Final BOQ Philippine Coast Guard

Date post: 26-Oct-2015
Category:
Upload: joan-munoz-heredia
View: 113 times
Download: 6 times
Share this document with a friend
150
BID OF QUANTITIES
Transcript
Page 1: Final BOQ Philippine Coast Guard

BID OF QUANTITIES

Page 2: Final BOQ Philippine Coast Guard

PROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : ESTIMATED CONTRACT COST=============================================================================

RECAPITULATION

I DIRECT COST ( DC )A MATERIAL COST P PB LABOR COST PC EQUIPEMT COST P

TOTAL DIRECT COST ( TDC )

II INDIRECT COST ( IC )D OVERHEAD, CONTINGENCIES and P

MISCELLANEOUS EXPENSESE CONTRACTOR'S PROFITF MOBILAZATION / DEMOBILIZATION

INDIRECT COST (IC)VAT 12% of TDC + IC)

TOTAL INDIRECT COST ( TIC )

III GENERATOR SETS (2 UNITS)

1 UNIT 250 KVA, 3PHASE, 230 Volts, STANDBY GENSET with fuel tankand other accessories1 UNIT 250 KVA, 3PHASE, 230 Volts, BACKUP GENSET with fuel tankand other accessories

IV TOTAL BID PRICE

Date: Prepared and Submitted by:

Name of Signatory

Designation

Firm / Company Name

Page 3: Final BOQ Philippine Coast Guard

PROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : SUMMARY OF ALL FACILITIES=============================================================================

%WT MATERIALS LABOR

01 CONSTRUCTION OF TWO (2) STOREY ADMINBUILDING

02 CONSTRUCTION OF TWO (2) STOREY MULTI-PURPOSE / BARRACKS BUILDING

03 CONSTRUCTION OF DISTRICT COMMANDER'SQUARTER

04 CONSTRUCTION OF POWER HOUSE / MAINSERVICE ENTRANCE / CONCRETEENCASEMENT / MANHOLES / AND PEDESTALS(WITH 2 UNITS GENERATOR SETS)

05 CONSTRUCTION OF GUARD HOUSES (3 UNITS)AND PERIMETER LIGHTS

06 FABRICATION AND INSTALLATION OF GATES (3 UNITS)

07 CONSTRUCTION OF ACCESS ROAD AND DRAINAGE SYSTEM

08 CONSTRUCTION OF ELEVATED WATER TANKPLATFORM

09 CONSTRUCTION OF FLAGPOLE

10 CONSTRUCTION OF MEDICAL / DENTAL BUILDING

11 CONSTRUCTION OF CEREMONIAL STAGE

12 CGD BICOL DEVELOPMENT MAIN SEWER AND WATER SUPPLY

TOTAL COST P-MATERIALSLABOREQUIPMENT

(Note: Generator Sets NOT included in the Direct and Indirect Cost)

Page 4: Final BOQ Philippine Coast Guard

PROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : SUMMARY=============================================================================01 TWO (2) STOREY ADMIN BUILDING

%WT MATERIALS LABOR

I EARTHWORKS

II TERMINATE CONTROL

III PLAIN AND REINFORCED CONCRETE

IV CONCRETE MASONRY

V MASONRY

VI CEILING and CARPENTRY WORKS

VII METAL AND ROOFING WORKS

VIII DOORS / WINDOWS / GLASS AND

IX TILE WORKS AND FLOOR FINISHES

X PAINTING VARNISHING

XI WATERPROOFING

XII PLUMBING AND SANITARY WORKS

XIII ELECTRICAL WORKS

SUB-TOTAL (01)MATERIALSLABOR

Page 5: Final BOQ Philippine Coast Guard

=============================================================================02 TWO (2) STOREY MULTI-PURPOSE / BARRACKS BUILDING

%WT MATERIALS LABOR

I EARTHWORKS

II TERMINATE CONTROL

III PLAIN AND REINFORCED CONCRETE

IV CONCRETE MASONRY

V MASONRY

VI CEILING and CARPENTRY WORKS

VII METAL AND ROOFING WORKS

VIII DOORS / WINDOWS / GLASS AND GLAZING(including Jambs ) / GRILLS AND HANDRILL

IX TILE WORKS AND FLOOR FINISHES

X PAINTING VARNISHING

XI WATERPROOFING

XII PLUMBING AND SANITARY WORKS

XIII ELECTRICAL WORKS

SUB-TOTAL (02)MATERIALS P -LABOR P -

Page 6: Final BOQ Philippine Coast Guard

=============================================================================03 DISTRICT COMMANDER'S QUARTER

%WT MATERIALS LABOR

I EARTHWORKS

II TERMINATE CONTROL

III PLAIN AND REINFORCED CONCRETE

IV CONCRETE MASONRY

V MASONRY

VI CEILING and CARPENTRY WORKS

VII METAL AND ROOFING WORKS

VIII DOORS / WINDOWS / GLASS AND GLAZING(including Jambs )

IX TILE WORKS AND FLOOR FINISHES

X PAINTING VARNISHING

XI PLUMBING AND SANITARY WORKS

XII ELECTRICAL WORKS

SUB-TOTAL (03) PMATERIALS PLABOR

Page 7: Final BOQ Philippine Coast Guard

=============================================================================04 POWERHOUSE / MAIN SERVICE ENTRANCE / CONCRETE ENCASEMENT / MANHOLES / PEDESTALS

%WT MATERIALS LABOR

I EARTHWORKS

II PLAIN AND REINFORCED CONCRETE

III CONCRETE MASONRY

IV MASONRY

V CARPENTRY WORKS

VI ROOF FRAMING AND ROOFING SYSTEM

VII DOORS / WINDOWS / GLASS AND GLAZING(including Jambs )

VIII STEEL WORKS

IX PAINTING VARNISHING

X CONCRETE PEDESTAL / MANHOLE / HANDHOLE / CONCRETE ENCASEMENT

XI FUEL TANK PEDESTAL

XII ELECTRICAL WORKS

SUB-TOTAL (04)MATERIALSLABOR

(Note: Generator Sets NOT included in the Direct and Indirect Cost)

Page 8: Final BOQ Philippine Coast Guard

=============================================================================05 GUARD HOUSE (3UNITS) AND PERIMETER LIGHTS

%WT MATERIALS LABOR

I EARTHWORKS

II CONCRETE WORKS

III CONCRETE MASONRY WORKS

IV MASONRY

V CARPENTRY WORKS

VI ROOF FRAMING AND ROOFING SYSTEM

VII DOORS / WINDOWS / GLASS AND GLAZING(including Jambs )

VIII TILE WORKS

IX PLUMBING WORKS

X PAINTING /VARNISHING

XI PERIMETER LIGHING PEDESTAL

XII ELECTRICAL WORKS

SUB-TOTAL (05)MATERIALSLABOR

Page 9: Final BOQ Philippine Coast Guard

=============================================================================06 FABRICATION AND INSTALLATION OF GATES (3 UNITS)

%WT MATERIALS LABOR

I EARTHWORKS

II CONCRETE WORKS

III PLASTERING

IV STEEL WORKS

V FORMWORKS / SCAFOLDING

VI PAINTING

SUB-TOTAL (06)MATERIALSLABOR

Page 10: Final BOQ Philippine Coast Guard

=============================================================================07 ACCESS ROAD AND DRAINAGE

%WT MATERIALS LABOR EQUIPMENT

I EARTHWORKS / SITE PREPARATION

II CONCRETE WORKS

III FORMWORKS

SUB-TOTAL (07)MATERIALS PLABOR P

P

Page 11: Final BOQ Philippine Coast Guard

=============================================================================08 CONCRETE ELEVATED WATER TANK PLATFORM

%WT MATERIALS LABOR

I EARTHWORKS P

II CONCRETE WORKS

III STEEL WORKS / WATER TANKS / PUMPS and SUPPLYLINES

IV PAINTING WORKS

SUB-TOTAL (08)MATERIALS PLABOR P

Page 12: Final BOQ Philippine Coast Guard

=============================================================================09 FLAGPOLE

%WT MATERIALS LABOR

I CONCRETE BREAKING / EAP

II CONCRETE / MASONRY WORKS

III STEEL WORKS

IV ACCESSORIES

V TILE WORKS

VI PAINTING WORKS

SUB-TOTAL (09)MATERIALS PLABOR P

Page 13: Final BOQ Philippine Coast Guard

=============================================================================10 MEDICAL / DENTAL BUILDING

%WT MATERIALS LABOR

I EARTHWORKS

II PLAIN AND REINFORCED CONCRETE

III CONCRETE MASONRY

IV MASONRY

V CARPENTRY WORKS

VI ROOF FRAMING AND ROOFING SYSTEM

VII DOORS / WINDOWS (including Jambs )

VIII TILE WORKS AND FLOOR FINISHES

IX PAINTING /VARNISHING

X PLUMBING AND SANITARY WORKS

XI ELECTRICAL WORKS

Page 14: Final BOQ Philippine Coast Guard

SUB-TOTAL (10)MATERIALS PLABOR P

=============================================================================11 CEREMONIAL STAGE

%WT MATERIALS LABOR

I EARTHWORKS

II CONCRETE WORKS

III CONCRETE MASONRY WORKS

IV MASONRY

V METAL AND ROOFING WORKS

VI DOORS / WINDOWS (including Jambs )

VII PAINTING /VARNISHING

VIII ELECTRICAL WORKS

SUB-TOTAL (11)MATERIALS PLABOR P

Page 15: Final BOQ Philippine Coast Guard

=============================================================================12 CGD BICOL DEVELOPMENT MAIN SEWER AND WATER SUPPLY

%WT MATERIALS LABOR

I EARTHWORKS

II PLAIN AND REINFORCED CONCRETE

III SEWER WASTER WATERDISCHARGE MAINS

IV PORTABLE WATER SUPPLY MAINS

SUB-TOTAL (12)MATERIALS PLABOR P

Page 16: Final BOQ Philippine Coast Guard

PROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : BID OF QUANTITIES (FORMAT)===================================================================================

01 TWO (2) STOREY ADMIN BUILDING

QTY UNIT DESCRIPTION %WT OF TOTAL UNIT COST (PhP) TOTAL (PhP)

I EARTHWORKS

1 cu m Excavation2 cu m Backfilling3 cu m Filling Materials

Sub - Total I

II TERMITE CONTROL

1 gals Solignum

Sub - Total II

III PLAIN AND REINFORCED CONCRETEIIIA Footing1 cu m Concrete Volume5 kgs 20mm dia Reinf. Steel Bars6 kgs 16mm dia Reinf. Steel Bars

IIIB Wall Footing (WF-1)1 cu m Concrete Volume5 kgs 12mm dia Reinf. Steel Bars

IIIC Columns1 cu m Concrete Volume5 kgs 25mm dia Reinf. Steel Bars6 kgs 20mm dia Reinf. Steel Bars7 kgs 16mm dia Reinf. Steel Bars8 kgs 10mm dia Reinf. Steel Bars

IIID Elevated Beams1 cu m Concrete Volume5 kgs 25mm dia Reinf. Steel Bars6 kgs 20mm dia Reinf. Steel Bars7 kgs 16mm dia Reinf. Steel Bars8 kgs 12mm dia Reinf. Steel Bars9 kgs 10mm dia Reinf. Steel Bars

IIIE Elevated Slab1 cu m Concrete Volume5 kgs 12mm dia Reinf. Steel Bars6 kgs 10mm dia Reinf. Steel Bars

IIIF Slab - on - Fill1 cu m Concrete Volume5 kgs 10mm dia Reinf. Steel Bars

IIIG Miscellaneous1 sq m Form Works Area

Sub - Total III

ITEM NR.

