1 of 35 First Quarter Report March 31, 2007
Transcript
Page 1: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

1 of 35

First Quarter ReportMarch 31, 2007

Page 2: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0
Page 3: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0
Page 4: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0
Page 5: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0
Page 6: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0
Page 7: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

1 of 46

05142007 Final

Table of Contents

Executive Summary...........................................................................................2

Program Overview........................................................................................5 Table 2-Toll Bridge Seismic Retrofit Program—Cost Summary.................6 Table 3-Toll Bridge Seismic Retrofit Program—Schedule Summary .........7

Program Costs....................................................................................................8 Baseline and Projected Budget .....................................................................8

Program Schedule..............................................................................................9 Baseline and Projected Schedule ..................................................................9

Program Funding and Financing .....................................................................10 Funding Status ............................................................................................11 Program Financing......................................................................................12

Project Status ...................................................................................................13 Ongoing Construction Projects ...................................................................13

SFOBB West Approach ..................................................................13 Milestones Achieved ...............................................................13 Project Funding........................................................................13 Major Risk Issues ....................................................................14

SFOBB East Span Seismic Replacement........................................16 Milestones Achieved – East Span Contracts ...........................19 Project Funding........................................................................22 Major Risk Issues ....................................................................24 Quarterly Environmental Compliance Highlights ...................24

Completed Projects .....................................................................................25 Risk Management Program .............................................................................27 Other Toll Bridges ...........................................................................................29

Dumbarton and Antioch Bridges ................................................................29 Summary of TBPOC Expenses .......................................................................30 Appendices ......................................................................................................31

Appendix A-1..............................................................................................32 Appendix A-2..............................................................................................33 Appendix B. ................................................................................................34 Appendix C. ................................................................................................36 Appendix D.................................................................................................37

Page 8: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

2 of 46

SFOBB Skyway – West End

Executive Summary The Toll Bridge Program Oversight Committee (TBPOC) submits the 2007 First Quarter Report ending March 31, 2007, for the Toll Bridge Seismic Retrofit Program (TBSRP) in accordance with Assembly Bill (AB) 144 and Senate Bill (SB) 66. This report provides the following:

1. Information on the progress of each project in the program.

2. Baseline budget for Capital Outlay (CO) and Capital Outlay Support (COS).

3. Current projected costs for CO and COS. 4. Expenditures to date. 5. Comparison of the baseline schedule to the

March 2007 projected schedule. 6. Summary of the milestones achieved during the

quarter. 7. Major risk assessment for the remaining

projects. 8. Summary of expenses incurred by the TBPOC

in performing its duties. Major Milestones During the First Quarter 2007

Significant progress on the completion of the seismic retrofit projects continued during this past quarter. Only one of the seven toll bridges in the TBSRP remains to be retrofitted. Appendix D includes a gallery of photos of construction activities on the bridge projects. The major milestones achieved during the quarter include:

• The San Francisco-Oakland Bay Bridge (SFOBB) West Approach Project is 77 percent complete as of March 20, 2007 and is on schedule to finish in August 2009. Frame 8U achieved a significant milestone by having both the north and south sections of the frame transversely stressed together into one complete structural unit. Major ongoing work during the quarter includes the continuation of work on the 5th Street and Harrison Street ramps. On March 27, 2007, eastbound Interstate 80 (I-80) traffic was detoured onto an interim eastbound alignment (ST6D). The detour realigned

eastbound traffic below the new westbound lanes of the approach to allow for the demolition of the final 3000-foot section of the old I-80 freeway structure from 2nd Street (near the Historic Clocktower) to 4th Street. Demolition began soon after the traffic was detoured and is being performed under a compressed schedule from the as-planned 110 days down to 17 days. The demolition work will be completed in mid-April. The compressed schedule has been implemented to minimize impacts and inconvenience to the local residents and businesses. An extensive public outreach began well in advance of this work and includes all of the upcoming impacts from future activities.

• The SFOBB East Span Seismic Replacement Project Skyway contract is expected to be completed in December 2007. The final segment closure pour was completed in February 2007. Remaining work includes fabrication and installation of the remaining hinge pipe beams, post-tensioning of the bridge segments and spans, installation of bicycle/pedestrian pathway, erection of the electrical service platforms, and other finish and punch list work.

Page 9: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

3 of 46

• The SFOBB East Span Seismic Replacement Project Self-Anchored Suspension (SAS) Marine Foundation East Pier and Tower Pier (E2/T1) contract is on schedule to be completed by March 2008. At the East Pier (E2), foundation pile driving has been completed. E2 footing frames are now being welded to the piles. At the Tower Pier (T1), all steel foundation casings and rock sockets have been installed. The basketball court sized T1 footing box was lowered over the casings in March 2007. Work is now progressing in preparation of the T1 bottom slab concrete placement.

• For the SFOBB East Span Seismic Replacement Project SAS Superstructure contract, American Bridge/Flour (ABF), the prime contractor for the project, has mobilized staff to their field offices at Pier 7 in Oakland and in China. Development of various administrative and design submittals is continuing. A final baseline schedule has been accepted by Caltrans. The contractor continues to finalize agreements with manufacturers, fabricators, suppliers and subcontractors. A contract with Zhenhua Port Machinery Company (ZPMC), of Shanghai, China, to supply and fabricate all the major steel structures in SAS including the tower, orthotropic box girders, and bike paths, was executed on July 18, 2006. Since executing their contact with ABF, ZPMC is currently setting up their shop to begin fabrication of the SAS tower and deck sections. ZPMC has prepared initial test mockups of the bridge sections and is finalizing welding and testing procedures for fabrication. Production fabrication is scheduled to begin in the fall of 2007 as final shop drawing submittals are approved.

• For the SFOBB East Span Seismic Replacement Project Yerba Buena Island South-South Detour (SSD) contract, Caltrans is designing the East and West tie-ins from the existing bridge and tunnel to the detour structure. The construction of the tie-ins are being managed by Caltrans to be completed in conjunction with the SAS

schedule to minimize impacts to the traveling public. Construction has also begun on advanced Yerba Buena Island Transition Structures (YBITS) foundation work. Foundations for Pier W3L were completed in the last quarter.

• The SFOBB East Span Seismic Replacement Project Oakland Touchdown (OTD) Submarine Cable contract was approved by Caltrans on January 11, 2007. The contract will replace the existing submerged electrical cable from Oakland to Treasure Island. The contractor is currently preparing contract submittals for Caltrans review and has placed an order for the cabling.

• The SFOBB East Span Seismic Replacement Project OTD #1 contract was advertised on February 26, 2007 with a planned bid opening of June 5, 2007. This contract will construct the westbound approach structure from the toll plaza to the new Skyway and a significant portion of the eastbound approach structure. The contract is scheduled to be completed in October 2009.

South South Detour

Page 10: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

4 of 46

• In March 2007, the TBPOC approved a number of changes to the Yerba Buena Island South-South Detour (SSD) contract to better integrate the detour work into the current project schedule and to reduce overall project risks by advancing Yerba Buena Island Transition Structures (YBITS) foundation work into the SSD contract. These changes increased the SSD contract budget by $202.5 million and decreased the YBITS contract by $23.2 million. The net project increase will be funded from the existing program contingency and does not change the overall Toll Bridge Seismic Retrofit Program budget.

SFOBB East Span SAS Project

Page 11: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

5 of 46

Program Overview Seven of the nine state-owned toll bridges were identified for seismic retrofit in the TBSRP:

1. Benicia-Martinez Bridge 2. Carquinez Bridge 3. San Mateo-Hayward Bridge 4. Vincent Thomas Bridge 5. San Diego-Coronado Bridge 6. Richmond-San Rafael Bridge 7. SFOBB (west span, west approach replacement,

and east span replacement). Seismic retrofit of these complex structures presents an extremely difficult engineering challenge and nowhere in the world has a bridge seismic safety program of this size been undertaken. Although the Dumbarton and the Antioch bridges were not included in the program, Caltrans is continuing to work on seismic vulnerability studies to assess the

potential for necessary retrofit work on these structures. See discussion on page 28.

As shown in Table 1-TBSRP Project Status, a significant portion of the TBSRP is complete. Only the SFOBB west approach and new east span seismic replacement projects remain to be seismically retrofitted.

The First Quarter 2007 forecast for those projects indicates that they will be completed within the current TBPOC approved cost and schedule estimates. Tables 2 and 3 provide a summary of the cost, schedule, and status of all the TBSRP projects.

Table 1-TBSRP Project Status

Toll Bridge Seismic Retrofit Projects Seismic Safety Status

San Francisco-Oakland Bay Bridge East Span Replacement Construction

San Francisco-Oakland Bay Bridge West Approach Replacement Construction

San Francisco-Oakland Bay Bridge West Span Seismic Retrofit Complete

San Mateo-Hayward Bridge Seismic Retrofit Complete

Richmond-San Rafael Bridge Seismic Retrofit Complete

Carquinez Bridge Eastbound Seismic Retrofit Complete

Benicia-Martinez Bridge Seismic Retrofit Complete

San Diego-Coronado Bridge Seismic Retrofit Complete

Vincent Thomas Bridge Seismic Retrofit Complete

Page 12: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

6 of 46

Table 2-Toll Bridge Seismic Retrofit Program—Cost Summary ($Millions)

Project

Work Status

AB 144 / SB 66

Budget (07/2005)

Approved Changes

Current Approved

Budget (03/2007)

Actual Cost To

Date (03/2007)

1sr Quarter

2007 Forecast

At-

Completion Variance

Cost Status

a b c d e = c + d f g h = g - e i

SFOBB East Span Replacement Project Capital Outlay Support 959.4 - 959.4 487.6 977.1 17.7 Capital Outlay Construction

Skyway Construction 1,293.0 - 1,293.0 1,140.5 1,293.0 - SAS E2/T1 Foundations Construction 313.5 - 313.5 203.6 313.5 - SAS Superstructure Construction 1,753.7 - 1,753.7 260.4 1,767.4 13.7 YBI South/South Detour Design/

Const 131.9 202.5 334.4 45.8 334.4 -

YBI Transition Structures Design 299.3 (23.2) 276.1 - 276.1 - Oakland Touchdown (OTD) 283.8 - 283.8 - 302.5 18.7 * OTD Submarine Cable Pending

