Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 5 6 7 8 9 - 2-1 9 2 7 3 9 2 0 3 8 9 30 8 2 0 1 7 9 1 2 5 8 9 10 12 15 16 17 2 2 5 6 28 1-11 12 Proposed Letting: Front Review / Date: Contract Time: Days Back Review / Date: Acquisition: No Yes Days PE Review / Date: Flexible Start: No Yes Cal. Days Time Sheet Charge No.: Special Start: No Yes Date Road No(s): Total Length: Alternative Contracting: No Yes Primary Work: # of Technical SP’s (Total sheets ) This Contract plan set includes: (Other) Roadway Plans Advance / Job File Checked Structure Plans All Sheets in Plans Signing Plans 20 Standard Index Signal Plans Landscaping Plans Lighting Plans Utility Plans (Other) Plans INCLUDES MANDATORY REVISION NO(S).: STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FINANCIAL PROJECT ID: __________________ FEDERAL FUNDS: YES NO DISTRICT ______ ________________________ COUNTY The 2010 Edition of the Florida Department of Transportation Standard Specifications is revised as follows:
Transcript
Page 1: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING

Revised 56789-2-19273920389308201791258910121516172256281-1112

Proposed Letting: Front Review / Date:

Contract Time: Days Back Review / Date:

Acquisition: No Yes Days PE Review / Date:

Flexible Start: No Yes Cal. Days Time Sheet Charge No.:

Special Start: No Yes Date Road No(s):

Total Length:

Alternative Contracting: No Yes Primary Work:

# of Technical SP’s (Total sheets )

This Contract plan set includes: (Other)

Roadway Plans Advance / Job File Checked

Structure Plans All Sheets in Plans

Signing Plans 20 Standard Index

Signal Plans

Landscaping Plans

Lighting Plans

Utility Plans

(Other) Plans

INCLUDES MANDATORY REVISION NO(S).:

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

FINANCIAL PROJECT ID: __________________

FEDERAL FUNDS: YES NO

DISTRICT ______

________________________ COUNTY

The 2010 Edition of the Florida Department of Transportation Standard Specifications is revised

as follows:

Page 2: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..2

SPECIFICATIONS WORKSHEET Resolved: Notes, Comments, Questions: _________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

_________ _________________________________________________________________________

Page 3: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..3

Page 4: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2011 Workbook.....1

SPECIAL PROVISIONS SP0000001 All Jobs Remarks

EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK. (REV 12-9-10) (FA 1-27-11) (7-11) Insert Information Required. Changes to: 2-4.

SP0020400 All Jobs (add contact

person and phone no.)

PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) Changes to: 2-5.1.

SP0020501AB

A+B Bidding. (Use with the approval of the Chief

Engineerproper authority). Use with

SP0030100AB, SP0030203AB,

SP0081300AB and SP0080701AB

PREPARATION OF PROPOSALS. (REV 2-21-05) (FA 3-31-05) (1-06) Insert Information Required. Changes to: 2-5.1.

SP0020501LR

Lane Rental. (Use with the approval of the Chief

Engineerproper authority). Use with

SP0030100LR, SP0081300LR and SP0081300LRDR

CONSIDERATION OF BIDS – SCOPE ALTERNATES. (REV 2-15-07) (7-07) Changes to: 3-1.

SP0030001 Use with proper authority.

*Notify Contracts Office on Transmittal Memo

AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) Insert Information Required. Changes to: 3-1.

SP0030100AB

A+B Bidding. (Use with the approval of the Chief

Engineerproper authority). Use with

SP0020501AB, SP0030203AB,

SP0080701AB and SP0081300AB

BUDGETARY CONSTRAINTS. (REV 9-26-06) (FA 10-6-06) (1-07) Changes to: 3-1.

SP0030100BC Use with proper authority.

*Notify Contracts Office on Transmittal Memo

AWARD AND EXECUTION OF CONTRACT. (REV 7-20-10) (FA 8-12-10) (1-11) Insert Information Required. Changes to: 3-1, 3-2.2, 3-5.1.

SP0030100DC

District Let Construction Contracts less than

$250,000 and all Maintenance Contracts,

excluding Lump Sum

Page 5: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..5

AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) Changes to: 3-1.

SP0030100LR

Lane Rental. (Use with the approval of the Chief

Engineerproper authority). Use with

SP0020501LR, SP0081300LR and SP0081300LRDR

AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) Changes to: 3-1.

SP0030100LS Lump Sum Projects

AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (7-10) Insert Information Required. *Contracts Office must approve Changes to: 3-2, 3-6 and 3-7.

SP0030200 When necessary to

change standard “Award and Execution”*

AWARD OF CONTRACT – A+B BIDDING. (REV 8-22-96) (FA 9-3-96) (7-11) Insert Information Required. Changes to: 3-2.

SP0030203AB

A+B Bidding. (Use with the approval of the Chief

Engineerproper authority). Use with

SP0020501AB, SP0030100AB,

SP0080701AB and SP0081300AB

Mandatory No. 1 AWARD AND EXECUTION OF CONTRACT. (REV 9-12-11) (1-12) Changes to 3-8, 3-9.

SP0030800 All Jobs.

New SP. Issued as Mandatory No. 1 to

move language relating to retention of records

from Article 3-9 to Article 3-8 to maintain

consistency with DB Div I specs and for clarity

regarding the requirements of the

Florida Public Records Laws.

SCOPE OF THE WORK – INTENT OF CONTRACT. (REV 8-19-09) (FA 8-24-09) (1-10) Insert Information Required. Changes to: 4-1.

SP0040100 All Jobs, excluding Lump

Sum. Do not use with SP0040100SLPQ.

SCOPE OF THE WORK. (REV 8-24-10) (FA 10-8-10) (7-11) Insert Information Required. Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.

SP0040100LS All Lump Sum Projects.

Do not use with SP0040100SLLS.

Page 6: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..6 SCOPE OF THE WORK – INTENT AND SCOPE. (REV 8-24-10) (FA 10-8-10) (7-11) Insert Information Required. Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.

SP0040100SLLS

All Projects less than $2,000,000 and less than

2,000 tons of asphalt - Streamline Lump Sum.

Do not use with SP0040100LS.

SCOPE OF THE WORK – INTENT AND SCOPE. (REV 9-16-09) (FA 11-9-09) (7-10) Insert Information Required. Changes to 4-1, 4-3.1, 4-3.4, 4-3.9.4.

SP0040100SLPQ

All Projects less than $2,000,000 and less than

2,000 tons of asphalt - Streamline Plan Quantity.

Do not use with SP0040100.

UNFORESEEABLE WORK. (REV 9-28-98) (1-10) Changes to: 4-4.

SP0040400 999-25

CONTROL OF THE WORK. (REV 3-15-02) (1-10) Changes to: 5-1.1, 5-2, 5-7.6

SP0050501LS Lump Sum Projects

INSPECTION. (REV 2-10-94) (1-10) Changes to: 5-9.1.

SP0050901 Long bridge jobs

(1500 feet or longer); modify to suit

CONTROL OF MATERIALS. (REV 8-17-09) (FA 8-24-09) (1-10) Changes to: 6-1.

SP0060100LS Lump Sum Projects

REQUIREMENTS FOR FEDERAL JOBS – COMPLIANCE WITH FHWA 1273. (REV 2-11-10) (FA 2-17-10)(7-10) Changes to: 7-1.1

SP0070101 All Federal Aid Jobs

LAWS TO BE OBSERVED. (REV 3-31-09) (FA 6-17-09) (1-10) Change(s) to: 7-1.1.1.

