Fixture Installation Orbital Shower Basic R3 5-06-0010 Publication date 2021-08-27
Transcript
Page 1: Fixture Installation

Fixture Installation

Orbital Shower Basic R35-06-0010

Publication date 2021-08-27

Page 2: Fixture Installation

Copyright © 2021,Orbital Systems

All rights reserved. No part of this document may be reproduced or copied in any form or by any means without writtenpermission from Orbital Systems. The English language version of this document contains the original instructions. All other

language versions are translations of the original instructions.

Page 3: Fixture Installation

Table of ContentsPrerequisites and Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Installation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Installation Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Orbital Shower Installation Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Orbital Shower Configuration Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Shower Installation Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Recycling Optimisation Site Suggestion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Fixture Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Component Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Kit Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Crucial Kit Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Installation Scenario Displayed in Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Prepare Shower Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Install Drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16Install Wall Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19Prepare Orbital Systems Shower Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Prepare 3rd Party Shower Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Install Core Wall Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Pipes & Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Prepare for Tiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24Apply Waterproofing Membrane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

For installations outside of Sweden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25For installations in Sweden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25Apply Waterproofing Membrane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Install Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Tiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Final Preparations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Page 3 of 31

Page 4: Fixture Installation

This page is intentionally left blank.

Page 4 of 31

Page 5: Fixture Installation

Prerequisites and ApprovalsOrbital Shower is designed and type approved according tothe Swedish requirements in Swedish National Board ofHousing and Building & Planning regulations (BBR). Thesystem is type approved according to RiSE (ResearchInstitutes of Sweden AB) with Type Approval CertificateC900373 & C900374. Orbital Shower is CE-marked basedon test reports from third party labs.

If industry regulations and instructions in this manual arefollowed, Orbital Systems guarantees a functional showersystem.

Page 5 of 31

Page 6: Fixture Installation

WarrantyThe Orbital Shower and its components aremanufactured from high-quality materials andassembled under strict standards.

Orbital Systems warranty covers defects which appear withina period of 2 years from delivery of the product or as long asthe extended warranty period bought or included in thepurchase.

Orbital Systems warranty does not cover:• Defects arising out of materials or a design specified by the

Customer, or by any alterations carried out without ourconsent.

• Defects that appear under conditions of operation notprovided for and under improper use of the product.

• Defects caused by faulty or non-occurring maintenance,incorrect installation or a faulty repair.

For showers outside of the warranty period spare parts areavailable for purchase directly from Orbital Systems.

ServiceOrbital Systems and our team of expert staff are available toassist you if you require product advice, experience anyproblems, need to purchase spare parts or to set up aservice appointment.

Repairs should only be carried out by Orbital Systems.

Contact us• [email protected]• www.orbital-systems.com• Europe: +46 (0)40 619 55 50

Page 6 of 31

Page 7: Fixture Installation

Installation Requirements

Connectivity

Internet connection: Either password protected 2,4 GHz / 5 GHz Wi-Fi network orEthernet is required.

Ethernet is a factory added option. It is not possible to use Wi-Fi asconnection method after the shower has been prepared for Ethernet.

Electrical Supply

Residual circuit breaker: One breaker per Shower Core

Power supply: One Phase, 240VAC / 50 Hz / 16A

Mains supply wire: Min. 2.5 mm2 (rated for 16A circuit)

Plumbing / Water

Incoming water supply connections: Separate hot and cold, 2x female G 1/2" swivel nut

Incoming cold water temp. (min-max): 4-25°C

Incoming hot water temp. (min-max): 50-65°C

Incoming water pressure (min-max): 2-10 bar

The supply pressure is the fundamental requirement for the showerflow:

• 2 bar: 7.5 litres/min• 3 bar: 9.5 litres/min• 4 bar: 11 litres/min

Recommended water supply flow: 9 litres/minute per inlet hot and cold

Water hardness (min-max): Minimum: 3°dH-10°dH

Recommended: 6°dH-10°dH (or a total hardness of 110-180mgCaCO3/litre)

Water iron content: <0,3mg/litre

Page 7 of 31

Page 8: Fixture Installation

Installation OverviewOrbital Shower Installation Options

max. 3000mm

The distance between the center of the Orbital Shower Coreand the center of the Drain Unit must not exceed 3000 mm.

