 15,450 15,450 15,450 15,45034011 Total 11,459 10,633 65,089 87,181 87,181 87,181

Print Date: 8/13/2018 11:28:22 AM Page: 10 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 11: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20084106 San Bernardino SCAB 4OM0701 NCN46 210 16.3 21.9 S EXEMPT - 93.126 0

Description: PTC 8,499 Agency SANBAG

ON SR 210 LANDSCAPING SEGMENTS 8-11 - PROVIDE PLANTING, IRRIGATION AND INERT GROUNDCOVER ALONG SR210 FROM WEST OF SIERRA AVE IN THE CITY OF FONTANA TO SR210/I-215 I.C IN SAN BERNARDINOFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSTP LOCAL 3,925 3,925 3,925 3,925LOCAL ADVANCE CONSTRUCTION

4,000 4,000 4,000 4,000

SBD CO MEASURE I 574 574 574 57420084106 Total 8,499 8,499 8,499 8,499

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20110110 San Bernardino SCAB 4M1007 CAX70 210 19.3 20.1 S NON-EXEMPT 0

Description: PTC 25,970 Agency SANBAG

CONSTRUCT NEW FULL-SERVICE INTERCHANGE WITH DIAMOND CONFIGURATION AT SR-210 AND PEPPER AVENUE IN THE CITY OF RIALTO. ADD WB AND EB ACCEL AND DECEL LANES AND WIDEN PEPPER FROM 2-4 LANES FROM HIGHLAND AVE. TO EXISTING 4 LANE SECTION S/O INTERCHANGE (Toll Credit: FY15/16 STPL $1,780)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSTP LOCAL 15,331 15,331 15,331 15,331SBD CO MEASURE I 2,500 4,005 4,134 10,639 10,639 10,63920110110 Total 2,500 4,005 19,465 25,970 25,970 25,970

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment200614 San Bernardino SCAB 200614 CAX69 215 21.4 5.1 S TCM 0

Description: PTC 186,472 Agency SANBAG

I-215 BI-COUNTY HOV LANE GAP CLOSURE PROJECT- ADD 1 HOV LANE IN EACH DIRECTION FROM SPRUCE ST. ON RIV 91 TO ORANGE SHOW RD;(ALSO INCLUDES RTP 4M0803 (STIP 2010 $24881 RCTC and $45089 SANBAG)(M003)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCMAQ 10,844 5,672 34,027 50,543 50,543 50,543LOCAL ADVANCE CONSTRUCTIONPRIVATE FUNDS 1,305 1,305 1,305 1,305SBD CO MEASURE I 4,815 8,210 35,819 48,844 48,844 48,844CORRIDOR MOBILITY PROGRAM 15,350 15,350 15,350 15,350NATIONAL HWY SYSTEM - IIP 4,961 4,961 4,961 4,961NATIONAL HWY SYSTEM - RIP 2,185 63,284 65,469 65,469 65,469200614 Total 19,149 13,882 153,441 186,472 186,472 186,472

Print Date: 8/13/2018 11:28:22 AM Page: 11 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 12: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentSBDLS05 San Bernardino SCAB REG0701 SHP03 999 S EXEMPT - 93.126 0

Description: PTC 6,534 Agency CALTRANS

GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURF AND/OR OTHER REHAB - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3) R/R/HIWAY XING, SAFER NON FED-AD SYSTEM ROADS, SHOULDER IMPROVMENTS, TRAFFIC CONTROL DEVICES&OPERATING ASSIST OTHER THAN SIGNALIZATION PROJECTS OR PROJECTS AT INDIVIDUAL SIGNALS, PAVEMT. MARK DEMOS, TRUCK CLIMBING LNS OUTSIDE URFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalSHOPP - ADVANCE CONSTRUCTION

6,534 6,534 6,534 6,534

SBDLS05 Total 6,534 6,534 6,534 6,534

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentSBDLS14 San Bernardino SCAB REG0701 NCR31 999 S EXEMPT - 93.126 0

Description: PTC 45,000 Agency CALTRANS

GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - HIGHWAY MAINTENANCE-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 TABLES 2 AND 3 CATEGORIES -PAVEMENT RESURFACING OR REHABILITATIONFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalNATIONAL HWY SYSTEM - HM 4,107 4,107 4,107 4,107SBDLS14 Total 4,107 4,107 4,107 4,107

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20150307 San Bernardino SCAB 4TL104 TDM20 T TCM Committed 0

Description: PTC 4,000 Agency OMNITRANS

COUNTY-WIDE VANPOOL PROJECT (Ongoing)(TDC: FY16/17 CMAQ CON $460k)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalFTA 5307 (FHWA TRANSFER FUNDS)

4,000 4,000 4,000 4,000

20150307 Total 4,000 4,000 4,000 4,000

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentSBD41109 San Bernardino SCAB SBD41109 RAO00 T EXEMPT - 93.126 0

Description: PTC 80,732 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY

METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK)

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalLOCAL TRANS FUNDS 76,810 76,810 76,810 76,810SBD CO MEASURE I 2,500 2,500 2,500 2,500STATE TRANSIT ASSIST 1,422 1,422 1,422 1,422SBD41109 Total 80,732 80,732 80,732 80,732

Print Date: 8/13/2018 11:28:22 AM Page: 12 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 13: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20061009 San Bernardino SCAB 4OM0701 NCR30 T EXEMPT - 93.126 0