Page 17: Final BOQ Philippine Coast Guard

IV CONCRETE MASONRY

1 sq m Wall Area

Sub - Total IVV MASONRY

Plastering1 sq m Area

Topping1 sq m Floor Area ( Assume thk. = 50 mm )

Sub - Total VVI CEILING and CARPENTRY WORKS

Interior1 sq m Ceiling Area

Exterior1 sq m Ceiling Area

Baseboards / Cornice1 pcs 1" x 4" x 8' Baseboards

Sub - Total VIVII METAL AND ROOFING WORKS

VIIA Roof Framing System

1 pcs 6mm thk. X 2" Angular Bar TR-1

2 pcs 6mm thk. X 2" Angular Bar TR-2

3 pcs 1.0 mm thk. 2" x 4" C - Purlins Roof Purlins

4 pcs 3/16" x 1-1/2" Angular Bar Cleats

5 pcs 1.0mm thk. 2" x 6" C - Purlins Facia Boards

6 kgs Welding Rod

VIIB Roofing Works1 sq m 0.50 mm x 1050 Pre-painted

Roofing Sheets ( Rib Type)2 l m Ridge Roll3 l m Gutter

VIIC Downspouts1 pcs Roof / Deck Drains and Strainers2 pcs Balcony Drains3 pcs 110mm dia x 3.0m PVC Pipe4 lot Assorted Pipes and Fittings

VIID Service Ladder

Page 18: Final BOQ Philippine Coast Guard

1 sets Service Ladder

Sub - Total VII

VIII DOORS / WINDOWS / GLASS AND GLAZINGS ( including Jambs ) / GRILLS AND HANDRAILS

01 pcs Doors02 pcs Analok Frameless Door03 pcs Sliding Window Aluminum Frame

Analok Glass04 pcs Wall Aluminum Frame

Analok Glass

Double Leaf Swing Door05 sq m 1/2" thk. Glass Doors Frameless

Aluminum Frame Analoc / Bronze w/ Fixed Transome Glass

Single Leaf Swing Door06 sq m 1/2" thk. Glass Doors Frameless

Aluminum Frame Analoc / Bronze w/ Fixed Transome Glass

07 sq m Panel Doors ( including Jamb )

08 sq m PVC Toilet Doors

Windows09 sq m Aluminum Frame Window s

Sliding / Aw ning Fixed Window s Bronze / Analoc / Brow n Glass

Glass Partitions10 sq m Aluminum Frame Glass Walls

Fixed / 3/8" thk. Glass Bronze / Analoc / Brow n Glass

STAINLESS STEEL RAILS

A MAIN STAIR RAILING ASSEMBLY01 l m Total Assembly Length

Bottom and Top Rails02 l m 2"dia. Stainless Steel Pipe

Intermediate Rails03 l m 1-1/2" dia. Stainless Steel Pipe

Balusters04 l m 2"dia. Stainless Steel Pipe

Post05 l m 4"dia. Stainless Steel Pipe

Flanges06 sets 4"dia. Stainless Steel Flanges

w / cover and fixing hardwares07 sets 2"dia. Stainless Steel Flanges

Page 19: Final BOQ Philippine Coast Guard

w / cover and fixing hardwares

08 sets Sphere Top (Ball Set)

B MAIN STAIR HAND RAILS (Wall Mounted)

01 l m Total Assembly Length02 l m 2"dia. Stainless Steel Pipe03 sets Wall BracketsC PWD ACCESS

01 l m Total Assembly Length Top Rails

02 l m 2"dia. Stainless Steel Pipe Intermediate Rails

03 l m 1-1/2" dia. Stainless Steel Pipe Balluster (Post)

04 l m 2"dia. Stainless Steel PipeFlanges

05 sets 2"dia. Stainless Steel Flanges w / cover and fixing hardwares

D MAIN ENTRANCE RAILINGS01 l m Total Assembly Length

Top and Intermediate Rails02 l m 2"dia. Stainless Steel Pipe

Balusters (Post)03 l m 2"dia. Stainless Steel Pipe

Flanges04 sets 2"dia. Stainless Steel Flanges

w / cover and fixing hardwaresE GROUND FLOOR BALCONY

GUARD RAIL AND STAIR RAILS ASSEMBLY

01 l m Total Assembly Length Top Rails

02 l m 2"dia. Stainless Steel Pipe Intermediate Rails

03 l m 1-1/2" dia. Stainless Steel Pipe Balusters (Post)

04 l m 2"dia. Stainless Steel Pipe Flanges

05 sets 2"dia. Stainless Steel Flanges w / cover and fixing hardwares

F SERVICE STAIR01 l m Total Assembly Length

Top Rails02 l m 2"dia. Stainless Steel Pipe

Balusters (Post)03 l m 2"dia. Stainless Steel Pipe

Flanges04 sets 2"dia. Stainless Steel Flanges

w / cover and fixing hardwares05 sets Wall Brackets

Vertical Members (Grills)06 pcs 16mm dia. X 6.0m Plain Round

Bars

Page 20: Final BOQ Philippine Coast Guard

Folding Wall Partitions01 sq m 25mm thk. X 8" (200mm) Verify ht)

UPVC Wood Grain Profile HARDWARES

01 sets Cylindrical Locksets02 pairs 3.5" x 3.5" Stainless Steel

Ball Bearing HingesSub - Total VIII

IX TILE WORKS AND FLOOR FINISHES

01 pcs 60 x 60 Polished Granite Floor Tiles

Interior Floor Area02 60 x 60 Unglazed Ceramic

Floor Tiles

Deck Area03 pcs 60 x 60 Unglazed Ceramic

Floor Tiles

Stairs04 pcs Non-Slip Stair Nosing

50mm x 2.0 M Aluminum / Brass

COMFORT ROOM05 pcs 30 x 30 Ceramic Floor Tiles06 pcs 20 x 30 Ceramic Wall Tiles

Sub - Total IXX PAINTING VARNISHING

01 sq m Masonry Walls02 sq m Ceiling03 sq m Baseboards04 sq m Doors

Sub - Total XXI WATERPROOFING01 sq m Membrane Water Proofing

With granules Torch Applied

Sub - Total XIXII PLUMBING AND SANITARY WORKS

Fixtures01 sets Water Closet02 sets Lavatory ( Pedestal / Top Mount )03 sets Kitchen / Laundry Sink04 sets Urinal05 sets Spray Washers complete with

accessories06 sets Telephone show er w/ faucet

Page 21: Final BOQ Philippine Coast Guard

07 sets Faucet Double Tap08 sets Soap / Tissue Holder09 sets Floor Drain

Plumbing09 pcs 20mm(1/2") dia Gate Valve10 sets 5300 li. Stainless Overhead Tank11 sets 2.0 Hp Water Pump12 unit Septic Vault

Sub - Total XII

XIII ELECTRICAL WORKS

XIIIA LIGHTING AND POWER WIRES AND CABLES THHN (Branch Circuits)

01 rolls 3.5mm2 Cu Cond Strnd02 rolls 8.0mm2 Cu Cond Strnd03 rolls 2.0mm2 Cu Cond Royal Cord (3C)(75m)

THW (Feeder/Subfeeder)01 mtrs 14mm2 Cu Cond Strnd02 mtrs 22mm2 Cu Cond Strnd03 mtrs 30mm2 Cu Cond Strnd04 mtrs 38mm2 Cu Cond Strnd

THW (Grounding)01 rolls 3.5mm2 Cu Cond Strnd02 roll 5.5mm2 Cu Cond Strnd03 mtrs 14mm2 Cu Cond Strnd04 mtrs 22mm2 Cu Cond Strnd05 mtrs 30mm2 Cu Cond Strnd06 mtrs 60mm2 Cu Cond Strnd

PIPES AND FITTINGS01 lghts 20mm Ø x 3m02 lghts 25mm Ø x 3m03 lghts 32mm Ø x 3m04 lghts 40mm Ø x 3m05 lghts 90mm Ø x 3m

01 pcs 20mm Ø Endbell02 pcs 25mm Ø Endbell03 pcs 90mm Ø Endbell01 pcs 90mm Ø Elbow

WIRING DEVICES01 sets One-Way, One Gang Switch02 sets One-Way, Two Gang Switch03 sets One-Way, Three Gang Switch04 sets Three-Way Switch05 sets One-Gang Conv. Outlet06 sets Duplex Conv Outlet07 sets Computer Power Outlet Grounding Type08 sets ACU Tandem Outlet

LIGHTING FIXTURES01 sets 1 x 15W Tubular LED Light w/ Housing

Page 22: Final BOQ Philippine Coast Guard

02 sets 2 x 11W LED Pin Light03 sets 1x11W Led Wall Lamp04 sets 1x42W LED Flood Light05 units LED Emergency Lights Dual Optics06 units LED Emergency Exit Light07 units LED Foot Lamps

BOXES AND CONDUITS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box03 pcs 6 x 6 Ga#14 Pull Box

Sub - Total XIIIA

XIIIB FIRE ALARM SYSTEM WIRES AND CABLES

01 rolls TF Wire# 1602 rolls 2.0mm2 Cu Cond Strnd

PIPES AND FITTINGS01 lghts 15mm Ø x 3m EMT02 lghts 20mm Ø x 3m EMT03 lghts 25mm Ø x 3m EMT04 lghts 32mm Ø x 3m EMT05 lghts 32mm Ø x 3 IMC06 pcs EMT Connectors, 15mm Ø07 pcs EMT Connectors, 20mm Ø08 pcs EMT Connectors, 25mm Ø09 pcs EMT Coupling, 15mm Ø10 pcs EMT Coupling, 20mm Ø11 pcs EMT Coupling, 25mm Ø

WIRING DEVICES01 pcs Smoke Detectors02 units Fire Alarm Bell03 units Fire Alarm Manual Station04 units FACP And Anunciators

BOXES AND CONDULETS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

Fire Protection Accessories01 units 20lbs FIRE EXTINGUISHER

with wall mounting Bracket02 lot Fire Hose Cabinet and

accessoriesSub - Total XIIIB

XIIIC SOLAR POWER SYSTEM01 units Solar Panel Accessories02 units Solar Battery and Accessories03 units Solar Charger/Charge Controller04 units Combiner05 unit Inverter06 unit Transfer Switch07 lot Wires and Cables08 lot Pipes and Fittings09 lot Hangers and Supports10 lot Miscellaneous and Hardwares

Sub - Total XIIIC

Page 23: Final BOQ Philippine Coast Guard

XIIID TELEPHONE/INTERCOM SYSTEM

WIRES AND CABLES01 rolls Telephone Wires

PIPE AND FITTINGS01 lghts 20mm Ø x 3m PVC02 lghts 25mm Ø x 3m PVC03 lghts 32mm Ø x 3m PVC04 pcs 20mm Ø Endbell05 pcs 25mm Ø Endbell06 pcs 32mm Ø Endbell

DEVICES01 sets Intercom Outlet

BOXES AND CABINETSpc TTC

01 pcs 4 x 2 Ga#14 Utility Box

Sub - Total XIIID

XIIIE CABLE SYSTEM

WIRES AND CABLES01 rolls Co-Axial Cable

PIPE AND FITTINGS01 lghts 25mm Ø x 3m PVC02 pcs 25mm Ø Endbell

DEVICES01 sets Cable TV Outlet02 pcs Cable TV Splitter

BOXES AND CABINETSunit MATV

01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

Sub - Total XIIIE

XIIIF COMPUTER/LAN SYSTEMPIPES AND FITTINGS

01 lgths 25mmØ x 3m PVC02 pcs 25mmØ Endbell

DEVICES01 lghts Computer outlet(LAN)

