Fire Tools and Fire Tools and Industrial Fire Industrial Fire

Precaution LevelsPrecaution Levels

ObjectivesObjectives• Define the following legal terms: Define the following legal terms:

Closed season Closed season Fire tool boxFire tool boxFire watchFire watchPump truck or pump trailer Pump truck or pump trailer

• Understand spark emitting equipment Understand spark emitting equipment requirementsrequirements

• Understand industrial fire precaution Understand industrial fire precaution levels and corresponding prohibitions.levels and corresponding prohibitions.

• Understand substitutions, reductions, and Understand substitutions, reductions, and increases of requirements.increases of requirements.

Closed SeasonClosed Season

RCW 76.04.005RCW 76.04.005 (Definitions) (Definitions)

““Closed Season” means the period between Closed Season” means the period between April 15 and October 15, unless the April 15 and October 15, unless the department designates different dates department designates different dates because of prevailing fire weather conditions.because of prevailing fire weather conditions.

Fire Tool BoxFire Tool Box

WAC 332.24.005WAC 332.24.005 (Definitions) (Definitions)

““Fire tool box” means a compartment of sound Fire tool box” means a compartment of sound construction with a waterproof lid, provided with construction with a waterproof lid, provided with hinges and hasps and so arranged that the box can hinges and hasps and so arranged that the box can be properly sealed and the contents kept dry. The be properly sealed and the contents kept dry. The box shall be red in color and marked "fire tools" in box shall be red in color and marked "fire tools" in white or black letters at least three inches high. white or black letters at least three inches high. The fire tool box shall contain a minimum of:The fire tool box shall contain a minimum of:

     (a) Two axes or pulaskis;     (a) Two axes or pulaskis;

     (b) Three adze eye hoes;     (b) Three adze eye hoes;

     (c) Three shovels.     (c) Three shovels.

Fire WatchFire Watch

WAC 332.24.005WAC 332.24.005 (Definitions) (Definitions)

““Firewatch” means at least one competent person Firewatch” means at least one competent person to be at the site(s) for to be at the site(s) for one hourone hour following the following the operation of spark-emitting equipment on class operation of spark-emitting equipment on class 3L days or above, or as determined by the 3L days or above, or as determined by the department based on the national fire danger department based on the national fire danger rating system and other fire danger conditions. rating system and other fire danger conditions. The firewatch shall be vigilant and so located or The firewatch shall be vigilant and so located or positioned to be able to detect within positioned to be able to detect within five minutesfive minutes fires which may originate at the site(s) of the fires which may originate at the site(s) of the equipment operation…equipment operation…

Pump Truck or Pump Pump Truck or Pump TrailerTrailer

WAC 332.24.005WAC 332.24.005 (Definitions) (Definitions)

(a) serviceable truck or trailer...with a water (a) serviceable truck or trailer...with a water tank of not less than a tank of not less than a three hundredthree hundred gallon gallon capacity, filled with water… capacity, filled with water…

        

Pump Truck or Pump Pump Truck or Pump TrailerTrailer

WAC 332.24.005WAC 332.24.005 (Definitions) (Definitions)

(b) The pump may be a portable pump or suitable power take-(b) The pump may be a portable pump or suitable power take-off pump. It shall be plumbed with a bypass or pressure relief off pump. It shall be plumbed with a bypass or pressure relief valve. The pump shall develop, at pump level, pressure valve. The pump shall develop, at pump level, pressure sufficient to discharge a minimum of twenty gallons per sufficient to discharge a minimum of twenty gallons per minute, using a one-quarter inch nozzle tip through a fifty minute, using a one-quarter inch nozzle tip through a fifty foot length of one inch or one and one-half inch rubber-lined foot length of one inch or one and one-half inch rubber-lined hose.hose.

(c) The pump truck or pump trailer (c) The pump truck or pump trailer shall be equipped with the following:shall be equipped with the following:

(i) A minimum of (i) A minimum of five hundred feetfive hundred feetof one or one and one-half inch of one or one and one-half inch cotton or synthetic jacket hose;cotton or synthetic jacket hose;

(ii) A fully stocked fire tool box.(ii) A fully stocked fire tool box.

..

