8/8/2019 Final Report to Company
1/53
PARAMOUNT SPINNING MILLS LIMITED
Page 1 of53
Production planning and control
Deputy General Manager: Ali Nayaz Manager: Khalid ikram
Assistant manager:Akmalshahzad PPC Officer:RanaZahid
Job of the posts:
Deputy General Manager:
Take orders from marketing department Give order completion date to the Marketing department Guide manager about order Overall checking of the order processing
Manager:
Get order from Deputy General Manager Make per day plan of action Get reports from production departments through WIP department on daily basis
department are
o Cutting departmento Stitching departmento Dying and printing departmento Washing departmento Finishing departmento WIP department
Update the reportsAssistant Manager:
Coordinate with manager Collect reports from Manager and make final report and update it Send its report to all concern department
8/8/2019 Final Report to Company
2/53
PARAMOUNT SPINNING MILLS LIMITED
Page 2 of53
All the office work related to documentation
PPC Officer:
Take standards of order requirement from marketing department and send relatedspecification to concern production departments
Get raw material fabric make a sample and send it for test and make report on thatsample for the meeting in which Quality department, Marketing department, Finance
department, PPC department and WIP department make minutes(Points) of that
meeting and send it to the above departments.
Linked Departments:
Commercial department:
Get order from Marketing department Arrange fabric from supplier according to the order requirement Deal outside from the company Sourcing department for PPC department
Material Management & Control department:
Get order from Marketing department Arrange Zip, buttons, thread from supplier according to the order requirement Deal outside from the company Sourcing department for PPC department
Note:
Marketing department deals with these departments and order them to get material
then send the report to PPC that the raw material will be in PPC store and asked about
the order completion date or you are able to handle this order know or not. Then DGM
meets with his team and check the availability of empty slot and machine, if availability
exist them DGM send report to marketing department to take the order and give them
a date and then finally marketing department take the order.
8/8/2019 Final Report to Company
3/53
PARAMOUNT SPINNING MILLS LIMITED
Page 3 of53
Cutting department:
Direct link with PPC department Capacity of 6000 piece per day Send daily report to WIP department
Stitching department:
Direct link with PPC through WIP department Capacity of 6000 piece per day Send daily report to WIP department
Washing department:
Direct link with PPC through WIP department Capacity depend on washing type Send daily report to WIP department
Finishing department:
Direct link with PPC through WIP department Capacity depend on demand type Send daily report to PPC department
WIP department:
Feeding
Its a chain or link between department Direct link with PPC department Send report to PPC of overall moving order from store to warehouse.
Note:
Capacity of the production department can be vary according to demand by overtime.
8/8/2019 Final Report to Company
4/53
PARAMOUNT SPINNING MILLS LIMITED
Page 4 of53
Some Main Points:
Order id:
In order ID two things are taken first one is short form of costumer name and
second one is order number. Lets take an example of FHI Garments Company
make short form of FHI Garments like FHG and if order is 15 then the code of
the order will be FH-15.
Extra percentage of the Material:
There is a percentage of extra raw materials for making order because there is
a chance of fault at any stage of production. This percentage varies according
to order importance normally average percentage is 3 to 5 percent. The
importance of the percentage depend upon two main factor
o
Complexity of processo Importance of costumer commitment
Exchange of reports:
Gulistan Group Of Company has its own server room so Email facility within
company is allow in all departments and department like marketing
department are allow to Email and contact outside the company to stay
connected to costumer.
Vehicle permission:
If outsourcing is required a form is execute for this purpose. Basically there
are three section on it. First is checked by head of department which contain
following data
8/8/2019 Final Report to Company
5/53
8/8/2019 Final Report to Company
6/53
PARAMOUNT SPINNING MILLS LIMITED
Page 6 of53
Daily modus operandi (routine): PPC
1. Receive daily report from WIP department of production section, name ofdepartment s of production section are
a. Cutting departmentb. Stitching departmentc. Washing departmentd. Finishing departmente. WIP department
2. Check and compare all individual reports with the combine report provided byWIP department, approved it and allow WIP department to send it to all
production department and also to finance department.
3. Contacting commercial and MM&C department if the shortage of the rawmaterial take place and send memo to then and one copy to marketing
department.
4. Planning for future work, orders and manage them, define overtime handleextra holidays and handle man power.
5. Send complete order to quality department and get report from them.6. Send report to related department about their work, faults and overall average.7. Get standards from marketing department and send specification to every
department about their work.
8. Check the sample get report on it from sampling department and arrangemeeting on every step of production with Quality department, Marketing
department and production department, make minutes of the meeting and send
it to all related department .
8/8/2019 Final Report to Company
7/53
PARAMOUNT SPINNING MILLS LIMITED
Page 7 of53
Work In Process Control Department
Deputy General Manager: Ali NayazManager: This post is not in this department
Assistant manager:ArshadBhattiIncharge of receiving: Mohammad Nadeem
Incharge of feeding: Baber GillIncharge of issuing: Mohammad awais
Store supervisor:Liaqat Ali
Job of the posts:
Deputy General Manager:
Take orders from marketing department Give order completion date to the Marketing department Guide Assistant manager about order Overall checking of the order processing
Assistant Manager:
Get order from Deputy General Manager Coordinate with the manager of PPC department Get reports from Incharge receiving section and send it to PPC manager and DGM Update production departments
Incharge of receiving section:
Receive fabric from PPC department after cutting and move it to stitching, washing andfinishing department.
Collect reports from production department combine it and make WIP daily report and sendto PPC manager through Assistant manager WIP along with all individual reports of
production departments.
8/8/2019 Final Report to Company
8/53
PARAMOUNT SPINNING MILLS LIMITED
Page 8 of53
Incharge of receiving section:
Receive standard from PPC officer and complete it by attaching sample on it and compare it Produce shortage report Issue material and control feeding reports
Incharge of feeding section:
Control no. of feeding area between different stitching department Generate daily report and send to incharge issuing section Handle troubleshoot at any step of production.