BOXES AND CONDULETS01 4 x 4 Ga#14 J Box with Cover02 4 x 2 Ga#14 Utility Box

Sub - Total XIIIFXIIIG PANEL BOARDS AND CIRCUIT BREAKERS

01 assy LP Main: ,60AT,14kAIC, 100AF

Page 24: Final BOQ Philippine Coast Guard

250V,3P,60Hz,Bolt-on Branches: 10 -15AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

02 assy PPC-1 Main: ,60AT,14kAIC, 100AF 250V,3P,60Hz,Bolt-on Branches: 9 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 3-space w/ flash mounting enclosure

03 assy PPC-2 Main: 60AT,18kAIC, 100AF 250V,3P,60Hz,Bolt-on Branches: 10 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

04 assy PPACU-1 Main: ,70AT,22kAIC, 100AF 250V,3P,60Hz Branches: 8 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 1-space w/ flash mounting enclosure

05 assy PPACU-2 Main: ,100AT,22kAIC, 100AF 250V,3P,60Hz Branches: 9 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 1-space w/ flash mounting enclosure

06 assy PEM Main: ,100AT,22kAIC, 100AF 250V,3P,60Hz Branches: 7 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 1-space w/ flash mounting enclosure

07 assy DP Main: ,100AT,25kAIC, 100AF 250V,3P,60Hz, Bolt-on Branches: 1 -60AT, 100AF, 14kAIC, 3P 3 -60AT, 100AF, 18kAIC, 3P 1 -60AT, 100AF, 22kAIC, 3P 1 -70AT, 100AF, 22kAIC, 3P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

Sub - Total XIIIG

XIIIG MISCELLANEOUS AND HARDWARES

Page 25: Final BOQ Philippine Coast Guard

1 mtrs 30 mm² Bare Copper Wire2 lnghts Exothermic welded connectors3 sets 3/4x10" Ground Rod5 assy Wire Gutter6 bndls Electrical Tape7 rolls Rupper Tape8 pcs Hacksaw Blade9 kgs Ga#14 GI Pull Wire

10 cans PVC Cement, 120cc11 pcks Cable Markers12 pcks Cable Glands13 pcs Assorted Terminal Lugs14 box Fabricated Pull Box (spicing box)

Sub - Total XIIIGTOATL XIII

SUB - TOTAL (01)(TWO (2) STOREY ADMIN BUILDING)

Page 26: Final BOQ Philippine Coast Guard

PROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : BID OF QUANTITIES (FORMAT)============================================================================

02 TWO (2) STOREY MULTI - PURPOSE / BARRACKS BUILDING============================================================================

QTY UNIT DESCRIPTION %WT OF TOTAL UNIT COST (PhP) TOTAL (PhP)

I EARTHWORKS01 cu m Excavation02 cu m Backfilling03 cu m Filling Materials

Sub - Total III TERMITE CONTROL

01 gals Solignum

Sub - Total IIIII PLAIN AND REINFORCED CONCRETE

IIIA Footing01 cu m Concrete Volume02 kgs 20mm dia Reinf. Steel Bars03 kgs 16mm dia Reinf. Steel Bars

IIIB Wall Footing (WF-1)01 cu m Concrete Volume05 kgs 12mm dia Reinf. Steel Bars

IIIC Columns01 cu m Concrete Volume05 kgs 25mm dia Reinf. Steel Bars06 kgs 20mm dia Reinf. Steel Bars07 kgs 16mm dia Reinf. Steel Bars08 kgs 10mm dia Reinf. Steel Bars

IIID Elevated Beams01 cu m Concrete Volume05 kgs 25mm dia Reinf. Steel Bars06 kgs 20mm dia Reinf. Steel Bars07 kgs 16mm dia Reinf. Steel Bars08 kgs 12mm dia Reinf. Steel Bars09 kgs 10mm dia Reinf. Steel Bars

IIIE Elevated Slab01 cu m Concrete Volume05 kgs 12mm dia Reinf. Steel Bars06 kgs 10mm dia Reinf. Steel Bars

ITEM NR.

Page 27: Final BOQ Philippine Coast Guard

IIIF Slab - on - Fill01 cu m Concrete Volume05 kgs 10mm dia Reinf. Steel Bars

IIIG Miscellaneous01 sq m Form Works Area

Sub - Total IIIIV CONCRETE MASONRY

01 sq m Wall Area

Sub - Total IVV MASONRY

Plastering01 sq m Area

Topping01 sq m Floor Area ( Assume thk. = 50 mm )

Sub - Total VVI CEILING and CARPENTRY WORKS

Interior01 sq m Ceiling Area

Exterior01 sq m Ceiling Area

Baseboards / Cornice01 pcs 1" x 4" x 8' Baseboards

Sub - Total VIVII METAL AND ROOFING WORKS

Roof Framing System

01 pcs 6mm thk. X 2" Angular Bar TR-1

02 pcs 6mm thk. X 2" Angular Bar TR-2

03 pcs 1.0 mm thk. 2" x 4" C - Purlins Roof Purlins

Page 28: Final BOQ Philippine Coast Guard

04 pcs 3/16" x 1-1/2" Angular Bar Cleats

05 pcs 2.0mm thk. 2" x 6" C - Purlins Facia Boards

06 kgs Welding Rod

Roofing Works01 sq m 0.50 mm x 1050 Pre-painted

Roofing Sheets ( Rib Type)02 l m Ridge Roll03 l m Gutter

Downspouts01 pcs Roof / Deck Drains and Strainers02 pcs Balcony Drains03 pcs 110mm dia x 3.0m PVC Pipe04 lot Assorted Pipes and Fittings

Fire Escape Stair01 sets Service Ladder

Sub - Total VII VIII DOORS / WINDOWS / GLASS AND GLAZINGS ( including Jambs ) / GRILLS AND HANDRAILS

01 pcs Doors02 pcs Analok Frameless Door03 pcs Sliding Window Aluminum Frame

Analok Glass04 pcs Wall Aluminum Frame

Analok Glass

Double Leaf Swing Door05 sq m 1/2" thk. Glass Doors Frameless

Aluminum Frame Analoc / Bronze w/ Fixed Transome Glass

Single Leaf Swing Door06 sq m 1/2" thk. Glass Doors Frameless

Aluminum Frame Analoc / Bronze w/ Fixed Transome Glass

07 sq m Panel Doors ( including Jamb )

08 sq m PVC Toilet Doors

Windows

Page 29: Final BOQ Philippine Coast Guard

09 sq m Aluminum Frame Window s Sliding / Aw ning Fixed Window s Bronze / Analoc / Brow n Glass

Glass Partitions10 sq m Aluminum Frame Glass Walls

Fixed / 3/8" thk. Glass Bronze / Analoc / Brow n Glass

STAINLESS STEEL RAILS

A MAIN STAIR RAILING ASSEMBLY01 l m Total Assembly Length

Bottom and Top Rails02 l m 2"dia. Stainless Steel Pipe

Intermediate Rails03 l m 1-1/2" dia. Stainless Steel Pipe

Balusters04 l m 2"dia. Stainless Steel Pipe

Post05 l m 4"dia. Stainless Steel Pipe

Flanges06 sets 4"dia. Stainless Steel Flanges

w / cover and fixing hardwares07 sets 2"dia. Stainless Steel Flanges

w / cover and fixing hardwares

08 sets Sphere Top (Ball Set)

B MAIN STAIR HAND RAILS (Wall Mounted)

01 l m Total Assembly Length02 l m 2"dia. Stainless Steel Pipe03 sets Wall Brackets

C PWD ACCESS01 l m Total Assembly Length

Top Rails02 l m 2"dia. Stainless Steel Pipe

Intermediate Rails03 l m 1-1/2" dia. Stainless Steel Pipe

Balluster (Post)04 l m 2"dia. Stainless Steel Pipe

Flanges05 sets 2"dia. Stainless Steel Flanges

w / cover and fixing hardwares

D MAIN ENTRANCE RAILINGS01 l m Total Assembly Length

Top and Intermediate Rails

Page 30: Final BOQ Philippine Coast Guard

02 l m 2"dia. Stainless Steel Pipe Balusters (Post)

03 l m 2"dia. Stainless Steel Pipe Flanges

04 sets 2"dia. Stainless Steel Flanges w / cover and fixing hardwares

E GROUND FLOOR BALCONY GUARD RAIL AND STAIR RAILS ASSEMBLY

01 l m Total Assembly Length Top Rails

02 l m 2"dia. Stainless Steel Pipe Intermediate Rails

03 l m 1-1/2" dia. Stainless Steel Pipe Balusters (Post)

04 l m 2"dia. Stainless Steel Pipe Flanges

05 sets 2"dia. Stainless Steel Flanges w / cover and fixing hardwares

F SERVICE STAIR1 l m Total Assembly Length

Top Rails2 l m 2"dia. Stainless Steel Pipe

Balusters (Post)3 l m 2"dia. Stainless Steel Pipe

Flanges4 sets 2"dia. Stainless Steel Flanges

w / cover and fixing hardwares5 sets Wall Brackets

Vertical Members (Grills)6 pcs 16mm dia. X 6.0m Plain Round

Bars

Folding Wall Partitions1 sq m 25mm thk. X 8" (200mm) Verify ht)

UPVC Wood Grain Profile

HARDWARES1 sets Cylindrical Locksets2 pairs 3.5" x 3.5" Stainless Steel

Ball Bearing Hinges

Sub - Total VIIIIX TILE WORKS AND FLOOR FINISHES

1 pcs 60 x 60 Polished Granite Floor Tiles Interior Floor Area

Deck Area2 pcs 60 x 60 Unglazed Ceramic

Page 31: Final BOQ Philippine Coast Guard

Floor Tiles

Stais3 pcs 60 x 60 Unglazed Ceramic

Floor Tiles

4 pcs Non-Slip Stair Nosing 50mm x 2.0 M Aluminum / Brass

COMFORT ROOM5 pcs 30 x 30 Ceramic Floor Tiles6 pcs 20 x 30 Ceramic Wall Tiles

Counter Top Finish7 pcs 60 x 60 Polished Granite

Floor Tiles

Sub - Total IXX PAINTING VARNISHING1 sq m Masonry Walls2 sq m Ceiling3 sq m Baseboards4 sq m Doors

Sub - Total XXI WATERPROOFING1 sq m Membrane Water Proofing

With granules Torch Applied

Sub - Total XIXII PLUMBING AND SANITARY WORKS

Fixtures01 sets Water Closet02 sets Lavatory ( Pedestal / Top Mount )03 sets Kitchen / Laundry Sink04 sets Urinal05 sets Spray Washers complete with

accessories06 sets Telephone show er w/ faucet07 sets Faucet Double Tap08 sets Soap / Tissue Holder09 sets Floor Drain

Plumbing09 pcs 20mm(1/2") dia Gate Valve10 sets 5300 li. Stainless Overhead Tank11 sets 2.0 Hp Water Pump12 unit Septic Vault

Page 32: Final BOQ Philippine Coast Guard

Sub - Total XII

XIII ELECTRICAL WORKSXIIIA LIGHTING AND POWER

WIRES AND CABLES THHN (Branch Circuits)

01 rolls 3.5mm² Cu Cond Strnd02 rolls 8.0mm² Cu Cond Strnd03 rolls 2.0mm² Cu Cond Royal Cord (3C)(75m)

THW (Feeder/Subfeeder)01 mtrs 14mm² Cu Cond Strnd02 mtrs 30mm² Cu Cond Strnd03 mtrs 38mm² Cu Cond Strnd

