    1.0 LOADING ARMS

    Loading arm are the equipment that permits the transfer of liquidor liquefied gasfrom one tank to another through an articulated pipe system consisting of rigid piping and

    swivel jointsto obtain flexibility.

    1.1 Classification on type of Construction

    -Top Loading Arms

    -Bottom Loading Arms

    1.2 Classification on type of Application

    -Marine Loading Arms-Bulk road Loading vehicle Loading Arm

    http://en.wikipedia.org/wiki/Liquidhttp://en.wikipedia.org/wiki/Swivel_jointhttp://en.wikipedia.org/wiki/Flexibilityhttp://en.wikipedia.org/wiki/Flexibilityhttp://en.wikipedia.org/wiki/Swivel_jointhttp://en.wikipedia.org/wiki/Liquid
  • 8/10/2019 Final PPT loading ARM

    2/15

    2.0 TOP LOADING VS. BOTTOM LOADING ARMS

    2.1 Bottom Loading arms

    a) Safe

    - Ground level operation

    - Reduced exposure to hydrocarbons (e.g. benzene) due to vapour collection,- Effective vapour collection possible,

    -Reduced risk of fire/explosion (compartment sealed during loading).

    b)Efficient

    - Fast vehicle turnaround (multi-compartment loadings),

    - Cheaper gantry design possible,

    - No up/down and left/right arm interlocks necessary,- Clean operation (dry-break couplings).

    c)Quality Assurance

    -Dedicated grade-selective couplings available

    -Cross-over protection system available

    Applications :-Solvents and common white oil products

    2.2 Top Loading Arms

    a) Historically, top loading has been predominant

    b) System is very flexible

    Applications :- Loading of black oil and heated products and for locations where

    operating conditions would not allow any alternative.

  • 8/10/2019 Final PPT loading ARM

    3/15

    3.0 TOP LOADING ARMS

    a)Articulated or Scissor type arms b) Boom type arms

    -Operating radius between 2.5 and 5 M

    -Employed when the greater reach

    is not required

    -Operating radius of up to 5.3 m and Above

  • 8/10/2019 Final PPT loading ARM

    4/15

    4.0 BOTTOM LOADING ARMS

    -Combined hoses/pipes - Balanced articulated loading arms

    -Simple in Construction

    -Not Suitable for Load Bulk Vehicles

    -Flexibility to use Variety of couplers

    -Easy to manoeuvre

    -Can be Easily be made to cross over one another

  • 8/10/2019 Final PPT loading ARM

    5/15

    5.0 COUPLINGS

    - Couplers and adapters are manufactured to a common standard

    - Liquid and vapor couplings for loading systems and vehicles shall be as perAPI RP 1004.

    - Nominal 4-inch loading coupling system

    5.1 Design features of API RP 1004 couplers

    -No twisting is required on attachment

    -Loading valve, which forms an integral part of the coupler, can only be opened

    when the coupling is securely fastened. This valve also opens the valve head on the

    vehicle adapter.

    -Dry-break disconnection that minimizes leakage.

  • 8/10/2019 Final PPT loading ARM

    6/15

    Fig.API RP 1004 Coupler

  • 8/10/2019 Final PPT loading ARM

    7/15

    6.0 SWIVEL JOINT

    -Major Component of loading Arm

    -Generally three piece construction

    -Causes full 360 deg rotation

    -Also features a leak detection hole to determine seal wear and Tear

  • 8/10/2019 Final PPT loading ARM

    8/15

    7.0 INTERLOCK SYSTEM

    -Secures the safety, security and quality of the loading,

    -It mainly comprises of

    -Earth interlock

    -Overfill protection-Low flow trip

    -Verification of vapor collection connection

    -Left/right detectors and up/down detectors for top loading arms

    -Loading arm stored after use

    7.1 Earth Interlock

    -Static electricity is generated during loading.

    - When non-conductive liquids are loaded an accumulation of static electricity

    can take place resulting in sparks .

    - The bonding resistance between the vehicle and the gantry shall be less than

    10 , and this earthing shall remain in position until all other loading operations

    have been completed.