Description: PTC 4,573 Agency SANBAG

METROLINK-SEALED CORRIDOR-SAN GABRIEL SUB-THIS PROJECTS CONSISTS OF A COMPREHENSIVE CORRIDOR SAFETY ENHANCEMENT PROGRAM ALONG SANBAG OWNED ROW (Toll credits to match: FY14/15: $250)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalFTA 5309(a) GUIDEWY 400 400 400 400LOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - SGR

573 573 573 573

RIVERSIDE-SAN BERNARDINO URBANIZED AREA

2,000 2,000 2,000 2,000

LOCAL TRANS FUNDS 1,468 1,468 1,468 1,468STATE TRANSIT ASSIST 132 132 132 13220061009 Total 4,573 4,573 4,573 4,573

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20061012 San Bernardino SCAB 4TR0101 RAN92 T TCM 0

Description: PTC 83,713 Agency SANBAG

DOWNTOWN S.B. PASSENGER RAIL – FROM SAN BERNARDINO METROLINK STATION TO APPROX. 1 MILE EAST TO A NEW TRANSIT STATION AT RIALTO AVE AND E ST. IN DOWNTOWN SAN BERNARDINOFund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCMAQ 10,306 10,306 10,306 10,306FTA 5307 UZA FORMULAR 800 12,000 12,800 12,800 12,800LOCAL TRANS FUNDS 200 10,123 10,323 10,323 10,323SBD CO MEASURE I 5,331 13,969 19,300 19,300 19,300CALIFORNIA TRANSIT SECURITY GRANT PROGRAM

3,696 3,696 3,696 3,696

PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

5,000 5,000 5,000 5,000

STATE LOCAL PARTNER 10,921 10,921 10,921 10,921STATE TRANSIT ASSIST 6,000 5,367 11,367 11,367 11,36720061012 Total 6,331 6,000 71,382 83,713 83,713 83,713

Print Date: 8/13/2018 11:28:22 AM Page: 13 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 14: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20152201 San Bernardino SCAB 4TR0101 TRN08 T EXEMPT - 93.126 0

Description: PTC 4,024 Agency SANBAG

Replace existing ticket vending machines and related support equipment with a modernized fare collection system. The upgrade will improve the fare collection system performance, reliability and customer interface. (Transportation Development Credits (TDC) to match: 16/17 $1,006). (Ongoing project)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalLOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - SGR

1,000 1,000 1,000 1,000

RIVERSIDE-SAN BERNARDINO URBANIZED AREA

3,024 3,024 3,024 3,024

20152201 Total 4,024 4,024 4,024 4,024

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20150602 San Bernardino SCAB 4TL104 PAO00 T EXEMPT - 93.126 0

Description: PTC 4,895 Agency VARIOUS AGENCIES

GROUPED PROJECTS FOR TRANSIT 5310 GRANT PROGRAM (SCAB & MDAB): PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES (Toll Credits: 5310 FY14/15 CON $422, FY16/17 CON $727)Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalLOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - EM

1,300 1,300 1,300 1,300

RIVERSIDE-SAN BERNARDINO URBANIZED AREA - EM

2,824 2,824 2,824 2,824

VICTORVILLE-HESPERIA URBANIZED AREA - EM

771 771 771 771

20150602 Total 4,895 4,895 4,895 4,895

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20110301 San Bernardino MDAB 4TL104 BUN07 T EXEMPT - 93.126 0

Description: PTC 2,455 Agency VICTOR VALLEY TRANSIT AUTHORITY

TRANSIT OPERATING EQUIPMENT - ITS SOFTWARE/HARDWARE: FY13/14 PASS.VENDING MACHINE(2); FY14/15 UPGRADE AND UPDATE ITS SYSTEMS. FY 15/16 BARSTOW FAREBOXES AND VARIOUS ITS. FY 16/17 ITS MOBILE TICKETING AND SMART CARDS.Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalAGENCY 200 200 200 200PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

1,860 1,860 1,860 1,860

STATE TRANSIT ASSIST 395 395 395 39520110301 Total 2,455 2,455 2,455 2,455

Print Date: 8/13/2018 11:28:22 AM Page: 14 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose

Page 15: Final 2019 Federal Transportation Improvement Programftip.scag.ca.gov/Documents/F2019-FTIP-PriorSBD.pdf · Final 2019 Federal Transportation Improvement Program 100% Prior Years San

Final 2019 Federal Transportation Improvement Program

100% Prior YearsSan Bernardino County Project ListingLocal Highway, State Highway, Transit

(in $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20111301 San Bernardino MDAB 4TL104 BUN07 T EXEMPT - 93.126 0

Description: PTC 1,250 Agency VICTOR VALLEY TRANSIT AUTHORITY

BUS SYSTEM-OPERATING ASSISTANCE-LIFELINE CONNECTIVITY BUS SERVICE BETWEEN VICTOR VALLEY AND SAN BERNARDINO VALLEY

Fund ENG R/W CON Total Prior 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 TotalCMAQ 1,000 1,000 1,000 1,000VICTORVILLE-HESPERIA URBANIZED AREA - FP

200 200 200 200

LOCAL TRANS FUNDS 50 50 50 5020111301 Total 1,250 1,250 1,250 1,250

Grand Total 103,963 128,756 1,026,885 1,259,604 1,259,604 1,259,604

Print Date: 8/13/2018 11:28:22 AM Page: 15 of 15

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2019 FTIP for this purpose


Recommended