+ All Categories
Home > Documents > Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates,...

Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates,...

Date post: 26-Mar-2015
Category:
Upload: isaiah-roach
View: 215 times
Download: 1 times
Share this document with a friend
Popular Tags:
38
Financial Services June, 2010 Page 1 Lean
Transcript
Page 1: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Financial Services

June, 2010

Page 1

Lean

Page 2: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 2

Chris Vogel

- founder Compass Affiliates,

providing management consulting

for Lean leadership and design.

Former Senior Vice President of Wells Fargo, Chris conducts Lean readiness assessments & action planning, provides Lean implementation consulting, works with leaders to develop Lean cultural systems, standardized Gemba walks, and leader development planning.

Page 3: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 3

Discussion Overview

• Lean

• Lean Leadership

• Policy Deployment Planning

• Wells Fargo Case Study

• Motivations and opportunities for change

• Changing the Document Management culture

• Where Wells started

• An example of the first major transformation

• What was learned and what was done next

• Results

• Myths, Achievements and Challenges

• Where to start

• Questions

Page 4: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Lean• What is it not?

– It is not tools, projects, cost cutting or people reductions

– It is not a way to make people work harder– It is not a passive activity practiced by one group and

not another– It is not a transition to the next “method”

• What is it?– It is a total company system connecting Purpose,

People, Process and all departments to increase Customer value, profitability and growth

Page 4

Page 5: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 5

Wells Fargo Case StudyWho is Document Management?

Document Management is an operations team providing paper imaging, electronic document routing, data lifting and document storage services to the Home and Consumer Finance division of Wells Fargo. Services provided were integrated with back-end and front-end transactional processing. The Home and Consumer Finance division included the following groups; Home Mortgage, Financial, Insurance, Home Equity Lending, Credit Cards, Student Loans, Trust Services.

To serve our internal Business Partners we had operations in NC, MN and Iowa. We had 1,200 team members providing services over two shifts, six days a week.

Processes were continuously improved in partnership with business partners to provide the most quality centric, secure and cost effective value, meeting the needs of Customers.

Page 6: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 6

Conditions Motivating Change

• Organic growth of imaging and data lifting across unconnected groups

• Technical infrastructure was becoming highly variable in design increasing cost

• Operations disciplines were defined by each separate process and department

• Volume nearly tripled to a record high following the Federal Reserve’s response to the 911 attacks

Page 7: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 7

Opportunities for Lean

• Departments were merged into a single division allowing a

central vision to develop

• The value of work effort was not clearly identifiable

• Many, many handoffs

• Processes were designed around batching work

• Work inventory was stored in rooms out of the way and out of

site until it was processed

• Defect rates and service performance were hard to measure

• Without adequate processes, management was required to

respond to the “loudest” priority

Page 8: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 8

Where Did We Start?

• Began value stream mapping our process

• Made our processes obvious; and started changing them

• Built our Operational Excellence (Lean) Model

Page 9: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 9

Began Value Stream Mapping Our Process

• We engaged external vsm expertise to help us get started and to teach us the discipline

• Began conducting Kaizen events, created change proposals began 30-60 day implementations (short cycles of improvement)

• Started to create flow and began shrinking batch sizes

• Began physically connecting processes and making operations visible

• Began to exchange post process auditing for a balance of in-process quality

• Began to explore work standardization through 5S

• Created initial baseline reporting for similar functions

Made Our Processes Obvious

Page 10: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 10

Built Our Operational Excellence (Lean) Model• Created our Operational Excellence (Lean) visual model for

reference, training, and communication

• We started experimenting with different training exercises to discourage batching and show the benefits of standardization

• We began creating production teams and breaking down the independent contributor system

Page 11: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 11

Continuous Improvement Process

Identified Goals

Mapped Current State

Identified Waste

Mapped Future State

Implemented

We followed the typical high-level Continuous Improvement Process

Page 12: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 12

Funding Systems

LIS LPS

2250 2250 2250 4500

CT CT 48 CT 55 CT 55

C/O 0 C/O 0 C/O 0 C/O 0

UT 100 UT 95 UT 95 UT 90

FPY high FPY high FPY high FPY ?

