    FEASIBILITY REPORT

    Technical Feasibility

    The Tracking system is feasible technically although there is some risk.

    Familiarity with the Application

    Nowadays numerous of GPS tracking system industry exist has no offer different

    tracking system product thats why, costumers need knowledge about the tracking

    system, and also the developers will provide procedure, training and demo for the

    costumer whose not familiar in the system .

    Familiarity with the Technology

    The Developers has enough knowledge in technology required to assist

    and secure the Tracking system. Operating system independent: the system is written

    entirely in java, using technologies such as apache tomcat for web service deployment,

    and mySQL for data store. The system will run on any system including Linux, Mac

    OSX, windows XP, Windows Vista and more. The system is supported by the google

    map and Microsoft virtual earth .The teams/developers are always ready to all users

    feedback.

    Project size

    The project team consist of 6 people. Businesses and consumers

    involvement will be required. The project time frame is somewhat critical, the tracking

    1

  • 8/12/2019 Final Project Format Mark22 FINAL

    2/38

    system is need to maintain because we offer our customers the best -of -the best

    tracking system product.

    Compatibility

    The tracking system is very useful when it comes in security of the

    consumers. It is compatible in different operating system. Tracking website can easily

    be customized to fit the motif of the specific company.

    ECONOMIC FEASIBILITY

    Year 0 Year 1 Year2 Total

    Total Benefits 48,000 46,000 144,00

    Total Costs 90,000 10,000 10,000 110,000

    Nets Benefits

    Total Benefits

    Total Cost

    90,000 38,000 86,000 84,000

    Cumulative Net

    cash flow

    90,000 (54,000) 34,000

    2

  • 8/12/2019 Final Project Format Mark22 FINAL

    3/38

    Total BenefitsTotal CostsRIO = -----------------------------------------

    Total Costs

    144,00020,000 124,000

    ROI = ---------------------------- = ----------- = 6.2%20,000 20,000

    That years Net Cash Flow That yearsNumber of years of negative cash flow ------------------------------------------------------

    That years Net Cash Flow

    86,00034,000 52,000BEP = 1 + --------------------------- = ------------- 1 + = 1.6 years

    86,000 86,000

    RIO = over 2 years : 6.2%

    Break-even occurs after 1.6 years.

    Tangible

    *Increase sales

    *Better supplier prices

    Intangible

    *Increase market share

    *Higher quality products

    *Improved customer service

    *Better supplier relation

    *Reduce potential liabilities

    3

  • 8/12/2019 Final Project Format Mark22 FINAL

    4/38

    Organizational Feasibility

    Tracking System Direct brings state-of-the-art car camera and GPS tracker to

    assist businesses and consumers, expected on bringing both real-time and passive

    GPS tracking devices to police agencies, families and businesses, expected to be the

    #1 online resource for those seeking to enhance automotive security and family safety,

    expected that this type of locational and video technology can be extremely valuable if

    person needs to have evidence corroborating a story in a motor vehicle accident,

    business wants to reduce potential liabilities or if a parent simply wants to enhance teen

    driving safety.

    Additional Comments

    We should find a consultant with expertise in fast changing technology.

    Improvement of the system is very important, additional features are needed (live chat,

    low battery alerts) or additional automotive securities (sensor alert). We will need to

    hire a new staff to support multiple users of the system.

    4

  • 8/12/2019 Final Project Format Mark22 FINAL

    5/38

    DESCRIPTION OF THE PROJECT

    The web based tracking system is a system designed using a combination of

    several modern information and communications technologies. The system comprises

    of vehicle-mounted tracking devices, a central server system and a web-based

    application. Through the system, users will have the facility of monitoring the location

    graphically and other relevant information of vehicle. This system is designed to serve

    enterprises with an unlimited number of vehicles and complex usage requirements. The

    web based system enables user to browse location track on map through developed

    web application embed Google Map and interact with database server for vehicles track

    details. Using the web based system enables users with different operating system

    platforms to easily reach the demanded details by the existence of internet access.

    The GPS-GPRS-based tracking system is a system that makes use of the Global

    Positioning System GPS to determine the precise location of a vehicle to which the

    device is attached. When a large number of objects or vehicles were spread all over the

    ground, the owner of corporation needs to keep track for fuel saving, security

    purposesetc. A tracking system is required to determine the location of any object at

    any given time and the distance travelled. Also, the need for a tracking system in users

    vehicle is used to prevent any kind of theft since police can use tracking reports to

    locate a stolen vehicle location. GPRS and GPS based tracking system will provide

    effective, real time vehicle location report. A GPS-GPRS based tracking system gives

    all the specifications about the location of a vehicle. The system utilizes geographic

    position and time information from the Global Positioning Satellites.