Orbital Shower Coreplaced on the samewall as the Drain Unitand Shower Head.

Orbital Shower Coreplaced on a wallperpendicular to theDrain Unit and ShowerHead.

Orbital Shower Coreplaced in a separateroom. Any potentialspill water from OrbitalShower Core needs tohave access to adrain.

Orbital Shower Coreplaced in a separateroom. Any potentialspill water from OrbitalShower Core needs tohave access to adrain.

When installing the Basic model, the Orbital Shower Core isinstalled outside the shower area. The limitation in distance,ensuring full system functionality, is maximum 3000 mm. Thekit only allows for mounting on a wall.

Any bends in the sleeves and conduits going to and fromOrbital Shower Core needs to be achieved by using 45°angles. For example, to achieve a 90° bend, two pcs of 45°bends needs to be used. No more than six 45° bends(maximum three 90° bends) in total can be used wheninstalling the Orbital Shower. These limitations applies toboth horizontal and vertical bends.

Orbital Shower ConfigurationRequirements

D.

D.

C.

W 450mm, H 750mm, D 150mm

max. 65 mm

min. 45 mm

A.

>0mm

B.

min. 100 mm

max. 350 mmX

X Finished floor height where it is level.

The following constraints apply to the configuration ofsystem components:

A. The top of the Orbital Shower Core must be placed lowerthan the bottom of the Diverter.

B. The piping between the Orbital Shower Core and theDrain Unit has to be built with a consistent slope towards theDrain Unit. Orbital Shower Core must be positioned minimum100 mm and maximum 350 mm above the top of the DrainUnit Frame.

C. Total distance between the Control Dial and OrbitalShower Core cannot exceed 3000 mm.

D. The piping between the Orbital Shower Core, any ShowerHeads and the Drain Unit has to be built with a consistentslope towards the Drain Unit. Total distance between theOrbital Shower Core and the Drain Unit cannot exceed 3000mm.

Page 8 of 31

Page 9: Fixture Installation

Wall InstallationThe weight of the Orbital Shower Core is approx. 25 kg. Thesurrounding structure must be able to support the forces thatwill stress the attachment points.

Page 9 of 31

Page 10: Fixture Installation

Shower Installation Overview

Available shower variants:

A: Orbital Systems Shower Head & Hand Shower

B: Orbital Systems Shower Head

C: 3rd Party Shower Head

Drain Unit HxWxD: 192x812x184 mm

Drain Connection: Ø75 mm

Recycling Optimisation Site SuggestionRecommended installation

A fully enclosed shower area with floor heating isrecommended to optimize recirculation rates.

Page 10 of 31

Page 11: Fixture Installation

Fixture InstallationComponent Overview

9

6

4

3

2

14

1

4

5

7

8

12

6

13

15

16

10

17

11

1. Conduit for Control Dial 350 cm (RSK 187 06 65)2. Top Bracket Assembly + screws, x23. Bottom Bracket Assembly + screws, x54. Conduit Elbow (RSK 187 79 99), x25. Conduit End Cap (RSK 187 71 96)6. Fixture + countersunk screws, x27. Drain Unit (RSK 711 54 63) + screws, x78. Frame9. Grating10. Outlet Unit (RSK 711 99 33)11. Drain Waterproofing Membrane12. Antenna13. Pipe 100 cm (RSK 283 20 03), x314. Fitting 40 mm x 45° (RSK 291 03 41), x215. Bend 50 mm x 45° (RSK 283 20 31), x616. Reducer 50-40 mm (RSK 291 03 56)17. Retainer Conduit (RSK 188 21 50), x3