SP0070111ES All American Recovery

and Reinvestment Act of 2009 Jobs

Removed from Workbook because no future ARRA lettings are anticipated.

PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (FA 4-14-05) (1-10) Changes to: 7-2.1.

SP0070201A Jobs with permits procured by DOT

Page 7: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..7 DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 7-16-09) (FA 7-30-09) (1-10) Changes to: 7-2.2

SP0070202 When DEP Generic

Permit is required

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-10) Insert Information Required. Changes to: 7-7.1, 7-13.2, 7-13.3.

SP0070701DC District Let Contracts less

than $250,000 and all Maintenance Contracts.

LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC – OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY. (REV 11-5-10) (FA 11-9-10) (7-11) Changes to 7-11.5.

SP0071105 Projects Involving CSX

Transportation.

UTILITY WORK. (REV 2-10-94) (1-10) Changes to: 7-11.6.3.

SP0071163A When there are no utility

work schedules

UTILITY SCHEDULES. (REV 8-27-01) (FA 4-14-05) (1-10) Changes to: 7-11.6.3.

SP0071163B When there are utility

work schedules

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 12-21-09) (FA 12-28-09) (7-10) Insert Information Required. Changes to: 7-16.

SP0071600 All Federal Aid Jobs

EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-10) Changes to: 7-26.

SP0072600 Non-Federal Aid Projects

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – PREFERENCE TO STATE RESIDENTS. (REV 6-15-10) (9-10) Changes to: 7-27.

SP0072700 Non-Federal Aid Projects

– Construction Projects Only

Page 8: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..8 LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – E-VERIFY. (REV 6-13-11) (FA 6-16-11) (8-11) Changes to 7-28.

SP0072800 All Jobs

New SP. These changes are the result of

Executive Order 11-116. Issued as Mandatory No.

1for the July 2011 WB.

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – SCRUTINIZED COMPANIES. (REV 6-17-11) (7-11) Changes to Section 7.

SP00729000 All Jobs

New SP. This change is a result of a newly created

Statute. Issued as Mandatory No. 2 for the

July 2011 WB.

PROSECUTION AND PROGRESS - SUBMISSION OF WORKING SCHEDULE. (REV 6-3-091-11-11) (FA 6-10-095-12-11) (1-102) Changes to: 8-3.2.

SP0080302A

Use only when CPM is authorized by District

Construction Engineer. Do not use with SP0080302DC

New SP. Merged in text from SP0080302 &

changed dates. To clarify the time frame for

submitting monthly updates and to add

language to encourage meeting with the

Contractor during review of the baseline schedule.

PROSECUTION AND PROGRESS. (REV 2-27-01) (1-10) Changes to: 8-3.2, 8-8, 8-9.1.

SP0080302DC

District Let Contracts (including Lump Sum) less than $250,000. Do

not use with SP0080302A

PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-15-10) (FA 2-17-10) (7-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.3.

SP0080303A When called for by the

District Construction Engineer.*

BEGINNING WORK. (REV 7-10-95) (1-10) Insert Information Required. Changes to: 8-3.3.

SP0080303B

When called for by the District Construction

Engineer. Use with the approval of the Chief

Engineer.

BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (1-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.3.

SP0080303C

When called for by the District Construction

Engineer. Use with the approval of the Chief

Engineer.

PROSECUTION OF WORK – PARTNERING. (REV 3-4-98) (FA 5-26-98) (1-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.6.

SP0080306 999-16*

Page 9: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..9 PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) *Contracts Office must be notified Changes to: 8-3.

SP0080307DRB 999-20 Items*

PROSECUTION OF WORK – REGIONAL DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) Changes to: 8-3.

SP0080307RDRB Jobs without 999-20

Items

PROSECUTION OF WORK – STATEWIDE DISPUTES REVIEW BOARD. (REV1-4-11) (FA 1-21-11) (7-11) Changes to: 8-3.

SP0080308SDRB 334, 337, 350, 570, 580 or

649 Items

PROSECUTION AND PROGRESS. (REV 8-1-00) (1-10) Changes to: 8-4.1, 8-7-3.1.

SP0080401LS Lump Sum Projects

LIMITATIONS OF OPERATIONS – FENCING. (REV 6-17-04) (FA 7-13-04) (1-10) Changes to: 8-4.8.

SP0080408 Jobs on Limited Access

Highways

CONTAMINATED MATERIAL – MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-11) Insert Information Required. *Insert Hazardous Waste Coordinator and contact number Changes to: 8-4.9.

SP0080409 Jobs with lighting*

COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (1-10) Insert Information Required. Changes to: 8-7.1.

SP0080701A Use when requested by

proper authority, (must be modified)

COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (1-10) Changes to: 8-7.1.

SP0080701AB

A+B Bidding. (Use with approval of the Chief

Engineerproper authority). Use with

SP0020501AB, SP0030100AB,

SP0030203AB and SP0081300AB

Page 10: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..10 COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (1-10) Insert Information Required. Changes to: 8-7.1.

SP0080701B

Only Use when called for requested by the District

Construction Engineer (must be modified).

COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (1-10) Changes to: 8-7.1.

SP0080701C

Use when requested by proper authoritythe

District Construction Engineer.

DAMAGE RECOVERY. (REV 2-4-04) (1-10) Insert Information Required. Changes to: 8.

SP0081300

Use when requested by proper authorityDistrict Construction Engineer. (Do not use with Lane

Rental)

PROSECUTION AND PROGRESS. (REV 7-28-97) (1-10) Changes to: 8-13.

SP0081300A

All Jobs with Alternative Bidding. Use with the approval of the Chief

Engineer.

8-13. Incentive – Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.

SP0081300AB

A+B Bidding. Use with the approval of the Chief

Engineer. Use with SP0020501AB, SP0030100AB,

SP0030203AB and SP0080701AB

8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert Information Required. Changes to: 8-13.

SP0081300ABB A+B Jobs with Bonus.

Use with the approval of the Chief Engineer.

8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.

SP0081300B Bonus (Date Specific).

Use with the approval of the Chief Engineer.

8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.

SP0081300BCD Bonus (Calendar Days).

Use with the approval of the Chief Engineer.

8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.

SP0081300ID

Incentive – Disincentive. Use with the approval of

the Chief Engineer. Do not use with

SP0081300MID

Page 11: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..11 8-13. Incentive – Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Changes to: 8-13.

SP0081300IDLR

Incentive-Disincentive for Lane Rental Days. Use

with the approval of the Chief Engineer. Do not

use with SP0081300LR or SP0081300LRDR

8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert Information Required. Changes to: 8-13.

SP0081300LQS Liquated Savings. Use

with the approval of the Chief Engineer.

8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) Insert Information Required. Changes to: 8-13.

SP0081300LR

Lane Rental. Use with the approval of the Chief

Engineer. Use with SP0020501LR,

SP0030100LR, and SP0081300LRDR

8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Changes to: 8-13.

SP0081300LRDR

Lane Rental. Use with the approval of the Chief

Engineer. Use with SP0020501LR,

SP0030100LR, and SP0081300LR

?

8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 4-12-06) (FA 4-25-06) (1-07) Insert Information Required. Changes to: 8-13.

SP0081300MB

Milestone Bonus. Use with the approval of the Chief Engineer. Do not

use with SP0081300B or SP0081300BCD

8-13. Incentive - Disincentive. (REV 2-9-06) (FA 4-25-06) (1-07) Insert Information Required. Changes to: 8-13.