    5

  • 8/12/2019 Final Project Format Mark22 FINAL

    6/38

    The system uses an On-Vehicle Module consists of GPS receiver and GSM

    modem, the device resides in the vehicle to be tracked. In order to track the movement

    of the vehicle Google Maps used for mapping the location. The GSM modem fetches

    the GPS location and sends it to the server using GPRS.

    We use the sashimi waterfall model because we can review the recent work that we

    made and it can be proceed from the next step even though we are not yet already finish the

    recently steps. It is also easy to understand and less time to spend. Moreover its best suit to use

    from our system because we can review some of the events on what will be our outcome of our

    work and we can predict what will be the best good and the risk that we encounter.

    6

  • 8/12/2019 Final Project Format Mark22 FINAL

    7/38

    PROJECT PLAN

    Task ID Task Name Assigned to Estimated

    Duration Start Date Finish date

    1 Analyze Feasibility M. Fesalboni and R. Falcunitin 3 Days 4/30/14 5/2/14

    2 Develop Work Plan M. Fesalboni 1 Day 5/2/14 5/2/14

    3 Develop Staffing Plan R. Falcunitin 1 Day 5/2/14 5/2/14

    4 Determine ProjectRequirements

    M. Fesalboni 2 Days 5/3/14 5/4/14

    5 Create Use Cases M. Fesalboni 2 Days 5/4/14 5/5/14

    6 Model Processes M. Fesalboni 1 Day 5/6/14 5/6/14

    7 Model Data M. Fesalboni 3 Days 5/11/14 5/13/14

    8 Design Physical System J. Arteza 3 Days 5/14/14 5/16/14

    9 Design Architecture J. Arteza 3 Days 5/14/14 5/16/14

    10 Design Component M. Salsona 2 Days 5/16/14 5/17/14

    11 Design Interface R.Eranes 1 Day 5/17/14 5/18/14

    12 Design Database & files A. Taladtad 2 Days 5/18/14 5/19/14

    13 Finalize Documentation S. Gabayno 1 Day 5/20/14 5/20/14

    14 Submit Documentation All Team Members 1 Day 5/20/14 5/20/14

    7

  • 8/12/2019 Final Project Format Mark22 FINAL

    8/38

    STAFFING PLAN

    ROLE Description AssignedTo

    Project Manager Oversees the project toensure that it meet itsobjectives on time andwithin budgets.

    Mark Fesalbuni

    System Analyst Designs web-based publictracking system with builtin car camera with focuson security

    Mark Fesalbuni

    Architecture Designer Designs tracking systemwith focus on faces of thesystem.

    JhonsonArtiza

    Interface Designer Designs tracking systemwith focus on componentsof the system.

    RuffelEranes

    Database Designer Designs the trackingsystem with focus oninformation of the systemthat includes data inputs

    of information gathered.

    AmeiTaladtad

    Component Designer Designs the trackingsystem with focus on thewhole component of thesystem

    Marissa Salsona

    Research and Encoder Researcher about thesystem and encoderthe content of the

    documents

    RealynFalcunitin

    Document Specialist Edits and compiles all thedocuments of the system

    ShyreenGabayno

    8

  • 8/12/2019 Final Project Format Mark22 FINAL

    9/38

    SYSTEM REQUIREMENTS

    User Requirements:

    1. The system will allowed the user to input a password and control access

    number.

    2. The tracking system with mySQL for data store, detail and summary reports

    can be customized to show historical data for a specific vehicle.

    Functional Requirements:

    1. Process Oriented

    2. The system will be tracked the devices from different manufacturers

    simultaneously.

    3. The system will allowed managers to determine the exact location, speed and

    general direction of the vehicle.

    4. The system will allowed a person to remotely access where the asset, vehicle

    or some other object is located at any given time.

    5. The system shall recorded visual and audio data both inside the cab as well

    as the outside.

    Non-Functional Requirements:

    1. Operational

    2. The system should be able to work on any operating system.

    3. The system can run on handheld devices.

    4. The system should be able to customize the websites easily to fit the motif of

    the specific company.

