+ All Categories
Home > Documents > Final Project on Disinvestment

Final Project on Disinvestment

Date post: 06-Apr-2018
Category:
Upload: urmi-maru
View: 226 times
Download: 1 times
Share this document with a friend

of 55

Transcript
  • 8/2/2019 Final Project on Disinvestment

    1/55

    Project on Disinvestment 2010

    What is Disinvestment

    In business, disinvestment means to sell off certain assets such as a

    manufacturing plant, a division or subsidiary, or product line. Some people

    use the term divestiture, or to divest when discussing disinvestment.

    For example, an electric generator manufacturer might sell off its consumer

    generator product lines and manufacturing facilities in order to raise money

    that can be used to expand its industrial generator product line.

    Another example is a consumer products company selling off a

    profitable division that no longer meets its long range goals. The proceeds

    from this disinvestment are then used to improve the companys financial

    position by reducing its debt.

    Investment refers to conversion of money or cash into securities,

    debentures, bonds or any other claims on money. At the same time,

    disinvestment involves the conversion of money claims or securities into

    money or cash.

    Disinvestments, also known as divestments, are processes utilized by

    companies when there is a need or desire to initiate a reduction in capital

    investment. Essentially functioning as the polar opposite of an investment,

    the process of divestment involves selling off current investments in order togenerate assets that can be used to better advantage in some other manner.

    Businesses sometimes use disinvestment as a means of changing the

    direction of the company in order to meet changing consumer needs and

    remain competitive.

    3 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    2/55

    Project on Disinvestment 2010

    One of the easiest ways to understand divestment is to think in terms of a

    company that has successfully produced a product for many years. However,

    changing technology is shrinking the demand for the companys product. A

    new product is developed that is anticipated to recapture the interest of

    consumers. However, this will leave the company with several physical

    facilities and a great deal of equipment that is not required for the

    production of the new product.

    In order to generate revenue that will aid in the manufacturing of the

    new product, the company will undergo a period of disinvestment. The plants

    and other facilities that are no longer required for production are sold off,

    along with the now obsolete equipment. By generating income from the sale

    of these divested holdings, the company creates resources that constitute a

    capital investment in the new product.

    At times, a company may choose to sell off a subsidiary or business unit

    as part of a disinvestment strategy. Doing so allows the company to begin

    the migration from focusing on one market sector to a different sector that

    holds more promise. In some cases, disinvestment involves selling the

    business unit to another company. At other times, the business unit is spun

    off into a separate company altogether.

    Disinvestment can also occur when there is a decision to make changes

    in the regulation of an industry. Perhaps the most well known example ofthis type of disinvestment application would be the deregulation of the

    communications industry in the United States during the 1980s. As part of

    the process, the Bell System was completely divested and emerged as eight

    different entities: the new AT&T, and seven regional Bell companies that

    were known collectively as the Baby Bells.

    4 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    3/55

    Project on Disinvestment 2010

    Because disinvestment does involve the sale of resources, companies

    often look very closely at the process before actually implementing any type

    of divestiture action. It is important to make sure that the investments thatare released are not likely to be required in the future, and that the revenue

    generated from the sale of the investments is highly likely to result in

    increased profitability for the company in the long run.

    Evolution of the Disinvestment

    Policy

    a) Initial Phase (1991-92 to 1998-99)

    1)The Statement of Industrial Policy dated July 24, 1991 stated that in the

    case of selected enterprises, part of Government holdings in the equity

    share capital of these enterprises will be disinvested in order to provide

    further market discipline to the performance of public enterprises. Thus,

    disinvestment of the Governments equity in CPSUs (Central Public Sector

    Units) started in 1991-92, when minority shareholding of the Central

    Government in 30 individual CPSUs was sold to selected financial

    institutions (LIC, GIC, UTI) in bundles, in order to ensure that along with the

    attractive shares, the not so attractive shares also got sold. Subsequently,

    shares of individual CPSUs were sold and the category of eligible buyers was

    gradually expanded to include individuals, NRIs and registered FIIs. By 1997,

    sale through the GDR route was also initiated and MTNL (1997-98), VSNL

    (1998-99) and GAIL (1999-2000) all used the opportunity to access the GDR

    5 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    4/55

    Project on Disinvestment 2010

    market. The number of listed CPSUs on domestic stock exchange stood at

    42 as on 31.3.2006.

    2)The policy on disinvestment has evolved through statements of Finance

    Ministers in their budget speeches. In the interim budget 1991-92, it was

    announced that the Government would disinvest up to 20 per cent of its

    equity in selected public sector undertakings in favor of mutual funds and

    financial or investment institutions in the public sector to broad-base the

    shareholding, improve management, enhance availability of resources forthese CPSUs and yield resources for the exchequer.

    3)The Rangarajan Committee recommended in April 1993 that the percentage

    of equity to be disinvested should be generally under 49% in industries

    reserved for the public sector and over 74% in other industries. As per

    statement of Industrial Policy dated 24th July 1991 the following industries

    were proposed to be reserved for the public sector:- Arms and ammunition

    and allied items of defense equipment, Defense aircraft and warships.

    Atomic Energy

    Coal and lignite

    Mineral oils

    Mining of iron ore, manganese ore, chrome ore, gypsum, sulphur, gold and

    diamond

    Mining of copper, lead, zinc, tin, molybdenum and wolfram

    6 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    5/55

    Project on Disinvestment 2010

    Minerals specified in the Schedule to the Atomic Energy (Control of

    Production and Use) Order, 1953

    Railway transport.

    4)In the budget speech of 1996-97, the proposal to establish a Disinvestment

    Commission was announced. It was also stated that the revenues generated

    from such disinvestment will be utilized for allocation to education and

    health sectors and for creating a fund to strengthen CPSUs.

    5) Public Sector Disinvestment Commission:-The Public Sector Disinvestment

    Commission was established on 23rd August 1996, for a period of three

    years, as an independent, non-statutory, advisory body with Shri G.V.

    Ramakrishna as full time Chairman, four other Members (part time) and a

    full time Member Secretary. 72 CPSUs were referred to the Commission.