Award - 9.6 -

* OTD No. 1 (Westbound) Design - 226.5 - * OTD No. 2 (Eastbound) Design - 62.0 - * OTD Electrical Systems Design - 4.4 -

Existing Bridge Demolition Design 239.2 - 239.2 - 222.0 (17.2) Stormwater Treatment Measures Construction 15.0 - 15.0 8.8 15.0 - East Span Completed Projects 90.3 - 90.3 89.2 90.3 - Right-of-Way and Environmental Mitigation 72.4 - 72.4 38.8 72.4 - Other Budgeted Capital 35.1 - 35.1 0.6 11.0 (24.1)

Total SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction

Capital Outlay Support 120.0 - 120.0 90.6 120.0 - Capital Outlay Construction 309.0 - 309.0 232.5 309.0 -

Total SFOBB West Approach Replacement 429.0 - 429.0 323.1 429.0 - Richmond-San Rafael Bridge Retrofit Construction

Capital Outlay Support 134.0 (7.0) 127.0 126.0 127.0 - Capital Outlay Construction & Right-of-Way 780.0 (82.0) 698.0 665.8 698.0 -

Total Richmond-San Rafael Bridge Retrofit 914.0 (89.0) 825.0 791.8 825.0 - Program Completed Projects Complete

Capital Outlay Support 219.8 - 219.8 219.4 219.8 - Capital Outlay Construction 705.6 - 705.6 698.1 705.6 -

Total Program Completed Projects 925.4 - 925.4 917.5 925.4 - Miscellaneous Program Costs 30.0 - 30.0 24.7 30.0 - Program Contingency 900.0 (90.2) 809.8 - 800.9 (8.9) Total Toll Bridge Seismic Retrofit Program 8,685.0 - 8,685.0 4,332.4 8,685.0 -

Within Approved Schedule and Budget

Potential Cost and Schedule Impacts: Likely future need for Program Contingency Allocation

Known Cost and Schedule Impacts: Request for Program Contingency Allocation forthcoming

Note: Details may not sum to totals due to rounding effects.

Page 13: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

7 of 46

Table 3-Toll Bridge Seismic Retrofit Program—Schedule Summary

Project

AB 144 / SB 66

Project Complete Baseline (07/2005)

Approved Changes (Months)

Project Complete Current

Approved Schedule (03/2007)

Project Complete Schedule Forecast (03/2007)

Schedule Variance (Months)

Schedule Status Remarks

a b c d= b + c e f = e – d g h SFOBB East Span Replacement Project

Skyway Apr 07 8 Dec 07 Dec 07 - . SAS E2/T1 Foundations Jun 08 (3) Mar 08 Mar 08 -

SAS Superstructure Mar 12 12 Mar 13 Mar 13 - See Note.

YBI South/South Detour Jul 07 36 Jun 10 Jun 10 -

YBI Transition Structures Nov 13 12 Nov 14 Nov 14 - In March 2006, the TBPOC approved the split of the YBI contract into three contracts.

Oakland Touchdown (OTD) Nov 13 12 Nov 14 Nov 14 -

OTD Submarine Cable n/a Jan 08 Jan 08 - This contract was approved on January 11, 2007.

OTD Westbound n/a Jul 09 Oct 09 3 Contract has been advertised with a bid opening planed on June 5, 2007

OTD Eastbound n/a Nov 14 Nov 14 - See Note.

Existing Bridge Demolition Sep 14 12 Sep 15 Sep 15 - See Note.

Stormwater Treatment Measures Mar 08 - Mar 08 Jun 07 (9) Forecast based on actual award date and duration in Contractor’s A+B bid.

Open to Traffic Date: Westbound Sep 11 12 Sep 12 Sep 12 - See Note.

Open to Traffic Date: Eastbound Sep 12 12 Sep 13 Sep 13 - See Note.

SFOBB West Approach Replacement Aug 09 - Aug 09 Aug 09 -

Richmond-San Rafael Bridge

Seismic Retrofit Aug 05 - Aug 05 Oct 05 2 Seismic retrofit completed July 29, 2005. Formal acceptance of this contract on October 28, 2005. $89 million has been transferred to Program Contingency.

Public Access Project n/a - May 07 Sep 07 4

Note: Schedules for selected projects and the Open to Traffic dates were extended by 12 months from the AB 144/SB 66 baseline schedule

due to Addenda #5 and #7 on the SAS Superstructure contract in response to bidder inquiries and to reduce costs.

Page 14: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

8 of 46

Table 4-Toll Bridge Seismic Retrofit Program Baseline (AB 144/SB 66) And Forecasts ($ million)

Contracts AB 144 / SB 66 Baseline Budget

Approved Changes

Current Approved

Budget 1st Quarter 2007

Forecast Variance

(1Q07 - Current Approved Budget)

Completed Projects

Benicia-Martinez 177.8 - 177.8 177.8 - Carquinez 114.2 - 114.2 114.2 - San Mateo-Hayward 163.5 - 163.5 163.5 - Vincent Thomas 58.5 - 58.5 58.5 - San Diego-Coronado 103.5 - 103.5 103.5 - SFOBB West Span 307.9 - 307.9 307.9 -

Ongoing Projects

Richmond-San Rafael 914.0 (89.0) 825.0 825.0 - SFOBB West Approach 429.0 - 429.0 429.0 - SFOBB East Span 5,486.6 179.2 5,665.8 5,674.7 8.9 Miscellaneous Program Costs 30.0 - 30.0 30.0 -

Subtotal 7,785.0 90.2 7,875.2 7,884.1 8.9

Program Contingency 900.0 (90.2) 809.8 800.9 (8.9)

Total Program 8,685.0 - 8,685.0 8,685.0 -

Program Costs Baseline and Projected Budget The 2005 AB 144/SB 66 baseline budget is $7.785 billion for CO and COS plus $900 million in program contingency, for a total baseline budget of $8.685 billion. The First Quarter 2007 forecast for the program remains within the $8.685 billion budget. The First Quarter 2007 forecast for the SFOBB East Span Project has increased to $5.675 billion due to a revised construction cost estimate on the OTD #1 and YBI SSD contracts.

Additional cost estimate and expenditure detail for the TBSRP are included in Appendices A-1 and A-2. The details of the cost estimates and expenditures for the SFOBB east span are shown in Appendix B

Page 15: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

9 of 46

Chart 1-Toll Bridge Seismic Retrofit Program Schedule Baseline AB 144/SB 66 vs. Projected Schedule

Program Schedule Baseline and Projected Schedule Seismic retrofit on six of the seven toll bridges in the TBSRP is complete. These structures include the Benicia-Martinez, Carquinez, Richmond-San Rafael, San Mateo-Hayward, Vincent Thomas, and San Diego-Coronado bridges. Seismic retrofitting of the SFOBB west span was completed in June 2004. The SFOBB West Approach and East Span Seismic Replacement projects are currently under construction. The current March 2007 schedule calls for achieving seismic safety and opening to traffic the SFOBB new east span in 2013.

The 12 months of schedule extension was granted by addendum to the SFOBB East Span Seismic Replacement Project SAS contract based on bidder inquiries received during advertisements. While the 12 month schedule extension for the SAS has also extended the schedules for YBITS and OTD

contracts accordingly, Caltrans is scheduling the contracts to accommodate the possibility of early SAS completion-based incentives also included in the SAS addendum.

On the SSD contract, the TPBOC has approved a forecast completion extension to 2010 to reduce overall program risks by advancing work from the YBITS contracts into the SSD contract. The extension will not impact the open-to-traffic date for the new east span and facilitate possibilities to accelerate opening of the new bridge.

It is estimated that all of the construction activities for the SFOBB East Span Seismic Replacement project will be completed by 2015, marked by the planned demolition of the existing SFOBB east span. Chart 1-Toll Bridge Seismic Retrofit Program Schedule, shows the baseline, AB 144/ SB 66 project schedule versus the projected completion schedules for the TBSRP projects under construction.

Page 16: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

10 of 46

Table 5-Program Budget as of March 31, 2007 ($ Millions)

Budgeted

Funding Available &

ContributionsFinancing

Seismic Surcharge Revenue AB 1171 2,282.0 2,282.0 Seismic Surcharge Revenue AB 144 2,150.0 2,150.0 BATA Consolidation 820.0 820.0

Subtotal - Financing 5,252.0 5,252.0

ContributionsProposition 192 790.0 789.0San Diego Coronado Toll Bridge Revenue Fund 33.0 33.0Vincent Thomas Bridge 15.0 6.9State Highway Account(1)(2) 745.0 745.0Public Transportation Account(1)(3) 130.0 90.0ITIP/SHOPP/Federal Contingency 448.0 0.0Federal Highway Bridge Replacement and Rehabilitation (HBRR) 642.0 500.0

SHA - East Span Demolition 300.0SHA - "Efficiency Savings"(4) 130.0 2.0

Redirect Spillover 125.0 Motor Vehicle Account 75.0 75.0

Subtotal - Contributions 3,433.0 2,240.9

Total Funding 8,685.0 7,492.9

Allocated to date 6,071.9

Remaining Unallocated 1,421.0

Notes: Program budget includes $900 million program contingency.

(1) The California Transportation Commission adopted a new schedule and changed the PTA/SHA split on December 15, 2005.

(4) To date, $2 million has been transferred from the SHA to the TBSRP, representing the commitment of "Efficiency Savings" for 2005-06 identifed under AB 144. Approximately $128 million remains to be distributed as scheduled by the CTC.

(3) To date, $90 million has been transferred from the PTA to the TBSRP, including the full $80 million transfer scheduled by the CTC to occur in 2005-06. Approximately $40 million remains to be transferred. Caltrans anticipates transfer of such balance in Fiscal Year 2006-07 as directed by the California Transportation Commission.

(2) To date, $645 million has been transferred from the SHA to the TBSRP, including the full $290 million transfer scheduled by the CTC to occur in 2005-06. An additional $100 million has been expended directly from the account.

Program Funding and Financing AB 144 established a funding level of $8.685 billion for the TBSRP. The bill specifies funding sources for the program, as shown in Table 5-Program Budget.

