1/30/17 1 Eagle River Traffic Mitigation Phase I Old Glenn Highway / Eagle River Road Intersection Improvements January 26, 2017 1 Eagle River Traffic Mitigation Phase I Public Meeting #6 6:00 P.M. OPEN HOUSE 6:30 P.M. PRESENTATION 7:00 P.M. OPEN HOUSE 8:00 P.M. ADJOURN Eagle River Traffic Mitigation Phase I Presentation Project Area Overview of Project Origin Project Goals Intersection Improvements Cross Drive - What We’ve Heard Funding Project Schedule Next Steps 2 Eagle River Traffic Mitigation Phase I Project Area OLD GLENN HIGHWAY / EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS 3 Eagle River Traffic Mitigation Phase I Project Origins 2003 Eagle River Central Business District Revitalization Plan Core Circulation Study Develop Design Solutions Consider Circulation Alternatives 2005 Official Streets and Highways Plan Establish Policies, Standards and Street Classifications Business Boulevard = Collector Old Glenn Highway and Eagle River Road = Arterial 2006 Chugiak-Eagle River Comprehensive Plan Update (CERC Plan) Specific Policy Guidelines: Utilities and Services for land use; Transportation Network = compatible with land use; acceptable level of service; maximum safety; and, a variety of transportation modes 2007 Chugiak-Eagle River 2027 LRTP/AMATS 2035 Metropolitan Transportation Plan Balanced Transportation System based on community values The adopted plan recommends the Business Boulevard Extension in the short term road projects (#133) 2009 Downtown Eagle River Overlay District Cohesive Town Center 2011 Eagle River Central Business District and Residential Core Circulation Study Develop Eagle River Downtown Revitalization Plan Projects to incorporate into Metropolitan Transportation Plan Evaluated Connected Streets, Couplet, and Main Street Concepts Business Blvd extension was one of the high priority projects identified and subsequently funded to design and construct 2013 Eagle River Traffic Mitigation Phase I Reconnaissance Report Developed as part of this project to evaluate possible solutions to existing traffic conditions at the three Eagle River Interchanges 2015 Eagle River Traffic Mitigation Phase I Draft Design Study Report - Business Boulevard Extention Developed as part of this project to evaluate connecting Business Blvd to Eagle River Rd. Identified necessity of improving intersection before connection can be made. 2016 Eagle River Traffic Mitigation Phase I Draft Design Study Report - Old Glenn Highway / Eagle River Road Intersection Developed as part of this project to evaluate improvements at the Old Glenn Hwy. and Eagle River Rd. intersection Identified intersection improvements to prepare for future Business Boulevard connection once funding is available. 4
Transcript
Page 1: FINAL ERTM PM 01.26 - Brooks and Associatesbrooks-alaska.com/ERTrafficMitigation/documents/FINAL... · 2018-12-14 · FINAL_ERTM_ PM_01.26.2017 Author: Camden Yehle Created Date:

1/30/17

1

Eagle RiverTraffic

MitigationPhase I

Old Glenn Highway / Eagle River Road

Intersection Improvements

January 26, 2017

1

Eagle RiverTraffic

MitigationPhase I

Public Meeting #66:00 P.M. OPEN HOUSE6:30 P.M. PRESENTATION7:00 P.M. OPEN HOUSE8:00 P.M. ADJOURN

Eagle RiverTraffic

MitigationPhase I

Presentation

• Project Area• Overview of Project Origin• Project Goals• Intersection Improvements• Cross Drive - What We’ve Heard• Funding • Project Schedule• Next Steps

2

Eagle RiverTraffic

MitigationPhase I

Project Area

OLD GLENN HIGHWAY / EAGLE RIVER ROADINTERSECTION IMPROVEMENTS

3

Eagle RiverTraffic

MitigationPhase I

Project Origins

2003 EagleRiverCentralBusinessDistrictRevitalizationPlanCoreCirculationStudyDevelopDesignSolutionsConsiderCirculationAlternatives

2005 OfficialStreetsandHighwaysPlanEstablishPolicies,StandardsandStreetClassificationsBusinessBoulevard=CollectorOldGlennHighwayandEagleRiverRoad=Arterial