    Subsequently, 8 cases were withdrawn. The Commission submitted 12

    reports for 58 CPSUs, recommending strategic sale in 28 cases, trade sale in

    8 cases, closure of 4 units, equity sales in 6 cases and no change

    (disinvestment deferred) in 12 cases. The Commission did not take up

    examination of the cases of six CPSUs, which were registered with the Board

    for Industrial & Financial Reconstruction (BIFR). The tenure of the Chairman

    of the Commission was extended till 30th November 1999.

    6)In the budget speech of 199899, it was announced that, in the generality of

    cases, the Governments shareholding in CPSUs would be brought down to26%. In the case of CPSUs involving strategic considerations, the

    Government would continue to retain majority shareholding. The interest of

    workers would be protected in all cases.

    7 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    6/55

    Project on Disinvestment 2010

    7) In the budget speech of 1999-2000, it was announced that Government's

    strategy towards the CPSUs would continue to encompass a judicious mix of

    strengthening strategic units, privatizing non-strategic ones through gradualdisinvestment or strategic sale and devising viable rehabilitation strategies

    for weak units.

    8) On 16th March 1999, the Government classified the CPSUs into strategic and

    non-strategic areas for the purpose of disinvestment. It was decided that

    the strategic CPSUs would be those functioning in areas of:

    Arms and ammunition and the allied items of defense equipment, defense

    aircrafts and warships

    Atomic energy (except in the areas related to the generation of nuclear

    power and applications of radiation and radio-isotopes to agriculture,

    medicine and non-strategic industries)

    Railway transport.

    All other CPSUs were to be considered as being non-strategic. For the non-

    strategic CPSUs, it was decided that reduction of the Governments

    shareholding to 26% would not be automatic and the manner and pace of

    doing so would be decided on a case-by-case basis on the following

    considerations:

    a) Whether the industrial sector required the presence of the public sector as

    a countervailing force to prevent concentration of power in private hands,

    and

    8 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    7/55

    Project on Disinvestment 2010

    b) Whether the industrial sector required a proper regulatory mechanism to

    protect the consumer interests before Public Sector Enterprises were

    privatized.

    9) It was also decided to establish a new Department for Disinvestment to

    systematize the policy approach to disinvestment and privatization and to

    give a fresh impetus to this programmed. The Department came into being

    on 10th December 1999.

    10) In the budget speech of 2000-2001, it was announced that the main

    elements of the Governments policy were to restructure and revive

    potentially viable CPSUs; close down CPSUs which cannot be revived; bring

    down Governments shareholding in all non-strategic CPSUs to 26% or

    lower, if necessary; and fully protect the interests of workers. The receipts

    from disinvestment and privatization will be used for meeting expenditure

    on social sectors, restructuring of CPSUs and for retiring public debt.

    9 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    8/55

    Project on Disinvestment 2010

    b) Second Phase (1999-00 to 2003-

    04):

    Reconstituted Public Sector Disinvestment Commission:-

    11) The Public Sector Disinvestment Commission was re-constituted on 24th

    July 2001 for a period of two years with Dr. R.H. Patil as Chairman (part

    time) along with four other Members (part time) and a full time Member

    Secretary. The then Ministry of Disinvestment had informed the

    Commission on 23rd January 2002 that all non-strategic CPSUs, including

    subsidiaries, but excluding IOC, ONGC and GAIL, stood referred to the

    Commission for it to prioritize, examine and make recommendations in the

    light of the Government policies articulated earlier on 16th March 1999 and

    the budget speeches of Finance Ministers from time to time. The

    Disinvestment Commissions in 25 reports submitted between February

    1997 March 2004 disinvestment through strategic sale in 59 cases;

    10 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    9/55

    Project on Disinvestment 2010

    disinvestment other than strategic sale in 32 cases and closure was

    recommended in 4 cases. The term of the Commission was subsequently

    extended till 31st

    October 2004. The Commission ceased to exist from 1st

    November, 2004.

    12)In the budget speech of 2001 2002, it was announced that CPSUs must

    be strengthened to compete and prosper in the new environment. A

    receipt of Rs. 12,000 crore was budgeted from disinvestment. Out of this,

    an amount of Rs. 7,000 crore was to be used for providing restructuringassistance to CPSUs, safety net to workers and reduction of debt burden

    and a sum of Rs. 5,000 crore for providing additional budgetary support

    for the Plan, primarily in the social and infrastructure sectors. This

    additional allocation for the Plan would be contingent upon realization of

    the anticipated receipts.

    13)The Government decided in September 2002 that CPSUs and Central

    Government owned cooperative societies (where Governments ownership

    is 51% or more) should not be permitted to participate as bidders in the

    disinvestment of other CPSUs unless specifically approved by the Core

    Group of Secretaries on Disinvestment (CGD). In December 2002 on the

    basis of a proposal of the Department of Fertilizers, it was decided that

    Multi State Cooperative Societies under the Department of Fertilizers be

    allowed to participate in the disinvestment of fertilizer CPSUs including

    National Fertilizers Limited.

    11 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    10/55

    Project on Disinvestment 2010

    14) In a suo motu statement made in both Houses of Parliament on 9th

    December, 2002, by the then Minister of Disinvestment, the Government

    reiterated the policy as The main objective of disinvestment is to putnational resources and assets to optimal use and in particular to unleash

    the productive potential inherent in our public sector enterprises. The

    policy of disinvestment specifically aims at:

    Modernization and up gradation of Public Sector Enterprises

    Creation of new assets

    Generating of employment

    Retiring of public debt

    Government would continue to ensure that disinvestment does

    not result in alienation of national assets, which, through the process

    of disinvestment, remain where they are. It would also ensure that

    disinvestment does not result in private monopolies. In order to

    provide complete visibility to the Governments continued commitment

    of utilization of disinvestment proceeds for social and infrastructure

    sectors, the Government would set up a Disinvestment Proceeds Fund.

    This Fund would be used for financing fresh employment opportunities

    and investment, and for retirement of public debt. For the

    disinvestment of natural asset companies, the Ministry of Finance and

    the Ministry of Disinvestment would work out guidelines. The Ministry

    of Finance would also prepare for consideration of the Cabinet

    Committee on Disinvestment a paper on the feasibility and modalities

    of setting up an Asset Management Company to hold manage and

    dispose the residual holding of the Government in the companies in

    12 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    11/55

    Project on Disinvestment 2010

    which the Governments equity has been disinvested to a strategic

    partner.