Page 17: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

11 of 46

Table 6-Toll Bridge Seismic Retrofit Program Financial Status as of March 31, 2007 ($ Millions)

687.997.9

789.0Bond Revenue (Toll Revenue Bonds) 1,062.0Commercial Paper(2) 80.0SANDAG 33.0Vincent Thomas(3) 6.9Federal Highway Bridge Replacement and Rehabilitation 500.0

Motor Vehicle Account 75.0745.0

90.02.0

4,168.7

3,384.1948.3

4,332.4

Capital Outlay 1,732.2State Operations 7.3

1,739.5

Total Expenditures and Encumbrances 6,071.9

Revenues:Toll Surcharge(1)

Encumbrances:

Bond Revenue (Seismic Bond of 1996)

Capital OutlayState Operations

SMIF Interest

Transfers to TBSRA:

State Highway Account(4)

Total Revenues and Transfers

(6) To date, $2 million has been transferred from the SHA to the TBSRP, representing the commitment of "Efficiency Savings" for 2005-06 identifed under AB 144. Approximately $128 million remains to be distributed as scheduled by the CTC.

Expenditures:

Total Expenditures

(1) The Toll Surcharge is dedicated to repayment of bonds beginning September 1, 2003. Toll Surcharge shown here is only toll revenue collected prior to that date.

Total Encumbrances

(2) $80 Million in Commercial Paper issued on or about April 5, 2005.

State Highway Account "Efficiency Savings"(6)

(4) To date, $645 million has been transferred from the SHA to the TBSRP, including the full $290 million transfer scheduled by the CTC to occur in 2005-06. An additional $100 million has been expended directly from the account.

Public Transportation Account(5)

(5) To date, $90 million has been transferred from the PTA to the TBSRP, including the full $80 million transfer scheduled by the CTC to occur in 2005-06. Approximately $40 million remains to be transferred. Caltrans anticipates transfer of such balance in 2006-07 as directed by the California Transportation Commission.

(3) No additional funding is expected from the Vincent Thomas Toll Revenue Account.

Funding Status The program’s financial status of revenues and expenditures is summarized in the table below, Table 6-Toll Bridge Seismic Retrofit Program Financial Status. The figures include the surcharge revenues collected, transfers from the SHA and the

PTA, and expenditures from the Toll Bridge Seismic Retrofit Account (TBSRA) and the Seismic Retrofit Bond Act of 1996 (Proposition 192).

Page 18: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

12 of 46

Program Financing As discussed above, AB 144 consolidated the administration of all toll revenues collected on the state-owned Bay Area toll bridges and financing of the TBSRP under the jurisdiction of BATA. BATA has direct programmatic responsibilities for the administration of all toll revenues collected on the state-owned bridges in the Bay Area and responsibilities for financial management of the TBSRP program, including:

• Administrative responsibility for collection and accounting of all toll revenues.

• Authorization to increase tolls on the state-owned bridges by $1.00, effective January 1, 2007.

• Project level toll-setting authority as necessary to cover additional cost increases beyond the funded program contingency in order to complete the TBSRP.

• Assumption of funding all of the roadway and bridge structure maintenance from Caltrans once bridge seismic retrofit projects are completed.

In accordance with its responsibilities provided under the law, in September 2005, BATA adopted a finance plan for the TBSRP. The major components of the finance plan include:

• Issuing $6.2 billion in debt, including defeasance of $1.5 billion in outstanding State Infrastructure Bank bonds and commercial paper.

• Increasing tolls on the state-owned bridges by $1.00, (from $3.00 to $4.00 for two-axle vehicles), effective January 1, 2007.

• Securing the maximum amount of state funding early in the construction schedule to most efficiently use toll funds (see the following discussion concerning the CTC funding schedule).

• Locking in current interest rates to the extent possible in order to improve the chances that the entire toll program construction and the operations and maintenance can be delivered within the $4.00 auto toll level.

In September 2005, BATA approved a Finance Plan for the TBSRP and other toll bridge improvement programs dependent on toll revenues from the state-owned bridges. The finance plan called for $6.2 billion in new debt issuances, including defeasance of the existing outstanding I-Bank bonds. Consistent with the finance plan, in December 2005, BATA approved the issuance of up to $1.0 billion of 2006 toll bridge revenue bonds in February 2006. The bond issuance will provide adequate cash flow to fund the SAS contract for the East Span Replacement project, which was awarded on May 3, 2006.

Furthermore, in March 2006, BATA approved the issuance of $1.2 billion in bonds to defease the I-Bank bonds approved in October 2005. Additionally, pursuant to the law, BATA held two public hearings, one in October and one in November 2005, to receive public testimony regarding the proposed $1.00 seismic surcharge toll increase beginning on January 1, 2007 on the state-owned toll bridges in the Bay Area. BATA approved the toll increase on January 25, 2006.

Pursuant to AB 144, on September 29, 2005, the CTC adopted a schedule - revised in December 2005 - for the transfer of state funds to BATA to fund the TBSRP. The schedule contains the timing and sources of the state contributions, which begin in Fiscal Year (FY) 2005-06 and distributes the contributions over the years of project construction to ensure a timely balance between state sources and the contributions from toll funds. In December 2005, the CTC re-adopted the schedule to reflect opportunities to maximize the use of available PTA funds and correct prior transfer transactions. The CTC’s December 2005 revised schedule for the transfer of funds allows BATA to pledge the state fund contribution to the financing of the TBSRP per BATA’s adopted finance plan. The CTC schedule is included in Appendix C.

In March 2007, BATA approved the issuance of $825 million in 2007 Toll Bridge Revenue Bonds. The financing will be used primarily to fund seismic retrofit projects. Upon issuance of the 2007 bonds, BATA’s debt total will be $4.9 billion.

Page 19: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

13 of 46

Aerial view of West Approach

Project Status Ongoing Construction Projects

SFOBB West Approach

The SFOBB west approach seismic retrofit project will remove and replace the west approach to the SFOBB, which includes all of the westbound mainline and most of the eastbound mainline from 4th Street to the SFOBB west anchorage, and all of the connecting entrances and exit ramps in downtown San Francisco. The construction work, which began in June 2003, is approximately 77 percent complete. Completion of this project is scheduled for 2009.

Upon completion of the retrofit project, the west approach mainline and ramps will have the same number of traffic lanes as before, but with improved highway geometrics. The mainline eastbound and westbound structures will be adjacent to each other at 4th Street and transition to a double-deck configuration with their own independent support system from Rincon Hill to the anchorage in order to tie into the existing SFOBB.

Milestones Achieved

The San Francisco-Oakland Bay Bridge (SFOBB) West Approach Project is 77 percent complete as of March 20, 2007 and is on schedule to finish in August 2009. Frame 8U achieved a significant milestone by having both the north and south sections transversely stressed together into one complete structural unit. Major ongoing work during the quarter includes the continuation of work on the 5th Street and Harrison Street ramps. On March 27, 2007, eastbound Interstate 80 (I-80) traffic was detoured onto an interim eastbound alignment (ST6D). The detour realigned eastbound traffic below the new westbound lanes of the approach to allow for the demolition of the final 3000-foot section of the old I-80 freeway structure from 2nd Street (near the Historic Clocktower) to 4th Street. Demolition began soon after the traffic was detoured and is being performed under a compressed schedule from the as-planned 110 days down to 17 days. The demolition work will be completed in mid-April. The compressed schedule has been implemented to minimize impacts and inconvenience to the local residents and businesses. An extensive public outreach was begun well in advance of this work and includes all of the upcoming impacts from future activities.

Project Funding

The AB 144/SB 66 baseline budget totals $429 million for the project with $309 million for CO and $120 million for COS. See Table 7-Baseline and Estimated Budget Need for SFOBB West Approach

Table 7-Baseline and Estimated Budget Need for SFOBB West Approach ($ million)

AB 144/

SB 66 Budget 1st Quarter

2007 Forecast Difference COS 120.0 120.0 -

CO 309.0 309.0 -

Total 429.0 429.0 -

Page 20: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

14 of 46

Major Risk Issues

Caltrans' west approach Risk Response Team is continuing with its efforts to manage project risks. Updated risk assessments have been regularly performed during the First Quarter as a standard project management practice.

Lessons learned to this point in the project continue to be important aspects of the implementation plans designed to mitigate risk, for example:

• The aggressive informational campaigns have proven successful in keeping the public fully informed of upcoming demolition operations that would affect traffic, thereby mitigating adverse public perception. Regional and local information campaigns will be launched during spring 2007 to proactively address public concerns related to upcoming work on the interim eastbound detour and subsequent demolition work.

• Equipment and labor resources were increased during low traffic times such as nights and weekends. This strategy reduced inconveniences to the surrounding residents and businesses and minimized impact to the regional motorists while maintaining the level of production required for the project to remain on the target schedule.

• A high-priority risk issue currently being addressed by Caltrans concerns investigation and testing for the identification of pile anomalies that must be completed timely so as to avoid construction impact. To respond to this risk, Caltrans Construction staff coordinates closely with Structure Design and Caltrans Material Engineering and Testing Service (METS) staff daily on pile investigation and testing issues, and proactively monitors this effort. Tracking of the testing effort is done at the individual pile level of detail. Team participation in Risk Management meetings has proven to be valuable in addressing this issue.

West Approach New I-80 Eastbound Westbound Model (Under Construction)

Page 21: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

15 of 46

SFO

BB

Wes

t App

roac

h R

etro

fit P

rogr

ess

Dia

gram

For T

he S

tage

5 M

ainl

ine

East

boun

d 80

Reb

uild

ing

San

Fran

cisc

oO

akla

nd

Ben

t Des

igna

tion

1L2L

3L4L

5L6L

7L8L

9L10

L11

L12

L13

L14

L15

LAb

ut 1

6L

Hinge 1L

Hinge 2L

Hinge 5L

Hinge 8L

Hinge 11L

Roa

dway

Dec

kB

ent C

ap, S

tem

, and

Sof

fit10

0% 80%

60%

40%

20%

100% 80

%60

%40

%20

%

Ben

t Des

igna

tion

1L2L

3L4L

5L6L

7L8L

9L10

L11

L12

L13

L14

L15

LAb

ut 1

6L

Not

es: 1

. Ben

ts 1

L an

d 2L

eac

h ha

ve 5

- 84

" Cas

t In

Dril

led

Hol

e (C

IDH

) pile

s.2.

