First sector cooldown Cryogenic Production Review. QSV. QSCA. QSCC. QSRA. QURA. QURC. QUI. QRL. Sector. 78 Cooldown Cryogenic system. Hélium storage: 80m 3 & 250m 3 Vessels 4.5K Refrigerator: Compressors,Cold box 1.8K Units: Screw compressors,Cold box Nitrogen pre cooler - PowerPoint PPT Presentation
Popular Tags:
14
First sector cooldown Cryogenic Production Review
Transcript
Page 1: First sector cooldown Cryogenic Production Review

First sector cooldownCryogenic Production

Review

Page 2: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 2

QUI

QSRA

QSCA

QURC

QSCC

QSV

QRL

Sector

QURA

78 Cooldown Cryogenic system

Hélium storage: 80m3 & 250m3 Vessels

4.5K Refrigerator: Compressors,Cold box

1.8K Units: Screw compressors,Cold

box

Nitrogen pre cooler Interconnecting box

QSAA

QSKA

QSDN

Page 3: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 3

Control Architecture For 78 COOLDOWN

SH8

US IP8

SDH8

QSV

QUI

QSDN

SHM8 SD8

LHCC

QSCCB

Comp 1.8K

QURC

CB 1.8K

1.8KDS1

UX85US85

SHBB8

Bat 2851

QSRA QSAAMain Dryer

QSKA

LHCA

QURA

Comp 4.5K

LCB4.5K

UCB 4.5K

4.5K

QSCA

Control room SHC8 EW1OS3OS4

PVSS data

servers

CCC

Sectors PLC

Profibus nets Worldfip nets

FIP GW

LHC Alcoves

LHC Tunnel

EW2

Ethernet backbone (IT-CS)

Page 4: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 4

Control Dependencies

Page 5: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 5

AP development Phase 1 :Devices Specification

Fie

ld d

evi

ces

PC

O d

evi

ces

I/O

de

vice

s

Page 6: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 6

devices

DB

device type templates

Instantiation generation

Instance Generator

PLC device instance

Supervision device

instance

AP development Phase 2 :Devices Instanciation

PLC

UNICOS FW

UNICOS library

UNICOS time stamped Middleware

Supervision

Devices Specification

Device instantiation

Device instantiation

Scripts

Page 7: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 7

AP development Phase 3 : LOGIC Spec. capture

Interlock Logic

Configuration logic

Global logic

Dependent Objectcontrol logic

Dependent Objectcontrol logic

Dependent Objectcontrol logic

For Each system components the process engineers supply the logic associated to each logic placeholder in a template document

Interlock Logic

Configuration logic

Global logic

Dependent Objectcontrol logic

Logic Placeholders

Page 8: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 8

devices

DB

device type templates

Instantiation generation

Instance Generator

PLC device instance

Supervision device

instance

AP development Phase 4 : Logic Skeleton Generation

PLC

UNICOS FW

UNICOS baseline

UNICOS time stamped Middleware

Supervision

Devices Specification

Device instantiation

Device instantiation

Scripts

Logic skeletonLogic Files

Logic templates

Basic Logic generation

Logic DB

Logic Generator

PlaceholderSkeletons

Page 9: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 9

AP development Phase 5: Process Logic & HMI Production & Maintenance

PLC

UNICOS FW

UNICOS baseline

UNICOS time stamped Middleware

Supervision

Device instantiation

Device instantiation

Control Logic

Manualproduction

Logic Specification

Manualproduction

Synoptic Specification

Synoptic views, …

Page 10: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 10

Logic Files

Logic templates

Logic generation

Logic DB

Logic Generator

devices

DB

device type templates

Instantiation generation

Instance Generator

PLC device instance

Supervision device

instance

Model based Generation for Sectors

PLC

UNICOS FW

UNICOS baseline

UNICOS time stamped Middleware

Supervision

Device instantiation

Device instantiation

Scripts

Meta-ModelGenerator

Meta-Model

META-MODEL

Complete Logic code

Replace generic skeletonBy

Actual logic model

Page 11: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 11

AB

-CO

-IS

AT

-AC

RPresent Application status

Sector 1-2 Sector 2-3

Point 4Point 2Point 1.8

Su

rface(b

uildin

gs+areas)

Cavern

Sh

aft

QRL QRL QRL QRL QRL QRL QRL QRL Tu

nn

el

QSCCA

To be duplicated

Master Version Under Development by AB/CO & AT/ACR

Under specification by AT/ACR.

