LIST of Program Proposals for funding within the Millennium Challenge Account Proposed program Main Program Components Expected outcomes Initiator Financing request 1. Support to education, social protection and health care systems Implementation of programs in line with PRSP priorities in the following sectors: education, health and social protection Enhanced efficiency of education, social protection and health care systems Ministry of Education and Science, Ministry of Health, Ministry of Labor and Social Issues 60 ml USD 2. Construction of an integrated social services center “Under Single Roof” in all marz centers and former regional centers (raions) RA Ministry of Labor and Social Issues 3. Production of orthopedic, prosthetic and life-facilitating devices RA Ministry of Labor and Social Issues 4. Creation of a hospice center RA Ministry of Labor and Social Issues 5. Creation of day centers for children without parental care in those marzes where such centers do not exist RA Ministry of Labor and Social Issues 6. Provision of housing (without right of ownership) to persons with many children and persons raising 4 and more under-age children RA Ministry of Labor and Social Issues 7. Establishment of integrated social services centers in all the RA marz centers Improved quality of social and health-care services provided to the population, increased access to social services and information, minimized RA Ministry of Labor and Social Issues 5.9 million USD
Transcript
Page 1: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

LIST of Program Proposals for funding within the Millennium Challenge Account

Proposed program Main Program Components Expected outcomes Initiator Financing

request 1. Support to education, social protection and health care systems

Implementation of programs in line with PRSP priorities in the following sectors: education, health and social protection

Enhanced efficiency of education, social protection and health care systems

Ministry of Education and Science, Ministry of Health, Ministry of Labor and Social Issues

60 ml USD

2. Construction of an integrated social services center “Under Single Roof” in all marz centers and former regional centers (raions)

RA Ministry of Labor and Social Issues

3. Production of orthopedic, prosthetic and life-facilitating devices

RA Ministry of Labor and Social Issues

4. Creation of a hospice center RA Ministry of Labor and Social Issues

5. Creation of day centers for children without parental care in those marzes where such centers do not exist

RA Ministry of Labor and Social Issues

6. Provision of housing (without right of ownership) to persons with many children and persons raising 4 and more under-age children

RA Ministry of Labor and Social Issues

7. Establishment of integrated social services centers in all the RA marz centers

Improved quality of social and health-care services provided to the population, increased access to social services and information, minimized

RA Ministry of Labor and Social Issues

5.9 million USD

Page 2: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

misfeasance in the social services sector, increased opportunities for exercising social rights for the most socially vulnerable groups of the society

8. Upgrade of irrigation systems ---Construction of gravity feed systems ----Restoration of Ararat plateau’s collector-drainage systems ----Restoration of primary and secondary systems ----Restoration and reconstruction of pump stations and wells ----Restoration of internal networks

30% reduction of irrigation-related maintenance costs and increased water supply to 50 % of irrigated areas

State Committee for Water Resources

220 ml USD

9. Construction of dams ----Completion of unfinished constructions (the three most significant ones can be identified) ----Construction of new dams (project estimates are available)

Increase of the irrigated areas up to 20% of the currently irrigated lands and increased water supply to more than 50 % of irrigated areas

State Committee for Water Resources

270 ml USD

10. Water supply (potable water) and water removal

----To upgrade external water supply systems- reconstruction and construction of water treatment stations, pump stations, chlorine stations, capping, replacement of pump stations by gravity feed systems ----To upgrade distribution networks- restoration of water lines, wells, network reconstructions related to zoning, construction of new networks ----Restoration of sewage treatment stations

Resolution of urgent issues existing in the water supply and water removal systems is expected to be completed

State Committee for Water Resources

60 ml USD

Page 3: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

11.Reconstruction and exploitation of Arpa-Sevan tunnel

State Committee for Water Resources

20.5 million USD

12. Reconstruction of community roads

Restoration of community/local roads

Restoration of 2919 km of community/local roads

RA Ministry of Transport and Communications

137.1 ml USD

13. Construction of a gravity feed water pipeline out of the Spandarian hydrostation pressure operated pipeline for the irrigation of Sissian irrigated lands

4330 hectares of land will become irrigated

State Committee for Water Resources

7.3 ml USD

14. Renovation, reconstruction and construction of new riverside containment and flood control facilities serviced by “Vorogum-Jrar” CJSC

State Committee for Water Resources

1.111 million USD

15. Melioration of saline lands in Ararat plateau and their utilization for agricultural purposes

----1:1000 scale salt removal on an 5450 hectare area ----Restoration of drainage networks on an area of 1120 hectares ----Construction of a drainage system for an area of 3000 hectares ----Desalination of 5450 hectares of saline lands ----Restoration of irrigation systems on an area of 2450 hectares ----Construction of irrigation systems for an area of 3000 hectares ----Utilization of 5450 hectares of

Desalination of 5450 hectares of land and their utilization for agricultural purposes

RA Ministry of Agriculture

144.1 ml USD

Page 4: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

land for agricultural purposes 16. Restoration of the country’s waste water treatment stations and construction of new ones as a priority

Restoration of waste water treatment stations in 6 settlements

State Committee for Water Resources

5160 ml drams

17. Development of alternative sources of energy

Creation of new types of high-capacity solar plants, Pilot – “Arev-100” plant with 350 kw capacity

Utilization of pollution-free new solar energy sources for supplying power to high-capacity stations

RA Ministry of Trade and Economic Development, Research Institute of Radiophysics

2 million USD

18. Upgrade and exploitation of radio-optical telescope - 54/2,6 facility

Increased precision of the facility Ensuring super-distance satellite connection

RA Ministry of Trade and Economic Development, Research Institute of Radiophysics

1 million USD

19. Upgrade of radio and acoustic holography

Identification of distribution of radio and acoustic fields through measurements made at the object

Spatial data received on examined facilities

RA Ministry of Trade and Economic Development, Research Institute of Radiophysics

1.7 million USD

20. Preservation of the characteristics of antennas of unique primary benchmarks and gradient of angle of pitch of radio-wave phases

11 primary benchmarks with their equipment and ðàíãå

Maintenance of similarity of different antennas and characteristics of radio engineering equipment

RA Ministry of Trade and Economic Development, Research Institute of Radiophysics

1.2 million USD

21. Expansion of molybdenum utilization

Production of special molybdenum-alloy with high physical and mechanical characteristics; setting up a production

Introduction of special molybdenum-alloy production

RA Ministry of Trade and Economic Development, Research Institute

2.5 million USD (for R&D and testing), 35,0 million

Page 5: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

of Non-ferrous Metallurgy

USD for production

22. Synthesis of new water soluble porthyrins and its utilization in agriculture

Production of synthesis of new porthyrins to be used in production, testing porthyrins in large greenhouse conditions (for vegetable-growing), testing porthyrins on grain-crops and vegetables in field conditions

Root rot treatment of agricultural plants and 25-30% decrease of loss resulting from disease, Increasing fertility and growth:

a) vegetables – by 10-15%,

b) grains – 5-10%, Increase of greenery by 10-15%

“Biotechnology Research Institute” CJSC, Yerevan State Medical University, Yerevan State University, Armenian Agricultural Academy