        

Pump Truck or Pump Pump Truck or Pump TrailerTrailer

WAC 332.24.005WAC 332.24.005 (Definitions) (Definitions)

(d) The tank shall be plumbed so that water may be (d) The tank shall be plumbed so that water may be withdrawn by one person by gravity feed. This withdrawn by one person by gravity feed. This outlet shall be adapted to accept the hose used outlet shall be adapted to accept the hose used with the pump truck or pump trailer. The outlet with the pump truck or pump trailer. The outlet shall be located for easy filling of pump cans.shall be located for easy filling of pump cans.

(e) The pump truck or pump trailer must be (e) The pump truck or pump trailer must be equipped with fuel, appropriate tools, accessories equipped with fuel, appropriate tools, accessories and fittings to perform its functions for a and fittings to perform its functions for a continuous period of continuous period of four hours. four hours. A recommended list of A recommended list of tools, fittings and accessories may tools, fittings and accessories may be obtained from the department.be obtained from the department.

        

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

““It shall be unlawful for anyone to operate, during It shall be unlawful for anyone to operate, during the closed season as defined in RCW the closed season as defined in RCW 76.04.005, any , any steam, internal combustion, electric engines or any steam, internal combustion, electric engines or any other devices which emit sparks on any forest land other devices which emit sparks on any forest land or any other place where, in the opinion of the or any other place where, in the opinion of the department, fire could be communicated to forest department, fire could be communicated to forest land land without first complying with the following without first complying with the following requirements for equipment or operations:”requirements for equipment or operations:”

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(1) Fixed-position machine:(1) Fixed-position machine:

(a) Two fire extinguishers, each(a) Two fire extinguishers, eachof at least a 5 B C rating.of at least a 5 B C rating.

(b) An approved exhaust (b) An approved exhaust system.system.

(c) An appropriately (c) An appropriately mounted shovel.mounted shovel.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(2) Logging railroad locomotive or common carrier locomotive:(2) Logging railroad locomotive or common carrier locomotive:

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(3) Passenger vehicle used for industrial or (3) Passenger vehicle used for industrial or commercial operations:commercial operations:

(a) A fire extinguisher of at least a 5 B C (a) A fire extinguisher of at least a 5 B C rating.rating.          (b) An approved exhaust system.(b) An approved exhaust system.

WAC 332.24.405WAC 332.24.405

(4) Portable power saw:(4) Portable power saw:

(a) A chemical fire extinguisher of at least (a) A chemical fire extinguisher of at least eight ounce capacity, fully charged and in good eight ounce capacity, fully charged and in good working order. The working order. The fire extinguisher shall fire extinguisher shall be kept in the immediate be kept in the immediate possession of possession of the operator.the operator.

(b) An approved exhaust system.(b) An approved exhaust system.

(c) A shovel, which shall be kept (c) A shovel, which shall be kept within within two minute two minute round-trip round-trip of the operator.of the operator.

(d) A fire watch.(d) A fire watch.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirements

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(5) Spark-emitting engines used for purposes not (5) Spark-emitting engines used for purposes not specifically mentioned herein, which, in the specifically mentioned herein, which, in the opinion of the department, may cause a forest opinion of the department, may cause a forest fire to start, unless equipped with:fire to start, unless equipped with:

(a) An approved exhaust system.(a) An approved exhaust system.

         (b) One fire extinguisher(b) One fire extinguisher of at leastof at least a 5 B C rating; however two-wheeled, a 5 B C rating; however two-wheeled,

three-wheeled, and four-wheeled three-wheeled, and four-wheeled motorcycles shall only be required to motorcycles shall only be required to have an approved exhaust system.*have an approved exhaust system.*

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(6) Tractor or mobile machine:(6) Tractor or mobile machine:

(a) One fire extinguisher of at least a 5 B C (a) One fire extinguisher of at least a 5 B C rating.rating.

(b) An approved (b) An approved exhaust system.exhaust system.          (c) An appropriately (c) An appropriately mounted shovel.mounted shovel.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(7) Truck or vehicle used for hauling:(7) Truck or vehicle used for hauling:

(a) One fire extinguisher of at least a 5 B C (a) One fire extinguisher of at least a 5 B C rating.rating.

(b) An approved (b) An approved exhaust system.exhaust system.