    5. The system can supports easy localization to languages other than English.

    9

  • 8/12/2019 Final Project Format Mark22 FINAL

    10/38

    USE CASE DIAGRAM

    System Start Up

    System Shut Down

    PIN

    View Record

    View Visual Data

    View system profile

    Edit record

    View location

    Track Vehicle

    Transaction with

    System

    View map

    PIN

    View accurate routes

    View location

    10

  • 8/12/2019 Final Project Format Mark22 FINAL

    11/38

    CONTEXT DIAGRAM

    Business manager

    Audio Visual Data

    Delay Offer Notice

    Operation situation

    Control access

    Vehicle details

    Offer decision

    Web-based TrackingSystem with Built in

    Camera

    Costumer

    Location Updates

    Arrival Time

    Driver

    Driver schedules

    Accurate routes

    11

  • 8/12/2019 Final Project Format Mark22 FINAL

    12/38

    ENTITY RELATIONSHIP DIAGRAM

    TRANSACTIONDETAILS

    *TRANSACTION_ID

    CATEGORY_ID

    CUSTOMERS

    *CUS_ID

    CUS_lastname

    CUS_firstname

    CUS_middlename

    CUS_contactno

    CUS_street

    CUS_town

    CUS_city

    SERVICETYPE

    SVC_typeid

    SVC_typedescription

    TRANSACTION

    *TRANSACTION_ID

    SVC_typeid

    CUS_ID

    TRANSACTION_date

    CATEGORYID

    *CATEGORY_ID

    CATEGORY_name

    CATEGORY_Description

    View category ID

    View Costumer Info

    Input transaction type

    View transaction details

    12

  • 8/12/2019 Final Project Format Mark22 FINAL

    13/38

    PHYSICAL SYSTEM DESIGN

    Computer and Mobile Phone

    Android Phone

    Vehicle with GPS Tracker

    Satellite

    GPS

    SMS

    Signals

    GPS Tracking Device

    13

  • 8/12/2019 Final Project Format Mark22 FINAL

    14/38

    ARCHITECTURAL DESIGN

    Internet

    Wireless NetworkGPS Satellite

    Wireless Server

    Vehicle

    Computer

    MobileNavigation Satellite Signals

    Onboard Reports

    Operational Data Reports

    14

  • 8/12/2019 Final Project Format Mark22 FINAL

    15/38

    COMPONENT DESIGN

    System Unit

    Microphone

    Monitor

    Mouse

    Printer

    Monitor

    Camera

    Keyboard

    PCI Interface Card

    PCI Video Card

    Speaker

    15

  • 8/12/2019 Final Project Format Mark22 FINAL

    16/38

    INTERFACE DESIGN

    YES NO

    Drivers Emergency Needs

    Owners Needs

    Simple YES-NO function for drivers

    One touch hotline phone access

    Drivers Entertainment Needs

    Monitor

    16

  • 8/12/2019 Final Project Format Mark22 FINAL

    17/38

    Control Program

    17

  • 8/12/2019 Final Project Format Mark22 FINAL

    18/38

    DATABASE DESIGN

    CUSTOMERS

    CUS_ID CUS_lastname CUS_firstname CUS_middlename CUS_contactno CUS_street CUS_town CUS_city