THW (Grounding)01 rolls 3.5mm² Cu Cond Strnd02 rolls 8.0mm²Cu Cond Strnd03 mtrs 14mm²Cu Cond Strnd04 mtrs 30mm²Cu Cond Strnd05 mtrs 38mm² Cu Cond Strnd

PIPES AND FITTINGS PVC PIPES

01 lghts 20mm Ø x 3m02 lghts 25mm Ø x 3m03 lghts 32mm Ø x 3m04 lghts 40mm Ø x 3m05 lghts 50mm Ø x 3m

PVC ENDBELL01 pcs 20mm Ø Endbell02 pcs03 pcs 32mm Ø Endbell04 pcs 40mm Ø Endbell05 pcs 50mm Ø Endbell

PVC ELBOW01 pcs 32mm Ø Elbow02 pcs 40mm Ø Elbow03 pcs 50mm Ø Elbow

WIRING DEVICES01 sets One-Way, One Gang Switch02 sets One-Way, Two Gang Switch03 sets One-Way, Three Gang Switch04 sets Three-Way Switch05 sets Duplex Conv Outlet

25mm Ø Endbell

Page 33: Final BOQ Philippine Coast Guard

06 sets ACU Tandem Outlet LIGHTING FIXTURES

01 sets 1 x 15W Tubular LED Light w/ Housing02 sets 2 x 11W LED Pin Light03 units LED Emergency Lights Dual Optics04 units LED Emergency Exit Light05 units LED Foot Lamps

BOXES AND CONDUITS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

Sub - Total XIIIA

XIIIB FIRE ALARM SYSTEM WIRES AND CABLES

01 rolls TF Wire# 1602 rolls 2.0mm2 Cu Cond Strnd

PIPES AND FITTINGS EMT CONDUITS

01 lghts 15mm dia x 3m EMT02 lghts 20mm dia x 3m EMT03 lghts 25mm dia x 3m EMT04 lghts 32mm dia x 3m EMT

05 lghts 32mm dia x 3 IMC06 lghts 40mm dia x 3m IMC

07 lghts 32mm dia L&B IMC08 lghts 40mm dia L&B IMC

09 pcs EMT Connectors, 15mm dia10 pcs EMT Connectors, 20mm dia11 pcs EMT Connectors, 25mm dia12 pcs EMT Connectors, 32mm dia

13 pcs EMT Coupling, 15mm dia14 pcs EMT Coupling, 20mm dia15 pcs EMT Coupling, 25mm dia16 pcs EMT Coupling, 32mm dia

WIRING DEVICES01 pcs Smoke Detectors02 units Fire Alarm Bell03 units Fire Alarm Manual Station04 units FACP And Anunciators

BOXES AND CONDULETS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

BOXES AND CONDULETS

Fire Protection Accessories01 units 20lbs FIRE EXTINGUISHER02 lot Fire Hose Cabinet and

accessories

Sub - Total XIIIB

Page 34: Final BOQ Philippine Coast Guard

XIIIC SOLAR POWER SYSTEM01 units Solar Panel Accessories02 units Solar Battery and Accessories03 units Solar Charger/Charge Controller04 units Combiner05 units Inverter06 units Transfer Switch07 lot Wires and Cables08 lot Pipes and Fittings09 lot Hangers and Supports10 lot Miscellaneous and Hardwares

Sub - Total XIIIC

XIIID INTERCOM SYSTEM

WIRES AND CABLES01 rolls Telephone Wires

PIPE AND FITTINGS PVC CONDUITS

01 lghts 25mm Ø x 3m PVC

02 pcs 25mm Ø Endbell03 pcs 32mm Ø Endbell

DEVICES01 sets Intercom Outlet

BOXES AND CABINETS02 pcs 4 x 2 Ga#14 Utility Box

Sub - Total XIIID

XIIIE CABLE TV SYSTEM

WIRES AND CABLES01 rolls Co-Axial Cable

PIPE AND FITTINGS PVC CONDUITS

01 lghts 25mm Ø x 3m PVC02 pcs 25mm Ø Endbell

DEVICES01 sets Cable TV Outlet02 pcs Cable TV Splitter

BOXES AND CABINETS01 pcs 4 x 2 Ga#14 Utility Box

Sub - Total XIIIE

XIIIF PANEL BOARDS AND CIRCUIT BREAKERS01 assy LP

Page 35: Final BOQ Philippine Coast Guard

Main: ,60AT,14kAIC, 100AF 250V,3P,60Hz,Bolt-on Branches: 10 -15AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

02 assy PP Main: ,60AT,14kAIC, 100AF 250V,3P,60Hz,Bolt-on Branches: 7 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 3-space w/ flash mounting enclosure

03 assy PPACU-1 Main: ,100AT,22kAIC, 100AF 250V,3P,60Hz,Bolt-on Branches: 8 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

04 assy PPACU-2 Main: ,100AT,22kAIC, 100AF 250V,3P,60Hz Branches: 6 -20AT, 50AF, 10kAIC, 2P 250V, 60Hz, Bolt-on 1-space w/ flash mounting enclosure

05 assy DP Main: ,225AT,25kAIC, 100AF 250V,3P,60Hz, Bolt-on Branches: 1 -60AT, 100AF, 18kAIC, 3P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

1 -60AT, 100AF, 22kAIC, 3P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

2 -100AT, 100AF, 25kAIC, 3P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

Sub - Total XIIIF

XIIIG MISCELLANEOUS AND HARDWARES01 mtrs 30 mm² Bare Copper Wire02 lghts 25mmØ Ground Rod

Page 36: Final BOQ Philippine Coast Guard

03 lnghts Exothermic welded connectors04 sets Wire Gutter05 assy Electrical Tape06 bndls Rupper Tape07 rolls Hacksaw Blade08 pcs Ga#14 GI Pull Wire09 kgs PVC Cement, 120cc10 cans 5mm x 300mm Cable Ties11 pcks Cable Markers12 pcks Cable Glands13 pcs Assorted Terminal Lugs14 box Fabricated Pull Box (spicing box)

Sub - Total XIIIGTOATL XIII

SUB - TOTAL (02)(TWO (2) STOREY MULTI-PURPOSE / BARRACKS BUILDING)

Page 37: Final BOQ Philippine Coast Guard

Construction of Coast Guard Distrcit Bicol (CGDBL) FacilitiesPROJECT TITLE : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARD

SUBJECT : BID OF QUANTITIES (FORMAT)===================================================================================

03 DISTRICT COMMANDER'S QUARTER===================================================================================

QTY UNIT DESCRIPTION % WT OF TOTAL UNIT COST (Php)

I EARTHWORKS01 cu.m. Excavation02 cu.m. Backfilling03 cu.m. Filling MaterialsII TERMITE CONTROL

01 gals SolignumSub-Total II

III PLAIN AND REINFORCED CONCRETEIIIA Footing01 cu.m. Concrete Volume05 kgs 12mm dia Reinf. Steel BarsIIIB Columns01 cu.m. Concrete Volume05 kgs 16mm dia Reinf. Steel Bars (5m)06 kgs 10mm dia Reinf. Steel BarsIIIC Wall Footing01 cu.m. Concrete Volume05 kgs 12mm dia Reinf. Steel Bars06 kgs 10mm dia Reinf. Steel BarsIIID Beam01 cu.m. Concrete Volume05 kgs 12mm dia Reinf. Steel Bars06 kgs 10mm dia Reinf. Steel BarsIIIE Elevated Slab01 cu.m. Concrete Volume05 kgs 10mm dia Reinf. Steel BarsIIIF Miscellaneous01 sq.m. Form Works Area

Sub-Total IIIIV CONCRETE MASONRY01 sq.m. Wall Area

Sub-Total IVV MASONRY

Plastering01 sq.m. Area

Topping01 sq.m. Floor Area 9Assume hk.=50mm)

ITEM NO.

TOTAL COST (Php)

Page 38: Final BOQ Philippine Coast Guard

Sub-Total V

Construction of Coast Guard District Bicol (CGDBCL) Facilities

VI CEILING and CARPENTRY WORKSInterior

01 sq.m. Ceiling AreaExterior

01 sq.m. Ceiling AreaBaseboards/Cornice

01 pcs. 1"x4"x8' Baseboards02 pcs. 1"x3"x8' Cornice

Hardwares01 sets Cylindrical Locksets02 pairs 3.5"x3.5" Stainless Steel

Ball Bearing HingesSub-Total VI

VII ROOF FRAMING AND ROOFING WORKSRoof Framing SystemTrusses

01 bdft 2"x6"x18'02 bdft 2"x4"x20'03 bdft Purlins, 2"x3"x12' Good Lumber04 bdft Rafters, 2"x6"x12' Good Lumber

Roofing Works01 sheets 0.50mm x 1050 Pre-painted

Roofing Sheets (Rib Type)02 pcs. Ridge Roll03 pcs. Gutter

Downspouts01 pcs. 110mm dia x 3.0m PVC Pipe

Sub-Total VIIVIII DOORS/WINDOWS/GLASS AND GLAZINGS (Including Jambs)01 pcs. Doors02 pcs. Analok Sliding Door03 pcs. Sliding Window Aluminum Frame

Analok GlassDouble Leaf Sliding Door

04 sq.m. 1/2" thk. Glass Doors inAluminum Frame Analoc/Bronze

05 sq.m. Panel Doors(Including Jamb)

06 sq.m. PVC Toilet DoorsWindows

07 sq.m. Aluminum Frame WindowsSliding WindowsBronze/Analoc/Brown Glass

Page 39: Final BOQ Philippine Coast Guard

Sub-Total VIII

Construction of Coast Guard District bicol (CGDBCL) Facilities

IX TITLE WORKS AND FLOOR FINISHES01 pcs. 60x60 Polished Granite

Floor TilesInterior Floor Area

02 pcs. 60x60 Unglazed CeramicFloor TilesCOMFORT ROOM

04 pcs. 30x30 Ceramic Floor Tiles05 pcs. 20x30 Ceramic Wall Tiles

Kitchen Counter Top10 pcs. Glazed Ceramic Wall Tiles (0.2m x 0.2m)

Sub-Total IXX PAINTING VARNISHING

01 sq.m. Masonry Walls02 sq.m. Ceiling 03 sq.m. Cornice and Baseboards

Sub-Total XXI PLUMBING AND SANITARY WORKS

Fixtures01 sets Water Closet02 sets Lavatory03 sets Stainless Steel Sink04 sets Spray Washers complete with

accessories05 sets Telephone shower w/ faucet06 sets Faucet

Plumbing08 pcs. 20mm (1/2") dia Gate Valve09 UNIT Septic Vault

Sub-Total XIXII ELECTRICAL WORKS

XIIA WIRES AND CABLESTHHN (Branch Circuits)

01 rolls02 mtrs03 mtrs

THW (Feeder/Sub01 mtrs

TW (Grounding)01 rolls 3.5 mm² Cu Cond Strnd02 mtrs 5.5 mm² Cu Cond Strnd03 mtrs 22 mm² Cu Cond Strnd

XIIB PIPES AND FITTINGS

3.5 mm² Cu Cond Strnd5.5 mm² Cu Cond Strnd2.0 mm² Cu Cond Royal Cord (3C) (75m)

22 mm² Cu Cond Strnd

Page 40: Final BOQ Philippine Coast Guard

PVC PIPES01 pcs.02 pcs.

