B R I D G E S T R E E T D I S T R I C T RIVERSIDE PARK: WEST PLAZA PHASE 1 IMPROVEMENTS
FINAL SITE PLAN SUBMITTAL
DATE PREPARED: FEBRUARY 28, 2017
MKSKSTUDIOS.COM
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 Li
SHEET NUMBER SHEET NAME ISSUE DATE REVISION DATE
Li INDEX OF SHEETS February 28, 2017
L1 CITY COUNCIL APPROVED MASTER PLAN February 28, 2017
L2 BASIC SITE PLAN: PHASE 1 IMPROVEMENTS February 28, 2017
L3 FINAL SITE PLAN: WEST PLAZA PHASE 1 February 28, 2017
L4 WEST PLAZA: MATERIALS PLAN February 28, 2017
L5 WEST PLAZA: CUSTOM BENCH AND PLANTER February 28, 2017
L6 WEST PLAZA: CUSTOM BENCH AND PLANTER February 28, 2017
L7 WEST PLAZA: BOLLARD DESIGN February 28, 2017
L8 WEST PLAZA: SITE SECTIONS February 28, 2017
L9 WEST PLAZA: SITE SECTIONS February 28, 2017
L10 WEST PLAZA: SITE SECTIONS February 28, 2017
L11 WEST PLAZA: SITE ELEVATION February 28, 2017
L12 WEST PLAZA: WALL DETAILS February 28, 2017
L13 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L14 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L15 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L16 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L17 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L18 WEST PLAZA: PERSPECTIVE RENDERING February 28, 2017
L19 WEST PLAZA: PRELIMINARY GRADING PLAN February 28, 2017
L20 WEST PLAZA: PRELIMINARY PLANTING PLAN February 28, 2017
L27 WEST PLAZA: PRELIMINARY LIGHTING PLAN February 28, 2017
N . H I G H S T .
S C I O T O R I V E R
R I V E R S I D E D R . ( N B )
R I V E R S I D E D R . ( S B )
JO
HN
SH
I EL
DS
PK
WY
.
RT
. 1
61
/ B
RI D
GE
ST
.
1|
2|
3|
4|
5|
6|
7|
8|
Pedestrian Bridge East Plaza
Pedestrian Bridge West Plaza
Pedestrian Bridge
The Green
Pathways & Trails
Indian Run Falls Trail
River Access & Overlooks
John Shields Parkway Plaza
RO
CK
CR
ES
S P
KW
Y.
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 1CITY COUNCIL APPROVED MASTER PLAN - MAY 2016
0’ 120’ 240’ 480’NORTH
0’NORTH
1
2
3
4 55
55
6
7
7
8
N . H I G H S T .
S C I O T O R I V E R
R I V E R S I D E D R . ( N B )
R I V E R S I D E D R . ( S B )
JO
HN
SH
I EL
DS
PK
WY
.
RT
. 1
61
/ B
RI D
GE
ST
.
RO
CK
CR
ES
S P
KW
Y.
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 2
NORTH0’ 80’ 160’ 320’0’
BASIC SITE PLAN: PHASE 1 IMPROVEMENTS
1|
a|
2|
b|
c|
d|
3|
4|
5|
6|
7|
8|
East Plaza Landing Upper Terrace 20,500 sf/0.47ac.
Pavilion
East Plaza Landing Lower Terrace 19,675 sf/0.45 ac.
Water Feature
Seating Terrace
Potential Ice Rink Location
The Green 100,875 sf/2.32 ac.
Pedestrian Underpass Temporary Connection
Overlook 2,258 sf/0.05 ac.
West Plaza Landing 7,250 sf/0.17 ac.
Pathways & Trails
Pedestrian Bridge Project
6
7
7
7
8
1
a
b
c
d2
435
RO
CK
CR
ES
S P
KW
Y.
N . H I G H S T .
S C I O T O R I V E R
R I V E R S I D E D R . ( N B )
R I V E R S I D E D R . ( S B )
JO
HN
SH
I EL
DS
PK
WY
.
RT
. 1
61
/ B
RI D
GE
ST
.
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 3
NORTH0’ 80’ 160’ 320’0’
FINAL SITE PLAN: WEST PLAZA PHASE 1 IMPROVEMENTS
1|
a|
2|
b|
c|
d|
3|
4|
5|
6|
7|
8|
East Plaza Landing Upper Terrace 20,500 sf/0.47ac.
Pavilion
East Plaza Landing Lower Terrace 19,675 sf/0.45 ac.
Water Feature
Seating Terrace
Potential Ice Rink Location
The Green 100,875 sf/2.32 ac.
Pedestrian Underpass Temporary Connection
Overlook 2,258 sf/0.05 ac.
West Plaza Landing 7,250 sf/0.17 ac.