    18 Sanchez Peter A. (02)454-5333 Bonifacio St. Odiongan Romblon

    19 Vargas Noralyn C. (02)342-3242 Carlos P. Garcia St. Odiongan Romblon

    20 Garcia Nollete I. (02)477-3842 Apolinario St. Odiongan Romblon

    21 Reyes Rosaline F. (02)411-0622 Quezon St. Odiongan Romblon

    22 Roxas Candy D. (02)322-6644 Jose Rizal St. Odiongan Romblon

    TRANSACTIONDETAILS

    TRANSACTION_ID CATEGORY_ID

    TRA_001 01

    TRA_002 02TRA_003 03

    TRA_004 04

    TRA_005 05

    CATEGORYID

    CATEGORY_ID CATEGORY_name CATEGORY_Description

    001 PAS Personal Driver

    002 NCV OJT Driver

    003 NIG Reserve Driver

    004 RFR Personal Driver

    005 CDR OJT Driver

    SERVICETYPE

    SVC_typeid SVC_typedescription

    45 Delivery

    46 Travel

    47 Travel

    48 Travel

    49 Delivery

    TRANSACTION

    TRANSACTION_ID SVC_typeid CUS_ID TRANSACTION_date

    TRA_001 45 18 05/17/2014

    TRA_002 46 19 05/18/2014

    TRA_003 47 20 05/19/2014

    TRA_004 48 21 05/20/2014

    TRA_005 49 22 05/21/2014

    18

  • 8/12/2019 Final Project Format Mark22 FINAL

    19/38

  • 8/12/2019 Final Project Format Mark22 FINAL

    20/38

    NARRATIVE

    REPORT

    20

  • 8/12/2019 Final Project Format Mark22 FINAL

    21/38

    MARK FESALBONI

    Project Manager and System Analyst

    This subject SAD(System Analysis and Design) in the beginning of the class Im

    just wondering that its so difficult to take up this subject and I also thinking that there

    was a system that needs to develop but instead Sir. Dennis was decided not to do the

    system because it needs a lot of time.

    At first, I was so thankful from my group mates because without their

    cooperation this hard work will not be successfully done. I am very thankful to Sir

    Dennis being our instructor from this subject because when I saw you Sir you try your

    best to pursue us being your student to become responsible in all obligation and task

    we need to do especially in our group project.

    As a leader of our group, it is my task to encourage and be a good example to

    them and also to assign them what they need to do. I am so particular about some

    reports of our group because this is my obligation. I am happy because I know we as a

    group will finish this work. And I am so glad that within two months of my summer class

    I learned a lot in this subject and Im also enjoying.

    Signed:

    MARK FETALVER FESALBONI

    Project Manager and System Analyst

    21

  • 8/12/2019 Final Project Format Mark22 FINAL

    22/38

    RUFEL JHON ERANES

    Interface Designer

    This is my first time to take up this subject although I have some ideas in this

    subject, because I already take up the subject software engineering, and my

    classmates who already take up this subject that theres a similarity between software

    engineering and system analysis and design. It seems that this subject is quite

    interesting and at the same time stressful.

    When our instructor assigned us in our respective group Ive expected a lot of

    possible outcome that our group might encounter. There comes a time that we face

    some common problem, but in the end, we still fix it. I am so happy of the result that we

    get after our report. Sometimes we got the highest score and sometimes not, but its

    okay because we never got the lowest score.

    Doing this project with them (my group mates) teach me how to value time and

    keep intact with other members. Because I believe that, to achieve a better result or

    which I say is to be the best group. All we need is a unity and because of that I enjoy

    my summer class and Im looking forward in the future that all of my learnings in this

    subject will help me to reach my dream.

    Signed:

    RUFEL JHON CLAUD ERANES

    Interface Designer

    22

  • 8/12/2019 Final Project Format Mark22 FINAL

    23/38

    REALYN FALCUNITIN

    Researcher and Encoder

    As far as I know that subject SAD (System Analysis and Design) is difficult but

    when the class started its become more easier if you want to learn, the best thing you

    can do to have such knowledge is by listening and have a full of understanding what the

    instructor teach. And its better to apply those things in our life also.

    I am grateful because when I know that Sir Dennis Salvador will be our instructor

    at this subject, I know we gain knowledge and thanks from you sir to have the patience

    in teaching although sometimes were so naughty. At first I felt nervous because I was

    surprise when Sir Dennis called some randomize students for what you listen when he

    spoke some topics and what will be this subject going through. During reporting its

    getting nervous but in some point I realize that it helps me a lot to encourage myself to

    spoke in the front of others. Thanks sir it helps me to learn a lot not to be shy in front

    and have a boldness just to defend what is your learning about our group system.

    In this subject, Sir Dennis gave us a group which everyone of us in our group has

    its own assignment and a task to do, Our leader assigned me as encoder and

    researcher at first it took so difficult but meanwhile its helps me also to discover a lot of

    things and explore about what is the important included our system. Thanks God

    because he always there to guide us and also gave us enough strength to overcome

    and be successful of our project work. I learned for long time being group mates needs

    a full of cooperation and being in tack with each other is a big help to value time.

    Signed:

    REALYN FORNEA FALCUNITIN

    Researcher and Encoder

    23

  • 8/12/2019 Final Project Format Mark22 FINAL

    24/38

    JHONSON ARTEZA

    Architecture Designer

    Our Subject is SAD which is System Analysis and Design, I expect in this

    subject that not so difficult although in advance all I thought sir wants us to make a

    mini system which is so challenging in my side which you can experience new codes,

    but in the meantime sir decided that were less time to have a implementation thats

    why we only do the proposal project.