Store Supervisor:
Issue raw material from main store and issue it to stitching department through incharge issuesection
Generate report for transactions
Linked department:
MM&C PPC Stitching department Washing department Finishing department
Internal section:
Fedding section Mini store
8/8/2019 Final Report to Company
9/53
PARAMOUNT SPINNING MILLS LIMITED
Page 9 of53
Daily modus operandi (routine):WIP1. Receive daily report from production section, name of department s of
production section are
a. Stitching departmentb. Washing departmentc. Finishing department
2. Combine it and send combine report with individual report of everydepartment to PPC manager and DGM.
3. After check by PPC manager this report is send to all concern departments.4. Receive standard and complete it by attaching sample on it.5. Issue material from main store and count it in mini store and then issue it to
stitching department.
6. Generate shortage report.7.
Feeding the fabric in stitching
8. Send memo to MM&C department
8/8/2019 Final Report to Company
10/53
PARAMOUNT SPINNING MILLS LIMITED
Page 10 of53
Order execution process: PPC & WIP
Marketing department take orders after asking DGM of PPC that can PPC have the
capacity of taking order and then take orders. The date given to the costumer is
decided by the DGM of PPC. After commitment from marketing department that raw
material will be in PPC store on this date then DGM have a meeting with his team of
PPC and they check that is there any free slot and are machines available then date is
finalized.
DGM send ok report to marketing department to get order. Marketing departmentsend standards of order to PPC department were PPC officer receive it. Standards are
also sending to commercial department and MM&C department for to buy raw
materials. PPC officer check the standard and pass it. Then give this standard to
incharge of issue section in WIP department were he check it and complete it by
attaching sample of raw material from MM&C department.
A sample is made by sampling department and PPC officer send it to washing and all
process and get result and arrange meeting to discuss the product changing nature.
Marketing department, Quality department, Production departments, PPC department
and Finance department attend this meeting, points are make and report of this
meeting is send to all related departments. After getting ok PPC officer send clearance
report to commercial, MM&C and WIP department.
Commercial and MM&C department contact to supplier to send the material and
incharge of issue section form WIP department complete the report and wait until the
PPC department give fabric to WIP after cutting(fabric is directly send to cutting
department there is no roll of WIP in this process) . When fabric is received from PPC
department feeding section of WIP department activate. Feeding section is place in
every step of stitching section. The purpose of feeding section is to pair the parts of
the order to avoid the fault of change in fabric material and color. Along with feeding
section there is a one section of quality from Quality department for the checking ofquality at every step of production from cutting to packing.
Now incharge of feeding department receive fabric and pair it and give it to stitching
department and send memo to incharge issue section in WIP who coordinate with
mini store supervisor and send report to main store for the material arranged by
MM&C department. Assistant store incharge check the status of the availability give
the available items to mini store supervisor of WIP department after counting and
give report to store incharge of the shortage which is then send to the MM&C
department from main store. Mini store supervisor report to incharge issue section of
8/8/2019 Final Report to Company
11/53
PARAMOUNT SPINNING MILLS LIMITED
Page 11 of53
the shortage who send report to assistant manager of the WIP department and PPC
officer of shortage both send memo to MM&C department of shortage and one copy
to marketing department for follow-up.
After getting material from main store mini store supervisor issue it to stitchingdepartment. After stitching incharge of receiving section of WIP department collect it
counts it and send it for washing. After washing, incharge of receive section of WIP
department collect it counts it and send it for finishing department WIP works end
here. PPC department send order to quality department were quality is check and at
last order packing take place then packing section send report to PPC department and
send order to store and at the end PPC department send complete report to DGM of
PPC and marketing for shipment. PPC send report to every production department
about their work, faults and over all working. During all this process daily report is
produce by every department and collects by the WIP department and then combinesreport is generated by incharge of receiving section of WIP department then gives it to
assistant manager of WIP. Assistant manager send it to PPC manager and DGM. PPC
mangers check it and send it to all concern departments.
8/8/2019 Final Report to Company
12/53
PARAMOUNT SPINNING MILLS LIMITED
Page 12 of53
Stitching Department
General Manager Production: Fawad Khan SeniorManager: Imtiyaz Ahmed
Deputy Manager: Daud Khan Assistant Manager 1: Ijaz Shah
Assistant Manager 2: Mohammed Saeed Line 1 Incharge: Sarfraz Ahmed Khan
Line 2 Incharge: Mohammad Iqbal Line 3 Incharge: Mohammad Imran
Line 4 Incharge: Mohammad Ali Coordinator: Mohammad Waris
Job of the posts:
General Manager Operation:
Head of Production department. Receive report on order taking and finalize the report Guide manager Overall checking of the Production department
Senior Manager:
Report to General Manager Operation Take plan from PPC Contact PPC and WIP department to give the fabric and accessories Make internal plan to get the target
Deputy Manager:
Coordinate with manager Collect reports from supervisor and make final report and update it Verify the reports send to PPC department and WIP department Check the status of the work Incharge of working line 1 and line 2
8/8/2019 Final Report to Company
13/53
PARAMOUNT SPINNING MILLS LIMITED
Page 13 of53
Assistant Manager 1:
Coordinate with deputy manager Collect reports from line man and make final report and update it Verify the reports send to deputy manager Check the status of the work Incharge of working line 3 and line 4
Assistant Manager 2:
Coordinate with deputy manager Collect reports from line man and make final report and update it Verify the reports send to deputy manager Check the status of the work Incharge of working line small parts (line 5)
Line Man(1 and 2):
Coordinate with deputy manager Collect reports from supervisor and make final report and update it Verify the reports send to deputy manager
Check the status of the work
Line Man(3and 4):
Coordinate with assistant manager 1 Collect reports from supervisor and make final report and update it Verify the reports send to assistant manager 1 Check the status of the work
Line Man(5):
Coordinate with assistant manager 2 Collect reports from supervisor and make final report and update it Verify the reports send to assistant manager 2 Check the status of the work
8/8/2019 Final Report to Company
14/53
PARAMOUNT SPINNING MILLS LIMITED
Page 14 of53
Program Coordinator:
Taking attendance Make gate pass for who apply for the jab in this section Leave or any kind of application submission Give program for over time before two hour of ending shift Guide cashier in monthly payment to workers Emails and send reports All paper work in office
Linked department:
MM&C ( for thread, zip and other accessories) PPC ( for reporting and plan of action) WIP (for fabric taking and give stitched garments)
Department Sections & Processes:
Basically there are number of step to make a stitched garment form raw fabric. The
department is divided in to 5 sections
Front section Back section Small section Assembly 1 Assembly 2
8/8/2019 Final Report to Company
15/53
PARAMOUNT SPINNING MILLS LIMITED
Page 15 of53
Front section:
In this section front part of the pent is stitched or complete. WIP department
get fabric from cutting department and give cut piece of front part of pent to this section.