(c) An appropriately (c) An appropriately mounted shovel.mounted shovel.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(8) During yarding, loading, milling, land clearing and right (8) During yarding, loading, milling, land clearing and right of way clearing…two serviceable five gallon backpack of way clearing…two serviceable five gallon backpack pump cans filled with water; however such operations in pump cans filled with water; however such operations in other areas of the state as other areas of the state as maymay be designated by the be designated by the department, in writing, must comply with the following department, in writing, must comply with the following additional requirements:additional requirements:

(a) A pump truck or pump trailer to be kept on the landing (a) A pump truck or pump trailer to be kept on the landing or within five minutes round-trip of the operation.or within five minutes round-trip of the operation.

(b) A fire watch.(b) A fire watch.

(c) Adequate facilities to report a fire within (c) Adequate facilities to report a fire within 15 minutes 15 minutes of of detection.detection.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(9) Balloon or other similar long-line or aerial logging (9) Balloon or other similar long-line or aerial logging systems:systems:

(a) Two serviceable five gallon backpack pump cans…(a) Two serviceable five gallon backpack pump cans…

(b) Portable (300 gallon) water supply available and fire (b) Portable (300 gallon) water supply available and fire tool tool kit shall contain(ing):kit shall contain(ing):

          (i) Three axes or pulaskis;(i) Three axes or pulaskis;

     (ii) Six shovels;     (ii) Six shovels;

     (iii) Six adze eye hoes.     (iii) Six adze eye hoes.

        

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(10) Each helicopter used for yarding, loading and (10) Each helicopter used for yarding, loading and land clearing or slash burning:land clearing or slash burning:

(a) A VHF radio, maintained in operational use, at (a) A VHF radio, maintained in operational use, at frequency 122.9 MHz.frequency 122.9 MHz.

(b) A portable water bucket (bucket capacity (b) A portable water bucket (bucket capacity depends on helicopter maximum payload).depends on helicopter maximum payload).

(c) A water source located within (c) A water source located within five minutes five minutes round-trip flying time round-trip flying time of every part of the operation.of every part of the operation.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(10) Each helicopter used for yarding, loading and land (10) Each helicopter used for yarding, loading and land clearing or slash burning:clearing or slash burning:

(d) The following sized fire tool kit packaged for ready (d) The following sized fire tool kit packaged for ready attachment to the cargo hook and located at the heliport attachment to the cargo hook and located at the heliport serving the operation:serving the operation:

     (i) Two axes or pulaskis;     (i) Two axes or pulaskis;

     (ii) Three shovels;     (ii) Three shovels;

     (iii) Three adze eye hoes.     (iii) Three adze eye hoes.

(e) Two fire extinguishers of at least 20 (e) Two fire extinguishers of at least 20 B C rating shall be kept with refueling equipment..B C rating shall be kept with refueling equipment..

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

(11) Railroad track installation and maintenance:(11) Railroad track installation and maintenance:

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

      

(12) Prior to beginning operations, all snags, stubs and dead trees over fifteen feet in height shall be cut within fifty feet of each fixed-position machine which will operate for two consecutive days or more in one position.

 The ground shall be initially cleared of all flammable debris under four inches in diameter beneath and within ten feet of each fixed-position machine which will operate for two consecutive days or more in one position.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

      

(13) The area around the tail, corner and haul back blocks must be kept clean of all flammable debris under four inches in diameter for a distance of six feet in all directions. Suitable flame-resistant blanket devices may be substituted for the clearing requirement when the six foot diameter area is covered. Each block must be equipped with (within 100 ft):

(a) one five gallon backpack pump can; (b) one shovel:

(c) one Pulaski.

Spark Emitting Spark Emitting Equipment Equipment

RequirementsRequirementsWAC 332.24.405WAC 332.24.405

      

(14) It shall be the operator's responsibility to identify points of line rub on cable logging operations during the closed season. If line rub occurs, the operator shall do what is necessary to stop, alleviate or control the line rub in order to prevent fires at these points. Satisfactory means include, but are not limited to:

     (a) Removal of the object which the line is rubbing on;

     (b) Changing the logging system;

     (c) Moving the cable location.

IFPL website: IFPL website: http://fortress.wa.gov/dnr/ifpl/IFPL.aspx

IFPL hotline:IFPL hotline:1-800-323-BURN1-800-323-BURN

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 1:Level 1:(Closed Season)(Closed Season)

Fire precaution requirements are in effect. Fire precaution requirements are in effect. Fire tools and a fire watch is required at Fire tools and a fire watch is required at this and all higher levels this and all higher levels unless otherwise unless otherwise waived.waived.