Ben

ts 3

L th

roug

h 5L

eac

h ha

ve 5

- 90

" Cas

t In

Dril

led

Hol

e (C

IDH

) pile

s.3.

Ben

ts 6

L th

roug

h 8L

eac

h ha

ve 4

- 90

" Cas

t In

Dril

led

Hol

e (C

IDH

) pile

s.4.

Ben

ts 9

L th

roug

h 15

L ea

ch h

ave

3 - 7

2" C

ast I

n D

rille

d H

ole

(CID

H) p

iles.

5. A

butm

ent 1

6L h

as 1

8 - 3

0" C

ast I

n D

rille

d H

ole

(CID

H) p

iles.

6. A

vera

ge P

ile le

ngth

s ar

e as

follo

ws:

B

ents

1L

thro

ugh

3L =

90'

, B

ent 4

L =

75'

Ben

t 5L

= 80

'B

ents

6L

thro

ugh

8L =

75'

Ben

t 9L

= 60

'B

ent 1

0L =

70'

Ben

ts 1

1L a

nd 1

2L =

73'

Ben

t 13L

= 7

0'B

ents

14L

and

15L

= 6

7'A

butm

ent 1

6L =

40'

7. T

his

char

t rep

rese

nts

the

rem

aini

ng w

ork

left

to o

pen

the

perm

anen

t mai

nlin

e ea

stbo

und

80 to

traf

fic.

8. It

ems

of w

ork

this

cha

rt do

es n

ot in

clud

e:

Har

rison

Off-

ram

p re

cons

truct

ion

Fram

e 8L

retro

fit w

ork

Sta

ge 6

wor

k w

hich

incl

udes

the

dem

oliti

on o

f ST6

D p

lann

ed fo

r Ear

ly 2

008

Com

plet

ion

of th

e re

st o

f the

Eas

tbou

nd 8

0 st

ruct

ure

afte

r the

ST6

D d

emol

ition

Apr

il-07

% c

ompl

ete

is b

ased

on

num

ber o

f col

umns

per

be

nt.

% c

ompl

ete

is b

ased

on

num

ber o

f pile

s pe

r be

nt.

See

Not

es fo

r pile

de

tails

.

Work in Progress

Completed Work

Lege

nd

CID

H P

iles

Col

umns

4th Street

3rd Street

2nd Street

Page 22: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

16 of 46

SFOBB East Span Seismic Replacement

The SFOBB East Span Seismic Replacement project will be seismically retrofitted through the complete replacement of the existing span. The project includes construction of the Skyway portion of the bridge (See SFOBB East Span Replacement Project picture below), which consists of two parallel concrete structures, each approximately 1.3 miles in length; an SAS bridge consisting of a 510-foot tower supporting a bridge deck connecting the Skyway bridge to YBI, transition structures on YBI and on the east end of the bridge connecting to the toll plaza area, and demolition of the existing east span.

The SFOBB east span project now consists of 21 contracts. Construction of the Oakland Touchdown (OTD) Approach Structures and the Yerba Buena Island Transition Structures (YBITS) has been split

into multiple contracts to facilitate construction flow and acceleration of work elements off the critical path for the completion of the new east span.

The current 21 SFOBB east span contracts are identified below:

Eight contracts are complete:

• Interim Retrofit (Existing Bridge) • East Span Retrofit (Existing Bridge) • Pile Installation Demonstration • OTD Geofill • YBI Archaeology • United States Coast Guard (USCG) Road

Relocation on YBI • SAS Land Foundations (W2) • YBI Electrical Substation

Table 8-SFOBB East Span Seismic Replacement Project Schedule Summary

Contract AB 144/SB 66 Baseline Pro

Approved Changes

Current Approved Schedule

1st Quarter 2007 Forecast Project Completion Date Variance (Months)

Skyway April 2007 8 December 2007 December 2007 - YBI South / South Detour* July 2007 36 June 2010 June 2010 - Stormwater Treatment Measures March 2008 - March 2008 June 2007 (9)

SAS E2/T1 Foundations June 2008 (3) March 2008 March 2008 -

Open to Traffic: Westbound September 2011 12 September 2012 September 2012 - SAS Superstructure March 2012 12 March 2013 March 2013 - Open to Traffic: Eastbound September 2012 12 September 2013 September 2013 - Oakland Touchdown (OTD) December 2013 12 December 2014 December 2014 -

* OTD Submarine Cable n/a January 2008 January 2008 -

* OTD No. 1 (Westbound) n/a July 2009 October 2009 3

* OTD No. 2 (Eastbound) n/a November 2014 November 2014 -

YBI Transition Structure* December 2013 12 November 2014 November 2014 -

Existing Bridge Demolition* September 2014 12 September 2015 September 2015 -

Note: The new east span forecast to be fully open to traffic in September 2013. Construction activities will continue beyond that date to complete the project, including demolition of the existing structure.

Page 23: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

17 of 46

SFOBB East Span Replacement Project

Six contracts are under construction: Note that percent complete figures for construction contracts are based on actual payments made divided by the contract amount.

• Skyway contract (94 percent complete) • South/South Detour (49 percent complete) • SAS Marine Foundations (E2/T1) (77 percent

complete) • SAS (18 percent complete) • Stormwater Treatment Measures (61 percent

complete)

Seven contracts are in design:

• OTD #1 contract: The contract was advertised on February 26, 2007 with bid opening scheduled for June 5, 2007.

• OTD #2 contract: The contract is planned to be advertised in summer 2010.

• OTD portions of the corridor electrical contract: This scope may be executed as a separate contract, or alternatively, may be included within OTD #2 contract and/or the other contracts within the east span corridor.

• YBITS #1 (design 80 percent complete to date) • YBITS #2 (design 80 percent complete to date) • YBITS #3 contract • Existing Bridge Demolition design (ten percent

complete to date)

The forecast completion date as compared to the AB 144/SB 66 baseline completion date for each of the major components of the SFOBB East Span Seismic Replacement project is shown in Table 8-SFOBB East Span Seismic Replacement Project Schedule Summary below.

The approved east span opening date has been extended by 12 months by the TBPOC through addendum issued on the SAS contract based on bidder inquiries received during advertisement. The current approved schedule does not include the potential for schedule reduction based on an early completion incentive on the SAS contract of six months that was also included in the addendum. The completion of the Skyway contract has been revised from April 2007 to December 2007 as approved by the TBPOC due to a Contract Change Order executed with the Contractor that resolves a variety of construction issues. The schedule for the YBI SSD contract has been extended to take into account the 12-month change to the SAS contract schedule and the incorporation of additional work scope from the YBITS contract. This extension is not expected to impact the new east span open-to-traffic date.

Page 24: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

18 of 46

San

Fran

cisc

oO

akla

nd

Pier

Loc

atio

n3

45

67

89

1011

1213

1415

16

Pier

Tab

le/P

reca

st S

egm

ents

Pier

Foo

ting

Pier

Loc

atio

n3

45

67

89

1011

1213

1415

16

San

Fran

cisc

oO

akla

nd

Pier

Loc

atio

n3

45

67

89

1011

1213

1415

16

Pier

Tab

le/P

reca

st S

egm

ents

Pier

Foo

ting

Pier

Loc

atio

n3

45

67

89

1011

1213

1415

16

Pier

Col

umn

Stee

l Pile

s

Closure

Closure

Closure

Closure

Closure

Hinge DW

Closure

Ove

rlay

Pier

Col

umn

Hinge BE

Closure

Work in Progress

Completed Work

Hinge EW

Closure

Closure

Closure

Closure

Hinge BW

Work in Progress

Completed Work

Lege

nd

Hinge CE

Closure

Closure

Closure

Closure

Ove

rlay

Hinge CW

Stee

l Pile

s

Closure

Closure

Closure

Hinge EE

Closure

Closure

Hinge DE

Closure

Closure

San

Fran

cisco

-Oak

land

Bay B

ridge

Eas

t Spa

n Re

plac

emen

t Pro

ject -

Sky

way C

ontra

ctJa

nuar

y 200

7

East

boun

d

Wes

tbou

nd

Page 25: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

19 of 46

Milestones Achieved – East Span Contracts

• The Skyway contract is 94 percent complete as of March 2007. The foundation work is complete including the installation of the fenders around six of the pier footings. The eastbound and westbound structures are 100 percent complete with the erection of all 452 segments (refer to diagram on page 18). The final closure pour was completed in February, 2007.

• An overall settlement has been reached with the Contractor to resolve all cost and schedule impacts posed by claims related to hinge pipe beam fabrication, service platforms, electrical appurtenances, polyester concrete overlay, modular joints and other tasks to be completed that were known as of August 1, 2006. A time extension of 220 working days, extending the project completion date to December 2007, has been approved by the TBPOC. The change in schedule to the Skyway contract will not delay the open-to-traffic date for the new East Span project, nor will this settlement negatively impact the overall budget for the Skyway contract or the project. Various Notices of Potential Change (NOPCs) have been issued by the Contractor on behalf of their Steel Orthotropic Box Girder (SOBG) fabrication subcontractor concerning issues related to that work scope that has been completed. All of these NOPCs have been recommended to be heard by the Dispute Review Board.

• The E2/T1 contract is 77 percent complete as of March 2007. At the East Pier (E2), foundation pile driving has been completed. E2 footing frames are now being welded to the piles. At the Tower Pier (T1), all steel foundation casings have been fabricated. Work is now progressing on installation of the casings and rock sockets. Fabrication of the T1 footing box was completed in Texas and was delivered and installed at the project site on March 17, 2007.

• The SFOBB East Span Seismic Replacement Project SAS Superstructure contract is 18 percent complete based on payments to the Contractor as of March 2007. The Contractor is mobilizing staff to the field office on Pier 7 in Oakland. Development of various administrative submittals, including the baseline schedule, is continuing. A final baseline schedule has been submitted by the Contractor and was accepted by Caltrans.

• The Contractor is finalizing agreements with various manufacturers, fabricators, suppliers and subcontractors, including Zhenhua Port Machinery Company (ZPMC), of Shanghai, China, to supply and fabricate all the major steel structures in the SAS. Caltrans is working to set up facilities and to organize resources in China that will ensure an effective Owner’s presence in the steel fabrication shops operated by ZPMC. Caltrans is also taking risk mitigation measures to address potential issues during construction due to structural steel plate conflicts and welding methods.