There are number of step in front section which are
1. Tracing:First the tic pocket (small pocket in jeans pent) is trace on front of the pocket
known as face of the pocket.
2. Ticket pocket making:Basically this is also a small part of the pent but if pocket is simple is made in
front section otherwise in small parts.
3. Ticket pocket attached:In this process ticket pocket is attached to front of the pocket on tracing area
with double needle stitch or depend on requirement.
4. Trimming:In this process the extra part of ticket attached to face of the pocket is trimmed
for accuracy.
5. Facing stitch:There are two types of facing stitch
Cover stitch:In this process simple stitch is used to attach pocket bag
with front.
Clean finish stitch:In this process first front is fold from sides and then
attached with pocket bag.
6. Pocket bag over lock:In this process pocket bag is lover lock from bottom side in inner side for the
safety.
7. Pocket bag top:In this process pocket bag is stitch from bottom side on outer side to hide over
lock and give a shape to pocket bag.
8. Hang:This is a basic process in which pocket is attached with panel simply with
double stitch on top or folding with double stitch.
8/8/2019 Final Report to Company
16/53
PARAMOUNT SPINNING MILLS LIMITED
Page 16 of53
9. Patching:In this process stitch attach the pocket bag with panel from side to cover and
secure.
10.ZIP attached kachha:In this process zip is attach with a strip which is then attached to panel.
11.ZIP attached packa:In this process strip with zip is attach with right side panel.
12.Edge attached:In this process front strip in attach on left side panel to hide zip.
13.J stitch:In this process J type stitch with double needle is place on front strip with zip
second side. This process is for attaching ZIP on both panels of the pent.
14.Crouch:In this process area under zip is attached together to complete the front of the
pent. There are two ways to crouch
Folded:First fabric is fold fro edges and then attached.
Top:
Simple stitch is used to attach the both side.
15.Bar tack:In this process the extra stitch is used on edges of stitch is used to protect the
stitching edges.
NOTE:
After is all process front part is ready now this part is send to the matching area
of its own line.
8/8/2019 Final Report to Company
17/53
PARAMOUNT SPINNING MILLS LIMITED
Page 17 of53
Small Part section:
In this section small part of the pent is stitched or complete. Basically this
section is extension or helping section for back section. WIP department get fabric from
cutting department and give cut piece of small part of pent to this section with standard and
sample. Process depends on demand but basic are discuss here. There are number of step in
small part section which are
1. Back pocket making:There are two ways
Over lock:
Pocket is over lock from sides and then presses it to give it a
shape.
Hamming:Pocket is fold from the sides and double stitch is apply and then
press it to give it a shape.
2. Mock stitch:Basically it is a double line curve stitch that shows a simple design on pocket
middle. Sometime costumer required embroidery then WIP department send
this cutting for embroidery then give it to this section only for hamming.
3. Yoke attached:Yoke is a piece which is attached between back panel and the belt of the pent.
Both yoke is attached with panels means left yoke with left panel and right
yoke with right panel.
4. Panel attached:Both panel left and right attached together and seet seem process is start in
which double needle stitch is apply to make a strong connection between both
panels.
NOTE:
After all this process this small part is send to pack section for further process.
This section is making small part of all the 4 lines.
8/8/2019 Final Report to Company
18/53
PARAMOUNT SPINNING MILLS LIMITED
Page 18 of53
Back section:
In this section small part and back panel is receive from small part section.
There is little number of steps in back section which is
1. Tracing:Back pocket is trace on back panel to get complete accuracy.
2. Back pocket attached:Back pocket is attached on back panel on tracing area.
3. Bar tack:Extra stitching on the ends of stitching is applied to protect it from stitch
losing.
After all this back part is also send to matching area of its own line then front part of the same
code is paired with back part and then this bundle move to assembly 1.
Assembly 1 section:
In this section following steps are done
1. Folder or Inseem safety:Pent front panel is attached with back panel of the same code. Attachment can
be folder in which both panels are attached fold and then joined with double or
triple stitch or simply with inseem safety in which both panels are attached
with single stitch with over lock the ends.
2. Out seem safety:Outseem safety is same like inseem safety but this stitch is on outer section or
on sides of the pent.
3. Top stitch 7 inches:It is a stitch on pocket side starts from belt end and end after 7 inches.
4. Loop making:Loop is a part of the pent that hold the external belt with pent is part is made in
this section.
8/8/2019 Final Report to Company
19/53
PARAMOUNT SPINNING MILLS LIMITED
Page 19 of53
5. Loop attached:There are two ways to attach the loop with pent
Insert:In this method loops are attached and stitches are inside of the
belt.
Onside:In this method stitches are also show on loop and attached on
the belt.
6. Waste belt attached:Then waste belt is attached with pent belt can be single piece or in pair.
After belt attachment pent send to assembly 2 after quality checking.
Assembly 2 section:
In this section following steps are done
1. Extra belt cutting and end close:In this process extra belt of the pent is cut according to requirement and end
close stitch is apply to close the end.
2. Eye let:It is a process in which hole is make for the button and edges are stitched for
safety.
3. Bar tack:At the end bar tack stitch is apply on loops, side seem and on hang.
NOTE:
8/8/2019 Final Report to Company
20/53
PARAMOUNT SPINNING MILLS LIMITED
Page 20 of53
There are two machines in the end of each line for small fault clearance
and if the fault is big then pent is send back to the person who create this
fault.
Daily modus operandi(routine): Stitching
9. Receive daily report from each line and make a plan to get target output.10.After check by manager this report is send to GM production, PPC and WIP
departments.