4.5 million USD

23. Improvement of physical and mechanical characteristics (including abrasion resistance and durability) and utilization of cutting blades and other materials made from hard alloy

Research and scientific study, Production of samples, Manufacturing application, Welding of cutting blades on iron body

Manufacturing of tools for metal processing, cutting, mining, wood processing, stone, oil, gas production, output of artesian and mineral water, Development of synthesis matrix for filler production

RA Ministry of Trade and Economic Development

25 million USD

24. Technological processes for increasing durability of materials through dislocation, decrease of vacancy defect and increase of theoretical durability

R&D, Production of samples, Manufacturing application

Increasing durability, ductility and homogeneity of cutting materials and products

RA Ministry of Trade and Economic Development

20 million USD

25. Development of small energy facilities in RA regions

Establishment of a development fund, design estimates for small hydro-electric power stations

Optimal utilization of RA’s energy resources, Fostering business in marzes

RA Ministry of Trade and Economic Development

5 million USD

26. Development of leasing activities

Establishment of a leasing fund; Creation of a data base; assistance in creation of security/guarantee and after-sales

Technical equipment of agriculture and its processing industry, upgrade of machine equipment and vehicle pool,

RA Ministry of Trade and Economic Development

57 million USD

Page 6: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

services network technical equipment of services sector, increased SME access to logistis

27. Introduction of innovations and High-Tech in SMEs

Creation of venture funds; Fully guaranteed acquisition of patents and copyright protection; Improved mechanisms and techniques for introduction of innovative projects and high technologies

Increase in number of SMEs introducing innovations and high technologies and creation of new jobs, expanded range and variety of products, Increased SME competitiveness through quality assurance and reduced costs

RA Ministry of Trade and Economic Development

25 million USD

28. Handicraft development State support for the sector; Creation of a network of centers; Recovery of the relate training system

Increase of employment rate up to 5%, Additional 2-3% economic growth at the final stage of the program

RA Ministry of Trade and Economic Development

40 million USD

29. Reconstruction and renovation of roads leading to tourist destinations from major highways and country roads

Renovation of following sections of roads leading to tourist destinations: to Haghpat – 5km, Sanahin – 5km, from Gyulagarak to neighboring villages and Sotchut – 10-15km, Yereruyk – 10-15km, Hamberd – 15km, Church of St.Mother of God in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian to Zorats Kar – 8km, from Goris to Khndzoresk – 5km, section from Goght to Geghard, from Goris-Kapan highway to Tatev – 7km, from Alaverdi-Noyemberyan highway to Akhtala – 4-5km, from Gyumri to

Road improvement, Providing tourists with easy access to tourist destinations

RA Ministry of Trade and Economic Development

5.8 million USD

Page 7: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Marmarashen – 9-10km, from highway to Odzun – 5km, to Goshavank – 6-7km.

30. Installation of road signage in all RA regions

Placing road signage in the RA territory with multilingual names and appropriate symbols at settlements and tourist destinations

Placing of signage/pointers for tourist access to information and directions

RA Ministry of Trade and Economic Development

450 thousand USD

31. Waste removal from tourist destination areas

Waste removal in tourist destinations, placing dustbins and building lavatories

Ensuring compliance and maintenance of hygiene norms

RA Ministry of Trade and Economic Development

40 thousand USD

32. Implementation of “Tourism Development Program in RA Communities”

Within the framework of the program introduction of technology for tourism management

Introduction of technology RA Ministry of Trade and Economic Development

130 million USD

33. Regional social and economic development

Select one rural community (with population of 1000) and one urban community (population of 5000) in each RA marz, Develop relevant infrastructure at selected locations to achieve quality of life meeting international standards

Creation of an attractive and model community to live and work; Development of other communities based on model community experience

RA Ministry of Trade and Economic Development

120 million USD

34. Construction of a water reservoir with 1 ml cubic meter capacity at the south foothills of Aragats mountain

1000 hectares of land will become irrigated

Armhydromet 1 ml USD

35. Development of bee-farming in support of vulnerable rural families

----Establishing bee-gardens ----Organizing trainings for beekeepers ----Establishing big bee farms in the marzes ----Providing swarm of bees to the poor families

Creating an income source for 1200 poor families through bee-farming

H.Javadyan Representative of PRSP SME working group

3 ml USD

Page 8: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

36. Creating an administrative information system of the RA communities

----Establishing administrative information registries for communities ----Establishing administrative information registries for marzes ----Improving RA countrywide administrative information registries ----Developing and introducing unified methodology for administrative information systems

Introducing an administrative information system based on the existing RA administrative registries

RA Minister of Territorial Administration and Coordination of Infrastructure

4 ml USD

37. Creation and implementation of a RA state unified information system

RA Ministry of Transport and Communications

3.66 million USD

38. Renovation of Armenian railway lines and artificial structures

RA Ministry of Transport and Communications

29.2 million USD

39. Training and retraining of individuals with outdated education

---Setting up distant learning classes ---Setting up online learning classes

AUA Arm State Engineering University

17.7 million USD

40. Green Homeland Program (Through efforts of members of the organization and those involved in the forest industry and community work to recover (fir, oak, beech, lime, maple trees etc.) and enrich (apple, pear trees, raspberry, blackberry bushes etc.) forests. To ensure the ongoing nature and further enhancement of the program by expected income)

---Constructing 2 workshops ---Purchasing 2 mini canneries ---Constructing sheds ---Training of workers

Improvement of social conditions of refugees and disaster victims in vicinity of Stepanavan and Aparan water reservoir forest regions, restoration of forests

NGO Women Intellectuals for Environmental Protection

218 thousand USD

41. Establishing “Armenian Agricultural Corporations Union”

The main goal of the program is the optimal use of agricultural resources

“Armenia-Diaspora” fund

Page 9: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

42. Regulation of financial lending for housing construction

Addressing housing issues of young socially vulnerable families

L. Nazaryan

43. “Professional Orientation Program”

Complex approach to addressing educational, training, housing and lifestyle issues of socially vulnerable families, the unemployed, the homeless and the adult inmates of orphanages.

L. Nazaryan

44. Haven of Hope Construction and furnishing of the compound Haven of Hope; creation of specialist teams; training and development of service methodology; delivery of alternative day services to the disabled, provision of social, psychological, legal, and professional consulting to parents and family members of the disabled; organization of conferences on disability and publication of scientific materials

Delivery of a complete set of day care services to the disabled, job creation for the disabled, full integration of the disabled into the society.