SP0081300MID

Milestone Incentive-Disincentive. Use with

approval of the Chief Engineer. Do not use with

SP0081300ID

MEASUREMENT AND PAYMENT. (REV 9-9-105-2-11) (FA 9-27-105-12-11) (7-111-12) Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.

SP0090103LS Lump Sum Projects. Do

not use with SP0090103SLLS.

New SP. Merged in text from SP0091100LS & changed dates. To add language requiring the

Contractor to submit and obtain approval of a

schedule of values for LS projects within 21 days after contract award or

at the preconstruction meeting, whichever is

earlier.

Page 12: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..12

MEASUREMENT AND PAYMENT. (REV 11-18-105-2-116-22-11) (FA 1-21-116-10-116-26-11) (7-111-12) Changes to 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9, 9-11.

SP0090103SLLS

All Projects less than $2,000,000 and less than

2,000 tons of asphalt - Streamline Lump Sum.

Do not use with SP0090103LS.

New SP. Merged in text from SP0090501SLLS &

changed dates. To comply with the

Department’s Electronic Estimates Disbursement (EED) payment system.

Merged in text from SP0090501SLLS &

changed dates. To add language requiring the

Contractor to submit and obtain approval of a

Schedule of Values for SLLS Projects within 21

days after the contract award or at the preconstruction

conference, whichever is earlier.

MEASUREMENT AND PAYMENT. (REV 11-18-10) (FA 1-21-11) (7-11) Changes to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9.

SP0090103SLPQ

All Projects less than $2,000,000 and less than

2,000 tons of asphalt - Streamline Plan Quantity.

Do not use with SP0090501DC.

MEASUREMENT AND PAYMENT. (REV 10-29-08) (FA 1-16-09) (1-10) Changes to: 9-5.1, 9-5.4, 9-9.

SP0090501DC

District Let Contracts. Excluding Lump Sum

Projects. Do not use with SP0090103SLPQ.

PARTIAL PAYMENTS-WITHHOLDING PAYMENT. (REV 2-11-09) (FA 6-16-09) (1-10) Change(s) to: 9-5.3

SP0090503ES All American Recovery

and Reinvestment Act of 2009 Jobs

MEASUREMENT AND PAYMENT-ACCEPTANCE AND FINAL PAYMENT DOCUMENTS. (REV 11-18-10) (FA 1-21-11) (7-11) Change(s) to: 9-8.1

SP0090801ES

All American Recovery and Reinvestment Act of

2009 Jobs. Do not use with SP0090801ESSL.

MEASUREMENT AND PAYMENT - ACCEPTANCE AND FINAL PAYMENT DOCUMENTS. (REV 5-12-10) (FA 7-29-10) (1-11) Change(s) to: 9-8.1

SP0090801ESSL

All ARRA of 2009 Projects less than

$2,000,000 and less than 2,000 tons of asphalt -

Streamline. Do not use with SP0090801ES

Page 13: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..13

Mandatory No. 1 MAINTENANCE OF TRAFFIC. (REV 8-3-11) (FA 8-9-11) (1-12) Changes to 102-13.12.

SP1021312

Use on Work Mix types – Add Lanes and

Reconstruction, Add Lanes and Rehab

Pavement, Interchanges, and New Road

Construction102-89-17 Items.

New SP. Issued Mandatory No. 1 to

revise usage note, dates did not change. To

delete the additional payment for restoring

damaged crash cushions.

ENGINEER’S FIELD OFFICE. (REV 2-17-101-4-11) (FA 4-26-102-17-11) (1-111-12) Changes to: 109.

SP1090000 109-71 Items

New SP. Merged in text from SP1090000 &

changed dates. To make the Engineer’s Field

Office available sooner. REMOVAL OF EXISTING STRUCTURES – STRUCTURES TO BE REMOVED. (REV 9-10-07) (FA 2-15-08) (1-10) Insert Information Required. Changes to: 110-6.1.

SP1100601

Use when requested by proper authority (Must have signed agreement

with Local Agency)

REMOVAL OF EXISTING STRUCTURES. (REV 5-13-05) (FA 8-18-05) (1-10) Changes to: 110-6.6.

SP1100606 Use when areas of

Asbestos Abatement are identified in the Plans

MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (1-10) Changes to: 110-11.2, 110-12.7.

SP1101102 110-84

EXCAVATION – IDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-10) Changes to: 120-1.

SP1200100A Use when contaminated

areas are delineated in the plans

EXCAVATION AND EMBANKMENT – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 120-10.3.1

SP1201003SL

All Projects less than $2,000,000 and less than

2,000 tons of asphalt – Streamline.

EXCAVATION FOR STRUCTURES AND PIPE – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 125-9.3.1

SP1250903SL

All Projects less than $2,000,000 and less than

2,000 tons of asphalt – Streamline.

STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (1-10) Changes to: 160-3.

SP1600300 Only when called for

Spec is deleted as it is no longer used as per Pavement Design

Section.

Page 14: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..14 STABILIZING – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 160-4.2.4

SP1600402SL

All Projects less than $2,000,000 and less than

2,000 tons of asphalt – Streamline.

PREDESIGNED STABILIZED SUBGRADE. (REV 3-12-07) (FA 3-14-07) (1-10) Changes to: 161.

SP1610000

Non-Traffic and Shoulder-Only

Construction. Do Not Use on Widening Projects

ROCK BASE – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 200-7.2.2

SP2000702SL

All Projects less than $2,000,000 and less than

2,000 tons of asphalt – Streamline.

GRADED AGGREGATE BASE. (REV 8-8-07) (1-10) Changes to: 204.

SP2040000 Non-FA Jobs with

285 Items

MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-10) Insert Information Required. Changes to: 327-1, 327-6.

SP3270100

When the plans provide a location for stockpiling milled material. Insert

quantity to be retained. Use all, tons, square yards

MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (1-10) Changes to: 327-2.

SP3270200 Use when requested by

districts

PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11) Changes to: 346-9.2.

SP3460902SL

All Projects less than $2,000,000 and less than

2,000 tons of asphalt – Streamline.

INTEGRAL PILE JACKETS. (REV 6-20-08) (FA 6-26-08) (1-10) Changes to: 457.

SP4570000 457 Items

Mandatory No. 2 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 1-25-12) (2-12) Changes to 460-7.2, 460-8.8.

SP4600702 When weathering steel is

used

New SP. Issued as Mandatory No. 2. These

specification changes are part of the increased use

of weathering steel as outlined in Structures

Design Bulletin C12-02 and Roadway Design

Bulletin 12-04.

Page 15: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..15

Mandatory No. 1 CRASH CUSHIONS. (REV 8-4-11) (FA 8-9-11) (1-12) Changes to 544-4.

SP5440400

Use on Work Mix types – Add Lanes and

Reconstruction, Add Lanes and Rehab

Pavement, Interchanges, and New Road

Construction.544-75-1AA Items

New SP. Issued Mandatory No. 1 to

revise usage note, dates did not change. To

delete the additional payment for restoring

damaged crash cushions.

FENCING. (REV 1-6-98) (1-10) Changes to: 550-2, 550-3.5, 550-6.2.

SP5500200 Type A fencing on non-

NHS Projects only

SP removed from the Workbook as it is no

longer needed.

PAINTED PAVEMENT MARKINGS. (REV 1-22-10) (FA 1-25-10) (7-10) Change(s) to: 710-2, 710-4.3, 710-4.5

SP7100200 Maintenance Projects

Only

SP removed from Workbook because it will

be a Developmental specification.

Mandatory No. 2 COATING STRUCTURAL STEEL. (REV 1-25-12) (2-12) Changes to 560-1, 560-9.7.