    15) The then Ministry of Disinvestment issued guidelines regarding

    Management-Employee Bids in Strategic Sale on 25th April 2003 to

    encourage and facilitate the participation of employee participation in

    strategic sales.

    16)In the budget speech for 2003-04, the Government announced that details

    regarding the already announced Disinvestment Fund and Asset

    Management Company, to hold residual shares post disinvestment, would

    be finalized early in 2003-04.

    Summary: -

    Industries reserved for PSUs prior to July 1991

    1. Arms and Ammunition and allied items of defence equipment.

    2. Atomic energy.

    3. Iron and steel.

    4. Heavy castings and forgings of iron and steel.

    5. Heavy plant and machinery required for iron and steel production, for

    mining, for machine tool manufacture and such other industries as may be

    specified by the Central Government.

    6. Heavy electrical plant including large hydraulic and steam turbines.

    13 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    12/55

    Project on Disinvestment 2010

    7. Coal and lignite.

    8. Minerals oils.

    9. Mining of iron ore, manganese ore, chrome ore, gypsum, sulphur, gold

    and diamond.

    10. Mining and processing copper, lead, zinc, tin molybdenum and wolfram.

    11. Minerals specified in the Schedule to the Atomic Energy (Control of

    Production and Use) Order 1953.

    12. Aircraft.

    13. Air transport.

    14. Rail transport.

    15. Ship building.

    16. Telephones and telephone cables telegraph and wireless apparatus

    (excluding radio receiving sets).

    17. Generation and distribution of electricity.

    Through Notification No. 477(E) dated 25.7.1991, the industries reserved for

    PSUs were reduced to eight areas from the previous list of seventeen.

    Industries reserved for PSUs since July 1991:

    1. Arms and Ammunition and allied items of defence equipment, defence

    aircraft and warship.

    2. Atomic Energy.

    3. Coal and Lignite.

    14 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    13/55

    Project on Disinvestment 2010

    4. Mineral Oils.

    5. Mining of iron ore, manganese ore, chrome ore, gypsum, sulphur, gold

    and diamond.

    6. Mining of copper, lead, zinc, tin, molybdenum and wolfram.

    7. Minerals specified in the schedule to Atomic Energy (Control of

    production and use) Order, 1953.

    8. Railway Transport.

    This list by December 2002 includes only three areas reserved for PSUs:

    Atomic Energy

    2) Minerals specified in schedule to atomic Energy (Control of Production

    and Use) Order, 1953.

    3) Railway Transport.

    Because of the current revenue expenditure on items such as interest

    payments, wages and salaries of Government employees and subsidies, the

    Government is left with hardly any surplus for capital expenditure on social

    and physical infrastructure. While the Government would like to spend on

    basic education, primary health and family welfare, large amount of

    resources are blocked in several non-strategic sectors such as hotels, tradingcompanies, consultancy companies, textile companies, chemical and

    pharmaceuticals companies, consumer goods companies etc. Not only this -

    the continued existence of the PSEs is forcing the Government to commit

    further resources for the sustenance of many non-viable PSEs. The

    Government continues to expose the taxpayers' money to risk, which it can

    15 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    14/55

    Project on Disinvestment 2010

    readily avoid. To top it all, there is a huge amount of debt overhang, which

    needs to be serviced and reduced before money is available to invest in

    infrastructure. All this makes disinvestment of the Government stake in thePSEs absolutely imperative.

    Criteria for Disinvestment

    The decision regarding disinvestment or liquidation viewed in the light of

    following criteria:

    a) Whether the objectives of the company are achieved?

    b) Whether there is decrease in number of beneficiaries?

    c) Whether serving the national interest will be affected because ofdisinvestment?

    d) Whether private sector can efficiently operate and manage the

    undertaking?

    16 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    15/55

    Project on Disinvestment 2010

    e) Whether the original rate of return targeted could not be possible to

    achieve?

    f) Whether socio-economic objectives lot its purpose?

    Objectives of Disinvestment

    The new economic policy initiated in July 1991 clearly indicated that PSUs

    had shown a very negative rate of return on capital employed. Inefficient

    PSUs had become and were continuing to be a drag on the Governments

    resources turning to be more of liabilities to the Government than beingassets. Many undertakings traditionally established as pillars of growth had

    become a burden on the economy. The national gross domestic product and

    gross national savings were also getting adversely affected by low returns

    from PSUs. About 10 to 15 % of the total gross domestic savings were

    getting reduced on account of low savings from PSUs. In relation to the

    17 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    16/55

    Project on Disinvestment 2010

    capital employed, the levels of profits were too low. Of the various factors

    responsible for low profits in the PSUs, the following were identified as

    particularly important:

    Price policy of public sector undertakings

    Underutilization of capacity

    Problems related to planning and construction of projects

    Problems of labour, personnel and management

    Lack of autonomy

    Hence, the need for the Government to get rid of these units and to

    concentrate on core activities was identified. The Government also took a

    view that it should move out of non-core businesses, especially the ones

    where the private sector had now entered in a significant way. Finally,

    disinvestment was also seen by the Government to raise funds for meeting

    general/specific needs.

    In this direction, the Government adopted the 'Disinvestment Policy'. This

    was identified as an active tool to reduce the burden of financing the PSUs.

    The following main objectives of disinvestment were outlined:

    To reduce the financial burden on the Government.

    To introduce, competition and market discipline.

    To fund growth.

    To encourage wider share of ownership.

    To depoliticize non-essential services.

    18 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    17/55

    Project on Disinvestment 2010

    19 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    18/55

    Project on Disinvestment 2010

    Importance of Disinvestment

    Presently, the Government has about Rs 2 lakh crore locked up in PSUs.

    Disinvestment of the Government stake is, thus, far too significant. The

    importance of disinvestment lies in utilization of funds for:

    Financing the increasing fiscal deficit

    Financing large-scale infrastructure development

    For investing in the economy to encourage spending

    For retiring Government debt- Almost 40-45% of the Centres revenue

    receipts go towards repaying public debt/interest

    For social programs like health and education

    Disinvestment also assumes significance due to the prevalence of an

    increasingly competitive environment, which makes it difficult for many PSUs

    to operate profitably. This leads to a rapid erosion of value of the public

    assets making it critical to disinvest early to realize a high value.