NGO Astghik representing parents of disabled children

7.152 ml USD (1.216 out of each is the contribution of the NGO)

45. Improvement of the Zoological Park

1. Renovation of big cat cages 2. Renovation of the unfinished

monkey cages 3. Water supply and irrigation

systems made operable 4. Improvement of park paths 5. Fencing of the territory

Zoo management 1 400 000 USD

46. Neutralization and utilization of chemical weed and pest killers in the ware houses of the Ministry of Agriculture

Moving and storing the chemicals Acquisition and installation of required and existing equipment Analytical Service and Scientific

Prevention of an environmental disaster

MIM ltd 6.06 ml USD

Page 10: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Department 47. Restoration of gas supply and gasification

“ArmRusGasProm” CJSC

48. Creation of a High-Tech Center Academic Center for Scientific Marketing

49. Use of alternative engine fuels in the means of transport

Creation of a republican center for switch to alternative engine fuels in vehicles, which will support the whole process including: drafting a law, development of regulations and technical documents, guides and relevant promotion materials, organization of trainings and providing security measures

Saving 40 million USD annually on fuel expenses

Gas-engine National Association

182.5 million USD

50. Reconstruction of outdoor illumination network of Yerevan streets

Tourism development through increasing the attractiveness of the city Development of late afternoon and night trade

Yerevan municipality

8.786 million USD

51. Development of Yerevan urban transport sector

Purchase of 500 updated city buses and maintenance of city mini-bus shuttles

Improvement of passenger traffic by Yerevan public transportation, Increased accessibility of public transportation services for socially vulnerable sections of the population

Yerevan municipality

21.5 million USD

52. Development of Yerevan city educational sector

Improved teaching and learning in Yerevan city schools and effective management of the system

Yerevan municipality

1.45 million USD

53. Prevention and treatment of arterial hypertension in Yerevan city

Yerevan municipality

427 million AMD

Page 11: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

54. Provision of equipment to Yerevan city's ambulatory policlinics

Yerevan municipality

1.373 billion AMD

55. Construction of water reservoirs and wells

1200 hectares of additional irrigated areas, 30-40% increase in the production of agricultural products

Aragatsotn marz administration

56. Construction and renovation of marz roads and bridges, installation of infrastructure

Aragatsotn marz administration

57. Construction and renovation of flood release channels,

Aragatsotn marz administration

58. Construction of local heating systems at 20 schools in 14 settlements of Aragatsotn marz that have gas supply

Aragatsotn marz administration

59. ---Education ---Healthcare ---Social security ---Water supply and water removal ---Irrigation ---Inter-community road network ---Water reservoirs ---Support to SMEs

Syunik marz administration

60. Construction of local heating systems at 33 schools of Syunik marz settlements that have gas supply

Syunik marz administration

61. Construction of 6-7 water reservoirs with a capacity of 12 million cubic meters

2500-3000 hectares of additional irrigated areas

Vayots Dzor marz administration

62. Reconstruction of 425 km out of 630 km of internal irrigation

Vayots Dzor marz administration

Page 12: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

network 63. Reconstruction of 288 km of marz roads

Vayots Dzor marz administration

64. Construction of treatment facilities for the three marz cities

Vayots Dzor marz administration

65. Upgrade of the drinking water system

Vayots Dzor marz administration

66. Reconstruction and equipment of schools

Vayots Dzor marz administration

67. Construction of local heating systems at 14 schools of Vayots Dzor marz settlements that have gas supply

Vayots Dzor marz administration

68. Construction of the Kaps water reservoir

Option 1: (70 million cubic meters) 12000 hectares of additional irrigated lands, 8 billion drams of additional income for the farmers Option 2: (45 million cubic meters) 8000 hectares of additional irrigated lands, 5.5 billion drams of additional income for the farmers

Shirak marz administration

I option:30 million USD II option: 20 million USD

69. Reconstruction of the Artic water reservoir

600 hectares of additional irrigated lands

Shirak marz administration

400 million drams

70. Reconstruction of 100 km of the following roads: Giumri-Amassia, Giumri-Anipemza, Giumri -Artik

Shirak marz administration

71. Construction of gravity flow irrigation systems; renovation of internal networks; restoration of cattle watering facilities in mountains

Tavush marz administration

Page 13: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

72. Construction of small water reservoirs

Tavush marz administration

73. Reopening of agricultural processing productions and starting new ones

Tavush marz administration

74. Renovation of drinking water systems

Tavush marz administration

75. Renovation and equipment of schools and cultural centers

Tavush marz administration

76. Attraction of grant and credit resources to create new jobs

Tavush marz administration

77. Improved drinking water supply Armavir marz administration

78. Improved irrigation water supply, renovation of 176,5 km of internal network

Armavir marz administration

79. Desalination of 3050 hectares of salty lands

Armavir marz administration

80.Construction of a water reservoir with a capacity of 60-70 million cubic meters in the administrative territory of Miasnikyan village

5000-6000 hectares of additional irrigated lands

Armavir marz administration

81.Enhanced water retention capacity of the riverside water channel

Gravity fed irrigation for 35000 hectares of lands

Armavir marz administration

82. Restoration of 208 km marz and community roads

Armavir marz administration

83. Construction of local heating systems at 73 schools in Armavir marz settlements that have gas supply

Armavir marz administration

84. Restoration of the Marmarik water reservoir

Kotayk marz administration

8 ml USD

85. Provision of gravity feed water Kotayk marz 1.5 million

Page 14: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

supply to 15 villages from the Armaghan spring

administration USD

86. Construction of Yeghvard water reservoir

Kotayk marz administration

87. Treatment of Hrazdan riverbed and Aghbjurak water reservoir

Kotayk marz administration

88. Reopening of Sevaberd water reservoir

1200 hectares of additional irrigated lands

Kotayk marz administration

4.5 million USD

89. Improved drinking water supply to the city of Hrazdan

Uninterrupted water supply to Hrazdan, annual saving of 5 million kW/hour electricity

Kotayk marz administration

2 million USD

90. Restoration of sewerage collectors of Hankavan, Tsakhkadzor and Hrazdan

Kotayk marz administration

400 000 USD

91. Restoration of Yeghvard irrigation system

Increased access to irrigation for 1000 hectares of land

Kotayk marz administration

350 000 USD

92. Restoration of Proshyan irrigation system

Increased access to irrigation for 100-500 hectares of land

Kotayk marz administration

170 000 USD

93. Restoration of the 25 km road leading to Burakn

Kotayk marz administration

100 000 USD

94. Reconstruction of Getnik water reservoir

6000 hectares of additional irrigated lands

Lory marz administration

35 million USD

95. Construction of Aramnis and Dzoraget water reservoirs

Reduces irrigation water tariffs, creation of recreation zones, construction of small hydro stations, developing fish-breeding and others

Lory marz administration

83 million USD

96. Restoration of internal irrigation systems in the marz

Increased reliability of irrigation water supply and reduced losses

Lory marz administration

72 million USD

97. Construction of small water reservoirs

Increased reliability of irrigation water supply

Lory marz administration

8.6 million USD

98. Restoration of marz irrigation pipelines, construction of gravity

Increased reliability of irrigation water supply

Lory marz administration

65.4 million USD

Page 15: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

feed systems Reduced cost of irrigation 99. Upgrade of water supply systems in Vanadzor, Spitak, Tashir, Allaverdi, Aghtala and a number of village communities