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 2:Level 2:(Partial Hootowl)(Partial Hootowl)

Limits the following activities between the Limits the following activities between the hours of 8 pm and 1 pm:hours of 8 pm and 1 pm:

• Power saws in the woods (landings saws Power saws in the woods (landings saws okay)okay)

• Cable yardingCable yarding• BlastingBlasting• Welding or cutting of metalWelding or cutting of metal

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 3:Level 3:(Partial Shutdown)(Partial Shutdown)

Prohibits some activities altogether and limits Prohibits some activities altogether and limits other activities between the hours of 8 pm other activities between the hours of 8 pm and 1 pm. and 1 pm.

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 3:Level 3:(Partial Shutdown)(Partial Shutdown)

Prohibited all together:Prohibited all together:• Cable yarding (except gravity systems Cable yarding (except gravity systems

and systems with approved motorized and systems with approved motorized carriages*)carriages*)

• Power saws in the woodsPower saws in the woods• All operations between 1 pm and 8 pmAll operations between 1 pm and 8 pm

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 3:Level 3:(Partial Shutdown)(Partial Shutdown)

Permitted from 8pm until 1 pm:Permitted from 8pm until 1 pm:• Cable yarding (gravity systems and Cable yarding (gravity systems and

systems with approved motorized systems with approved motorized carriages* only)carriages* only)

• Landing SawsLanding Saws• Tractor/skidder operationsTractor/skidder operations• Loading and haulingLoading and hauling• BlastingBlasting• Welding or cutting of metalWelding or cutting of metal

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Level 4:Level 4:(General Shutdown)(General Shutdown)

All operations prohibited. All operations prohibited.

Industrial Fire Industrial Fire Precaution LevelsPrecaution Levels

Substitution, Substitution, Reduction, or Increase Reduction, or Increase

of Requirementsof RequirementsWAC 332.24.411WAC 332.24.411

      

(1) The department may accept serviceable equivalents to any of the requirements in WAC 332-24-405. Such substitutions must be made in writing by the department.

(2) The department may, by written permission, reduce the requirements set forth in WAC 332-24-405 whenever, in the opinion of the department, the operation is of such type or location and/or weather is such that all the requirements are not needed for the protection of life and property.

(3) The department may, in writing, require additional equipment, above the requirements of WAC 332-24-405..

Substitution, Substitution, Reduction, or Increase Reduction, or Increase

of Requirementsof RequirementsWAC 332.24.411WAC 332.24.411

Operators wishing to continue an activity that is prohibited under an Operators wishing to continue an activity that is prohibited under an industrial fire precaution level must obtain a written waiver from DNR. The industrial fire precaution level must obtain a written waiver from DNR. The operator must also obtain the landowner's permission to seek a waiver. operator must also obtain the landowner's permission to seek a waiver. The DNR will not issue a waiver against the wishes of the landowner. The DNR will not issue a waiver against the wishes of the landowner. The The DNR may require mitigating measures as part of the waiver.DNR may require mitigating measures as part of the waiver.

      

Substitution, Substitution, Reduction, or Increase Reduction, or Increase

of Requirementsof RequirementsWAC 332.24.411WAC 332.24.411

Examples of mitigating measures: Examples of mitigating measures:

• Wetting down or removal of slash fuel in the immediate operating area.Wetting down or removal of slash fuel in the immediate operating area.• Ceasing activities when the relative humidity is less than 35 percent or during Ceasing activities when the relative humidity is less than 35 percent or during

windy conditions. windy conditions. • Roving patrol during the waiver period as well as after working hours. Roving patrol during the waiver period as well as after working hours. • Providing an additional water supply or fire fighting tools. Providing an additional water supply or fire fighting tools.

      

ObjectivesObjectives• Define the following legal terms: Define the following legal terms:

Closed season Closed season Fire tool boxFire tool boxFire watchFire watchPump truck or pump trailer Pump truck or pump trailer

• Understand spark emitting equipment Understand spark emitting equipment requirementsrequirements

• Understand industrial fire precaution Understand industrial fire precaution levels and corresponding prohibitions.levels and corresponding prohibitions.

• Understand substitutions, reductions, and Understand substitutions, reductions, and increases of requirements.increases of requirements.


Recommended