11.Receive standard distribute it according to section wise.12.Deputy manager Coordination with manager13.Report to General Manager Operation14.Take plan from PPC15.Contact PPC and WIP department to give the fabric and accessories16.Make internal plan to get the target17.Taking attendance18.Give program for over time before two hour of ending shift19.Emails and send reports
8/8/2019 Final Report to Company
21/53
PARAMOUNT SPINNING MILLS LIMITED
Page 21 of53
Washing Department
General Manager Production: Fawad Khan SeniorManager: Mohammad Zahid
Assistant Manager: Ashfaq Ahmed
Product development Manager: Fasial Shahbaz
Three shift incharge for Morning, Evening and Night
Job of the posts:
General Manager Operation:
Head of Production department. Receive report on order taking and finalize the report Guide manager Overall checking of the Production department
Senior Manager:
Report to General Manager Operation Take plan from GM Operation Make internal plan to get the target and implement it.
Assistant Manager:
Coordinate with Senior Manager Take target time from Senior Manager Check the status of the work Overall take care of washing
Product Development Manager :
Overall work on sample washing Report to Senior Manger
8/8/2019 Final Report to Company
22/53
PARAMOUNT SPINNING MILLS LIMITED
Page 22 of53
Linked department:
MM&C ( for chemical like enzyme, softener and other accessories) PPC ( for reporting and plan of action) Sewing (for the garment taking) WIP (middleman between Washing, Sewing and Finishing) Finishing (for send the wash garments)
Department Sections & Processes:
Basically there are number of step to wash garment to get required shade, color, style and
size. The department is divided in to 5 sections
Style section Washing section Drying section Shade checking section
Special effect:In this section required style is made on paint as required by the costumer.
Style can be
16.Fading:To fade the paint KMNO4 chemical is sprayed on the pants on the required
area and then send it for washing.
17.Crinkles:Basically it is a style found on thy panel on front and back. It is like wrinkles
on pant. For this purpose hardener chemical is spray on required section andthen wrinkles are made manually and clip with clipper and bake it in oven
with the temp of 70 to 80 degree centigrade and then after the wash.
NOTE:
There is much other style required by the costumer small changes are made in
this process and goal is achieved. Recipe of chemical is made with the help of
sample recipe which was applied on sample piece.
8/8/2019 Final Report to Company
23/53
PARAMOUNT SPINNING MILLS LIMITED
Page 23 of53
Washing section:
In this section garment is wash. The purpose of the wash is to get required color, shade, size
and style. There are some elements uses in washing which are
5. Desizer:Desizor is used in washing to desize or shrink the garment according to
requirement.
6. Enzyme:Basically it is a bacteria whose eat the garment fabric and it is use to get grain
on the fabric or you can say that it is used to thinner the garment fabric.
7. Stone:It is basically a simple stone used in wash to help enzyme and bleach to do
their work as fast as possible.
8. Bleach:It is used for lighter the color of the fabric.
9. Bio-Polish:It is basically an acidic enzyme used to fade the required area where KMNO4
is spray.
10.Softener:It is basically used for soften the garment and remove the hardness
With the combination of all these steps there are different types of wash for the denim and
twill garments.
8/8/2019 Final Report to Company
24/53
PARAMOUNT SPINNING MILLS LIMITED
Page 24 of53
For Denim washes are
4. RIN wash:This wash is combination of desizor and softener.
5. Enzyme wash:This wash is combination of enzyme and softener.
6. Bleach wash:This wash is combination of desizor, enzyme and bleach.
7. Hard or Dark stone wash:This wash is combination of desizor, Enzyme with stone and softener.
8. Middle stone wash:This wash is combination of desizor, Enzyme with stone, small amount of
bleach and softener.
9. Light stone wash:This wash is combination of desizor, Enzyme with stone, bleach and softener.
10.Bio-Polish wash:This wash is combination of polish, desizor, Enzyme with stone, bleach and
softener.
For Twill washes are
1. Garment wash:Only softener is used in this kind of wash.
2. Enzyme wash:This wash is combination of enzyme and softener.
3. Stone Enzyme wash:This wash is combination of enzyme with stone and softener.
4. Garment dying wash:This wash is combination of bleach, dying and softener.
After wash the garment is move to spinner to spin out the garment and then move to the dryer
to dry the garments and then move it to the shade checking if shade is not according to
requirement then garment is send back for the washing.
8/8/2019 Final Report to Company
25/53
PARAMOUNT SPINNING MILLS LIMITED
Page 25 of53
Machine Uses in washing department:
In this department following machines are used
7. Oven:Any type of wrinkle style made on pent is backed in oven to make the wrinkle
permanent so the style remains after wash. This machine has time and
temperature control panel so easy to set time and temperature according to
requirement.
8. Barrel machine:Used for both denim and twill wash. This machine has two way water input
system for hot and cold water with time and temperature control meter.
9. Spinner machine:It is used after wash with fresh water to clean the garment with chemical
recipe with machine has also time control panel.
10.Dryer machine:Dryer is used to dry the garment because there is no time to dry the garment in
sun light this machine has time with temperature control panel.
11.Tonello machine:It is a window PLC operated machine which is used for twill garment wash
and especially for garment dying process known as Tint wash. The following
step is feed in the panel and machine do the entire task automatically. This is a
machine which can perform both washing and spinning. The steps are
Set the level of water Setting of rotation Set the work time Drain 1 (changing of water) Set the level of water Set the level of heat Setting of rotation after second filling Addition of chemicals (softener, bleach, enzyme etc) Set the work time Drain 2 (discard the second filling of water) Setting of spinning time. Opening of door
8/8/2019 Final Report to Company
26/53
PARAMOUNT SPINNING MILLS LIMITED
Page 26 of53
Daily modus operandi (routine): Washing
20.Receive daily report from each section and make a plan to get target output.21.After check by manager this report is send to GM production, PPC and WIP
departments.