Increased and reliable supply of drinking water to the population

Lory marz administration

16.45 million USD

100. Upgrade of water removal systems in Vanadzor, Spitak, Tashir, Allaverdi, and Aghtala

Lory marz administration

13.83 million USD

101. Protection of environment Reduced air and water pollution, improved sanitary conditions

Lory marz administration

820 000 USD

102. Construction of refuse facilities in Spitak and Alaverdi

Improved sanitary hygiene situation in Spitak and Alaverdi

Lory marz administration

275 000 USD

103. Capital renovation of Lori marz roads

Lory marz administration

17.5 billion drams

104. Capital renovation of Lori marz republican roads

Lory marz administration

8.42 billion drams

105. Construction of local heating systems at secondary schools in Lory marz

Heating of about 100 schools Lory marz administration

1.5-2 million USD

106. Reforming village schools in Lory marz and creating guarantees for their sustainable development

Creation of support agricultural farms at 100 village schools of Lory marz, Cultivation of 300-350 hectares of land, Construction of irrigation systems, Purchase of farming plants, equipment, seeding-machines, fertilizers and pesticides, Establishing bee-gardens, Training on bee-farming, Purchase of bee swarm for cattle-breeding,

Creation of additional income sources for 100 school villages of the marz, Upgraded equipment of teaching laboratories and cabinets, Computer classes, Development of an information network, Creation of 3000 new jobs, Training of 3000 high-school students and providing basic knowledge and experience in

Lory marz administration, «Lory School» Fund

2.5 million USD

Page 16: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Purchase of buildings, premises and cattle, Processing and sales of production

farming

107. Improved building premises for kindergartens in rural communities and large neighborhoods of city communities of Lory marz

Layout-planning work; Construction of new buildings; Capital renovation of buildings in emergency conditions

Providing normal conditions for pre-school education; Inclusion of 1500 children in pre-school education

Lory marz administration

4.5 million USD

108. Measures to ensure the healthy reproduction of the generation in border areas and communities distant from main roads, improve primary maternal health care and disease prevention in Lory marz

Written and verbal promotional activities, diagnostics and consulting services, Provision of small healthcare libraries (10 books), hygiene and personal care products to 1000 families, Increased circulation (1000 copies) of “Speghani” newspaper of Vanadzor Medical College and its free distribution to the population, Presentations for parents, young married couples and high school students, Setting up 10 temporary consulting centers of maternity and child care, Series of radio and TV broadcasts and debates (round tables) – 5 events, Construction of 5 simple sports playgrounds

1000 families will get minimal healthcare knowledge, which in turn will significantly increase their healthcare culture and families will pay more attention to basic health protection needs, 1200 people in border zones and remote communities will be diagnosed and provided with necessary consultations, Birthrate of children with poor health and child mortality rate will decrease by 20-30%, Improved health conditions of the growing generation, Parents will be more attentive towards reproductive health of the generation, Healthy lifestyles will be enrooted, Creation of a healthcare databank for the residents of 20 communities

“Tagavoranist” NGO

63 million AMD

109. Legal awareness program for the Lori marz local leadership.

1. Mini trainings for local leaders

Increased legal awareness of community leaders will

Lori marz administration,

24800 USD

Page 17: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Increased efficiency of local governance through legal awareness

2. Thematic discussions by local TV channels

3. Legal consulting for local leaders

promote involvement in local governance, will restore self-confidence and belief in the future of the country, will help to overcome individual’s alienation from state

Armenian Constitutional Advocacy Center

110. Construction of a new school building in Vanadzor for the Human Rights School

The following activities have been planned: (development area – 1000 square meters, total area – 3775 square meters, construction volume- 12600 square meters) 1. tasking the design organization

with preparation of the working design based on the technical assignment (SOW)

2. Construction ---General Construction ---Engineering ---Interior

The construction of the Human Rights School in Vanadzor will support educational and cultural development of regions alongside with Yerevan

Lori marz administration, Armenian Constitutional Advocacy Center

775,000 USD

111. Restoration of irrigation systems; restoration of drinking water system; upgrade of marz and inter-marz roads; construction of sewerage treatment stations in Vardenis, Martuni, Vardenik and Gavar; reconstruction and construction of education, health and cultural centers

Gegharkunik marz administration

112. Construction and equipment of schools, pre-school institutions, culture centers, sport schools and sport playgrounds; capital renovation and equipment of

Ararat marz administration

Page 18: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

hospitals and policlinics in 4 of the marz cities, rural ambulatories; restoration of drinking water network; construction of water removal systems, water supply to newly constructed districts; restoration of irrigation systems; construction of water reservoirs; desalination of lands; construction of waste water removal systems in the cities of the marz; installation of telephone communication in a number of cities; renovation of inter-community and in-community roads and bridges; completion and exploitation of unfinished and multi-unit apartment buildings 113. Reconstruction of the Martuni-Nerkin Getashen road

Reconstruction of the road Reconstruction of the 15 km road

Zohrab Shahinyan President of youth NGO Shahen

80 000 USD

114. Rebuilding of Stepanavan City devastated economy

Renovation of water pipeline and sewerage system, streets renovation, outdoor lighting restoration, in- and intra-community highways renovation

Stepanavan Municipality

115. Flat, iron and tied roof capital renovation of multi-unit apartment buildings in Echmiadzin City

Improved conditions for living in multi- apartment building

Echmiadzin Municipality

338.652 mln AMD, with 10% or 33.865 mln AMD co-financing

116. Roof renovation for Ararat City multi-apartment buildings

Ararat Municipality

372.329 mln AMD, out

Page 19: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

of which 22.396 mln AMD is community investment

117. Roof renovation for Ararat City public multi-apartment buildings

Ararat Municipality

43.69 mln AMD, out of which 0.932 mln AMD is community investment

118. Inter-town road renovation in Aparan

Aparan Municipality

85 mln AMD, out of which 3.5 mln AMD is community investment

119. Aparan City water supply and water removal internal network restoration

Aparan Municipality

500 mln AMD

120. Roof renovation program for 9 and 5 floor multi-apartment buildings in Ijevan City

Ijevan Municipality

111.5 mln. AMD

121. Asphalt covering for 11000 sq.m of Aslanyan and Metaghagortsneri streets in Ijevan City

Ijevan Municipality

53.87 mln. AMD

122. Construction of 40-room hotel in Ijevan City

Ijevan Municipality

159.9. mln. AMD

123. Potable water internal pipeline capital renovation program in 1st, 2nd, 3rd, 4th and 6th micro-districts of Abovyan City

Abovyan Municipality

110.7 thousand USD

Page 20: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

124. Flat and gable roof capital renovation in multi-apartment buildings of 1st, 2nd, 3rd and 4th micro-districts of Abovyan City