    My experience in this subject that Ive never forget are first I am so nervo us

    when in terms of reporting because Im so shy but thanks sir you gave me courage

    and advice from our reporting what will the best. Thanks also from my partner which

    is Realyn who taught me some vocabularies and how to report in front of everyone it

    really helps me a lot.

    In our Group were so lucky to have a leader who is strictly and scolded us

    sometimes if we forgot to do our task, he always remind us about the reporting and

    do what the priority first. Being an Architecture Designer it gives me a difficult task but

    as the day past I Realize that I am a big help from our group and also I learned to it.

    Signed:

    JHONSON FRANCO ARTEZA

    Architecture Designer

    2

  • 8/12/2019 Final Project Format Mark22 FINAL

    25/38

    AMIE TALADTAD

    Database Designer

    In my first day in the subject SAD (System Analysis and Design) for me its hard

    and thinker subject. In every day we meet a lot of discussion and we have power point

    presentation to the different group before he discus the topic they give the task to us to

    present in the front of my instructor and my classmates.

    In this subject I learned a lot in system analysis and design and how to manage

    my time to the different subject that I take in this summer class and of course from to

    the SAD subject, how to cooperate to my group mate and the task that we give to each

    of us. During our reporting I felt nervous because Im shy and low voice to spoke in the

    front of others. But I realize that it help me to encourage myself to speak in the front.

    Im grateful that in my group mates and o f course our leader was responsible to

    do the assignment and the task that we assigned to each other. For me in this subject

    is difficult, challenging and more on analysis.

    Signed:

    AMIE GUYO TALADTAD

    Database Designer

    25

  • 8/12/2019 Final Project Format Mark22 FINAL

    26/38

  • 8/12/2019 Final Project Format Mark22 FINAL

    27/38

    SHYREEN B. GABAYNO

    Documentation Specialist

    When Im taking up this subject I know its not very hard and I know its more only on

    system that we need to analyze and Im just expecting from this subject it needs to build a mini

    system but thanks God to from our instructor who is Sir Dennis it was decided that we dont

    need to build a system. I know its difficult and basically it will need more time but since we are

    taking this subject onlythis summer.

    Im so glad that we have a group that we are in tack in terms of doing such projects. Im

    so worried when theres a time that Sir wants to separate every group from individual but were

    so lucky because we have a leader that is always prepared although he so strictly in terms of

    our project. Thats why we prove to other groups that we can dothis.

    Thanks God were getting to finish this work group and I know God is always giving us

    wisdom and enough strength to do our project well. I was assign to do thae task of compilation

    of our documentation it is so hard but in the end it only needs cooperation and time. I really do

    appreciated what we do.

    Signed:

    SHYREEN BACLAS GABAYNO

    Documentation Specialist

    27

  • 8/12/2019 Final Project Format Mark22 FINAL

    28/38

    PROFILES

    28

  • 8/12/2019 Final Project Format Mark22 FINAL

    29/38

    MARK FESALBONI

    Nickname: mack

    Age: 21

    Address:Anahao odiongan Romblon

    Birthday: June 3,1992

    Civil Status:Single

    Digs and sound of: Together (Neyo)

    Film Fancies: Transformer/Iron man

    Cant live without:Shoes

    Hangout/s:Kwarto lang!!

    Haven: Church

    Best pals: Trisha,Francisca

    Lucky charms: Cologne

    Energy boosters: Juice

    Hard habits to break: Playing table tennis

    Wannabe: System analyst someday

    Primary School:Anahao Elementary School,Anahao Odiogan Romblon

    Secondary School:Romblon National High School, Dapawan Odiongan RombloN

    Tertiary School:RomblonStateUniversity, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Crush is thousand but love is only one

    29

  • 8/12/2019 Final Project Format Mark22 FINAL

    30/38

    AMIE G. TALADTAD

    Nickname:Amz, mie

    Age:19

    Address:Limon Sur, Looc, Romblon

    Birthday:February 4, 1995

    Civil Status:Single

    Digs and sound of:The man who can be moved (The script)

    Film Fancies:fullhouse

    Cant live without:Money, Cellphone, Family and friends

    Hangout/s:my room

    Haven:church, house

    Best pals:n/a

    Lucky charms:Rosary

    Energy boosters:Sting, Gatorade

    Hard habits to break:

    Wannabe:I want to be a chef someday

    Primary School:Limon Sur, Elementary, School

    Secondary School:Looc National High School

    Tertiary School:RomblonStateUniversity, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Learn from the past, plan for the future by focusing on today.