22.Receive standard distribute it according to section wise.23.Report to General Manager Operation24.Take estimated time from GM Operation25.Make internal plan to get the target26.Taking attendance27.Emails and send reports
8/8/2019 Final Report to Company
27/53
PARAMOUNT SPINNING MILLS LIMITED
Page 27 of53
Finishing Department
General Manager Production: Fawad Khan Manager: Mohammad Ramzan
Assistant Manager: Anwar-ul-Haq Shift Incharge: Bashir Mohammad
Trim/buttoning Incharge: Mr. Mudassar Carding Supervisor: Tahir Mehmood
Measurement Supervisor: Mohammad Harron Dispatch Incharge: Aslam Masee
Job of the posts:
Manager:
Report to General Manager Operation Take plan from GM Operation
Make internal plan to get the target and implement it.
Assistant Manager:
Coordinate with Senior Manager Take target time from Senior Manager Check the status of the work Overall take care of washing
Shift Incharge:
Report to Assistant Manager Take plan from Assistant Manager Responsible for the work of his shift Guide supervisor to achieve the target
8/8/2019 Final Report to Company
28/53
PARAMOUNT SPINNING MILLS LIMITED
Page 28 of53
Linked department:
MM&C ( for thread, zip and other accessories) PPC ( for reporting and plan of action) WIP (for washed garment taking and dispatch it) Marketing Department (send report of finish the order)
Department Sections & Processes:
Basically there are number of step to dispatch the complete garment form washed garments.
The department is divided in to 5 sections
Trimming/Buttoning section Press section Checking section Measurement section Carding section Dispatch section
Trimming/ buttoning section:
In this section washed garment is revieved from washing department
through WIP department. Here two type of process are performed
Trimming:
In this process all the extra thread is trimmed and pent is send to checking
table for inspection. Trimming is for
o Extra loop (inside/ outside)o Extra thread (inside/ outside)o Checking
8/8/2019 Final Report to Company
29/53
PARAMOUNT SPINNING MILLS LIMITED
Page 29 of53
Buttoning:
In this section following steps are done and then send to the checking table for
final approval
o Shank button ( Top button on pent for eyelet)o Reverts ( For the safety of corner stitches)o Lather label ( Attached or patch on back side)o Size or Care label ( Extra label required by costumer)
Press section:
In this section pent is press according to the given table in which required
shrinkage and after wash shrinkage is given if pent is more than its size then it go back to
washing and if there is over shrinkage pent then this fault is cover by pressing and machine
used for this purpose is known as MACPI. In this section press is checked in following
manner
o Inseam presso Out seam presso Front and Back press
After press garment is send to the Checking area.
Checking Area:
In this section final check is take place of pent in which finishing is check.
Because it is a final checking area so it is important to check the garment carefully so there
are three type of checker for this checking
Checker ( Initial checker for inspection) Final Checker ( Final checker for inspection) Super Checker ( End checker for the garment inspection)
First two belong to finishing department last one belong to Quality department
Measurement section:
In this section full measurement of the pent is checked like waist, length, thy,
Inseam, Out seam and after this it is send to the Carding area
8/8/2019 Final Report to Company
30/53
PARAMOUNT SPINNING MILLS LIMITED
Page 30 of53
Carding section:
In this section following steps are done
Attachment of Tags Disclaimer Tags Waist band Tags Price Tickets Pocket Flasher
Dispatch section:
In this section after carding pent are separate on two basis
Shade wise ( For packing same shade in same pack) Size wise ( For packing required size in order)
Packing is further divided in two parts (depend on customer demand)
Per piece poly bag Jumbo poly bag
Carton of packed pent is divided in two ways
Assorted carton:Is this carton type customer defined the different size ofsame order for example 4 pants of 34 size, 10 pants of
32 size etc.
Solid carton:In this type costumer required same size in single carton
for example all pieces of 32 sizes.
Number of pants in each carton is depend on customer demand if costumer asked for
fixed packing them he define the number of pant in each carton and if he asked for weight
based then he will give the required weight like 90 kg or 180 pound then carton is made withtotal weight of 90 kg or 180 pound number of pants are not defined in this type. After carton
is made following tags are apply on carton
Size wise back up Carton mark/ number Shipment mark (based on customer) Carton sticker Bar codes
8/8/2019 Final Report to Company
31/53
PARAMOUNT SPINNING MILLS LIMITED
Page 31 of53
Daily modus operandi (routine): Finishing
28.Receive daily report from each section and make a plan to get target output.29.After check by manager this report is send to GM production, PPC and WIP
departments.
30.Receive standard distribute it according to section wise.31.Assitant manager Coordination with manager32.Report to General Manager Operation33.Take plan from GM operation and required date of dispatching from PPC34.Contact PPC and WIP department to give accessories35.Make internal plan to get the target36.Taking attendance37.
Give program for over time before two hour of ending shift
38.Emails and send reports
8/8/2019 Final Report to Company
32/53
PARAMOUNT SPINNING MILLS LIMITED
Page 32 of53
Quality Department
GM Production: Fawad Khan Manager: Mohammad Salman
Fabric Q.Incharge: Javed Iqbal Cutting Q.Incharge: Mohammad Shahid
Sewing Q.Incharge: Ibrahim Doger Washing Q.Incharge: Mohammad Hafeez
Finishing Q.incharge:
Job of the posts:
Manager:
Report to General Manager Operation Take plan from GM Operation
Make internal plan to get the target and implement it. Make it possible to complete the order quantity with quality. Check the report and the sample of the order and pass it
Incharge:
Report to Manager Take plan from Manager Responsible for the quality work of his department Guide quality supervisor to achieve the target Check all the order and match with sample Create daily report of departmental progress Surprise checking of working lines Randomly check of any piece in any section
8/8/2019 Final Report to Company
33/53
PARAMOUNT SPINNING MILLS LIMITED
Page 33 of53
Linked department:
MM&C ( for thread, zip and other accessories quality checking) Fabric store ( for check the quality of the fabric) PPC ( for reporting and plan of action) Marketing Department (get the sample of the order) Cutting Department ( for the checking the quality of work ) Sewing Department ( for the checking the quality of work ) Washing Department ( for the checking the quality of work ) Finishing Department ( for the checking the quality of work )
Department Sections & Processes:
Basically quality department is almost present in all production departments. From fabric
import to garments export there is quality section in every production department. The
purpose of this department is to control and manage quality of the order with quantity of theorder. There are basically six section of this department which is distributed in production
section which
Quality department for fabric inspection (FID) Quality department for cutting department Quality department for sewing department Quality department for washing department Quality department for finishing department
Quality department for MM&C department
Quality department for fabric inspection:
This is the section of quality department which exist in fabric store. The
purpose of this section is to check the fabric at initial stage so the is no b-pare pant because of
fabric fault. Fault may be of any kind to find out fault number of processes are apply to the
fabric describe as under
8/8/2019 Final Report to Company
34/53
8/8/2019 Final Report to Company
35/53
PARAMOUNT SPINNING MILLS LIMITED
Page 35 of53
end. Three of half meter and left three of one meter. One full width with 12 inches
length piece is also cutted from every roll.