Abovyan Municipality

502.3 thousand USD

125. Renovation and construction of flood control facilities in Sevan City

Sevan Municipality

45 mln. AMD, where 10% is community investment

126. Gortsaranajin street (connecting Sevan City lakeside and peninsula) unfinished bridge capital construction

Sevan Municipality

66 mln. AMD, where 10% is community investment

127. Construction of roads connecting Sevan City Cheremushka and Nor Tagh districts

Sevan Municipality

31 mln. AMD, where 10% is community investment

128. Artik City Stadium reconstruction program

Artik Municipality

84.7 mln. AMD

129. Roofs and entrances renovation for 69 multi-apartment buildings in Sisian City

Sisian Municipality

400.4 mln. AMD

130. Multi-apartment buildings roof renovation in Ajapnyak, Dzakhapnyak and Kechut districts of Jermuk City

Jermuk Municipality

240-250 mln. AMD, community participation 5-10%

131. Renovation of Kapan City Dzorq district Daily Regulating

Kapan Municipality

7.284 mln. AMD

Page 21: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Water Reservoir 132. M. Zhapyan street pot hole reconstructioin in Kapan City

Kapan Municipality

24.033 mln. AMD

133. Multi- apartment buildings flat and gable roof capital renovation in Alaverdi City

Alaverdi Municipality

140 thousand USD

134. Capital renovation of water pipeline and sewerage internal network in Alaverdi City

Alaverdi Municipality

4 mln USD

135. Reinforcement of N12 emergency building in Sanahin Station district

Alaverdi Municipality

25 mln. AMD

136. Construction of 0.2 mln. cubic meters water reservoir in Melik village, Aragatsotn marz

Provision of necessary irrigation water for Melik village farming

Melik Village Administration

207.7 thousand USD

137. Establishment of high-speed telecommunication network

“Partnership for Open Society” Initiative

138. Timber resources restoration program

“Partnership for Open Society” Initiative

139. Development of public monitoring concept for the proposals

“Partnership for Open Society” Initiative

140. Public roads construction and renovation

“Partnership for Open Society” Initiative

I version: 186 mln. USD; II version – 135 mln. USD; III version 90 mln. USD

141. Installation of local heating systems at public secondary schools

Ensuring necessary length of academic year and education

“Partnership for Open Society”

Page 22: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

quality, improving next generations’ health

Initiative

142. Establishment of museum devoted to Armenian traditional way of life “Armenian’s Hearth”

To construct a premise with 7m x 9m total area adjacent to “Kzher” and coated with Armenian tuff scrap

Ensuring national patrimony through cultural heritage

Samvel Arakelyan “Kzher” art salon

8.5 thousand USD

143. Project proposal aimed at ensuring stable economic growth and poverty reduction in rural communities of the RA

Phase I Inventory of rural organic waste; inventory results analysis; as a result of the analysis biogas stations capacity selection and optimal positioning Phase II Feasibility study for program implementation Phase III Design and construction of 10 pilot stations

Provision of alternative energy source; increase of cultivating land fertility, pasture productivity improvement, deforestation reduction.

“SHGHTA” NGO, “Gas-Engine National Association” NGO, “GasJerSarqer” Ltd

Phase I – 10 thousand USD; Phase II – 10 thousand USD; Phase III – 1 mln. USD

144. Establishment of food security system and capacity building

Rent of space for laboratories, procurement of equipment, professional training

Increase of quality and security of the food consumed in the Republic of Armenia

“Friends of Nature” NGO

1672 thousand USD

145. “Tale House” education program

“Puprik” puppet show

146. Design and construction of super-modern synchrotron radiation “CANDLE” scientific complex in Armenia

Pre-construction phase includes (duration 1 year): Establishment of laboratories with necessary modern equipment and experimental stands (vacuum, magnet and magneting metering, high-frequency equipment, linear accelerator, beam-forming and other experimental stations) Technical design of key centers and

1. As a result of pre-construction phase:

---Creation of modern research and development base ---“Brain drain” prevention, full utilization of mental potential ---New jobs creation ---Utilization of new technologies ---Country promotion and

Page 23: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

equipment stations of “CANDLE” complex; production of main components prototypes Design of main building of synchrotron radiation “CANDLE” scientific complex Geological and micro-seismic examination of the area where the Complex should be built Establishment of the Accelerator and User Consulting International Commissions

integration in global scientific and technological development 2. Long-term perspective ---Establishment of the modern and fully equipped R&D center for long-term prospective high technology research and education ---Provision of base necessary for human resource development and professional improvement in all spheres of education, R&D and production ---“Brain drain” prevention and professional brain-inflow ---Application of the achievement of the science to production and science-intensive production development ---Creation of favorable environment for investment in high tech ---Advancement of existing production capacitates of the RA by placing part of the equipment production orders to local producers ---Improvement of health services through creating advanced diagnostic and treatment capacities ---Ecological problems solution

Synchrotron Radiation Exploitation Scientific Research Center (CANDLE)

4 mln USD

147. Public monitoring for programs financed under

Public awareness of the MCA program, direct monitoring of the

Ensuring the transparency of the programs implemented in

Public Dialogue and Initiatives

0.2-0.6% of the

Page 24: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Millennium Challenge Account program by the beneficiaries

the framework of MCA, increase of the role of communities as program stakeholders

Center NGO programs financed under MCA

148. Long-term development of fish-breeding in Armenia

“Armavir Farmer” CJSC

5.445 mln. USD

149. Establishment of the eco-biotechnological seed production complex

Creation of the biotechnological complex, greenhouses, processing industry, diary processing, and warehouse construction

25-45% increase in crops fertility

M. G. Hovhanissyan’s Institute of Botany of the National Science Academy of the RA

8.4 mln. USD

150. “Best start for child’s future” Refurbishment and furnishing of the building, room and pool renovation, design and training Creation of health center for children development Provision of consulting services to the parents of children with health impairments

“Haj Mankik” Charitable NGO

150 thousand USD, NGO investment – 25 thousand

151. Gasification of Lusaghbjur community, Lori marz

Lusaghbjur community

40-45 mln. AMD

152. Application of Hydroponics methodology for unused and/or ineffectively used rural land in the Republic of Armenia

Up to 100 times irrigation water savings Up to 10 times crop fertility increase

Samvel Nerisyan 400-500 thousand USD for the area of 10 ha

153. Ensuing participation of Northern regions’ citizens (Lori, Shirak, Tavush) in community, marz and republic-level decision-making and implementation processes

Organization of public discussions Organization of roundtables Training in monitoring methods for public initiatives groups Implementation of periodic monitoring

Helsinki Civic Assembly Vanadzor Branch

194.16 thousand USD

Page 25: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Information leaflets dissemination to increase the overall public awareness

154. Water supply improvement in Ashnak village, Aragatsotn marz

240 mln AMD

155. Armenian-English, English-Armenian translation software

Information Technology Development Support Council (ITDSC), SEUA, “ISMA” Ltd

199.2 mln AMD

156. Information Network Installation in rural regions

ITDSC 25.6 mln USD

157. Effective usage of water recourses in Sevan lake basin

Construction of 6 small reservoirs Improvement of 6150 ha land irrigation

Armenian Agricultural Academy

21.3 mln USD

158. Effective usage of water recourses in Talin region, Aragatsotn Marz

Construction of 9 small reservoirs Improvement of 1239 ha land irrigation

Armenian Agricultural Academy

11.8 mln USD

159. Establishment of sports hostel in Ararat City

Red Cross Society, “Women’s Homeland” NGO, “Angel” NGO, “Women’s Council” NGO, “Union of Veterans” NGO