Provided by Customer:1. Waterproofing Conduit Membrane cc40 for Diverter2. Waterproofing Conduit Membrane for Shower Head3. Waterproofing Conduit Membrane for Control Dial4. Waterproofing Conduit Membrane for Pipe to Orbital

Shower Core

Orbital Systems Shower Head & Hand Shower

4

5

1

3

6

2

1. Wallbox Uni Push (RSK 188 25 12) + pan head stainlesssteel screw, x8

2. Retainer Conduit (RSK 188 21 50), x53. PEX Hose with Conduit 550 cm (RSK 188 23 36)4. Conduit Elbow (RSK 187 79 99), x35. Mixer Bracket (RSK 188 11 94)6. Fixture + countersunk screw, x2

Kit Measurements

Page 11 of 31

Page 12: Fixture Installation

74

5 m

m1

46

mm

442 mm

466 mmCrucial Kit Measurements

CAUTIONCrucial measurements!

X

11

00

mm

14

50

mm

150 mm 150 mm

X Finished floor height where it is level.

68

8 m

m

85

0 m

m

min. 80mm

min

. 10

0 m

m

ma

x. 3

50

mm

Page 12 of 31

Page 13: Fixture Installation

Installation Scenario Displayed in ManualAdjust lengths and bends on hoses and cables depending oninstallation scenario.

See section Configuration Requirements [8] in ChapterInstallation Overview [8] for requirements on maximumlengths and maximum number of conduit bends.

Page 13 of 31

Page 14: Fixture Installation

Prepare Shower Area

1. Mark the finished floor height where it is level (>170mm). This mark will be used as measurement "X" in theinstallation process to ensure that there is enough spacefor the Drain Unit.

150 mm

20 mm

>170 mm

X

X

2.95 mm

min. 400mm

X

X Finished floor height where it is level.

3. CAUTIONIt is crucial that all noggin pieces are inlevel and set according to recommendedmeasurements to avoid misalignment inthe shower installation.

95 mm

95 mm

60

mm

60

mm

60

mm

45 mm

1555 m

m

190

0 -

230

0 m

m

39

0 m

m

Page 14 of 31

Page 15: Fixture Installation

4. Apply wall covering according to local regulations.

X

Z ZØ75 mm

33,5 mm

X Finished floor height where it is level.Z The hole is centered in the shower area.

5. NOTICEAdjust slot in studs and wall coveringdepending on Hand Shower and ControlDial placement. Make sure to place theslots to the back, to avoid the wallcovering screws damaging the pipes andhoses.

Page 15 of 31

Page 16: Fixture Installation

6.

41 RSK 187 79 99RSK 187 06 65

Draw Pipes, Pex Hoses with Conduits and DrainConduits for Control Dial, Diverter and Drain Unit to theOrbital Shower Core mounting area. Use ConduitElbows in kit to achieve the bends.See section Configuration Requirements [8] in ChapterInstallation Overview [8] for requirements on maximumlengths and maximum number of conduit bends.

NOTICEPictures are for illustration purposes only,adjust conduit routing and bends to localrequirements.

Install Drain

107 RSK 711 54 63 RSK 711 99 33

1. CAUTIONPlumbing and electrical installationshould be performed according to localregulations.

CAUTIONDo not remove the Protective Cover untilthe Frame is being installed in a laterstep.

x7

Countersunk stainless steel screw

All supplied screws (x7) must be inserted.

Page 16 of 31

Page 17: Fixture Installation

2.

≥30mm

X

X

Z Z

X Finished floor height where it is level.

Z Drain Unit is centered in the shower area.

3. Connect Drain Unit to the sewerage system as definedby local regulations.

1413 RSK 283 20 03 RSK 291 03 41

1615 RSK 283 20 31 RSK 291 03 56

1. NOTICEApply lubricant according to localregulations to all Pipes and Fittings.

CAUTIONCheck water tightness to eliminateleakage.