Fabric inspection:
Fabric inspection on machine:
To inspect the fabric on machine, four point system (American) is used in this
respect. The method is if the fault is in between 0 to 3 inches then give it one
point if the fault is in between 4 to 6 inches then the points are two if between
7 to 9 then three and if 10 inches to one meter then 4 points. At the end all
points are added and then multiply with 100 x 100 and then divide by total
length and at last dive the answer with the smallest width of the fabric if theanswer is more than 15 points the fabric is b-two if less than 15 than fabric is
in A condition. If fabric got points more than 20 then the fabric is rejected
piece.
Fabric inspection for shade and shrinkage:
To inspect the fabric for shade and shrinkage following steps are done
1. Half meter piece is cutted from fabric of all rolls of same order.2. Make a 25 x 25 inches square on it by garment marker.3. Kg tube is made of the mark fabric4. Send it for wash and then get its results and make a report on shrinkage
and shade changing behavior of the fabric
Fabric inspection for skew (twist checking):
To inspect the fabric for skew checking following steps are done
1. Get the piece of 4 x 6 inches from the fabic of all the rolls of sameorder.
2. Sewing it and then wash it3. Get the result and make a report that how much the twist is present in
this fabric.
Fabric inspection for center to side shade:
To inspect the fabric for center to side shade following steps are done
1. Get the piece of full width and 12 inches length.2. Cut it in to 4 equal pieces3. Sewing side part in middle with central part on side4. Send it for wash and then get its results and make a report on shrinkage
and shade changing behavior of the fabric
8/8/2019 Final Report to Company
36/53
PARAMOUNT SPINNING MILLS LIMITED
Page 36 of53
Fabric inspection for Gram Square Meter:
To inspect the fabric for gram square meter first we get the piece and cut it inrequired size and weight it in ounces and then convert it in grams. Normally
the weight of denim is in between 8 to 14 ounces and 14 is a good quality and
for twill the value starts from 4 to 9 and 9 is the good quality for twill fabric.
Quality department for cutting inspection:
In cutting department quality department have different task to do which are
Check the fabric layer that layer is according to shade report. Marker is first check by the quality department and then apply on the
fabric
Do line to line checking on cutting but this checking is randomlynearly 10% if fault is miner
Check the number on the cutting and marker randomly Fault caught by cutting department checker wait for the quality
department and asked for approval or rejection
Quality department for sewing inspection:
In sewing department quality department have following task
Receive the cutting report with cutting from cutting Check the feed to sewing department Piece to piece checking on the final checking table Randomly in line checking
Quality department for washing inspection:
In sewing department quality department have following task
Receive the garment report with garment from sewing department
8/8/2019 Final Report to Company
37/53
PARAMOUNT SPINNING MILLS LIMITED
Page 37 of53
Check the feed to washing department Piece to piece checking on the final checking table
o Shade wiseo Fashion wise
Randomly in line checking Rejection send back to the washing for rewash
Quality department for finishing inspection:
In finishing department quality department have following task
Receive the washing report with garment from washing department Check the feed to finishing department Piece to piece checking on the final checking table Randomly in line checking
Quality department for MM&C inspection:
In MM&C department quality department have following task
Receive the report with sample from marketing department Check the quality of the before wash and after wash accessories
8/8/2019 Final Report to Company
38/53
PARAMOUNT SPINNING MILLS LIMITED
Page 38 of53
Industrial Engineering
General Manager: Fawad Khan DeputyManager: Asif Muzaffar
Job of the posts:
General Manager Operation:
Head of Production department. Receive report on order taking and finalize the report Guide manager Overall checking of the Production department
Manager:
Making daily and monthly production efficiency reports Make style bulletins at costing stage Check feasibility of new styles and suggest and monitor garment feasibility at
sampling stage
Training of new time study supervisors Time and motion study of new operations to suggest piece rate Production rating by capacity study Layout setting and making production flow according to new styles Any other assignment given by seniors
Linked Departments
Marketing department (reporting about export import) Finishing department (reporting for the status of order) PPC department (report of order dispatch)
8/8/2019 Final Report to Company
39/53
PARAMOUNT SPINNING MILLS LIMITED
Page 39 of53
Department Purpose and Procedures
Industrial engineering is most important in every business especially in production line. Let
start discuss from where it start
Frederick Taylor and Scientific Management
In 1911, Frederick Winslow Taylor published his work, The Principles of Scientific
Management, in which he described how the application of the scientific method to the
management of workers greatly could improve productivity. Scientific management methods
called for optimizing the way that tasks were performed and simplifying the jobs enough so
that workers could be trained to perform their specialized sequence of motions in the one
"best" way.
Prior to scientific management, work was performed by skilled craftsmen who had learned
their jobs in lengthy apprenticeships. They made their own decisions about how their job was
to be performed. Scientific management took away much of this autonomy and convertedskilled crafts into a series of simplified jobs that could be performed by unskilled workers
who easily could be trained for the tasks.
Industrial Engineering is the combination of Engineering plus Business Administration. In
this modern age, Industrial Engineering is the main tool of success that helps boost up
production with quality assurance. Industrial Engineering is about making the best use of
available resources ( man, money, machine, material & methods) to:
a) Increase the productivity
b) Improve the quality
c) Lower the costd) Assure safety of Personal & machines.
e) Create and maintain good working criteria to improve efficiency.