4.5 mln. USD per annum

160. Tophlurazane serum R&D works

R&D of the medical product serum, pre-clinical and clinical examinations, organization of product synthesis for pilot and industrial scale production

Can be used to ease cerebral forms of essential hypertension (headache, dizziness, migraine, ear noise), cerebral blood flow, posttraumatic disturbance,

Institute of Fine Organic Chemistry, Ministry of Healthcare of the

5 mln USD

Page 26: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

peripheral blood supply disturbance, allergy

RA

161. Piratidin serum R&D works R&D of the medical product serum, pre-clinical and clinical examinations, organization of product synthesis for pilot and industrial scale production

Potential atypical original tranquilizer having also anti-epileptic, anti-amnesia and dope effect; has low toxicity and does not create narcotic dependence. Absorbed easily and has long-lasting effect. The serum cost is to be 30-40% lower than its international analogs

Institute of Fine Organic Chemistry, Ministry of Healthcare of the RA

5 mln USD

162. Sustainable tourism development and poverty reduction

Development of combined cultural, historical and ecological tourism schemes Creation of respective infrastructure and PR campaign for designed tourism schemes implementation

Association for Sustainable Human Development NGO, “Hazarashen” NGO, “Association of Ecological Tourism” NGO, “Civil Society Center” NGO

Phase I – 35 thousand USD Phase II- 865 thousand USD

163. Preparation of Sevan lake littoral zones for the lake level increase

Water quality increase, positive effect on agriculture, tourism and ecology

Association for Sustainable Human Development NGO, ArmStateProject, Ecological Bio-stability NGO

Phase I – 56 thousand USD Phase II – 19 mln USD

164. Construction of small hydropower stations cascade on the

Gyumri Hydropower

1.5 mln USD

Page 27: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

drinking water pipeline outgoing from Mantash water reservoir, Shirak marz

Station Ltd

165. “Ororots” project Support to pregnant women and families with new-born children all over the Republic of Armenia

Association of Women with higher education

2.5 mln. USD

166. Hematology support program in the RA

Center of Hematology of the Ministry of the Healthcare of the RA

2.85 mln USD

167. Healthcare quality improvement for pregnant women in risk groups in the RA

1. Perinatology, midwifery and gynecology center (PMG) technical re-equipment

2. Improvement of healthcare for expectants

3. Provision of quality and affordable healthcare services for safe delivery and perinatal period

4. Advancement of midwifery and gynecology care quality and management

1. Decrease in maternal and infant mortality

2. Reproductive and demographic indicators improvement

3. Decrease in the number of premature newborns, reduction of congenital malformations and congenitally disabled children, healthy succession of generation

4. Birth rate and overall demographic increase, poverty reduction, economic development, gene pool preservation

Ministry of the Healthcare of the RA Perinatology, midwifery and gynecology center (PMG) Professor R. A. Abrahamyan, Corresponding Memer of the National Academy of Sciences

2.5 mln. USD

168. National program for perinatal healthcare improvement

1. Advancement of midwifery and gynecology care quality and management

2. Technical and equipment base improvement for

1. Decrease in maternity and infant diseases and mortality

2. Birth rate increase 3. Prevention of

Ministry of the Healthcare of the RA Perinatology,

6.95 mln USD

Page 28: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

maternity hospitals of the Republic of Armenia

3. Ensuring affordable and quality prenatal care particularly for vulnerable groups of society

4. Improvement of prenatal care and midwifery for expectants

pregnancy complications

4. Infant disablement rate reduction

5. Overall population health improvement

6. Healthy workforce provision

7. Economic development 8. Poverty reduction

midwifery and gynecology center (PMG)

169. Project aimed at provision of social-psychological support and physical preparation to pregnant women

1. Quality improvement of health care services to pregnant women and women in post-delivery period

2. Introduction of psychological support and physical preparation system in maternity hospitals and polyclinics

3. Awareness increase among the expectants

4. Refurbishment and furnishing of spaces necessary for pregnancy psychological support and physical preparation program

1. Birth rate increase 2. Reduction in pregnancy

complications 3. Healthcare

improvement for expectants

4. Availability of pregnancy psychological support and physical preparation skills

Ministry of Healthcare of the RA Armenian Association of Obstetrician-gynecologists and Neonathologists

1.52 mln USD

170. Prevention of HIV-infection communication from mother to child

1. Antenatal healthcare quality improvement and affordability provision

2. Free testing of HIV-infected expectants and anti-retrovirus treatment provision, if necessary

3. Medical staff training on

1. Prevention of fetus intrauterine infection communication

2. Reduction of HIV-infected children rate

3. Infant disablement rate reduction

4. Infant treatment,

Chair of Midwifery (Perinatology), Gynecology and women reproductive health of Yerevan State Medical

5 mln USD

Page 29: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

expectants consulting and examination

4. Public awareness increase, safe sexual life practices promotion

healthcare and medicine cost reduction, poverty reduction

University after M. Heratsi of the Ministry of Healthcare of the Republic of Armenia

171. Women’s reproductive organs cancer prevention program

1. Development and introduction of screening system for women reproductive organs cancer prevention

2. Increase in volume of free medical services to women in fertile age

3. Ensuring necessary technical equipment (mammography, colposcopy) for regional maternity hospitals

4. Periodic examinations of women’s reproductive organs, particularly cervix and breast; tests proper implementation

5. Medical staff and population awareness increase

1. To reduce gynecopathy and mortality from reproductive organs malignant neoplasm, namely cervical and breast cancer

2. Reduce the costs of treatment and healthcare for patients with cancer by implementing women reproductive organs cancer prevention program

3. Women’s health improvement

4. Assist poverty reduction through reducing cancer

Ministry of Healthcare of the Republic of Armenia Chair of Midwifery (Perinatology), Gynecology and women reproductive health of Yerevan State Medical University after M. Heratsi of the Ministry of Healthcare of the Republic of Armenia

2.89 mln USD

172. Sexually transmitted diseases and sterility prevention program

1. Increase the affordability of modern contraceptives

2. Sexually transmitted diseases prevention through safe sexual life practices promotion

3. Reduction of infertility

1. Improvement of population reproductive health

2. Birth rate and population upsurge

3. Healthy workforce creation

Ministry of Healthcare of the Republic of Armenia

5 mln USD

Page 30: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

4. Economic development

5. Poverty reduction 173. Climacteric age women’s health and life quality improvement

1. Introduction of hormonal therapy for climacteric age women

2. Provision of medical hormonal preparations for climacteric age women

3. Medical staff and women awareness increase on substituting hormonal preparations application

1. Climacteric age women health and life quality improvement, prevention of diseases

2. Climacteric age women disease reduction, medical treatment and care cost reduction

3. Medical preparations cost reduction, poverty reduction

Ministry of Healthcare of the Republic of Armenia Armenian Association of Obstetrician-gynecologists and Neonatologs