Yerba Buena Island Contracts

• For the Yerba Buena Island South-South Detour (SSD) contract, Caltrans and its consultants have assumed design responsibilities from the Contractor for the design the East and West tie-ins from the existing bridge and tunnel to the detour structure. Completion of their design is being managed by Caltrans and is to be completed in conjunction with the SAS schedule to minimize impacts to the traveling public. The viaduct segment is being fabricated in South Korea.

• The YBITS #1 contract will construct structures necessary to connect the new SAS to the existing YBI tunnel. To minimize schedule and construction risk, TBPOC approved the option to accelerate portions of YBITS #1 work, including shifting critical path work to the SSD contractor. The YBITS foundation work was added to the SSD contract because foundation

Page 26: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

20 of 46

work is always the highest risk element of structure construction. Early construction of the foundations would significantly reduce risk to the east span corridor schedule. Preparation of final PS&E packages is currently underway.

• A need was identified to accelerate work on pier W3L due to the SAS contractor need for access to that area. The SSD contractor, CC Myers, completed that work and the SAS contractor has been granted access to that area ahead of schedule.

• The YBITS #2 contract includes demolition of the South/South Detour (SSD) temporary structure, completion of the new eastbound on-ramp, completion of the bike path section on YBI and reconstruction of local and affected facilities at YBI. Eastbound traffic will be placed on the new structure in this contract. The majority of the design work is complete. Preparation of detailed plans and quantity calculations are in progress. The decision on the accelerated work will impact design work on this contract.

• The YBITS #3 contract is for landscaping, and includes slope restoration, vegetation restoration and plant maintenance for the areas affected by YBI construction. A planting concept and preliminary plans have been developed for a majority of the area. Determination of the extent of the U.S. Coast Guard area to be landscaped is still pending. Development of the final plans has not been completed.

Oakland Touchdown Contracts

• The OTD Submarine Cable contract will replace the existing submarine electrical cable from Oakland to Treasure Island. The cable relocation contract will place a new electrical cable(s) between the East Bay and Treasure Island because the existing electrical cable providing power to the island is close to foundation work necessary for the construction of the OTD #1 contract, which was advertised in

February 2007. On January 11, 2007, Caltrans approved a contract with Manson Construction for the submarine cable contract. Notice to proceed was issued on February 6, 2007. The contractor is currently preparing contract submittals for Caltrans review and has placed an order for the cabling. The cable is expected in the Bay Area in the summer of 2007.

• The OTD #1 contract includes construction of all of the marine foundations, westbound bridge section and roadway approach for the section that connects the new Skyway portion to the roadway west of the Oakland Toll Plaza. Design work is complete. PS&E were submitted to the Caltrans Office Engineer on September 1, 2006. This contract was advertised to the bidders on February 26, 2007 and contract completion is scheduled for October 2009. The contract will include workaround specification language to minimize risks from a delayed submarine cable contract.

• The OTD #2 contract includes construction of the remaining eastbound bridge section and roadway approach for the section that connects the new Skyway portion to the roadway west of the Oakland Toll Plaza. This work will occur once the westbound traffic is shifted onto the new SAS. Design work for the structures portion of the OTD #2 contract is complete. Design work on the roadway portion is ongoing.

• A fourth contract could incorporate most of the electrical elements from OTD, as well as from other segments of the east span into a single contract and is currently being scoped. The inclusion of this work into another existing contract is also being considered.

Page 27: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

21 of 46

Aerial view of Skyway construction

Other Contracts

• The Stormwater Treatment Measures contract is 61 percent complete as of March 2007. The Stormwater Project was required as part of the environmental mitigation package for the SFOBB Seismic Safety Project by the Regional Water Quality Control Board. The project will reduce the concentration of stormwater runoff pollutants including industrial chemicals, asbestos from brake pads, hydrocarbons, and heavy metals, from entering into the adjacent Emeryville Crescent. The Emeryville Crescent is a 558-acre tidal marsh and cove that supports up to 14,000 shorebirds and thousands of other birds, including the endangered clapper rail which nests and forages in the vegetative cover of the marsh. This area has been described as supporting the largest number of shorebird species regularly occurring at one place within San Francisco Bay (Bodega Bay Institute, 1978). The project will provide water treatment of at least 85% of the average annual runoff from a 155-acre shed area in the vicinity of the

SFOBB Toll Plaza. By removing toxins from the SFOBB runoff, Caltrans will enhance the habitat quality of the Emeryville Crescent and by extension, the San Francisco Bay. Current work continues on the installation of drainage structures, piping and pump stations. Work has also started on planned bioretention basins.

• Design on the Existing Bridge Demolition contract is 10 percent complete. Design work has been temporarily suspended to assign engineering resources to higher priority tasks, and will resume at a later time. The contract schedule completion date has been extended by 12 months due to a 12-month SAS contract extension.

Page 28: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

22 of 46

Project Funding

Baseline and Projected Budget and Schedule

The AB 144/SB 66 baseline budget for the SFOBB east span is $5.486 billion with $4.527 billion for CO and $959.4 million for COS. The current approved budget for SFOBB east span is $5.666 billion with $4.707 billion for CO and $959.3 million for COS. This amount does not include program contingencies. See Table 9-SFOBB East Span Replacement Cost Summary.

The TBPOC re-evaluates project and contract cost forecasts continuously. The estimate-at-completion as of March 31, 2007, includes revised forecasts from AB 144/SB 66 budget, as follows:

• A forecast increase in the cost of COS to $977.1 million as a result of a detailed staffing and consultant contract cost forecast completed as of the end of the First Quarter 2007. This forecast includes considerations of revised and increased construction contract schedules as mentioned elsewhere in this report that require coverage by staff and consultants.

• A forecast $13.7 million increase for the SAS Superstructure contract to cover actions taken to encourage additional bidders for the project, including the bidder’s stipend for the lowest three responsive bidders.

• A forecast $18.7 million increase in the CO for the OTD contract due to an approved Engineer’s Estimate for the OTD #1contract. The COS for the contract was also increased to cover the

Table 9-SFOBB East Span Replacement Cost Summary ($ Millions)

Contract AB 144/ SB 66

Budget Approved Changes

Current Approved

Budget Cost To Date

(03/2007)

1st Quarter 2007

Forecast Variance a b c d = b + c e f g = f - d

Capital Outlay Support 959.4 - 959.4 487.6 977.1 17.7 Capital Outlay Skyway 1,293.0 - 1,293.0 1,140.5 1,293.0 - SAS E2/T1 Foundations 313.5 - 313.5 203.6 313.5 - SAS Superstructure 1,753.7 - 1,753.7 260.4 1,767.4 13.7 YBI South/South Detour 131.9 202.5 334.4 45.8 334.4 - YBI Transition Structures 299.3 (23.2) 276.1 - 276.1 - Oakland Touchdown 283.8 - 283.8 - 302.5 18.7

OTD Submarine Cable - 9.6 OTD Westbound - 226.5 OTD Eastbound - 62.0 OTD Electrical Systems - 4.4

Existing Bridge Demolition 239.2 - 239.2 - 222.0 (17.2) Stormwater Treatment Measures 15.0 - 15.0 8.8 15.0 - East Span Completed Projects 90.3 - 90.3 89.2 90.3 - Right-of-Way and Environmental Mitigation 72.4 - 72.4 38.8 72.4 -

Other Budgeted Capital 35.1 - 35.1 0.6 11.0 (24.1)

TOTAL 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9

Note: Details may not sum to totals due to rounding effects.

Page 29: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

23 of 46

Chart 2-San Francisco-Oakland Bay Bridge East Span Corridor Schedule Baseline AB 144/SB 66 vs. Current Projected

5additional work to split the contract and to administer four separate contracts over a longer duration rather than the original single contract.

• A forecast $17.2 million decrease for the Bridge Demolition Contract due to a re-evaluation of the cost escalation rates for the project.

• All of the variances discussed above can be funded from a combination of other budgeted capital and Toll Bridge Seismic Retrofit Program Contingency. The forecast for the SFOBB east span has increased by $8.9 million to $5.675 billion.

• The current March 2007 schedule calls for achieving seismic safety and opening to traffic the SFOBB new east span in 2013. The 12 months of schedule extension was granted by

addenda to the SFOBB East Span Seismic Replacement Project SAS contract based on bidder inquires received during advertisements.

• In March 2007, the TBPOC approved a number of changes to the YBI SSD contract to better integrate the detour work into the current project schedule and to reduce overall project risks by advancing YBITS foundation work into the SSD contract. These changes increased the overall SSD contract budget by $202.5 million and decreased the YBITS contract by $23.2 million.

While the 12 month schedule extension for the SAS has also extended the schedules for YBITS and OTD contracts accordingly, Caltrans is scheduling the contracts to accommodate the possibility of an early SAS completion based on incentives also included by the SAS addenda.

Page 30: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

24 of 46

For the SSD contract, the amount of delay to this contract is yet to be fully determined and is subject to analysis by Caltrans and negotiation with the Contractor. This delay is not expected to impact the open-to-traffic for the new east span.

It is estimated that all of the construction activities for the SFOBB East Span Seismic Replacement project will be completed by 2015, marked by the planned demolition of the existing SFOBB east span.

The comparison of the AB 144/SB 66 baseline schedule and the current projected schedule is shown in Chart 2-SFOBB East Span Corridor Schedule, Baseline AB 144/SB 66 vs. Current Projected. It should be noted that the schedules shown in Chart 2 do not at this time account for the potential “worst-case” issues that may affect the schedule identified in the SFOBB East Span Seismic Retrofit Project Risk Management Plan.

Major Risk Issues

SFOBB East Span Project Replacement Risk Management Plan

Caltrans continues to implement comprehensive risk management on all SFOBB East Span Seismic Replacement Project contracts in accordance with AB 144. Currently, Caltrans and BATA have embarked on an initiative to manage risk jointly. Risk response efforts continue to focus on encouraging responsive bids for future contracts and mitigating the estimated cost/schedule impact of identified risks. See “Risk Management Program” on page 27 for more information.