PVC ELBOW01 pcs. 20 mm Ø Elbow02 pcs. 32 mm Ø Elbow

Construction of Coast Guard District Bicol (CGDBCL) Facilities

XIIC WIRING DEVICES01 sets One-way, One-Gang Switch02 sets One-way, One-Gang Switch03 sets One-way, One-Gang Switch04 sets One-Gang Conv Outlet05 sets Duplex Conv Outlet06 sets ACU Tandem Outlet07 sets Cable TV Outlet

XIID LIGHTING FIXTURES01 sets 1x11W LED Pin Light02 sets 4x5W LED Drop Light03 units LED Emergency Lights Dual Optics

XIIE BOXES AND CONDULETS01 pcs. 4x4 Ga#14 J Box with Cover02 pcs. 4x2 Ga#14 Utility Box

XIIF PANEL BOARDS AND CIRCUIT BREAKERS01 assy LPP

Main: 60AT, 14kAIC, 100AF250V, 3P, 60Hz, Bolt-onBranches:2-15AT, 50AF, 10kAIC, 2P5-20AT, 50AF, 10kAIC, 2P250V, 60Hz, Bolt-on 3-spacew/ flash mounting enclosure

XIIG MISCELLANEOUS AND HARDWARES01 bndls Electrical Tape02 rolls Rubber tape03 pcs. Hacksaw Blade04 kgs Ga #14 GI Pull Wire05 can PVC Cement, 120cc06 pck Assorted Cable Ties07 pck Assorted Cable Markers08 pcs. Cable Glands09 box Assorted Terminal Lugs10 pairs Cotton Gloves11 units Fire Extinguisher with Wall Mounting Bracket

Sub-Total XIISUB-TOTAL (03)

20 mm Ø Endbell32 mm Ø Endbell

Page 41: Final BOQ Philippine Coast Guard

DISTRICT COMMANDER'S QUARTER

Page 42: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)==============================================================================04 POWERHOUSE/MAIN SERVICE ENTRANCE/CONCRETE ENCASEMENT/MANHOLES/PEDESTALS

QTY UNIT DESCRIPTION % WT OF TOTAL UNIT COST (PHP)

I EARTHWORKS01 SQ. M. Demolition02 CU. M. Excavation03 CU. M. Backfilling04 CU. M. Filling Materials

Sub-Total IIII PLAIN AND REINFORCED CONCRETE

IIA Column Footing01 CU. M. Concrete Volume05 KGSIIB Wall Footing01 CU. M. Concrete Volume05 KGS06 KGSIIIC Column 01 CU. M. Concrete Volume05 KGS 16MM Ø Reinf. Steel Bars07 KGS 10MM Ø Reinf. Steel BarsIID Tie Bean (WF-TB)01 CU. M. Concrete Volume

Reinforcements05 KGS 16MM Ø Reinf. Steel Bars

(Continous Bar)06 KGS 12MM Ø Reinf. Steel Bars

(Extra Bars)07 KGS 10MM Ø Reinf. Steel Bars

(Stirrups)IIE Elevated Beams (Roof Beams)01 CU. M. Concrete Volume

Reinforcements05 KGS 16MM Ø Reinf. Steel Bars

(Continous Bar)06 KGS 12MM Ø Reinf. Steel Bars

(Extra Bars)07 KGS 10MM Ø Reinf. Steel Bars

(Stirrups)IIF Slab on Fill01 CU. M. Concrete Volume05 KGS 10MM Ø Reinf. Steel BarsIIG Elevated Slab (S1)

ITEM NR.

TOTAL COST (PHP)

16MM Ø Reinf. Steel Bars

12MM Ø Reinf. Steel Bars10MM Ø Reinf. Steel Bars

Page 43: Final BOQ Philippine Coast Guard

01 CU. M. Concrete Volume05 KGS 10MM Ø Reinf. Steel Bars

IIH

01 CU. M. Concrete Volume05 KGS 10MM Ø Reinf. Steel Bars06 KGS 12MM Ø Reinf. Steel BarsII I Miscellaneous01 SQ. M. Form Works Area

Sub-Total IIIII CONCRETE MASONRY

01 SQ. M. Wall Area05 KGS 10MM Ø Reinf. Steel Bars06 KGS Ga # 16 GI Tie Wire

Cable Trench 01 SQ. M. Wall Area05 KGS 10MM Ø Reinf. Steel Bars06 KGS Ga # 16 GI Tie Wire

Manhole01 SQ. M. Wall Area05 KGS 10MM Ø Reinf. Steel Bars

Sub-Total IIIIV MASONRY

Plastering01 SQ. M. Wall Area

Cable Trench01 SQ. M. Wall Area

Manhole01 SQ. M. Wall Area

Topping01 SQ. M. Floor Area (Assume hk.=12mm)

Sub-Total IVV CARPENTRY WORKS

Interior/Exterior Ceiling01 SQ. M. Ceiling Area

Sub-Total VVI ROOF FRAMING AND ROOFING SYSTEM

VIA Roof Framing SystemTrusses

01 pcs 3/16" thk. 2"x4"C-PurlinsRoof Purlins

04 pcs 1.0mm thk. 2"x4"C-PurlinsCleats

05 pcs 3/16"x1-1/2" Angular Bar

Cable Trench Slab, Man hole Slab & Concrete Incasement

Page 44: Final BOQ Philippine Coast Guard

Facia Boards06 pcs 1.0mm thk. 2"x18"C-Purlins07 KGS Welding Rod

VIB Roofing Works01 SQ. M. 0.40mmx1050 Pre-painted

Roofing sheets (Rib Type)02 l.m. Ridge Cap02 l.m. Inside Gutter03 pcs Tekscrew04 pcs Rivets05 pcs Silicon Sealant06 gal Touch-up Paint03 length07 pcs

Sub-Total VIVII DOORS/WINDOWS (Including Jambs)

01 set Steel Door02 sets Flush Door04 sets Steel Louver Windows04 sets Analok Glass Window05 SQ. M. Steel Door06 SQ. M. Flush Door04 SQ. M. Steel Louver Windows08 SQ. M. Analok Glass Window

Sub-Total VIIVIII STEEL WORKS

Cable Tray and Cable Trench Cover01 pcs 3/16 thk x 2"x2" Angle Bar02 pcs 3/16 thk x 2" Flat Bar03 pcs 12mm dia Expansion Bolt04 SQ. M. 1/2" thk Checkered Steel Plate05 box Welding Rod

Manhole Cover01 pcs 3/16 thk x 2"x2" Angle Bar02 pcs 1/4" thk Checkered Steel Plate

Sub-Total VIIIIX PAINTING/VARNISHING

01 SQ. M. Masonry Walls02 SQ. M. Ceiling 03 SQ. M. Doors04 SQ. M. Metal/Steel Surface

(Railings/Roof Framing)Sub-Total IX

#4"Øx10' PVC Emerald#4"ØPVC Elbow

Page 45: Final BOQ Philippine Coast Guard

X CONCRETE PEDESTAL, MANHOLE AND CONCRETE ENCASEMENTConcrete Pedestal Column

01 CU. M. Concrete Volume02 KGS 16MM Ø Steel Bar03 KGS 10MM Ø Steel Bar

Footing01 CU. M. Concrete Volume02 KGS 16MM Ø Steel Bar

XA Concrete Encasement (Main Service Entrance)01 CU. M. Concrete Volume02 KGS 16MM Ø Steel Bar03 KGS 10MM Ø Steel Bar

XB Manhole (Main Service Entrance)01 CU. M. Concrete Volume02 KGS 10MM Ø Steel Bar07 KGS08 Sets 15MM thk Checkered Plate (Cover)09 Bags Sahara Waterproof

XC Form Works (Main Service Entrance)01 SQ. M. Form Works Area

XD Concrete Encasement (Telephone/Intercom/Cable TV Service Entrance)01 CU. M. Concrete Volume02 KGS 10MM Ø Steel Bar

XE Handhole (Telephone/Intercom/Cable TV Service Entrance)01 CU. M. Concrete Volume02 KGS 10MM Ø Steel Bar06 KGS Ga # 16 GI Tie Wires07 KGS 38MM x 38MM x 4MM thk Angle Bar08 KGS 15MM thk Checkered Plate (Cover)09 KGS Sahara Waterproof

Cement (32 kgs/pouch) XF Form works (Telephone/Intercom/Cable TV Service Entrance

01 SQ. M. Form Works AreaSub-Total X

38MM Ø x 38MM x 4MM thk Angle Bar

Page 46: Final BOQ Philippine Coast Guard

XI FUEL TANK PEDESTAL01 CU. M. Concrete Pedestal (For Fuel Tank)05 KGS06 KGS 10MM Ø Steel Bar

Form Works01 SQ. M. Surface Area

Sub-Total XIXII ELECTRICAL WORKS (POWER HOUSE AND MAIN SERVICE ENTRANCE)

XIIA WIRES AND CABLESTHHN (Branch Circuits)

01 rolls02 mtrs03 mtrs

THW (Feeder/Subfeeder)01 mtrs02 mtrs03 mtrs

TW (Grounding)01 rolls02 mtrs03 mtrs 14mm² Cu Cond Strnd04 mtrs 30mm² Cu Cond Strnd05 mtrs 250mm² Cu Cond Strnd

XIIB PIPES AND FTTINGS01 lgths02 lgths03 lgths04 lgths01 pcs 20mm Ø Endbell 02 pcs 32mm Ø Endbell03 pcs 40mm Ø Endbell04 pcs 110mm Ø Endbell01 pcs02 pcs03 pcs

XIIIC WIRING DEVICES01 sets One-Way, One-Gang Switch

12MM Ø Steel Bar

3.5 mm² Cu Cond Strnd5.5 mm² Cu Cond Strnd2.0 mm² Cu Cond Royal Cord (3C)(75m)

14mm² Cu Cond Strnd30mm² Cu Cond Strnd250mm² Cu Cond Strnd

3.5mm² Cu Cond Strnd5.5mm² Cu Cond Strnd

20mm Ø x 3m32mm Ø x 3m40mm Ø x 3m110mm Ø x 3m

20mm Ø Elbow32mm Ø Elbow110mm Ø Elbow

Page 47: Final BOQ Philippine Coast Guard

02 sets One-Way, Three-Gang Switch03 sets Duplex Conv Outlet04 sets ACU Tandem Outlet05 sets One Gang Conv Outlet

XIID LIGHTING FIXTURES01 sets 1x40va Industrial Type FF02 sets 2x40va egg-crate Type FF

XIIE BOXES AND CONDULETS01 pcs 4x4 Ga#14 J Box with Cover02 pcs 4x2 Ga#14 Utility Box

XIIF PANELBOARDS AND CIRCUIT BREAKERS01 assy LPP-PH

Main: 60AT, 22kAIC, 100AF250V, 3P, 60Hz, Bolt-onBranches:5-20AT, 50AF, 10kAIC, 2P250V, 60Hz, Bolt-on 3-spacew/ flash mounting enclosure

02 assy DP-PHMain: 100AT, 22kAIC, 100AF250V, 3P, 60Hz, Bolt-onBranches:2-60AT, 100AF, 18kAIC, 3P250V, 60Hz, Bolt-on 1-40AT, 50AF, 14kAIC, 2P250V, 60Hz, Bolt-on2-20AT, 50AF, 14kAIC, 2P2-spacew/ flash mounting enclosure

03 assy ATS600AT, 600AF, 3P, 250V, 60HzFree Standing EnclosureFrequency: 60HzFree Standing Enclosure

04 assy MDPMain: 600AT, 600AF, 65kAIC3P, 250V, 60Hz, Bolt-onBranches:1-60AT, 100AF, 22kAIC250V, 60Hz, Bolt-on1-60AT, 100AF, 25kAIC250V, 60Hz, Bolt-on1-250AT, 100AF, 25kAIC250V, 60Hz, Bolt-on1-225AT, 250AF, 25kAIC250V, 60Hz, Bolt-on2-Space

Page 48: Final BOQ Philippine Coast Guard

Free Standing Cabinet TypeXIIG MISCELLANEOUS AND HARDWARES

01 mtrs 30mm² Bare Copper Wire02 pcs05 pcs09 pcs04 pcs 3/4 x 10" Ground Rod05 bndls Electrical Tape06 rolls Rubber Tape07 pcs Hacksaw Blade08 kgs Ga #14 GI Pull Wire09 cans PVC Cement, 120cc

10 pcks Assorted Cable Ties11 pcks Cable Markers12 pcs Cable Glands13 box Assorted Terminal Lugs14 units Fire Extinguisher with mounting bracket15 lot Genset Concrete Pad and accessories

Sub-Total XIISUB-TOTAL (04)POWERHOUSE/MAIN SERVICEENTRANCE/CONCRETEENCASEMENT/MANHOLESPEDESTALS

(Note: Generator Sets NOT included in the Direct and Indirect Cost.)