    Reasons for disinvestment

    20 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    19/55

    Project on Disinvestment 2010

    The public sector in India at present is at cross roads. The new economic

    policy initiated in July 1991, clearly indicated that the public sector

    undertakings have shown a very negative rate of return on capital employed.On account of this phenomenon many public sector undertakings have

    become burden to the government. They are in fact turning out to be

    liabilities to the government rather than being assets.

    This is a sector which the government clearly wants to get rid off. In this

    direction the government has adopted a new approach to reform and

    improve the public sector undertakings performance i.e. 'Disinvestment

    policy'. This has gained lot of importance especially in latter part of 90s. At

    present the government seriously perceives the disinvestment policy as an

    active tool to reduce the burden to financing the public sector undertakings.

    21 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    20/55

    Project on Disinvestment 2010

    Benefits of Disinvestment

    Some overall benefits of Disinvestment, irrespective of the approach used

    are as follows:

    For the Government:-

    1. Raising valuable resources for the government, which could be used to

    bridge the fiscal deficit for one, but also for various developmental

    projects in key areas such as infrastructure? The Financial Times (20th

    May 2009) quotes a report brought out by the French securities firm

    CLSA to state: A reduction in shareholding to hypothetically 51% across

    all the state-owned entities could bring in USD 62 billion (Rs. 2.9 lakh

    crore approximately) at current market prices (thus valuing the

    government holdings in listed state-owned companies at Rs 8.8 lakh

    crore). Even a 10% stake sale in the ten large public state undertakings

    that are likely disinvestment candidates can bring in USD 17 billion (Rs.

    80000 crore approximately)". Another such estimate by Delhi-based

    PRIME Database suggests that if the Government follows up on its

    promise of bringing down its equity stake in listed CPSEs to 86%, it can

    mobilise Rs. 7248 crore going by the current market valuations.

    2. Apart from generating a one-time sale amount, a lot of these stake sales

    would also result in annual revenues for the government, as has been

    shown in the past.

    3. The government can focus more on core activities such as infrastructure,

    defence, education, healthcare, and law and order.

    4. A leaner government with reduction in the number of ministries and

    22 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    21/55

    Project on Disinvestment 2010

    bureaucrats.

    For the Markets and Economy: -

    1. Brings about greater efficiencies for the economy and markets as a

    whole.

    For the Taxpayers:-

    1. Letting go of these assets is best in the long term interest of the tax

    payers as the current yield on these investments in abysmally low. Even

    if the funds from the sale are not utilised for bridging fiscal deficit, a

    much better utilisation of these stuck funds would be into critical

    sectors such as healthcare, education and infrastructure.

    2. Unlocking of shareholder (in this case the citizens of India) value

    For the Employees: -

    1. Monetary gains through ESOPs and preferential issue of shares.

    2. Pay rises, as has been seen in past divestments.

    3. Greater opportunities and avenues for career growth- further

    employment generation

    For the PSUs: -

    1. Greater autonomy leading to higher efficiencies

    23 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    22/55

    Project on Disinvestment 2010

    Benefits specific to each approach used for Disinvestment

    Complete Privatisation: -

    In most parts of the world, it has been proven that Privatisation brings

    the maximum returns to the tax payer, thus making it the best form of

    Disinvestment. Since complete control is given off by the government, the

    reforms are immediate, and the results start showing soon.

    Majority Sale: -

    A majority stake sale to a strategic buyer has its positives in getting a

    superior valuation (though sometimes not as good as an outright sale) for

    the government purely due to market dynamics. With some of the PSUs

    being virtual monopolies, private players have a lot of interest in acquiring

    stakes in them. It was because of this reason that this became the chosen

    vehicle for Disinvestment in the early 2000's.

    Minority Sale: -

    Given the current political and social compulsions, complete privatisation

    may not be a solution in the Indian context. Even a majority stake sale would

    be met with opposition.

    Offloading a part of the governments equity by way of a minority stake sale

    24 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    23/55

    Project on Disinvestment 2010

    is the only workable option, as in this case, the control would still be with the

    government. Minority stakes can be sold either to selected private players,

    or to the public by way of a Public Offer or auctioned off to financialinstitutions. Offloading minority stakes to private players does not make

    sense for the government since valuations would be driven down by the fact

    that the government still retains control/ decision making of the company.

    This has been proven in transactions in the past wherein the P-E ratios

    typically accompanying such a sale were found to be low.

    On the other hand, a minority stake sale via a Public Offer has several

    benefits.

    For the Government: -

    1. Minority Stake sales via Public Offers provide benefits of long term

    capital appreciation- Disinvestment done in a staggered manner can

    help the government realize the real value of these PSUs, as has been

    shown by recent PSU IPOs wherein the valuation that the market has

    given to the PSUs is far higher than the original offer price. For

    example, in the case of NTPC, the Government sold each share at Rs.

    62 in its IPO in October 2004. In its FPO in February 2010, the

    Government was able to realise Rs. 201 for the same share!

    For the PSU: -

    1.Listing leads to better and timely disclosures, bringing in greater

    transparency and professionalism, thus protecting the interest of the

    investors.

    2. Greater efficiency by way of being accountable to thousands of

    shareholders

    25 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    24/55

    Project on Disinvestment 2010

    3. Listing provides an opportunity to raise capital to fund new projects

    /undertake expansions/diversifications and for acquisitions. An initial

    listing increases a company's ability to raise further capital throughvarious routes like preferential issue, rights issue, Qualified

    Institutional Placements and ADRs/GDRs/FCCBs, and in the process

    attract a wide and varied body of institutional and professional

    investors.

    4. Listing raises a company's public profile with customers, suppliers,

    investors, financial institutions and the media. A listed company is

    typically covered in analyst reports and may also be included in one or

    more of indices of the stock exchanges.