SP5600100 When weathering steel is

used

New SP. Issued as Mandatory No. 2. These

specification changes are part of the increased use

of weathering steel as outlined in Structures

Design Bulletin C12-02 and Roadway Design

Bulletin 12-04. MOTORIST AID CALL BOX RELOCATION. (REV 8-24-10) (1-11) Changes to: 714.

SP7140000 714-1-500

TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (1-10) Changes to: 741.

SP7410000 741-70 Items

TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (1-10) Changes to: 743.

SP7430000 743-70 Items

TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV10-22-10) (FA11-22-10) (7-11) Changes to: 744.

SP7440000 744-70 Items

TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 6-22-10) (FA11-22-10) (7-11) Changes to: 745.

SP7450000 745-70 Items

Page 16: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..16 TRAFFIC MONITORING SITE CABINET. (REV 5-6-08) (FA 10-14-08) (1-10) Changes to: 746.

SP7460000 746-7A-BCD Items

TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (1-10) Changes to: 747.

SP7470000 747-70 Items

GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (1-10) Changes to: 748.

SP7480000 Jobs with Traffic Monitoring Sites

Mandatory No. 2 STRUCTURAL COATING MATERIALS. (REV 1-25-12) (2-12) Changes to 975-6.1.

SP9750601 When weathering steel is

used

New SP. Issued as Mandatory No. 2. These

specification changes are part of the increased use

of weathering steel as outlined in Structures

Design Bulletin C12-02 and Roadway Design

Bulletin 12-04. TRAFFIC MARKING MATERIALS. (REV 1-21-107-5-11) (FA 1-25-107-18-11) (7-101-12) Change(s) to: 971-4

SP9710400 Maintenance Projects

Only

SP removed from Workbook because it will

be a Developmental specification.

Page 17: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..17

DEVELOPMENTAL SPECIFICATIONS

SPY000008 When called for

Page 18: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..18

SUPPLEMENTAL SPECIFICATIONS

SS0000001 All Jobs Remarks

001 DEFINITIONS AND TERMS - DEFINITIONS. (REV 6-8-105-16-11) (FA 7-29-108-16-11) (1-111-12) Changes to: 1-3

SS0010300 All Jobs

New SS. Merged in text from SS0010300 & changed dates. To

include a definition for Special Events.

002 PREQUALIFICATION OF BIDDERS. (REV 12-28-105-24-11) (FA 1-4-116-7-11) (7-111-12) Changes to: 2-1, 2-2.1, 2-2.2.

SS0020100 All Jobs

New SS. Merged in text from SS0020201 & changed dates. To

modify the language to accommodate online

ordering and the download of electronic

files containing bidding documents for

advertised projects.

003 AWARD AND EXECUTION OF CONTRACT. (REV 8-10-093-9-11) (FA 8-13-095-12-11) (1-1012) Changes to: 3-5.4, 3-6, 3-7, 3-9.

SS0030600SS0030504 All Jobs

New SS. Merged in text from SS0030900; dates

are same as for SS0030504. To move the retained records

requirement from 5-13 to 3-9. Merged in text

from SS0030504 & changed dates. To

clarify the indemnity limits of the Surety. Text merged in text

from SS0030600 and used latest dates.

004 SCOPE OF THE WORK. (REV 7-19-108-2-11) (FA 9-20-108-16-11) (7-111-12) Changes to: 4-3.1, 4-3.9, 4-6.

SS0040301 All Jobs

New SS. Merged in text from SS0040309 & changed dates. To

clarify that the Department will pay for reasonable documented

engineering costs associated with Cost

Saving Initiative Proposals.

Page 19: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..19

005 CONTROL OF THE WORK (REV 6-16-103-9-116-10-11) (FA 7-29-105-12-116-26-11) (1-112) Changes to: 5-1.4.5.6, 5-1.4.8, 5-1.5.4, 5-12.2.2, 5-12.6.2, 5-13.

SS0050104 All Jobs

New SS. Merged in text from SS0050105 & changed dates. To

require any Specialty Engineers inspecting

the work affecting public safety to attend

the pre-erection meeting with the

Specialty Engineer and Engineer. Merged in

text from SS0051300 & changed dates. To move the retained

records requirement from 5-13 to 3-9.

006 CONTROL OF MATERIALS. (REV 6-23-10) (FA 7-29-10) (1-11) Changes to: 6-4, 6-5.3.

SS0060400 All Jobs

007 LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 11-24-106-28-11) (FA 1-21-117-18-11) (7-111-12) Changes to: 7-1.4, 7-2, 7-7.5, 7-11.4, 7-11.6.1, 7-24, 7-25.

SS0070104 All Jobs

New SS. Merged in text from SS0070104 & changed dates. To

clarify the use of the Department’s

Endangered Wildlife Guidelines when an

endangered species is encountered on the

project.

Page 20: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..20

008 PROSECUTION AND PROGRESS. (REV 7-22-103-9-115-23-115-9-11) (FA 9-20-105-12-117-21-118-16-11)(7-111-12) Changes to8-3.3, 8-4.9, 8-6.4, 8-7.3.2, 8-10.2.

SS0080303 All Jobs

New SS. Merged in text from SS0080303 & changed dates. To

include direction to the Contractor regarding

Special Events. Merged in text from SS0080102

& changed dates. To revise the liquidated

damages rates in accordance with

Section 337.18(2) F.S. Merged in text from

SS0080409 & changed dates. To state the

Department will indemnify the

contractor if unforeseen contamination is

discovered, provided the contractor

immediately stops work in these areas and

notifies the Department.

009 MEASUREMENT AND PAYMENT. (REV 11-18-103-9-11) (FA 1-21-115-12-11) (7-111-12) Changes to: 9-2, 9-5.2, 9-5.6, 9-8.1.

SS0090200 All Jobs

New SS. Merged in text from SS0090506 &

dates stayed the same. To require the

Contractor to indemnify the Department related to Contractor payment

and performance issues. Merged in text

from SS0090502 & changed dates. To

delete language relating to

disqualification of the surety for failure to

perform; this language will be added to all

Department bond forms.

Page 21: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..21

102 MAINTENANCE OF TRAFFIC. (REV 10-7-105-23-116-15-118-3-11) (FA 10-19-106-7-118-9-11) (7-111-12) Changes to: 102.

SS1020000 All Jobs

New SS. Text merged in from SS102131 &

kept the same dates. To restore the additional payment for damaged crash cushions. Text

merged in from SS1020504 & changed

dates. To clarify the use, method of

measurement, and basis of payment for

temporary signals, temporary detection

and traffic control officers. Additionally,

the term “arrow panel” has been changed to

“arrow board” for consistency with the

MUTCD and the additional payment for

restoring damaged crash cushions has been deleted. Text

merged in from SS1020302 & changed

dates. To emphasize compliance with the

Americans with Disabilities Act (ADA)

Standards for Transportation

Facilities. 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION. (REV 11-18-10) (FA 1-21-11) (7-11) Changes to: 104.

SS1040000 All Jobs

Page 22: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..22

105 CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS. (REV 9-17-103-28-115-18-11) (FA 1-4-115-12-118-4-11) (7-111-12) Changes to: 105-3, 105-5, 105-6, 105-8.

SS1050301 All Jobs

New SS Merged in text from SS1050806 & changed dates. To

allow non-CTQP qualified asphalt

technicians to measure the temperature of the hot mix asphalt in the haul trucks under the direction of a CTQP

Plant Level II technician. Merged in

text from SS1050808 & changed dates. To

clarify the responsibilities of the

Contractor’s supervisory personnel

for concrete post-tensioned segmental

box girder construction. Usage note: All Jobs.

