Finding the payoff in reducing risks
Northwest Hydropower AssociationFebruary 2013
Bill Christman, PEEngineering Services managerChelan County PUDWenatchee, WA
Earthquake
Cyprus Street Viaduct – Loma Prieta earthquake
Lack of anti-burst wrapping
Lack of connection between upper and lower vertical elements
Hurricane
Flooding in New York from Hurricane Sandy
Buildings in known flood zone – mapped before the storm
Dam failure
Sayano-Shushenskaya Hydro-electric Dam, Russia - 2009
Missing head cover bolts(known)
41 of 49 bolts recovered had fatigue cracks
10 years of increasingmachine vibration
Stadium collapse
University of Washington - 1987
Sequencing oversight in demolition – “tiny” wires removed too soon
Bridge collapse
Tacoma Narrows Bridge - 1940
Budget problems
Known weaknesses
Bridge collapse
I-35W Bridge in Minneapolis, Minn. - 2007
Shop drawing gusset plate omission
New load w/o verifyingdemand/capacity ratio
Bridge collapse
Lacey V. Murrow Floating Bridgeacross Lake Washington – 1960, above, and today, right.
Manhole coversleft open
Big storm causes internal flooding
Sound practice
Rocky Reach Dam, Columbia River, WA
Post-Folsom spill gate risk reduction:
Monitoring and good response to spill gate bearing wear
Sound practice
Rock Island Dam, Columbia River, WA
Monitoring and response to increased uplift
(Decrease in foundation drainage)
Space NeedleSeattle, Wash.
1961 – designed & built to withstand:• 200 mph winds• Magnitude 9.1 earthquake
Center of gravity is 5 feet above ground level
Sound practice
The higher the risk, the higher the cost
No ownershipin the results
No link to culture and institutional knowledge