    For the Employees: -

    1. Though there could be opposition from employees of some PSUs, this

    can be countered and also turned into a favorable situation by offering

    ESOPs/preferential issue of shares to them. This would provide tangible

    monetary benefits to them, and also make them an interested party in

    better performance of their companies.

    For the Markets and Economy: -

    1. These PSU IPOs present the best opportunity of widening the equity

    investing retail base by providing greater and safer investment

    opportunities. Curbs and measures, however, would need to be put in

    26 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    25/55

    Project on Disinvestment 2010

    place to ensure that institutional investors do not run away with the

    bulk of this sale and only retail participation is allowed in these issues.

    Public offers have been one of the frequently used techniques in theUK to transfer state assets and businesses to private ownership. The

    method has been fairly successful, having increased the shareholding

    population from 4% to 25%. For example, British Telecom alone

    created 2.1 million shareholders in the UK, when privatized.

    2. Listed PSUs already form about 30% of the total market capitalization.

    With more PSUs being listed, this would provide a greater depth and

    width to our capital market

    A minority stake sale via Auctioning to financial institutions also has certain

    benefits:

    1. Bidding by a group of large, informed investors would provide the

    highest likelihood of the assets receiving the best valuation.

    2. The process takes relatively little time as the modalities are less

    demanding than those for a full-scale public offer process that can take

    many months.

    3. This will provide a direct conduit for interested foreign investors

    4. Retail participation can come in through the mutual funds, Provident

    Funds and the NPS.

    Types of Disinvestment

    a) Offer for sale to public at fixed price:-

    27 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    26/55

    Project on Disinvestment 2010

    In this type of disinvestment, the government holds the sale of the

    equity shares to the public at large at a pre determined price. Examples:-

    MFIL, BALCO, CMC, HTL, IBP, HZL, PPL, and IPCL.

    b) Strategic sale:-

    In this type, significant management rights are transferred to the

    investor i.e. majority of equity holdings is divested. Examples: -Offer of 1

    million shares of VSNL, listing of ONGC IPO.

    c)International offering:-

    This is essentially targeted at the FII (foreign institutional investors).

    Ex:-GDR of VSNL, MTNL, etc.

    d) Asset sale and winding up:-

    This is normally resorted to in companies that are either sick or facing

    closure. This is done by the process of auction or tender. Ex:-Auction of sick

    PSUs.

    e) Strategies of Disinvestment:

    Government adopted following disinvestment strategies for proper revenue

    collection from disinvestment:

    Selection of Companies to be offered-The list of companies offered

    in the first phase of disinvestment had to be limited to those

    companies whose investments in market appreciates without much

    difficulty and price reasonably.

    Pricing of the Equity-The Pricing formula adopted for the referral price

    was average of NAV (Net Asset Value) and PECV (Profit earning

    28 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    27/55

    Project on Disinvestment 2010

    capacity value) at 10%industry capitalization rate. This was as

    existence at that time.

    Rationale for Disinvestment Mechanism-A direct offer of shares to the

    public was not feasible because even with most sophisticated valuation

    skill a fair issue price on company basis was possible to determine

    since the PSUs were unknown to the market. The risk of over-pricing or

    under-pricing on a company specific basis was real but clearly

    unaffordable.

    29 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    28/55

    Project on Disinvestment 2010

    Methods of Disinvestment

    The following are the three methods adopted by the Government of India for

    disinvesting the Public sector undertakings. There are three Methods of

    valuation approved by the Disinvestment Commission

    1. Net Asset Method:

    This will indicate the net assets of the enterprise as shown in the books of

    accounts. It shows the historical value of the assets. It is the cost price less

    depreciation provided so far on assets. It does not reflect the true position of

    profitability of the firm as it overlooks the value of intangibles such as

    goodwill, brands, distribution network and customer relationships which are

    important to determine the intrinsic value of the enterprise. This model is

    more suitable in case of liquidation than in case of disinvestment.

    2. Profit Earning Capacity Value Method:

    The profit earning capacity is generally based on the profits actually

    earned or anticipated. It values a company on the basis of the underlying

    assets. This method does not consider or project the future cash flow.

    3. Discounted Cash Flow Method:

    In this method the future incremental cash flows are forecasted and

    discounted into present value by applying cost of capital rate. The method

    indicates the intrinsic value of the firm and this method is considered assuperior than other methods as it projects future cash flows and the earning

    potential of the firm, takes into account intangibles such as brand equity,

    marketing & distribution network, the level of competition likely to be faced

    in future, risk factors to which enterprises are exposed as well as value of its

    30 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    29/55

    Project on Disinvestment 2010

    core assets. Out of these three methods the discounted cash flow method is

    used widely though it is the most difficult.

    Questionnaire

    1) Do you know about Disinvestment?

    2) Do you think Disinvestment has fundamental effect on the company?

    3) Do you think the disinvestment that has happened till now has

    achieved its objective?

    4) Do you think that Engineering and power generation sector are two

    major pillars for growth of Indian Economy?

    5) Do you think there are unidentified government companies or sectors

    that can have been identified at early stage to go for disinvestment?

    31 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    30/55

    Project on Disinvestment 2010

    Case Studies

    a) Engineering Industry:

    Market Overview

    The engineering sector is the largest segment of Indian industry The

    engineering sector is the largest segment of the overall Indian industrial

    sector. India has a strong engineering and capital goods base. The important

    groups within the engineering industry include machinery & instruments,

    primary and semi finished iron & steel, steel bars & rods, non-ferrous metals,

    electronic goods and project exports. The engineering sector employs over 4

    million skilled and semi-skilled workers (direct and indirect). The sector can

    be categorised into heavy engineering and light engineering segments.

    Heavy engineering segment forms the majority of the engineering sector in

    India. In the year 2003-04, out of the total engineering production of US$ 22

    billion, the heavy engineering market contributed over 80 per cent with the

    light engineering segment accounting for the remaining. India has a well-

    developed and diversified industrial machinery/ capital base capable of

    manufacturing the entire range of industrial machinery. The industry has

    also managed to successfully develop advanced manufacturing technology

    over the years. Among the developing countries, India is a major exporter of

    heavy and light engineering goods, producing a wide range of items. The

    bulk of capital goods required for power projects, fertiliser, cement, steel and

    32 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    31/55

    Project on Disinvestment 2010

    petrochemical plants and mining equipment are made in India. The country

    also makes construction machinery, equipment for irrigation projects, diesel

    engines, tractors, transport vehicles, cotton textile and sugar mill machinery.