5 mln USD

174. Development program for children under 5 years age

Professional knowledge base expansion of pediatricians and family doctors Preparation of study materials Introduction of nutrition programs Intellectual and physical growth abnormality identification and early medical intervention Social mobilization of population for solving immune protection problems

Improvement of children health Reduction of chronic malnutrition and anemia rate Integration of children with special need into the community Reduction of disease and mortality rate through integrated vaccination system

Ministry of Healthcare of the Republic of Armenia “Arabkir” charitable organization – Children and Minors Health Institute

5 mln USD

175. School children health protection program

Healthy life style promotion Development and introduction of disease prevention guidelines Physical training Oral cavity hygiene

Ministry of Healthcare of the Republic of Armenia “Arabkir” charitable organization –

450 thousand USD

Page 31: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Children and Minors Health Institute

176. Adolescent health protection program

Creation of adolescent support centers Healthy life style promotion Sexual health training

Ministry of Healthcare of the Republic of Armenia “Arabkir” charitable organization – Children and Minors Health Institute

177. “Children diseases integrated treatment” strategy implementation

Development of regional constituents Population education Development of hospital constituents, etc.

Population awareness increase Improvement of children healthcare quality

Ministry of Healthcare of the Republic of Armenia “Arabkir” charitable organization – Children and Minors Health Institute

4 mln USD

178. Children’s hospital, ambulance and intensive therapy improvement program

Medical staff professional training Provision of necessary equipment Provision of equipment to hospital intensive therapy wards

Improvement of children healthcare quality

Ministry of Healthcare of the Republic of Armenia

5 mln USD

179. Newborns care, treatment and rehabilitation program

Newborns rehabilitation department technical re-equipment Provision of special transportation means Development of guidelines

Infant disease and mortality rate reduction

Ministry of Healthcare of the Republic of Armenia

4 mln USD

Page 32: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Medical staff training, etc. 180. Healthcare program for children with development impairment

Examination of children with development impairments and provision of necessary interventions Development of educational materials Development of methodical instructions, etc.

Prevention of children disablement Social integration of children and minors with special needs

Ministry of Healthcare of the Republic of Armenia Ministry of Labor and Social Issues of the Republic of Armenia “Arabkir” charitable organization – Children and Minors Health Institute

3 mln USD

181. Implementation of flood control measures at Goris River, Syunik Marz, Republic of Armenia

Implementations of hydro-technical flood control measures are of crucial importance for reducing the risk of desertification of Goris City and adjacent territories. Initial examinations of the terrain and maximum cost analysis have demonstrated that there are 26 flood beds, out of which 17 are extremely

The implementation of this program will protect the territory against the desertification threat; will create favorable conditions for increasing the cultivated land fertility and utilization of unused land in farming; Goris population will be secured

Ministry of Nature Protection of the Republic of Armenia

3.361 mln USD

Page 33: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

dangerous. It is proposed to implement the following measures to secure against the most dangerous flood beds: Construction of floodwater drainage facilities; Construction of flood energy containment facilities; Construction of flood removal facilities Construction of riverside-protection facilities

against flood risk.

182.”Main issues of ecological tourism development in Armenia” “Development of ecotourism in areas under special protection and dendro-parks” “International and regional cooperation and integration of ecotourism in the global marketplace”

Organization of ecotourism in areas under special protection, including national parks, natural parks, dendro-parks, reserves and natural memorials

1. Creation of the profitable ecotourism industry will ensure the social-economic and ecological development of the country.

2. Creation and maintenance of ecotourism sustainable network in the areas under special protection. To ensure the above it is necessary to establish ecotourism development agency at the Ministry of Nature Protection or a public non-commercial organization under natural resources management agency, which would consist of three departments (organization of ecotourism, information dissemination, public and international

Ministry of Nature Protection of the Republic of Armenia

2.3 mln. USD

Page 34: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

relations, and marketing) and have staff of 17 professionals.

3. Armenia will form and advance the main directions of ecotourism, including promotion and information.

4. Number of professional tourists, including amateur fishing and hunting will increase thus ensuring about 12-15% increase of overall inbound tourists annually (about 1000 tourists in the first year)

183. Forestation and reforestation of Sevan basin

Forests of Sevan basin cover around 17 thousand hectares, 12 thousand of which are artificial forest plantations, particularly clusters of pine-trees, poplars, sea-buckthorn and other trees and bushes. Unfortunately, 35-40% of forestry has been significantly damaged due to negative climate and earth conditions and anthropogenic factor; some species have disappeared.

1. Forestation of around 5 thousand hectares of land,

2. Reforestation of around 4.2 thousand hectares of land,

3. Cleaning and total removal of coastal and underwater trees and bushes on around 2.3 thousand hectares,

4. Planting of high-value and useful trees/bushes during forestation and creation of new industrial plantations, especially sea-buckthorn, dog-rose and oleaster seedlings,

5. Establishment of small farms for processing of raw materials and creation of new jobs in RA Gegharkunik marz

RA Ministry of Nature Protection

3.6 million USD

Page 35: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

184. Introduction of effective economic and financial mechanisms aimed at evaluation of environmental damages and reducing level of pollution

Improve economic mechanisms for reducing the level of environmental pollution (ecological payments) and possibley maximize their fiscal and regulatory role. Development of modern mechanisms for estimation of the environmental damage caused by water and climate pollution, pollutant emissions and utilization of chemical materials; creation of related expert group though trainings and teaching courses; Creation of a legal framework required for funding (setting up funds) the measures aimed at addressing ecological issues.

Reduce the volume of pollutant emissions in RA, Establish normative regulatory framework meeting modern international standards for estimation of damages caused to the environment, as well as develop a system of relevant expert examinations. Introduce effective funding mechanisms aimed at nature protection.

RA Ministry of Nature Protection

300 thousand USD

185. Protection of Sevan’s trout species, breeding-production stock recovery

Create community fish-farms for production of viable trout fry, Training and professional development of staff involved in production, Training and awareness building among fish-breeders

Release of viable trout fry into Sevan lake (150 thousand annually), Increased number of trout fish in Sevan lake by 15-20 thousand annually, Recovery of “Gegharkuni” and “Summer Spawning Trout” populations of Sevan trout fish

RA Ministry of Nature Protection

200 thousand USD

186. Introduction of environmentally safe technologies for sewage water treatment in Baghramyan city of Armavir marz and Vardenis city of Gegharkunik marz

Utilization of low-cost technology for sewage water treatment through a biological lake system

Utilization of low-cost technology for sewage water treatment, system operations at a minimum costs, Improvement of sanitary conditions in the city and neighboring areas,

RA Ministry of Nature Protection

100 thousand USD

Page 36: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Sewage water treatment in primary constructions, Agricultural utilization of nutrients of stagnant silt as cheap fertilizers

187. Effective production of biogas in Gegharkunik marz

The project is aimed at resolving a number of environmental, energy and agricultural issues through production of biogas in Gegharkunik marz.