Page 17 of 31

Page 18: Fixture Installation

2.

68

8 m

m

85

0 m

m

min. 80mm

min

. 10

0 m

m

ma

x. 3

50

mm

3. Anchor the Pipes and Fittings according to localregulations.

Provided by Customer:• Anchors

CAUTIONMake sure to fasten and anchor thePipes and Fittings so they cannot moveor be separated.

Page 18 of 31

Page 19: Fixture Installation

4. CAUTIONCheck water tightness to eliminateleakage.

For installations in Sweden leakage test shall beperformed in accordance with Branschregler for SäkerVatteninstallation based on methods for Plastic- andMetal Pipe Systems. For more information on how toperform leakage test see Branschregler for SäkerVatteninstallation. The leakage test shall bedocumented.

Install Wall BracketsNOTICEFollowing steps only valid for Orbital SystemsShower Head and Hand Shower.

4

1 RSK 188 23 36

RSK 187 79 99 5

1.

>100mm

2.

3.

Page 19 of 31

Page 20: Fixture Installation

4.

6

Make sure the Shower Head and the Control Dial arecentered vertically.

34

0 m

m

34

0 m

m

150 mm

x2

Countersunk stainless steel screw

5.

6

x2

Countersunk stainless steel screw

6.

18 RSK 188 21 50

Anchor the Control Dial and Diverter Piping according tolocal regulations.

Prepare Orbital Systems Shower Head

1 RSK 188 25 12

Page 20 of 31

Page 21: Fixture Installation

1. Measure and mark placement of Wallbox UNI Push.

1900mm - 2300mm

2. Follow instructions provided in installation box for theWallbox UNI Push. Installation should be performedaccording to local regulations. Make sure that thesupport sleeve is inserted into the pipe and that the pipeis fully inserted, and past the o-ring, into the Wallbox UNIPush.

Wallbox UNI Push withexternal supportsleeve

Wallbox UNI Push withintegrated supportsleeve

x4

Pan head stainless steel screw

Prepare 3rd Party Shower HeadAt this stage, consider the necessary preparations forinstalling the 3rd Party Shower Head, according to localregulations.

Requirements for installing 3rd Party Diverters, ShowerHeads and Hand Showers (applies to installation with OrbitalShower):

• When using a 3rd Party Diverter, Shower Head or HandShower, it is recommended to choose products with lowcounter pressure in order to optimise the Orbital Showerperformance. Should the combined counter pressure fromthe Diverter and Shower Head / Hand Shower exceed 1bar at 10 L/min, it will affect the lifespan of the FilterCapsule negatively. A combined counter pressureexceeding 1,5 bar at 10 L/min is not recommended.

• Any installed Shower Heads / Hand Showers should allowfor a water flow of min. 9 L/min.

• It is recommended to install Diverters designed for wall-integration.

Install Core Wall Mounting

2 3

Page 21 of 31

Page 22: Fixture Installation

1. Measure and align the placement of the Core WallMounting.

68

8 m

m

min

. 10

0 m

m

ma

x. 3

50

mm

2. The weight of the Orbital Shower Core is approx. 25 kg.The wall construction must be able to support this load.

x7

Pan head stainless steel screw

Pipes & Connections

1.

68

8 m

m

85

0 m

m

min. 80mm

min

. 10

0 m

m

ma

x. 3

50

mm

Page 22 of 31

Page 23: Fixture Installation

2. Prepare incoming water and electricity. Draw Cables andConduits and use Wall Conduits for anchoring. UseRetainer Conduits in kit to anchor Conduits for ShowerHead/Hand Shower.

CAUTIONThe Orbital Shower Core shall beconnected to the top inlet.

CAUTIONThe Shower Head shall be connected tothe bottom inlet.

NOTICEWall Conduits for incoming water andelectricity is supplied by customer.

3.