    The engineering industry has shown capacity to manufacture large-size

    plants and equipment for various sectors like power, fertiliser and cement.

    Lately, air pollution control equipment is also being made in the country. The

    heavy electrical industry in India meets the entire domestic demand. Players

    in the engineering sector in India can be categorised as follows:

    Equipment manufacturers such as Bharat Earth Movers Limited

    (BEML), Siemens, Cummins India, ABB, etc

    Execution specialists such as Bharat Heavy Electricals

    Ltd.(BHEL), Larsen &Toubro (L&T), Engineers India, etc and

    Niche players such as Thermax in environmental solutions,

    Voltas in electro-mechanical projects, ABB for automation technologies and

    so on.

    A large number of multinational companies like Cummins, Alfa Laval,

    Sandwik

    Asia, etc. have also entered the engineering industry in India.

    Indias engineering industry is dominated by organized players

    33 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    32/55

    Project on Disinvestment 2010

    The heavy and light engineering segments in this sector can be further

    classified as shown in the table. As the sector demands a high level of

    capability and investment, it is dominated by large organized players.

    34 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    33/55

    Project on Disinvestment 2010

    This industry comprises multinational companies, joint ventures, large

    domestic players, regional players in the organized sector and large number

    of small players in the unorganized sector. Some unorganized players also

    exist at lower levels where the technology required is very basic.

    35 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    34/55

    Project on Disinvestment 2010

    BHEL

    36 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    35/55

    Project on Disinvestment 2010

    Introduction:-

    BHEL is the largest engineering and manufacturing enterprise in India in the

    energy-related/infrastructure sector, today. BHEL was established more than

    40 years ago, ushering in the indigenous Heavy Electrical Equipment

    industry in India - a dream that has been more than realized with a well-

    recognized track record of performance. The company has been earning

    profits continuously since 1971- 72 and paying dividends since 1976-77.

    BHEL manufactures over 180 products under 30 major product groups and

    caters to core sectors of the Indian Economy viz., Power Generation &

    Transmission, Industry, Transportation, Telecommunication, Renewable

    Energy, etc. The wide network of BHEL's 14 manufacturing divisions, four

    Power Sector regional centers, over 100 project sites, eight service centers

    and 18 regional offices, enables the Company to promptly serve its

    customers and provide them with suitable products, systems and services

    efficiently and at competitive prices. The high level of quality & reliability of

    its products is due to the emphasis on design, engineering and

    manufacturing to international standards by acquiring and adapting some ofthe best technologies from leading companies in the world, together with

    technologies developed in its own R&D centers.

    BHEL has acquired certifications to Quality Management Systems (ISO

    9001), Environmental Management Systems (ISO 14001) and Occupational

    Health & Safety Management

    Systems (OHSAS 18001) and is also well on its journey towards Total QualityManagement.

    BHEL has:-

    37 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    36/55

    Project on Disinvestment 2010

    Installed equipment for over 90,000 MW of power generation -- for Utilities,

    Captive and Industrial users.

    Supplied over 2,25,000 MVA transformer capacity and other equipment

    operating in Transmission & Distribution network up to 400 kV (AC & DC).

    Supplied over 25,000 Motors with Drive Control System to Power projects,

    Petrochemicals, Refineries, Steel, Aluminum, Fertilizer, Cement plants, etc.

    Supplied Traction electrics and AC/DC locos to power over 12,000 kms

    Railway network.

    Supplied over one million Valves to Power Plants and other Industries.

    BHEL's operations are organized around three business sectors, namely

    Power, Industry - including Transmission, Transportation,

    Telecommunication & Renewable Energy - and Overseas Business. This

    enables BHEL to have a strong customer orientation, to be sensitive to his

    needs and respond quickly to the changes in the market.

    BHEL, ranking among the major power plant equipment suppliers in the

    world, is one of the largest exporters of engineering products & services

    from India. Over the years, BHEL has established its references in around 60

    countries of the world, ranging from the United States in the West to New

    Zealand in the Far East. BHEL's export range covers individual products to

    complete Power Stations, Turnkey Contracts for Power Plants, EPC Contracts,

    HV/EHV Substations, O&M Services for familiar technologies, Specialized

    after-market services like Residual Life Assessment (RLA) studies and

    Retrofitting, Refurbishing & Overhauling, and supplies to manufacturers &

    EPC contractors.

    BHEL has assimilated and updated/adopted the state-of-theart- technologies

    in the Power and Industrial equipment sectors acquired from world leaders.

    38 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    37/55

    Project on Disinvestment 2010

    BHEL has successfully undertaken turnkey projects on its own and

    possesses the requisite flexibility to interface and complement international

    companies for large projects, and has also exhibited adaptability bymanufacturing and supplying intermediate products to the design of other

    manufacturers and original equipment manufacturers (OEMs). The success in

    the area of rehabilitation and life extension of power projects has

    established. BHEL as a reliable alternative to the OEMs for such power

    plants. BHEL's vision is to become a world-class engineering enterprise,

    committed to enhancing stakeholder value. The company is striving to give

    shape to its aspirations and fulfill the expectations of the country to become

    a global player. The greatest strength of BHEL is its highly skilled and

    committed 43,300 employees. Every employee is given an equal opportunity

    to develop himself and grow in his career. Continuous training and

    retraining, career planning, a positive work culture and participative style of

    management all these have engendered development of a committed and

    motivated workforce setting new benchmarks in terms of productivity,

    quality and responsiveness.