Setting up biogas production, Creation of alternative energy sources and production of biogas, Decrease of anthropogenic impact on Sevan lake waters

RA Ministry of Nature Protection

150 thousand USD

188. Development of National Water Program

Outline of water resources project which will ensure more effective utilization of water resources

RA Ministry of Nature Protection, Water Resources Management Agency

400 thousand USD

189. Strengthening of regional departments of water basin management of Water Resources Management Agency

Increased efficiency of water resources management

RA Ministry of Nature Protection, Water Resources Management Agency

151 thousand USD

190. Establishment of State Water Cadastre Institute

Support to strengthening of RA State Water Cadastre

RA Ministry of Nature Protection, Water Resources Management Agency

154.8 thousand USD

191. Creation of Youth Development Center

Computer courses for young people Armenian Red Cross Association, Vedi branch organization

192. Cultural socialization of poor Organization of integrated social and national cultural activities

“Hazarashen” Armenian Center for Genealogical

219.2 thousand USD, 60.2 thousand out of

Page 37: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

Studies NGO

which is the NGO's contribution

193. Youth inclusion, participation and capacity building in marzes

Skills and training needs assessment, Support and assistance in identification of target groups of vulnerable youth, Training and consulting services, Organization of training courses

“Coalition of Armenian Professionals” NGO

2.95 million USD

194. Promotion of healthy lifestyles of disabled persons with limited mobility

Creation of a technical and logistical base for service provision

Decreased discrimination of disabled persons with limited mobility in social and healthcare systems

Armenian Red Cross

195. Young girls leadership institute

Civil Society Development Center

246 thousand USD, 66 thousand out of which is the NGO's contribution

196. Free legal assistance and information system development in Armenia

Provision of free legal assistance and free legal information

“Association of Young Lawyers of Armenia” NGO

1.009 million USD with 110 thousand contribution from the NGO

197. Support to Armenia’s most vulnerable groups

Providing easy access to social healthcare services for 18 thousand vulnerable persons in 7 marzes of Armenia

“Mission Armenia” charity NGO

8.3 million USD, out of which 5.3 million is the NGO’s contribution

198. Growth of leather processing industry

Union of Tanners 80 thousand USD

199. Agro-ecotourism development in Armenia

“Agropress” NGO

141.2 thousand USD

Page 38: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

200. Creation of new jobs in Tavush marz and support of financial sustainability of “Araga” charity NGO

“Araga” charity NGO

152.6 million AMD with 10.6 million of NGO’s contribution

201. Poultry farming development in Shirak marz

«Graf» LTD, «Meghvik» NGO

1.702 million USD with 104.1 thousand USD of own contribution

202. Provision of complex services in plant protection and supply of high-quality chemicals and fertilizers

48.6 thousand USD

203. Increasing quantity of wheat in RA by cultivating unused areas

“Pantera” LTD “Meghvik” NGO

5.929 million USD

204. Seed production development Creation of small seed production farms, Assistance to seed production farms, Provision of high quality seeds to rural farms in marzes

Seed production development of grain-crops, potato, bread grain, papilionaceous plants and corn

Agricultural department of Lori marz administration

50 thousand USD

205. Pedigree cattle development Recovery of pedigree cattle farming, Assistance to small pedigree cattle farms, Development of pedigree cattle breeding through artificial insemination

Recovery of reproduction tradition of special Caucasian grey breed

Agricultural department of Lori marz administration

35 thousand USD

206. Poultry breeding development Construction of small poultry yards near poultry-breeding farms, Provision of broilers to individual farms, Expansion of poultry breeding industry

Breeding of 250000 broiler chickens in one cycle

Agricultural department of Lori marz administration

50 thousand USD

207. Creation of one economic zone Capacity and problem analysis in Growth of employment rate «Trichk»

Page 39: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

involving several rural communities rural communities, Distribution of sectors and works among communities, Enterprise creation and operations in communities, Mutual aid, Barter, Identification and settlement of community and intercommunity problems

and productivity, Increase of living standards, Poverty reduction in rural communities

educational, cultural and consulting NGO

208. Decreasing corruption risk in RA through preventive measures and promoting corruption intolerance among population

Organization of training courses, discussions and publishing of promotional materials with anti-corruption content for young people, development of information network, organization of regional and republican conferences

Increasing population awareness and understanding of corruption threats and its consequences, Securing continuous development of anticorruption process through the following: training of young trainers, thematic library and reading hall, website, associations, experience and promotional materials

«Trichk» educational, cultural and consulting NGO, “Independent Analytical Center” NGO

209. Center for training of trainers specialized in environment and nature protection

Publication of methodical guides for trainers, Training courses, Textbook development and publication, Creation of eco-clubs in secondary schools

Formation and development of nature protection culture, Prevention and recovery of nature and environmental pollution and destruction

«Trichk» educational, cultural and consulting NGO

210. Piratidin serum R&D works Medicine development, pre-clinical and clinical testing, product synthesis for pilot and industrial scale production

The serum cost is to be 30-40% lower than its international analogs

Institute of Fine Organic Chemistry, Ministry of Healthcare of the

5 mln USD

Page 40: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

RA 211. Tophlurazane serum R&D works

Medicine development, pre-clinical and clinical testing, product synthesis for pilot and industrial scale production

Can be used to ease cerebral forms of essential hypertension, cerebral blood flow, posttraumatic disturbance, peripheral blood supply disturbance, allergy

Institute of Fine Organic Chemistry, Ministry of Healthcare of the RA

5 mln USD

212. Establishment of “Women’s Entrepreneurship Development Center”

Establishing implementation office, Continuous upgrading of women’s professional qualifications, Implementing several business projects

“Rural Woman” NGO, “Harmonious development” NGO, “Armenian Intellectual Woman” NGO

9.45 million USD

213.Capital reconstruction and construction of roads leading to several tourist destinations in Lori marz

Road improvement providing tourists with easy access to tourist destination areas, as well as inclusion of new historical and cultural monuments in sightseeing tours

Lori marz administration

3577 million AMD

214. Production of geranium oil “Farmer Vahe” LTD

30million AMD

215. 2004-2010 national program for improving women’s life quality and increasing their role in RA society

Women’s Republican Council of Armenia

216. Strengthening democratic processes in RA

Legal counseling to public “Aporia” LTD 120 thousand USD

217. Organization of cultural center Development of cultural strategy, which will become indivisible part of our routine life through its gradual

“Institute of Cultural and National Values” NGO, “Young

36 thousand USD

Page 41: Final complete - AIDlist-MilleniumProjects PART I · in Arzni – 5km, Hagharcin – last 2km, Gladzor – 3-4km, Vorotnaberd – 5-6km, from Sisian to Sisavank – 3km, from Sisian

integration Tavush” NGO, “Mshatur” LTD

218. Development of healthcare system as means of sustainable economic development

Purchase of up-to-date medical equipment (mostly diagnostic)

“Erebuni” medical center

5.255 million USD

219. Infrastructure development though training and education

ACCELS


Recommended