25mm Ø Ground Rod Connector12mm Ø x 300mm Oval-Eye Bolt200mm Ø Solderless Conn

Page 49: Final BOQ Philippine Coast Guard

PROJECT: PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION: REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAY

OWNER: PHILIPPINE COAST GUARDSUBJECT: BID OF QUANTITIES (FORMAT)

05 GUARD HOUSE (3 UNITS) AND PERIMETER LIGHTS

ITEM NR. QTY UNIT DESCRIPTION % WT OF TOTAL UNIT COST (PHP)

I EARTHWORKS01 cu.m Exacavation02 cu.m Backfilling

Sub-Total I II CONCRETE WORKSIIA Footing01 cu.m Concrete Volume05 kgsIIB Column01 cu.m Concrete Volume05 kgs 16mm Ø Reinf. Steel Bars06 kgsIIC Slab on Fill 01 cu.m Concrete Volume05 kgsIID Miscellaneous01 sq.m Form Works Area

Sub-Total IIIII CONCRETE MASONRY WORKS

Masonry Wall01 sq.m Wall Area05 kgs 10mm Ø Reinf. Steel Bars

Sub-Total IIIIV MASONRY

Plastering01 sq.m Area

Sub-Total IVV CARPENTRY WORKS

Ceiling01 sq.m Ceiling Area

Sub-Total V

TOTAL COST (PHP)

16mm Ø Reinf. Steel Bars

10mm Ø Reinf. Steel Bars

12mm Ø Reinf. Steel Bars

Page 50: Final BOQ Philippine Coast Guard

VI ROOF FRAMING AND ROOFING SYSTEMVIA Roof Framing System01 bdft. 50mm x 100mm Wd. Roof

Trusses/Rafter02 bdft. 50mm x 75mm Wd. Roof

Purlins03 bdft. 50mm x 75mm Wd. Roof

Cleats04 bdft. 10mm x 120mm Wd. Roof

FaciaVIB Roofing Works01 sq.m 0.50mm x 1050 Pre-painted

Roofing Sheets (Rib Type)02 l.m. Ridge Roll/Capping03 l.m. Pre-painted plain gutter04 l.m. Tekscrew05 pcs. Rivets06 pcs. Silicon Sealant07 gal Touch-up paintVIC Downspouts01 length02 pcs.

Sub-Total VIVII DOORS/WINDOWS (Including Jambs)01 pcs. Flush Door02 pcs. Clear Glass Sliding Windows03 sq.m Flush Door04 sq.m Clear Glass Sliding Windows05 sq.m Door Lockset06 set 4"x2" Door Hinges

Sub-Total VIIVIII TILE WORKS

Toilet01 pcs. 40cm x 40cm Glazed Tiles

Wall Tiles02 pcs. 40cm x 40cm Glazed Tiles

Floor TilesGuard Room

03 pcs. 40cm x 40cm Glazed TilesFloor Tiles

Sub-Total VIII

#4"Øx10' PVC Emerald#4"ØPVC Elbow

Page 51: Final BOQ Philippine Coast Guard

IX PLUMBING WORKS01 set Water Closet w/ lavatories02 pcs. 4" x 4" PVC Floor Drain15 unit Septic Vault

Water Line01 pcs. Brass Faucet03 pcs.

Sub-Total IXX PAINTING /VARNISHING

(3-Coats Painting)01 sq.m Masonry Wall02 sq.m Ceiling04 sq.m Doors05 sq.m Solignum Application

Sub-Total XXI PERIMETER LIGHTING PEDESTALXIA EARTHWORKS01 cu.m ExacavationXIB PLAIN AND REINFORCED CONCRETE

Footing/Column01 cu.m Concrete Volume06 kgs 16mm Ø Reinf. Steel Bars07 kgs 10mm Ø Reinf. Steel Bars

Miscellaneous01 sq.m Form Works AreaXIC STEEL WORKS

FABRICATED LAMP POST01 kgs 3" dia SCH 40 G.I. Pipe02 kgs 2" dia SCH 40 G.I. Pipe03 pcs. 3/16 Angle Bar04 pcs. 5/8 dia Round Bar05 box Welding Rod

MISCELLANEOUS AND HARDWARES01 pcs. .25m x .25m Metal Plate02 pcs. 3/4" x 3" x 12" Plain Finish Bent

Sub-Total XIXII ELECTRICAL WORKS

WIRES AND CABLESTHHN (Branch Circuits)

01 roll02 rolls03 rolls04 rolls

#1/2Ø Gate Valve

3.5 mm² Cu Cond Strnd8.0 mm² Cu Cond Strnd14 mm² Cu Cond Strnd2.0 mm² Royal Cord (3C) (75m)

Page 52: Final BOQ Philippine Coast Guard

PIPES AND FITTINGS01 lgths 02 lgths

PVC ELBOW01 pcs.02 pcs.

PVC ENDBELL01 pcs.02 pcs.

WIRING DEVICES01 sets One-Way, Two-Gang Switch02 sets One-Way, Three-Gang Switch03 sets Duplex Conv Outlet

LIGHTING FIXTURES01 unit 1 x 42 W LED Street Light02 units 1 x 11 W LED Buld w/ Receptacles

BOXES AND CONDULETS01 pcs. 4 x 4 Ga#14 J Box with Cover02 pcs. 4 x 2 Ga#14 Utility Box

Sub-Total XIIA PANELBOARDS AND CIRCUIT BREAKERS

01 assy LPPGH-1Main: 20AT, 10kAIC, 50AF250V, 2P, 60Hz, Bolt-onBranches:1-15AT, 50AF, 10kAIC, 2P1-20AT, 50AF, 10kAIC, 2P

02 assy LPPGH-2Main: 30AT, 14kAIC, 50AF250V, 2P, 60Hz, Bolt-on 2-space

03 assy LPPGH-3Main: 60AT, 14kAIC, 2PBranches:3-15AT, 50AF, 10kAIC, 2P3-20AT, 50AF, 10kAIC, 2P250V, 60Hz, Bolt-on 2-space

04 assy Motor Control Panel, 20 ampereSub-Total XIIB

20 mm Ø x 3m25 mm Ø x 3m

20 mm Ø Elbow25 mm Ø Elbow

20 mm Ø Endbell25 mm Ø Endbell

Page 53: Final BOQ Philippine Coast Guard

MISCELLANEOUS AND HARDWARES01 pcs.02 pcs. 3/4 x 10" Ground Rod03 bndls Electrical tape04 rolls Rubber Tape05 pcs. Hacksaw Blade06 kgs Ga #14 Gl Pull Wire07 cans PVC Cement, 120 cc08 pcks Assorted Cable Ties09 pcs. Cable Glands10 box Assorted Terminal Lugs11 box Assorted Bolts and Nuts

Sub-Total XIICTotal XII

SUB-TOTAL (05)GUARD HOUSE (3 UNITS) AND PERIMETERLIGHTS

25mm Ø Ground Rod Connector

Page 54: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)==========================================================================06 FABRICATION AND INSTALLATION OF GATES (3 UNITS)==========================================================================

ITEM NR. QTY UNIT DESCRIPTION

I EARTHWORKSEarthworks and Demolition

01 CU.M. Cut Concrete Opening02 CU.M. Excavation03 CU.M. Backfilling

Sub-Total III CONCRETE WORKS

FOR THREE (3) NEW GATESFooting

01 CU.M. Concrete Volume05 KGS 12 mm dia RSB x 6.0m

Column01 CU.M. Concrete Volume05 KGS 10mm dia RSB06 KGS 12mm dia RSB

FOR TWO (2) EXISTING GATES (TO BE DEMOLISHED AND FENCED)Wall Footing

01 CU.M. Concrete Volume05 KGS 12mm dia RSB x 6.0m

Footing01 CU.M. Concrete Volume05 KGS 12mm dia RSB x 6.0m

Column01 CU.M. Concrete Volume05 KGS 10mm dia RSB06 KGS 12mm dia RSB

CHB Wall01 sq.m Wall Area05 KGS 10mm dia RSB x 6.0m

Sub-Total IIIII PLASTERING

01 sq.m Wall AreaSub-Total III

% WT OF TOTAL

UNIT COST (PHP)

TOTAL COST (PHP)

Page 55: Final BOQ Philippine Coast Guard

IV STEELWORKSFence Railing

01 pcs. 5.0mm thk. X 50.0mm x 50.0mmx 6.0m Angle Bar Railings

02 pcs. 6.0mm thk. X 63.0mm x 63.0mmx 6.0m Angle Bar

03 KGS Welding RodSteel Gate

01 sq.m Area (3-units of Steel Gate)02 pcs. 3/4" thk. G.I. Pipe Sched 40x6.0m03 pcs. 2-1/2" thk G.I. Pipe Sched 40x6.0m

for Gate Frames04 KGS Welding Rod

Fence Railing01 pcs. 5.0mm thk. X 50.0mm x 50.0mm

x 6.0m Angle Bar Railings02 KGS 6.0mm thk. X 63.0mm x 63.0mm

x 6.0m Angle Bar 03 KGS Welding Rod

Steel Gate01 sq.m Area (3-units of Steel Gate)02 pcs. 3/4" thk. G.I. Pipe Sched 40x6.0m03 pcs. 2-1/2" thk G.I. Pipe Sched 40x6.0m

for Gate Frames04 KGS Welding Rod

Fence Railing01 pcs. 5.0mm thk. X 50.0mm x 50.0mm

6.0m Angle Bar Railings02 pcs. 6.0mm thk. X 63.0mm x 63.0mm

6.0m Angle Bar03 KGS Welding Rod

Steel Gate01 sq.m Area (3-units of Steel Gate)02 pcs. 3/4" thk. G.I. Pipe Sched 40x6.0m03 pcs. 2-1/2" thk G.I. Pipe Sched 40x6.0m

for Gate Frames04 KGS Welding Rod

Sub-Total IVV FORMWORKS/SCAFOLDING01 sq.m Area

Sub-Total VVI PAINTING01 sq.m Masonry Walls02 sq.m Metal/Steel Surfaces

Sub-Total VISUB-TOTAL (06)

Page 56: Final BOQ Philippine Coast Guard

PERIMETER FENCE AND GATES (3 UNITS)

Page 57: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)========================================================================== 07 ACCESS ROAD AND DRAINAGE==========================================================================

QTY UNIT DESCRIPTION UNIT COST (PHP)

I EARTHWORKS01 cu.m. Clearing and Grabbing02 cu.m. Grading and Compaction03 cu.m. Base Coarse 9Filling Materials)04 cu.m. 3/4" Crushed gravel and Fine Sand

(Finishing Surfaces)Equipment

01 hr Plate and Virbratory CompactorSub-Total I

II CONCRETE WORKSIIA 100mm thk. (average) SIDEWALK

452.00 SQ.M. AreaUsing Class "A" mixture

01 cu.m. Concrete Volume05 kgs 12mm dia. X 6.0 Deformed

Reinf BarsIIB 200mm thk. (average) ROADWAY

940.00 sq.m. Surface AreaUsing Class "A" mixture

01 cu.m. Concrete Volume05 kgs 16mm dia. X 6.0m Deformed

Reinf BarsIIC Catch Basin and Concrete Pipes

1595.00 sq.m. Surface AreaUsing Class "A" mixture

01 cu.m. Concrete Volume05 kgs 12mm dia. X 6.0 Deformed

Reinf Bars05 pcs 300mm dia. X 1.20m

Reinforced Concrete PipesEquipment

01 days 1 Bagger Concrete MixerSub-Total II

III FORMWORKSFormworks

01 sq.m. AreaSub-Total III

SUB-TOTAL (07)

ITEM NR.