    -Loading shall not be permitted by the flow control system/interlock systemif the vehicle is not bonded effectively.

  • 8/10/2019 Final PPT loading ARM

    9/15

    7.2 Overfill Protection Systems

    a)Flow valve on gantry, sensor on vehicle arrangement

    - Liquid level control sensor is fitted permanently in each vehicle compartment.

    - The sensors on the vehicle are connected to the gantry flow control/interlock

    system.contd.

  • 8/10/2019 Final PPT loading ARM

    10/15

    -Loading is only permitted when none of the sensors gives a high liquid level signal.

    b)Flow valve and sensor on gantry

    - For top loading only

    - Liquid level sensors are fitted on the loading arms and in case of overflow

    the control system on the gantry stops the flow to the loading arm.

    -Not normally be employed because loading arm mounted sensors are

    susceptible to mechanical damage

    c) Flow valve and sensor on vehicle.

    -This self-contained vehicle-mounted system is only used for bottom loading.

    -Each compartment of the vehicle is permanently fitted with a liquid level sensor

    and with a foot valve, which closes in case of high level.

  • 8/10/2019 Final PPT loading ARM

    11/15

    8.0 OTHER ACCESSORIES

    8.1 Deadman Type Loading Valve

    -Ensures loading of the product only in the case operators Personnel attention

    -Safety against mishandling of the product .

    8.2 Vacuum Breaker

    -Simple accessory to relive unwanted vacuum which may develop in the pipe line.

    8.3 Emergency Release System

    -Extra Safety for Loading /Unloading LPG and LNG Toxic Gases

    -Provides 100% instant shut off, reducing the danger to operator and the

    surrounding.

    8.4 Dry Disconnect Couplings

    -Prevent Spillage from routine accidental disconnects.-suitable for loading and Unloading of LPG and other Flammable Fluids.

    8.5 Arm Locking Device

    -To hold arm in locking position.

    8.6 Drip Bucket Clamp-Collect Spillage after loading /Unloading.

  • 8/10/2019 Final PPT loading ARM

    12/15

    9.0 ACTIVITIES INVOLVED IN PRE AND POST ORDERING

    9.1 Scope of Supply of Vendor

    -Fabrication and Assembly-Manufacturing and procurement of equipment and materials

    -Inspection and Testing

    -Performance test of fully assembled arms

    -Preparation for Shipment, packing and shipment

    -Preparation and submission of documentation

    9.2 Extent of Supply

    -Loading arms

    -Arm Balancing system

    -Mounting stand post

    -Emergency Release coupling-Swivel joints

    - Drain and Hydro test connections

    -Name Plate and Support

    -Over Fill protection system

    -Lock down system

    -Vacum Breaker

    -Local Flow meter

    -Greasing points on swivel points

    -Earth lugs

    -First Fill of consumables.

  • 8/10/2019 Final PPT loading ARM

    13/15

    10. SPECIFCATIONS TO THE VENDOR

    Process Requirements

    -Fluid Handled

    -Operating Pressure and Temperature

    -Design Pressure and Temperature,MDMT-Flow rate, Pressure Drop Etc.

    Mechanical Requirements

    -Design Wind speed (Manouvering /Connected/Maintainence Position)

    - Earth Quake Factor

    -Design Life

    - Material of Construction

    -Nozzle Connections

    Inspection Requirements

    -Radiography procedures or specifications

    - Painting specification

    -Packing and Shipping Procedures

    -Spare Parts Philosophy

  • 8/10/2019 Final PPT loading ARM

    14/15

    11.0 MAJOR DELIVERABLES

    - General Arrangement Drawing

    - Detail Drawing for Arms , Couplers and Other accessories

    with bill of materials

    -Strength Calculation and other calculation

    -Working Envelope for piping

    -Visual Inspection Reports

    - ERS Test ,Swivel Test Reports

    -PMI ,NDE Test Reports

    - Earthing Diagram

    - Preservation and Packing procedures

    - Operation and Maintenance Manuals

  • 8/10/2019 Final PPT loading ARM

    15/15