Lead Time 1.5 hr 1.5 hr. 1.5 hr. 4 hr

Process Time sec 48 sec 55 sec 55 sec

Mail In Label Creation ReceivingOpen Mail, Notes and

Checks

I I I I I

VALUE STREAM MAPPING TOOLCurrent State Map 6/30/03

450 9000 3000 100

CT 28 CT 20 CT 277 CT 55 CT 45

C/O 0 C/O 0 C/O 0 C/O 0 C/O 0

UT 95 UT 99 UT 100 UT 65 UT 90

FPY ? FPY ? FPY ? FPY ? FPY ?

.35 hr 12 hr. 8 hr. 0 hr

28 sec 20 sec 277 sec 55 sec 45 sec

Inventory Control

Arrow

Image Capture

Kofax

Scan Pack Creation Prepping Scanning Validation

SMS

Trident Headers

I I I I Total Inventory WIP

900 4500 3000 200 200 3000

CT 65 CT 42 CT 5 CT 5 CT 5

C/O 0 C/O 0 C/O 0 C/O 0 C/O 0

UT 99 UT 90 UT 90 UT 90 UT 90

FPY ? FPY ? FPY high FPY low FPY High

Throughput Time =

12 hr 24 hr. 2 hr. .25 hrs. 2 hrs 69.1 hrs or 4.31 days

Value Added Time =

65 sec 42 sec 5 sec 5 sec 5 sec 705 sec

Ship Off-SiteReconstruction Fileroom match

35600

FileNet

Move to Cart-CF Check for Requests

I I I I I I

LegendCT = Cycle TimeC0 = change over timeUT = uptimeFPY = first pass yield

Present State Value Stream Map

Page 13: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 13

VALUE STREAM MAPPING TOOL

Funding Systems

LIS LPS

1000 2 2 2 2 2

CT CT 48 CT 55 CT 55 CT 28 CT 20

C/O 0 C/O 0 C/O 0 C/O 0 C/O 0 C/O 0

UT 100 UT 95 UT 95 UT 90 UT 95 UT 99

FPY high FPY high FPY high FPY ? FPY ? FPY ?

Lead Time 3 hrs 40 sec 40 sec 40 sec 40 sec 40 sec

Process Time sec 10 sec 10 sec 10 sec 10 sec 10 sec

Mail In Notes and Checks 10 Key Receiving

SMS

WF Inventory Control

Arrow

Labels and HeadersOpen Mail Pss Pull - Checks

Inventory Control

ICS

I I I I I I I

VALUE STREAM MAPPING TOOLFuture State Map

120 65 14 10

CT 55 CT 45 CT 65 CT 42

C/O 0 C/O 0 C/O 0 C/O 0

UT 65 UT 90 UT 99 UT 90

FPY ? FPY ? FPY ? FPY ?

20 min 4.33 hours 14 min 10 min

10 sec 275 sec 55 sec 55 sec

Milk Run Prepping Prep QC Scan

Image Capture

Kofax

FileNet

I I I I Total Inventory WIP

10 10 200 3000

CT 5 CT 5 CT 5

C/O 0 C/O 0 C/O 0

UT 90 UT 90 UT 90

FPY high FPY low FPY High

Throughput Time =

10 min 10 min 2 hrs 11.1 hrs or 4.31 days .69 days

Value Added Time =

55 sec 55 sec 5 sec 570 sec

4449

Validate Reconstruct Ship Off-Site

I I I I

Future State Value Stream Map

LegendCT = Cycle TimeC0 = change over timeUT = uptimeFPY = first pass yield

Page 14: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 14

1200 ft. File Travel8 Back Flows9 Intersections

1

2 34

5 5 5

555

34

67

88

88

9 9

9 910

11

12

13

PSS

Validation

Operational Flow – Before

Page 15: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 15

Door

Door

Rece

iving

PS

S

Rece

iving

Rece

iving

Rece

iving

Milk Runs

Con

v I ma

gin

g M

odu

le

Govt Im

ag

ing

Mo

dule

Govt Im

ag

ing

Mo

dule

Govt Im

ag

ing

Mo

dule

Con

v I ma

gin

g M

odu

le

Con

v I ma

gin

g M

odu

le

Con

v I ma

gin

g M

odu

le

Con

v I ma

gin

g M

odu

le

Con

v I ma

gin

g M

odu

le

Govt Match

Loan Packages Out

Fre i gh t

Elev ato r

Qualit y

As s ur anc e

Door

Fi le R

oom

Fut ure F

inal D

ocs Buil dout

Design Objectives: 1. Critical path is consolidated into

main production space.2. Elimination of backflows and

intersections.3. Circular flow from monument

(freight elevator).4. 75% reduction in travel.