Quarterly Environmental Compliance Highlights

SFOBB east span environmental tasks for the current quarter are focused on mitigation monitoring. All weekly, monthly, and annual compliance reports to resource agencies have been

delivered on time with no comments from receiving agencies. Key successes this quarter include:

• Bird monitoring was conducted weekly in the active construction areas. American Peregrine falcon and California clapper rail nest monitoring for the 2006/2007 nesting season began mid-December. On March 12, 2007, a female American Peregrine Falcon was observed laying eggs at the nest site located on the south leg of Pier E3. Based on previous observations during this nesting season, the estimated hatching date will be on or about April 21, 2007.

• Turbidity monitoring was conducted without incident during drilling and decanting at Pier T1.

• Monitoring for herring spawning activity within the project construction limits began on December and will continue through March 31 each year. Physical monitoring in January 2007 during pile-drilling and decanting activities at Pier 1 did not detect any herring spawning within 200 meters of Caltrans construction operations.

• Monitoring of the one-year eelgrass pilot program at the North Basin site was completed in July 2006. The results of the monitoring were presented to the resources agencies on December 5, 2006. Caltrans is currently in the process of amending Bay Conservation and Development Commission Permit to implement one additional year of eelgrass restoration monitoring and additional plantings during Spring/Summer 2007. An additional year of monitoring will enable Caltrans to accurately access the feasibility of continuing restoration efforts.

Page 31: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

25 of 46

Table 10-Cost Comparison AB 144/SB 66, First Quarter 2007 Forecast and Expenditures through March 31, 2007 for Completed Projects ($ million)

Project AB 144/ SB 66 Budget

Approved Changes

Current Approved

Budget Cost To Date

(03/2007) 1st Quarter

2007 Forecast Variance

a b c d = b + c e f g = f - d San Francisco-Oakland Bay Bridge West Span Seismic Retrofit Project

307.9 - 307.9 301.1 307.9 -

Carquinez Bridge Retrofit Project 114.2 - 114.2 114.2 114.2 - Benicia-Martinez Bridge Retrofit Project 177.8 - 177.8 177.8 177.8 -

San Mateo-Hayward Bridge Retrofit Project 163.5 - 163.5 163.4 163.5 -

Richmond-San Rafael Bridge Retrofit Project 914.0 (89.0) 825.0 791.8 825.0 -

Vincent Thomas Bridge Retrofit Project 58.5 - 58.5 58.4 58.5 -

San Diego-Coronado Bridge Retrofit Project 103.5 - 103.5 102.6 103.5 -

TOTAL 1,839.4 (89.0) 1,750.4 1,709.3 1,750.4 -

Note: Details may not sum to totals due to rounding effects. Capital Outlay Support and Capital Outlay have been

combined. Although seismic retrofit of the Richmond-San Rafael and San Diego-Coronado bridges are complete,

environmental mitigation/monitoring work is still ongoing.

Completed Projects Seismic retrofit and project close-out has been completed on the Benicia-Martinez, Carquinez, San Mateo-Hayward, Vincent Thomas, San Diego-Coronado toll bridges and on the west span of the SFOBB. See Table 10-Cost Comparison AB 144/SB 66, First Quarter 2007 Forecast and Expenditures through March 2007 for Completed Projects. The Richmond-San Rafael Bridge project expenditures have not been completely closed because Caltrans is in discussions with regulatory agencies regarding potential mitigations for impacts on fish in the project area.

Caltrans awarded a contract for the construction of a public access lot on the Marin side of the Richmond-San Rafael Bridge to comply with a Bay Conservation and Development Commission (BCDC) permit condition. The Richmond-San Rafael Public Access Project will provide public

access to the Bay shoreline at the north end of the Richmond-San Rafael Bridge in Marin County. This contract will be completed in 2007.

To close out the Richmond-San Rafael Seismic Retrofit Project, Caltrans faces potential exposures concerning the environmental mitigation for negative impacts on fish, which is currently being discussed with regulatory agencies. Final savings for the Richmond-San Rafael Bridge project will be based on the resolution of pending negotiations with environmental permitting agencies regarding the cost of pile driving mitigation. Initial project cost savings in the amount of $89 million have been transferred to the Toll Bridge Seismic Retrofit Program Contingency, as directed by the TBPOC.

Page 32: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

26 of 46

Page 33: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

27 of 46

Risk Management Program The following is a summary of risk management activities during the First Quarter of 2007.

Developments this Quarter

• Corridor Schedule Risk Analysis: The project schedules have been integrated into a corridor schedule for schedule risk analysis. The schedule has been updated according to the accepted SAS schedule. The schedule risk analysis is on-going with the participation of the Corridor Schedule Team.

• Corridor Schedule Team: The Corridor Schedule Team (CST) reviews, assesses and mitigates corridor schedule risks for the East Span. The CST reviewed several opportunities to enhance the schedule and provided recommendations to management regarding schedule decisions and risk mitigation:

• Several Yerba Buena Island (YBI) Transition Structure foundations have been moved into the South-South Detour (SSD) contract. This reduces the risk that construction of the foundations (inherently risky owing to potential differing site conditions) may cause a delay to the corridor because such work will be completed well in advance of when needed.

• The careful phasing of the SSD West Tie-in construction will complete this critical work well ahead of when the structure will be required, minimizing the number of bridge closures, and reducing the risk of delay. It replaces much of the existing viaduct near the tunnel portal, eliminating the risk of unforeseen problems during retrofit of an old structure.

• A milestone was added to the OTD 1 contract documents for early completion of westbound access to the Skyway. This is

intended to assure that the Self-Anchored Suspension (SAS) bridge contractor will have timely access to the SAS site via the Skyway.

• The Corridor Schedule Team evaluated a request from the SAS contractor for additional work area on YBI to facilitate the construction of the W2 cap beam, temporary towers for the bridge deck on and near YBI, and cable installation. The Team recommended that the extra work area be granted to reduce the risk of delays arising from this work.

• Capital Outlay Support Risks: The Capital

Outlay Support (COS) risk register contains support cost risks that affect all projects and incorporates from the project risk registers those risks that have an impact on COS. The risks were updated this quarter, including a revision of Caltrans overhead rate projections.

• Program-level Risks: The program-level risk register captures risks that are common to all projects. Many of the risks have been quantified this quarter and are included in the assessment of the adequacy of the Program Reserve.

• Corridor Contingency: Corridor contingency is the sum of the contingency allowance remaining on the projects. It is intended to cover project risks. On-going quantitative risk analysis assesses the adequacy of the corridor contingency, and any potential need to increase it.

• Adequacy of Reserves: AB144 requires Caltrans to regularly assess its reserves for risks and potential claims. Currently, there is a forecasted $800.9 million Program Reserve. Quantitative risk analysis is on-going to assess the combined effect of corridor contingency, COS risks and program-level risks. Results indicate that a draw on the Reserve may ultimately be necessary.

Page 34: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

28 of 46

Risk Management Achievements on Contracts

• Skyway Contract: No significant schedule risks remain and there has been no increase in cost risk exposure. Outstanding Notices of Potential Claim are being resolved.

• West Approach: The project team has completed several risky work elements, such as the opening of the revised ST6D detour to traffic. The new lane alignment eliminates constructability issues associated with the temporary on-ramps and the potential for significant traffic operations difficulties.

• E2-T1 Foundations Contract: A number of risks have been reduced or retired as the work has progressed beyond the risks. The contract is unlikely to delay the SAS contract, affirming a schedule risk assessment about one year ago by Risk Management.

• South-South Detour Contract: A well-defined plan has been completed with the contractor to mitigate risks to the planned bridge closure. Efforts are continuing to mitigate schedule risks to the next milestones.

• SAS Contract: Potential fabrication and quality assurance risks were investigated during visits to China, and mitigation options are under consideration. Caltrans is studying the contractor’s request for availability of additional work area for cable installation. It has potential impacts on SAS work sequencing, work on the YBI Transition Structures, and the corridor schedule.

• Submarine Cable Relocation Contract: The contractor’s schedule will meet the required date. Cable procurement is underway and, if it arrives as planned, there will be no risk of delay to the Oakland Touchdown contract or the corridor. On January 11, 2007, Caltrans approved a contract with Manson Construction for this project.

Near-Term Risk Management Actions

The anticipated risk management activities over the next two quarters will focus on:

• Continuing the development and execution of appropriate and effective risk responses for all projects.

• Assessing COS, program-level, and corridor schedule risks.

• Evaluating potential draws on the Program Reserve.

• Further refining risk management procedures and processes.

Forecast near-term risk management activities are based on what is known and anticipated at this time. They remain subject to change as conditions, events, and priorities dictate.

West Approach demolition

Page 35: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

29 of 46

Other Toll Bridges

Dumbarton and Antioch Bridges

State Route 84 crosses the southern region of San Francisco Bay between the cities of Newark to the east and East Palo Alto to the west. The Route consists of three lanes in each direction and an eight-foot bicycle/pedestrian lane. The AADT of the Route is near 81,000. The bridge is over 2 km in length and is positioned in an approximately normal geometry between two seismic faults which the USGS has reported to pose most of the significant seismic threat to the San Francisco Bay Area: the San Andreas Fault, some 15 km to the west of the bridge; and the Hayward Fault, some 13 km to the east of the bridge.

State Route 160 crosses the San Joaquin River between the city of Antioch and Sherman Island (leading to Rio Vista) via the Antioch Bridge. The Bridge carries a single lane of traffic in each direction. The AADT for the Route is slightly over 13,000 vehicles per day. The bridge is threatened by the Bird’s Landing Seismic Zone, Cost Range/Sierra Nevada Boundary Zone and the San Andreas Fault.

Cost and Schedule

A preliminary cost estimate, schedule, and an initial risk analysis have been developed to complete a comprehensive seismic analysis for each bridge. The preliminary estimate and schedule were developed as a baseline assuming a complete geotechnical and geophysical investigation is required at each bridge.

Current Progress These bridges are currently being evaluated for seismic safety and post-earthquake performance. Work is underway in three specific areas: seismology, geology and geotechnical engineering, and bridge structural engineering.

In June 2006, BATA approved $17.8 million in funding to proceed with the comprehensive seismic analysis of the bridges. By September 2006, BATA entered into contract with a geotechnical and geophysical consultant to evaluate the bridges.