Industrial Engineer applies engineering methods and production plans to produce more
efficient & effective human machine systems. Industrial Engineer makes production lines
more efficient, analyze people, objects flow through system and design work stations that
reduce employees fatigue and accidents. Industrial Engineer coordinates the systems &
processes multifaceted operations to ensure the most efficient flow at an optimum cost.
8/8/2019 Final Report to Company
40/53
PARAMOUNT SPINNING MILLS LIMITED
Page 40 of53
The techniques used in carrying out productivity improvement programmers are mostly for
collecting information and increase the effectiveness of work. The methods used fall into two
groups
The technical approach (engineering technique and economic analysis) The human approach (behavior method)
Since most of the techniques are well describe in the literature of the industrial engineering
three well known techniques are as under
Work study:
Work study is a combination of groups of techniques, methods, study and work measurement
which are used to examine peoples work and indicates the factor which effect efficiency.
Work study is normally used in an attempt to increase output from a given quantity of
resouses with little or no further capital investment. This is achieved by systematically
analyzing existing operation process and work methods.
The basic procedure ok work study is as under
Select the job or process to be studied Record from direct observation everything that happen in order to obtain data for
analysis
Examine in turn, the purpose of of the activity, the place it is performed, thesequences in which the element is performed, the person who is doing this
Develop the most economic method, taking into account all the circumstancesmeasure the amount of the work involved in this method used and calculates a
standard time for doing
Define the new method and the related time Install the new method and time as agreed standard practice Maintain the new standard practice by proper control procedures
8/8/2019 Final Report to Company
41/53
PARAMOUNT SPINNING MILLS LIMITED
Page 41 of53
Method study:
Method study is also called mention study, method analysis or method engineering is the
systematic recording and critical examination of existing and perposed ways of doing work in
order to develop and apply easier more effective methods and to reduce cost. It is used in
improving processes and procedures, plant layout, design of plant and equipment to reduce
human factor and fatigue, use of material, machine and man power and develop better
physical and working environment. The basic stage of method study is complex technique
that combines several simple tools. The commonly used method study tools are
Analysis of films Emotion photography (memory and motion a way of using film to analysis to film to
analyze)
Micro motion analysis Question technique (general and specific questions which help to indicate purpose,
place, sequence, person, means )
Work measurement:
Work measurement establishes the tome to qualified worker needs to carry out a specified job
at a define level of performance. Whereas method study helps us to eliminate unnecessary
movement help in investigating, reducing and subsequently eliminates in effectives time
during which work is not be performed.
Work measurement also used to set of standard times for carry out work. Thus work
measurement help to
Compare the efficiency of alternative methods Determine the number of machines one can operate or monitor Provide information and using set time standards on which the planning and
scheduling of production can be base
Set standard for the machine use and labor performance
8/8/2019 Final Report to Company
42/53
PARAMOUNT SPINNING MILLS LIMITED
Page 42 of53
Provide information on which tender selling prices and delivery promises can bebased
Work measurement provide the basis information necessary for designing, planning,organizing and controlling the work especially in industries where the time element is
important.
8/8/2019 Final Report to Company
43/53
PARAMOUNT SPINNING MILLS LIMITED
Page 43 of53
MM&C Department
GM Production: Fawad Khan Manager: Mohammad Suleman
Assistant Manager (M): Safqat Mehmood Assistant Manager (M): Syed Ahsan Raza
Control Incharge (C): Mohammad
Job of the posts:
General Manager Operation:
Head of Production department. Receive report on order taking and finalize the report Guide manager Overall checking of the Production department
Manager:
Report to General Manager Operation Take OC (order conformation) from Marketing department. Contact Supplier if there is any kind of problem take place Check on assistant manager and their work
Assistant Manager (M):
Coordinate with manager Receive bill of material from marketing department Generate purchase order and send it to supplier, marketing department, account
department, control assistant Incharge
Receive daily feedback from MM&C control incharge Approved accessories send by the supplier
8/8/2019 Final Report to Company
44/53
8/8/2019 Final Report to Company
45/53
PARAMOUNT SPINNING MILLS LIMITED
Page 45 of53
Department working criteria:
After getting order conformation, marketing department merchandiser send full details in
specification report and sample of small accessories on trim card with order conformation
letter. After getting these all things assistant manager do number of jobs
Check to the list of the supplier of the related accessory Short list them on company criteria Send them sample and detail to them Negotiate with them on price and quality After negotiation assistant manager generate purchase order (PO) and send it to
o Suppliero Accounts departmento Control inchargeo Main store
Purchase letter is with accessories details and sample. So supplier get following things from
MM&C department
Purchase order Accessories sample and details Time of delivery
The control incharge receive order with delivery challen with same purchase order number.
Some time supplier send the copy of purchase order with delivery challen. Control incharge
count the number of packets and asked item per packets and send a report to main storethrough their software WIZMAN and in which daily report of receiving is generated on daily
basis which is then send to the MM&C assistant manager. Control incharge from MM&C
department take receiving on the register manually and give accessories to them. After
receiving of accessories main store count it if the accessories are short then they send report
to MM&C department. If the shortage is on small level then supplier sends it free of cost
(FOC) otherwise depend on their deal,
8/8/2019 Final Report to Company
46/53
PARAMOUNT SPINNING MILLS LIMITED
Page 46 of53
Daily modus operandi (routine): MM&C
39.Update daily receiving report from control incharge40.Contact supplier for delivery41.Handle small problems in accessories42.Generate over all progress report43.Receive daily report from control incharge to get planned target output.44.After check by manager this PO is send to store, control incharge accounts and
PPC departments.
45.Report to General Manager Operation46.Take order conformation (OC) from Marketing department47.Take accessories details and sample on trim card from Marketing department48.
