#1 Tell us your requirements and choose a Call Off mechanism Set out the key requirements and aspects of your project, such as type of work, a brief specification, timescales and budgets. We will explain the two call off routes available to you under the framework; direct selection or mini-competition. Typically it takes two weeks to appoint a contractor via direct selection, and six weeks for a mini competition (depending on requirements and approval process). #2 #3 #4 Kick Start Meeting To ensure projects run smoothly we will facilitate a kick start meeting between you and the chosen contractor to finalise your requirement prior to starting on site. On Site Phase Use our tailored and efficient framework systems to complete valuations, and to manage progress and handovers. We will provide any support you need and use the appropriate framework mechanism as leverage to address any issues raised. Closeout We will undertake a scheme review to develop action plans for ourselves and our contractors. This will inform continuous improvement of future procurements and contractor selections. A specialist fire framework providing a compliant, cost-effective and flexible procurement solution for social housing landlords throughout the UK. Fire Risk & Mitigation Framework At Re:allies we provide you with a clear and simple way to quickly access experts through our frameworks at anytime during your project. The earlier we become involved in the planning of a project, the more value we can provide. Contact us: [email protected] For more information call 0121 515 3831 or email [email protected] Passion for Procurement Partnership
Transcript
Page 1: Fire Risk & Mitigation Framework - CHIC · Hall Fire Protection Ltd √ Hall & Kay Fire Engineering Ltd √ Horbury Group √ Hughes Brothers Building and Joinery Limited √ Huyton

v

#1Tell us your requirements and choose a Call Off mechanismSet out the key requirements and aspects of your project, such as type of work, a brief specification, timescales and budgets. We will explain the two call off routes available to you under the framework; direct selection or mini-competition.

Typically it takes two weeks to appoint a contractor via direct selection, and six weeks for a mini competition (depending on requirements and approval process).

#2

#3

#4

Kick Start Meeting To ensure projects run smoothly we will facilitate a kick start meeting between you and the chosen contractor to finalise your requirement prior to starting on site.

On Site Phase Use our tailored and efficient framework systems to complete valuations, and to manage progress and handovers. We will provide any support you need and use the appropriate framework mechanism as leverage to address any issues raised.

Closeout We will undertake a scheme review to develop action plans for ourselves and our contractors. This will inform continuous improvement of future procurements and contractor selections.

A specialist fire framework providing a compliant, cost-effective and flexible procurement solution for social housing landlords throughout the UK.

Fire Risk & Mitigation Framework

At Re:allies we provide you with a clear and simple way to quickly access experts through our frameworks at anytime during your project. The earlier we become involved in the planning of a project, the more value we can provide.

Contact us: [email protected]

For more information call 0121 515 3831or email [email protected]

Passion for Procurement Partnership

Page 2: Fire Risk & Mitigation Framework - CHIC · Hall Fire Protection Ltd √ Hall & Kay Fire Engineering Ltd √ Horbury Group √ Hughes Brothers Building and Joinery Limited √ Huyton

Benefits for social housing landlordsThe Re:allies Fire Risk & Mitigation Framework has been developed to ensure the properties our members manage are safe and compliant, providing a one stop procurement framework that guarantees substantial cost savings by using collaborative purchasing strategies.

Landlords also benefit from benchmarking across a range of suppliers and contractors to ensure true best value is preserved. Added social value measures are also embedded to maximise the framework’s positive impact in local communities.

Employment and trainingFramework contractors are required to offer a minimum of two full-time training opportunities per £1million project value spent through the framework, supporting local people to start their career. Re:allies targeted support ensures training opportunities connect with the local community.

User friendly processThe Framework is backed by an extensive database of capability and price information to assist contractor selection, mini competition process and the efficient award of contracts. All our frameworks use our advanced online Schemes Plus procurement system.

Accredited contractorsContractors on Lots 1, 3 and 4 are required to hold independently verified accreditations such as BAFE SP2015, Loss Prevention Certification Board LPS 1014 and 1048, FIRAS, International Fire Consultants Certification, National Inspection Council for Electrical Installation Contracting (NICEIC), Approved Contractor Electrical Contractors’ Association (ECA), or equivalents. There are no mandatory accreditations for Lot 2 but landlords have the ability to use capability to select.

Speed, certainty and savingsThe framework is compliant with UK and EU procurement legislation, saving up to 77 days on the procurement process. Our frameworks provide excellent efficiency in terms of procurement time scales and added value.

FlexibilityThe varying forms of the JCT, or any standards for maintenance or construction contracts, are available under the framework offer as tailored solutions to meet any project requirements.

Community investment fundingSurplus generated through the framework is gifted to Re:allies’ charitable organisations Re:vision and EN:Able Communities. Both are registered with the Charities Commission and distribute the funds to local employment and community groups located within member landlord communities to support social and economic regeneration.

Lot StructureLot 1: Fire Risk Assessments. Lot 2: Fire Precaution Works. Lot 3: Sprinkler Systems - design, supply, installation, ongoing maintenance and servicing. Lot 4: Detection and Alarm Systems - design, supply, installation, ongoing maintenance and servicing.

TechnicalSpecification developed in association with Greater Manchester Fire Safety Technical Group, a sub group to the Greater Manchester High Rise Taskforce.

Lot 1A Lot 1B Lot 1C Lot 1D Lot 2A Lot 2B Lot 2C Lot 2D Lot 3A Lot 3B Lot 3C Lot 3D Lot 4A Lot 4B Lot 4C Lot 4D

North Midlands South Wales North Midlands South Wales North Midlands South Wales North Midlands South Wales

A Connolly Ltd √ √ √

AB Building & Electrical √

Allied Protection Ltd √ √ √ √ √

Anglian Building Products √ √ √

Argus Fire Protection Company Ltd √ √ √ √

B4Box √

Campbell & Kennedy √ √ √ √

CLC Contractors Limited √ √ √

Close Circuit Security Services Ltd √

Compco Fire Systems √ √ √ √

Domestic Sprinklers Ltd √ √ √ √

EFT Systems Ltd √ √ √

Emtec Fire Systems √ √

Emanuel Whittaker Ltd √

ENGIE Regeneration Ltd √ √ √ √

FCS-live Ltd √ √ √ √

Fieldway Supplies Ltd √

Fire Rite UK √ √ √ √ √

Fire Safety First √ √ √ √

GTM Fire Protection Ltd √ √ √ √

Hall Fire Protection Ltd √ √ √ √

Hall & Kay Fire Engineering Ltd √ √ √ √

Horbury Group √ √ √

Hughes Brothers Building and Joinery Limited √

Huyton Plumbing and Heating Ltd √

Jackson, Jackson & Sons Ltd √

JM Passive Fire Protection Ltd √ √ √

Keystone Fire Safety Ltd √ √

Kier Services Ltd √ √ √ √

Mears Ltd √ √ √

Neo Property Solutions Ltd √ √ √ √

Novus Property Solutions Ltd √ √ √ √

Pennington Choices Ltd √ √ √ √

Seddon Construction √ √

Springhead Sprinklers Ltd √ √ √ √

TCL Group √

Thermotech Fire Protection Ltd √ √ √ √

Total Fire Services Ltd √

Truline Construction & Interior Services Ltd √

UK Sprinklers Ltd √ √ √ √

Ventro Ltd √ √

Warden Construction Limited √

Wates Living Space √ √ √

Wright Build Ltd √

WRPS Ltd √

Zeras Industries √ √ √

Fire Risk Assessments Fire Precaution Works Sprinkler Systems Detection and Alarm SystemsFramework Contractors, Lots & Regions


Recommended