2006 Chugiak-EagleRiverComprehensivePlanUpdate(CERCPlan)SpecificPolicyGuidelines:Util itiesandServicesforlanduse;TransportationNetwork=compatiblewithlanduse;acceptablelevelofservice;maximumsafety;and,avarietyoftransportationmodes

2007 Chugiak-EagleRiver2027LRTP/AMATS2035MetropolitanTransportationPlanBalancedTransportationSystembasedoncommunityvaluesTheadoptedplanrecommendstheBusinessBoulevardExtensionintheshorttermroadprojects(#133)

2009 DowntownEagleRiverOverlayDistrictCohesiveTownCenter

2011 EagleRiverCentralBusinessDistrictandResidentialCoreCirculationStudyDevelopEagleRiverDowntownRevitalizationPlanProjectstoincorporateintoMetropolitanTransportationPlanEvaluatedConnectedStreets,Couplet,andMainStreetConceptsBusinessBlvdextensionwasoneofthehighpriorityprojectsidentifiedandsubsequentlyfundedtodesignandconstruct

2013 EagleRiverTrafficMitigationPhaseIReconnaissanceReportDevelopedaspartofthisprojecttoevaluatepossiblesolutionstoexistingtrafficconditionsatthethreeEagleRiverInterchanges

2015 EagleRiverTrafficMitigationPhaseIDraftDesignStudyReport-BusinessBoulevardExtentionDevelopedaspartofthisprojecttoevaluateconnectingBusinessBlvdtoEagleRiverRd.Identifiednecessityofimprovingintersectionbeforeconnectioncanbemade.

2016 EagleRiverTrafficMitigationPhaseIDraftDesignStudyReport-OldGlennHighway/EagleRiverRoadIntersectionDevelopedaspartofthisprojecttoevaluateimprovementsattheOldGlennHwy.andEagleRiverRd.intersectionIdentifiedintersectionimprovementstoprepareforfutureBusinessBoulevardconnectiononcefundingisavailable.

4

Page 2: FINAL ERTM PM 01.26 - Brooks and Associatesbrooks-alaska.com/ERTrafficMitigation/documents/FINAL... · 2018-12-14 · FINAL_ERTM_ PM_01.26.2017 Author: Camden Yehle Created Date:

1/30/17

2

Eagle RiverTraffic

MitigationPhase I

Eagle River Central Business District and Residential Core Circulation Study

5

Feature Description

7PartialinterchangetoFarmAvenueoftheGlennHighway(couldincludeanovercrossingtoaN/ScollectoronthewestsideoftheGlennHighway)

8 RealignmentofFarmAvenuewithEagleRiverLoopRoad

10 ExtensionofBusinessBoulevardsouthtoEagleRiverRoad

11Direct-accessrampfromGlennHighwaynorthboundoff-ramptoEagleRiverRoadsouthbound

Eagle RiverTraffic

MitigationPhase I

Project developed as a result of 2015 Eagle River Traffic Mitigation Phase I project extending Business Blvd to Eagle River Rd

– Construction of extension first requires intersection improvements.

– Extension project funding not currently identified

Intersection Project Foundation

6

Eagle RiverTraffic

MitigationPhase I

Prepare a traffic analysis, design study report, and final design package for intersection improvementsat Eagle River Road and Old Glenn Highway. This project will:

– Add a hook ramp for southbound Eagle River Road traffic to bypass the signal

– Reduce weaving movements

– Increase future capacity at the intersection

– Prepare the intersection for a future connection to Business Boulevard

Project Goals

7

Eagle RiverTraffic

MitigationPhase I

1. Proposed connection to Business Blvd on hold pending funding.

2. Transition Old Glenn Hwy to accommodate three southbound lanes at intersection with Eagle River Rd

3. Add two-way left-turn lane

4. End acceleration merge lane

(continued)

Intersection Improvements

8

1 2

4

3

Page 3: FINAL ERTM PM 01.26 - Brooks and Associatesbrooks-alaska.com/ERTrafficMitigation/documents/FINAL... · 2018-12-14 · FINAL_ERTM_ PM_01.26.2017 Author: Camden Yehle Created Date:

1/30/17

3

Eagle RiverTraffic

MitigationPhase I

Intersection Improvements

9

78

5. Construct hook ramp to provide uninterrupted flow for vehicles traveling southbound on Eagle River Road

6. Widen westbound approach from 2 to 3 lanes (add through lane)

7. Widen northbound approach from 2 to 3 lanes (add left-turn lane)

8. Modify Cross Drive access

6

5

Eagle RiverTraffic

MitigationPhase I

Cross Drive AccessOpportunities and Challenges

Opportunities• Simplify an already busy

intersection

• Increase safety by reducing vehicle conflict points

• Eliminate or reduce east/west pedestrian crossing conflicts

• Reduce ROW impacts along Old Glenn Highway

• Reduce cut-through traffic (bank parking lot)

Challenges:• Change in routine access

to local businesses and residents

• Increase in cut-through traffic (bank parking lot)

• Increase traffic on Brooks Loop

10

Eagle RiverTraffic

MitigationPhase I

Brooks Loop / Cross Drive Access What We’ve Heard

11

Held Stakeholder Meeting on January 11, 2017 - What we’ve heard:

• Support for closing Cross Drive• Support for right-in-right-out access at Cross Drive• Support for Closing Cross Drive if secondary access is provided• Install a traffic signal at Brooks Loop and Old Glenn Highway• Concerns about losing direct access and parking for businesses• Vehicle-pedestrian safety concerns in the area of Cross Drive and

Pizza Man• Support for switching the direction of the one-way on Brooks

Loop. • Add connection from Brooks Loop to Centerfield Drive through

the MOA owned lot to reduce cut through traffic through the bank parking lot.

• Access needs to accommodate large delivery trucks.

Eagle RiverTraffic

MitigationPhase I

Additional Options under consideration:

a) Interim connection from Brooks Loop to Centerfield Drive

b) Convert Brooks Loop to Right-in, Right-out

c) Reverse Brooks Loop One-Way Circulation

d) Make Cross Drive One-Way

12

a

Brooks Loop / Cross Drive Access Options

ConvertCrossDriveto• Right-in,Right-out• Right-inOnly• ClosedAccess

bc

d

Page 4: FINAL ERTM PM 01.26 - Brooks and Associatesbrooks-alaska.com/ERTrafficMitigation/documents/FINAL... · 2018-12-14 · FINAL_ERTM_ PM_01.26.2017 Author: Camden Yehle Created Date:

1/30/17

4

Eagle RiverTraffic

MitigationPhase I

Work Completed to Date

• Alternatives Analysis for Business Boulevard Extension

– Reconnaissance Report, Concept Report, Design Study Report, and Traffic Analysis

• Alternatives Analysis for Old Glenn Highway and Eagle River Road Intersection Improvements

– Design Study Report, Traffic Analysis, and Preliminary Design

• Public and Stakeholder Outreach

ü Four Technical Advisory Committee Meetingsü Multiple Agency and Stakeholder Meetingsü Six Public Meetings and Workshops

13

Eagle RiverTraffic

MitigationPhase I

Project Funding

14

FUNDEDBYSTATEGRANTSTOTALING $8.5M

BusinessBoulevardExtensionAlternativesRangefrom

$23Mto$28M(2013Estimate)

PreliminaryEngineeringandROWCostto-Date

$2.3M

FundingRemaining $6.3M

Estimatedconstructioncostandavailablefundingwillbefurtherevaluatedfollowingthe65%Design.

Eagle RiverTraffic

MitigationPhase I

Intersection Project Schedule

15

Eagle RiverTraffic

MitigationPhase I

Next Steps

• Proceed with evaluating additional improvements

• March 2017 - Final Intersection Design Study Report and 35% Design

• Proceed with detailed design of Preferred Intersection Improvements that fall within funded budget

• September 2017 - Next Public Meeting @ 65% Design level

16

Page 5: FINAL ERTM PM 01.26 - Brooks and Associatesbrooks-alaska.com/ERTrafficMitigation/documents/FINAL... · 2018-12-14 · FINAL_ERTM_ PM_01.26.2017 Author: Camden Yehle Created Date:

1/30/17

5

Eagle RiverTraffic

MitigationPhase I

Stay Involved

17

VISIT: http://brooks-alaska.com/ERTrafficMitigation/index.html