107 LITTER REMOVAL AND MOWING (REV 12-17-09) (FA 1-27-10) (7-10) New Section 107.

SS1070000 All Jobs

110 CLEARING AND GRUBBING. (REV 5-29-09) (FA 7-15-09) (1-10) Changes to 110-6.2.1.

SS1100602 All Jobs

120 EXCAVATION AND EMBANKMENT. (REV 7-12-10) (FA 8-16-10) (1-11) Changes to: 120.

SS1200102 All Jobs

121 FLOWABLE FILL. (REV 3-12-10) (FA 5-24-10) (1-11) Changes to: 121

SS1210000 All Jobs

125 EXCAVATION FOR STRUCTURES AND PIPE – ACCEPTANCE PROGRAM. (REV 6-3-09) (FA 8-13-09) (1-10) Changes to: 125-9.1, 125-9.1.1.

SS1250901 All Jobs

Page 23: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..23

160 STABILIZING. (REV 5-20-105-24-11) (FA 7-12-106-7-11) (1-111-12) Change to 160-3.2, 160-4.3.2.

SS1600302 All Jobs

New SS. Merged in text from SS1600302 & changed dates. To

better address potential settlement issues when

these materials are used.

200 ROCK BASE. (REV 10-12-10) (FA 12-10-10) (7-11) Changes to 200-7.2.1.

SS2000702 All Jobs

234 SUPERPAVE ASPHALT BASE. (REV 6-11-105-19-11) (FA 8-16-108-4-11) (1-111-12) Changes to: 234-1, 234-4, 234-5, 234-8,.

SS2340100 All Jobs

New SS. Merged in text from SS2340400 & changed dates. To

update references to Section 320 due to a

rewrite of that section. 287 ASPHALT TREATED PERMEABLE BASE – CONTROL OF QUALITY. (REV 5-19-11) (FA 8-4-11) (1-12) Changes to 287-4.

SS2870400 All Jobs

New SS. To update references to Section

320 due to a rewrite of that section.

300 PRIME AND TACK COATS FOR BASE COURSES – RATE OF APPLICATION. (REV 6-10-10) (FA 8-16-10) (1-11) Changes to: 300-8.4.

SS3000804 All Jobs

320 HOT MIX ASHPALT – PLANT, METHODS, AND EQUIPMENT. (REV 1-8-107-19-11) (FA 2-2-108-4-11) (7-101-12) Changes to: 320-2.2, 320-5.

SS3200202SS3200000 All Jobs

New SS. Merged in text from SS3200000 &

changed dates. (Section 320 was

completely rewritten.) To provide an overall update of the Section. Section 320 will now

address plant requirements.

327 MILLING OF EXISTING ASPHALT PAVEMENT – CONSTRUCTION. (REV 1-26-106-7-11) (FA 2-2-108-4-11) (7-101-12) Changes to: 327-3.

SS3270300 All Jobs

New SS. Merged in text from SS3270302 & changed dates. To

correct references to Section 320 due to

revisions.

Page 24: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..24

330 HOT MIX ASPHALT – GENERAL CONSTRUCTION REQUIREMENTS. (REV 1-12-115-18-117-20-11) (FA 1-24-118-4-11) (7-111-12) Changes to: 330.

SS3300000 All Jobs

New SS. Merged in text from SS3300000 &

changed dates. (Section 330 was

completely rewritten.) To provide an overall update of the Section. Section 330 will now

address roadway requirements.

334 SUPERPAVE ASPHALT CONCRETE. (REV 1-10-115-19-118-9-11) (FA 1-27-118-4-118-16-11) (7-111-12) Changes to: 334-3.2.6, 334-5.1.2, 334-5.4.4..

SS3340000 All Jobs

New SS. Merged in text from SS3340104 &

changed dates. To add text that was

inadvertently omitted in the original submittal of SS3340104. Merged in

text from SS3340104 & changed dates. To

update the language for consistency with

industry practice and to correct references to

Section 320 due to revisions.

336 ASPHALT RUBBER BINDER. (REV 5-24-10) (FA 8-16-10) (1-11) Changes to: 336.

SS3360000 All Jobs

337 ASPHALT CONCRETE FRICTION COURSES. (REV 7-29-105-19-11) (FA 8-16-108-4-11) (1-111-12) Changes to: 337.

SS3370000 All Jobs

New SS. Merged in text from SS3370500 & changed dates. To

correct references to Sections 320 and 330

due to revisions.338 VALUE ADDED ASPHALT PAVEMENT. (REV 2-12-10) (2-17-10) (7-10) Changes to: 338-1, 338-5.

SS3380100 All Jobs

339 MISCELLANEOUS ASPHALT PAVEMENT – METHOD OF MEASUREMENT. (REV 5-19-11) (FA 8-4-11) (1-12) Changes to 339-7.

SS3390700 All Jobs

New SS. To correct references to Sections

320 and 330 due to revisions. Text merged in from SS3390700 &

used latest dates. 341 ASPHALT RUBBER MEMBRANE INTERLAYER. (REV 7-29-09) (FA 8-11-09) (1-10) Changes to: 341-4, 341-5.

SS3410400 All Jobs

Page 25: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..25

346 PORTLAND CEMENT CONCRETE. (REV 1-13-113-28-11) (FA 1-31-115-18-11) (7-111-12) Changes to: 346.

SS3460000 All Jobs

New SS. Merged in text from SS3460301 & changed dates. To

simplify the use of a higher class concrete

by including the details for doing so in the approved QC Plan

347 PORTLAND CEMENT CONCRETE – CLASS NS. (REV 11-10-10) (FA 11-22-10) (7-11) Changes to 347-2.1, 347-4.1.

SS3470201 All Jobs

350 CEMENT CONCRETE PAVEMENT. (REV 1-12-11) (FA 1-24-11) (7-11) Changes to: 350-1, 350-3.3, 350-5.4, 350-6, 350-7.2, 350-9.1, 350-12.4, 350-18.

SS3500100 All Jobs

352 GRINDING CONCRETE PAVEMENT. (REV 12-21-10) (FA 1-3-11) (7-11) Changes to 352.

SS3520000 All Jobs

353 CONCRETE PAVEMENT SLAB REPLACEMENT. (REV 12-17-10) (FA 1-3-11) (7-11) Changes to 353-2, 353-3.1.

SS3530200 All Jobs

355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT. (REV 2-12-10) (FA 2-17-10) (7-10) Changes to: 355-1, 355-4, 355-5.

SS3550100 All Jobs

370 BRIDGE APPROACH EXPANSION JOINTS. (REV 6-21-10) (FA 7-29-10) (1-11) Change(s) to: 370-2.

SS3700200 All Jobs

400 CONCRETE STRUCTURES. (REV 6-14-10) (FA 7-29-10) (1-11) Changes to: 400.

SS4000100 All Jobs

407 THREE-SIDED PRECAST CONCRETE CULVERT. (REV 6-8-105-4-11) (FA 7-29-105-18-11) (1-1112) Changes to: 407.

SS4070000 407-1 Items

New SS. Merged in text from SS4070300 & changed dates. To

change “Value Engineering Cost

Proposal (VECP)” to “Cost Savings Initiative

Proposal”.

Page 26: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..26 410 PRECAST CONCRETE BOX CULVERT. (REV 6-8-10) (FA 7-29-10) (1-11) Changes to:410-3.1, 410-6.1.