5 RSK 187 71 96

Anchor piping for Control Dial with Conduit End Cap.

Page 23 of 31

Page 24: Fixture Installation

Prepare for Tiling

1. Raise the floor until it is level with the flange on the drainunit.

2. Form a steep inclination according to local regulations(min. 2% inclination) towards the Drain Unit. Make surethat the lowest part of the inclination is in level towardsthe Drain unit surface.

Min. 2%

3. Apply wall covering according to local regulations.

Page 24 of 31

Page 25: Fixture Installation

Apply Waterproofing Membrane

For installations outside of SwedenThe following chapter describes a general waterproofingmembrane procedure for installing Orbital Shower in a wet-room area. Local rules and regulations for how to applywaterproofing membrane in wet-room areas shall be applied.

For installations in SwedenFollowing waterproofing membranes are approved accordingto Swedish regulations. Choose one of the following and goto www.orbital-systems.com for separate instructions of howto apply your chosen waterproofing membrane.

• Ardex 7+8• Bostik Pro• Bostik Universal• Casco• CC Höganäs• Centro• Ecodur• FF Kakel• Finja• GK Hero• Hey'di• Kiilto• LIP• Mapei WP90 och WP200• Midun• Mira• Mira Vapourmat• PCi• Schönox• Sopro• Weber• Zebra

Apply Waterproofing MembraneWaterproofing membrane shall be applied around 5penetrations on the floor and wall.

11

Provided by Customer:1. Waterproofing Conduit Membrane cc40 for Diverter2. Waterproofing Conduit Membrane for Shower Head3. Waterproofing Conduit Membrane for Control Dial

Page 25 of 31

Page 26: Fixture Installation

1. Roughen the metal surface of the Drain Unit and clean itwith rubbing alcohol or similar.

NOTICETo achieve optimal bonding, all surfacesshould be clean and free of adhesionreducing substances (e.g. dust, acid,grease).

2. Apply waterproofing glue to the Drain Unit's metalflange.

3. Spread the waterproofing glue with a fine-toothed gluespreader or brush.

Page 26 of 31

Page 27: Fixture Installation

4. Apply liquid membrane to the floor- and wall surfacewhich the Drain Waterproofing Membrane is going tocover.

5. Apply the Drain Waterproofing Membrane around theDrain Unit. When mounting the Drain WaterproofingMembrane, make sure to cover both the floor and thewall. Firmly apply pressure and remove air pockets usinga smoothing tool. Make sure no blisters or creasesoccur.

6.

Page 27 of 31

Page 28: Fixture Installation

7. Apply Waterproofing Conduit Membrane according tochosen manufacturer to seal the conduits coming out ofthe wall.

8. Make sure remaining surfaces are being waterproofedaccording to chosen waterproofing membranemanufacturer and local regulations.

Install Frame

8

Tiling

1. Cut holes in tiles for water connections. Create a slotbetween the holes and fill the slot with grouting up to tilelevel.

CAUTIONDo not cut the PEX Hoses, they need tostick out for coming installation steps.

Min 8 mm, Max 16 mm

Ø 30 mm

Page 28 of 31

Page 29: Fixture Installation

2. Make sure the tiles do not overlap the Grating, allowing itto be removed.

NOTICEFloor tiles must be level with, or higherthan the Frame. To achieve this, the floortiles must be at least 8 mm thick.

3.

2 mm

2 mm

4.

9

Final PreparationsCAUTIONThe Orbital Shower will not function withoutexecuting above mentioned steps.

Fixture Installation completed.

Next step is to install the Orbital Shower Core, Control Dial,Shower Head and Hand Shower (including Diverter andHand Shower Holder). See Technology Installation Manualfor details.

Page 29 of 31

Page 30: Fixture Installation

This page is intentionally left blank.

Page 30 of 31

Page 31: Fixture Installation

C E R T I F I E D S P A C E T E C H N O L O G Y


Recommended