Pathways & Trails
Pedestrian Bridge Project
6
7
7
7
8
1
a
b
c
d2
435
3
5
7
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 40’ 10’ 20’ 40’
NORTH0’
NORTHMATERIALS PLAN
C
B
A
D
G
F
E
H
J
I
MATERIALS LEGEND
Brick Paver PlazaManufacturer: Belden BrickSize: 4”x 8” x 2 1/4” Pattern: Herringbone, no lugsColor to match adjacent sidewalk
BollardSteel bollard with powdercoat paint
Custom Precast Concrete Bench & PlanterAcid etch finish
Pedestrian Bridge GuardrailStainlesss steel cables; teak handrail
Retaining Wall with Rubble Stone VeneerLimestone veneer in varied sizes
Pedestrian Bridge
Pedestrian Bridge - Handrail TransitionCustom precast concrete inlay
Architectural Precast Concrete Paving Varied width; acid etch finish
Architectural Precast Concrete StairsVaried width; acid etch finish
Stabilized Aggregate Maintenance PathBuff colored crushed aggregate
C
A
B
I
A
B
A
H
F
D
D
E
J
EE
I
G
C
C
3 3
21
2
6
6
1
4
4
C
C
H
High Street
Phase 01 Limits
Bridge Park WestBuilding Z1
Bridge Park WestBuilding Z2
TOP
OF B
LUFF
TOE
OF
BLU
FF
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 5CUSTOM BENCH & PLANTER
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 6CUSTOM BENCH & PLANTER
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 7BOLLARD
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 8SITE SECTIONS
NORTH0’ 5’ 10’ 20’0’
1 | SOUTH PLAZA ELEVATION
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 9SITE SECTIONS
2 | NORTH PLAZA ELEVATION
NORTH0’ 5’ 10’ 20’0’
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 10SITE SECTIONS
4 | STAIR SECTION
3 | WEST PLAZA ELEVATION
NORTH0’ 5’ 10’ 20’0’
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 11 SITE ELEVATION
C
B
A
D
G
F
E
MATERIALS LEGEND
Pedestrian Bridge
Indiana Limestone QuoinCut stone with light sandblast finish
Indiana Limestone CorniceCut stone with light sandblast finish
Pedestrian Bridge GuardrailStainlesss steel cables; teak handrail
Retaining Wall with Rubble Stone VeneerLimestone veneer: 6” - 18” height
Rubble Stone Veneer Base CourseLimestone veneer: 18”-30” heightbase course
Bridge Park West Building Z1Mixed use
DB
E
E
E
C
D
A
E G
F
B
5 | WEST WALL ELEVATION
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 12WALL DETAILS
C
B
A
A B
CC
DD
EE
FF
G
D
G
H
F
E
MATERIALS LEGEND
Pedestrian Bridge
Indiana Limestone QuoinCut stone with light sandblast finish
Indiana Limestone CorniceCut stone with light sandblast finish
Pedestrian Bridge GuardrailStainlesss steel cables; teak handrail
Retaining Wall with Rubble Stone VeneerLimestone veneer: 6” - 18” height
Rubble Stone Veneer Base CourseLimestone veneer: 18”-30” heightbase course
Bridge Park West Building Z1Mixed use
Wall UplightLinear LED with warm color temperature
H
6
6
6 | WALL SECTION 7 | WALL ELEVATION ENLARGEMENT
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 13PERSPECTIVE RENDERING
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 14PERSPECTIVE RENDERING
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 15PERSPECTIVE RENDERING
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 16PERSPECTIVE RENDERING
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 17PERSPECTIVE RENDERING
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 180’ 10’ 20’ 40’
NORTH0’
NORTHGRADING PLAN
GRADING LEGEND
00.00 + Proposed Spot Grade
TW 00.00 Proposed Top Of WallBW 00.00 Proposed Bottom Of Wall
0.00% Percent Slope
+ BS 811.10
+ TS 820.70
+ 820.48
+ 820.49
+ 820.68
+ 822.70
822.00 +
820.52 +FFE 823.15
FFE 820.00
823.15 +
FFE 820.75
820.52 +
820.16 +
(820.22) +
819.84 +
+ 821.84
+ 822.20
+ 820.14
+ 820.34
+ (819.89)
+ (819.89)
+ (819.89)
TW 814.40BW 810.90
TW 820.68 BW 811.08
TW 820.68 BW 820.68
TW 822.15 BW 820.40
1.60%
1.50%
1.60%
1.56%
1.65%2.
13%
3.38%
3.12%
High Street
Phase 01 Limits
Bridge Park WestBuilding Z1
Bridge Park WestBuilding Z2
TOP
OF B
LUFF
TOE
OF
BLU
FF
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 190’ 10’ 20’ 40’
NORTH0’
NORTHPLANTING PLAN
PLANTING LEGEND
Existing Street Tree
Low Ornamental PlantingsSelections for seasonal interest
Ornamental PlantingsSelections to naturalize the bluff and provide stabilization
B
C
B
B
C
C
B
B
A
C
B
B
C
A
A
High Street
Phase 01 Limits
Bridge Park WestBuilding Z1
Bridge Park WestBuilding Z2
TOP
OF B
LUFF
TOE
OF
BLU
FF
MKSKSTUDIOS.COM
DUBLIN | RIVERSIDE PARKPrepared: February 28, 2017 L 200’ 10’ 20’ 40’
NORTH0’
NORTHLIGHTING PLAN
LIGHTING LEGEND
Adjacent Building LightingAmbient lighting from building Z1 and Z2
Railing LightingContinuous LED integrated into railing
Street LightingHistoric District standard fixture
Bench LightingIndirect linear LED; concealed
B
C
D
D
D
B
B
D
C C
D
A
D
D
D
D
A A
High Street
Phase 01 Limits
Bridge Park WestBuilding Z1
Bridge Park WestBuilding Z2
TOP
OF B
LUFF
TOE
OF
BLU
FF