SS4100301 All Jobs

415 REINFORCING STEEL–BAR SUPPORTS. (REV 1-4-11) (FA 2-14-11) (7-11) Changes to 415-5.10, 415-5.13

SS4150510 All Jobs

416 INSTALLATION OF POST-INSTALLED ANCHOR SYSTEMS AND DOWELS FOR STRUCTURAL APPLICATIONS IN CONCRETE ELEMENTS. (REV 2-24-116-23-118-8-11) (FA 5-18-117-18-118-10-11) (1-12) Changes to 416-6.1.

SS4160601000 All Jobs

New SS. Merged in text from SS4160000 & changed dates. To

remove undercut anchor systems.

Undercut anchor systems will be addressed in a

developmental spec to be used on specific

projects. Merged in text from SS4160000 & changed dates. To

clarify the language and to add undercut

anchor systems. Text merged in from

SS4160601 & used latest dates. To require

at least one test per day.

443 FRENCH DRAINS. (REV 6-4-10) (FA 8-17-10) (1-11) Changes to: 443-2.3, 443-5, 443-6, 443-7.

SS4430203 All Jobs

446 EDGEDRAIN (DRAINCRETE) – CONTROL OF QUALITY. (REV 1-15-10) (FA 2-19-10) (7-10) Changes to 446-3.

SS4460300 All Jobs

Page 27: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..27

450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION. (REV 7-26-108-3-11) (FA 7-29-108-10-11) (1-111-12) Changes to: 450-9.2, 450-10.3.2.3, 450-12.4.

SS4500902SS4500000 All Jobs

New SS. Merged in text from SS4500000 & changed dates. To

include tolerances for Florida U-Beam

diaphragms and beam strand sheathing; change concrete

temperature requirements during

cold weather; include language relating to the disposition of products

with cosmetic and minor cracks; address

the storage of products at the plant during the curing period, and for

general formatting. Text merged in from

SS4500902.

452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 1-19-116-22-11) (FA 2-4-117-28-11) (7-111-12) Changes to: 452.

SS4520000 All Precast Segmental

Bridge Jobs

New SS. Merged in text from SS4520801 & changed dates. To

address issues relating to crane placement (both on and off the

bridge) and shop drawing submittals.

453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 11-18-10) (FA 11-24-10) (7-11) Changes to: 453.

SS4530000 All Precast Segmental

Bridge Jobs

455 STRUCTURES FOUNDATIONS. (REV 1-13-115-11-11) (FA 2-4-115-18-11) (7-111-12) Changes to: 455-4, 455-7.7, 455-11.2.2, 455-11.2.8, 455-11.8, 455-12.8.

SS4550510SS4550000 All Jobs

New SS. To rename fiberglass structurally reinforced composite

piles to the more general term polymeric

piles and move payment to Section 471. Text

merged in from SS4550510 & used

latest dates.

458 BRIDGE DECK JOINTS. (REV 6-17-11) (FA 6-21-11) (1-12) Changes to 458.

SS4580000 All Jobs

New SS. To update references to test methods for slip

resistance for sidewalk cover plates to reflect

current industry practice.

Page 28: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..28 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS (REV 5-18-10) (FA 6-1-10) (1-11) Changes to: 460-7.6

SS4600706 All Jobs

462 POST-TENSIONING. (REV 12-3-107-21-11) (FA 12-10-107-28-11) (7-111-12) Changes to:462.

SS4620000 462 Items

New SS. Merged in text from SS49620000 &

changes dates. To allow the use of new

materials and construction practices,

to clarify material requirements and for

general cleanup 470 TIMBER STRUCTURES. (REV 2-2-11) (FA 4-11-11) (1-12) Changes to 470-12.2.

SS4701202 All Jobs New SS. To include a

new timber preservative.

471 POLYMERIC FENDER SYSTEMS. (REV 5-10-11) (FA 5-19-11) (1-12) Changes to 471.

SS4710000 All Jobs New SS. To add

requirements for polymeric piles.

502 SHEAR CONNECTORS. (REV 2-22-10) (FA 4-15-10) (1-11) Changes to: 502-1

SS5020100 All Jobs

521 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 5-31-11) (FA 6-10-11) (1-12) Changes to 521-7.

SS5210700 All Jobs

New SS. To add the provision regarding

cracks in unreinforced plain concrete barrier

walls as detailed in Design Index 410.

522 CONCRETE SIDEWALK. (REV 7-29-10) (FA 9-20-10) (7-11) Changes to 522-7.2.

SS5220702 All Jobs

Page 29: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..29

523 PATTERNED/TEXTURED PAVEMENT. (REV 6-1-108-2-11) (FA 7-29-108-4-11) (1-111-12) Changes to: 523-2.

SS5230200SS5230000 All Jobs

New SS. Merged in text from SS5230000 & changed dates. To

clarify the applicability of products for use on asphalt and concrete

surfaces subject to vehicular and non-

vehicular traffic. The language also clarifies

manufacturer submittal and testing

requirements and documentation

necessary for evaluation for inclusion

on the Qualified Products List (QPL).

524 CONCRETE DITCH AND SLOPE PAVEMENT. (REV 8-13-09) (10-6-09) (7-10) Changes to: 524-2, 524-9, 524-10.

SS5240200 All Jobs

527 DETECTABLE WARNINGS ON WALKING SURFACES. (REV 1-12-11) (FA 1-21-11) (7-11) Changes to: 527.

SS5270000 All Jobs

534 CONCRETE SOUND BARRIERS. (REV12-22-10) (FA1-3-11) (7-11) Changes to: 534

SS5340000 All Jobs

536 GUARDRAIL. (REV 6-9-10) (FA 7-16-10) (1-11) Changes to 536-2.4.

SS5360204 All Jobs

538 RESETTING GUARDRAIL. (REV 3-1-11) (FA 5-10-11) (1-12) Changes to 538.

SS5380000 All Jobs New SS. To clarify the

reuse of materials.

Page 30: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..30

544 CRASH CUSHIONS. (REV 10-7-106-15-118-4-11) (FA 10-26-108-9-11) (7-111-12) Changes to: 544.

SS5440000 All Jobs

New SS. Text merged in from SS5440400 &

kept the same dates. To restore the additional payment for damaged

crash cushions. Merged in text from SS5440000

& changed dates. To delete the additional

payment for the restoration of damaged

crash cushions. 546 RUMBLE STRIPS. (REV 7-6-09) (FA 8-31-09) (1-10) Changes to: 546-2.

SS5460200 All Jobs

548 RETAINING WALL SYSTEMS. (REV 1-27-11) (FA 2-4-11) (7-11) Changes to: 548.

SS5480000 All Jobs

550 FENCING (REV 5-14-10) (FA 7-20-10) (1-11) Changes to: 550-3.1.

SS5500301 All Jobs

555 DIRECTIONAL BORE. (REV 1-10-114-5-11) (FA 1-24-115-31-11) (7-111-12) Changes to: 555-3.1.

SS5550000 555 Items

New SS. Merged in text from SS5550301 & changed dates. To

update the language to be consistent with

changes to Section 556.

556 JACK AND BORE. (REV 6-22-105-23-11) (FA 7-29-106-10-11) (1-111-12) Changes to: 556-2, 556-3.1, 556-8.

SS5560800SS5560200 556 Items

New SS. To update the language for

consistency with current industry

standards and to reference the Design

Standards for maintaining pedestrian traffic. Text merged in

from SS5560200 & used latest dates.