    Analysis of BHEL

    39 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    38/55

    Project on Disinvestment 2010

    b) Engineering Industry:

    Market overview

    The process of electrification commenced in India almost with the developed

    world, in the 1880s, with the establishment of a small hydroelectric power

    station in Darjeeling. However, commercial production and distribution

    started in 1889, in Calcutta (now Kolkata). In the year 1947, the country had

    a power generating capacity of 1,362 MW. Generation and distribution ofelectrical power was carried out primarily by private utility companies such

    as Calcutta Electric. Power was available only in a few urban centers; rural

    areas and villages did not have electricity. After 1947, all new power

    generation, transmission and distribution in the rural sector and the urban

    centers (which was not served by private utilities) came Power Sector Report

    40 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    39/55

    Project on Disinvestment 2010

    ABS, Bangalore 22 | P a g e Power Sector Report (Apr - 2009) under the

    purview of State and Central government agencies. State Electricity Boards

    (SEBs) were formed in all the states. Legal provisions to support and regulatethe sector were put in place through the Indian Electricity Act, 1910. Shortly

    after independence, a second Act - The Electricity (Supply)

    Act, 1948 was formulated, paving the way for establishing Electricity Boards

    in the states of the Union. In 1960s and 70s, enormous impetus was given

    for the expansion of distribution of electricity in rural areas. It was thought

    by policy makers that as the private players were small and did not have

    required resources for the massive expansion drive, the production of power

    was reserved for the public sector in the Industrial Policy Resolution of 1956.

    Since then, almost all new investment in power generation, transmission and

    distribution has been made in the public sector. Most of the private players

    were bought out by state electricity boards. From the installed capacity of

    only 1,362mw in 1947, has increased to 97000 MW as on March 2000 which

    has since crossed 100,000 MW mark India has become sixth largest

    producer and consumer of electricity in the world equaling the capacities ofUK and France combined. The number of consumers connected to the Indian

    power grid exceeds is 75 million. India's power system today with its

    extensive regional grids maturing in to an integrated national grid, has

    millions of kilometers of T & D lines criss-crossing diverse topography of the

    country.

    However, the achievements of India's power sector growth looks phony on

    the face of huge gaps in supply and demand on one side and antediluvian

    generation and distribution system on the verge of collapse having plagued

    by inefficiencies, mismanagement, political interference and corruption for

    decades, on the other. Indian power sector is at the cross road today. A

    paradigm shift is in escapable- for better or may be for worse.

    41 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    40/55

    Project on Disinvestment 2010

    42 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    41/55

    Project on Disinvestment 2010

    NTPC

    Introduction:

    Indias largest power company, NTPC was set up in 1975 to accelerate power

    development in India. NTPC is emerging as a diversified power major with

    presence in the entire value chain of the power generation business. Apart

    from power generation, which is the mainstay of the company, NTPC has

    already ventured into consultancy, power trading, ash utilization and coal

    mining. NTPC ranked 317th in the 2009, Forbes Global 2000 ranking of the

    Worlds biggest companies.

    43 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    42/55

    Project on Disinvestment 2010

    The total installed capacity of the company is 32,194 MW (including JVs) with

    15 coal based and 7 gas based stations, located across the country. In

    addition under JVs, 4 stations are coal based & another station uses

    naptha/LNG as fuel. By 2017, the power generation portfolio is expected to

    have a diversified fuel mix with coal based capacity of around 53,000 MW,

    10,000 MW through gas, 9,000 MW through Hydro generation, about 2000

    MW from nuclear sources and around 1000 MW from Renewable Energy

    Sources (RES). NTPC has adopted a multi-pronged growth strategy which

    includes capacity, addition through green field projects, expansion of

    existing stations, joint ventures, subsidiaries and takeover of stations.

    NTPC has been operating its plants at high efficiency levels. Although the

    company has 18.10% of the total national capacity, it contributes 28.60% of

    total power generation due to its focus on high efficiency.

    44 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    43/55

    Project on Disinvestment 2010

    NTPC IPO:-

    In October 2004, NTPC launched its Initial Public Offering (IPO) consisting of

    5.25% as fresh issue and 5.25% as offer for sale by Government of India.

    NTPC thus became a listed company in November 2004 with the government

    holding 89.5% of the equity share capital. The rest is held by Institutional

    Investors and the Public. The issue was a resounding success. NTPC is among

    the largest five companies in India in terms of market capitalisation

    45 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    44/55

    Project on Disinvestment 2010

    . At NTPC, People before Plant Load Factor is the mantra that guides all HR

    related policies. NTPC has been awarded No.1, Best Workplace in India

    among large organizations and the best PSU for the year 2009, by the Great

    Places to Work Institute, India Chapter in collaboration with The Economic

    Times.

    The concept of Corporate Social Responsibility is deeply ingrained in NTPC's

    culture. Through its expansive CSR initiatives, NTPC strives to develop

    mutual trust with the communities that surround its power stations.

    46 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    45/55

    Project on Disinvestment 2010

    Operations

    In terms of operations, NTPC has always been considerably above the national av

    availability factor for coal based power stations has increased from 89.32% in 1

    91.76% in 2009-10, which compares favorably with international standards. Th

    increased from 76.6% in 1998-99 to 90.81% during the year 2009-10.

    47 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    46/55

    Project on Disinvestment 2010

    The table below shows that while the installed capacity has increased by 62.15%

    twelve years the generation has increased by 99.84%.

    48 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    47/55

    Project on Disinvestment 2010

    DESCRIPTION UNIT 1998-99 2009-10% OF

    INCREASE

    Installed

    CapacityMW 17,786 28,840 62.15

    Generation MUs 1,09,505 2,18,840 99.84

    * Excluding JVs and Subsidiaries

    The table below shows the detailed operational performance of coal based station

    years.

    OPERATIONAL PERFORMANCE OF COAL BASED

    NTPC STATIONS

    Generation(BU) PLF(%)

    Availabilit

    y

    Factor(%)

    2009-10 218.84 90.81 91.76

    2008-09 206.94 91.14 92.47

    2007-08 200.86 92.24 92.12

    2006-07 188.67 89.43 90.09

    2005-06 170.88 87.52 89.91

    49 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    48/55

    Project on Disinvestment 2010

    2004-05 159.11 87.51 91.20

    2003-04 149.16 84.40 88.79

    2002-03 140.86 83.57 88.70

    2001-02 133.20 81.11 89.09

    2000-01 130.10 81.80 88.54

    1999-00 118.70 80.39 90.06

    1998-99 109.50 76.60 89.36

    Market overview: Hydropower

    In FY09, demand for electricity exceeded supply by 11%, compared with

    9.90% in FY08. Indias peak demand deficit during FY09 was 12% or

    13,124MW; it is anticipated to be 152,746MW by 2012 with total energy

    requirements of 969 billion units.