Operational Flow – After

Page 16: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 16

Add Capacity

Transformational Timeline

Timing:

Key Themes: • Physical Layout• Cost Projections• Current flow

analysis

8 week 6 weeks 8 weeks 4 weeks 12 weeks

• Purchase equipment

• Setup physical Space

• Recruit team• Train operators

Transition and Stabilize Environment

Full Volume PrototypeLayoutAnalysis & Design

• Build out space on lines to handle the co-location volume and timeline.

• Test receiving and imaging line

• Document results• Go/NoGo

Decision

• Convert all MPLS volume to new flow design

Page 17: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

17

Initial State

Page 18: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 18

Lean Imaging Flow (Scanning, QC and Reconstruct)

Packages In Preppers 13 loans/hour, aggregate cycle time = 55 seconds Scanning 55 seconds

Validation55 seconds

Load to cart foroff-site

Reconstruction55 seconds

Cycle time = 55 secondsThroughput Time = 14.8 minutesDirect Labor = 7.4 minutesModule Capacity = 9750 loans / monthOne Shift Capacity = 126,750 loans / month

First Generation Flow

Page 19: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

19

Year 1 – First Imaging Line

Page 20: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

20

Imaging Lines – Year 2 Better

Page 21: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 21

Review120 sec

Scanner

Scan120 sec

Prep / Disposition120 sec

Work Queue Imaged Files

Imaging Flow (Scanning, QC and Reconstruct)

Second Generation Flow

Page 22: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

22

Imaging Cells – Year 4

Page 23: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

23

Andon shows normal vs. abnormal for administrative work

Page 24: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 24

What Did We Learn?• People need to envision their efforts fitting into an overall vision or

Lean operational model

• Staff have kaizen knowledge and are very willing to contribute

• In order to be successful, all team members must contribute as a learning organization therefore a learning strategy was required

• Batching work is a natural tendency for people and requires a conscious choice to overcome

• Leadership at all levels needed to spend dedicated time on the floor to understand and respond to the needs of the system

• If you cannot differentiate abnormal from normal operating conditions, you don’t have standardized work and cannot kaizen

• Check / Adjust is just as important as Plan / Do

Page 25: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 25

How Did We Adjust?• We developed a training strategy for all team member levels, clearly

showing expected skills and development timelines

• We did training at all levels showing the pitfalls of batching and benefits of flow

• We required managers to spend dedicated time on the production floor every day and IT support in operations

• We realized our weakness in standardized work, trained leadership to recognize, trained staff on the value and took it to the next level

• We clarified the relationship of team members and their accountabilities concerning Kaizen, variation, overburden, change approval, etc…

• We evolved the Operational Excellence (Lean) model and stated the cultural norms

Page 26: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 26

Doc Mgmt Lean System

Page 27: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 27

Philosophical Underpinnings

• Focus on business partner / customer value

• People are the most critical element

• A commitment to continuous improvement

Page 28: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 28

Managerial Culture

• Generosity of spirit and sustained sense of trust

• Accountability at all levels of the organization to improve their work

• Fact based decision making

• Commitment to creation of sustained learning

• Problems are considered good things because they help direct us to our improvement opportunities

• All support functions, technology development and projects focus on direct operational value stream improvement

Page 29: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 29

Tools

Standard Operational & Lean – A3 Format– Value Stream Mapping– Small lot processing– Just in time– Quality in process (jidoka)– 5S– Production Boards– Andons– Standardized Work Charts

Product Development Tools– Agile Processes– Burn Down Charts– Agile activity tracking

software

Tools– Flow– Pull – Gemba walks– Action Boards– Kanban– Pareto Charts– Mistake Proof (poka yoke)– PDCA discipline– Many others…..

Page 30: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 30

ResultsYear 1 Year 2 Year 3 Year 4

Year 5

Year 6

Overall Improvement

Operations Cost per Image (decrease)

13% 24% 25% 25% 34% 28% 76%

Images per FTE (increase)

(21%) 27% 30% 40% 21% 17% 168%

Image Availability Lead time (decrease)

45% 17% 20% 25% 28% 31% 92%

Space Consumption(decrease)

33% 26% 0% 0% 0% 0% 50%

First Pass Yield 64.0% 78% 99.5% 99.8% 99.9% 99.9% 35.9 pct pts

Business Partner Service Level Compliance

50% 75% 99% 99% 99.5% 99.7% 49.7 pct pts

Transactional Volume

12% (10%) 0% 100% 111% 50% 371%

Page 31: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 31

What happened after that?