% WT OF TOTAL

TOTAL COST (PHP)

Page 58: Final BOQ Philippine Coast Guard

ACCESS ROAD AND DRAINAGE

Page 59: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)========================================================================= 08 CONCRETE ELEVATED WATER TANK PLATFORM=========================================================================

QTY UNIT DESCRIPTION

I EARTHWORKS01 cu.m Excavation02 cu.m Backfilling

Sub-Total III CONCRETE WORKSIIA Footing01 cu.m Concrete Volume05 kgs 16mm dia. Deformed Reinf BarsIIB Tie Beam01 cu.m Concrete Volume

16mm dia. Deformed Reinf Bars10mm dia. Deformed Reinf Bars

IIC Column01 cu.m Concrete Volume05 kgs 16mm dia. Deformed Reinf Bars06 kgs 10mm dia. Deformed Reinf Bars IID Beams01 cu.m Concrete Volume05 kgs 16mm dia. Deformed Reinf Bars06 kgs 10mm dia. Deformed Reinf Bars IIE Slab01 cu.m Concrete Volume05 kgs 10mm dia. Deformed Reinf Bars IIF Formworks01 sq.m. Contact Area

Sub-Total II

ITEM NR.

% WT OF TOTAL

UNIT COST (PHP)

TOTAL COST (PHP)

Page 60: Final BOQ Philippine Coast Guard

III STEEL WORKS/WATER TANKS/PUMPS AND SUPPLY LINESIIIA Railguard01 pcs 2"dia. G.I. Pipe Sch. 40 (Handrail)02 pcs 4mm (3/16") thk. X 25mm (1")

Angular Bar (Grills)IIIB Steel Ladder03 kgs 16mm dia. Deformed Reinf BarsIIIC Stainless Steel Water Tank04 unit 5300 li Stainless Steel Water Tank05 unit 2.0 Hp Water Pump (Eurostar)06 unit 82 gallons Pressure Tank07 pcs 1"dia. G.I. Pipe Sch. 4008 lot Assorted Pipes and FittingsIIID Main Supply Lines09 lot Fitting Installation10 l.m. 38mm dia. (1-1/2") HDPE Pipe

SDR-11 (Blue) average Length11 lot HDPE Pipe and FittingsIIIE Laying Preparations01 l.m. Concrete Volume02 cu.m Concrete Breaking03 cu.m Excavations04 cu.m Backfilling

Concrete Filler01 cu.m Concrete Volume

(75mm (3") thk. Average)Sub-Total III

IV PAINTING WORKS01 sq.m. Surface Area (2 Coats)

Sub-Total IVSUB-TOTAL (08)CONCRETE ELEVATED WATER TANK PLATFORM

Page 61: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)========================================================================= 09 FLAGPOLE=========================================================================

QTY UNIT DESCRIPTION % WT OF TOTAL

I CONCRETE BREAKING/EARTHWORKS

01 cu. m Excavation 02 cu. m Backfilling

Sub-Total I

II CONCRETE/MASONRY WORKS

IIA Footing/Column Pedestal 01 cu. m Concrete Volume 05 kgs 16mm dia. Deformed Reinf Bars 06 kgs 12mm dia. Deformed Reinf Bars IIB Masonry/Slab on Fill 01 sq.m. Wall area 02 cu. m Concrete Volume (Slab) 07 kgs 10mm dia. Deformed Reinf Bars IIC Formworks 01 sq.m. Contact Area

Sub-Total II

III STEEL WORKS

01 pcs 50mm dia G.I. Pipe sched 40 02 pcs 75mm dia G.I. pipe sched 40 03 pcs 100mm dia G.I. Pipe Sched 40 04 pcs 100mm dia Stainless Pipe

(Low Grade) x 1.00m Chain Post 05 pcs 100mm Dia x 1.50m Stainless Post 06 pcs 100mm Dia Stainless Ball 07 pcs Flagpole Cleat 08 kgs Welding Rod (For Stainless) 09 kgs Welding Rod

Sub-Total III

ITEM NR.

UNIT COST (PHP)

TOTAL COST (PHP)

Page 62: Final BOQ Philippine Coast Guard

IV ACCESSORIES

01 pc 100mm Dia Stainless Finial Ball 02 pc 75mm Dia Pulley 03 pcs 50mm Dia Pulley 04 l.m. 8mm Dia Stainless Chain

8mm Dia Stainless Chain 05 pcs Hooked 06 roll 6mm Flag Rope

Sub-Total IV

V TITLE WORKS

01 pcs 60cm x 60 Granite Tile 02 bags Tile Grout 2.0 kg 03 bags Tile Adhesive 25.0 kg

Sub-Total V

VI PAINTING WORKS

01 sq.m. Surface Area (Preparation) Surface Area (3-coats

02 sq.m. Application) Sub-Total VI

SUB-TOTAL (09)FLAGPOLE

Page 63: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)=========================================================================10 MEDICAL / DENTAL BUILDING=========================================================================

QTY UNIT DESCRIPTION

I EARTHWORKS 01 cu. m Excavation 02 cu. m Backfilling 03 cu. m Filing Materials

Sub-Total IIII PLAIN AND REINFORCED CONCRETEIIA Column Footing 01 cu. m Concrete Volume 05 kgs IIB Wall Footing 01 cu. m Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars 06 kgs 12mm Ø Reinf. Steel Bars IIC Column 01 cu. m Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars 06 kgs 12mm Ø Reinf. Steel BarsIID Beams (Tie Beam/Roof Beam) 01 Concrete Volume

Reinforcement 05 kgs 16mm Ø Reinf. Steel Bars

(Continuos Bar) 06 kgs

(Stirrups) IIF Slab on Fill 01 cu. m Concrete Volume 05 kgs 10mm Ø Reinf. Steel Bars IIG Miscellaneous 01 cu. m Form Works Area

Sub-Total II

ITEM NR.

% WT OF TOTAL

UNIT COST (PHP)

TOTAL COST (PHP)

16mm Ø Reinf. Steel Bars

10mm Ø Reinf. Steel Bars

Page 64: Final BOQ Philippine Coast Guard

III CONCRETE MASONRY01 sq.m Wall Area 05 kgs 10mm Ø Reinf. Steel Bars

Sub-Total III IV MASONRY

Plastering (1/2-3/4 thk. Plastering)

01 sq.m Area Topping (Average, 20mm thk.) Floor Area (Assume hk. = 12mm)

Sub-Total IV V CARPENTRY WORKS

Interior Ceiling01 sq.m Ceiling Area

Exterior Ceiling 01 sq.m Ceiling Area

Double Wall partion 01 sq.m Wall Area

Cabinets01 sq.m Cabinet Wall

Sub-Total V VI ROOF FRAMING AND ROOFING SYSTEMVI Roof Framing System

Top Chord 01 pcs 3/16" thk. 2" Angular Bar

Bottom Chord 02 3/16" thk. 2" Angular Bar

Web Member 03 pcs 3/16" thk. 2" Angular Bar

Roof Purlins 04 pcs 1.0mm thk. 2" x 4" C-Purlins

Cleats 05 pcs 3/16" x 1-1/2" Angular Bar

Facia Boards 06 pc 1.0mm thk. 2" x 12" C-Purlins 07 kgs 16mm Ø Reinf. Steel Bars 08 kgs Welding Rod

VIB Roofing Works 01 sq.m 0.50mm x 1050 Pre-painted

Roofing Sheets (Rib Type) 02 l.m. Ridge Roll 03 l.m. Pre-Painted Plain Gutter 04 l.m. Pre-Painted Flushing

Sub-Total VI

Page 65: Final BOQ Philippine Coast Guard

VII DOORS/WINDOWS (including Jambs)01 pcs Panel Door 02 pcs Flush Door 03 pcs PVC Toilet Doors 04 pcs Windows 05 sq.m Panel Door 06 sq.m Flush Door 07 sq.m PVC Toilet Doors 08 sq.m Analok Glass Window

Sub-Total VIII VIII TILE WORKS AND FLOOR FINISHES

Counter 01 pcs 20cm x 20cm Glazed Tiles

Comfort Rooms 02 pcs 40 x 40 Ceramic Wall Tiles 03 pcs 40 x 40 Ceramic Floor Tiles

Sub-Total IX IX PAINTING/VARNISHING

01 sq.m Masonry Walls 02 sq.m Ceiling 02 sq.m Plywood Wall 03 sq.m Doors 04 sq.m Cabinet Lockers 05 sq.m Metal/Steel Surfaces

(Roof Framing System) Sub-Total X

X PLUMBING WORKS01 set Water Closet 02 set Lavatory Sink 03 pcs 4" x 4" Floor Drain

Water Line 01 pcs Brass Faucet 07 pcs

Septic Vault/Catch Basin 01 cu. m Excavation 02 sq.m Masonry 07 kgs 10mm dia. RSB

Formworks 01 sq.m Area

Sub-Total XI

#1/2Ø Gate Valve

Page 66: Final BOQ Philippine Coast Guard

XI ELECTRICAL WORKSXIA WIRES AND CABLES

THHN (Branch Circuits) 01 rolls 02 mtrs 03 mtrs

THW (Feeder/Subfeeder) 01 mtrs

TW (Grounding) 01 roll 3.5 mm² Cu Cond Strnd 02 rolls 5.5 mm² Cu Cond Strnd 03 mtrs 22 mm² Cu Cond Strnd

Sub-Total XIA XIB PIPES AND FITTINGS

PVC PIPES 01 lgths 02 lgths 03 lgths

PVC ENDBELL 01 pcs 20 mm Ø Endbell02 pcs 25 mm Ø Endbell03 pcs 40 mm Ø x Endbell

PVC ELBOW01 pcs02 pcs03 pcs

Sub-Total XIBXIC WIRING DEVICES

01 sets One-Way, One-Gang Switch02 sets One-Way, Two-Gang Switch03 sets One-Way, Three-Gang Switch04 sets One-Gang Conv Outlet05 sets Duplex Conv Outlet06 sets Special Purpose Outlet07 sets ACU Outlet10 sets Computer Tandem Outlet

Sub-Total XICXID LIGHTING FIXTURES

01 sets 1 x 15W Tubular LED Light w/ Housing02 sets 2 x 11W LED Pin Light03 sets Emergency Lights Dual Optics04 set Emergency Exit Light

3.5 mm² Cu Cond Strnd5.5 mm² Cu Cond Strnd2.0 mm² Cu Cond Royal Cord (3C)(75m)