557 VIBRATORY PLOWING. (REV 6-22-10) (FA 7-29-10) (1-11) Changes to: 557-6

SS5570600 557 Items

560 COATING STRUCTURAL STEEL. (REV 10-4-10) (FA 11-9-10) (7-11) Changes to: 560.

SS5600000 All Jobs

Page 31: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..31 561 COATING EXISTING STRUCTURAL STEEL. (REV 1-27-10) (FA 2-10-10) (7-10) New Section 561

SS5610000 561 Items

562 REPAIR OF GALVANIZED SURFACES. (REV 3-2-11) (FA 5-10-11) (1-12) Changes to 562-2.

SS5620200 All Jobs

New SS. To clarify when QPL approved

galvanizing compounds are required.

563 ANTI-GRAFFITI COATING SYSTEM – DESCRIPTION. (REV 4-27-09) (FA 5-27-09) (1-10) Changes to: 563.

SS5630100 All Jobs

570 PERFORMANCE TURF. (REV 10-14-09) (FA 12-28-09) (7-10) Changes to: 570.

SS5700000 All Jobs

580 LANDSCAPE INSTALLATION – PLANT ESTABLISHMENT PERIOD AND CONTRACTOR’S WARRANTY. (REV 8-9-10) (FA 10-8-10) (7-11) Changes to 580-5.

SS5800500 All Jobs

603 GENERAL REQUIREMENTS FOR THE INSTALLATION AND EVALUATION OF TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 1-20-106-16-11) (FA 1-28-108-5-11) (7-101-12) Change(s) to: 603.

SS6030000 All Jobs

New SS. Merged in text from SS6030202 & changed dates. To

update the specification to processes, approval

references and definitions contained in the Traffic Engineering

Manual. 608 GUARANTIES FOR TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 1-20-10) (FA 1-28-10) (7-10) Changes to: 608.

SS6080000 All Jobs

611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 6-22-105-12-11) (FA 7-26-108-5-11) (1-111-12) Changes to: 611.

SS6110000 All Jobs

New SS. Merged in text from SS6110400 & changed dates. To

clarify requirements regarding acceptance

testing performed close to non-working days.

This change is related to changes in other Sections regarding

Special Events.

Page 32: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..32 630 CONDUIT – FIBER OPTIC CABLE LOCATE WIRE. (REV 11-22-10) (FA 1-6-11) (7-11) Changes to 630-3.1.2

SS6300301 All Jobs

634 SPAN WIRE ASSEMBLY. (REV 11-4-10) (FA 1-3-11) (7-11) Changes to 634-2.3, 634-3.3.

SS6340203 All Jobs

635 PULL AND JUNCTION BOXES. (REV 7-28-10) (FA 8-3-10) (1-11) Changes to: 635-3.

SS6350300 All Jobs

649 GALVANIZED STEEL STRAIN POLES, MAST ARMS AND MONOTUBE ASSEMBLIES – MATERIALS. (REV 11-15-106-8-11) (FA 1-6-116-16-11) (7-111-12) Changes to 649-2, 649-4.3.

SS6490200 All Jobs

New SS. Merged in text from SS6490403 & changed dates. To

correct a cross reference to another

Article.

650 VEHICULAR SIGNAL ASSEMBLIES – INSTALLATION. (REV2-2-11) (FA2-7-11) (7-11) Changes to: 650-2, 650-3.7 thru 3.11, 650-4.2, 650-5.

SS6500200 All Jobs

690 REMOVAL OF EXISTING TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 6-16-10) (FA 7-26-10) (1-11) Changes to: 690

SS6900000 All Jobs

699 INTERNALLY ILLUMINATED SIGNS. (REV 11-15-10) (FA 1-4-11) (7-11) Changes to: 699-3.

SS6990300 All Jobs

700 HIGHWAY SIGNING. (REV 11-15-10) (FA 1-4-11) (7-11) Changes to: 700.

SS7000000 All Jobs

701 AUDIBLE AND VIBRATORY PAVEMENT MARKINGS. (REV 11-4-10) (FA 1-4-11) (7-11) Changes to: 701.

SS7010000 All Jobs

702 WET WEATHER PAVEMENT MARKINGS (REV 11-4-10) (FA1-4-11) (7-11) Changes to: 702.

SS7020000 702 Items

Page 33: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..33 705 OBJECT MARKERS AND DELINEATORS. (REV 5-17-10) (FA 7-16-10) (1-11) Changes to: 705-2.1

SS7050201 All Jobs

709 TRAFFIC STRIPES AND MARKINGS – TWO REACTIVE COMPONENTS. (REV11-4-10) (FA1-4-11) (7-11) Changes to: 709.

SS7090000 All Jobs

710 PAINTED PAVEMENT MARKINGS. (REV 7-9-09) (FA 7-20-09) (1-10) Changes to: 710-2, 710-4.1, 710-4.1.1, 710-4.3.

SS7100200 All Jobs

711 THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS. (REV 11-4-10) (FA 1-6-11) (7-11) Changes to: 711.

SS7110000 All Jobs

713 PERMANENT TAPE STRIPES AND MARKINGS. (REV12-22-10) (FA1-4-11) (7-11) Changes to: 713.

SS7130000 All Jobs

715 HIGHWAY LIGHTING SYSTEM. (REV12-2-10) (FA 1-4-11) (7-11) Changes to: 715-1, 715-6.4, 715-16.

SS7150100 All Jobs

780 INTELLIGENT TRANSPORTATION SYSTEMS - GENERAL REQUIREMENTS. (REV 8-7-06) (FA 8-15-06) (1-10) Changes to: 780.

SS7800000 All ITS Jobs

781 INTELLIGENT TRANSPORTATION SYSTEMS - MOTORIST INFORMATION SYSTEMS. (REV 12-7-10) (FA 1-24-11) (7-11) Changes to: 781.

SS7810000 781 Items

Page 34: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..34

782 INTELLIGENT TRANSPORTATION SYSTEMS - VIDEO EQUIPMENT. (REV 11-10-105-31-11) (FA 1-24-117-28-11)(7-111-12) Changes to: 782.

SS7820000 782 Items

New SS. Merged in text from SS7820202 & changed dates. To

update the specification to current approval and

interoperability requirements for

equipment and remove references to obsolete

CRT technology.

783 INTELLIGENT TRANSPORTATION SYSTEMS - FIBER OPTIC CABLE AND INTERCONNECT. (REV 1-27-115-31-11) (FA 2-4-117-28-11) (7-111-12) Changes to: 783.

SS7830000 783 Items

New SS Merged in text from SS7830302 & changed dates. To

update the specification to updated Design

Standard Index number and remove the

requirement for hex bolts.

784 INTELLIGENT TRANSPORTATION SYSTEMS - NETWORK DEVICES. (REV 11-10-105-31-11) (FA 1-24-117-28-11) (7-111-12) Changes to: 784.

SS7840000 784 Items

New SS. Merged in text from SS7840302 & changed dates. To update functional

requirements for the data rates and

programmable bit rates for encoders/decoders

based on device evaluations at the

Traffic Engineering Research Laboratory.

785 INTELLIGENT TRANSPORTATION SYSTEMS - INFRASTRUCTURE. (REV 1-31-117-29-118-5-11) (FA 2-24-118-9-11) (7-111-12) Changes to: 785.

SS7850000 785 Items

New SS. Merged in text from SS7850200 & changed dates. To

clarify and update the requirements and

expectations for ground system testing and

certifications, removing unnecessary cross

references and clarifying the

requirements for main ground bar

attachments.

Page 35: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..35 786 INTELLIGENT TRANSPORTATION SYSTEMS – VEHICLE DETECTION AND DATA COLLECTION. (REV 4-26-104-5-11) (FA 6-22-104-6-11) (1-111-12) Changes to: 786-13.