    30

  • 8/12/2019 Final Project Format Mark22 FINAL

    31/38

    RUFEL JHON C. ERANES

    Nickname:Fhel, Ruffz

    Age:20

    Address:PoblacionLooc, Romblon

    Birthday:September 3, 1993

    Civil Status:Single

    Digs and sound of:Soldier (before you exit)

    Film Fancies:Percy Jackson Movies

    Cant live without:Money, C.P, Love Life, Crushes, Boys and friends

    Hangout/s:Anywhere where I can spend more time partying

    Haven:in my house, specifically in my room

    Best pals:N/A

    Lucky charms:Rosary

    Energy boosters:Gatorade

    Hard habits to break:biting my thumbnails

    Wannabe:Print Ad Model, good singer, Celebrity and a rich businessman

    Primary School:Looc Central Elementary School, Looc, Romblon

    Secondary School:Looc National High School, Looc, Romblon

    Tertiary School:Romblon State University, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Dont mind what others think about you, just be yourself and make the most of it.

    31

  • 8/12/2019 Final Project Format Mark22 FINAL

    32/38

    REALYN F. FALCUNITIN

    Nickname:Lheng,Ryn

    Age:19

    Address:Brgy. Dapawan, Odiongan, Romblon

    Birthday:June 15,1994

    Civil Status:Single

    Digs and sound of:All album of Owl City (Tom Young)

    Film Fancies:Anime, and Japanese movies

    Cant live without:Faith to God and Praying before everything

    Hangout/s:Store, House

    Haven:House

    Best pals:EB and JB

    Lucky charms:My key chain teddy and cherry blossom

    Energy boosters:Bear brand, Dutch milk

    Hard habits to break:______

    Wannabe:A professional IT someday

    Primary School:Odiongan South Central Elementary School

    Secondary School:Romblon National High School

    Tertiary School:Romblon State University, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Make the best you can and God will do the rest

    32

  • 8/12/2019 Final Project Format Mark22 FINAL

    33/38

    Johnson F. Arteza

    Nickname:shon

    Age:19

    Address:Brgy. Ligaya, Odiongan, Romblon

    Birthday:September 26,1994

    Civil Status:Single

    Digs and sound of:Dynimite(taio Cruz)

    Film Fancies:Action

    Cant live without:Family

    Hangout/s:House

    Haven:House

    Best pals:Realyn, Rafael, Ken Joshua, Jape

    Lucky charms:Ring

    Energy boosters:Milo

    Hard habits to break:Biting Pen

    Wannabe:IT Programmer

    Primary School:Odiongan South Central Elementary School, Liwayway

    Secondary School:Romblon National High School ,Dapawan

    Tertiary School:Romblon State University, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Study is useless but kodigo is the best(joke) .

    33

  • 8/12/2019 Final Project Format Mark22 FINAL

    34/38

    SHYREEN N. GABAYNO

    Nickname:Shy

    Age:20

    Address:Tanagan, San Andres, Romblon

    Birthday:December 18, 1993

    Civil Status:Single

    Digs and sound of:Thank You (Rueben Morgan)

    Film Fancies:Facing the Giant, Fire proof and Barbie

    Cant live without:Oxygen

    Hangout/s:Seashore

    Haven: Home

    Best pals:Mhie,Isah ,Zhel

    Lucky charms:Bible

    Energy boosters:H2O ,and Milk

    Hard habits to break:Playing under the rain

    Wannabe:to become a NASA Technologists(new dream)

    Primary School:Tanagan Elementary School, Tanagan, San Andres,Romblon

    Secondary School:Tanagan National High School, Tanagan, San Andres, Romblon

    Tertiary School:Romblon State University, Odiongan, Romblon

    Degree: Bachelor of Science in Information Technology

    Motto:Life is not a series of chances, but it is a series of choices.

    34

  • 8/12/2019 Final Project Format Mark22 FINAL

    35/38

    PICTURES

    35

  • 8/12/2019 Final Project Format Mark22 FINAL

    36/38

    WORKING FOR OUR FEASIBILITY REPORT

    Why are you staring at me, Whatsyour Problem????

    Kelan mob a talaga ak sasagutin

    huh?? Naiinip na ako!!

    36

  • 8/12/2019 Final Project Format Mark22 FINAL

    37/38

    STAFFING PLAN AND WORK PLAN