Receive bill of material from marketing department
49.Generate purchase order and send it to supplier, marketing department,account department, control assistant Incharge
50.Receive daily feedback from MM&C control incharge51.Approved accessories send by the supplier
8/8/2019 Final Report to Company
47/53
PARAMOUNT SPINNING MILLS LIMITED
Page 47 of53
HR Department
GM HR & Admin: Major(R) Munir Ahmend Awan Deputy Manager: Mian Bashir Ahmed
Assistant Manager : Ibrahim Sabir Executive Officer: Mohammad Mobeen
Job of the posts:
General Manager Operation:
Head of HR & Admin department. Receive report on employee problem, employee recruitment and finalize the report Guide deputy manager Overall checking of the HR & Admin department
Deputy Manager:
Report to General Manager HR & Admin Control issue of the employee like leaves, attendance, pay problem, facility payment Control the issue of recruitment of new employee Check the issue like office problem Check on assistant manager and their work
Assistant Manager:
Coordinate with deputy manager
All the paper work of the office Generation of the notices and work order letter Control time office Control the issue of recruitment of new employee and contact them Make file of daily documents which is send to GM on daily bases Handle security issues Arrange conservation between worker and deputy manager HR Control the issue of EOBI and SSC issue
8/8/2019 Final Report to Company
48/53
PARAMOUNT SPINNING MILLS LIMITED
Page 48 of53
Handle the salary issue
Department working criteria:HR department do number of jobs which are defined below
Hiring process Attendance issues Leave and holidays issues Compensation issue Company letter generation Salary issue Loan issue Employee old age benefits issue Social Security Card Worker problem issues Control labor union issues
Hiring Process:
First of all we discuss the hiring process of the company because paramount stitching unit is
divided into two parts production and offices so there are two ways of recruitment of the
employees. First we talk about officers recruitment for these purpose numbers of steps arehere
First add in news paper Collection of CVs Short listing of CVs Interview call and Interview Rating of interview
8/8/2019 Final Report to Company
49/53
PARAMOUNT SPINNING MILLS LIMITED
Page 49 of53
Final selection the candidates Appointment letter
Above criteria is for offices employee but when we talk about the worker recruitment there
is no add in newspaper basically worker recruitment reference method is used for this
purpose any employee refer them and the procedure starts
Call the with the reference of company employee Check the skill and take a trail Appointment of the worker
E_ From:
When the hiring process end no matter for officer or worker E_form (employment form) is
generated in which all the details are maintain with the following documents
Copy of national identity card Three photograph of the employee Joining letter Experience letter (if any) Copy of education documents (must for officers and optional for workers)
Attendance issue:
Copy of the joining letter is send to time office for attendance where hand scan is taken for
the daily attendance of the employee by the hand scan machine.
Probation Time:
Probation time is only for the officer employee worker starts their job instantly and observed
by the incharge but for officer employee knows as MT management trainee there is
probation period starts. Normally it may vary from 3 month to 9 month but this depend on
company management CEC (central executive committee) decision to increase it to 1 year
8/8/2019 Final Report to Company
50/53
PARAMOUNT SPINNING MILLS LIMITED
Page 50 of53
and decrease it to zero. An induction plan is made for the MT which helps him/her to visit
nominated department within probation time and submit report on these department within
time of probation. This report become the base on which is decided to end the probation time
or increase it. During probation time, if company is not satisfied with employee workingcompany can fire him/her without any advance notice.
Hand Books:
When probation time ends and MT become permanent employee hand book is provided to
him/her to understand company rules and relation and help them to understand different
situation.
Leave Criteria:
According to company rule and regulation there are 1.5 leaves per month so there are 18
leaves in one year which is divided in two portions.
Casual leaves = 10 leaves Sick leaves = 8 leaves
Second kind of leave is annual leaves which are from 14 to 15 days. Third kind of leave is
maternity holidays for women 45 days before and 45 days after. Fourth one is CPL.
CPL (Compensatory leaves):
If someone work in off days then he will CPL. According to rule and regulation
person should use this CPL in three days but due to work load and order availability,
company allow the person to avail it at any time.
Compensation:
When the employee get the job compensation is decided by the management (CEC) like
Car of 800cc, 1000cc,1300c and more Mobile and charges of mobile calls
8/8/2019 Final Report to Company
51/53
PARAMOUNT SPINNING MILLS LIMITED
Page 51 of53
Amount of petrol 200 liter, less or moreThis depend on CEC to give them all of this compensation or some or more of them
Fire or Resignation (permanent staff):
When the employee is fired or he/she want to resign clearance form is generated on which
employee need to take sign from different department like
Human recourse Head of department Canteen Store Security Time Office Cashier
Employee must give notice one month before. Company cut the salary of month as per
company defined rules. If employee spend more than one year them company give him/her
one month salary so this salary equalize the deduction of the salary, if employee more the 2
years then the formula is
Net Salary = salary*number of year - one month salary deduction
Company Letter:
There are two types of company letter
Warning letter Appreciation letter
8/8/2019 Final Report to Company
52/53
PARAMOUNT SPINNING MILLS LIMITED
Page 52 of53
Warning letter:
During job if the employee is not taking interest in work and do not give its required
output them he/she got warning letter to improve its work.
Appreciation letter:
If employee show good interest in work and give more than required than he got
appreciation letter which also save in its file which help him in promotion.
EOBI (employee old age benefits Institute):
When employee joins the company generates EOBI (employee old age benefits institute)file
which pay pension to employee when he is more than 60 years. For EOBI company pay 300rupee and 60 rupee is paid from the employee pay.
SSC (Social Security Card):
Basically it is a medical card for the employee. Employee is eligible for this card when
his/her pay is more than 10000 rupees this card is also facilitate wife, children and parents of
the employee. Company pay all the expenses for SSC.
Salary:
Minimum salary of the worker is according to government rule which is 6000 rupee and for
the managerial level on upper level then worker pay is decided by CEC. The net salary is
calculated by following formula
First hand scan is calculated by machine Leaves and CPL added manually Then formula
Gross salary = (salary/days of the month)*no. of working days Then different kind of charges are minus from the gross salary like
o Income Taxo EOBI chargeso Breakage (if any)o Absents charges (if any)o Loan
8/8/2019 Final Report to Company
53/53
PARAMOUNT SPINNING MILLS LIMITED
After minus these charges net salary is send to the accounts department If salary is more then 15000/= then pay is transfer to employee account and if salary is
less than 15000/= then employee take it by hand.
Worker Problem Solutions:
HR also handle the problem of labor unions and make budgets for ramazam, overtime food
and their transport.