    Hydropower Potential in India

    According to the Hydro Power Policy 2008, India has enormous potential for

    hydroelectric generation; about 84,000MW at 60% load factor, which

    translates into 148,700MW in terms of installed capacity, according to CEA.

    Moreover, 6,782MW of installed capacity has been assessed from small,

    mini, and micro hydroelectric schemes. The estimated hydropower potential

    and probable installed capacities of major Indian River systems are given

    below:

    50 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    49/55

    Project on Disinvestment 2010

    As of May 31, 2009, the total installed capacity in the country was

    149,392MW

    and hydropower (including pumped storage schemes in the country)

    accounts for

    36,878MW.

    Share of Hydropower in Total Power Generation in India, as of May

    31, 2009

    51 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    50/55

    Project on Disinvestment 2010

    This capacity does not include small hydropower capacity of 1,168MW from

    hydropower plants with an installed generating capacity up to 25MW. These

    small scale hydropower generators were classified as Renewable Energy

    Sources (RES) (along with wind energy and biomass energy) in FY09. A

    capacity addition of 78,700.4MW has been proposed in the eleventh five

    year plan. Of this, capacity addition of 15,627MW is proposed from

    hydropower - 3,392MW has already been commissioned and 12,235MW is

    under construction, as of May 31, 2009.

    52 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    51/55

    Project on Disinvestment 2010

    NHPC

    Company

    NHPC was incorporated under the Companies Act in 1975 as a private limited

    company. It became a public limited company from, 1986, and its name

    changed to NHPC Limited. NHPC is a hydroelectric power generating

    company, which is dedicated to the planning, development and

    53 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    52/55

    Project on Disinvestment 2010

    implementation of an integrated and efficient network of hydroelectric

    projects in India. The company executes all aspects of the development of

    hydroelectric projects - from conceptualizing to commissioning. It has

    developed and constructed 13 hydroelectric power stations and its current

    total installed capacity is 5,175MW. NHPCs current total generating capacity

    is 5,134.2MW, which takes into account a downgrade of capacity ratings of

    the Loktak and Tanakpur power stations by the CEA. NHPCs power stations

    and hydroelectric projects are located predominantly in the North and North

    East India, in Jammu & Kashmir, Himachal Pradesh, Uttarakhand, Arunachal

    Pradesh, Assam, Manipur, Sikkim, and West Bengal. The company and its

    subsidiary, NHDC, generated 16,582.72 MU and 2,368.45 MU of electricity in

    FY09; they sold 14,587.88 MU and 2,345.01 MU, respectively. NHPCs

    average selling price was INR2.03 per unit and the average capacity indices

    for FY07, FY08 and FY09 were 94.11%, 96.13% and 93.61%, respectively.

    Joint Ventures

    NHPC selectively forms alliances with state governments to undertake

    development of projects. Pursuant to a MoU with the government of Madhya

    Pradesh, NHPC incorporated NHDC on August 1, 2000 to take advantage of

    the hydroelectric potential of the Narmada river basin. In September 2007, it

    signed a MoU with the government of Manipur to establish a JV to develop

    the Loktak Downstream hydroelectric project. In June 2007, the company

    entered into a MoA with the Arunachal Pradesh government to implement

    the Dibang project on an own-and-operate basis. Further, on October 10,

    2008, it signed a MoU with the JKSPDC, the government of Jammu & Kashmir

    and PTC, to implement the Pakal Dul and other hydroelectric projects in the

    Chenab river basin with an anticipated aggregate installed capacity of

    ~2,100MW. In recognition of NHPCs performance, it was designated a Mini-

    Ratna Category-I public sector undertaking in April 2008. The company now

    54 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    53/55

    Project on Disinvestment 2010

    has greater autonomy to undertake new projects without GoIs approval,

    subject to an investment ceiling of INR5 billion. The President of India and its

    nominees currently hold 100% of NHPCs issued and paid-up equity sharecapital. After the issue, the President of India will hold 86.36%of the post-

    issue paid-up equity share capital.

    NHPC Limited IPO

    Public issue of 1.68 bn shares with a face value of INR10 at a price band of

    INR30- INR 36, aggregating to INR50.32bn - INR60.39bn. The issue comprises

    an offer for sale of 0.56bn shares and fresh issue of 1.1bn shares.

    Background

    NHPC is a hydroelectric power generating company, which is dedicated to

    the planning, development, and implementation of an integrated and

    efficient network of hydroelectric projects in India. NHPC is involved in all

    aspects of hydroelectric projects - from conceptualizing to commissioning.

    Objects Of The Issue

    To part finance the construction and development costs of projects such as

    Subansiri Lower, Uri II, Chamera - III, Parbati III, Nimoo Bazgo, Chutak,

    and Teesta Low Dam IV. General corporate purposes

    Valuation

    We value NHPC on a P/BV basis relative to peers like JP Hydro in the hydel

    space and NTPC and Tata Power, CESC and KSK Energy. While there are no

    comparable peers, we believe hydel companies should be accorded

    discounting lower than its thermal peers owing to the higher risks of

    execution and long gestation periods. We believe NHPCs nearest

    comparable peer is NTPC owing to a common lineage and large scale. Bulk of

    55 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    54/55

    Project on Disinvestment 2010

    NHPCs projects are being commissioned in FY11 and FY13. We have

    estimated the addition to gross block, funding and debt repayment as per

    norms for FY12 when the first tranche of projects will be eligible for full RoE.We have also considered that the projects will be commissioned as

    scheduled. The upper price band of INR36 discounts NHPCs FY12E book

    value by 1.62x and the lower price band discounts FY12E book value by

    1.38x. The upper P/BV is at a 31% discount to NTPC while the lower P/BV is

    at a 41% discount to NTPC. We believe that the higher price band does not

    adequately factor in the risks. Thus, we recommend SUBSCRIBE at the

    lower price band of INR30.

    56 | P a g e

  • 8/2/2019 Final Project on Disinvestment

    55/55

    Project on Disinvestment 2010


Recommended