Ready in Unity/PVSS

QURCA

QSCCB

QURCB

Version Waiting for Update by Master Version

QSCA

QSRA

QURA

QSV

QSDN

QUIA

QSV QSV

QSDN

QSCB

QSRB

QUIB

QSDN

QSCCBQSCBQSCA

QSRA

QURA

QSCCA

QURCA QURCB

QUIC

QSRB

Point 6

QSV

QSDN

QSCCAQSCAQSCB

QSRB

QURA

QSCCB

QURCB QURCA

QUIC

QSRA

Point 8

QSV

QSDN

QSCCBQSCBQSCA

QSRA

QURA

QSCCA

QURCA QURCB

QUIC

QSRB

Sector 3-4 Sector 4-5 Sector 5-6 Sector 6-7 Sector 7-8 Sector 8-1

QSAA QSAA QSAAQSAA QSAB QSAB QSAB

QSKAQSKAQSKAQSKA

QSAB

Page 12: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 12

Some Numbers

QRL QRL

14

14

475

4

4

4

6 6

92

6

Sector 7-8 Sector 8-1

14 14

14

27264428

Instancedevice Instances &

Process logic

Number of Application Versions

QRL QRL

QSV

QSDN

QSCCBQSCBQSCA

QSRA

QURA

QSCCA

QURCA QURCB

1238

QSRB

9913 9913

QSAB QSAB

QSKA

1250245725321250

Number of Devices Number of Datapoints sent to logging at 0.1hz max

QRL QRL

QSV

QSDN

QSCCBQSCBQSCA

QSRA

QURA

QSCCA

QURCA QURCB

2219

QSRB

26019 26019

QSAB QSAB

QSKA

2456466248142456

Total :28553 Total : 68645

Page 13: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 13

Cooldown status

LHC sector 78 - First cooldown

75

100

125

150

175

200

225

250

275

300

15/01/07 18:00 17/01/07 18:00 19/01/07 18:00 21/01/07 18:00 23/01/07 18:00 25/01/07 18:00 27/01/07 18:00 29/01/07 18:00 31/01/07 18:00

Time (UTC)

Tem

per

atu

re (

K)

0%

20%

40%

60%

80%

100%

Co

oli

ng

ca

pa

cit

y (

% o

f 6

00

kW

)

Supply temperature Magnet temperature (average over sector)

Return temperature Cooling Capacity

Start cooldown

Cooling

capacity

Supply

temperature

Return

temperature

Magnet

temperature

k l

Week-end On-call activity

m

n

o

j

Week-end On-call activity

pRandom Emergency

stop in surface building

q

Page 14: First sector cooldown Cryogenic Production Review

Ph Gayet AB/CO ISAB-CO TC, 1 february 2007 14

Bilan

Good Production applications ready on

due time Production methodology allow easy

and clean maintenance All application under one

supervision system Recurrent communication problem

solved before CD Coherent and efficient powering

and networking schema (no stop at last powercut)

CNIC Implementation transparent. Operators trained and happy with

proposed HMI Remote access via terminal server

Not so good Too Many versions for logic that

have induced some regression during system commissioning

Each integration of a new system in PVSS can induce limited but painful regressions if strict procedures are not followed

Need for reverse engineering tools One PLC stop that have induced

several hours of delay Control loop on Ethernet are at risk Some discrepancies between

production and sector HMI to solve Still some requirements to

implement Too many users on terminal

servers need of clusters


Recommended