Work in the area of seismology is defining the seismic groundmotions used for design. Recommended Safety Evaluation (SE) level motions have been developed for both bridges and are currently under review by and external and independent Seismic Safety Peer Review Panel (SSPRP). SE motions represent future large earthquakes. Work in this area to be completed in the near future includes finalizing the SE motions, developing lower level Functional Evaluation (FE) motions, and multiple earthquake time-histories that can be used in the checking phase of the projects. Draft reports have been released.

Work in the area of geology and geotechnical engineering includes field drilling and studying of soil samples to identify soil types, locations, and engineering properties. This work supports work in defining how the soil at the bridge sites move during earthquakes and how the rigidly the bridge’s foundations are held in the soil. The drilling operations are complete at both bridge sites; information is being shared with the seismologic team and the bridge structure team. Draft reports have been released.

Work in the area of bridge structural engineering is underway for both bridges. The structures team to date has been collecting and evaluating structural information on the bridges, reducing that information for use in computer models of the bridges, and initiating early computational runs of the models. Geological, geotechnical, and seismological information from the work areas mentioned previously is being incorporated into the bridge evaluations.

Page 36: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

30 of 46

Table 11-Toll Bridge Program Oversight Committee

Expenses: July 1, 2005 through March 31, 2007 ($ Millions) Agency/Program Activity Expenses

BATA 0.2

Caltrans 0.5

CTC 0.1

Reporting 1.2

Total Program 2.0

Summary of TBPOC Expenses Pursuant to Streets and Highways Code Section 30952.1 (d), expenses incurred by Caltrans, BATA, and the California Transportation Commission (CTC) for costs directly related to the duties associated with the TBPOC are to be reimbursed by toll revenues. Table 11-Toll Bridge Program Oversight Committee Actual Expenses: July 1, 2005 through March 31, 2007 shows expenses through March 31, 2007, for TBPOC functioning, support, and monthly and quarterly reporting.

Page 37: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

31 of 46

Appendices

A. TBSRP All Bridges AB 144/SB 66 Baseline Budget, Forecasts, and Expenditures through March 31, 2007 (A-1 and A-2).

B. TBSRP East Span Only AB 144/SB 66 Baseline Budget, Forecasts, and Expenditures through March 31, 2007.

C. CTC First Quarter Schedule.

D. Project/Contract Photographs.

Page 38: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

32 of 46

AB 144/SB 66 TBPOC Current Fourth Quarter First Quarter Variance ExpendituresBridge Baseline Approved 2006 2007 (1st Q07 - 4th Q06) Through

Budget Forecast Forecast Mar 2007

Benicia-MartinezCapital Outlay Support 38.1 38.1 38.1 38.1 - 38.1 Capital Outlay 139.7 139.7 139.7 139.7 - 139.7 Total 177.8 177.8 177.8 177.8 - 177.8

CarquinezCapital Outlay Support 28.7 28.7 28.7 28.7 - 28.8 Capital Outlay 85.5 85.5 85.5 85.5 - 85.4 Total 114.2 114.2 114.2 114.2 - 114.2

San Mateo-HaywardCapital Outlay Support 28.1 28.1 28.1 28.1 - 28.1 Capital Outlay 135.4 135.4 135.4 135.4 - 135.3 Total 163.5 163.5 163.5 163.5 - 163.4

Vincent ThomasCapital Outlay Support 16.4 16.4 16.4 16.4 - 16.4 Capital Outlay 42.1 42.1 42.1 42.1 - 42.0 Total 58.5 58.5 58.5 58.5 - 58.4

San Diego-CoronadoCapital Outlay Support 33.5 33.5 33.5 33.5 - 33.2 Capital Outlay 70.0 70.0 70.0 70.0 - 69.4 Total 103.5 103.5 103.5 103.5 - 102.6

Richmond-San Rafael Capital Outlay Support 134.0 127.0 127.0 127.0 - 126.0 Capital Outlay 780.0 698.0 698.0 698.0 - 665.8 *

Total 914.0 825.0 825.0 825.0 - 791.8

West Span RetrofitCapital Outlay Support 75.0 75.0 75.0 75.0 - 74.8 Capital Outlay 232.9 232.9 232.9 232.9 - 226.3 Total 307.9 307.9 307.9 307.9 - 301.1

West ApproachCapital Outlay Support 120.0 120.0 120.0 120.0 - 90.6 Capital Outlay 309.0 309.0 309.0 309.0 - 232.5 Total 429.0 429.0 429.0 429.0 - 323.1

SFOBB East SpanCapital Outlay Support 959.4 959.4 977.1 977.1 - 487.6 Capital Outlay 4,492.1 4,671.3 4,546.8 4,686.6 139.8 1,787.1 Other Budgeted Capital 35.1 35.1 11.0 11.0 - 0.6 Total 5,486.6 5,665.8 5,534.9 5,674.7 139.8 2,275.3

Miscellaneous Program Costs 30.0 30.0 30.0 30.0 - 24.7 Subtotal Capital Outlay Support 1,463.2 1,456.2 1,473.9 1,473.9 - 948.3

Subtotal Capital Outlay 6,321.8 6,419.0 6,270.4 6,410.2 139.8 3,384.1 Subtotal Toll Seismic Retrofit 7,785.0 7,875.2 7,744.3 7,884.1 139.8 4,332.4

Program Contingency 900.0 809.8 940.7 800.9 (139.8) -

Total Toll Seismic Retrofit Program 8,685.0 8,685.0 8,685.0 8,685.0 - 4,332.4

Toll Bridge Seismic Retrofit Program AB 144/SB 66 Baseline Budget, Forecasts, and Expenditures Through March 31, 2007

($ millions)

Notes: * Budget for Richmond-San Rafael Bridge include $16.9 million of deck joint rehabilitation work that's considered to be eligible for seismic retrofit program funding. (Due to the rounding of numbers, the totals above are shown within $0.1).

Appendix A-1.

Page 39: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

33 of 46

AB 144 Baseline TBPOC Current Expenditures to date and Estimated Costs not yetBridge Budget Approved Budget Encumbrances Spent or Encumbered Total Forecast

as of Mar 2007 as of Mar 2007 as of Mar 2007See Note (1)

(Columns C +D)

Other Completed ProjectsCapital Outlay Support 144.9 144.9 144.7 0.2 144.9 Capital Outlay 472.6 472.6 473.4 (0.7) 472.7 Total 617.5 617.5 618.1 (0.5) 617.6

Richmond-San RafaelCapital Outlay Support 134.0 127.0 126.1 0.9 127.0 Capital Outlay 698.0 698.0 673.1 24.9 698.0 Project Reserves 82.0 - - - - Total 914.0 825.0 799.2 25.8 825.0

West Span RetrofitCapital Outlay Support 75.0 75.0 74.8 0.2 75.0 Capital Outlay 232.9 232.9 234.2 (1.3) 232.9 Total 307.9 307.9 309.0 (1.1) 307.9

West ApproachCapital Outlay Support 120.0 120.0 91.8 28.2 120.0 Capital Outlay 309.0 309.0 299.8 9.2 309.0 Total 429.0 429.0 391.6 37.4 429.0

SFOBB East Span -SkywayCapital Outlay Support 197.0 197.0 161.2 35.8 197.0 Capital Outlay 1,293.0 1,293.0 1,238.1 54.9 1,293.0 Total 1,490.0 1,490.0 1,399.3 90.7 1,490.0

SFOBB East Span -SAS- SuperstructureCapital Outlay Support 214.6 214.6 36.9 177.7 214.6 Capital Outlay 1,753.7 1,753.7 1,647.6 119.8 1,767.4 Total 1,968.3 1,968.3 1,684.5 297.5 1,982.0

SFOBB East Span -SAS- FoundationsCapital Outlay Support 62.5 51.5 30.1 21.4 51.5 Capital Outlay 339.9 339.9 303.7 36.2 339.9 Total 402.4 391.4 333.8 57.6 391.4

Small YBI ProjectsCapital Outlay Support 10.6 10.6 10.2 0.4 10.6 Capital Outlay 15.6 15.6 16.2 (0.5) 15.7 Total 26.2 26.2 26.4 (0.1) 26.3

South/South DetourCapital Outlay Support 29.5 39.5 21.1 18.4 39.5 Capital Outlay 131.9 334.4 131.5 202.9 334.4 Total 161.4 373.9 152.6 221.3 373.9

YBI - Transition StructuresCapital Outlay Support 78.7 78.7 13.3 65.4 78.7 Capital Outlay 299.4 276.1 0.1 276.0 276.1 Total 378.1 354.8 13.4 341.4 354.8

Oakland TouchdownCapital Outlay Support 74.4 74.4 24.2 67.9 92.1 Capital Outlay 283.8 283.8 9.5 293.0 302.5 Total 358.2 358.2 33.7 360.9 394.6

East Span Other Small ProjectCapital Outlay Support 212.3 213.3 196.1 17.2 213.3 Capital Outlay 170.8 170.8 89.0 57.6 146.6 Total 383.1 384.1 285.1 74.8 359.9

Existing Bridge DemolitionCapital Outlay Support 79.7 79.7 0.3 79.4 79.7 Capital Outlay 239.2 239.2 - 222.0 222.0 Total 318.9 318.9 0.3 301.4 301.7

Miscellaneous Program Costs 30.0 30.0 24.9 5.1 30.0

Total Capital Outlay Support (2) 1,463.2 1,456.2 955.7 518.2 1,473.9 Total Capital Outlay 6,321.8 6,419.0 5,116.2 1,294.0 6,410.2 Program Total 7,785.0 7,875.2 6,071.9 1,812.2 7,884.1

(1). Funds allocated to project or contract for Capital Outlay and Support needs includes Capital Outlay Support total allocation for FY 06/07.(2). Total Capital Outlay Support includes program indirect costs.

(Due to the rounding of numbers, the totals above are shown within $0.1).

Toll Bridge Seismic Retrofit Program - SAS Alternative AB 144 Baseline Budget, Forecasts and Expenditures Through March 31, 2007

($ in millions)

Appendix A-2.

Page 40: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

34 of 46

Appendix B.