SS7860000 786 Items

New SS. Merged in text from SS7861300 &

changed dates. To align the pay items listed in

the spec with the BOE.

901 COARSE AGGREGATE. (REV 12-15-095-31-11) (FA 12-21-096-7-11) (7-101-12) Changes to: 901-1.4.

SS9010104SS9010000 All Jobs

New SS. To expand the use of reclaimed Portland cement

concrete as outlined in DCE Memo 16-10 and Materials Bulletin 06-

10.Text merged in from SS9010104 & used

latest dates

914 STABILIZATION MATERIALS. (REV 5-17-11) (FA 6-7-11) (1-12) Changes to 914.

SS9140000 All Jobs

New SS. To move and modify language

regarding RAP and RAP blended material

from Section 160 to avoid potential

settlement issues by determining the actual asphalt content in the final mixed subgrade.

916 BITUMINOUS MATERIALS. (REV 1-13-115-19-11) (FA 1-27-118-4-11) (7-111-12) Changes to: 916-1, 916.3.2, 916-4.

SS9160000 All Jobs

New SS. Merged in text from SS9160100 & changed dates. To

change “mass loss” to “mass change” to be

consistent with AASHTO T 240.

919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER. (REV 6-22-09) (FA 6-25-09) (1-10) Changes to: 919-3.

SS9190300 All Jobs

921 PORTLAND CEMENT AND BLENDED CEMENT. (REV 10-21-10) (FA 1-4-11) (7-11) Changes to 921-1.

SS9210100 All Jobs

923 WATER FOR CONCRETE. (REV 5-20-10) (FA 6-9-10) (1-11) Changes to: 923

SS9230000 All Jobs

926 EPOXY COMPOUNDS. (REV 1-4-10) (FA 1-14-10) (7-10) Changes to: 926-1, 926-2.2.

SS9260100 All Jobs

Page 36: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..36 929 POZZOLANS AND SLAG. (REV 12-17-10) (FA 1-3-11) (7-11) Changes to 929-2, 929-3.2, 929-4.2, 929-6.3.

SS9290200 All Jobs

931 METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 3-26-103-23-117-11-11) (FA 5-26-105-12-118-10-11) (1-111-12) Changes to: 931-1.1, 931-3.6.

SS9310101SS9310000 All Jobs

New SS. Merged in text from SS9310000 & changed dates. To

update the language to current usage. The term “steel wire fabric” has been changed to “wire

reinforcement”. Merged in text from

SS9310306 & changed dates. To specify one

coat of primer instead of a rust preventative compound for metal

dowel bar assemblies used in concrete pavement joints.

932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 8-2-106-15-11) (FA 8-12-106-21-11) (1-111-12) Changes to: 932-1.

SS9320102SS9320100 All Jobs

New SS. Merged in text from SS9320100 & changed dates. To replace a MIL Specification with current ASTM Specifications and delete a field test for low modulus silicone sealants. Text merged in from SS9320102 and changed dates.

936 WIRE ROPE FOR FENDER PILE CLUSTER. (REV 8-9-11) (1-12)

SS9360000 All Jobs

Spec is deleted as it is no longer needed as per

the Structures Design Office.

Page 37: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..37

937 POST-INSTALLED ANCHOR SYSTEMS FOR STRUCTURAL APPLICATIONS IN CONCRETE ELEMENTS. (REV 6-23-118-5-11) (FA 7-18-118-10-11) (1-12) Changes to 937.

SS9370000 All Jobs

New SS. Merged in text from SS9370000 & changed dates. To

clarify the language and to remove undercut

anchor systems. Undercut anchor

systems will be addressed in a

developmental spec to be used on specific

projects. SS9370000 - To clarify the language

and to add undercut anchor systems.

938 POST-TENSIONING GROUT. (REV 5-1-094-28-11) (FA 5-19-096-30-11) (1-1012) Changes to: 938.

SS9380000 462 Items

New SS. Merged in text from SS9380402 & changed dates. To

modify the limit and test method for chloride.

948 MISCELLANEOUS TYPES OF PIPE. (REV 5-19-10) (FA 6-9-10) (1-11) Changes to: 948-1.7, 948-2.3, 948-4.

SS9480203 All Jobs

955 TIMBER TREATMENT (INCLUDING TREATING MATERIALS). (REV 2-2-11) (FA 4-11-11) (1-12) Changes to 955-2.2, 955-4, 955-5.

SS9550202 All Jobs New SS. To include a

new timber preservative.

962 STRUCTURAL STEEL AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM). (REV 2-23-10) (FA 5-4-10) (1-11) Changes to: 962-1.2, 962-8.2, 962-8.4.2.

SS9620102 All Jobs

971 TRAFFIC MARKING MATERIALS. (REV 2-15-115-26-117-21-11) (FA 2-22-117-20-117-22-11) (7-111-12) Changes to:971.

SS9710000 All Jobs

New SS. Merged in text from SS9710303 & changed dates. To

include text inadvertently deleted in

original FA submittal. Merged in text from

SS9710303 & changed dates. To correct the

value for the minimum of fineness of grind, dry

opacity and remove maximum value for

fineness of grind.

Page 38: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..38 972 RECYCLED PLASTIC PRODUCTS. (REV 7-8-10) (FA 7-20-10) (1-11) Changes to: 972-1, 972-3, 972-4, 972-5, 972-6.

SS9720100 All Jobs

973 STRUCTURAL PLASTICS. (REV 5-11-095-10-116-24-118-1-11) (FA 6-10-095-19-117-6-118-4-11) (1-101-12) Changes to: 973.

SS9730000 All Jobs

New SS. Merged in text from SS9730000 & changed dates. To

remove the requirement for abrasion testing. Merged in text from

SS9730300 & changed dates. To correct a

typo. Merged in text from SS9730000 & changed dates. To move the material

requirements for polymeric piles to

Section 471 and revise some of the testing

requirements for wales and dimensional

lumber.975 STRUCTURAL COATING SYSTEMSMATERIALS. (REV 7-20-10) (FA 11-9-10) (7-11) Changes to: 975.

SS9750000 All Jobs

981 TURF MATERIALS. (REV 7-1-10) (FA 8-16-10) (1-11) Changes to 981-1, 981-4, 981-5.

SS9810100 All Jobs

987 PREPARED SOIL LAYER MATERIALS (REV 1-15-10) (FA 2-17-10) (7-10) Changes to 987-1.

SS9870100 All Jobs

990 TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS. (REV 11-22-106-15-11) (FA 12-10-108-9-11) (7-111-12) Changes to: 990.

SS9900000 All Jobs

New SS. Merged in text from SS9900301 & changed dates. To

modify the language for consistency with the

MUTCD and to clarify when to use Type B and

Type C arrow boards. 993 OBJECT MARKERS AND DELINEATORS. (REV 7-8-10) (7-16-10) (1-11) Changes to: 993-1.4, 993-2.3.1.

SS9930104 All Jobs

Page 39: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..39 994 RETROREFLECTIVE AND NONREFLECTIVE SHEETING FOR TRAFFIC CONTROL DEVICES. (REV 2-8-10) (FA 2-10-10) (7-10) Changes to: 994.

SS9940000 All Jobs

Page 40: FINAL Workbook 1-12 REDLINE Man02 - fdot.gov€¦ · Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING Revised 56789-2-19273920389308201791258910121516172256281-1112 Proposed

Draft January 2012 Workbook…..40

APPENDICES

APENDIC Header

TECHNICAL SPECIAL PROVISIONS. The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package. Insert # ________

TSPs Jobs with TSPs


Recommended