• Creating Level Pull

• Improving the connection between leadership objectives and production staff (A3 and Catch ball)

• Improving synergies between operations and project management / software development initiatives

• Further ingrain the cultural norm that leaders are teachers and give everyone the skills to grow knowledge

• Infect others

Page 32: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 32

What we might have changed?

• Spend more time communicating the cultural vision and the mechanisms of our Lean model

• Lead with the A3 Hoshin Kanri process

• Involve staff earlier in the process (training, work flow design, production boards)

• Train, educate, and emphasize standardized work

What Strategies Worked Well?• Start with focus on value definition

• Begin value stream mapping

• Focus on making work visible and connected

• Continue to favor action over analysis

Page 33: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Hoshin Kanri – True North

Page 33

Performance, gaps, and targets         This year's action plan                                

      SLA CPL CPI CPK   Goals     Activities     J F M A M J J A S O N D

Last Year Targets: DM 98% na $ 0.121 ?   A. Strengthen strategic planning 1. Teach Management Hoshin Kanri                        

  WFHM 98% $ 22.69 $ 0.082 ?   and policy deployment process 2. Require mgmt to build Mother A3s and                  

  WFF 98% ? $ 0.076 ?     baby A3s within departments              

  CCG ? ? ? na     3. Communicate goal / strategies to staff                  

  CS na na na na     through catch ball                

                       

Last Year Actual: DM 99.70% ? $ 0.121 ?   B. Deliver cost reduction 25% 1. Standardize work at all sites                        

  WFHM 99.64% $19.03 $ 0.085 ?   greater than budget 2. Kaizen not Kaikaku                        

  WFF 99.8% ? $ 0.063 ?     3. Empower staff to manage muda                    

  CCG ? ? ? na                      

    CS na na na na   C. Institutionalize OE culture 1. Execute training program focus on                  

at all levels OE & Muda for staff, A3 & Stan Wk for mgr              

Reflection on last year's activities           2. All non-staff spends 2 days in cell                    

Activity     Rating Key Results / Issues                        

Meet Financial Obj G Goals met                      

      D. Institutionalize effective BCP 1. Operationalize new Des Moines site                  

Stabilize ops & tech Y Cannot easily move work between sites and rate rally redundancies 2. Common capture platform all sites                    

                               

Support CORE G Dates made, resource split effective                    

                         

Engage staff in process Y Idea boards put in place, don’t own muda E. Institutionalize effective 1. Mature Lean/Agile project practices                        

      project execution 2. Align team with function (create zones)                

Pass Audit G Flying colors     3. Measure and forecast velocity                    

        4. Create effective tracking & comm                    

Advance Ops Excellence Y Training prgm stalled, mgrs cant do work                    

F. Instantiate financial allocations 1. Deliver high level KPIs                      

Analysis / Justification to this year's activities       and metrics 2. Roll out allocation method for all BPs                

                      3. Standard reporting formats / goals                        

Cost burden to business partners limits process improvement opportunities.

    Follow-up / Unresolved issues                                

Operations are unstable and improvements are not sustainable.  

1. Catch ball may not be well understood by staff by end of 2007                                    

       

We are unable to forecast project execution and deliver expected results on schedule. 2. Training program will not be well integrated with Corporate L&D team  

       

Inconsistent communication of financial allocations, metrics, and SLAs confuse business 3. Long term second site will still need to be identified  

partners and erode confidence in the corporate business model.      

    4. High level KPIs and operational reporting may not be synchronous  

       

                5. Intense focus on our operational needs is often an obstacle for BPs.  

                                     

Signatures:             Author: Chris Vogel

Version and date: V2 4/2/2007

Page 34: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Hoshin On Production Floor

Page 34

Page 35: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

35

Production support responds real-time to andons for administrative work

Page 36: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Employee Engagement

Page 36

Page 37: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Common Myths• Operation discipline doesn’t allow for good customer

service

• Standardized work is an insult to personal creativity

• Lean tools are designed to get rid of people

• Leaders can deploy the OE system from their office

Challenges

• Underestimating the criticality of standardized work

• Overcoming staff perception of Lean being a people cutting method

• Creating discipline for management time spent on the floor

Page 38: Financial Services June, 2010 Page 1 Lean. Page 2 Chris Vogel - founder Compass Affiliates, providing management consulting for Lean leadership and design.

Page 38

Questions


Recommended