AB 144/SB 66 TBPOC Current Fourth Quarter 2006 First Quarter 2007 Variance Expenditures East Span Contract Baseline Approved Budget Forecast Forecast (1st Q07 - 4th Q06) Through

See Note (1) Mar 2007

SFOBB East Span -SkywayCapital Outlay Support 197.0 197.0 197.0 197.0 - 159.8 Capital Outlay 1,293.0 1,293.0 1,293.0 1,293.0 - 1,140.5 Total 1,490.0 1,490.0 1,490.0 1,490.0 - 1,300.3

SFOBB East Span -SAS- E2/T1 FoundationsCapital Outlay Support 52.5 41.5 52.5 41.5 (11.0) 20.2 Capital Outlay 313.5 313.5 313.5 313.5 - 203.6 Total 366.0 355.0 366.0 355.0 (11.0) 223.8

SFOBB East Span -SAS- SuperstructureCapital Outlay Support 214.6 214.6 214.6 214.6 - 33.7 Capital Outlay 1,753.7 1,753.7 1,767.4 1,767.4 - 260.4 Total 1,968.3 1,968.3 1,982.0 1,982.0 - 294.1

SFOBB East Span -SAS- W2 FoundationsCapital Outlay Support 10.0 10.0 10.0 10.0 - 9.2 Capital Outlay 26.4 26.4 26.4 26.4 - 25.8 Total 36.4 36.4 36.4 36.4 - 35.0

South/South DetourCapital Outlay Support 29.5 39.5 29.5 39.5 10.0 21.0 Capital Outlay 131.9 334.4 152.2 334.4 182.2 45.8 Total 161.4 373.9 181.7 373.9 192.2 66.8

YBI - Transition StructuresCapital Outlay Support 78.7 78.7 78.7 78.7 - 13.3 Capital Outlay 299.3 276.1 318.5 276.1 (42.4) - Total 378.0 354.8 397.2 354.8 (42.4) 13.3

Oakland Touchdown (Total, including the following split contracts and prior-to-split expenses)Capital Outlay Support 74.4 74.4 92.1 92.1 - 23.9 Capital Outlay 283.8 283.8 302.5 302.5 - - Total 358.2 358.2 394.6 394.6 - 23.9

Oakland Touchdown Contract - Submarine CableCapital Outlay Support - - 3.0 3.0 - 0.4 Capital Outlay - - 9.6 9.6 - - Total - - 12.6 12.6 - 0.4

Oakland Touchdown Contract No. 1 (Westbound)Capital Outlay Support - - 49.9 49.9 - 3.3 Capital Outlay - - 226.5 226.5 - - Total - - 276.4 276.4 - 3.3

Oakland Touchdown Contract No. 2 (Eastbound)Capital Outlay Support - - 15.8 15.8 - 0.2 Capital Outlay - - 62.0 62.0 - - Total - - 77.8 77.8 - 0.2

Oakland Touchdown Contract - Electrical SystemsCapital Outlay Support - - 1.4 1.4 - 0.1 Capital Outlay - - 4.4 4.4 - - Total - - 5.8 5.8 - 0.1

Toll Bridge Seismic Retrofit Program - SFOBB East Span Only AB 144/SB 66 Baseline Budget, Forecasts, and Expenditures Through March 31, 2007

($ millions)

Page 41: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

35 of 46

AB 144/SB 66 TBPOC Current Fourth Quarter 2006 First Quarter 2007 Variance Expenditures East Span Contract Baseline Approved Budget Forecast Forecast (1st Q07 - 4th Q06) Through

See Note (1) Mar 2007

YBI/SAS (Archeology)Capital Outlay Support 1.1 1.1 1.1 1.1 - 1.1 Capital Outlay 1.1 1.1 1.1 1.1 - 1.1 Total 2.2 2.2 2.2 2.2 - 2.2

YBI - USCG Rd RelocationCapital Outlay Support 3.0 3.0 3.0 3.0 - 2.7 Capital Outlay 3.0 3.0 3.0 3.0 - 2.8 Total 6.0 6.0 6.0 6.0 - 5.5

YBI - Substation and ViaductCapital Outlay Support 6.5 6.5 6.5 6.5 - 6.4 Capital Outlay 11.6 11.6 11.6 11.6 - 11.3 Total 18.1 18.1 18.1 18.1 - 17.7

Oakland GeofillCapital Outlay Support 2.5 2.5 2.5 2.5 - 2.5 Capital Outlay 8.2 8.2 8.2 8.2 - 8.2 Total 10.7 10.7 10.7 10.7 - 10.7

Pile Installation Demonstration ProjectCapital Outlay Support 1.8 1.8 1.8 1.8 - 1.8 Capital Outlay 9.2 9.2 9.2 9.2 - 9.2 Total 11.0 11.0 11.0 11.0 - 11.0

Existing Bridge DemolitionCapital Outlay Support 79.7 79.7 79.7 79.7 - 0.3 Capital Outlay 239.2 239.2 222.0 222.0 - - Total 318.9 318.9 301.7 301.7 - 0.3

Stormwater Treatment MeasuresCapital Outlay Support 6.0 8.0 7.0 8.0 1.0 6.4 Capital Outlay 15.0 15.0 15.0 15.0 - 8.8 Total 21.0 23.0 22.0 23.0 1.0 15.2

Right-of-way and Environmental MitigationCapital Outlay Support - - - - - - Capital Outlay 72.4 72.4 72.4 72.4 - 38.8 Total 72.4 72.4 72.4 72.4 - 38.8

Sunk Cost - Existing East Span RetrofitCapital Outlay Support 39.5 39.5 39.5 39.5 - 39.5 Capital Outlay 30.8 30.8 30.8 30.8 - 30.8 Total 70.3 70.3 70.3 70.3 - 70.3

Environmental Phase (Expended)Capital Outlay Support 97.7 97.7 97.7 97.7 - 97.7

Project Expenditures, Pre-splitsCapital Outlay Support 44.9 44.9 44.9 44.9 - 44.9

Non-project Specific CostsCapital Outlay Support 20.0 19.0 19.0 19.0 - 3.2

Subtotal East Span Capital Outlay Support 959.4 959.4 977.1 977.1 - 487.6 Subtotal East Span Capital Outlay and Sunk Costs 4,492.1 4,671.3 4,546.8 4,686.6 139.8 1,787.1 Other Budgeted Capital 35.1 35.1 11.0 11.0 - 0.6

5,486.6 5,665.8 5,534.9 5,674.7 139.8 2,275.3

(1)

(Due to the rounding of numbers, the totals above are shown within $0.1).

Current contract allotment to install two submarine electrical cables is $11.5 million. Additional non-program funding to support this allocation beyond the $9.6 million of available programs funds has been made available by the Treasure Island Development Authority.

Total SFOBB East Span

Toll Bridge Seismic Retrofit Program - SFOBB East Span Only AB 144/SB 66 Baseline Budget, Forecasts, and Expenditures Through March 31, 2007

($ millions)

Appendix B. (Cont’d.)

Page 42: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

36 of 46

Appendix C. CTC TBSRP Contributions Adopted December 2005

Schedule of Contributions to the Toll Bridge Seismic Retrofit Program ($ million)

Source Description 2005-06 (Actual) 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Total

SHA 290 290

PTA 80 40 120

Highway Bridge Replacement and Rehabilitation (HBRR )

100 100 100 42 342 AB 1171

Contingency 1 99 100 100 148 448

SHA* 2 8 53 50 17 130

Motor Vehicle Account (MVA) 75 75

Spillover 125 125 AB 144

SHA** 300 300

Total 547 273 100 43 99 153 150 165 300 1830

* Caltrans Efficiency Savings

** SFOBB East Span Demolition Cost

Page 43: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

37 of 46

Skyway Eastbound & Westbound

Skyway Erected Service Platform

Skyway Sandblasting the Bridge Soffit

Appendix D. Project/Contract Photographs

SFOBB East Span Replacement Project

Skyway Contract

Skyway Erecting the Service Platform

Page 44: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

38 of 46

Skyway - Pouring Concrete Bridge Barrier

Skyway Orthotropic Box Girder

Skyway Looking East (two)

Skyway Looking East (one)

Skyway Expansion Joint Installation

Skyway Contract (Cont’d.)

Skyway Eastbound Hinge BE Expansion Joint

Page 45: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

39 of 46

SAS Superstructure Contract

SAS Superstructure Artist Rendition

Page 46: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

40 of 46

W2 - Preparation for Falsework Erection (two)

W2 - Preparation for Falsework Erection (one)

SAS Superstructure Contract (Cont’d.)

Page 47: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

41 of 46

SAS E2/T1 Foundations Contract

E2 Prepared and Sheltered for pile head connection welding

Rock Socket Drilling in Pile # 4 at T1

Page 48: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

42 of 46

SAS E2/T1 Foundations Contract (Cont’d.)

T1 = Foundation for the 530-foot steel tower E2 = Eastern Support of the suspension roadway W2 = Western Support of the suspension roadway

T1 – Footing Box

T1 - Bottom Slab Concrete

Page 49: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

43 of 46

YBI SSD Contract

Viaduct Bent Cap Falsework

Footing and Pier Columns for Bent 48

WTI Phase 1 - Demolition of North Overhang

WTI Phase 1 - Staging Area

W3L

Page 50: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

44 of 46

SFOBB West Approach Replacement Project

Page 51: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

45 of 46

SFOBB West Approach Replacement Project (Cont’d.)

West Approach Demo Upper deck Westbound (two)

West Approach New Harrison Off-ramp Falsework

West Approach Overhead View of the newly opened SD60 Ramp & the Old Eastbound 80 Structure

West Approach Demo Upper deck Westbound (one)

West Approach Overhead View of the newly opened SD60 Ramp & the Old Eastbound 80 Structure (Wider View)

West Approach Demolition Upper deck Westbound

Page 52: First Quarter ReportTotal SFOBB East Span Replacement Project 5,486.6 179.2 5,665.8 2,275.3 5,674.7 8.9 SFOBB West Approach Replacement Construction z Capital Outlay Support 120.0

2007 First Quarter Report – Toll Bridge Seismic Retrofit Program

46 of 46

SFOBB West Approach Replacement Project (Cont’d.)

West Approach Overhead View


Recommended