22 mm² Cu Cond Strnd

20 mm Ø x 3 m25 mm Ø x 3 m40 mm Ø x 3 m

20 mm Ø Elbow25 mm Ø Elbow40 mm Ø Elbow

Page 67: Final BOQ Philippine Coast Guard

Sub-Total XID

XIE BOXES AND CONDULETS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

Sub-Total XIEXIG FIRE ALARM SYSTEM

WIRES AND CABLES z01 rolls TF Wire # 1602 roll 2.0 mm² Cu Cond Strnd

PIPES AND FITTINGS01 lgths02 lgths 20 mm Ø x 3 m EMT04 lgths 15 mm Ø x 3 m IMC05 pcs06 pcs07 pcs EMT Connectors, 20mm Ø09 pcs10 pcs EMT Coupling, 20mm Ø

WIRING DEVICES01 pcs Smoke Detector02 units Fire Alarm Bell03 unit Fire Alarm Manual Station

BOXES AND CONDULETS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 Utility Box

unit 20 lbs Fire Extinguisher with wall mounting bracket

Sub-Total XIG

15 mm Ø x 3 m EMT

15 mm Ø IMC L&BEMT Connectors, 15mm Ø

EMT Coupling, 15mm Ø

Page 68: Final BOQ Philippine Coast Guard

XIH TELEPHONE/INTERCON SYSTEMWIRES AND CABLES

01 roll Telephone WirePIPES AND FITTINGS

02 lgths03 pcs 25 mm Ø Endbell

DEVICES01 sets Telephone Outlet

BOXES AND CABINETS01 pcs TTC02 pcs 4 x 2 Ga#14 Utility Box

Sub-Total XIHXIJ CABLE TV SYSTEM

WIRES AND CABLES01 roll CO-Axial Cable

PIPES AND FITTINGS01 lgths02 pcs 25mm Ø Endbell

DEVICES01 sets Cable TV Outlet02 pcs Cable TV Splitter

BOXES AND CABINETS02 pcs 4 x 4 Ga#14 J Box with Cover03 pcs 4 x 2 Ga#14 Utility Box

Sub-Total XIJXIK MISCELLANEOUS AND HARDWARES (Electrical)01 bndl Electrical Tape02 rolls Rubber Tape03 pcs Hacksaw Blade 04 kgs Ga #14 GI Pull Wire05 cans PVC Cement, 120cc06 pck 5mm x 300mm Cable Ties07 pcks Cable Markers08 box Assorted Terminal Lugs09 box Assorted Bolts and Nuts10 pc Entrance Cap, 40mm dia.

Sub-Total XIKTOTAL - XI

25 mm Ø x 3 m PVC

25mm Ø x 3m PVC

Page 69: Final BOQ Philippine Coast Guard

SUB-TOTAL (10)MEDICAL/DENTAL BUILDING

Page 70: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)========================================================================= 11 CEREMONIAL STAGE=========================================================================

QTY UNIT DESCRIPTION

I EARTHWORKS 01 cu.m. Excavation02 cu.m. Backfilling

Sub-Total III CONCRETE WORKSIIA Footing01 cu.m. Concrete Volume 05 kgsIIB Wall Footing (WF-1)01 cu.m. Concrete Volume 05 kgs 12 mm dia Reinf. Steel BarsIIC Column01 cu.m. Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars06 kgs 12 mm dia Reinf. Steel Bars07 kgsIID Elevated Beams01 cu.m. Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars06 kgs 12 mm dia Reinf. Steel Bars07 kgs 10 mm Ø Reinf. Steel BarsIIE Tiers Support Enclined Beam01 cu.m. Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars06 kgs 12 mm dia Reinf. Steel Bars07 kgs 10 mm Ø Reinf. Steel BarsIIF Roof Beam01 cu.m. Concrete Volume 05 kgs 16mm Ø Reinf. Steel Bars06 kgs 12 mm dia Reinf. Steel Bars07 kgs 10 mm Ø Reinf. Steel BarsIIG Bleacher Area Elevated Slab01 cu.m. Concrete Volume 05 kgs 12 mm dia Reinf. Steel Bars06 kgs 10 mm Ø Reinf. Steel BarsIIH Stage Area Elevated Slab01 cu.m. Concrete Volume 05 kgs 12 mm dia Reinf. Steel Bars

ITEM NR.

% WT OF TOTAL

UNIT COST (PHP)

TOTAL COST (PHP)

16mm Ø Reinf. Steel Bars

10 mm Ø Reinf. Steel Bars

Page 71: Final BOQ Philippine Coast Guard

06 kgs 10 mm Ø Reinf. Steel Bars

III Stage Area Slab on Fill01 cu.m. Concrete Volume 05 kgs 12 mm dia Reinf. Steel BarsIIJ Ground Slab on Fill01 cu.m. Concrete Volume 05 kgs 10 mm Ø Reinf. Steel BarsIIK Concrete Stairs01 cu.m. Concrete Volume 05 kgs 10 mm Ø Reinf. Steel BarsIIL Miscellaneous01 sq.m. Form Works AreaIII CONCRETE MASONRY WORKS

Masonry Wall01 sq.m. Wall Area

Sub-Total IIIV MASONRY

Roof Framing SystemTR-1 (Rafter)

01 pcs 6mm thk. X 2" Angular BarTRUSS Top and Bottom Chord

02 pcs 3/16" thk. 2" Angular BarWEB MEMBERTR-3 (Parallel web Chord)

03 pcs 6mm thk. X 2" Angular BarTop/Bottom Chord

04 pcs 3/16" thk. 2" Angular BarWEB MEMBERROOF PURLINS

05 pcs 1.0mm thk. 2" x 4" C-Purlins06 pcs 3/16"x1-1/2" Angular Bar

Cleats07 pcs 2.0 mm thk. 2" x 6" C-Purlins

Facia Boards08 pcs Welding Rod09 sq.m. Roofing Works

0.50mm x 1050 Pre-paintedRoofing Sheets (Rib Type)

10 pcs Texcrew11 l.m. Flashing Sheet

Railing Works12 pcs 3" dia GI Pipe Handrail/balluster13 pcs 2 1/2" dia. Gi Railings

Sub-Total V

Page 72: Final BOQ Philippine Coast Guard

VI DOORS/WINDOWS (Including Jambs)01 pcs Flush Door02 sq.m. Flush Door03 pcs 4"x8"x8" Glass Block04 sets Door Lockset05 sets 4"x2" Door Hinges

Sub-Total VIVII PAINTING/VARNISHING

(3-Coats Painting)01 sq.m. Masonry Wall02 sq.m. Doors03 sq.m. Solignum Application

Sub-Total VIIVIII ELECTRICAL WORKS

WIRES AND CABLESTHHN (Branch Circuits)

01 rolls02 mtrs

THW (Feeder/Subfeeder)01 mtrs

TW (Grounding)01 8.0 mm² Cu Cond Strnd

PIPES AND FITTINGS01 lghts02 lghts 32 mm Ø Endbell

PVC Elbow01 pcs 32 mm Ø Elbow

WIRING DEVICES01 sets One-Way, One-Gang Switch02 sets One-Way, Three-Gang Switch03 sets Duplex Conv Outlet

LIGHTING FIXTURES01 sets 1 x 15W Tubular LED Light w/ Housing02 sets 1 x 11W LED Pin Light03 sets 1 x 11W LED Spot Light

BOXES AND CONDULETS01 pcs 4 x 4 Ga#14 J Box with Cover02 pcs 4 x 2 Ga#14 J Utility Box

3.5 mm² Cu Cond Strnd2.0 mm² Cu Cond Royal Cord (3C)(75m)

8.0 mm² Cu Cond Strnd

20 mm Ø Endbell

Page 73: Final BOQ Philippine Coast Guard

PANELBOARDS AND CIRCUIT BREAKERS01 assy LPP

Main: 20AT, 10kAIC, 100AF 250V, 2P, 60HZ, Bolt-on Branches: 1-15AT, 50AF, 10kAIC, 2P 1-20AT, 50AF,10kAIC, 2P 250V, 60Hz, Bolt-on 2-space w/ flash mounting enclosure

MISCELLANEOUS AND HARDWARES01 bndl Electrical Tape02 rolls Rubber Tape03 pcs Hacksaw Blade04 kgs Ga #14 GI Pull Wire05 cans PVC Cement, 120cc06 pck 5mm x 300mm Cable Ties07 pck Cable Markers08 pcs Cable Glands

Sub-Total IG

SUB-TOTAL (11)CEREMONIAL STAGE

Page 74: Final BOQ Philippine Coast Guard

PROJECT : PROPOSED COAST GUARD DISTRICT BICOL (CGDBCL) FACILITIESLOCATION : REGIONAL GOVERNMENT CENTER, RAWIS, LEGASPI CITY, ALBAYOWNER : PHILIPPINE COAST GUARDSUBJECT : BID OF QUANTITIES (FORMAT)========================================================================= 12 CGD BICOL DEVELOPMENT MAIN SEWER AND WATER SUPPLY=========================================================================

QTY UNIT DESCRIPTION % WT OF TOTAL UNIT COST (PHP)

I EARTHWORKS

01 CU.M. Excavation02 CU.M. Backfilling

Sub-Total I

II PLAIN AND REINFORCE CONCRETE

Lean Concrete Encasement01 CU.M. Concrete Volume

Sub-Total II

III SEWER WASTER WATER DISCHARGE MAINS

Pipes and Fittings01 pcs 110mmØ x 3.0m PVC Pipe02 pcs 45 deg x 110mmØ PVC Elbow03 pcs 110mmØ PVC Wye04 pcs 110mmØ PVC Clean-out Plug

Sub -Total III

IV POTABLE WASTER DISCHARGE MAINS

IVA ABOVE GROUND WATER TANK (CISTERN)

01 units 5300 Stainless Steel Water Tank Grade 304 0.90mm thk. Horizontal with Steel Platform including Float Valve and other accessories

IVB SUPPLY Pipes and Fittings

01 l.m. 1-1/2" dia. PE Pipe SDR-11 (Blue)

02 units 1-1/2" dia. Gate Valve03 units 1-1/2" P.E. Elbow04 units 1-1/2" P.E. Tee05 units 1-1/2" P.E. Adapter

ITEM NR.

TOTAL COST (PHP)

Page 75: Final BOQ Philippine Coast Guard

IVC Above Ground Installation Pipes and Fittings

01 pcs 1-1/2" dia. G.I. Pipe Sch 4002 units 1-1/2" dia. Gate Valve03 units 1-1/2" dia. Check Valve04 units 1-1/2" dia. Elbow05 units 1-1/2" dia. G.I. Coupling06 units 1-1/2" dia. G.I. Union Patente

IVD DISTRIBUTION

Pipes and Fittings01 l.m. 1-1/2" dia. PE Pipe SDR-11

(Blue)02 l.m. 3/4" dia. PE Pipe SDR-11

(Blue)03 units 3/4" dia. Gate Valve04 units 1-1/2" P.E. Elbow05 units 1-1/2" P.E. Adapter06 units 3/4" P.E. Elbow07 units 3/4" P.E. Tee08 units 3/4" P.E. Adaptor

IVE Above Ground Installation Pipes and Fittings

01 pcs 1-1/2" dia. G.I. Pipe Sch 4002 units 1-1/2" dia. Gate Valve03 units 1-1/2" dia. G.I. Elbow04 units 1-1/2" dia G.I. Union Patente05 units 1-1/2" dia. G.I. Coupling

Sub-Total IV

SUB-TOTAL (12)CGD BICOL DEVELOPMENT MAIN SEWER AND WATER SUPPLY